About this file

This is a Request for Variance form and guidance document from the VA Office of Information and Technology's Infrastructure Standards for Telecommunications Spaces v4.0. The specific variance request is from the Amarillo, TX VA Medical Center (Building 7, OI&T Administrative) dated October 24, 2023, seeking to serve Building 07/First Level WAO from the second level Telecommunications Room #208 and omit a new TR on the first level.

The document includes detailed requirements for variance requests, including architectural specifications, equipment details, and submission procedures. The variance process requires documenting why standards cannot be met due to constraints like cost, schedule, or architectural limitations. The problem statement indicates Building 07 is decommissioning an existing Computer Room #208 to serve as the TR for first and second levels, with 43 WAO total on the first level to be served by the second level TR. Supporting floor plans and site diagrams show the telecommunications infrastructure layout, including cable pathways, fiber routes, and equipment locations across multiple buildings at the facility.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--EHRM Construction Amarillo-Project 504-21-700, newest first.
File Type Posted
36C77624R0084 0014.docx DOCX document
PPQ - Amarillo.docx DOCX document
Att 28 - 504-21-700.EHRM.Amarillo.Add4.20250401.pdf PDF
Att 22 - 00 41 13.10 - Construction Estimate Breakdown Template.xlsx XLSX spreadsheet
36C77624R0084 0013.docx DOCX document
RFP 36C77624R0084 3-28-2025.docx DOCX document
36C77624R0084 0006 SF 30.docx DOCX document
Att 1 Construction SOW Revised 504-21-700 - 3-27-25.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
36C77624R0084 0012.docx DOCX document
0011 - DBA Wage Rates - Potter County - 3-14-25.pdf PDF
36C77624R0084 0011.pdf PDF
36C77624R0084 0010.docx DOCX document
Att 27- 504-21-700 EHRM Amarillo Add3 20250306.pdf PDF
36C77624R0084 0008.docx DOCX document
36C77624R0084 0009.docx DOCX document
Att 26-504-21-700 EHRM Amarillo.ADD 2-13-25.pdf PDF
36C77624R0084 0007.docx DOCX document
Att 20-Updated Wage Determ 1-3-25 Potter County TX.pdf PDF
Att 23-S05-Vendor Questions and RFIs Rspns Final.xlsx XLSX spreadsheet
Att 25- Amendment 0006-updated RFP 36C77624R0084.docx DOCX document
Att 24-504-21-700 EHRM Amarillo.ADD-1.20250128.pdf PDF
Prebid Site Visit Sign-in 1-6-25 n 1-17-25 combined.pdf PDF
36C77624R0084 0005.docx DOCX document
36C77624R0084 0004.docx DOCX document
36C77624R0084 0003.docx DOCX document
36C77624R0084 0002.docx DOCX document
36C77624R0084 0001.docx DOCX document
36C77624R0084_1 tradeoffs Final.pdf PDF
Att 5-504-23-053 EHRM PCRA.pdf PDF
Att 10-EHRM Ama IFC Bld8.zip ZIP file
Att 11-EHRM Ama IFC Bld7 Bld9.zip ZIP file
Att 13-EHRM Ama IFC Bld26 Bld28 Bld29.zip ZIP file
Att 20-WD-Amarillo verified 12-17-24.pdf PDF
Att 2-Limitations on Subcont - Constr.pdf PDF
Att 4-EHRM Prj Stnd Compl Memo.pdf PDF
Att 7-Amarillo_EHRM.SPEC.part 1.zip ZIP file
Att 14-EHRM Ama IFC Bld33 Bld34 Bld35 Bld36.zip ZIP file
Att 17-EHRM Ama IFC Bld54.zip ZIP file
Att 1 Construction SOW Prj 504-21-700 11.13.24.pdf PDF
Att 3-ICRA DRAFT EHRM 12 14 2023 LEVEL 4.pdf PDF
Att 9-EHRM Ama IFC Bld1 Bld4.zip ZIP file
Att 19-Asbestos Insp Rpt.zip ZIP file
Att 22-Division Cost Breakdown.xlsx XLSX spreadsheet
Att 8-Amarillo_EHRM.SPEC.part 2.zip ZIP file
Att 12-EHRM Ama IFC Bld10 Bld11 Bld12 Bld14.zip ZIP file
Att 15-EHRM Ama IFC Bld44 Bld45 Bld46.zip ZIP file
Att 16-EHRM Ama IFC Bld48 Bld49 Bld53.zip ZIP file
Att 18-EHRM Ama IFC SITE.20241022.zip ZIP file
Att 21-PPQ.docx DOCX document
Show all 50

Z2DA--EHRM Construction Amarillo-Project 504-21-700 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF INFORMATION AND TECHNOLOGY

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-1

Appendix A: Request for Variance Infrastructure Standards for Telecommunications Spaces v4.0 Request Date:

Government POC:

Org Represented:

Email Address:

Contact Phone:

Site, Building #, Room, Mission of the Facility Where Requested (also note admin vs medical specific use):

Variance Requested:

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-2

Standards Section Title, Number, and Page:

Standards Section Text:

Problem Statement (explain how site/ project exhausted all possibilities to meet standards and why it cannot be achieved due to cost, schedule, architectural constraints, etc.):

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-3

Required Detail on Page A-4:

• Missing detail may delay or prevent processing.

• Details vary depending on the nature of the request (see items 1-6 below).

Note: If there are multiple buildings or multiple floors with identical room or building floorplans and designs, then you may use a single request and drawing for that floorplan. Annotate each building and room number that is accurately represented by the drawings.

1. Telecommunications Room (TR) or Other Space Architecture (Size)

a. Number of racks and total data drops (WAOs) versus the total number expected to be active (requiring patching to switches, typically approximately 50%)

b. Dimensions of the space, not just square footage. The footprint needs to be understood (primarily with 3 ft clearance around racks on all sides).

c. Other potential locations considered as trade-offs but were deemed unworkable

d. Attach both the building drawing to see the macro view, architecture, and distances and the TR or other space drawing to see the footprint and other spec requirements.

2. Telecommunications Room (TR) or Other Space Architecture (Location):

a. Number of racks and total data drops (WAOs) versus the total number expected to be active (requiring patching to switches, typically approximately 50%)

b. Cable distances to WAO

c. Dimensions of the space, not just square footage. The footprint needs to be understood (primarily with 3 ft clearance around racks on all sides).

d. Other locations considered as trade-offs but were deemed unworkable

e. Attach:

i. Diamond analysis

ii. Building drawing to see the macro view, architecture, horizontal and vertical distances between other TRs and telecommunications spaces, and distances to adjacent water or RFI sources

iii. TR or space drawing to see the footprint and other spec requirements

3. Cabling and Outside Plant: Attach campus drawing to see the macro view, paths, and distances between other telecommunications spaces.

4. Power: Attach schematics of all equipment and connections.

5. HVAC: Attach drawings and specs of all equipment.

6. Other: Attach specs of all equipment and drawings of telecommunications spaces.

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-4

Enter Required Detail:

Proposed Alternate Method:

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-5

Plan to Bring Project into Compliance:

Timeline to Bring Project into Compliance:

Funding Plan to Complete:

Choose Temporary or Permanent:

Coordinating Instructions:

• Before requesting, review to see if a solution has already been provided for the subject:

o VHA HEFP EHRM - Guidance Documents from Solution Delivery (sharepoint.com) o VHA HEFP EHRM - Design Alerts (sharepoint.com)

• EHRM Variances are requested through EHRM HEFP SEP Network Infrastructure Project Station Inquiry (SI Tool): Healthcare Engineering - Home (sharepoint.com)

• Submit an EHRM HEFP SEP Network Infrastructure Project Station Inquiry - Job Aid.pdf.

• Send all other requests to: OIT Data Center and Infrastructure Engineering (DCIE)

VAITESEDatacenterEngineering2@va.gov.

• Subject line: Include Station/Site Name_VISN XX_Project No_ EHRM (if applicable)_High-

Level Project Description_Variance Request_(Nature of Request).

• Example: Bronx NY_VISN 10_10-369_EHRM_Remodel MCR_Variance Request_(Power).

Submitter must digitally sign the email under the Options heading in Outlook.

Attach all required diagrams, one-line drawings, photos, manufacturer’s brochures, and/or other supplemental information to support your application.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FForms%2FAllItems.aspx%3Fid%3D%252Fsites%252FVHAOCAMESEHRM%252FVHA%2520Site%2520Assessment%2520Resources%252FGuidance%2520Documents%2520From%2520Solution%2520Delivery%26viewid%3Dd14511ba-8bd6-461a-9a61-472a9277303c&data=05%7C01%7C%7C5a0f973c5dff4b93ba4908db35dcd060%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638162994720459281%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lcT9tw%2BHFyo8LpmWh%2FsT0n4TvJLoks%2BRSFm66mI9%2Br8%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FForms%2FAllItems.aspx%3Fid%3D%252Fsites%252FVHAOCAMESEHRM%252FVHA%2520Site%2520Assessment%2520Resources%252FDesign%2520Alerts%26viewid%3Dd14511ba-8bd6-461a-9a61-472a9277303c&data=05%7C01%7C%7C5a0f973c5dff4b93ba4908db35dcd060%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638162994720459281%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BCvivBylsfmsW7qHV6PL%2FlMmcnyC%2F%2FTBoZMjQf33zKY%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHA10NA5E%2FSitePages%2FHome.aspx&data=05%7C01%7C%7C3b0075283a774a38decb08dae9c8a27d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638079345164482103%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FsHkJdoy0Y3gEjFfbRyZ%2BOlRTKDr0eloHLK5%2Be4rAWk%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/ap/b-59584e83/?url=https%3A%2F%2Fdvagov.sharepoint.com%2F%3Ab%3A%2Fr%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FHow%2520To%2527s%2FHow%2520to%2520Submit%2520an%2520EHRM%2520HEFP%2520SEP%2520Network%2520Infrastructure%2520Project%2520Station%2520Inquiry%2520-%2520Job%2520Aid.pdf%3Fcsf%3D1%26web%3D1%26e%3DwcSGpo&data=05%7C01%7C%7C3b0075283a774a38decb08dae9c8a27d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638079345164482103%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YEK1vV034ueOTV2znaNwpqw0rTDEGqv2A66coiESBQk%3D&reserved=0 mailto:VAITESEDatacenterEngineering2@va.go

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-6

What is a variance?

A variance is an allowable deviation from specific requirements of a published standard where a proposed alternate method of installation or operation will provide equal or higher safety, reliability, redundancy, and sustainability objectives. Alternately, under emergency time-sensitive circumstances a temporary variance may be granted without meeting the criteria above with an actionable plan to bring the project into compliance within a reasonable time frame. They should be submitted only as a last resort after the project and site have exhausted all other alternatives to meet specifications.

What will a variance not do?

A variance will not avoid compliance with the intention of a standard section or rule. A variance is not a method to recover from an installation or design error. A variance will not be granted if the alternate method would reduce the safety or effectiveness of the installation or equipment.

What does a variance cover?

If the variance is granted, it shall be limited to the particular site and installation covered in the application and will NOT be considered as a precedent for other installations.

Who may apply for a variance?

Those responsible for compliance with the standards may apply for a variance.

Who grants a variance?

A variance is granted only by DCIE upon written request through the approved process for submission, tracking, and processing. New variance requests embedded in project designs are not actionable for approval. They still need to go through the process.

How is a variance approved?

DCIE will approve, deny, or ask for clarification from their respective mailboxes. Allow a minimum of two weeks for processing. The return email from the DCIE organizational address is proof of the final decision of the Authority Having Jurisdiction (AHJ).

What are the disposition requirements of the determination?

A record of the variance determination email and any supporting attachments should remain with the project and be attached for context to all future design review or variance requests for the site. Retain the determination on file for the site for use in budgeting and initiating projects to upgrade the infrastructure to minimum ISTS specifications at the next technical refresh.:

UP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

DN

WAP

WAP

WAP

WAP

WAP

WAP

CORRIDOR

OFFICE/WORKSPACE

OFFICE

Room

OFFICE

OFFICE

STAIR

HAC

RESTROOM

OFFICE

OFFICE

CORRIDOR

108A

MECHANICAL

110A

OFFICE

111A

OFFICE

111B

OFFICE

106B

ENTRY

108B

ELEV

103-B

103-AP-A

103-A

102-F

102-G 102-A

102-B

2-

C

2- D

2-

E

101-A

2-

F

2-

E

2-

D

2- A

2-

B

2- C

111B-AP-A

111B-A

108A-AP-A

111A-AP-A

111A-E

111A-D

111A-F

111A-C 111A-B

111A-A111-A

111-B

1-

C 111-D

111-E

111-F

111-G

1-

H

NO DATA

NO DATANO

DATA

7-

B

107-A10 6B

-C

6B

-B

6B -A

106B-E

106B-D

6-

B

106-A

105-B

105-AP-A

105-C

105-A

B25-CAM-01

B25-E

B25-A

B25-B

B25-C

B25-D

TYP.

TYP.

TYP.

TYP.

ELEV MACHINE

OFFICE

TR/ELEC

STORAGE

4B

STORAGE

OFFICE

OFFICE

STORAGE

CORRIDOR

MECHANICAL

4C

OFFICE

2A

STAIR

10A

ELEV

2A-A

3-AP-A

2A-B

3-B

2-E 2-D

2-B

2-A

2-C

7-A 8-AP-A

10-AP-A

5-A

6-AP-A

6-E

6-A

6-C6-B

6-D

10A-AP-A

4B-AP-A

07T-101 D4

TR/ELEC

4A

07T-101 D2

3-C

3-CAM-01

3-A

TYP.

TYP.

TYP.

TYP.

BUILDING

ENTRANCE

BUILDING

ENTRANCE

TR/ELEC

136 SF

TYP.

TYP.

5 17

TR/ELEC

4A

38 SF

STORAGE

4B

OFFICE

2A3-A

CORRIDOR

ISC

SECRETARY

CHIEF

HAC

RESTROOM

COMPUTER ROOM

PROGRAM

PRINTER ROOM

208A

MECHANICAL

207A

STAIR

201A

ELEV

203-AP-A 20

3-

D

3-

E

3-

A

3-

B

203-C

4-

D

4-

C

4-

B 204-A

4-

E

4-

F

205-AP-A

205-B

205-A

5-

C

205-D

NO DATA

NO DATA

NO DATA

201-AP-A

209-C

209-D

9-

E

209-A

209-B 208A-D 208A-E

208A-A 208A-B

208A-C

208-AP-B

208-AP-A

TYP.

TYP.

TYP.

TYP.

TR/ELEC

136 SF

TYP.

4 3

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

3- C

AM

-0

TR/ELEC

4A

38 SF

STORAGE

4B

OFFICE

2A

3-B

3-C

3-AP-A

3-A

TYP.

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group 325 N. Saint Paul Street, Suite 3100 Dallas, TX 75201

MAT PERKINS

469-330-9710

STAMP

UPDATED AND RE-ISSUED FOR CONSTRUCTION 09/18/2023

Au to de sk

D oc s:

//5

-2

1-

EH

R M

In fra st ru ct ur e U pg ra de s at A m ar illo V

AM

C

/5

-2 1-

0.

EH

R

M .A m ar illo .B

.M

EP

.rv t

-0 9-

2:

:4

07T-101

TELECOMMUNICATION PLANS - BASEMENT,

FIRST & SECOND LEVEL

504-21-700

B07

09/18/2023 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

6010 Amarillo Blvd. West, Amarillo, TX 79106

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.

PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL

OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL

NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &

NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.

NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.

ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN

WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.

UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF

EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE

TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL

PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE

EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE

REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH

EXISTING CONDUIT CAPACITY.

ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK.

LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL

INFORMATION

CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL

TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE

DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.

REFER TO R-900 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING

CONDITIONS.

FOR EXISTING SECURITY CAMERAS BEING RE-CABLED, MAINTAIN EXISTING

CAMERA ANGLE AND PROTECT IN PLACE

ALL EXISTING PENETRATIONS NO LONGER BEING USED WILL BE FILLED WITH

RATED ASSEMBLY.

VERTICAL ROUTE FOR TELECOM RISER. SEAL ALL FLOOR PENETRATIONS TO

MAINTAIN FIRE RATING.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH

EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS

ON SHEET T-501 FOR ADDITIONAL INFORMATION.

EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE

NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON

SHEET T-501 FOR ADDITIONAL INFORMATION.

PROVIDE NEW 4-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS

AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE

SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION

AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.

PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES

AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL EXISTING

DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE NEW RACK AND

ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE NEW RACK,

REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE FINAL

PERMANENT POSITION.

PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE CAREFULLY

PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING RACK SHALL BE

TRANSFERRED TO THE NEW LOCATION ON THE NEW RACK. CONTRACTOR SHALL

PROVIDE SHOP DRAWINGS SHOWING THE PROPOSED NEW RACK ELEVATION

AND PROVIDE A PHASING PLAN FOR TRANSFERRING ALL EXISTING DEVICES TO

REMAIN TO THE NEW RACKS.

PROVIDE NEW CABLE TRAY, TRAY INSERTS AND FIBER OPTIC RACEWAY PER

REQUIREMENTS LISTED IN CABLE TRAY SCHEDULE AND 27 05 36. COORDINATE

WITH EXISTING CONDITIONS AND SUBMIT COORDINATION DRAWINGS FOR

REVIEW PRIOR TO COMMENCING WORK. COORDINATION DRAWINGS SHALL

SHOW PROPOSED A AND B PATH REDUNDANT FIBER PATHS. COORDINATE

FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR ADDITIONAL

REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD CABLE TRAY.

PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION

SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN WISENET

XNP-6320. MOUNT AT 8’ – 6” A.F.F. TO TOP OF WALL BRACKET. INTEGRATE

CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH EXISTING IT

NETWORK.

PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.

NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR

HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH

ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.

EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE

PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS

INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE

AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN

FOR TRANSFERRING FIBER.

EXISTING EQUIPMENT TO RELOCATED.

EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO

BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH

EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE

OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR

TRANSFERRING FIBER.

PROVIDE NEW iSTAR EDGE (ESTAR002) ACCESS CONTROL SYSTEM. INSTALL PER

MANUFACTURER'S RECOMMENDATIONS.

ALL EXISTING ANALOG PHONE CABLE DEVICES AND TERMINATIONS ETC. SHALL

REMAIN OPERATIONAL AT ALL TIMES AND SHALL BE RETAINED AND REUSED.

PROTECT IN PLACE.

HORIZONTAL CABLE LENGTH LIMITATIONS PER STANDARD 3.1.

VERTICAL ROUTE FOR TELECOM RISER. ALL FLOOR PENETRATIONS TO MAINTAIN

FIRE RATING.

CONTRACTOR SHALL FIELD VERIFY EXISTING TELECOMMUNICATIONS EQUIPMENT

TO BE DEMOLISHED PRIOR TO COMMENCING WORK.

NEW JSA/FDS CABINETS.

NEW CRAC UNITS, REFER TO MECHANICAL.

EQUIPMENT TO BE REMOVED AND RETURNED TO OWNER.

PROVIDE SENSAPHONE 9600 REMOTE MONITORING AND ALARM SYSTEM.

PROVIDE NEW SENSAPHONE EXPRESS II WITH EXPANSION MODULES FOR 40

POINTS. NEW SENSAPHONE EXPRESS II SHALL MONITOR: (1) MCR AMBIENT AIR

TEMPERATURE, (2) CRAC UNIT OPERATION, (3) CRAC SUPPLY AND RETURN AIR

TEMPERATURE, (4) MCR ROOM HUMIDITY, (5) MOISTURE SENSORS BELOW

RAISED FLOOR, AND (6)REDUNDANT UPS OPERATION. COORDINATE WITH NEW

AND EXISTING CONDITIONS.

EXISTING EQUIPMENT TO REMAIN IN PLACE TO ACT AS TEMPORARY SERVICE

UNTIL NEW COMPUTER ROOM IS COMPLETE. THESE ARE TO BE DECOMISIONED

ONCE PRIMARY SERVICE IS INSTALLED.

SCALE: 1/8" = 1'-0"F5

TELECOMMUNICATION PLAN - FIRST

LEVEL

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

SCALE: 1/8" = 1'-0"F2

TELECOMMUNICATION PLAN -

BASEMENT LEVEL

SCALE: 1/2" = 1'-0"D4

TELECOMMUNICATION PLAN -

BASEMENT LEVEL - ROOM 3 - DEMO

SCALE: 1/8" = 1'-0"D6

TELECOMMUNICATION PLAN -

SECOND LEVEL

SCALE: 1/2" = 1'-0"D2

TELECOMMUNICATION PLAN -

BASEMENT LEVEL - ROOM 3 - NEW

NOT TO SCALE

F9 BUILDING 25

Revisions: Date:

Entrance

59'

76'-7"

BD

Em er ge nc y De pt

SITE

PLAN

TEMPORARY ROUTE TO CLC & ENDO CLINIC

SMOKING SHR.

38'-113_4"

77'-21_2"

47'-6 3__16"

75'-10 1__16"

18'-815__16"

251'-23_4"

N44°15'49" W 1000.00'

1. FUEL LINES FROM TANKS TO BOILER PLANT 1' APART

ONE IS SUPPLY AND ONE IS RETURN UNSURE WHICH IS WHICH.

1. FUEL LINES FROM TANKS TO BOILER PLANT 1' APART ONE IS

SUPPLY AND ONE IS RETURN UNSURE WHICH IS WHICH.

18-AMA-1-NG-1

18-AMA-1-PW-1

18-AMA-4-NG-1

18-AMA-4-PW-1

18-AMA-28-NG-1

18-AMA-28-PW-1

18-AMA-MF-CW-1

18-AMA-28-CW-1

18-AMA-1-CW-1

18-AMA-28-ST-1

18-AMA-MF-ST-1

18-AMA-11-NG-1

18-AMA-33-NG-1

18-AMA-1-ST-1

18-AMA-1-CW-1

18-AMA-4-ST-1

18-AMA-29-CW-1

18-AMA-29-ST-1

18-AMA-29-33-PW-1

18-AMA-MF-BMU-1

18-AMA-MF-CMU-1

18-AMA-4-CW-1

PA

RK

IN

G

FO

R

VIS

ITA

TIO

N

9 Mental Health (Building 44) Back Entrance (employees) 0700 - 0800

10 Mental Health (Building 44) Bottom Entrance 0700 - 1630

7 & 8 Specialty Clinic (Building 46) Bottom and Top Entrances 0700 - 1630

5 & 6 Primary Care (Building 48) Bottom and Top Entrances 0700 - 1630

3 Medical Arts (Building 33) Entrance 0700 - 1630

1 Main Lobby Entrance (Building 28) Open 24/7

2 Physical Therapy (Building 1) North East Entrance 0630 -

4 Services (Building 4) North West Entrance 0630 - 1630

11 Museum (Building 1) East Entrance 0630 - 1630

12 CLC Entrance (Building 54) 0630 - 1630

BD Back Dock (Building 28) West Entrance 0630 - 1630

BASE - X

VA

BOUNDARY

VA

BOUNDARY

VA

BOUNDARY

VA

BOUNDARY

SMOKING SHR.

SMOKING SHELTER

NEW

CLC

REHAD &

PROSTHETICS

L E G E N D

Construction AreaRoute to

CLC& ENDO

ClinicParking for

CLC& ENDO

ClinicProposed Directional Signs

SP

OT

TE

R

FL

AG

GE

R

FL

AG

GE

R

IRRIGATED

AREA291,837

sf

6.70 acres

HISTORIC

HGFEDCBA

FIRE NODE

LEGEND

PANEL

LOC.

FRONT ENTRANCE BLDG. 29

EMERGENCE DEPT. BLDG. 28

IN HALLWAY BY PHYSICAL

MECH. ROOM FIRST FLOOR

MECH. ROOM FIRST FLOOR

NODE

NODE

NODE

NODE

NODE

NODE

BUILDINGS 11, 14, & 34

NODE

COLOR

THERAPY, BUILDING 1

BUILDING 44

BUILDING 46

= PANEL

LOCATION

NODE

16 FRONT ENTRANCE BLDG. 48

UNDERGROUND TUNNE

L

N

N 44°15'49" W 380.10'

N

°1 '2

E

.8

M O

RG

AN

S °1 7' W

.6 2'

P A R K

H

ER

E

18-AMA-MF-NG-1 18-AMA-MF-PW-1

18-AMA-MF-PW-2

18-AMA-MF-NG-2

SEE NOTE

1.

7'8"

1 _

GARAGE INTER

TRAPRALPH CABE SAW THIS

ANDREPORTED IT TO

BEACCURATE

11/19/08

X

FM

X

FM

R

X

FM

R

X F M R

XF

M R-

XF

M R-

XF

M R-

XF

M R- 4-

XF

M R- 4-

OIL FILLED TRANSFORMERS

UNDERGROUND

DIESEL FUEL

OIL

OUTSIDE BLDG

3,000

UNDERGROUND

PROPANE EMERG

BACK-UP

OUTSIDE BLDG

3 ABOVE

GROUND

DIESEL FUEL

OIL

OUTSIDE BLDG

16,000

4 ABOVE

GROUND

DIESEL 155

GENERATOR

OUTSIDE BLDG

5 ABOVE

GROUND

DIESEL 750

GENERATOR

OUTSIDE BLDG

1,000

6 ABOVE

GROUND

DIESEL 550

GENERATOR

OUTSIDE BLDG

7 ABOVE

GROUND

DIESEL VEHICLE

FUEL

OUTSIDE BLDG

8 ABOVE

GROUND

GAS VEHICLE

FUEL

OUTSIDE BLDG

FUEL

TANK

29 30

X6X5

X4

X3

X2 X1

2a

DATA LINES (FIBER

OPTICS)

WHITAKER

HUB

WHITAKER

HUB

WHITAKER

HUB

13170

12971

11980

18921

12011

78500

12601

13001

35629

12680

13905

S.W. 9TH AVENUE

U .S H

IG

H W A Y

H

ER

N D O N

E.

W

ALK

ER

N

ED

M

ANW

ED

M A N

W .W

A

LK

ER

S.

ED

M

AN

(A M A R

IL

LO

B

LV

D

BLDG

BLDG 33

BLDG

BLDG

BLDG

BLDG

BLDG

BLDG

BLDG

BLDG 49

BLDG

BLDG

BLDG

BLDG

BLDG

BLDG

BLDG

36 BLDG

BLDG

BLDG

BLDG

BLDG

BLDG

BLDG 13

S. EDMAN

HERNDON

E. WALKER

N. EDMAN

S.W. 9TH AVENUE

W . W

ALKER

W. E

DMAN

U.S . H

IG

HW

AY

(E) COMM

MANHOLE

EXISTING BUILDING

NEW FIBER IN EXISTING CONDUIT.

SERVICE PROVIDER A - AT&T

NEW FIBER IN NEW CONDUIT. SERVICE

PROVIDER B - CENTURY LINK

(E) COMM

MANHOLE

NEW HANDHOLE/PULL BOX

NEW PATH A AND B FIBER, OPPOSITE

SIDES OF TUNNEL OR IN NEW

SEPARATE CONDUIT

BLDG

BLDG

NEW MANHOLE

7 5

(E) COMM

MANHOLE

BLDG

MCR

PATH "B"

PATH "A"

(E) COMM

MANHOLE

EXISTING CONDUIT (FOR

REFERENCE ONLY)

SERVICE PROVIDER A -

SERVICE PROVIDER B -

NEW FIBER (24F OS2 TO EACH TR IN

EACH BUILDING) IN NEW CONDUIT -

"B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN

EACH BUILDING) IN NEW CONDUIT -

"A" ROUTE

NEW MCR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

KEYNOTES

TRIPLE C - The A/E Group 325 N. Saint Paul Street, Suite 3100 Dallas, TX 75201 Mat Perkins 469-330-9710

STAMP

Au to de sk

D oc s:

//5

-2

1-

EH

R M

In fra st ru ct ur e U pg ra de s at A m ar illo V

AM

C

/5

-2 1-

0.

EH

R

M .A m ar illo .S ite .rv t

-0 9-

3:

:0

TS100

TELECOMMUNICATIONS SITE PLAN 504-21-700

SITE

09/18/2023 M. Perkins K. Struble

ISSUED FOR

CONSTRCUTION

EHRM INFRASTRUCTURE

UPGRADES

6010 Amarillo Blvd. West, Amarillo, TX 79106

LEGEND

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

EXISTING FIBER FEED TO REMAIN.

INSTALL NEW FIBER - FEED THROUGH EXISTING CONDUIT.

INSTALL NEW FIBER AND CONDUIT OR CABLE TRAY.

NEW HANDHOLE/PULLBOX WITH LOCKING COVER, SEE DETAILS B1, C1 & F8,

SHEET T-501.

INSTALL NEW FIBER IN FOUR (4) 4" PVC CONDUIT - TRENCH AND REPLACE

EXISTING LANDSCAPE - MATCH EXISTING, SEE DETAIL E1, SHEET T-501.

DIRECTIONAL BORE AT SIDEWALK, CURB AND ASPHALT. PROVIDE FIBER OPTIC

CABLE PER SHEETS T-601.

INSTALL NEW FIBER IN THE EXISTING STEAM TUNNEL.

INCOMING WAN FROM CENTURY LINK.

INCOMING WAN FROM AT&T.

NEW MANHOLE, SEE DETAIL E4, SHEET T-501

INSTALL NEW LOCKING HANDHOLE COVER PER DETAIL F8, SHEET T-501

OEHRM OUTSIDE PLANT (OSP) FIBER SPECIFICATIONS

1" = 60'-0"F1 TELECOMMUNICATIONS - SITE PLAN

Revisions: Date:

2'-

0"

262'-0"

Appendix A: Request for Variance

RequestDate: 10/24/2023
GovPOC: Logan Dunn
OrgRepresented: Amarillo, TX VA Medical Center (V17, Station 504)
Email: logan.dunn@va.gov
Phone: 806-355-9703 x4516
SiteInfo: Amarillo, TX VA Medical Center (V17, Station 504), Building 7,

OI&T (Administrative)

VarianceRequested: Variance to serve Building 07/First Level WAO from the second level Telecommunications Room #208 and omit a new TR on first level.
StandardsInfo: Sheet 5, Detail 1, Telecommunication Room Notes, (OIT) Infrastructure Standard for Telecommunications Spaces, version 3.1.
StandardsText: "THERE SHALL BE A MINIMUM OF ONE TELECOMMUNICATIONS ROOM (TR) PER FLOOR."
ProblemStatement: Building 07 design decommissions and renovates an existing Computer Room #208 to serve as the TR for the first and second levels. The existing computer room now serves at the Main Computer Room. This project is providing a new MCR Building 06. The existing MCR will be decommissioned and configured to act as the second level TR. VA/AE investigated all options for serving the first level and provided multiple options for First Level TR locations. Adding a TR to first level was deemed too disruptive to existing structure due to the

age and architectural layout of the building. There is no existing first level TR space. B07/first level has (43) WAO total. This minimal load will be served by an adequately size TR on the second level (i.e., converted MCR).

EnterDetail: D6/07T-101, F2/07T-101 & F5/07T-102. See attached.
ProposedMethod: Since no other space allocation was approved, and providing a new addition was not viable based on cost and complexity and the low WAO count. VA decided to apply for a variance on this level and use the large existing space that is currently serving as the Main Computer Room, #208. Room #208 will be re-purposed to act as a TR for the First and Second levels.
PlanCompliance: Variance requested to retain design to route all First Level cables to new second level TR #208.
Timeline: