36C77624R0084 0010.docx

DOCX document 120 KB Posted

Attached to
Z2DA--EHRM Construction Amarillo-Project 504-21-700 Federal contract opportunity
Solicitation number
36C77624R0084
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is an Amendment (SF 30) to Solicitation 36C77624R0084 for the VA's Electronic Health Record Modernization (EHRM) construction project in Amarillo. The amendment extends the proposal submission deadline to March 21, 2025, at 1 PM EDT and includes Addendum 3 for clarification of telecommunication data device and circuit schedules.

The underlying solicitation involves comprehensive infrastructure upgrades across multiple campus buildings, including electrical panel upgrades, power systems, building management system interfaces, HVAC improvements, communication infrastructure enhancements, and physical security upgrades. The project scope covers 24 building locations and involves replacing the main computer room, upgrading telecommunications closets, and campus fiber and data cable infrastructure. The total period of performance is 548 calendar days from the Notice to Proceed, with updated pricing documents and amendment acknowledgments to be submitted via email to specified VA contracting personnel.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--EHRM Construction Amarillo-Project 504-21-700, newest first.
File Type Posted
36C77624R0084 0014.docx DOCX document
36C77624R0084 0013.docx DOCX document
PPQ - Amarillo.docx DOCX document
Att 28 - 504-21-700.EHRM.Amarillo.Add4.20250401.pdf PDF
Att 22 - 00 41 13.10 - Construction Estimate Breakdown Template.xlsx XLSX spreadsheet
RFP 36C77624R0084 3-28-2025.docx DOCX document
Att 1 Construction SOW Revised 504-21-700 - 3-27-25.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
36C77624R0084 0006 SF 30.docx DOCX document
36C77624R0084 0012.docx DOCX document
0011 - DBA Wage Rates - Potter County - 3-14-25.pdf PDF
36C77624R0084 0011.pdf PDF
Att 27- 504-21-700 EHRM Amarillo Add3 20250306.pdf PDF
36C77624R0084 0009.docx DOCX document
36C77624R0084 0008.docx DOCX document
Att 26-504-21-700 EHRM Amarillo.ADD 2-13-25.pdf PDF
36C77624R0084 0007.docx DOCX document
Att 20-Updated Wage Determ 1-3-25 Potter County TX.pdf PDF
Att 23-S05-Vendor Questions and RFIs Rspns Final.xlsx XLSX spreadsheet
Att 25- Amendment 0006-updated RFP 36C77624R0084.docx DOCX document
Att 24-504-21-700 EHRM Amarillo.ADD-1.20250128.pdf PDF
Prebid Site Visit Sign-in 1-6-25 n 1-17-25 combined.pdf PDF
36C77624R0084 0005.docx DOCX document
36C77624R0084 0004.docx DOCX document
36C77624R0084 0003.docx DOCX document
36C77624R0084 0002.docx DOCX document
36C77624R0084 0001.docx DOCX document
36C77624R0084_1 tradeoffs Final.pdf PDF
Att 5-504-23-053 EHRM PCRA.pdf PDF
Att 10-EHRM Ama IFC Bld8.zip ZIP file
Att 11-EHRM Ama IFC Bld7 Bld9.zip ZIP file
Att 13-EHRM Ama IFC Bld26 Bld28 Bld29.zip ZIP file
Att 20-WD-Amarillo verified 12-17-24.pdf PDF
Att 1 Construction SOW Prj 504-21-700 11.13.24.pdf PDF
Att 3-ICRA DRAFT EHRM 12 14 2023 LEVEL 4.pdf PDF
Att 6- OIT-InfrastrucStdTelecomSpaces-AppxA B07.pdf PDF
Att 9-EHRM Ama IFC Bld1 Bld4.zip ZIP file
Att 19-Asbestos Insp Rpt.zip ZIP file
Att 22-Division Cost Breakdown.xlsx XLSX spreadsheet
Att 2-Limitations on Subcont - Constr.pdf PDF
Att 4-EHRM Prj Stnd Compl Memo.pdf PDF
Att 7-Amarillo_EHRM.SPEC.part 1.zip ZIP file
Att 14-EHRM Ama IFC Bld33 Bld34 Bld35 Bld36.zip ZIP file
Att 17-EHRM Ama IFC Bld54.zip ZIP file
Att 8-Amarillo_EHRM.SPEC.part 2.zip ZIP file
Att 12-EHRM Ama IFC Bld10 Bld11 Bld12 Bld14.zip ZIP file
Att 15-EHRM Ama IFC Bld44 Bld45 Bld46.zip ZIP file
Att 16-EHRM Ama IFC Bld48 Bld49 Bld53.zip ZIP file
Att 18-EHRM Ama IFC SITE.20241022.zip ZIP file
Att 21-PPQ.docx DOCX document
Show all 50

Z2DA--EHRM Construction Amarillo-Project 504-21-700 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

03-12-2025

504-21-700 36C776 Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776 Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77624R0084 12-18-2024

X

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-21-2025 1PM EDT

1 (ONE)

This Amendment is to extend the updated proposals due date and to post addendum 3-clarification of cable schedules.

Please see next page for details!

Richelle Gray Contracting Officer

This Amendment is to:

1. Post Addendum 3 to clarify telecom data device/circuit schedules. (clarification, with no changes) See: Att 27- 504-21-700.EHRM.Amarillo.Add3.20250306

1. Extend the Due date of proposals to 3/21/2024 and reiterate:

1. All offers must follow all the submission instructions as included in the original solicitation as amended.

1. Acknowledgement of this and ALL Amendments is required. Updated Pricing documents or the statement that there is no updated pricing, along with acknowledgement of the amendment are due 3/21/25 at 1pm EST, by email to Heather.Holland3@va.gov & Thomas.Kracinovich@va.gov.

A. CLOSING STATEMENT:

The changes represented in this amendment constitute a change to the solicitation.

Changes to the solicitation are limited to the terms expressed herein.

All other terms and conditions of the solicitation remain the same.

End of Document

File details come from the government source that posted it. Updated .