Att E - Vail-Tortolita_Government Furnished Property.pdf

PDF 300 KB Posted

Attached to
Vail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild Synopsis
Solicitation number
89503124RWA000063
Issued by

About this file

This document is the Government Furnished Property (GFP) list for the Vail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild Solicitation. It details the equipment, materials, and other items that will be provided by the government for this project, including reels of optical ground wire, conductor, insulators, pole structures, and hardware. The GFP list provides the estimated weight, delivery dates, delivery locations, and estimated costs for each item. The known delivery dates are between August 2024 and July 2025, with some items having delivery dates to be determined later. The materials will be delivered to the Avra Valley location and the Phoenix Warehouse. This GFP list is associated with the Vail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild Solicitation (Solicitation Number: 89503124RWA000063) issued by the Department of Energy Western Area Power Administration.

View the file

Other files

File Type Posted
89503124RWA000063_AMD_0007.pdf PDF
89503124RWA000063_AMD_0006.pdf PDF
89503124RWA000063_AMD_0005.pdf PDF
89503124RWA000063_AMD_0004.pdf PDF
89503124RWA000063_AMD_0003.pdf PDF
89503124RWA000063_AMD_0002.pdf PDF
89503124RWA000063_AMD_0001.pdf PDF
Att R - Past Performance Cover Letter.pdf PDF
Att M - Location Vicinity_Del Bac.pdf PDF
Att J - Vail-Tortolita_Tumamoc Hill_Geotech Report.pdf PDF
Att N - Location Vicinity_Nogales.pdf PDF
Att C - Vail-Tortolita_Bid Schedule.pdf PDF
Att F - Vail-Tortolita_Project Drawings 1 of 3.pdf PDF
Att Q - Current Subcontracting Plan Template.pdf PDF
Att K - Location Vicinity_Arva Valley.pdf PDF
Att G - Vail-Tortolita_Project Drawings 2 of 3.pdf PDF
Att L - Location Vicinity_Camino Del Cerro.pdf PDF
Solicitation No. 89503124RWA000063.pdf PDF
Att H - Vail-Tortolita_Project Drawings 3 of 3.pdf PDF
Att S - Past Performance Questionnaire.pdf PDF
Att P - Vail Tortolita_Access Map Book.pdf PDF
Att I - Vail-Tortolita_Geotech Report.pdf PDF
Att A - Section L Addendum to FAR 52.215-1.pdf PDF
Att D - Vail-Tortolita_Project Specifications.pdf PDF
Att O - Location Vicinity_Aerospace.pdf PDF
Att B - Section M DOE-M-2012 Basis for Award.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOVERNMENT FURNISHED PROPERTY

A. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) 11,270-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-01

3767 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $29,866

One (1) 21,770-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-02

7277 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $57,691

One (1) 21,810-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-03

7291 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $57,797

One (1) 18,030-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-04

6027 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $47,780

One (1) 10,950-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-05

3660 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $29,018

One (1) 19,250-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-06

6435 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $51,013

One (1) 15,290-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-07

5111 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $40,519

One (1) 17,970-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-08

6007 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $47,621

One (1) 19,540-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-09

6532 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $51,781

One (1) 13,990-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-10

4677 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $37,074

One (1) 14,370-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-11

4804 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $38,081

One (1) 13,860-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-12

4633 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $36,729

One (1) 14,450-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-13

4830 NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $38,293

One (1) 10,190-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-14

3406 TBD

See note 2

TBD

See note 1 $27,004

One (1) 21,220-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-15

7200 TBD

See note 2

TBD

See note 1 $56,233

Attachment E

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) 10,280-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-16

3420 TBD

See note 2

TBD

See note 1 $27,242

One (1) 18,360-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-17

6137 TBD

See note 2

TBD

See note 1 $48,654

One (1) 11,840-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-18

4292 TBD

See note 2

TBD

See note 1 $31,376

One (1) 20,570-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-19

6876 TBD

See note 2

TBD

See note 1 $54,511

One (1) 13,860-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-20

4633 TBD

See note 2

TBD

See note 1 $36,729

One (1) 18,840-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-21

6298 TBD

See note 2

TBD

See note 1 $49,926

One (1) 19,750-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-22

6602 TBD

See note 2

TBD

See note 1 $52,338

One (1) 13,440-FT reel of optical ground wire –SX-41/47/531 (DNO- 10744, 96 fiber) – Reel No. VT-23

6355 TBD

See note 2

TBD

See note 1 $35,616

21 OPGW ground clamps, AFL P/N OBCE2E21 2 ea. NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $840

450 OPGW downlead clamps, AFL P/N FDOA-B5B5 2 ea. NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $18,482

21 OPGW coil brackets, AFL P/N CB- 44-3AL 30 ea. NST 8/9/2024

NLT 11/8/20242

Avra Valley Appendix B $8,229

130 10,000-FT reels of 1272 kcmil, ACSS/MA2, 54/19, Pheasant conductor

16,337 ea. NST 8/9/2024

NLT 11/8/2024

Avra Valley Appendix B $6,097,000

21 10,000-FT reels of 1/2-inch, 7-strand, high-strength steel overhead ground wire

5170 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $623,202

972 single-string suspension insulator assemblies Type SI11-B (25,000 lbs), without insulators, suitable for 1272 kcmil, 54/19, Pheasant ACSS/MA2

10 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $240,665

153 single-string suspension insulator assemblies Type SI11-B (Jumper) (25,000 lbs), without insulators, suitable for 1272 kcmil, 54/19, Pheasant ACSS/MA2

160 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $62,520

348 double-string tension insulator assemblies Type T21-C (30,000 lbs) , without insulators, suitable for 1272 kcmil, 54/19, Pheasant ACSS/MA2

40 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $206,689

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

Nine (9) horizontal post insulator assemblies Type HF1-F (2000 lbs) , without insulators, suitable for 1272 kcmil, 54/19, Pheasant ACSS/MA2

10 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $12,885

Nine (9) double-string tension insulator assemblies Type T21-C (30,000 lbs), without insulators, suitable for 795 kcmil, ACSR/SD, Type 16, Drake/SD

40 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $6,746

Three (3) double-string tension insulator assemblies Type T21-C (30,000 lbs), without insulators, suitable for 795 kcmil, 26/7, Drake

ACSR

40 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $1,599

161 suspension assemblies Type OGW-SL (15,000 lbs) suitable for 1/2-inch, high strength or extra high strength, 7-strand steel overhead ground wire

10 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $35,541

52 tension assemblies Type OGW-TV (20,000 lbs) suitable for 1/2-inch, high strength or extra high strength, 7-strand steel overhead ground wire

13 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $11,375

Six (6) tension assemblies Type OGW- TV (20,000 lbs) suitable for 3/8-inch, high strength or extra high strength, 7-strand steel overhead ground wire

13 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $1,002

163 suspension assemblies Type OPGW-SL (15,000 lbs) suitable for 0.531-inch diameter optical overhead ground wire

10 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $39,214

66 tension assemblies Type OPGW- TV (20,000 lbs) suitable for 0.531-inch diameter optical overhead ground wire

13 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $33,266

200 conductor compression splices suitable for 1272 kcmil, 54/19, Pheasant ACSS/MA2

12 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $90,161

40 overhead ground wire compression splices suitable for 1/2-inch, high strength, 7-strand steel overhead ground wire

3 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $3,498

Vibration dampers for 1272 kcmil, 54/19, Pheasant ACSS/MA2, quantity for TLT-DP / SGR-TUC segment

20 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $870,230

Vibration dampers for 1/2-inch, high strength, 7-strand steel overhead ground wire, quantity for TLT-DP / SGR-TUC segment

6 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $145,038

Vibration dampers for 0.531-inch diameter optical overhead ground wire, quantity for TLT-DP / SGR-TUC segment

6 ea. NST 9/30/2024

NLT 1/20/2025

Appendix B $145,038

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

25 aerial marker balls, orange, 36-inch, suitable for 1/2-inch, high strength, 7-strand steel overhead ground wire

17 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $24,475

20 aerial marker balls, yellow, 36-inch, suitable for 1/2-inch, high strength, 7-strand steel overhead ground wire

17 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $19,580

20 aerial marker balls, white, 36-inch, suitable for 1/2-inch, high strength, 7-strand steel overhead ground wire

17 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $19,580

35 aerial marker balls, orange, 36-inch, suitable for 0.531-inch diameter optical overhead ground wire

17 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $36,238

20 aerial marker balls, yellow, 36-inch, suitable for 0.531-inch diameter optical overhead ground wire

17 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $20,707

20 aerial marker balls, white, 36-inch, suitable for 0.531-inch diameter optical overhead ground wire

17 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $20,707

71 bird flight diverters, PLP catalog number SFD-1140 0.70 ea. NST 9/30/2024

NLT 1/20/2025

Avra Valley Appendix B $1,299

1179 230-kV composite suspension insulators, with grading ring, for suspension assemblies and jumpers

22 ea. NST 5/31/2024

NLT 1/20/2025

Phoenix Warehouse See note 1

$439,400

780 230-kV composite suspension insulators, with grading ring, for tension assemblies

22 ea. NST 5/31/2024

NLT 1/20/2025

Phoenix Warehouse See note 1

$290,700

12-line post insulators, with grading ring, for jumpers 100 ea. NST 5/31/2024

NLT 1/20/2025

Phoenix Warehouse See note 1

$7,400

915 230-kV composite suspension insulators, with grading ring, for suspension assemblies and jumpers

22 ea. TBD See note 2

TBD

See note 1 $341,000

858 230-kV composite suspension insulators, with grading ring, for tension assemblies

22 ea. TBD See note 2

TBD

See note 1 $319,800

3-line post insulators, with grading ring, for jumpers 100 ea. TBD

See note 2

TBD

See note 1 $2,000

One (1) Type 291K-35 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cages

25,600

NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $103,500

One (1) Type 291K-40 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cages

28,300 TBD

See note 2

TBD

See note 1 $114,650

One (1) Type 291K-55 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cages

39,100 TBD

See note 2

TBD

See note 1 $152,150

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 291K-60 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cages

40,950

NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $159,600

One (1) Type 291M-40 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cages

27,700 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $112,100

One (1) Type 291N-50 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

51,050 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $196,050

One (1) Type 291N-55 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

56,350 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $215,950

One (1) Type 291N-65 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

61,900 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $237,300

One (1) Type 291N-75 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

68,300 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $261,850

Three (3) Type 291N-85 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

77,950 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $298,300 ea.

One (1) Type 291N-90 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

79,950 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $306,100

One (1) Type 291N-95 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

85,050 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $325,400

Two (2) Type 291S-80 (DE) with 36-FT embedment dulled-galvanized steel pole structures with maintenance provisions

23,150 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $96,400 ea.

One (1) Type 291Y-45 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

27,450 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $111,650 ea.

One (1) Type 291Y-45 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

27,450 ea. TBD See note 2

TBD

See note 1 $111,650 ea.

Two (2) Type 292A-55 (DE) with 37-FT embedment dulled-galvanized steel pole structures with maintenance provisions

41,250 ea. TBD See note 2

See note 1 $158,600 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 292A-55 (DE) with 40-FT embedment dulled-galvanized steel pole structure with maintenance provisions

43,200 TBD

See note 2

TBD

See note 1 $165,850

One (1) Type 292A-70 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

42,700 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $165,400

One (1) Type 292A-70 (DE) with 30.5-FT embedment dulled-galvanized steel pole structure with maintenance provisions

45,250 TBD

See note 2

TBD

See note 1 $174,200

One (1) Type 292A-75 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

45,000 TBD

See note 2

TBD

See note 1 $174,350

One (1) Type 292A-80 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

47,250 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $183,050

One (1) Type 292A-85 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

52,750 TBD

See note 2

TBD

See note 1 $203,900

One (1) Type 292A-85 (DE) with 35-FT embedment dulled-galvanized steel pole structure with maintenance provisions

55,400 TBD

See note 2

TBD

See note 1 $212,900

One (1) Type 292A-85 (DE) with 42-FT embedment dulled-galvanized steel pole structure with maintenance provisions

57,850 TBD

See note 2

TBD

See note 1 $222,050

One (1) Type 292A-90 (DE) with 35-FT embedment dulled-galvanized steel pole structure with maintenance provisions

56,600 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $217,600

One (1) Type 292D-55 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

57,300 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $219,450 ea.

Three (3) Type 292D-55 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

57,300 ea. TBD See note 2

TBD

See note 1 $219,450 ea.

One (1) Type 292D-60 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

63,800 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $243,850

Six (6) Type 292D-70 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

69,750 ea. NST 12/16/24

NLT 2/28/25

Appendix B $266,700 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

Five (5) Type 292D-70 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

69,750 ea. NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $266,700 ea.

Five (5) Type 292D-70 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

69,750 ea. TBD See note 2

TBD

See note 1 $266,700 ea.

Two (2) Type 292D-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

71,500 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $273,550 ea.

One (1) Type 292D-75 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

71,500 ea. NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $273,550 ea.

Four (4) Type 292D-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

71,500 ea. TBD See note 2

TBD

See note 1 $273,550 ea.

One (1) Type 292D-85 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

75,150 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $287,500 ea.

One (1) Type 292D-85 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

75,150 ea. TBD See note 2

TBD

See note 1 $287,500 ea.

One (1) Type 292D-135 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

114,300 NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $436,400

Two (2) Type 292F-70 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

52,500 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $200,900 ea.

Four (4) Type 292F-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

58,950 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $225,250 ea.

One (1) Type 292F-105 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

77,650 TBD

See note 2

TBD

See note 1 $296,650

One (1) Type 292M-105 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

111,750 TBD

See note 2

TBD

See note 1 $424,050

One (1) Type 292N-50 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

76,300 TBD

See note 2

See note 1 $290,050

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 292N-55 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

86,150 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $327,050 ea.

One (1) Type 292N-55 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

86,150 ea. TBD See note 2

TBD

See note 1 $327,050 ea.

Two (2) Type 292N-60 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

89,300 ea. TBD See note 2

TBD

See note 1 $339,100 ea.

One (1) Type 292N-65 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

93,000 TBD

See note 2

TBD

See note 1 $353,250

One (1) Type 292N-70 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

96,800 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $367,550 ea.

Three (3) Type 292N-70 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

96,800 ea. TBD See note 2

TBD

See note 1 $367,550 ea.

Two (2) Type 292N-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

102,300 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $388,550 ea.

Four (4) Type 292N-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

102,300 ea. TBD See note 2

TBD

See note 1 $388,550 ea.

Two (2) Type 292N-80 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

103,900 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $394,700 ea.

One (1) Type 292N-85 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

106,250 TBD

See note 2

TBD

See note 1 $403,750

One (1) Type 292N-95 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

113,400 TBD

See note 2

TBD

See note 1 $430,900

One (1) Type 292S-70 (DE) with 27-FT embedment dulled-galvanized steel pole structure with maintenance provisions

30,250 TBD

See note 2

TBD

See note 1 $118,400

One (1) Type 292S-75 (DE) with 27-FT embedment dulled-galvanized steel pole structure with maintenance provisions

32,200 NST 12/16/24

NLT 2/28/25

Appendix B $126,050

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 292S-75 (DE) with 31.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

33,300 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $130,150

One (1) Type 292S-75 (DE) with 36-FT embedment dulled-galvanized steel pole structure with maintenance provisions

35,300 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $137,600

Five (5) Type 292S-80 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

32,250 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $126,950 ea.

One (1) Type 292S-80 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

32,250 ea. TBD See note 2

TBD

See note 1 $126,950 ea.

One (1) Type 292S-80 (DE) with 26-FT embedment dulled-galvanized steel pole structure with maintenance provisions

33,600 TBD

See note 2

TBD

See note 1 $131,450

Nineteen (19) Type 292S-80 (DE) with 29.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

34,450 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $134,600 ea.

Twelve (12) Type 292S-80 (DE) with 29.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

34,450 ea. TBD See note 2

TBD

See note 1 $134,600 ea.

Fifteen (15) Type 292S-80 (DE) with 31-FT embedment dulled-galvanized steel pole structures with maintenance provisions

34,850 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $136,100 ea.

Nine (9) Type 292S-80 (DE) with 34.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

35,700 ea. TBD See note 2

TBD

See note 1 $139,250 ea.

One (1) Type 292S-80 (DE) with 36.5- FT embedment dulled-galvanized steel pole structure with maintenance provision

36,850 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $143,550 ea.

Five (5) Type 292S-80 (DE) with 36.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

36,850 ea. TBD See note 2

TBD

See note 1 $143,550 ea.

Two (2) Type 292S-80 (DE) with 39.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

37,600 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $146,350 ea.

Two (2) Type 292S-80 (DE) with 43-FT embedment dulled-galvanized steel pole structures with maintenance provisions

38,450 ea. NST 12/16/24

NLT 2/28/25

Appendix B $149,500 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

Two (2) Type 292S-80 (DE) with 47-FT embedment dulled-galvanized steel pole structures with maintenance provisions

39,500 ea. TBD See note 2

TBD

See note 1 $153,400 ea.

Eleven (11) Type 292S-85 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

33,800 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $133,100 ea.

Twelve (12) Type 292S-85 (DE) with 28.5-ft embedment dulled-galvanized steel pole structures with maintenance provisions

35,550 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $139,100 ea.

Four (4) Type 292S-85 (DE) with 28.5-ft embedment dulled-galvanized steel pole structures with maintenance provisions

35,550 ea. TBD See note 2

TBD

See note 1 $139,100 ea.

Eight (8) Type 292S-85 (DE) with 31.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

36,300 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $141,850 ea.

Four (4) Type 292S-85 (DE) with 35- FT embedment dulled-galvanized steel pole structures with maintenance provisions

37,200 ea. TBD See note 2

TBD

See note 1 $145,200 ea.

Two (2) Type 292S-85 (DE) with 36.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

39,700 ea. TBD See note 2

TBD

See note 1 $154,500 ea.

Nine (9) Type 292S-85 (DE) with 40- FT embedment dulled-galvanized steel pole structures with maintenance provisions

40,600 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $157,850 ea.

One (1) Type 292S-85 (DE) with 40-FT embedment dulled-galvanized steel pole structure with maintenance provision

40,600 ea. TBD See note 2

TBD

See note 1 $157,850 ea.

One (1) Type 292S-85 (DE) with 43-FT embedment dulled-galvanized steel pole structure with maintenance provisions

41,400 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $160,850

Five (5) Type 292S-90 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

35,900 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $141,100 ea.

Two (2) Type 292S-90 (DE) with 27.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

38,150 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $148,950 ea.

Four (4) Type 292S-90 (DE) with 31.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

39,200 ea. NST 12/16/24

NLT 2/28/25

Appendix B $152,850 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 292S-90 (DE) with 35-FT embedment dulled-galvanized steel pole structure with maintenance provisions

40,150 TBD

See note 2

TBD

See note 1 $156,400

One (1) Type 292S-90 (DE) with 36.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

41,100 TBD

See note 2

TBD

See note 1 $159,900

One (1) Type 292S-90 (DE) with 38.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

41,650 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $161,950

Two (2) Type 292S-90 (DE) with 43.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

43,000 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $167,000 ea.

One (1) Type 292S-95 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

37,250 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $146,500

One (1) Type 292S-95 (DE) with 28-FT embedment dulled-galvanized steel pole structure with maintenance provisions

39,650 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $154,900

Two (2) Type 292S-100 (DE) with 32.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

41,700 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $162,700 ea.

One (1) Type 292S-135 (DE) with 42- FT embedment dulled-galvanized steel pole structure with maintenance provisions

62,750 TBD

See note 2

TBD

See note 1 $242,900

One (1) Type 292T-50 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

54,050 TBD

See note 2

TBD

See note 1 $206,850

Four (4) Type 292X-60 (DE) with 25.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

23,300 ea. TBD See note 2

TBD

See note 1 $96,550 ea.

One (1) Type 292X-60 (DE) with 31-FT embedment dulled-galvanized steel pole structure with maintenance provisions

24,200 TBD

See note 2

TBD

See note 1 $100,250

Three (3) Type 292X-65 (DE) with 27.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

26,500 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $104,300 ea.

Three (3) Type 292X-65 (DE) with 27.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

26,500 ea. TBD See note 2

See note 1 $104,300 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 292X-65 (DE) with 29.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

26,900 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $105,750 ea.

One (1) Type 292X-65 (DE) with 29.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

26,900 ea. NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $105,750 ea.

Four (4) Type 292X-65 (DE) with 29.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

26,900 ea. TBD See note 2

TBD

See note 1 $105,750 ea.

One (1) Type 292X-65 (DE) with 31.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

27,300 TBD

See note 2

TBD

See note 1 $107,250

Four (4) Type 292X-70 (DE) with 26.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

26,950 ea. TBD See note 2

TBD

See note 1 $106,150 ea.

Three (3) Type 292X-70 (DE) with 30- FT embedment dulled-galvanized steel pole structures with maintenance provisions

27,650 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $108,750 ea.

Eight (8) Type 292X-70 (DE) with 34- FT embedment dulled-galvanized steel pole structures with maintenance provisions

28,850 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $113,200 ea.

Two (2) Type 292X-70 (DE) with 36-FT embedment dulled-galvanized steel pole structures with maintenance provisions

29,250 ea. TBD See note 2

TBD

See note 1 $114,700 ea.

Two (2) Type 292X-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

27,550 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $114,050 ea.

Five (5) Type 292X-75 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

27,550 ea. TBD See note 2

TBD

See note 1 $114,050 ea.

Three (3) Type 292X-75 (DE) with 26- FT embedment dulled-galvanized steel pole structures with maintenance provisions

27,900 ea. TBD See note 2

TBD

See note 1 $110,050 ea.

Five (5) Type 292X-75 (DE) with 30-FT embedment dulled-galvanized steel pole structures with maintenance provisions

28,700 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $113,050 ea.

Two (2) Type 292X-75 (DE) with 30-FT embedment dulled-galvanized steel pole structures with maintenance provisions

28,700 ea. NST 2/1/25

NLT 7/15/25

Appendix B $113,050 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

Three (3) Type 292X-75 (DE) with 30- FT embedment dulled-galvanized steel pole structures with maintenance provisions

28,700 ea. TBD See note 2

TBD

See note 1 $113,050 ea.

One (1) Type 292X-75 (DE) with 34.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

30,000 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $117,850

One (1) Type 292X-75 (DE) with 41-FT embedment dulled-galvanized steel pole structure with maintenance provisions

31,300 TBD

See note 2

TBD

See note 1 $122,700

Four (4) Type 292X-80 (BP) dulled-galvanized steel pole structures with maintenance provisions and anchor bolt cages

28,200 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $111,750 ea.

One (1) Type 292X-80 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

28,200 ea. TBD See note 2

TBD

See note 1 $111,750 ea.

Three (3) Type 292X-80 (DE) with 27- FT embedment dulled-galvanized steel pole structures with maintenance provisions

29,150 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $114,900 ea.

Three (3) Type 292X-80 (DE) with 27- FT embedment dulled-galvanized steel pole structures with maintenance provisions

29,150 ea. TBD See note 2

TBD

See note 1 $114,900 ea.

Thirteen (13) Type 292X-80 (DE) with 29.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

29,700 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $116,950 ea.

Two (2) Type 292X-80 (DE) with 30.5-ft embedment dulled-galvanized steel pole structures with maintenance provisions

29,900 ea. TBD See note 2

TBD

See note 1 $117,700 ea.

Two (2) Type 292X-80 (DE) with 33-FT embedment dulled-galvanized steel pole structures with maintenance provisions

30,400 ea. TBD See note 2

TBD

See note 1 $119,550 ea.

Three (3) Type 292X-80 (DE) with 38.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

31,950 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $125,300 ea.

One (1) Type 292X-80 (DE) with 38.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

31,950 ea. TBD See note 2

TBD

See note 1 $125,300 ea.

Two (2) Type 292X-80 (DE) with 45-FT embedment dulled-galvanized steel pole structures with maintenance provisions

33,300 ea. TBD See note 2

See note 1 $130,350 ea.

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

One (1) Type 292X-85 (BP) dulled-galvanized steel pole structure with maintenance provisions and anchor bolt cage

29,250 NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $116,050

Five (5) Type 292X-85 (DE) with 27-FT embedment dulled-galvanized steel pole structures with maintenance provisions

30,250 ea. TBD See note 2

TBD

See note 1 $119,350 ea.

Two (2) Type 292X-85 (DE) with 30.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

30,950 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $121,950 ea.

Three (3) Type 292X-85 (DE) with 30.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

30,950 ea. NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $121,950 ea.

Two (2) Type 292X-85 (DE) with 41.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

33,700 ea. NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $132,200 ea.

One (1) Type 292X-85 (DE) with 41.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

33,700 ea. TBD See note 2

TBD

See note 1 $132,200 ea.

One (1) Type 292X-90 (DE) with 27-FT embedment dulled-galvanized steel pole structure with maintenance provisions

31,350 TBD

See note 2

TBD

See note 1 $123,650

One (1) Type 292X-90 (DE) with 30.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

32,100 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $126,450 ea.

Two (2) Type 292X-90 (DE) with 30.5- FT embedment dulled-galvanized steel pole structures with maintenance provisions

32,100 ea. TBD See note 2

TBD

See note 1 $126,450 ea.

One (1) Type 292X-90 (DE) with 41.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

35,400 TBD

See note 2

TBD

See note 1 $138,700

One (1) Type 292X-95 (DE) with 30.5- FT embedment dulled-galvanized steel pole structure with maintenance provisions

33,700 NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $132,750

One (1) Type 292X-100 (DE) with 27.5-FT embedment dulled-galvanized steel pole structure with maintenance provisions

34,700 TBD

See note 2

TBD

See note 1 $136,700

One (1) Type 292X-100 (DE) with 42.5-FT embedment dulled-galvanized steel pole structure with maintenance provisions

38,600 TBD

See note 2

See note 1 $151,200

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

DELIVERY

LOCATION

ESTIMATED

COST

Two (2) Type 292X-105 (DE) with 30.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

36,550 ea. NST 12/16/24

NLT 2/28/25

Avra Valley Appendix B $143,950 ea.

Two (2) Type 292X-105 (DE) with 34- FT embedment dulled-galvanized steel pole structures with maintenance provisions

37,350 ea. TBD See note 2

TBD

See note 1 $146,900 ea.

One (1) Type 292X-110 (DE) with 43- FT embedment dulled-galvanized steel pole structure with maintenance provisions

43,850 TBD

See note 2

TBD

See note 1 $171,300

One (1) Type 292X-115 (DE) with 34.5-FT embedment dulled-galvanized steel pole structure with maintenance provisions

42,550 TBD

See note 2

TBD

See note 1 $166,650

One (1) Type 292X-120 (DE) with 28- FT embedment dulled-galvanized steel pole structure with maintenance provisions

43,400 TBD

See note 2

TBD

See note 1 $170,150

Two (2) Type 292X-120 (DE) with 37- FT embedment dulled-galvanized steel pole structures with maintenance provisions

46,350 ea. TBD See note 2

TBD

See note 1 $181,150 ea.

One (1) Type 292X-125 (DE) with 28- FT embedment dulled-galvanized steel pole structure with maintenance provisions

44,900 TBD

See note 2

TBD

See note 1 $175,950

Two (2) Type 292X-140 (DE) with 33.5-FT embedment dulled-galvanized steel pole structures with maintenance provisions

51,600 ea. NST 2/1/25

NLT 7/15/25

Avra Valley Appendix B $201,800 ea.

One (1) Type 292X-140 (DE) with 33.5-FT embedment dulled-galvanized steel pole structure with maintenance provisions

51,600 ea. TBD See note 2

TBD

See note 1 $201,800 ea.

10,934 Left Anchor Plates dulled-galvanized – Mark 1FP-5L 1.3 ea. TBD

See note 2

TBD

See note 1 $17.00 ea.

10,934 Right Anchor Plates dulled-galvanized – Mark 1FP-5R 1.3 ea. TBD

See note 2

See note 1 $17.00 ea.

NST – No sooner than.

NLT – No later than.

1. POINTS-OF-DELIVERY: Material furnished by WAPA will be delivered to the locations identified in the table, except for materials listed as delivery location TBD. The Contractor shall select the delivery locations for the materials listed as TBD. The Contractor shall load, transport and unload the material to the jobsite. The Contractor shall inspect the equipment and report any damages to the COR.

a. Materials delivered to the Phoenix Warehouse are located at the following address:

615 S 43rd Avenue Phoenix, AZ 85009

2. DELIVERY DATES: Delivery dates that are known are shown in the table. WAPA will notify the

Contractor at a later date for material delivery dates marked “TBD”.

A. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:
1. POINTS-OF-DELIVERY: Material furnished by WAPA will be delivered to the locations identified in the table, except for materials listed as delivery location TBD. The Contractor shall select the delivery locations for the materials listed as TBD. ...
2. DELIVERY DATES: Delivery dates that are known are shown in the table. WAPA will notify the Contractor at a later date for material delivery dates marked “TBD”.

File details come from the government source that posted it. Updated .