Appendix O - Historical 3-yr Record of Non-Gap Service Calls - 20191204.xlsx

XLSX spreadsheet 13 MB Posted

Attached to
Amendment 0003 for the Global Sustainment of Anti-Terrorism Force Protection (AT/FP) Systems and Assets, Worldwide.
Solicitation number
N3943020R2245
Issued by

About this file

This draft request for proposal solicits feedback on a planned single-award indefinite delivery indefinite quantity contract for the global sustainment of anti-terrorism force protection systems and assets worldwide. The Naval Facilities Engineering and Expeditionary Warfare Center intends to issue an eight-year IDIQ contract with a maximum capacity of $600 million, including a base ordering period of five years and an optional ordering period of three years. A large initial task order would provide sustainment for existing systems and over 81,000 assets over seven option years. Separate task orders issued could include technological refreshment, upgrades, repairs from third-party damage or acts of God, and approved engineering changes. Potential offerors are advised the acquisition strategy requires approval and the draft RFP has not completed review. Industry feedback is requested by March 31st on the draft RFP and attachments, excluding Attachment I which contains Distribution Statement D restrictions. Depending on the COVID-19 situation, Navy may schedule an industry day or written responses.

View the file

Other files

File Type Posted
N3943020R22450003.pdf PDF
N3943020R22450002.pdf PDF
Attachment 2 Pricing Schedule 20200921.xlsx XLSX spreadsheet
Attachment 2 Pricing Schedule 20200916.xlsx XLSX spreadsheet
Attachment 6 - Safety Factor 20200909.doc DOC document
Attachment 2 - Pricing 20200909.xlsx XLSX spreadsheet
Remedy Incident Guide.pdf PDF
Attachment 9 - Sustainment Task Order PWS 20200909.docx DOCX document
AIM User Guide.pdf PDF
Remedy CDRL Submission Guide.pdf PDF
LENEL Dongles list June 2020.xlsx XLSX spreadsheet
Attachment 5 - Subcontracting Plan Template 20200910.doc DOC document
N3943020R22450001.pdf PDF
N3943020R2245.pdf PDF
Appendix A - Acronym List.pdf PDF
Attachment 9 Sustainment Task Order PWS 20200730.docx DOCX document
Draft RFP RFIs 20200820.pdf PDF
Attachment 7 - Wage Determinations 20200819.pdf PDF
Appendix B Contractor User Guide for Remedy AIM 20200709 Final.docx DOCX document
Attachment 4 - SB Participation and Commitment Strategy 20200812.docx DOCX document
Attachment 2 - ELIN Price Schedule 20200812.xlsx XLSX spreadsheet
PreProposal Conference Materials.pdf PDF
PreProposal Conf Invitiations.pdf PDF
Pre-Proposal Conference RFIs.pdf PDF
N3943020R2245 Draft 7 Aug 2020.pdf PDF
Attachment 2 20200612.xlsx XLSX spreadsheet
APP-M Subcomponent Detail for Systems to be Sustained - 20200713 Final.xlsx XLSX spreadsheet
Appendix B Contractor User Guide for Remedy AIM 20200709 Final.pdf PDF
N3943020R2245 Draft 17Jul2020.pdf PDF
Appendix D3 Tech Refresh 20200714 Final.pdf PDF
APP-C List of Systems to be Sustained - 20200709 Final.xlsx XLSX spreadsheet
Appendix D1 Sustainment 20200714.pdf PDF
Attachment 9 Sustainment Task Order PWS 20200715 Final.docx DOCX document
Appendix D2 New Install 20200714 Final.pdf PDF
20200429 RFP Questions.pdf PDF
N3943020R2245 Draft Rev2.pdf PDF
N3943020R2245 Draft Rev1.pdf PDF
Appendix K - GSC DD254 Draft 20191206.pdf PDF
Appendix G CDRL Review Process BMT Approved 12Jan16.pdf PDF
Attachment 4 - SB Participation and Commitment Strategy.docx DOCX document
Attachment 5 - Subcontracting Plan Template.doc DOC document
Appendix N - Historical 3-yr Asset Failure Data - 20191204.xlsx XLSX spreadsheet
Appendix Q - Historical FRU Costs.xlsx XLSX spreadsheet
Attachment 2 - ELIN Price Schedule - 20200306.xlsx XLSX spreadsheet
Attachment 9 - Sustainment Task Order PWS.docx DOCX document
Attachment 6 - Safety Factor.doc DOC document
Appendix M - Subcomponent Detail for Systems to be Sustained - 20191203.xlsx XLSX spreadsheet
Attachment 1 - PPQ.docx DOCX document
Appendix F - CDRL A033 Asset Data Template v2.2.xlsx XLSX spreadsheet
Attachment 8 - RFI Form.doc DOC document
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Year Non-Gap Service Calls

Incident ID (NFAC)StatusDays OpenUnique Remedy IDPrincipal CategoryFamily of SystemsProject RegionBase (Site)Unique IdentifierProject NameSummaryDescriptionLast UpdateDate UpdatedWork Info TypeEstimated Start DateEstimated Resolution DateAssigned GroupContractor Assignment DateAssociated ContractImpactUrgencyPrioritySystem Down?Create DateSubmit DateWaiver OpenApproved Waiver Time (hrs)Operational Categorization Tier 1Operational Categorization Tier 2Operational Categorization Tier 3PM Task IDProduct Categorization Tier 1Product Categorization Tier 2Product Categorization Tier 3Last Resolved DateTotal Time to Repair (TTR) (Days)Resolution Categorization Tier 1Resolution Categorization Tier 2Resolution Categorization Tier 3Resolution Product Categorization Tier 1Resolution Product Categorization Tier 2Resolution Product Categorization Tier 3Repair Replace FormPass/FailPMI ReportPass/FailCustomer Sign Off SheetPass/FailResolution
NFAC00000108985Closed11253PSACACP-VGCNREURAFCENTNAS SigonellaNAS II Main GatePSAC.ACP-VG.CNREURAFCENT.NAS Sigonella.NAS II Main GateNAS II POPUP BOLLARD, The lids on the out bound bollards are looseNAS II POPUP BOLLARD, The lids on the out bound bollards are loosetechs have resolved the issue with nas 2 baller lid REPLACED BROKEN BOLTS , TESTED FOR OPERATION ALL IS BACK TO WORKING ORDER12/6/16 2:27General Information12/6/16 2:30Serco GSC12/5/16 1:09N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 1:0912/5/16 1:09NoHardwareBiometrics & Access ControlBollard12/6/16 2:271.05HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A738733;701354;CSO SHEET NAS 2 BOLLAR LID ( CM )5.pdfPasstechs have resolved the issue with nas 2 baller lid REPLACED BROKEN BOLTS , TESTED FOR OPERATION ALL IS BACK TO WORKING ORDER
NFAC00000108988Closed322041PSACACP-AVG-LCNRSENAS PensacolaWest GatePSAC.ACP-AVG-L.CNRSE.NAS Pensacola.West Gate**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.West Gate***PM***December 2016***PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.West GateWe completed a PM of the West gate NAS Pensacola, we lubricates all points and tested as per manufacturer specifications. The system is working properly No Further Issues. Resolving This Ticket.1/6/17 16:37General Information1/3/17 9:001/3/17 9:00Serco GSC1/3/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 3:0312/5/16 3:03No2435HardwarePreventive MaintenancePreventive Maintenance1/6/17 16:373.32HardwareTech AssistNo Fault FoundHardwarePreventive MaintenancePreventive Maintenance731098;700328;NFAC00000108988.pdfPassN/A***PM***December 2016***PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.West GateWe completed a PM of the West gate NAS Pensacola, we lubricates all points and tested as per manufacturer specifications. The system is working properly No Further Issues. Resolving This Ticket.
NFAC00000108989Closed72248PSACACP-AVG-LCNRSENAS PensacolaCorry Station Gate 7PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.Corry Station Gate 7**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.Corry Station Gate 7PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.Corry Station Gate 7. We Performed a PM on the AVG system at Corey Station. We lubricated and adjusted the gate system as per specifications. we tested all functions of the gate and verified proper operation.12/12/16 15:49General Information1/3/17 9:001/3/17 9:00Serco GSC1/3/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 3:0312/5/16 3:03No2443HardwarePreventive MaintenancePreventive Maintenance12/12/16 15:49-21.72HardwareTech AssistNo Fault FoundHardwarePreventive MaintenancePreventive Maintenance723883;698252;NFAC00000108989.pdfPassN/APSAC.ACP-AVG-L.CNRSE.NAS Pensacola.Corry Station Gate 7. We Performed a PM on the AVG system at Corey Station. We lubricated and adjusted the gate system as per specifications. we tested all functions of the gate and verified proper operation.
NFAC00000108990Closed641848PSACACP-VGCNRSWNAVBASE San DiegoGate 29PSAC.ACP-VG.CNRSW.NAVBASE San Diego.Gate 29**PM** Quarterly** January 2017*****PM***December 2016***PSAC.ACP-AVG-L.CNRSW.NAVBASE San Diego.Gate 29PM completed. No issues noted. Checklist to follow.2/7/17 16:21General Information1/3/17 9:001/4/17 9:00Serco GSC1/3/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 3:0312/5/16 3:03No2864HardwarePreventive MaintenancePreventive Maintenance2/7/17 16:2135.31HardwareTech AssistPMHardwarePreventive MaintenancePreventive MaintenanceFailN/APM completed with no issues noted. Checklist to follow.
NFAC00000108991Closed291040PSACACP-VGNDWNAS Patuxent RiverWebster Field Main GatePSAC.ACP-VG.NDW.NAS Patuxent River.Webster Field Main Gate**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-H.NDW.NAS Patuxent River.Webster Field Main GateUploading CSO1/9/17 7:21General Information1/3/17 9:001/4/17 9:00Serco GSC1/3/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 3:0312/5/16 3:03No2944HardwarePreventive MaintenancePreventive Maintenance1/3/17 10:310.06HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance692432;655338;CSO### 108991 Webster Field Main Gate Unique ID#1040 1203.pdfPassN/ATech arrived on site at Webster Field Main gate . to perform a scheduled Preventive Maintenance Unique ID# 1040 The inbound and outbound POP-UP Barriers were inspected and tested.

Inspection of the basic mechanical systems. Checked Hydraulic fluid level . Checked hydraulic pressure units for indications of oil leaks around hydraulic cylinders, hydraulic pump and hydraulic hose fittings. Inspected hydraulic hoses for abnormal wear. Checked for obvious signs of physical damage. Charger Tek RTIC-1120 battery charger (charging) ,Battery was at (13.2 vdc), Piston Accumulator (no leaks), Hydrologic Fluid Container (full), pressure gage was reading (1800lb) Manual Controller Enclosure, Console Enclosure, Stop Light In/out-Bound Lanes were inspected for obvious signs of physical damage, barrier pits were clean with no obstruction at the trains. An operational check UP/DOWN was conducted at the barrier controller and the guard house controller with Police Officer Hogan, resulting in the barrier being fully operational. Ensured that the correct light came on,(RED) was on when the barrier were up and (Yellow)came on when the barriers were in the down position. Noted any deficiencies for follow up corrective maintenance. PM was inspected by Chris Quijada a Performance Assessment Rep. for Pax. River.

A preventative maintenance could not be performed on the gate arms because the equipment Loop detectors have been damaged by Grounds maintenance and/or asphalt resurfacing near Gate arms. Customer has been notified.12/5/16 16:1313.1713.17
NFAC00000108992Closed82268C4IMNS-GV/IVCNREURAFCENTNAS SigonellaNAS IIC4I.MNS-GV/IV.CNREURAFCENT.NAS Sigonella.NAS IIMass-Notification Speakers in Barracks
#623/NAS-2 is on the "fritz"We received a report that the Mass-Notification Speakers in Barracks

#623/NAS-2 is on the "fritz". According to people who work over there, it is in need of repair or replacement. The sound is very-low to no sound at

all. Please let us know if it is fixed and complete. Thank you!Updated Resolution Categorization to include Third Party Damage7/28/17 14:22Incident Task / Action12/14/16 15:00Serco GSC12/5/16 4:15N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 4:1512/5/16 4:15No2.28HardwareTech AssistThird Party DamageHardwareAV EquipmentSpeaker12/13/16 5:467.97HardwareTech AssistThird Party DamageHardwareAV EquipmentAV EquipmentN/A732414;699300;BLD 623 GV CSO SHEET (cm ).pdfPasstechs have resolved issue with bld 623 gv . GV system is running thru the bld sound system ( PA ) The PA system does not fall under the ATFP Global sustainment . Techs have informed the E.M.O. of this problem and she will be in contact with the people responsible of the PA system12/6/16 13:4333.4733.47
NFAC00000108994Closed02467PSACACP-VGCNRSENS MayportSeminole GatePSAC.ACP-VG.CNRSE.NS Mayport.Seminole GateSeminole Gate will not open, NS MayportCustomer called and stated Seminole Gate will not open, NS MayportUploaded customer sign off form12/5/16 14:45General InformationSerco GSC12/5/16 4:28N39430-16-C-18111-Critical1-CriticalCriticalYes12/5/16 4:2812/5/16 4:28NoHardwareBiometrics & Access ControlGate12/5/16 8:350.17HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A686979;653875;NFAC108994 MP Seminole Gate 5 DEC 16.pdfPassFound blown fuse to the pump motor. Replaced fuse with a spare. Tested gate for proper operation with Sgt. Rahim present. All tests SAT12/5/16 5:401.21.2
NFAC00000108993Closed0239PSACACP-AVG-HCNRMANS NewportGate 17PSAC.ACP-AVG-H.CNRMA.NS Newport.Gate 17Drop Arm AVG Gate 17Controller for drop arm meltedThe Drop arm controller has gone bad. A new one has been installed and the barrier tested. The gate is working correctly now.12/5/16 10:34General Information12/3/16 1:00Serco GSC12/5/16 5:33N39430-16-C-18112-High2-HighHighNo12/5/16 5:3312/5/16 5:33NoHardwareBiometrics & Access ControlDrop Arm12/5/16 10:340.21HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A284248;221333;NFAC00000108993.pdfPassThe Drop arm controller has gone bad. A new one has been installed and the barrier tested. The gate is working correctly now.12/5/16 10:204.794.79
NFAC00000109014Closed21025PSACACP-AVG-LCNRMANSA MechanicsburgSouth GatePSAC.ACP-AVG-L.CNRMA.NSA Mechanicsburg.South GateSouth Gate at NSA Mechanicsburg is never used, but over the weekend the gate opened on it's ownCustomer called and stated the South Gate at NSA Mechanicsburg is never used, but over the weekend the gate opened on it's own, request to have it looked at as the motor seems to be running on it's own.Mark did more research and found that the AC power was off and the DC power was still on. The battery discharged to the point that the barrier opened because the battery voltage dropped so low. There will be an SOP put out that will cover the procedure od how to leave a gate that is not going to be used for an extended period of time to alleviate this problem in the future.12/7/16 14:07General Information12/5/16 1:0012/9/16 1:00Serco GSC12/5/16 6:12N39430-16-C-18112-High2-HighHighNo12/5/16 6:1212/5/16 6:12NoHardwareBiometrics & Access ControlGate12/7/16 14:072.33HardwareTech AssistTrainingHardwareBiometrics & Access ControlBiometrics & Access ControlN/A97299;92727;109014.pdfPassMark did more research and found that the AC power was off and the DC power was still on. The battery discharged to the point that the barrier opened because the battery voltage dropped so low. There will be an SOP put out that will cover the procedure od how to leave a gate that is not going to be used for an extended period of time to alleviate this problem in the future.12/5/16 10:484.64.6
NFAC00000109036Closed12047PSACACP-AVG-LCNRSENAS Corpus ChristiNorth Back GatePSAC.ACP-AVG-L.CNRSE.NAS Corpus Christi.North Back GateThe yellow caution lights are on constantly vice blinking as normal.The yellow caution lights are on constantly vice blinking as normal.The tech tested the system and then switched from AUTO to manual and then to maintenance and then back to AUTO and could not duplicate the Yellow light constantly on. Upon arrival and in every mode the yellow light was flashing when it was supposed to. This fault could not be duplicated.12/6/16 9:57General Information12/5/16 1:0012/7/16 1:00Serco GSC12/5/16 6:49N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 6:4912/5/16 6:49NoHardwareBiometrics & Access ControlGate12/6/16 9:571.13HardwareTech AssistNo Fault FoundHardwareBiometrics & Access ControlBiometrics & Access ControlN/A723884;698119;NFAC00000109036.pdfPassThe tech tested the system and then switched from AUTO to manual and then to maintenance and then back to AUTO and could not duplicate the Yellow light constantly on. Upon arrival and in every mode the yellow light was flashing when it was supposed to. This fault could not be duplicated.12/5/16 9:452.932.93
NFAC00000109046Closed0239PSACACP-AVG-HCNRMANS NewportGate 17PSAC.ACP-AVG-H.CNRMA.NS Newport.Gate 17Hydraulic hose brokenHydraulic hose broken on in bound barrierThe tech found 2 bad Hydraulic hoses. The hoses were replaced and the barrier tested. The barrier is working correctly now.12/5/16 11:22General Information12/5/16 1:00Serco GSC12/5/16 6:56N39430-16-C-18112-High2-HighHighNo12/5/16 6:5612/5/16 6:56NoHardwareBiometrics & Access ControlHydraulics12/5/16 11:220.18HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A827262;650990;CSO 109046.pdfPassThe tech found 2 bad Hydraulic hoses. The hoses were replaced and the barrier tested. The barrier is working correctly now.12/5/16 10:513.923.92
NFAC00000109049Closed02325PSACACP-VGCNRHJB Pearl Harbor - HickamNimitz GatePSAC.ACP-VG.CNRH.JB Pearl Harbor - Hickam.Nimitz GateCustomer called and stated that the Barrier at the NITMIZ Gate lane 4 will on go up in the emergencyCustomer called and stated that the Barrier at the NITMIZ Gate lane 4 will on go up in the emergency mode.Tech arrived to troubleshoot. Barriers tested SAT. No fault found.12/5/16 14:31General InformationSerco GSC12/5/16 7:12N39430-16-C-18112-High2-HighHighNo12/5/16 7:1212/5/16 7:12NoHardwareBiometrics & Access ControlBarrier12/5/16 14:310.3HardwareTech AssistNo Fault FoundHardwareBiometrics & Access ControlBiometrics & Access ControlN/A724166;698438;ATFP_CSO_109049.pdfPassBarriers tested SAT. No fault found.12/5/16 14:297.297.29
NFAC00000109041Closed01022PSACACP-AVG-LCNRSENAS JRB New OrleansBack GatePSAC.ACP-AVG-L.CNRSE.NAS JRB New Orleans.Back GateSentry interface All Stop Fault will not clearAVG - Rejection loop in alarm Sentry interface All Stop Fault will not clear.Maintenance completed Issue Resolved12/5/16 9:07General Information12/5/16 23:00Serco GSC12/5/16 8:28N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 8:2812/5/16 8:28NoHardwareBiometrics & Access ControlGate12/5/16 9:070.03HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A686199;651899;NFAC00000109041.pdfPassTroubleshot the report problem of AVG Sentry interface for Rejection loop in alarm Sentry interface All Stop Fault will not clear. Found the problem to be whenever the gate was placed in auto the all stop fault would appear and not clear also the rejection loop would appear and not clear. Found the problem to be the rejection loop was tripped and would not reset. Resolved this issue by rewiring the rejection and turn around loops wiring connection had broken. Also placed a new loop connection on the loop detector. Reset the PLC on the interface. Restore all comms and reset all faults and cleared them. Perform a test of the entire system to verify operational status in all modes. Restored the system to normal operations no other problems found. Problem Resolved Informed the Physical Security Officer of the Issue's and resolution for the issues. No further problems found. No further action required. Resolving this issue.12/5/16 8:340.110.11
NFAC00000109056Closed2126C4IOPC-EOCCNRSENCBC GulfportC4I.OPC-EOC.CNRSE.NCBC GulfportVTC needs audio output adjustedOPC-EOC- VTC has needs to test audio level.Maintenance completed Issue Resolved12/7/16 22:57General InformationSerco GSC12/5/16 8:44N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 8:4412/5/16 8:44NoHardwareBiometrics & Access ControlControl Panel12/7/16 22:572.59HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A802969;688233;NFAC00000109056.pdfPassTroubleshot the report problem of the VTC located in the EOC not responding too commands of Audio not working. Found the problem to be the amplifier for the VTC. Able to control the VTC and monitors with the controllers. Resolving this issue the system and AMX controller network at the workstation are working. Powered the amplifier up to test the audio. Perform a test of the system in all modes. Restored the system to normal operations no other problems found. Problem Resolved Informed the Physical Security Officer of the Issue's and resolution for the issues. No further problems found. No further action required. Resolving this issue.12/5/16 9:080.410.41
NFAC00000109067Closed01231C4IMNS-GV/IVCNRSENSA Mid SouthC4I.MNS-GV/IV.CNRSE.NSA Mid SouthCustomer called and reported GV is showing a fault on site 2 on commanderCustomer called and reported GV is showing a fault on site 2 on commanderCSO Attached12/7/16 11:20General Information12/4/16 23:0012/4/16 23:00Serco GSC12/5/16 9:23N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 9:2312/5/16 9:23NoHardwareAV EquipmentSpeaker12/5/16 10:320.05HardwareTech AssistRepairHardwareAV EquipmentAV EquipmentN/A730511;698383;NFAC 109067.pdfPassUpon arrival observed that the fault on Commander was an AC power and charger. Went to the site and confirmed that there was no 120v AC power going to the site. Customer called the base power contractor and had them restore 120v AC power to the site. I then tested the site and it restored the
site back to no faults resolving the issue.12/5/16 10:291.11.1
NFAC00000109072Closed11037PSACACP-AVG-LNDWNAS Patuxent RiverWebster Field Back GatePSAC.ACP-AVG-L.NDW.NAS Patuxent River.Webster Field Back GateThere are two faults:

1. Lane 2 gate failed to secure.

2. Lane 3 gate failed to secure. There are two faults:

1. Lane 2 gate failed to secure.

2. Lane 3 gate failed to secure.

Main control panel for both: (ATFP: 0000168100)Customer Sign-Off form or PMI checklist summited.7/13/17 4:57General Information12/5/16 1:0012/7/16 1:00Serco GSC12/5/16 10:55N39430-16-C-18112-High2-HighHighNo12/5/16 10:5512/5/16 10:55NoHardwareBiometrics & Access ControlGate12/6/16 16:101.22HardwareTech AssistNo Fault FoundHardwareBiometrics & Access ControlBiometrics & Access ControlN/A706995;679280;ATFP CSO NFAC00000109072.pdfPassTech arrived onsite at the back gate of Webster Field at 8:00 am. The Gate was in Auto mode working as designed. Tech ask the officer at the gate how has the gate been running today? He said it’s been running good with no issues. Tech checked the alarm history at the console for Faults on Monday that could have caused the reported issue. Lane 2 VTG gate failed to secure.10:15 Lane 3 VTG gate failed to secure.10:35.Tech checked at the VMAG enclosure using the hand held P1 PROGRAMER and there were no fault/error logged there Monday 12-5. Tech using the hand held P1 PROGRAMER individually relearned the inbound and outbound AVG gates. Tech was there for 4 hours with Chris Byrd watching 50+ cars use the out bound lane and 40+ cars use the inbound lane, we did not receive any new faults during this time. The gate is working as designed. Tech will continue to monitor the gate for any new faults.12/5/16 12:161.361.36
NFAC00000109076Closed11348PSACACP-VGCNRMAJEB Little Creek - Fort StoryGate 5PSAC.ACP-VG.CNRMA.JEB Little Creek - Fort Story.Gate 5Customer called and stated that the limit switch HCAS Lane 1 Gate 5 is not functionally properly.Customer called and stated that the limit switch HCAS Lane 1 Gate 5 is not functionally properly.CSO upload12/6/16 15:47General InformationSerco GSC12/5/16 11:42N39430-16-C-18112-High2-HighHighNo12/5/16 11:4212/5/16 11:42No7HardwareBiometrics & Access ControlSwitch12/6/16 8:450.59HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A12984;12465;NFAC109076 LC gate 5 limit switch.pdfPassTechs were onsite and discovered failed limit switch. Limit switch was removed and new was installed, tested. HACS unit is back in full operation. Limit switch/lighting is correct.12/5/16 12:250.710.71
NFAC00000109078Closed392444PSACACP-VGCNRMANS NewportGate 23 NUWCPSAC.ACP-VG.CNRMA.NS Newport.Gate 23 NUWCNOT AVG BARRIER> Traffic Light on HVB at Gate 23Traffic Light on HVB at Gate 23.

Not an AVG barrier Red light is intermittently coming on and off. CSO Form uploaded 1/24/17 7:52 General Information 12/6/16 1:00 1/13/17 15:00 Serco GSC 12/5/16 12:33 N39430-16-C-1811 3-Routine 3-Routine Routine No 12/5/16 12:33 12/5/16 12:33 No 435.87 Hardware Biometrics & Access Control Gate 1/13/17 9:52 20.73 Hardware Tech Assist Repair Hardware Biometrics & Access Control Biometrics & Access Control N/A 867675;694559;CSO 109078.pdf Pass Techs were onsite again this week with onsite tech assist from LPS and found a crushed upper limit switch splice which caused the hold down solenoid to release. Techs repaired and relocated the splice out bound signal and barrier systems now appear to be operating properly. Will wait till the morning to see if the issue has returned. If not will resolve this issue.

Tech returned this morning and confirmed issue has been resolved. Resolving ticket, CSO to follow.12/6/16 11:5223.3223.32
NFAC00000109083Closed02321PSACACP-VGCNRHJB Pearl Harbor - HickamMakalapa GatePSAC.ACP-VG.CNRH.JB Pearl Harbor - Hickam.Makalapa GateBarrier 3 leaking oilThe barrier (#3 inbound) is leaking oil (about a gallon) and the oil is leaking down the road and have had to shut down the lane.Techs arrived to troubleshoot. Techs found oil and water in the barrier cavity. Guards had used an absorbent to cover the oil on the ground. Tech cleaned the barrier cavity and the absorbent. Techs tested multiple times and could not see any signs of leaking. Techs will continue to monitor. Problem resolved.12/5/16 23:41General InformationSerco GSC12/5/16 14:04N39430-16-C-18112-High2-HighHighNo12/5/16 14:0412/5/16 14:04NoHardwareBiometrics & Access ControlBarrier12/5/16 23:410.4HardwareTech AssistNo Fault FoundHardwareBiometrics & Access ControlBiometrics & Access ControlN/A724559;698821;ATFP_CSO_109083.pdfPassTechs found oil and water in the barrier cavity. Guards had used an absorbent to cover the oil on the ground. Tech cleaned the barrier cavity and the absorbent. Techs tested multiple times and could not see any signs of leaking. Techs will continue to monitor. Problem resolved.12/5/16 14:320.460.46
NFAC00000109085Closed391995PSACESS-NMCCNRSWNAVBASE CoronadoNASNIPSAC.ESS-NMC.CNRSW.NAVBASE Coronado.NASNIIDS monitoring system not working and 743 Amory continues to alarmIDS monitoring system not working and 743 Amory continues to alarmCustomer Sign-Off form or PMI checklist summited.8/21/17 4:30General Information12/5/16 17:001/13/17 1:00Serco GSC12/5/16 14:07N39430-16-C-18112-High2-HighHighNo12/5/16 14:0712/5/16 14:07No7.8HardwareNetworkAlarm1/13/17 13:1038.64HardwareTech AssistReplaceHardwareNetworkNetworkN/A706728;679239;ATFP CSO NFAC00000109085.pdfPassRegion lead reports High speed routers were replaced and the MAG came back online. MAG tested and issue resolved.12/5/16 14:260.320.32
NFAC00000109091Closed22156PSACACP-VGCNRSWNAVBASE Point LomaDrop Arms and Vehicle BarriersPSAC.ACP-VG.CNRSW.NAVBASE Point Loma.Drop Arms and Vehicle BarriersOutbound lane and wedge control panel show red.The post 1 outbound lane indicator light (outdoor) is lit red, but wedges are still flush.

The wedge control panel indicator in the guardhouse outbound lane shows red light. attached signed mars report 12/11/16 7:31 General Information Serco GSC 12/5/16 17:23 N39430-16-C-1811 3-Routine 3-Routine Routine No 12/5/16 17:23 12/5/16 17:23 No Hardware Biometrics & Access Control Barrier 12/7/16 7:55 1.61 Hardware Tech Assist Repair Hardware Biometrics & Access Control Biometrics & Access Control N/A 729022;700023;point loma topside post 1 wedges 06dec2016 nfac00000109091 mars signed.pdf Pass NFAC00000109091 CNRSW.NAVBASE Point Loma.Drop Arms and Vehicle Barriers post 1

tech arrived on site about 1700 started to trouble shoot the logic found that the outbound controller cards did not have any leds lit testing voltages on point 11 and 12 there was 18 vdc on 11 but no voltage on 12. there was a break in the limit switch control logic. at 2000 tech was able to gain access to the wedges and found several limit switch assemblies were not aligned correctly. tech aligned the switches and tested I both manual and efo modes. Also security performed their daily test. all lights on the panel and traffic control are functioning correctly12/6/16 8:1614.8814.88
NFAC00000109097Closed255C4IMNS-GV/IVCNREURAFCENTNS RotaC4I.MNS-GV/IV.CNREURAFCENT.NS RotaI am submitting the below IRT Bldg-3262 (Security) building intercom/WAVES
speakers are fuzzy hissiI am submitting the below IRT Bldg-3262 (Security) building intercom/WAVES
speakers are fuzzy hissing/feedbackChecked the Discount Ticket box to remove this ticket from calculations for Trend Reports7/13/18 11:48General Information12/6/16 22:00Serco GSC12/5/16 23:24N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 23:2412/5/16 23:24NoHardwareAV EquipmentSpeaker12/7/16 1:091.07CancellationNon ATFP IssueNon Sustainment IssueHardwareAV EquipmentAV EquipmentN/A589924;580819;ATFP CSO NFAC00000109097.pdfPassThe incident has been documented previously. The interior audio system belongs to PW Waves is only an external input to the system12/7/16 1:0825.7225.72
NFAC00000109099Closed255C4IMNS-GV/IVCNREURAFCENTNS RotaC4I.MNS-GV/IV.CNREURAFCENT.NS RotaIRT BEQ 567 building WAVES is OOC and does not

establish connection with the base station. Problem:

While in normal operation the WAVES unit does not sync with the base station.

Recommendation:

Recommend move both the WAVES unit and Antenna to a better location to allow

the unit to sync with the base station.Customer Sign-Off form or PMI checklist summited.8/28/17 23:17General Information12/6/16 22:00Serco GSC12/5/16 23:27N39430-16-C-18113-Routine3-RoutineRoutineNo12/5/16 23:2712/5/16 23:27NoHardwareTech AssistThird Party DamageHardwareMiscellaneousReference Guide12/7/16 1:251.08HardwareTech AssistThird Party DamageHardwareMiscellaneousMiscellaneousN/A575054;565980;ATFP CSO NFAC00000109099.pdfPassThe waves antenna was reinstalled incorrectly and the system is not able to connect with the IBS12/7/16 1:1025.7125.71
NFAC00000109104Closed01513PSACACP-VGCNRSWNAVBASE San DiegoMain Gate 6PSAC.ACP-VG.CNRSW.NAVBASE San Diego.Main Gate 6Gate 2 inbound lane wedge 2Inbound wedge for Gate 2 faceplate is hanging off wedge. Wedge will not fully retract.Customer Sign-Off form or PMI checklist summited.8/8/17 0:30General InformationSerco GSC12/6/16 1:58N39430-16-C-18111-Critical1-CriticalCriticalYes12/6/16 1:5812/6/16 1:58NoHardwareBiometrics & Access ControlWedge12/6/16 10:450.37HardwareTech AssistNo Fault FoundHardwareBiometrics & Access ControlBiometrics & Access ControlN/A706701;679223;ATFP CSO NFAC00000109104.pdfPassTech onsite and was able to cycle the barrier several times with the Chief of Police present. No issue found. Ticket resolved.12/6/16 9:13
NFAC00000109106Closed731726C4IDPC-CDSCNRMANSA PhiladelphiaC4I.DPC-CDS.CNRMA.NSA Philadelphia**PM** Semiannual** January 2017*****PM***December 2016***C4I.DPC-LDC.CNRMA.NSA PhiladelphiaPM completed. Technician routing PM checklist to customer for signature then upload to ticket in remedy.2/17/17 13:25General Information1/4/17 9:001/4/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No1700HardwarePreventive MaintenancePreventive Maintenance2/17/17 13:2544.18HardwareTech AssistPMHardwarePreventive MaintenancePreventive MaintenanceFailN/APM completed. Technician routing PM checklist to customer for signature then upload to ticket in remedy.2/3/17 10:03
NFAC00000109107Closed711699C4IDPC-CDSCNRSWNAVBASE Ventura CountyPort HuenemeC4I.DPC-CDS.CNRSW.NAVBASE Ventura County.Port Hueneme**PM** Semiannual** January 2017*****PM***December 2016***C4I.DPC-LDC.CNRSW.NAVBASE Ventura County.Port HuenemeCSOS attached2/28/17 18:34General Information1/4/17 9:001/4/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No1760HardwarePreventive MaintenancePreventive Maintenance2/15/17 17:0742.34HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance723703;698571;NFAC00000109107_28FEB2017.pdfPassN/ATech on site preformed semi annual preventative maintenance. Tech fully tested the system. Groomed and cleaned the racks, increased cable management. removed unnecessary clutter. SIS tech preformed a tech refresh reimaging SP1 and DB1. Kepler networks tested all network connections and s scheduled to preform a DSLAM replacement on 2/16/17. Tested batteries on UPS. UPS in building 1443 needs a new battery will be order. System functioning as designed.2/15/17 16:50
NFAC00000109108Closed301989PSACESS-NMCCNRMANAS OceanaPSAC.ESS-NMC.CNRMA.NAS Oceana**PM** Semiannual** January 2017*****PM***December 2016***PSAC.ESS-NMC.CNRMA.NAS OceanaNFAC109108CSONASOceanaNMC attached to document.1/5/17 14:51General Information1/4/17 9:001/4/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No1851HardwarePreventive MaintenancePreventive Maintenance1/5/17 6:580.92HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance320491;269837;NFAC109108CSO NAS Oceana NMC PM.pdfPassN/AMagazine IDS circuit and battery enclosures were inspected for corrosion/moisture and tested for AC/DC operation at power supply for proper voltages and found sat. Dissicant was placed in enclosures for moisture control.
Alarms cleared after PMs were performed and IDS system was placed back in service.1/5/17 6:50723.2722.27
NFAC00000109110Closed122117C4IOPC-EOCCNRMANAVSUBBASE New LondonC4I.OPC-EOC.CNRMA.NAVSUBBASE New London**PM** Semiannual** January 2017*****PM***December 2016***C4I.OPC-EOC.CNRMA.NAVSUBBASE New LondonPM has been completed. Deficiencies and details listed in the PM check list being routed through customer for signature. Resolving ticket.4/7/17 12:15General Information1/4/17 9:001/4/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No2055HardwarePreventive MaintenancePreventive Maintenance4/7/17 12:1593.14HardwareTech AssistPMHardwarePreventive MaintenancePreventive MaintenanceFailN/APM has been completed. Deficiencies and details listed in the PM check list being routed through customer for signature. Resolving ticket.12/6/16 8:39
NFAC00000109111Closed21316C4IOPC-EOCCNRNWNAVBASE KitsapBangorC4I.OPC-EOC.CNRNW.NAVBASE Kitsap.Bangor**PM** Semiannual** January 2017*****PM***December 2016***C4I.OPC-EOC.CNRNW.NAVBASE Kitsap.BangorCustomer Sign-Off form or PMI checklist summited.7/7/17 7:24General Information1/4/17 9:001/4/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No2078HardwarePreventive MaintenancePreventive Maintenance7/7/17 7:20183.93HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance2784327;2403462;NFAC00000123194.NFAC00000109111.signedPMI.NBKBngr EOC.Jun2017.Jan2017.SemiAnn PM.pdfPassN/ACompleted SemiAnn PM IAW PM checklist. Signed PMI will be uploaded.7/7/17 7:09
NFAC00000109112Closed391672PSACACP-AVG-LCNRMANSA Hampton RoadsPost 201 JF Staff College Gate (Bravo)PSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.Post 201 JF Staff College Gate (Bravo)**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.Post 201 JF Staff College Gate (Bravo)cso to follow1/14/17 10:52General Information1/4/17 9:001/5/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No2652HardwarePreventive MaintenancePreventive Maintenance1/14/17 10:5210.08HardwareTech AssistPMHardwarePreventive MaintenancePreventive MaintenanceFailN/ATechnicians checked the VTBs and VTGs for normal operation locally at the enclosures and lubricated all springs and greased all pivot points inside the enclosures. All photo eyes, light curtains and loop detectors were tested. The Sentry Interface was tested for operation of the gates in manual mode then in automatic mode ensuring all Gates and Barriers work as designed. All welds were inspected for any signs of breaking.
All discrepancies are noted and a new trouble ticket will follow as appropriate.1/14/17 10:50943.27242.27
NFAC00000109113Closed341024PSACACP-AVG-LCNRMANSA MechanicsburgEast GatePSAC.ACP-AVG-L.CNRMA.NSA Mechanicsburg.East Gate**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-L.CNRMA.NSA Mechanicsburg.East GateAdding customer sign off sheet1/13/17 9:30General Information1/4/17 9:001/5/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No2670HardwarePreventive MaintenancePreventive Maintenance1/9/17 14:465.24HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance133574;133103;[Untitled]_2017011008540900.pdfPassN/AMonthly preventive maintenance performed in accordance with the maintenance index. customer sign off sheet to follow.1/9/17 14:42
NFAC00000109114Closed3984PSACACP-AVG-HCNRMANS NewportGate 1PSAC.ACP-AVG-H.CNRMA.NS Newport.Gate 1**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-H.CNRMA.NS Newport.Gate 1cso to folllow1/14/17 10:48General Information1/4/17 9:001/5/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No2684HardwarePreventive MaintenancePreventive Maintenance1/14/17 10:4810.08HardwareTech AssistPMHardwarePreventive MaintenancePreventive MaintenanceFailN/ATechnicians checked the VTBs and VTGs for normal operation locally at the enclosures and lubricated all springs and greased all pivot points inside the enclosures. All photo eyes, light curtains and loop detectors were tested. The Sentry Interface was tested for operation of the gates in manual mode then in automatic mode ensuring all Gates and Barriers work as designed. All welds were inspected for any signs of breaking.
All discrepancies are noted and a new trouble ticket will follow as appropriate.12/22/16 9:13389.65389.65
NFAC00000109115Closed91359PSACACP-AVG-LCNRMANSA Hampton RoadsGate 10 (Charlie)PSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.Gate 10 (Charlie)**PM** Monthly** January 2017*****PM***December 2016***PSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.Gate 10 (Charlie)Attached CSO12/28/16 7:07General Information1/4/17 9:001/5/17 9:00Serco GSC1/4/17 9:00N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 3:3412/6/16 3:34No2715HardwarePreventive MaintenancePreventive Maintenance12/15/16 15:24-19.73HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance733753;700605;NFAC00000110455Gate C_PM 27 DEC 2016.pdfPassN/ATechnicians checked the VTBs and VTGs for normal operation locally at the enclosures and lubricated all springs, greased all pivot points and inspected drive belts inside the enclosures. All photo eyes, light curtains and loop detectors were tested. The Sentry Interface was tested for operation of the gates in manual mode then in automatic mode ensuring all Gates and Barriers work as designed. All welds were inspected for any signs of breaking.
All discrepancies are noted and a new trouble ticket will follow as appropriate.12/15/16 15:12227.64227.64
NFAC00000109117Closed81064PSACESS-PerimeterNDWNSA South PotomacNSF Indian Head VPMSPSAC.ESS-Perimeter.NDW.NSA South Potomac.NSF Indian Head VPMScamera outages on the VPMS at (Indian Head) base> Pole 5 Fixed N

> Pole 5 PTZ > Pole 15 Fixed N > Pole 15 Fixed S > Pole 16 Fixed N > Pole 16 PTZ > Pole 17 Fixed Cam 1 > Pole 17 Fixed Cam 2 > Pole 17 PTZ Cam > Pole 18 Fixed Cam 1 > Pole 18 Fixed Cam 2 > Pole 18 PTZ

> SNBLDG-2172

> STUMP NECK MAIN GATE 2217 Customer Sign-Off form or PMI checklist summited. 8/2/17 5:24 General Information Serco GSC 12/6/16 6:49 N39430-16-C-1811 3-Routine 3-Routine Routine No 12/6/16 6:49 12/6/16 6:49 No Hardware AV Equipment Camera 12/14/16 18:31 8.49 Hardware Tech Assist Repair Hardware AV Equipment AV Equipment N/A 714275;682682;ATFP CSO NFAC00000109117.pdf Pass From: Amanuel Berhe [mailto:Amanuel.Berhe@ultra-3eti.com] Sent: Wednesday, December 14, 2016 10:16 AM To: Smith, Christopher O Subject: RE: ATFP Incident NFAC00000109117 has been assigned to your group, Serco GSC, for action. Project Base Site: NSA South Potomac [Serco Use]  Chris,  B2172 camera at the stump neck is back online as well.  Chris D was able to reconfigre the port and that fix the issue.

 Close your ticket :)  Thanks Amanuel    Sent via the Samsung Galaxy S® 5 ACTIVE™, an AT&T 4G LTE smartphone

-------- Original message -------- From: "Smith, Christopher O" <Christopher.Smith1@serco-na.com> Date: 12/13/2016 9:16 PM (GMT-05:00) To: Amanuel Berhe <Amanuel.Berhe@ultra-3eti.com> Subject: RE: ATFP Incident NFAC00000109117 has been assigned to your group, Serco GSC, for action. Project Base Site: NSA South Potomac [Serco Use] Classification: Serco Use Only Great minds think alike!

 Keep me posted.

 Thanks,  Christopher Smith NDW Regional Lead – AT/FP Cell: 240-204-7548 Email: Christopher.smith1@serco-na.com Serco Inc. www.serco-na.com     From: Amanuel Berhe [mailto:Amanuel.Berhe@ultra-3eti.com] Sent: Tuesday, December 13, 2016 8:20 PM To: Smith, Christopher O Subject: RE: ATFP Incident NFAC00000109117 has been assigned to your group, Serco GSC, for action. Project Base Site: NSA South Potomac  Chris,  I was about to send you the update. The main gate cameras is back online. The encoder work fine after some configuration change on the swich side.

 B2172, is still having issue. The Swich seems to be fine. Radio and encoder not reachable from the network. Will be back to the site sometime this week to dig deeper.

 Thanks!

Amanuel    Sent via the Samsung Galaxy S® 5 ACTIVE™, an AT&T 4G LTE smartphone

-------- Original message -------- From: "Smith, Christopher O" <Christopher.Smith1@serco-na.com> Date: 12/13/2016 8:06 PM (GMT-05:00) To: Amanuel Berhe <Amanuel.Berhe@ultra-3eti.com> Subject: RE: ATFP Incident NFAC00000109117 has been assigned to your group, Serco GSC, for action. Project Base Site: NSA South Potomac Amanuel, Â Has there been any new updates to the below?

 Please advise.

 Thanks,  Christopher Smith NDW Regional Lead – AT/FP Cell: 240-204-7548 Email: Christopher.smith1@serco-na.com Serco Inc. www.serco-na.com    From: Amanuel Berhe [mailto:Amanuel.Berhe@ultra-3eti.com] Sent: Thursday, December 08, 2016 8:13 PM To: Smith, Christopher O Subject: RE: ATFP Incident NFAC00000109117 has been assigned to your group, Serco GSC, for action. Project Base Site: NSA South Potomac  Chris,  The 525V- 3 that I tried to replace today has missed some update. It didn't work as I expecte. I will have engineering to take a look at it tommorow before we try to repair the bad one or order new radio. Keep you posted.

 Thanks!

Amanuel12/7/16 16:5634.1234.12
NFAC00000109116Closed32527PSACACP-VGCNRMANWS EarleMain GatePSAC.ACP-VG.CNRMA.NWS Earle.Main GateCustomer called and stated that the Main side ECP barrier is not working properly. During morning chCustomer called and stated that the Main side ECP barrier is not working properly. During morning check the barrier cycle up but now the barrier will not go up and the red light stays on.Uploaded CSO12/19/16 6:47General Information12/8/16 22:00Serco GSC12/6/16 6:53N39430-16-C-18111-Critical1-CriticalCriticalYes12/6/16 6:5312/6/16 6:53NoHardwareBiometrics & Access ControlBarrier12/9/16 16:383.41HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A704639;679173;NFAC00000109116.pdfPassTechs were back onsite today. Parts were rcvd and techs replaced the 24vdc power supply. Techs confirmed PLC now had good power and was working properly. Base physical security conducted Manual and EFO tests from Main ECP bldg. and secondary guard shack. All tests SAT, barriers were restored to full duty. Resolving ticket, CSO to follow.12/6/16 9:252.532.53
NFAC00000109123Closed481862C4IMNS-GV/IVCNRSENAS KingsvilleC4I.MNS-GV/IV.CNRSE.NAS KingsvilleG/V tower 2 and 3 shows systems failingCustomer called and stated G/V tower 2 and 3 shows systems failing. Towers 2 battery fail and Tower 3 system fail. NSA Kingville, TXadded csos1/27/17 12:03General Information12/26/16 1:00Serco GSC12/6/16 7:40N39430-16-C-18112-High2-HighHighNo12/6/16 7:4012/6/16 7:40NoHardwareInfrastructureSecurity System1/23/17 18:0648.43HardwareTech AssistReplaceHardwareInfrastructureInfrastructureN/A720821;697698;NFAC00000109123 GV 26 Jan 2017.pdfPassRegion lead reports that Tower 2 has been resolved. Charging system and replacement batteries are fully installed and system is operational.12/8/16 10:2550.7550.75
NFAC00000109125Closed6258C4IMNS-GV/IVCNRMAJEB Little Creek - Fort StoryC4I.MNS-GV/IV.CNRMA.JEB Little Creek - Fort StoryUPS unit at alternate base station is beeping.Alternate Base Station UPS is showing faulty batteries. UPS is beeping and red light is flashing.CSO uploaded12/21/16 6:17General InformationSerco GSC12/6/16 15:04N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 8:1012/6/16 8:10NoHardwareMiscellaneousReference Guide12/12/16 12:175.88HardwareTech AssistReplaceHardwarePower DistributionPower DistributionN/A721282;697196;NFAC00000109125-Alt Base Station UPS.pdfPassDuring routine preventive maintenance it was noticed that the UPS at the alternate base station was beeping and the batteries were failing. Techs replaced UPS with the newer model and tested the system. The base station worked great and the unit was returned to normal operation. CSO to follow.12/6/16 15:036.890.89
NFAC00000109127Closed01415PSACESS-PerimeterCNRMANSA CranePSAC.ESS-Perimeter.CNRMA.NSA CraneVideo from cameras for the ECP's at NSA Crane has been lost to monitors in emergency dispatch.Video from cameras for the ECP's at NSA Crane has been lost to monitors in emergency dispatch.CSO attached.12/7/16 4:38General Information12/6/16 11:0012/6/16 13:00Serco GSC12/6/16 8:14N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 8:1412/6/16 8:14NoHardwareAV EquipmentCamera12/6/16 12:070.16HardwareTech AssistUser ErrorHardwareComputerComputerN/A720194;687473;NFAC00000109127.pdfPassTech went on site and found no video and no Milestone application running for video. Tech then re-established connection with the Milestone server and all video came back up.12/6/16 11:593.753.75
NFAC00000109129Closed49153C4IMNS-GV/IVCNRMANS NorfolkC4I.MNS-GV/IV.CNRMA.NS NorfolkUnit 29 at the Navy Exchange is showing a faultInside Voice unit at the Navy Exchange is showing a Current Fail fault and a System Fail Fault.CSO uploaded1/27/17 7:54General Information1/26/17 15:00Serco GSC12/6/16 8:17N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 8:1712/6/16 8:17NoHardwareMiscellaneousReference Guide1/24/17 16:5249.36HardwareTech AssistRepairHardwareAV EquipmentAV EquipmentN/A721342;697256;NFAC00000109129-NEX Speaker.pdfPassCustomer said there was a fault at unit 29 at the NEX. Techs found that the speaker was blown and would not play. Techs replaced the speaker and the new speaker blew again. Techs ordered another speaker and a new amplifier card. the amp card and speaker was replaced and the unit was recalibrated. The unit was tested and worked as designed. The unit was returned to normal operation and CSO to follow.12/6/16 10:332.262.26
NFAC00000109118Closed0153C4IMNS-GV/IVCNRMANS NorfolkC4I.MNS-GV/IV.CNRMA.NS NorfolkUnit 28 at the Commissary is showing a faultInside Voice unit at the Commissary is showing a Current Fail fault and a System Fail Fault.CSO uploaded12/16/16 4:57General InformationSerco GSC12/6/16 8:18N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 8:1812/6/16 8:18NoHardwareAV EquipmentSpeaker12/6/16 10:470.1HardwareTech AssistRepairHardwareAV EquipmentAV EquipmentN/A737240;701930;NFAC00000109118-Commissary Unit.pdfPassCustomer reported that unit was showing a current and system fault. Technicians did a simple calibration of the unit to reset the speakers and the fault went away. The unit was tested and passed. Unit was returned to normal operation. CSO to follow.12/6/16 10:342.272.27
NFAC00000109130Closed61502PSACESS-PerimeterCNRSENAS PensacolaPSAC.ESS-Perimeter.CNRSE.NAS PensacolaNas Pensacola front gate ptz camera inopNas Pensacola front gate ptz camera inopNas Pensacola front gate ptz camera inop. We found that the camera housing was broken and would not hold the camera in place, also found the PTZ gears were broken, probably as a result of rubbing on the Dome. We ordered a replacement Housing and Camera, we replaced both and tested with Leon Polnitz. The Camera is working again. No further Actions Required. Resolving This issue.12/12/16 15:41General Information12/6/16 1:0012/9/16 1:00Serco GSC12/6/16 8:20N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 8:2012/6/16 8:20NoHardwareAV EquipmentCamera12/12/16 15:416.31HardwareTech AssistReplaceHardwareAV EquipmentAV EquipmentN/A723154;698492;NFAC00000109130.pdfPassNas Pensacola front gate ptz camera inop. We found that the camera housing was broken and would not hold the camera in place, also found the PTZ gears were broken, probably as a result of rubbing on the Dome. We ordered a replacement Housing and Camera, we replaced both and tested with Leon Polnitz. The Camera is working again. No further Actions Required. Resolving This issue12/6/16 12:003.673.67
NFAC00000109136Closed72382PSACACP-VGNDWNSA AnnapolisUSNA Gate 1PSAC.ACP-VG.NDW.NSA Annapolis.USNA Gate 1Annapolis: Gate 1 Turnstile; One card is swiped, 7 people can walk through before it locks.Annapolis: Gate 1 Turnstile; One card is swiped, 7 people can walk through before it locks.
Walking to the turnstile from off the base it is the one on the right.Annapolis: Gate 1 Turnstile 2 One card is swiped, 7 people can walk through before it locks.Issue found on site Bad Micro switch and bad fuse.Action taken was to replace the bad fuse and micro switch once fuse was replaced people were able to gain access with there card and after the micro switch was replaced after one person that gain access the turnstile would lock once again turnstile is working as should be.12/13/16 13:52General Information12/7/16 1:00Serco GSC12/6/16 9:39N39430-16-C-18111-Critical1-CriticalCriticalYes12/6/16 9:3912/6/16 9:39No1.85HardwareBiometrics & Access ControlTurnstile12/13/16 13:527.1HardwareTech AssistReplaceHardwareMiscellaneousMiscellaneousN/A655244;640438;Annapolis NFAC 109136 Gate 1 Turnstile 2 bad fuse and micro switch 12-13-16.pdfPassAnnapolis: Gate 1 Turnstile 2 One card is swiped, 7 people can walk through before it locks.Issue found on site Bad Micro switch and bad fuse.Action taken was to replace the bad fuse and micro switch once fuse was replaced people were able to gain access with there card and after the micro switch was replaced after one person that gain access the turnstile would lock once again turnstile is working as should be.12/6/16 10:270.810.81
NFAC00000109138Closed01231C4IMNS-GV/IVCNRSENSA Mid SouthC4I.MNS-GV/IV.CNRSE.NSA Mid SouthGV alternate base station located BLDG 237 continues to shutoff.Customer called and reported GV alternate base station located BLDG 237 continues to shutoff. Customer is suspecting power failureCSO Attached12/7/16 11:20General Information12/5/16 23:0012/5/16 23:00Serco GSC12/6/16 9:43N39430-16-C-18112-High1-CriticalHighNo12/6/16 9:4312/6/16 9:43NoHardwareAV EquipmentSpeaker12/6/16 18:590.39HardwareTech AssistRepairHardwareAV EquipmentAV EquipmentN/A726448;696507;NFAC 109138.pdfPassUpon arrival the base station and computer were off. I checked the power and discovered it was only plugged into a Â

surge protector not a UPS battery backup.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .