Revised Attachment 1 - CLIN Schedule of Prices.xlsx

XLSX spreadsheet 207 KB Posted

Attached to
US Coast Guard Base Kodiak Base Operations Support Services
Solicitation number
70Z08423RKODI0001
Issued by

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Base Kodiak BOSS Award Fee Plan_Final.pdf PDF
First page of the 1449.pdf PDF
Remaining RFI 6.22.23.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Attachment 6- Davis Bacon Act WD AK20230005 5.24.23.pdf PDF
Attachment 5- Davis-Bacon Act WD AK20230001 5.24.23.pdf PDF
Final Request for Information 5.24.23.xlsx XLSX spreadsheet
Attachment 2 - Performance Work Statement 5.24.23.pdf PDF
Final Request for Proposal 70Z08423RKODI0001 5.24.23.pdf PDF
Attachment 1 - CLIN Schedule of Prices 5.23.23.xlsx XLSX spreadsheet
Amendment_0007.pdf PDF
Amendment 0002.pdf PDF
Amendment 0006.pdf PDF
Amendment 0003.pdf PDF
Amendment 0005.pdf PDF
Amendment 0001.pdf PDF
Amendment 0004.pdf PDF
Attachment 2 - Performance Work Statement dated 13-MAR-23.pdf PDF
Revised Request for Proposal 70Z08423RKODI0001 3.20.23.pdf PDF
Request for Information 3.20.23.xlsx XLSX spreadsheet
Preproposal Conf-BOSS Kodiak-22-FEB-2023.pptx PPTX presentation
CBA- signed 4 Mar 2022.pdf PDF
Revised REQUEST FOR PROPOSAL 70Z08423RKODI0001.pdf PDF
BOSS Kodiak Preproposal Conference Schedule.pdf PDF
Attendance Sheet page 2.pdf PDF
Revised Attachment 3 - Past Performance Questionnaire.pdf PDF
Attendance Sheet page 1.pdf PDF
Attachment 4 - Service Contract Act WD 2015-5687.pdf PDF
Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
TE 16.4 Coupon Stations (1).pdf PDF
TE 11.1 Drinking Water Monitoring Program.pdf PDF
TE 10.4 2017 Tsunami Readiness Plan - Final PDF.pdf PDF
Appendix I.3 Historical Fuel Transfers.xls XLS spreadsheet
Appendix C Summary Table of Task Area Deliverables Sections_v1.xlsx XLSX spreadsheet
Attachment 7 - CBA 2022-2024 dated 04 Mar 2022.pdf PDF
Appendix F.3 Example PM Schedule.xlsx XLSX spreadsheet
Appendix H Shore Facilities Inventory 2020.xlsx XLSX spreadsheet
TE 1.2 Mapbook_2021.pdf PDF
TE 16.1 CHP System Description (1).pdf PDF
TE 17.2 Oil Water Separators_May_2021 (1).pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Appendix B Government Property.Equipment.and Materials List.xlsx XLSX spreadsheet
Appendix I.2 Hazardous Waste Historical Annual Container and Sampling Costs.pdf PDF
Appendix E Performance Requirements Statement.pdf PDF
Request for Proposal.pdf PDF
TE 18.1 MBIT Report.xls XLS spreadsheet
TE 17.1 Used Oil System Description_May_2021 (1).pdf PDF
TE 19.1 COM Worksheet.xlsx XLSX spreadsheet
Appendix F.2 Equipment by Category Cat 1-5.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Schedule Solicitation 70Z08423RKODI0001 Amendment 0008

INDEFINITE-DELIVERY, INDEFINITE-QUANTITY CONTRACT LINE ITEMS*Base Ordering Period (x=0)Ordering Period One (x=1)Ordering Period Two (x=2)Ordering Period Three (x=3)Ordering Period Four (x=4)
CLIN GROUPSUBCLINTYPE OF WORKPWS SECTIONEst QtyUnitUnit PriceAmountEst QtyUnitUnit PriceAmountEst QtyUnitUnit PriceAmountEst QtyUnitUnit PriceAmountEst QtyUnitUnit PriceAmount
x0030x0030ASTANDING3.0 GENERAL SCOPE REQUIREMENTS12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x0030BSTANDING3.10 KEY CONTROL12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x0030CSTANDING3.11. ENERGY AND UTILITIES CONSERVATION PROGRAMS **12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x0030FSTANDING3.18 REQUIRED PLANS12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x0030 Total:$0.00x0030 Total:$0.00x0030 Total:$0.00x0030 Total:$0.00x0030 Total:$0.00
x0040x0040AIDIQ4.0 LVL III Work20/projectsVariousVarious20/projectsVariousVarious20/projectsVariousVarious20/projectsVariousVarious15/projectsVariousVarious
x001x001STANDING5.1 LEVEL II WORK.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x001AAIDIQ5.1.2.A.A CONTRACTOR IDENTIFIED WORK2400/work order$ 20.00$48,000.002400/work order$ 20.00$48,000.002400/work order$ 20.00$48,000.002400/work order$ 20.00$48,000.001800/work order$ 20.00$36,000.00
x001AIDIQ5.1.4.A OFF-ISLAND TRAVEL6/event$0.006/event$0.006/event$0.006/event$0.004/event$0.00
x001BIDIQ5.1.4.B OFF-ISLAND PER DIEM12/day$0.0012/day$0.0012/day$0.0012/day$0.009/day$0.00
x001CIDIQ5.1.4.C GYM EQUIPMENT DIAGNOSIS & REPAIR15/event$0.0015/event$0.0015/event$0.0015/event$0.0011/event$0.00
x001DIDIQ5.1.4.D ADDITIONAL WOS4/lot of 25$0.004/lot of 25$0.004/lot of 25$0.004/lot of 25$0.003/lot of 25$0.00
x001EIDIQ5.1.4.D ADDITIONAL WOS1/lot of 250$0.001/lot of 250$0.001/lot of 250$0.001/lot of 250$0.001/lot of 250$0.00
x001NNNAVY5.1.5 SERVICE SPECIFICATIONS FOR U.S. NAVY12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x001 Total:$48,000.00x001 Total:$48,000.00x001 Total:$48,000.00x001 Total:$48,000.00x001 Total:$36,000.00
x002x002STANDING5.2 PREVENTIVE MAINTENANCE (PM)12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x002AIDIQ5.2.4.A EQUIPMENT ENROLLMENT (SINGLE)50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x002BIDIQ5.2.4.A EQUIPMENT ENROLLMENT (LOT OF 25)8/lot of 25$0.008/lot of 25$0.008/lot of 25$0.008/lot of 25$0.006/lot of 25$0.00
x002CIDIQ5.2.4.B SERVICE NEWLY ENROLLED EQUIPMENT (SINGLE)200/each$0.00200/each$0.00200/each$0.00200/each$0.00150/each$0.00
x002DIDIQ5.2.4.B SERVICE NEWLY ENROLLED EQUIPMENT (LOT OF 25)20/lot of 25$0.0020/lot of 25$0.0020/lot of 25$0.0020/lot of 25$0.0015/lot of 25$0.00
x002EIDIQ5.2.4.C PM CATEFGORY 5 PM ITEMS1/lot$0.001/lot$0.001/lot$0.001/lot$0.001/lot$0.00
x002NNNAVY5.2.5 SERVICE SPECIFICATIONS FOR US NAVY12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x002 Total:$0.00x002 Total:$0.00x002 Total:$0.00x002 Total:$0.00x002 Total:$0.00
x003x003STANDING5.3. JANITORIAL SERVICES.12Month$0.0012Month$0.0012Month$0.0012Month$0.009Month$0.00
x003AIDIQ5.3.4.A DISINFECT AN OFFICE, HOTEL ROOM, OR BARRACKS ROOM20/each$0.0020/each$0.0020/each$0.0020/each$0.0015/each$0.00
x003BIDIQ5.3.4.B REFILL HAND SANITIZING MACHINES200/each$0.00200/each$0.00200/each$0.00200/each$0.00150/each$0.00
x003NNNAVY5.3.5 SERVICE SPECIFICATIONS FOR U.S. NAVY.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x003 Total:$0.00x003 Total:$0.00x003 Total:$0.00x003 Total:$0.00x003 Total:$0.00
x004x004STANDING5.4 REFUSE COLLECTION AND DISPOSAL12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x004NNNAVY5.4.5 SERVICE SPECIFICATIONS FOR THE U.S. NAVY.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x004 Total:$0.00x004 Total:$0.00x004 Total:$0.00x004 Total:$0.00x004 Total:$0.00
x005x005STANDING5.5 GROUNDS MAINTENANCE12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x005AIDIQ5.5.4.A. ADDITIONAL BRUSH CLEARING (ADJACENT TO ROADWAYS).25/mile$0.0025/mile$0.0025/mile$0.0025/mile$0.0018/mile$0.00
x005BIDIQ5.5.4.B. ADDITIONAL BRUSH CLEARING (AREA)30/acre$0.0030/acre$0.0030/acre$0.0030/acre$0.0022/acre$0.00
x005CIDIQ5.5.4.C. TREE REMOVAL20/tree$0.0020/tree$0.0020/tree$0.0020/tree$0.0015/tree$0.00
x005D1IDIQ5.5.4.D.1. Topsoil750/cu yd$0.00750/cu yd$0.00750/cu yd$0.00750/cu yd$0.00562/cu yd$0.00
x005D2IDIQ5.5.4.D.2. Gravel750/cu yd$0.00750/cu yd$0.00750/cu yd$0.00750/cu yd$0.00562/cu yd$0.00
x005EIDIQ5.5.4.E. PRUNING4/ (1/4) acre$0.004/ (1/4) acre$0.004/ (1/4) acre$0.004/ (1/4) acre$0.003/ (1/4) acre$0.00
x005FIDIQ5.5.4.F. RESEEDING750/sq yd$0.00750/sq yd$0.00750/sq yd$0.00750/sq yd$0.00562/sq yd$0.00
x005GIDIQ5.5.4.G. SPORTS FIELD GROUND COVER MAINTENANCE4/event$0.004/event$0.004/event$0.004/event$0.003/event$0.00
x005HIDIQ5.5.4.H. MULCHING AND WEED REMOVAL OF LANDSCAPED AREAS IN SEMI-IMPROVED AREAS2500/sqft$0.002500/sqft$0.002500/sqft$0.002500/sqft$0.001875/sqft$0.00
x005IIDIQ5.5.4.I. TREE PRUNING IN SEMI-IMPROVED AREAS20/event$0.0020/event$0.0020/event$0.0020/event$0.0015/event$0.00
x005JIDIQ5.5.4.J. HEDGE TRIMMING1500/linear ft$0.001500/linear ft$0.001500/linear ft$0.001500/linear ft$0.001125/linear ft$0.00
x005KIDIQ5.5.4.K. EDGING10000/linear ft$0.0010000/linear ft$0.0010000/linear ft$0.0010000/linear ft$0.007500/linear ft$0.00
x005LIDIQ5.5.4.L. TRIMMING IN OTHER THAN IMPROVED AREAS20000/linear ft$0.0020000/linear ft$0.0020000/linear ft$0.0020000/linear ft$0.0015000/linear ft$0.00
x005NNNAVY5.5.5 SERVICE SPECIFICATIONS FOR U.S. NAVY.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x005 Total:$0.00x005 Total:$0.00x005 Total:$0.00x005 Total:$0.00x005 Total:$0.00
x006x006STANDING5.6 SNOW REMOVAL, ICE CONTROL, AND TRACTION.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x006NNNAVY5.6.5 Service Specifications for U.S. Navy12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x006 Total:$0.00x006 Total:$0.00x006 Total:$0.00x006 Total:$0.00x006 Total:$0.00
x007x007STANDING5.7. ROADWAY AND SEWER MAINTENANCE AND REPAIR12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x007AIDIQ5.7.4.A AIR STATION MARKINGS5/lot of 500 linear ft$0.005/lot of 500 linear ft$0.005/lot of 500 linear ft$0.005/lot of 500 linear ft$0.003/lot of 500 linear ft$0.00
x007BIDIQ5.7.4.B PAVEMENT CRACK FILLING.10000/linear ft$0.0010000/linear ft$0.0010000/linear ft$0.0010000/linear ft$0.002500/linear ft$0.00
x007CIDIQ5.7.4.C EMULSIFIED ASPHALT SEAL COATING PAVEMENT12/lot of 1000 sqft$0.0010/lot of 1000 sqft$0.0010/lot of 1000 sqft$0.0010/lot of 1000 sqft$0.008/lot of 1000 sqft$0.00
x007DIDIQ5.7.4.D MISCELLANEOUS GRADING12/lot of 1000 linear ft$0.0010/lot of 1000 linear ft$0.0010/lot of 1000 linear ft$0.0010/lot of 1000 linear ft$0.008/lot of 1000 linear ft$0.00
x007EIDIQ5.7.4.E MISCELLANEOUS PAVEMENT MARKING12/lot of 500 linear ft$0.0010/lot of 500 linear ft$0.0010/lot of 500 linear ft$0.0010/lot of 500 linear ft$0.008/lot of 500 linear ft$0.00
x007FIDIQ5.7.4.F PAVEMENT PATCHING AND REPAIR50/lot of 100 sqyd$0.0050/lot of 100 sqyd$0.0050/lot of 100 sqyd$0.0050/lot of 100 sqyd$0.0038/lot of 100 sqyd$0.00
x007NNNAVY5.7.5 SERVICE SPECIFICATIONS FOR U.S. NAVY6/event$0.006/event$0.006/event$0.006/event$0.005/event$0.00
x007 Total:$0.00x007 Total:$0.00x007 Total:$0.00x007 Total:$0.00x007 Total:$0.00
x008x008STANDING5.8. FUEL SERVICES.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x008AIDIQ5.8.4.A BULK TANK CLEANING AND ENTRY FOR INSPECTION.2/event$0.002/event$0.002/event$0.002/event$0.001/event$0.00
x008BIDIQ5.8.4.B ADDITIONAL FUEL SAMPLING AND ANALYSIS.50/event$0.0050/event$0.0050/event$0.0050/event$0.0038/event$0.00
x008CIDIQ5.8.4.C CARGO PIER CATHODIC PROTECTION INSPECTION1/event$0.001/event$0.001/event$0.001/event$0.001/event$0.00
x008DIDIQ5.8.4.D FUEL PIER CATHODIC PROTECTION INSPECTION1/event$0.001/event$0.001/event$0.001/event$3.001/event$0.00
x008EIDIQ5.8.4.E VESSEL BOOMING SERVICE30/event$0.0030/event$0.0030/event$0.0030/event$0.0023/event$0.00
x008 Total:$0.00x008 Total:$0.00x008 Total:$0.00x008 Total:$3.00x008 Total:$0.00
x009x009STANDING5.9 AIR PROGRAMS12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x009 Total:$0.00x009 Total:$0.00x009 Total:$0.00x009 Total:$0.00x009 Total:$0.00
x010x010STANDING5.10 ENVIRONMENTAL MANAGEMENT AND STEWARDSHIP.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x010 Total:$0.00x010 Total:$0.00x010 Total:$0.00x010 Total:$0.00x010 Total:$0.00
x011x011STANDING5.11 WATER PROGRAMS.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x011 Total:$0.00x011 Total:$0.00x011 Total:$0.00x011 Total:$0.00x011 Total:$0.00
x012x012STANDING5.12 REGULATED WASTE.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x012 Total:$0.00x012 Total:$0.00x012 Total:$0.00x012 Total:$0.00x012 Total:$0.00
x013x013STANDING5.13 HEATING OIL TANK TESTING.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x013AIDIQ5.13.4.A INTEGRITY TESTING12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x013NNNAVY5.13.5 SERVICE SPECIFICATIONS FOR U.S. NAVY12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x013 Total:$0.00x013 Total:$0.00x013 Total:$0.00x013 Total:$0.00x013 Total:$0.00
x014x014STANDING5.14 DISASTER AND SPILL RESPONSE.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x014AIDIQ5.14.5.A SPILLS BEYOND LEVEL II3/event$0.003/event$0.003/event$0.003/event$0.002/event$0.00
x014NNNAVY5.14.6 SERVICE SPECIFICATIONS FOR U.S. NAVY.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x014 Total:$0.00x014 Total:$0.00x014 Total:$0.00x014 Total:$0.00x014 Total:$0.00
x015x015STANDING5.15. VEHICLES AND MOTORIZED EQUIPMENT.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x015AIDIQ5.15.4.A. SEASONAL TIRE CHANGES.20/lot of 4 tires$0.0020/lot of 4 tires$0.0020/lot of 4 tires$0.0020/lot of 4 tires$0.0015/lot of 4 tires$0.00
x015NNNAVY5.15.5. SERVICE SPECIFICATIONS FOR U.S. NAVY12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x015 Total:$0.00x015 Total:$0.00x015 Total:$0.00x015 Total:$0.00x015 Total:$0.00
x0165.16. CENTRAL HEATING PLANT, WASTE WATER TREATMENT PLANT, AND WATER TREATMENT PLANT
x016AIDIQ5.16.4.A INSTALL ADDITIONAL COUPON STATIONS8/unit$0.008/unit$0.008/unit$0.008/unit$0.006/unit$0.00
x016BIDIQ5.16.4.B. WATER SYSTEM AST INSPECTION AND CLEANING1/event$0.001/event$0.001/event$0.001/event$0.001/event$0.00
x016CSTANDING5.16.5. CENTRAL HEATING PLANT OPERATIONS.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x016DSTANDING5.16.6. WASTE WATER TREATMENT PLANT.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x016ESTANDING5.16.7. WATER TREATMENT PLANT.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x016 Total:$0.00x016 Total:$0.00x016 Total:$0.00x016 Total:$0.00x016 Total:$0.00
x017x017STANDING5.17. LIQUID OILY WASTE FACILITIES AND EQUIPMENT.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x017AIDIQ5.17.4.A. RECEIVE, PUMP, AND TRANSPORT TENANT UNIT USED OIL AND OILY WATER.10000/gallon$0.0010000/gallon$0.0010000/gallon$0.0010000/gallon$0.007500/gallon$0.00
x017 Total:$0.00x017 Total:$0.00x017 Total:$0.00x017 Total:$0.00x017 Total:$0.00
x018x018STANDING5.18. MAIL, SHIPPING, AND RECEIVING.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x018AIDIQ5.18.4.A. ON-BASE MAIL DELIVERY SERVICES.10/event$0.0010/event$0.0010/event$0.0010/event$0.008/event$0.00
x018BIDIQ5.18.4.B. OFF-BASE MAIL DELIVERY SERVICES.30/event$0.0030/event$0.0030/event$0.0030/event$0.0023/event$0.00
x018CIDIQ5.18.4.C. AFTER-HOURS SHIPPING AND RECEIVING40/event$0.0040/event$0.0040/event$0.0040/event$0.0030/event$0.00
x018NNNAVY5.18.5. SERVICE SPECIFICATIONS FOR U.S. NAVY.12/month$0.0012/month$0.0012/month$0.0012/month$0.009/month$0.00
x018 Total:$0.00x018 Total:$0.00x018 Total:$0.00x018 Total:$0.00x018 Total:$0.00
x0195.19. HOUSING MAINTENANCE.
x019AAIDIQ5.19.4.A. BASIC COM PACKAGE – CLIN X019AA150/unit$0.00150/unit$0.00150/unit$0.00150/unit$0.00112/unit$0.00
5.19.4.B. ADDITIONAL MAINTENANCE ITEMS
x019ABIDIQComplete Cleaning Service for Vacant Units35/each$0.0035/each$0.0035/each$0.0035/each$0.0026/each$0.00
x019ACIDIQChemically Shampoo Carpet10000/sq ft$0.0010000/sq ft$0.0010000/sq ft$0.0010000/sq ft$0.007500/sq ft$0.00
x019ADIDIQPressure Wash Exterior (per unit)75/each$0.0075/each$0.0075/each$0.0075/each$0.0056/each$0.00
x019AEIDIQPressure Wash Exterior (per SF)5000/sq ft$0.005000/sq ft$0.005000/sq ft$0.005000/sq ft$0.003750/sq ft$0.00
x019AFIDIQInstall Interior Hinged Hollow Core Door75/each$0.0075/each$0.0075/each$0.0075/each$0.0056/each$0.00
x019AGIDIQInstall Interior Hinged Hollow Core Door (with frame)10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019AHIDIQInstall Interior Solid Core Door (door only)10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019AJIDIQInstall Interior Solid Core Door (with frame)5/each$0.005/each$0.005/each$0.005/each$0.004/each$0.00
x019AKIDIQInstall Exterior Hinged Solid Core Door (door only)5/each$0.005/each$0.005/each$0.005/each$0.004/each$0.00
x019ALIDIQInstall Exterior Hinged Solid Core Door (with Frame)10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019AMIDIQInstall Bi-Fold or By-Pass Closet Door (all doors, hardware & frame)15/each$0.0015/each$0.0015/each$0.0015/each$0.0011/each$0.00
x019ANIDIQInstall Bi-Fold or By-Pass Closet Door (Door only-per panel)15/each$0.0015/each$0.0015/each$0.0015/each$0.0011/each$0.00
x019AOIDIQInstall Sliding Patio/Balcony Door (Both panes including frame)10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019APIDIQInstall Storm Door15/each$0.0015/each$0.0015/each$0.0015/each$0.0011/each$0.00
x019AQIDIQInstall Garage Door and Runners5/each$0.005/each$0.005/each$0.005/each$0.004/each$0.00
x019ARIDIQInstall Window/door Screen and Frame200/each$0.00200/each$0.00200/each$0.00200/each$0.00150/each$0.00
x019ASIDIQInstall Window Glass75/each$0.0075/each$0.0075/each$0.0075/each$0.0056/each$0.00
x019ATIDIQInstall Complete Window Including Frame25/each$0.0025/each$0.0025/each$0.0025/each$0.0019/each$0.00
x019AUIDIQInstall Siding (X019AUA to X019AUD)
x019AUAIDIQREPLACE SIDING (VINYL)250/Linear Feet$0.00250/Linear Feet$0.00250/Linear Feet$0.00250/Linear Feet$0.00188/Linear Feet$0.00
x019AUBIDIQREPLACE SIDING (ALUMINUM)250/Linear Feet$0.00250/Linear Feet$0.00250/Linear Feet$0.00250/Linear Feet$0.00188/Linear Feet$0.00
x019AUCIDIQREPLACE SIDING (CEDAR)750/Linear Feet$0.00750/Linear Feet$0.00750/Linear Feet$0.00750/Linear Feet$0.00563/Linear Feet$0.00
x019AUDIDIQREPLACE SIDING (CEMENT BOARD)750/Linear Feet$0.00750/Linear Feet$0.00750/Linear Feet$0.00750/Linear Feet$0.00563/Linear Feet$0.00
x019AVIDIQInstall Gutter/Downspouts1000/Linear Feet$0.001000/Linear Feet$0.001000/Linear Feet$0.001000/Linear Feet$0.00750/Linear Feet$0.00
x019AWIDIQInstall Mini-Blind/Vertical Blind1500/Linear Feet$0.001500/Linear Feet$0.001500/Linear Feet$0.001500/Linear Feet$0.001125/Linear Feet$0.00
x019AXIDIQInstall Interior/Exterior Light Fixture ( X019AXA to X019AXB )
x019AXAIDIQREPLACE EXTERIOR LIGHT FIXTURE75/each$0.0075/each$0.0075/each$0.0075/each$0.0056/each$0.00
x019AXBIDIQREPLACE EXTERIOR LIGHT FIXTURE75/each$0.0075/each$0.0075/each$0.0075/each$0.0056/each$0.00
x019AYIDIQInstall Kitchen Counter-tops/Bathroom Vanity Top/Backsplash2000/Linear Feet$0.002000/Linear Feet$0.002000/Linear Feet$0.002000/Linear Feet$0.001500/Linear Feet$0.00
x019AZIDIQInstall Medicine Cabinet25/each$0.0025/each$0.0025/each$0.0025/each$0.0019/each$0.00
x019BAIDIQInstall Gypsum/Greenboard
x019BAAIDIQInstall Regular Gypsum2000/sq ft$0.002000/sq ft$0.002000/sq ft$0.002000/sq ft$0.001500/sq ft$0.00
x019BABIDIQInstall Moister Resistant Gypsum2000/sq ft$0.002000/sq ft$0.002000/sq ft$0.002000/sq ft$0.001500/sq ft$0.00
x019BBIDIQFull Interior Paint (2 Bedroom Units) includes 2+90/each$0.0090/each$0.0090/each$0.0090/each$0.0068/each$0.00
x019BCIDIQFull Interior Paint (3 Bedroom Units)40/each$0.0040/each$0.0040/each$0.0040/each$0.0030/each$0.00
x019BDIDIQFull Interior Paint (4 Bedroom Units)40/each$0.0040/each$0.0040/each$0.0040/each$0.0030/each$0.00
x019BEIDIQInterior Paint75000/sq ft$0.0075000/sq ft$0.0075000/sq ft$0.0075000/sq ft$0.0056250/sq ft$0.00
x019BFIDIQExterior Paint25000/sq ft$0.0025000/sq ft$0.0025000/sq ft$0.0025000/sq ft$0.0018750/sq ft$0.00
x019BGIDIQInstall Carpet with Padding (with Tack strips and Transition Strips)10000/sq yd$0.0010000/sq yd$0.0010000/sq yd$0.0010000/sq yd$0.007500/sq yd$0.00
x019BHAIDIQREPLACE BASE MOLDING (RUBBER)3500/Linear Feet$0.003500/Linear Feet$0.003500/Linear Feet$0.003500/Linear Feet$0.002625/Linear Feet$0.00
x019BHBIDIQREPLACE BASE MOLDING (WOOD)3500/Linear Feet$0.003500/Linear Feet$0.003500/Linear Feet$0.003500/Linear Feet$0.002625/Linear Feet$0.00
x019BJIDIQInstall Bath Tub35/each$0.0035/each$0.0035/each$0.0035/each$0.0026/each$0.00
x019BKIDIQGrass Cutting (vacant/not in COM)360/each$0.00360/each$0.00360/each$0.00360/each$0.00342/each$0.00
x019BLIDIQInstall Kitchen sink10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019BMIDIQInstall bathroom sink10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019BNIDIQInstall Shower Enclosure50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BOIDIQInstall Bathroom Exhaust Fan20/each$0.0020/each$0.0020/each$0.0020/each$0.0015/each$0.00
x019BPIDIQRefinish Cabinets50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BQIDIQFire Place Inspection/Cleaning100/each$0.00100/each$0.00100/each$0.00100/each$0.0075/each$0.00
x019BRIDIQInstall Refrigerator50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BSIDIQInstall Dishwasher50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BTIDIQInstall Clothes Washer50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BUIDIQInstall Clothes Dryer50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BVIDIQInstall Freestanding Stove/Oven50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019BWIDIQInstall Cook Top Range16/each$0.0016/each$0.0016/each$0.0016/each$0.0012/each$0.00
x019BXIDIQInstall Under Counter Oven16/each$0.0016/each$0.0016/each$0.0016/each$0.0012/each$0.00
x019BYIDIQInstall Garbage Disposal30/each$0.0030/each$0.0030/each$0.0030/each$0.0023/each$0.00
x019BZIDIQReplace Deck Boards1000/Linear Feet$0.001000/Linear Feet$0.001000/Linear Feet$0.001000/Linear Feet$0.00750/Linear Feet$0.00
x019CAIDIQReplace in kind Structural Roof Support15/each$0.0015/each$0.0015/each$0.0015/each$0.0011/each$0.00
x019CBIDIQInstall in kind Kitchen Oven Hood40/each$0.0040/each$0.0040/each$0.0040/each$0.0030/each$0.00
x019CCIDIQInstall Vinyl Tile Plank Flooring – Red Cherry Wood5000/sq yd$0.005000/sq yd$0.005000/sq yd$0.005000/sq yd$0.003750/sq yd$0.00
x019CDIDIQInstall Vinyl Tile Plank Flooring – Aegean Travertine2000/sq yd$0.002000/sq yd$0.002000/sq yd$0.002000/sq yd$0.001500/sq yd$0.00
x019CEIDIQAsbestos Testing50/each$0.0050/each$0.0050/each$0.0050/each$0.0038/each$0.00
x019CFIDIQAsbestos Flooring/Mastic Abatement250/sq yd$0.00250/sq yd$0.00250/sq yd$0.00250/sq yd$0.00188/sq yd$0.00
x019CGIDIQAsbestos Wallboard Abatement100/sq yd$0.00100/sq yd$0.00100/sq yd$0.00100/sq yd$0.0075/sq yd$0.00
x019CHIDIQLead Paint Abatement5000/sq ft$0.005000/sq ft$0.005000/sq ft$0.005000/sq ft$0.003750/sq ft$0.00
x019CJIDIQInstall Deep Freezer30/each$0.0030/each$0.0030/each$0.0030/each$0.0023/each$0.00
x019CKIDIQInstall New Storage Shed10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019CLIDIQ5 Day COM package10/each$0.0010/each$0.0010/each$0.0010/each$0.008/each$0.00
x019 Total:$0.00x019 Total:$0.00x019 Total:$0.00x019 Total:$0.00x019 Total:$0.00
x020x020STANDING5.20 SUPPORT SERVICES12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x020AIDIQ5.20.4.A. CRANE SERVICES.380/hr$0.00380/hr$0.00380/hr$0.00380/hr$0.00285/hr$0.00
x020BIDIQ5.20.4B HEAVY LIFT CRANE SERVICES.100/hr$0.00100/hr$0.00100/hr$0.00100/hr$0.00750/hr$0.00
x020NNNAVY5.20.5 SERVICE SPECIFICATIONS FOR U.S. NAVY12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x020 Total:$0.00x020 Total:$0.00x020 Total:$0.00x020 Total:$0.00x020 Total:$0.00
x021x021STANDING5.21 PEST CONTROL SERVICES12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x021AIDIQ5.21.5.A. ANIMAL CONTROL36/event$0.0036/event$0.0036/event$0.0036/event$0.0027/event$0.00
x021BIDIQ5.21.5.B. PEST SERVICES IN ADDITIONAL LOCATIONS12/event$0.0012/event$0.0012/event$0.0012/event$0.009/event$0.00
x021NNNAVY5.21.6 SERVICE SPECIFICATIONS FOR U.S. NAVY6/event$0.006/event$0.006/event$0.006/event$0.005/event$0.00
x021 Total:$0.00x021 Total:$0.00x021 Total:$0.00x021 Total:$0.00x021 Total:$0.00
x022x022ASTANDING5.22 MAINTENANCE, REPAIR, AND IMPROVEMENT UNIT PRICED WORK.$0.00$0.00$0.00$0.00$0.00
x022AAIDIQ5.22.4.A. INTERIOR PAINTING.100,000/sq ft$0.00100,000/sq ft$0.00100,000/sq ft$0.00100,000/sq ft$0.0075,000/sq ft$0.00
x022ABIDIQ5.22.4.A. EXTERIOR PAINTING.100,000/sq ft$0.00100,000/sq ft$0.00100,000/sq ft$0.00100,000/sq ft$0.0075,000/sq ft$0.00
x022BIDIQ5.22.4.B. CARPETING30000/sq ft$0.0030000/sq ft$0.0030000/sq ft$0.0030000/sq ft$0.0022500/sq ft$0.00
x022CIDIQ5.22.4.C. VINYL OR SHEET LINOLEUM2000/sq ft$0.002000/sq ft$0.002000/sq ft$0.002000/sq ft$0.001500/sq ft$0.00
x022DIDIQ5.22.4.D. LAMINATE FLOORING10000/sq ft$0.0010000/sq ft$0.0010000/sq ft$0.0010000/sq ft$0.007500/sq ft$0.00
x022EIDIQ5.22.4.E. COVE BASE MOLDING Wood / Rubber6000/linear ft$0.006000/linear ft$0.006000/linear ft$0.006000/linear ft$0.004500/linear ft$0.00
x022FIDIQ5.22.4.F. ROPPE RUBBER FLOOR TILE.4500/sq ft$0.004500/sq ft$0.004500/sq ft$0.004500/sq ft$0.003375/sq ft$0.00
x022GIDIQ5.22.4.G. ROPPE STAIR TREAD AND RISER500/linear ft$0.00500/linear ft$0.00500/linear ft$0.00500/linear ft$0.00375/linear ft$0.00
x022HIDIQ5.22.4.H. STAIR CARPETING.600/sq ft$0.00600/sq ft$0.00600/sq ft$0.00600/sq ft$0.00450/sq ft$0.00
x022IIDIQ5.22.4.I. VINYL FLOOR TILE4500/sq ft$0.004500/sq ft$0.004500/sq ft$0.004500/sq ft$0.003375/sq ft$0.00
x022JIDIQ5.22.4.J. METALIZING ((400) sq. ft. limit does not apply).1000/sq ft$0.001000/sq ft$0.001000/sq ft$0.001000/sq ft$0.00750/sq ft$0.00
x022KIDIQ5.22.4.K. REPLACE FLOORING RARE PENNY OAK VINYL PLANK3000/sq ft$0.003000/sq ft$0.003000/sq ft$0.003000/sq ft$0.002250/sq ft$0.00
x022LIDIQ5.22.4.K REPLACE FLOORING ANNA MARIA MARBLE VINYL PLANK2000/sq ft$0.002000/sq ft$0.002000/sq ft$0.002000/sq ft$0.001500/sq ft$0.00
x022MIDIQ5.22.4.L LEAD ABATEMENT INTERIOR1000/sq ft$0.001000/sq ft$0.001000/sq ft$0.001000/sq ft$0.00750/sq ft$0.00
x022NIDIQ5.22.4.L LEAD ABATEMENT EXTERIOR2000/sq ft$0.002000/sq ft$0.002000/sq ft$0.002000/sq ft$0.001500/sq ft$0.00
x022NNNAVY5.22.5. SERVICE SPECIFICATIONS FOR U.S. NAVY.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x022 Total:$0.00x022 Total:$0.00x022 Total:$0.00x022 Total:$0.00x022 Total:$0.00
x023x023STANDING5.23 AIR STATION VEHICLES AND EQUIPMENT.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x023AIDIQ5.23.4.A. AIR STATION UTV PM PLAN15/each$0.0015/each$0.0015/each$0.0015/each$0.0011/each$0.00
x023 Total:$0.00x023 Total:$0.00x023 Total:$0.00x023 Total:$0.00x023 Total:$0.00
x024x024STANDING5.24 ALARM AND FIRE SUPPRESSION SYSTEMS12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x024NNNAVY5.24.5. SERVICE SPECIFICATIONS FOR U.S. NAVY.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x024 Total:$0.00x024 Total:$0.00x024 Total:$0.00x024 Total:$0.00x024 Total:$0.00
x025x025STANDING5.25 LOCKSMITH SERVICES12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x025AIDIQ5.25.4.A. BULK REKEYING/RECOREING20/lot of 10$0.0020/lot of 10$0.0020/lot of 10$0.0020/lot of 10$0.0015/lot of 10$0.00
x025NNNAVY5.25.5. SERVICE SPECIFICATIONS FOR U.S. NAVY12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x025 Total:$0.00x025 Total:$0.00x025 Total:$0.00x025 Total:$0.00x025 Total:$0.00
x026x026STANDING5.26. DIG PERMITS AND OUTAGES12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x026 Total:$0.00x026 Total:$0.00x026 Total:$0.00x026 Total:$0.00x026 Total:$0.00
x027x027ASTANDINGSECTION 7.0 PERSONNEL REQUIREMENTS AND QUALIFICATIONS.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027BSTANDING7.2.1. PROJECT MANAGER (PM).12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027CSTANDING7.2.2. CONTRACTOR QUALITY CONTROL (CQC) REPRESENTATIVE12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027DSTANDING7.2.3. UTILITY SYSTEMS MANAGER12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027ESTANDING7.2.4. OSH PROGRAM MANAGER12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027FSTANDING7.2.5. ENVIRONMENTAL PROGRAM MANAGER12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027GSTANDING7.2.6. AVIATION FUEL STATION PRIMARY OPERATOR (AFO).12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027HSTANDING7.2.7. LEAD OPERATORS FOR FUEL SERVICES, WWTP, WTP, CHP, AND USED OIL PLANT.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027ISTANDING7.2.8. LEAD JOURNEYMAN STEAMFITTER.12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027JSTANDING7.2.9. MECHANICAL ADMINISTRATOR12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027KSTANDING7.2.10. LEAD JOURNEYMAN ELECTRICIAN12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x027 Total:$0.00x027 Total:$0.00x027 Total:$0.00x027 Total:$0.00x027 Total:$0.00
x028x028STANDING7.5 TRAINING PROGRAM & PLAN12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x028 Total:$0.00x028 Total:$0.00x028 Total:$0.00x028 Total:$0.00x028 Total:$0.00
x029x029STANDING8.0 QUALITY CONTROL12/Month$0.0012/Month$0.0012/Month$0.0012/Month$0.009/Month$0.00
x029 Total:$0.00x029 Total:$0.00x029 Total:$0.00x029 Total:$0.00x029 Total:$0.00
x=0x=1x=2x=3x=4
ANNUAL CONTRACT VALUE FOR ALL LINE ITEMS:$48,000.00$48,000.00$48,000.00$48,003.00$36,000.00
TOTAL 5-YEAR CONTRACT VALUE FOR ALL LINE ITEMS:$228,003.00
*ORDERS FOR ANY OF THE CLINS ABOVE WILL ONLY BE ORDERED AND FUNDED ON TASK ORDERS AGAINST THE CONTRACT.

CLIN x0040 Labor Rates

CLIN x0040 Level III Job Orders, IAW Section 4 of the PWS
This labor may be subject to the Service Contract Labor Standards or Construction Wage Rate Requirements .
Note: To calculate the total price for this line item:
(1) use proposed composite* labor rates for each labor category below;
(2) multiply by the exact number of labor hours indicated for each labor category times the
applicable composite labor rate and enter the total for that labor category;
(3) add all category totals for a total labor cost;
(4) add the cost of any materials, equipment and subcontractor (MES) costs, which is to include
its markup factor, to the total labor costs to arrive at the total price for the Level III Job Orders.
*Composite Labor Rates: The composite labor rate for each labor category shall be fixed hourly rate
including but not limited to wages, health and welfare benefits, other fringe benefits, taxes,
Overhead**, G&A**and Profit**. The composite labor rates listed below are binding for all Level III
Job Orders issued during the period of performance of the contract.
**Except for adjustments in accordance with FAR 52.222-43, Fair Labor Standards Act and Service
Contract Act--Price Adjustment (Multiple Year and Option Contracts) and
FAR 52.222-32 -- Construction Wage Rate Requirements—Price Adjustment (Actual Method) the composite
labor rate is binding for all Level III Job Orders issued during this performance period of the contract.
Service work that exceeds the $10,000 Level II ceiling threshold, in combined direct labor and direct material
costs will become a Level III job order IAW Section 4.1 of the PWS.
The number of estimated hours shown will be used for evaluation and budgetary purposes.
The number of hours required in any contract year will vary, and the Government does not guarantee the
amount of hours shown will equal the amount of hours the contractor will have to provide.
= Offeror shall edit sections marked in yellow to reflect their bid, the numbers listed are for example purposes only
CONSTRUCTION LABOR RATES FOR LEVEL III JOB ORDERS
Firm Fixed Price (FFP) Rates Subject to the Construction Wage Rate Requirements
Composite Labor Rates
EstimatedTotal
Labor CategoryLabor HoursBase PeriodOption Year 1Option Year 2Option Year 3Option Year 4Base PeriodOption Year 1Option Year 2Option Year 3Option Year 4
1. Asbestos Worker80x=$ - 0$ - 0$ - 0$ - 0$ - 0
2. Hazardous Material Handler10x=$ - 0$ - 0$ - 0$ - 0$ - 0
3. Boilermaker5x=$ - 0$ - 0$ - 0$ - 0$ - 0
4. Carpenter200x=$ - 0$ - 0$ - 0$ - 0$ - 0
5. Electrician60x=$ - 0$ - 0$ - 0$ - 0$ - 0
6. Painter,Brush,Roller,Sign200x=$ - 0$ - 0$ - 0$ - 0$ - 0
7. Painter,Steel,Paper,Vinyl200x=$ - 0$ - 0$ - 0$ - 0$ - 0
8. Painter,Spray,Sandblast15x=$ - 0$ - 0$ - 0$ - 0$ - 0
9. Plumbers,Steamfitters400x=$ - 0$ - 0$ - 0$ - 0$ - 0
10. Roofers100x=$ - 0$ - 0$ - 0$ - 0$ - 0
11. Sheet Metal Workers50x=$ - 0$ - 0$ - 0$ - 0$ - 0
12. Sprinkler Fitters20x=$ - 0$ - 0$ - 0$ - 0$ - 0
13. Tile Setters20x=$ - 0$ - 0$ - 0$ - 0$ - 0
14. Laborers, Group 1200x=$ - 0$ - 0$ - 0$ - 0$ - 0
15. Laborers, Group 2200x=$ - 0$ - 0$ - 0$ - 0$ - 0
16. Laborers, Group 3200x=$ - 0$ - 0$ - 0$ - 0$ - 0
17. Power Equip.Oper,Grp 1120x=$ - 0$ - 0$ - 0$ - 0$ - 0
18. Power Equip.Oper,Grp 1A120x=$ - 0$ - 0$ - 0$ - 0$ - 0
19. Power Equip.Oper,Grp 2120x=$ - 0$ - 0$ - 0$ - 0$ - 0
20. Power Equip.Oper,Grp 35x=$ - 0$ - 0$ - 0$ - 0$ - 0
21. Truck Drivers, Group 15x=$ - 0$ - 0$ - 0$ - 0$ - 0
22. Truck Drivers, Group 25x=$ - 0$ - 0$ - 0$ - 0$ - 0
23. Truck Drivers, Group 35x=$ - 0$ - 0$ - 0$ - 0$ - 0
24. Truck Drivers, Group 45x=$ - 0$ - 0$ - 0$ - 0$ - 0
25. Truck Drivers, Group 55x=$ - 0$ - 0$ - 0$ - 0$ - 0
26. SCADA Technician15x=$ - 0$ - 0$ - 0$ - 0$ - 0
27. DDC Technician10x=$ - 0$ - 0$ - 0$ - 0$ - 0
28. Mechanical Administrator25x=$ - 0$ - 0$ - 0$ - 0$ - 0
(A) Total FFP Labor Cost for Construction Wage Rate RequirementsTotal$ - 0$ - 0$ - 0$ - 0$ - 0
(SUM TOTAL FOR 1 - 28)
FFP Rates Subject to the Service Contract Labor Standards
Estimated
Labor CategoryLabor Hours

AUTOMOTIVE SERVICES:

1. Motor Equip Metal Mechanic5x=$ - 0$ - 0$ - 0$ - 0$ - 0
2. Motor Vehicle Mechanic40x=$ - 0$ - 0$ - 0$ - 0$ - 0
3. Motor Vehicle Mech Helper2x=$ - 0$ - 0$ - 0$ - 0$ - 0
4. Motor Vehicle Wrecker2x=$ - 0$ - 0$ - 0$ - 0$ - 0
5. Tire Repairer2x=$ - 0$ - 0$ - 0$ - 0$ - 0

GENERAL SERVICES AND SUPPORT:

6. Janitor, Porter, Cleaner10x=$ - 0$ - 0$ - 0$ - 0$ - 0
7. Laborer, General Maint.2x=$ - 0$ - 0$ - 0$ - 0$ - 0
8. Laborer, Grounds Maint.120x=$ - 0$ - 0$ - 0$ - 0$ - 0

MATERIALS HANDLING & PACKING:

9. Forklift Operator5x=$ - 0$ - 0$ - 0$ - 0$ - 0
10. Fuel Distr Systems Oper.80x=$ - 0$ - 0$ - 0$ - 0$ - 0
11. Material Handling Laborer3x=$ - 0$ - 0$ - 0$ - 0$ - 0
12. Hazardous Material Tech5x=$ - 0$ - 0$ - 0$ - 0$ - 0

MECHANICS & MAINTENANCE & REPAIR:

13. Carpenter, Maintenance100x=$ - 0$ - 0$ - 0$ - 0$ - 0
14. Carpet Layer3x=$ - 0$ - 0$ - 0$ - 0$ - 0
15. Electrician, Maintenance40x=$ - 0$ - 0$ - 0$ - 0$ - 0
16. Fire Alarm System Mech15x=$ - 0$ - 0$ - 0$ - 0$ - 0
17. General Maint. Worker20x=$ - 0$ - 0$ - 0$ - 0$ - 0
18. Heating, Regrigeration & Air
Conditioning Mechanic15x=$ - 0$ - 0$ - 0$ - 0$ - 0
19. Heavy Equipment Mechanic80x=$ - 0$ - 0$ - 0$ - 0$ - 0
20. Maintenance Trades Helper3x=$ - 0$ - 0$ - 0$ - 0$ - 0
21. Mason, Maintenance3x=$ - 0$ - 0$ - 0$ - 0$ - 0
22. Painter, Maintenance40x=$ - 0$ - 0$ - 0$ - 0$ - 0
23. Pipe Fitter, Maintenance40x=$ - 0$ - 0$ - 0$ - 0$ - 0
24. Plumber, Maintenance40x=$ - 0$ - 0$ - 0$ - 0$ - 0
25. Asbestos Worker3x=$ - 0$ - 0$ - 0$ - 0$ - 0
26. Welder, Maintenance10x=$ - 0$ - 0$ - 0$ - 0$ - 0
27. Rigger3x=$ - 0$ - 0$ - 0$ - 0$ - 0
28. Elevator Repairer3x=$ - 0$ - 0$ - 0$ - 0$ - 0
29. Appliance Mechanic3x=$ - 0$ - 0$ - 0$ - 0$ - 0
30. Electronics Technician5x=$ - 0$ - 0$ - 0$ - 0$ - 0
31. Machinist Maintenance3x=$ - 0$ - 0$ - 0$ - 0$ - 0
32. Sheet Metal Worker, Maint.3x=$ - 0$ - 0$ - 0$ - 0$ - 0

PLANT & SYSTEM OPERATION:

33. Boiler Operator5x=$ - 0$ - 0$ - 0$ - 0$ - 0
34. Sewage Plant Operator5x=$ - 0$ - 0$ - 0$ - 0$ - 0
35. Water Treatment Plant Oper5x=$ - 0$ - 0$ - 0$ - 0$ - 0

TRANSPORTATION/MOBILE EQUIPMENT:

36. Bus Driver5x=$ - 0$ - 0$ - 0$ - 0$ - 0
37. Heavy Equipment Operator80x=$ - 0$ - 0$ - 0$ - 0$ - 0
38. Tractor Operator5x=$ - 0$ - 0$ - 0$ - 0$ - 0
39. Truck Driver, Light Truck2x=$ - 0$ - 0$ - 0$ - 0$ - 0
40. Truck Driver, Medium Truck2x=$ - 0$ - 0$ - 0$ - 0$ - 0
41. Truck Driver, Heavy Truck25x=$ - 0$ - 0$ - 0$ - 0$ - 0
(B) Total FFP Labor Cost for Service Contract Labor StandardsTotal$ - 0$ - 0$ - 0$ - 0$ - 0
(SUM TOTAL FOR 1-41)
(C) TOTAL LABOR COST FOR LEVEL III JOB ORDERS
[SUM OF (A)+(B)]$ - 0$ - 0$ - 0$ - 0$ - 0
(D)MATERIAL, EQUIPMENT AND SUBCONTRACTING (MES) HANDLING/ADMINISTRATIVE/
PROFIT RATES FOR JOB ORDERS

For evaluation purposes only, MES costs are estimated at:

Material$10,000.00
Equipment$2,000.00
Subcontractor$23,000.00
SUM OF MES (D) COSTS$35,000.00All Years

(E) Project lead/estimating/construction supervisor E = 0.00% All Years

(F)A handling charge (as a %) will be added to the MES costs for indirect (overhead) costs.
The MES handling charge is binding for all Level III orders issued during this period. The handling
charge shall not include profit, shall include all appropriate costs IAW
section 4.1 of the PWSF =0.00%All Years
A profit rate (as a %) will be applied to the MES costs for Profit.
(G)The Profit rate is binding for Level III orders issued during this period, and
shall be applied IAW section 4.1 of the PWS.G=0.00%All Years
(H) TOTAL ESTIMATED MES FOR LEVEL III JOB ORDERSH=0.00%All Years
(E+F+G)
Base PeriodOption Year 1Option Year 2Option Year 3Option Year 4
(J) TOTAL PRICE FOR LEVEL III JOB ORDERS FOR BASE ORDERING PERIODJ=$0.00$0.00$0.00$0.00$0.00
Base PeriodOption Year 1Option Year 2Option Year 3Option Year 4
$ 35,000.00$ 35,000.00$ 35,000.00$ 35,000.00$ 35,000.00
This is the total of labor (C) plus the total MES (H). (This figure is for evaluation and budget purposes only and
is not part of the firm-fixed-priced portion of the contract.)

Q&As

Line Item from summary pageListed PWS SectionActual PWS SectionDescriptionAnnual Cost Model Estimate ($K)Annual Legacy Service Price ($K)CommentsComments
CLINS should be lined up in numerical order so that they are easier to follow and in alignment with the PWS documentsummary tab provides the requested sequence
CLIN numbering system do not match up to the PWS document CLIN numbers. These are all specified belowCLIN number system updated to reflect PWS
Where do the material costs come from? Are there any materials included in the costs listed below or are they just labor costsUSCG provided historical Non-Labor Costs
Other labor related costs: These are not correctly calculated. The first year should not have a wage determination. After the second year, each previous year wage determination gets added to the current wage determination. It should not be $2.3M straight across the board every year.wage rates frozen in base and first option year and increased each subsequent year
125.195.24AIRSTA Vehicles$74$246.0There is no major change to this service. We would like to know how $74K annually was calculated. This value is important because we need to be able to provide the aviation product line with an accurate cost so that we can be reimbursed properlyConcur that there is no major change to the scope of work. The current contract reports an average of 2173 labor hours per year and an average of $20k in nonlabor costs. Current estimate is calculated using the distribution of work across similar labor categories for Air Station Vehicles in the legacy contract and applying estimated future wages.
5.145.22MRIN/A$200.0MRI and housing maintenance should be separated. IN the cost model they are lumped together. MRI's are IDIQ and typically we spend about $200K on MRIs alone.CLINS have been separated in this version of the cost model. The estimate for MRIs is mostly contained in IDIQ items and aligns with existing spending trends.
135.175.19Housing MaintenanceN/A$1,200.0These need to be broken down to their indivual service areas (MRI- 5.22, Housing Maintenance 5.19). Is 56K the monthly cost or the annual cost for housing maintenance? Housing maintenance is done as IDIQ and we currently spend over $1M annually on housing maintenance.Legacy COMCOR services broken out to reflect MRI and Housing Maintenance.
145.10 (a-h)5.9-5.14Environmental$188$532.8This should be broken down for the appropriate PWS sections for 5.9-5.14. In addition, 5.13 is a completely new CLIN so there is no historical data. How was this cost modeled? Legacy environmental is $496K annually.The legacy Environmental Services have been divided into separate CLINS (5.9 through 5.14). Section 5.13 was modeled using the labor categories normally affiliated with Environmental work in the legacy BOSS contract supplemented by an estimate of the level of effor to support the existing scope of work - 350-500 hrs per year. The subCLINS for tank replacement are estimated seperately.
155.95.8Fuel Services$627$564.1Current contract cost is approx $564K. Given that we added requirements to this CLIN the cost is probably not valid.Noted the addition of "non-routine plant operations" and shifting of some work to IDIQ. Contractor reports an average of 6700 labor hours to support this effort.
165.65.5Grounds Maintenance$305$135.6The legacy cost of this is $135K annually. Does this cost model include the added COMMSTA maintenance we added.The 10-yr average cost for grounds maintenance was reported as $286k/year and we understood that Grounds Maintenance for the COMMSTA was being accomplished in the legacy BOSS contract as Service Work. Based on our interview with the COR, we identified the labor categories in the legacy contract under Service Work and reallocated those hours to Grounds Maintenance to capture the COMMSTA level of effort (2850hrs/yr). The legacy BOSS contract utilized approximately 9000 hrs/yr.
175.35.3Janitorial$55$1,453.0Where is the source data for this? There is no way that janitorial is $54K per year. We pay more per year for that for some of the buildings alone under the current contract. While we reduced levels of service, we did not reduce them that much. For reference, we are currently paying $121K per month for janitorialLegacy contract reports an average of 30,000 hrs/yr and an additional $85k annually in non-labor costs The comparison between the cleaning schedules in the legacy and new PWS indicated a 15% reduction in janitorial services and has been included in this workbook.
185.15.1Service Work (Level III)$33This is done as IDIQ as funding is available based on needs of the CG. We typically spend about $300K on Level 3.Current cost model shows a similar estimate
195.135.18Shipping & Receiving$911$835.0The legacy cost of this is $835K annually. We made significant cuts to this CLIN and would expect to see a reduced cost.Cost model estimates a 40% reduction due to reduced customer service hours 45.5 to 30 hrs per week. Shifted unit mail delivery, off-base delivery, and after hours shipping to IDIQ or service work.
20Mgmt/Admin$3,260$1,500.0How was this cost determined? Was the key personnel section used to delineate management staffing?The cost model includes labor categories normally affiliated with contract management and administration (QC, purchasing, accounting, lead trades, and management) based on their historical use. This equates to an average of 30,500 hrs/yr and an additional $663k annually in non-labor costs for the management and administration of the contract.
215.165.21Pest Control$4$53.0The BOSS subs this out to a 3rd party contractor. It appears that this cost could be the monthly cost, but not the annual cost for pest control. We have also increased the requirements here and would expect to see an increase to the service cost. $4400 annually does not seem to be an accurate?The inclusion of non-labor cost data in this version of the cost model likely address this comment. Furthermore, we noted a significant increase in the frequency of inspections from quarterly & monthly to monthly & weekly which impacts barracks, food service facilities, air station ready crew berthing, and the child development center, office spaces, recreational facilities, housing, and other regularly occupied spaces.
225.125.16Plant OPS$807$1,357.9The legacy plant ops included LOWS, which has now been broken out. LOWS should be listed separately as 5.17. The legacy cost for all of our plants is $1.35M. The cost model shows $800K. Where did this number come from?The operations of various plants is broken out in this version of the cost model, including LOWS as a separate CLIN
235.25.2Preventive Maintenance$25$418.0How was this calculated? Where is the source data from? Level of Effort is different in the new PWS.Legacy contract reports an average of 2200 hrs/yr and an additional $77k annually in non-labor costs for Preventative Maintenance. The cost model includes an additional 21779 hrs in the labor categories provided to the USCG by Cardno for new equipment enrollment.
245.25.2Preventive Maintenance (equip enrollment)$1,396NewSince this is all new, where is the basis for this data? The equipment enrollment efforts are estimated to take an additional 30K hours. We would like to see the source data to be able to provide an accurate evaluation.Legacy contract reports an average of 2200 hrs/yr and an additional $77k annually in non-labor costs for Preventative Maintenance. The cost model includes an additional 21779 hrs in the labor categories provided to the USCG by Cardno for new equipment enrollment.
255.46Records Reports Deliverables$18$43.0This is currently $43K per year under the existing contract. What is the basis of calculations for this? My understanding is that we cut down on a lot of reports that are unnecessary, but how was this calculated?There are significant discrepancies in the reported data regarding "Reports". Depending on the source, levels of effort to support the generation of "Reports" ranges from 144-550 hrs per year. Legacy contract reports paying $43k annually. Independent review of requested reports for the new contract indicate approximately 3250 hrs annually to produce 814 reports which may equate to $200k annually.
265.55.4Refuse$142$98.7The legacy service is 99K annually. Cost model estimate is $142K. Since we moved some of the recycling stuff from janitorial to this section this could make sense, but would like to see calculation.Referencing government comment, bulk recycle was included in the Refuse Section of the legacy contract Section C.5.5.4.2. Current contract reports 2788 labor hours and $6k annually in support of this effort.
275.85.7Roadway, Sewer and Maintenance$71$388.1The legacy service cost is $388K/year. Cost model cost is $71K/year. How was this cost estimate developed. The LOS didn't change that drastically.Current contract reports 3900 labor hours and $33k in non-labor costs. Current PWS removes the requirement to maintain "SIGNAGE" but other scope appears equivalent.
285.185.23Front Gate$970The legacy service is $241K. The cost model is $970K. How was this estimated?Current contract reports 9596 labor hours. Current contract staffing needs requires a minimum of 8760 hrs.