36C77624R0084 0012.docx
DOCX document 120 KB Posted
- Attached to
- Z2DA--EHRM Construction Amarillo-Project 504-21-700 Federal contract opportunity
- Solicitation number
- 36C77624R0084
About this file
This document is a Standard Form 30 (SF 30) Amendment to Solicitation 36C77624R0084 for an Electronic Health Record Modernization (EHRM) construction project at the Amarillo VA Medical Center. The amendment addresses multiple updates, including corrections to the project number, providing the SF 30 for amendment 0006, and updating the solicitation with revised attachments such as the Construction Statement of Work, Limitations on Subcontracting, and Performance Potential Questionnaire.
The project involves comprehensive infrastructure improvements across multiple campus buildings, including electrical upgrades, telecommunications infrastructure enhancements, HVAC reconfiguration, physical security upgrades, and hazardous material abatement. The construction scope covers 24 building locations and associated site work, with a total performance period of 548 calendar days from the Notice to Proceed. The solicitation is issued by the Department of Veterans Affairs Program Contracting Activity Central, with the project focused on modernizing the electronic health record system and supporting infrastructure at the Amarillo VA facility.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--EHRM Construction Amarillo-Project 504-21-700 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
03-28-2025
504-21-700 36C776 Kara Evert Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C776
Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders
36C77624R0084 12-18-2024
X
ONE
The purpose of this amendment is to:
1) Correct the project number in the Contract Opportunities posting
2) Provide the SF 30 for amendment 0006 for offerors' use to acknowledge receipt and acceptance that was not previously provided
3) Provide a revised solicitation that replaces the previous updated solicitation in its entirety from amendment 0006
4) Provide three updated solicitation attachments See page 2 for more details.
Richelle Gray Contracting Officer
VA-VHA-RPOC-2023-0041
With this amendment to the solicitation, the following updates are being implemented:
1) The revised RFP includes changes to the SF 1442, price schedule, instructions to offerors (evaluation criteria), clauses and provisions.
2) The following RFP attachments have been updated or corrected:
· Att 1 Construction SOW Revised 504-21-700 - 3-27-25 replaces Att 1 Construction SOW Prj 504-21-700 11.13.24
· Limitations on Subcontracting - Construction replaces Att 2-Limitations on Subcont – Constr
· PPQ - Amarillo replaces Att 21-PPQ
See attached document: 36C77624R0084 0006 SF 30.
See attached document: Att 1 Construction SOW Revised 504-21-700 - 3-27-25.
See attached document: Limitations on Subcontracting - Construction.
See attached document: PPQ - Amarillo.
End of Document