This document is a bid schedule for the Vail-Tortolita Double-Circuit 230-kV Transmission Line Rebuild project. It details the contract line items (CLINs) and estimated quantities for various products and services required, including:
Installing Government-furnished transmission line steel pole structures, overhead ground wire assemblies, optical overhead ground wire assemblies, and 230-kV and 115-kV insulator assemblies. The project also requires furnishing and installing 230-kV and 115-kV conductors, overhead ground wires, optical overhead ground wires, bird diverters, line markers, and vibration dampers. Mobilization, access road work, and substation demolition are also included. Pricing is provided on a per-unit basis for each CLIN. The total estimated value is not explicitly stated. This bid schedule is part of the solicitation with Solicitation Number 89503124RWA000063, issued by the Department of Energy Western Area Power Administration.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Unit Unit Price Amount
0012 291K-55 (BP) 1 EA $ $
EA $
12,775
Installing dulled-galvanized base-plated (BP) Government-furnished transmission line steel pole structures on concrete foundations, as follows:
Concrete foundations for Government-furnished base-plated (BP) transmission line steel pole structures
0007 EA
0002 Removing existing transmission line LS
0006 New access roads 8.5 MI
Fence grounds
Estimated Quantity
LS
Work or Material
0001 LS
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
Mobilization and preparatory work (not to exceed 5% of total, see sections H and M)
Clearing
Access road repair
Permanent gates in existing barbed wire fences
0013 291K-60 (BP)
EA
EA
291K-35 (BP)
LS
EA $
0016 291N-55 (BP) 1
0014 291M-40 (BP) 1 EA
0011 291K-40 (BP) 1 EA
CY $
EA
$0003 LBSNogales substation demolition 35,000
0015 291N-50 (BP)
Attachment C
Estimated Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0026 292A-85 (BP) 1 EA $ $
0024 292A-75 (BP) 1 EA $ $
0028 292D-60 (BP) 1 EA $ $
291N-65 (BP) 1
291N-95 (BP) 1
0021 EA $ $
0022 291Y-45 (BP)
EA $ $
0018 291N-75 (BP) 1 EA $
0019 291N-85 (BP) 3 EA $ $
0020 291N-90 (BP) 1 EA $ $
2 EA $ $
0023 292A-70 (BP) 1 EA $ $
0025 292A-80 (BP) 1 EA $ $
0027 292D-55 (BP) 4 EA $ $
0029 292D-70 (BP) 16 EA $ $
0030 292D-75 (BP) 7 EA $ $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0043 292N-80 (BP) 2 EA $ $
0031 292D-85 (BP) 2 EA $ $
0032 292D-135 (BP) 1 EA $ $
292N-50 (BP) 1 EA $
0038 292N-55 (BP) 2 EA $ $
0039 292N-60 (BP) 2 EA $ $
0040 292N-65 (BP) 1 EA $ $
0041 292N-70 (BP) 4 EA $ $
0042 292N-75 (BP) 6 EA $ $
0044 292N-85 (BP) 1 EA $ $
0033 292F-70 (BP) 2 EA $ $
0034 292F-75 (BP) 4 EA $ $
0035 292F-105 (BP) 1 EA $ $
0036 292M-105 (BP) 1 EA $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0058 292A-85 (DE); Embed Length 35 FT 1 EA $ $
0051 292X-75 (BP)
Installing dulled-galvanized direct-embedded (DE) Government-furnished transmission line steel pole structures with concrete backfill, as follows:
$0050 292T-50 (BP) 1 EA $
7 EA $ $
0052 292X-80 (BP) 5 EA $ $
0053 292X-85 (BP) 1 EA $ $
0045 292N-95 (BP) 1 EA $ $
0056 292A-55 (DE); Embed Length 40 FT 1 EA $ $
0046 292S-80 (BP) 6 EA $ $
0047 292S-85 (BP) 11 EA $ $
0048 292S-90 (BP) 5 EA $ $
0049 292S-95 (BP) 1 EA $ $
0055 292A-55 (DE); Embed Length 37 FT 2 EA $ $
0054 291S-80 (DE); Embed Length 36 FT 2 EA $ $
0057 292A-70 (DE); Embed Length 30.5 FT 1 EA $ $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0064 292S-75 (DE); Embed Length 36 FT 1 $
0068 292S-80 (DE); Embed Length 34.5 FT 9 EA $ $
0067 292S-80 (DE); Embed Length 31 FT 15 EA $ $
0066 292S-80 (DE); Embed Length 29.5 FT 31 EA $ $
EA $
0065 292S-80 (DE); Embed Length 26 FT 1 EA $ $
0059 292A-85 (DE); Embed Length 42 FT 1 EA $ $
0060 292A-90 (DE); Embed Length 35 FT 1 EA $ $
0061 292S-70 (DE); Embed Length 27 FT 1 EA $ $
0062 292S-75 (DE); Embed Length 27 FT 1 EA $ $
0063 292S-75 (DE); Embed Length 31.5 FT 1 EA $ $
0069 292S-80 (DE); Embed Length 36.5 FT 6 EA $ $
0070 292S-80 (DE); Embed Length 39.5 FT 2 EA $ $
0071 292S-80 (DE); Embed Length 43 FT 2 EA $ $
0072 292S-80 (DE); Embed Length 47 FT 2 EA $ $
0073 292S-85 (DE); Embed Length 28.5 FT 16 EA $ $
0074 292S-85 (DE); Embed Length 31.5 FT 8 EA $ $
0075 292S-85 (DE); Embed Length 35 FT 4 EA $ $
0076 292S-85 (DE); Embed Length 36.5 FT 2 EA $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0083 292S-90 (DE); Embed Length 38.5 FT 1 EA $ $
0084 292S-90 (DE); Embed Length 43.5 FT 2 EA $ $
0085 292S-95 (DE); Embed Length 28 FT 1 EA $ $
0086 292S-100 (DE); Embed Length 32.5 FT 2 EA $ $
EA $
292X-70 (DE); Embed Length 26.5 FT 4 EA $
0091 292X-65 (DE); Embed Length 29.5 FT 6 EA $ $
0092 292X-65 (DE); Embed Length 31.5 FT 1
0090 292X-65 (DE); Embed Length 27.5 FT 6 EA $ $
0089 292X-60 (DE); Embed Length 31 FT 1 EA $ $
0088 292X-60 (DE); Embed Length 25.5 FT 4 EA $ $
0087 292S-135 (DE); Embed Length 42 FT 1 EA $ $
0077 292S-85 (DE); Embed Length 40 FT 10 EA $ $
0078 292S-85 (DE); Embed Length 43 FT 1 EA $ $
0079 292S-90 (DE); Embed Length 27.5 FT 2 EA $ $
0080 292S-90 (DE); Embed Length 31.5 FT 4 EA $ $
0081 292S-90 (DE); Embed Length 35 FT 1 EA $ $
0082 292S-90 (DE); Embed Length 36.5 FT 1 EA $ $
0094 292X-70 (DE); Embed Length 30 FT 3 EA $ $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0095 8 EA $ $
292X-75 (DE); Embed Length 34.5 FT 1 EA $ $
292X-70 (DE); Embed Length 34 FT
0096 292X-70 (DE); Embed Length 36 FT 2 EA $ $
0097 292X-75 (DE); Embed Length 26 FT 3 EA $ $
0098 292X-75 (DE); Embed Length 30 FT 10 EA $ $
0100 292X-75 (DE); Embed Length 41 FT 1 EA $ $
0101 292X-80 (DE); Embed Length 27 FT 6 EA $ $
0102 292X-80 (DE); Embed Length 29.5 FT 13 EA $ $
0103 292X-80 (DE); Embed Length 30.5 FT 2 EA $ $
0104 292X-80 (DE); Embed Length 33 FT 2 EA $ $
0105 292X-80 (DE); Embed Length 38.5 FT 4 EA $ $
0106 292X-80 (DE); Embed Length 45 FT 2 EA $ $
0107 292X-85 (DE); Embed Length 27 FT 5 EA $ $
0108 292X-85 (DE); Embed Length 30.5 FT 5 EA $ $
0109 292X-85 (DE); Embed Length 41.5 FT 3 EA $ $
0110 292X-90 (DE); Embed Length 27 FT 1 EA $ $
0111 292X-90 (DE); Embed Length 30.5 FT 3 EA $ $
0112 292X-90 (DE); Embed Length 41.5 FT 1 EA $ $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
$0127 Horizontal post insulator assemblies Type HF1-F 9 EA $
$0126 Double-string tension insulator assemblies Type T21- C
348 EA $
0125 Single-string suspension insulator assemblies Type SI11-B (Jumper)
153 EA $ $
0124 Single-string suspension insulator assemblies Type
SI11-B
972 EA $
Installing Government-Furnished 230-kV insulator assemblies with Government-Furnished insulators suitable for 1272 kcmil, 54/19, PHEASANT ACSS/MA2 conductor as follows:
0114 292X-100 (DE); Embed Length 27.5 FT 1 EA $ $
0113 292X-95 (DE); Embed Length 30.5 FT 1 EA $ $
0115 292X-100 (DE); Embed Length 42.5 FT 1 EA $ $
0116 292X-105 (DE); Embed Length 30.5 FT 2 EA $ $
0117 292X-105 (DE); Embed Length 34 FT 2 EA $ $
0118 292X-110 (DE); Embed Length 43 FT 1 EA $ $
0119 292X-115 (DE); Embed Length 34.5 FT 1 EA $ $
0120 292X-120 (DE); Embed Length 28 FT 1 EA $ $
0121 292X-120 (DE); Embed Length 37 FT 2 EA $ $
0122 292X-125 (DE); Embed Length 28 FT 1 EA $ $
0123 292X-140 (DE); Embed Length 33.5 FT 3 EA $ $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
0136 Double-string tension insulator assemblies Type T21- C
3 EA $
Installing Government-Furnished 115-kV insulator assemblies with Government-Furnished insulators suitable for 795 kcmil, 26/7, DRAKE ACSR conductor as follows:
Installing Government-Furnished 115-kV insulator assemblies with Government-Furnished insulators suitable for 795 kcmil, ACSR/SD, Type 16, Drake/SD conductor as follows:
$0134 Double-string tension insulator assemblies Type T21- C
9 EA $
EA
EASingle-string suspension insulator assemblies Type
SI11-B
Double-string tension insulator assemblies Type T21- C
Horizontal post insulator assemblies Type HF1-F 3
$Single-string suspension insulator assemblies Type SI11-B (Jumper)
EA $0130
7290128
Double-string tension insulator assemblies Type T21- C-R
Furnishing and installing 230-kV insulator assemblies with Government-Furnished insulators suitable for 1272 kcmil, 54/19, PHEASANT ACSS/MA2 conductor as follows:
EA $
$$EA
$0131 Double-string tension insulator assemblies Type T21- D
4 EA $
Furnishing and installing 115-kV insulator assemblies with Government-Furnished insulators suitable for 795 kcmil, ACSR/SD, Type 16, Drake/SD conductor as follows:
$0135 Double-string tension insulator assemblies Type T21- C
3 EA $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
$0144 Tension assemblies Type OPGW-TV 66 EA $
0143 Suspension assemblies Type OPGW-SL 163 EA $ $
Installing Government-Furnished optical overhead ground wire assemblies complete with clamps for 0.531-inch diameter optical overhead ground wire as follows:
Installing Government-Furnished overhead ground wire assemblies complete with clamps for 3/8-inch, high strength or extra high strength, 7-strand steel overhead ground wire as follows:
$0141 Tension assemblies Type OGW-TV 6 EA $
0138 Tension assemblies Type OGW-TV 52 EA $
Installing Government-Furnished overhead ground wire assemblies complete with clamps for 1/2-inch, high strength or extra high strength, 7-strand steel overhead ground wire as follows:
0137 Suspension assemblies Type OGW-SL 161 EA $
0142 Tension assemblies Type OGW-TV 2 EA
Furnishing and installing overhead ground wire assemblies complete with clamps for 3/8-inch, high strength or extra high strength, 7-strand steel overhead ground wire as follows:
Furnishing and installing overhead ground wire assemblies complete with clamps for 1/2-inch, high strength or extra high strength, 7-strand steel overhead ground wire as follows:
Suspension assemblies Type OPGW-SL0145 127 EA $
Furnishing and installing optical overhead ground wire assemblies complete with clamps for 0.531-inch diameter optical overhead ground wire as follows:
Suspension assemblies Type OGW-SL
0139 116
0140 $Tension assemblies Type OGW-TV EA
$EA $
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
MI $ $
0158 Install Government-Furnished bird diverters 71 EA $ $
LS $
0156 Install Government-Furnished line markers 140 EA $ $
0151 Install one (1) Government-Furnished 1/2-inch, 7-strand, high-strength steel overhead ground wire
34.7 MI $ $
0148 Install three (3) Government-Furnished 1272 kcmil, ACSS/MA2, 54/19, PHEASANT conductors
2.2
0153 62.8
0159 Furnish and install bird diverters 211
0154 Install Government-Furnished vibration dampers for conductors, OGW, and OPGW on the Tortolita – DeMoss- Petrie / Saguaro – Tucson segment
$MI $
LS
Furnish and install six (6) 1272 kcmil, ACSS/MA2, 54/19, PHEASANT conductors
MI
MI $
Install one (1) Government-furnished 0.531-inch-diameter, 96-fiber optical overhead ground wire
Spare parts LS $
$EA $
Furnish and install line markers
EA $
74 EATension assemblies Type OPGW-TV
24.4
$TOTAL
0155 Furnish and install vibration dampers for conductors, OGW, and OPGW on the DeMoss-Petrie – Vail / Tucson
– Apache Segment
Install and test fiber optic cable(s) and provide associated equipment
LS
0147 Install six (6) Government-Furnished 1272 kcmil, ACSS/MA2, 54/19, PHEASANT conductors
34.5
2.8Furnish and install three (3) 1272 kcmil, ACSS/MA2, 54/19, PHEASANT conductors
0152 Furnish and install one (1) 1/2-inch, 7-strand, high-strength steel overhead ground wire
MI
$MI
Quantity
Work or Material
SECTION B
SUPPLIES OR SERVICES AND PRICES
BID SCHEDULE
VAIL - TORTOLITA
REVISION 1
CY = cubic yards AC = acres LBS = pounds
ABBREVIATIONS
CLIN = contract line item number EA = each LF = linear feet LS = for the lump sum of MI = miles