Appendix G Example Job Plans.pdf

PDF 427 KB Posted

Attached to
US Coast Guard Base Kodiak Base Operations Support Services
Solicitation number
70Z08423RKODI0001
Issued by

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Base Kodiak BOSS Award Fee Plan_Final.pdf PDF
First page of the 1449.pdf PDF
Remaining RFI 6.22.23.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Revised Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
Attachment 6- Davis Bacon Act WD AK20230005 5.24.23.pdf PDF
Attachment 5- Davis-Bacon Act WD AK20230001 5.24.23.pdf PDF
Final Request for Information 5.24.23.xlsx XLSX spreadsheet
Attachment 2 - Performance Work Statement 5.24.23.pdf PDF
Final Request for Proposal 70Z08423RKODI0001 5.24.23.pdf PDF
Attachment 1 - CLIN Schedule of Prices 5.23.23.xlsx XLSX spreadsheet
Amendment_0007.pdf PDF
Amendment 0002.pdf PDF
Amendment 0006.pdf PDF
Amendment 0003.pdf PDF
Amendment 0005.pdf PDF
Amendment 0001.pdf PDF
Amendment 0004.pdf PDF
Attachment 2 - Performance Work Statement dated 13-MAR-23.pdf PDF
Revised Request for Proposal 70Z08423RKODI0001 3.20.23.pdf PDF
Request for Information 3.20.23.xlsx XLSX spreadsheet
Preproposal Conf-BOSS Kodiak-22-FEB-2023.pptx PPTX presentation
CBA- signed 4 Mar 2022.pdf PDF
Revised REQUEST FOR PROPOSAL 70Z08423RKODI0001.pdf PDF
BOSS Kodiak Preproposal Conference Schedule.pdf PDF
Attendance Sheet page 2.pdf PDF
Revised Attachment 3 - Past Performance Questionnaire.pdf PDF
Attendance Sheet page 1.pdf PDF
Attachment 4 - Service Contract Act WD 2015-5687.pdf PDF
Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
TE 16.4 Coupon Stations (1).pdf PDF
TE 11.1 Drinking Water Monitoring Program.pdf PDF
TE 10.4 2017 Tsunami Readiness Plan - Final PDF.pdf PDF
Appendix I.3 Historical Fuel Transfers.xls XLS spreadsheet
Appendix C Summary Table of Task Area Deliverables Sections_v1.xlsx XLSX spreadsheet
Attachment 7 - CBA 2022-2024 dated 04 Mar 2022.pdf PDF
Appendix F.3 Example PM Schedule.xlsx XLSX spreadsheet
Appendix H Shore Facilities Inventory 2020.xlsx XLSX spreadsheet
TE 1.2 Mapbook_2021.pdf PDF
TE 16.1 CHP System Description (1).pdf PDF
TE 17.2 Oil Water Separators_May_2021 (1).pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Appendix B Government Property.Equipment.and Materials List.xlsx XLSX spreadsheet
Appendix I.2 Hazardous Waste Historical Annual Container and Sampling Costs.pdf PDF
Appendix E Performance Requirements Statement.pdf PDF
Request for Proposal.pdf PDF
TE 18.1 MBIT Report.xls XLS spreadsheet
TE 17.1 Used Oil System Description_May_2021 (1).pdf PDF
TE 19.1 COM Worksheet.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix “G” Example Job Plans

D3045-110-1950-Q-Air handling unit, 3 tons through 24 tons Quarterly

Sequence Task Description Nested Job Plan Duration

10 Check with operating or area personnel for deficiencies

0:02

20 Check controls and unit for proper operation 0:02

30 Check for unusual noise or vibration 0:02

40 Check tension, condition and alignment of belts, adjust as necessary

0:02

50 Clean coils, blowere, motor and drain piping as, required

60 Lubricate shaft and motor bearings 0:03

70 Replace air filters 0:05

80 Inspect exterior piping and valves for leaks;

tighten connection as required

0:05

90 Clean around equipment 0:04

100 Fil l out maintenance checklist and report deficiencies

0:01

110 Document recommended changes or additional work

0:01

111 Document general condition of equipment 0:01

112 Is USCG CMMS Equipment Identifier (tag) maintained on the equipment

0:01

113 Ensure LOGBOOK is fil led out, in easily identifiable location and in adequate document holder

0:01

114 Record recommendations for Job Plan updates 0:01

115 Ensure work space is picked up and clean prior to departure

0:01

D4015-100-1950-A-Backflow prevention device, up to 4" Annual

D3045-210-1950-S-Fan, Axial, up to 5,000 CFM Semi-Annual

10 Test and calibrate check valve operation of back flow prevention device with test set

0:11

20 Bleed air from backflow preventer 0:03

30 Inspect for leaks under pressure 0:00

40 Clean backflow preventer and surrounding area 0:04

50 Fil l out maintenance checklist and report deficiencies

0:01

60 Document recommended changes or additional work

0:01

70 Document general condition of equipment 0:01

80 Is USCG CMMS Equipment Identifier (tag) maintained on the equipment

0:01

90 Ensure LOGBOOK is fi lled out, in easily identifiable location and in adequate document holder

0:01

100 Record recommendations for Job Plan updates 0:01

110 Ensure work space is picked up and clean prior to departure

0:01

Sequence Task Description Nested Job Plan Duration

10 Start and stop fan with local switch. 0:01

20 Check fan for noise and vibration. 0:05

30 Check electrical wiring and connections; tight en loose connections.

0:02

40 Check motor and fan shaft bearings for noise, vibration, overheating; lubricate as required.

0:20

50 Clean fan and surrounding area. 0:09

60 Fil l out maintenance checklist and report defi ciencies.

0:01

70 Document recommended changes or additional work

0:01

80 Document general condition of equipment 0:01

90 Is USCG CMMS Equipment Identifier (tag) maintained on the equipment

0:01

100 Ensure LOGBOOK is fil led out, in easily identifiable location and in adequate document holder

0:01

110 Record recommendations for Job Plan updates

0:01

120 Ensure work space is picked up and clean prior to departure

Job Plan 2077 D3055-110-3950-A-Unit heater, steam/hot water Annual

10 Check with operating or area personnel 0:12

20 Inspect, clean and adjust control valves and thermo sensing bulbs.

0:14

30 Inspect system for leaks (If water/steam) 0:01

40 Check for proper operation and adjust thermostat

0:03

50 Check fan and motor for vibration and noise.

lubricate bearings

0:04

60 Check electrical wiring to blower motor 0:11

70 Clean area around unit heater coils as necessary

0:05

80 Fil l out maintenance checklist and report deficiencies

0:10

90 Document recommended changes or additional work

0:01

100 Document general condition of equipment 0:01

110 Is USCG CMMS Equipment Identifier (tag) maintained on the equipment

0:01

120 Ensure LOGBOOK is fil led out, in easily identifiable location and in adequate document holder

0:01

130 Record recommendations for Job Plan updates

0:01

140 Ensure work space is picked up and clean

Job Plan 10006 STAIRMASTER-ELLIPTICAL RUNNER Quarterly

10 VERIFY UNIT IS TAGGED W/ DESIGNATION

NUMBER

0:00

20 VERIFYEQUIPMENT LOGBOOK IS STATIONED AT

/NEAR EQUIPMENT & LOOK OVER PAST

ENTRIES FOR ISSUES

0:00

30 REMOVE, CLEAN, AND LUBE THE DRIVE AND

STEP CHAINS

0:00

40 CLEAN AND LUBE THE STEP CHAIN CONNECTION

POINTS

0:00

50 CLEAN AND LUBE THE PEDAL SHAFTS AND

LEVELING ARM PINS

0:00

60 LUBE THE DRIVE HUB ASSEMBLY 0:00

70 CLEAN AND INSPECT THE LEVELING ARM SHAFTS 0:00

80 CLEAN AND INSPECT THE PEDAL ARM SHAFTS

AND RETURN SPRINGS

0:00

90 REPLACE DRIVE BELTS AND INSPECT AND

ADJUST TENSION

0:00

100 TEST/RPR BATTERY CIRCUIT AND REPLACE

BATTERY

0:00

110 CLEAN UP SPILLS OF GREASE, OIL, OR OTHER

MATERIALS

0:00

120 Document recommended changes or additional work

0:01

130 Document general condition of equipment 0:01

140 Is USCG CMMS Equipment Identifier (tag) maintained on the equipment

0:01

150 Ensure LOGBOOK is fil led out, in easily identifiable location and in adequate document holder

0:01

160 Record recommendations for Job Plan updates

0:01

170 Ensure work space is picked up and clean