This is a Request for Variance form and guidance document from the VA Office of Information and Technology's Infrastructure Standards for Telecommunications Spaces v4.0. The specific variance request is from the Amarillo, TX VA Medical Center (Building 7, OI&T Administrative) dated October 24, 2023, seeking to serve Building 07/First Level WAO from the second level Telecommunications Room #208 and omit a new TR on the first level.
The document includes detailed requirements for variance requests, including architectural specifications, equipment details, and submission procedures. The variance process requires documenting why standards cannot be met due to constraints like cost, schedule, or architectural limitations. The problem statement indicates Building 07 is decommissioning an existing Computer Room #208 to serve as the TR for first and second levels, with 43 WAO total on the first level to be served by the second level TR. Supporting floor plans and site diagrams show the telecommunications infrastructure layout, including cable pathways, fiber routes, and equipment locations across multiple buildings at the facility.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--EHRM Construction Amarillo-Project 504-21-700 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE OF INFORMATION AND TECHNOLOGY
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-1
Appendix A: Request for Variance Infrastructure Standards for Telecommunications Spaces v4.0 Request Date:
Government POC:
Org Represented:
Email Address:
Contact Phone:
Site, Building #, Room, Mission of the Facility Where Requested (also note admin vs medical specific use):
Variance Requested:
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-2
Standards Section Title, Number, and Page:
Standards Section Text:
Problem Statement (explain how site/ project exhausted all possibilities to meet standards and why it cannot be achieved due to cost, schedule, architectural constraints, etc.):
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-3
Required Detail on Page A-4:
• Missing detail may delay or prevent processing.
• Details vary depending on the nature of the request (see items 1-6 below).
Note: If there are multiple buildings or multiple floors with identical room or building floorplans and designs, then you may use a single request and drawing for that floorplan. Annotate each building and room number that is accurately represented by the drawings.
1. Telecommunications Room (TR) or Other Space Architecture (Size)
a. Number of racks and total data drops (WAOs) versus the total number expected to be active (requiring patching to switches, typically approximately 50%)
b. Dimensions of the space, not just square footage. The footprint needs to be understood (primarily with 3 ft clearance around racks on all sides).
c. Other potential locations considered as trade-offs but were deemed unworkable
d. Attach both the building drawing to see the macro view, architecture, and distances and the TR or other space drawing to see the footprint and other spec requirements.
2. Telecommunications Room (TR) or Other Space Architecture (Location):
a. Number of racks and total data drops (WAOs) versus the total number expected to be active (requiring patching to switches, typically approximately 50%)
b. Cable distances to WAO
c. Dimensions of the space, not just square footage. The footprint needs to be understood (primarily with 3 ft clearance around racks on all sides).
d. Other locations considered as trade-offs but were deemed unworkable
e. Attach:
i. Diamond analysis
ii. Building drawing to see the macro view, architecture, horizontal and vertical distances between other TRs and telecommunications spaces, and distances to adjacent water or RFI sources
iii. TR or space drawing to see the footprint and other spec requirements
3. Cabling and Outside Plant: Attach campus drawing to see the macro view, paths, and distances between other telecommunications spaces.
4. Power: Attach schematics of all equipment and connections.
5. HVAC: Attach drawings and specs of all equipment.
6. Other: Attach specs of all equipment and drawings of telecommunications spaces.
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-4
Enter Required Detail:
Proposed Alternate Method:
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-5
Plan to Bring Project into Compliance:
Timeline to Bring Project into Compliance:
Funding Plan to Complete:
Choose Temporary or Permanent:
Coordinating Instructions:
• Before requesting, review to see if a solution has already been provided for the subject:
o VHA HEFP EHRM - Guidance Documents from Solution Delivery (sharepoint.com) o VHA HEFP EHRM - Design Alerts (sharepoint.com)
• EHRM Variances are requested through EHRM HEFP SEP Network Infrastructure Project Station Inquiry (SI Tool): Healthcare Engineering - Home (sharepoint.com)
• Submit an EHRM HEFP SEP Network Infrastructure Project Station Inquiry - Job Aid.pdf.
• Send all other requests to: OIT Data Center and Infrastructure Engineering (DCIE)
VAITESEDatacenterEngineering2@va.gov.
• Subject line: Include Station/Site Name_VISN XX_Project No_ EHRM (if applicable)_High-
Level Project Description_Variance Request_(Nature of Request).
• Example: Bronx NY_VISN 10_10-369_EHRM_Remodel MCR_Variance Request_(Power).
Submitter must digitally sign the email under the Options heading in Outlook.
Attach all required diagrams, one-line drawings, photos, manufacturer’s brochures, and/or other supplemental information to support your application.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FForms%2FAllItems.aspx%3Fid%3D%252Fsites%252FVHAOCAMESEHRM%252FVHA%2520Site%2520Assessment%2520Resources%252FGuidance%2520Documents%2520From%2520Solution%2520Delivery%26viewid%3Dd14511ba-8bd6-461a-9a61-472a9277303c&data=05%7C01%7C%7C5a0f973c5dff4b93ba4908db35dcd060%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638162994720459281%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lcT9tw%2BHFyo8LpmWh%2FsT0n4TvJLoks%2BRSFm66mI9%2Br8%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FForms%2FAllItems.aspx%3Fid%3D%252Fsites%252FVHAOCAMESEHRM%252FVHA%2520Site%2520Assessment%2520Resources%252FDesign%2520Alerts%26viewid%3Dd14511ba-8bd6-461a-9a61-472a9277303c&data=05%7C01%7C%7C5a0f973c5dff4b93ba4908db35dcd060%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638162994720459281%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BCvivBylsfmsW7qHV6PL%2FlMmcnyC%2F%2FTBoZMjQf33zKY%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHA10NA5E%2FSitePages%2FHome.aspx&data=05%7C01%7C%7C3b0075283a774a38decb08dae9c8a27d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638079345164482103%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FsHkJdoy0Y3gEjFfbRyZ%2BOlRTKDr0eloHLK5%2Be4rAWk%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/ap/b-59584e83/?url=https%3A%2F%2Fdvagov.sharepoint.com%2F%3Ab%3A%2Fr%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FHow%2520To%2527s%2FHow%2520to%2520Submit%2520an%2520EHRM%2520HEFP%2520SEP%2520Network%2520Infrastructure%2520Project%2520Station%2520Inquiry%2520-%2520Job%2520Aid.pdf%3Fcsf%3D1%26web%3D1%26e%3DwcSGpo&data=05%7C01%7C%7C3b0075283a774a38decb08dae9c8a27d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638079345164482103%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YEK1vV034ueOTV2znaNwpqw0rTDEGqv2A66coiESBQk%3D&reserved=0 mailto:VAITESEDatacenterEngineering2@va.go
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-6
What is a variance?
A variance is an allowable deviation from specific requirements of a published standard where a proposed alternate method of installation or operation will provide equal or higher safety, reliability, redundancy, and sustainability objectives. Alternately, under emergency time-sensitive circumstances a temporary variance may be granted without meeting the criteria above with an actionable plan to bring the project into compliance within a reasonable time frame. They should be submitted only as a last resort after the project and site have exhausted all other alternatives to meet specifications.
What will a variance not do?
A variance will not avoid compliance with the intention of a standard section or rule. A variance is not a method to recover from an installation or design error. A variance will not be granted if the alternate method would reduce the safety or effectiveness of the installation or equipment.
What does a variance cover?
If the variance is granted, it shall be limited to the particular site and installation covered in the application and will NOT be considered as a precedent for other installations.
Who may apply for a variance?
Those responsible for compliance with the standards may apply for a variance.
Who grants a variance?
A variance is granted only by DCIE upon written request through the approved process for submission, tracking, and processing. New variance requests embedded in project designs are not actionable for approval. They still need to go through the process.
How is a variance approved?
DCIE will approve, deny, or ask for clarification from their respective mailboxes. Allow a minimum of two weeks for processing. The return email from the DCIE organizational address is proof of the final decision of the Authority Having Jurisdiction (AHJ).
What are the disposition requirements of the determination?
A record of the variance determination email and any supporting attachments should remain with the project and be attached for context to all future design review or variance requests for the site. Retain the determination on file for the site for use in budgeting and initiating projects to upgrade the infrastructure to minimum ISTS specifications at the next technical refresh.:
UP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
DN
WAP
WAP
WAP
WAP
WAP
WAP
CORRIDOR
OFFICE/WORKSPACE
OFFICE
Room
OFFICE
OFFICE
STAIR
HAC
RESTROOM
OFFICE
OFFICE
CORRIDOR
108A
MECHANICAL
110A
OFFICE
111A
OFFICE
111B
OFFICE
106B
ENTRY
108B
ELEV
103-B
103-AP-A
103-A
102-F
102-G 102-A
102-B
2-
C
2- D
2-
E
101-A
2-
F
2-
E
2-
D
2- A
2-
B
2- C
111B-AP-A
111B-A
108A-AP-A
111A-AP-A
111A-E
111A-D
111A-F
111A-C 111A-B
111A-A111-A
111-B
1-
C 111-D
111-E
111-F
111-G
1-
H
NO DATA
NO DATANO
DATA
7-
B
107-A10 6B
-C
6B
-B
6B -A
106B-E
106B-D
6-
B
106-A
105-B
105-AP-A
105-C
105-A
B25-CAM-01
B25-E
B25-A
B25-B
B25-C
B25-D
TYP.
TYP.
TYP.
TYP.
ELEV MACHINE
OFFICE
TR/ELEC
STORAGE
4B
STORAGE
OFFICE
OFFICE
STORAGE
CORRIDOR
MECHANICAL
4C
OFFICE
2A
STAIR
10A
ELEV
2A-A
3-AP-A
2A-B
3-B
2-E 2-D
2-B
2-A
2-C
7-A 8-AP-A
10-AP-A
5-A
6-AP-A
6-E
6-A
6-C6-B
6-D
10A-AP-A
4B-AP-A
07T-101 D4
TR/ELEC
4A
07T-101 D2
3-C
3-CAM-01
3-A
TYP.
TYP.
TYP.
TYP.
BUILDING
ENTRANCE
BUILDING
ENTRANCE
TR/ELEC
136 SF
TYP.
TYP.
5 17
TR/ELEC
4A
38 SF
STORAGE
4B
OFFICE
2A3-A
CORRIDOR
ISC
SECRETARY
CHIEF
HAC
RESTROOM
COMPUTER ROOM
PROGRAM
PRINTER ROOM
208A
MECHANICAL
207A
STAIR
201A
ELEV
203-AP-A 20
3-
D
3-
E
3-
A
3-
B
203-C
4-
D
4-
C
4-
B 204-A
4-
E
4-
F
205-AP-A
205-B
205-A
5-
C
205-D
NO DATA
NO DATA
NO DATA
201-AP-A
209-C
209-D
9-
E
209-A
209-B 208A-D 208A-E
208A-A 208A-B
208A-C
208-AP-B
208-AP-A
TYP.
TYP.
TYP.
TYP.
TR/ELEC
136 SF
TYP.
4 3
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
3- C
AM
-0
TR/ELEC
4A
38 SF
STORAGE
4B
OFFICE
2A
3-B
3-C
3-AP-A
3-A
TYP.
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group 325 N. Saint Paul Street, Suite 3100 Dallas, TX 75201
MAT PERKINS
469-330-9710
STAMP
UPDATED AND RE-ISSUED FOR CONSTRUCTION 09/18/2023
Au to de sk
D oc s:
//5
-2
1-
EH
R M
In fra st ru ct ur e U pg ra de s at A m ar illo V
AM
C
/5
-2 1-
0.
EH
R
M .A m ar illo .B
.M
EP
.rv t
-0 9-
2:
:4
07T-101
TELECOMMUNICATION PLANS - BASEMENT,
FIRST & SECOND LEVEL
504-21-700
B07
09/18/2023 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
6010 Amarillo Blvd. West, Amarillo, TX 79106
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.
REFER TO R-900 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
FOR EXISTING SECURITY CAMERAS BEING RE-CABLED, MAINTAIN EXISTING
CAMERA ANGLE AND PROTECT IN PLACE
ALL EXISTING PENETRATIONS NO LONGER BEING USED WILL BE FILLED WITH
RATED ASSEMBLY.
VERTICAL ROUTE FOR TELECOM RISER. SEAL ALL FLOOR PENETRATIONS TO
MAINTAIN FIRE RATING.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
PROVIDE NEW 4-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL EXISTING
DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE NEW RACK AND
ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE NEW RACK,
REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE FINAL
PERMANENT POSITION.
PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE CAREFULLY
PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING RACK SHALL BE
TRANSFERRED TO THE NEW LOCATION ON THE NEW RACK. CONTRACTOR SHALL
PROVIDE SHOP DRAWINGS SHOWING THE PROPOSED NEW RACK ELEVATION
AND PROVIDE A PHASING PLAN FOR TRANSFERRING ALL EXISTING DEVICES TO
REMAIN TO THE NEW RACKS.
PROVIDE NEW CABLE TRAY, TRAY INSERTS AND FIBER OPTIC RACEWAY PER
REQUIREMENTS LISTED IN CABLE TRAY SCHEDULE AND 27 05 36. COORDINATE
WITH EXISTING CONDITIONS AND SUBMIT COORDINATION DRAWINGS FOR
REVIEW PRIOR TO COMMENCING WORK. COORDINATION DRAWINGS SHALL
SHOW PROPOSED A AND B PATH REDUNDANT FIBER PATHS. COORDINATE
FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR ADDITIONAL
REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD CABLE TRAY.
PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN WISENET
XNP-6320. MOUNT AT 8’ – 6” A.F.F. TO TOP OF WALL BRACKET. INTEGRATE
CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH EXISTING IT
NETWORK.
PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
EXISTING EQUIPMENT TO RELOCATED.
EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
PROVIDE NEW iSTAR EDGE (ESTAR002) ACCESS CONTROL SYSTEM. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS.
ALL EXISTING ANALOG PHONE CABLE DEVICES AND TERMINATIONS ETC. SHALL
REMAIN OPERATIONAL AT ALL TIMES AND SHALL BE RETAINED AND REUSED.
PROTECT IN PLACE.
HORIZONTAL CABLE LENGTH LIMITATIONS PER STANDARD 3.1.
VERTICAL ROUTE FOR TELECOM RISER. ALL FLOOR PENETRATIONS TO MAINTAIN
FIRE RATING.
CONTRACTOR SHALL FIELD VERIFY EXISTING TELECOMMUNICATIONS EQUIPMENT
TO BE DEMOLISHED PRIOR TO COMMENCING WORK.
NEW JSA/FDS CABINETS.
NEW CRAC UNITS, REFER TO MECHANICAL.
EQUIPMENT TO BE REMOVED AND RETURNED TO OWNER.
PROVIDE SENSAPHONE 9600 REMOTE MONITORING AND ALARM SYSTEM.
PROVIDE NEW SENSAPHONE EXPRESS II WITH EXPANSION MODULES FOR 40
POINTS. NEW SENSAPHONE EXPRESS II SHALL MONITOR: (1) MCR AMBIENT AIR
TEMPERATURE, (2) CRAC UNIT OPERATION, (3) CRAC SUPPLY AND RETURN AIR
TEMPERATURE, (4) MCR ROOM HUMIDITY, (5) MOISTURE SENSORS BELOW
RAISED FLOOR, AND (6)REDUNDANT UPS OPERATION. COORDINATE WITH NEW
AND EXISTING CONDITIONS.
EXISTING EQUIPMENT TO REMAIN IN PLACE TO ACT AS TEMPORARY SERVICE
UNTIL NEW COMPUTER ROOM IS COMPLETE. THESE ARE TO BE DECOMISIONED
ONCE PRIMARY SERVICE IS INSTALLED.
SCALE: 1/8" = 1'-0"F5
TELECOMMUNICATION PLAN - FIRST
LEVEL
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/8" = 1'-0"F2
TELECOMMUNICATION PLAN -
BASEMENT LEVEL
SCALE: 1/2" = 1'-0"D4
TELECOMMUNICATION PLAN -
BASEMENT LEVEL - ROOM 3 - DEMO
SCALE: 1/8" = 1'-0"D6
TELECOMMUNICATION PLAN -
SECOND LEVEL
SCALE: 1/2" = 1'-0"D2
TELECOMMUNICATION PLAN -
BASEMENT LEVEL - ROOM 3 - NEW
NOT TO SCALE
F9 BUILDING 25
Revisions: Date:
Entrance
59'
76'-7"
BD
Em er ge nc y De pt
SITE
PLAN
TEMPORARY ROUTE TO CLC & ENDO CLINIC
SMOKING SHR.
38'-113_4"
77'-21_2"
47'-6 3__16"
75'-10 1__16"
18'-815__16"
251'-23_4"
N44°15'49" W 1000.00'
1. FUEL LINES FROM TANKS TO BOILER PLANT 1' APART
ONE IS SUPPLY AND ONE IS RETURN UNSURE WHICH IS WHICH.
1. FUEL LINES FROM TANKS TO BOILER PLANT 1' APART ONE IS
SUPPLY AND ONE IS RETURN UNSURE WHICH IS WHICH.
18-AMA-1-NG-1
18-AMA-1-PW-1
18-AMA-4-NG-1
18-AMA-4-PW-1
18-AMA-28-NG-1
18-AMA-28-PW-1
18-AMA-MF-CW-1
18-AMA-28-CW-1
18-AMA-1-CW-1
18-AMA-28-ST-1
18-AMA-MF-ST-1
18-AMA-11-NG-1
18-AMA-33-NG-1
18-AMA-1-ST-1
18-AMA-1-CW-1
18-AMA-4-ST-1
18-AMA-29-CW-1
18-AMA-29-ST-1
18-AMA-29-33-PW-1
18-AMA-MF-BMU-1
18-AMA-MF-CMU-1
18-AMA-4-CW-1
PA
RK
IN
G
FO
R
VIS
ITA
TIO
N
9 Mental Health (Building 44) Back Entrance (employees) 0700 - 0800
10 Mental Health (Building 44) Bottom Entrance 0700 - 1630
7 & 8 Specialty Clinic (Building 46) Bottom and Top Entrances 0700 - 1630
5 & 6 Primary Care (Building 48) Bottom and Top Entrances 0700 - 1630
3 Medical Arts (Building 33) Entrance 0700 - 1630
1 Main Lobby Entrance (Building 28) Open 24/7
2 Physical Therapy (Building 1) North East Entrance 0630 -
4 Services (Building 4) North West Entrance 0630 - 1630
11 Museum (Building 1) East Entrance 0630 - 1630
12 CLC Entrance (Building 54) 0630 - 1630
BD Back Dock (Building 28) West Entrance 0630 - 1630
BASE - X
VA
BOUNDARY
VA
BOUNDARY
VA
BOUNDARY
VA
BOUNDARY
SMOKING SHR.
SMOKING SHELTER
NEW
CLC
REHAD &
PROSTHETICS
L E G E N D
Construction AreaRoute to
CLC& ENDO
ClinicParking for
CLC& ENDO
ClinicProposed Directional Signs
SP
OT
TE
R
FL
AG
GE
R
FL
AG
GE
R
IRRIGATED
AREA291,837
sf
6.70 acres
HISTORIC
HGFEDCBA
FIRE NODE
LEGEND
PANEL
LOC.
FRONT ENTRANCE BLDG. 29
EMERGENCE DEPT. BLDG. 28
IN HALLWAY BY PHYSICAL
MECH. ROOM FIRST FLOOR
MECH. ROOM FIRST FLOOR
NODE
NODE
NODE
NODE
NODE
NODE
BUILDINGS 11, 14, & 34
NODE
COLOR
THERAPY, BUILDING 1
BUILDING 44
BUILDING 46
= PANEL
LOCATION
NODE
16 FRONT ENTRANCE BLDG. 48
UNDERGROUND TUNNE
L
N
N 44°15'49" W 380.10'
N
°1 '2
E
.8
M O
RG
AN
S °1 7' W
.6 2'
P A R K
H
ER
E
18-AMA-MF-NG-1 18-AMA-MF-PW-1
18-AMA-MF-PW-2
18-AMA-MF-NG-2
SEE NOTE
1.
7'8"
1 _
GARAGE INTER
TRAPRALPH CABE SAW THIS
ANDREPORTED IT TO
BEACCURATE
11/19/08
X
FM
X
FM
R
X
FM
R
X F M R
XF
M R-
XF
M R-
XF
M R-
XF
M R- 4-
XF
M R- 4-
OIL FILLED TRANSFORMERS
UNDERGROUND
DIESEL FUEL
OIL
OUTSIDE BLDG
3,000
UNDERGROUND
PROPANE EMERG
BACK-UP
OUTSIDE BLDG
3 ABOVE
GROUND
DIESEL FUEL
OIL
OUTSIDE BLDG
16,000
4 ABOVE
GROUND
DIESEL 155
GENERATOR
OUTSIDE BLDG
5 ABOVE
GROUND
DIESEL 750
GENERATOR
OUTSIDE BLDG
1,000
6 ABOVE
GROUND
DIESEL 550
GENERATOR
OUTSIDE BLDG
7 ABOVE
GROUND
DIESEL VEHICLE
FUEL
OUTSIDE BLDG
8 ABOVE
GROUND
GAS VEHICLE
FUEL
OUTSIDE BLDG
FUEL
TANK
29 30
X6X5
X4
X3
X2 X1
2a
DATA LINES (FIBER
OPTICS)
WHITAKER
HUB
WHITAKER
HUB
WHITAKER
HUB
13170
12971
11980
18921
12011
78500
12601
13001
35629
12680
13905
S.W. 9TH AVENUE
U .S H
IG
H W A Y
H
ER
N D O N
E.
W
ALK
ER
N
ED
M
ANW
ED
M A N
W .W
A
LK
ER
S.
ED
M
AN
(A M A R
IL
LO
B
LV
D
BLDG
BLDG 33
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG 49
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
36 BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG 13
S. EDMAN
HERNDON
E. WALKER
N. EDMAN
S.W. 9TH AVENUE
W . W
ALKER
W. E
DMAN
U.S . H
IG
HW
AY
(E) COMM
MANHOLE
EXISTING BUILDING
NEW FIBER IN EXISTING CONDUIT.
SERVICE PROVIDER A - AT&T
NEW FIBER IN NEW CONDUIT. SERVICE
PROVIDER B - CENTURY LINK
(E) COMM
MANHOLE
NEW HANDHOLE/PULL BOX
NEW PATH A AND B FIBER, OPPOSITE
SIDES OF TUNNEL OR IN NEW
SEPARATE CONDUIT
BLDG
BLDG
NEW MANHOLE
7 5
(E) COMM
MANHOLE
BLDG
MCR
PATH "B"
PATH "A"
(E) COMM
MANHOLE
EXISTING CONDUIT (FOR
REFERENCE ONLY)
SERVICE PROVIDER A -
SERVICE PROVIDER B -
NEW FIBER (24F OS2 TO EACH TR IN
EACH BUILDING) IN NEW CONDUIT -
"B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN
EACH BUILDING) IN NEW CONDUIT -
"A" ROUTE
NEW MCR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
KEYNOTES
TRIPLE C - The A/E Group 325 N. Saint Paul Street, Suite 3100 Dallas, TX 75201 Mat Perkins 469-330-9710
STAMP
Au to de sk
D oc s:
//5
-2
1-
EH
R M
In fra st ru ct ur e U pg ra de s at A m ar illo V
AM
C
/5
-2 1-
0.
EH
R
M .A m ar illo .S ite .rv t
-0 9-
3:
:0
TS100
TELECOMMUNICATIONS SITE PLAN 504-21-700
SITE
09/18/2023 M. Perkins K. Struble
ISSUED FOR
CONSTRCUTION
EHRM INFRASTRUCTURE
UPGRADES
6010 Amarillo Blvd. West, Amarillo, TX 79106
LEGEND
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
EXISTING FIBER FEED TO REMAIN.
INSTALL NEW FIBER - FEED THROUGH EXISTING CONDUIT.
INSTALL NEW FIBER AND CONDUIT OR CABLE TRAY.
NEW HANDHOLE/PULLBOX WITH LOCKING COVER, SEE DETAILS B1, C1 & F8,
SHEET T-501.
INSTALL NEW FIBER IN FOUR (4) 4" PVC CONDUIT - TRENCH AND REPLACE
EXISTING LANDSCAPE - MATCH EXISTING, SEE DETAIL E1, SHEET T-501.
DIRECTIONAL BORE AT SIDEWALK, CURB AND ASPHALT. PROVIDE FIBER OPTIC
CABLE PER SHEETS T-601.
INSTALL NEW FIBER IN THE EXISTING STEAM TUNNEL.
INCOMING WAN FROM CENTURY LINK.
INCOMING WAN FROM AT&T.
NEW MANHOLE, SEE DETAIL E4, SHEET T-501
INSTALL NEW LOCKING HANDHOLE COVER PER DETAIL F8, SHEET T-501
OEHRM OUTSIDE PLANT (OSP) FIBER SPECIFICATIONS
1" = 60'-0"F1 TELECOMMUNICATIONS - SITE PLAN
Revisions: Date:
2'-
0"
262'-0"
Appendix A: Request for Variance
| RequestDate: 10/24/2023 |
| GovPOC: Logan Dunn |
| OrgRepresented: Amarillo, TX VA Medical Center (V17, Station 504) |
| Email: logan.dunn@va.gov |
| Phone: 806-355-9703 x4516 |
| SiteInfo: Amarillo, TX VA Medical Center (V17, Station 504), Building 7, |
OI&T (Administrative)
| VarianceRequested: Variance to serve Building 07/First Level WAO from the second level Telecommunications Room #208 and omit a new TR on first level. |
| StandardsInfo: Sheet 5, Detail 1, Telecommunication Room Notes, (OIT) Infrastructure Standard for Telecommunications Spaces, version 3.1. |
| StandardsText: "THERE SHALL BE A MINIMUM OF ONE TELECOMMUNICATIONS ROOM (TR) PER FLOOR." |
| ProblemStatement: Building 07 design decommissions and renovates an existing Computer Room #208 to serve as the TR for the first and second levels. The existing computer room now serves at the Main Computer Room. This project is providing a new MCR Building 06. The existing MCR will be decommissioned and configured to act as the second level TR. VA/AE investigated all options for serving the first level and provided multiple options for First Level TR locations. Adding a TR to first level was deemed too disruptive to existing structure due to the |
age and architectural layout of the building. There is no existing first level TR space. B07/first level has (43) WAO total. This minimal load will be served by an adequately size TR on the second level (i.e., converted MCR).
| EnterDetail: D6/07T-101, F2/07T-101 & F5/07T-102. See attached. |
| ProposedMethod: Since no other space allocation was approved, and providing a new addition was not viable based on cost and complexity and the low WAO count. VA decided to apply for a variance on this level and use the large existing space that is currently serving as the Main Computer Room, #208. Room #208 will be re-purposed to act as a TR for the First and Second levels. |
| PlanCompliance: Variance requested to retain design to route all First Level cables to new second level TR #208. |
| Timeline: |
| Funding: |
| TempPerm: [Permanent] |