This document is an amendment to a federal solicitation for the Vail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild project. The amendment clarifies the answer to a previous question and provides the correct outage dates for the project. The outage dates, which are provided in the project specifications, are as follows:
Marana - Rattlesnake (North Segment): 4/1/2025 - 6/23/2025
Tortolita - Marana (North Segment): 6/24/2025 - 10/16/2025
Rattlesnake - Tucson (North Segment): 10/17/2025 - 4/23/2026
Tucson - Del Bac (South Segment): 4/24/2026 - 10/26/2026
Del Bac - Vail (South Segment): 10/27/2026 - 5/26/2027
The solicitation is being issued by the Department of Energy Western Area Power Administration and has a solicitation number of 89503124RWA000063.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
89503124RWA000063
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
05/09/20240004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/01/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PLEASE SEE CONTINUATION PAGE FOR DETAILS
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Melanie A. Dewing
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
05/09/2024
89503124RWA000063
Amendment 0004
The purpose of this amendment is to clarify the answer to question #7 on amendment 0003 and give the correct outage dates for this project.
A. Amendment 0003 question and answer (revised) as follows:
Question 7: Please confirm that WAPA intends for segments of the existing T-Line alignments to be de-energized entirely, thus allowing crews to perform full removal and construct the new T-Line efficiently without having to perform any work around energized lines. Please confirm that the “Outage” windows provided on letter from DOE titled “Notice of Advisory Two-Step Process” is trying to communicate this.
Answer 7: The T-Line alignments will be de-energized based on the outage dates in Attachment D – Vail-Tortolita_Project Specifications, pages 6-7, D.2.a.(1) through (4).
The outage dates provided on the letter from DOE titled “Notice of Advisory Two-Step Process” is changed to the outage dates provided in Attachment D - Vail- Tortolita_Project Specifications, pages 6-7, D.2.a.(1) through (4).
The dates are as follows:
(1) Marana – Rattlesnake:Marana – Rattlesnake (North Segment): 4/1/2025 – 6/23/2025 Tortolita – Marana (North Segment): 6/24/2025 – 10/16/2025 Rattlesnake – Tucson (North Segment): 10/17/2025 – 4/23/2026 Tucson – Del Bac (South Segment): 4/24/2026 – 10/26/2026 Del Bac – Vail (South Segment): 10/27/2026 – 5/26/2027
| 2024-05-09T11:56:19-0600 | |
| MELANIE DEWING |
File details come from the government source that posted it. Updated .