Request for Information 3.20.23.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
US Coast Guard Base Kodiak Base Operations Support Services
Solicitation number
70Z08423RKODI0001
Issued by

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Base Kodiak BOSS Award Fee Plan_Final.pdf PDF
First page of the 1449.pdf PDF
Remaining RFI 6.22.23.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Revised Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
Attachment 6- Davis Bacon Act WD AK20230005 5.24.23.pdf PDF
Attachment 5- Davis-Bacon Act WD AK20230001 5.24.23.pdf PDF
Final Request for Information 5.24.23.xlsx XLSX spreadsheet
Attachment 2 - Performance Work Statement 5.24.23.pdf PDF
Final Request for Proposal 70Z08423RKODI0001 5.24.23.pdf PDF
Attachment 1 - CLIN Schedule of Prices 5.23.23.xlsx XLSX spreadsheet
Amendment_0007.pdf PDF
Amendment 0002.pdf PDF
Amendment 0006.pdf PDF
Amendment 0003.pdf PDF
Amendment 0005.pdf PDF
Amendment 0001.pdf PDF
Amendment 0004.pdf PDF
Attachment 2 - Performance Work Statement dated 13-MAR-23.pdf PDF
Revised Request for Proposal 70Z08423RKODI0001 3.20.23.pdf PDF
Preproposal Conf-BOSS Kodiak-22-FEB-2023.pptx PPTX presentation
CBA- signed 4 Mar 2022.pdf PDF
Revised REQUEST FOR PROPOSAL 70Z08423RKODI0001.pdf PDF
BOSS Kodiak Preproposal Conference Schedule.pdf PDF
Attendance Sheet page 2.pdf PDF
Revised Attachment 3 - Past Performance Questionnaire.pdf PDF
Attendance Sheet page 1.pdf PDF
Attachment 4 - Service Contract Act WD 2015-5687.pdf PDF
Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
TE 16.4 Coupon Stations (1).pdf PDF
TE 11.1 Drinking Water Monitoring Program.pdf PDF
TE 10.4 2017 Tsunami Readiness Plan - Final PDF.pdf PDF
Appendix I.3 Historical Fuel Transfers.xls XLS spreadsheet
Appendix C Summary Table of Task Area Deliverables Sections_v1.xlsx XLSX spreadsheet
Attachment 7 - CBA 2022-2024 dated 04 Mar 2022.pdf PDF
Appendix F.3 Example PM Schedule.xlsx XLSX spreadsheet
Appendix H Shore Facilities Inventory 2020.xlsx XLSX spreadsheet
TE 1.2 Mapbook_2021.pdf PDF
TE 16.1 CHP System Description (1).pdf PDF
TE 17.2 Oil Water Separators_May_2021 (1).pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Appendix B Government Property.Equipment.and Materials List.xlsx XLSX spreadsheet
Appendix I.2 Hazardous Waste Historical Annual Container and Sampling Costs.pdf PDF
Appendix E Performance Requirements Statement.pdf PDF
Request for Proposal.pdf PDF
TE 18.1 MBIT Report.xls XLS spreadsheet
TE 17.1 Used Oil System Description_May_2021 (1).pdf PDF
TE 19.1 COM Worksheet.xlsx XLSX spreadsheet
Appendix F.2 Equipment by Category Cat 1-5.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Industry Questions Government Responses

Question 1: PWS 5.3.1.A.1. states:” The Contractor shall provide janitorial services for thirty-three (33) separate buildings. The information listed in TE 3.1 identifies the buildings requiring janitorial services and TE 1.0 and TE 3.3 identify the estimated square footage for each type of maintained space. The majority of these buildings are all located on Base Kodiak proper except for the ESD, T1 and T2, N-71 Training Facility,N-92 CWTF Berthing, and N51 Golf Course.” Will the Government please supply TE 1.0, TE 3.1, and TE 3.3 identified in this requirement as we are unable to locate the missing Technical Exhibits in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 2: PWS 5.3.2.I.1. states: “The Contractor shall collect miscellaneous recyclable materials from the satellite recycling collection locations as specified in TE 4.1 or when notified by the COR that containers are full. Miscellaneous recyclable materials at satellite recycling collection locations include the following items: plastics, aluminum cans, office paper, paperboard, and magazines. The Contractor shall ensure collected materials shall be deposited in specifically designated recycling locations. Should the regularly scheduled collection day fall on a Federal holiday then the adjusted collection day is the day prior to the Federal holiday Will the Government please supply TE 4.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 3: PWS 5.3.5. states: “WORK SPECIFICATIONS FOR US NAVY. Provide all work described in this task area. Standing work cleaning is listed in TE 3.2.” Will the Government please supply TE 3.2 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 4: PWS 5.8.1.E.1. States: “The Contractor shall have qualified persons inspect fuel farm vehicles and equipment daily, perform operations maintenance, and perform repairs only to their fuel dispensing systems under this Section. The minimum qualifications are a Transportation Worker Identification Credential (TWIC) card; a Commercial Driver’s License (CDL) with a Tanker and Hazmat endorsement; training and experience with sampling fuels; and repairing fueling equipment. Aviation Fuel Farm Equipment inspection intervals, checklists, and required logs are found in TE 8.1. The Contractor shall perform all other mobile fuel equipment service work and repairs under Section 5.23.” Will the Government please supply TE 8.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 5: PWS 5.8.2.N.3. states: “The Contractor shall perform Aviation Fuel Farm equipment, fuel hydrant cart and fuel truck inspections in accordance with the requirements defined/outlined in TE 8.1. Contractor will complete a separate ESD Form 44 and ESD Form 45 for each mobile Fuel Equipment. ESD Forms will be left in N96 for QA Checks by Air Station Designated Fuel King representative. Air Station representative will collect the forms for submission to ACMS. Examples of Forms will be provided in TE 2.0.” Will the Government please supply TE 2.0 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 6: PWS 5.10.2.E.3. states: “Base Kodiak maintains an Intergraded Cultural Resource Management Plan, as well as Programmatic Agreement with the State Historic Preservation Officer regarding the Operation, Maintenance, and Development of the Base, TE 10.3. In coordination with the Base, the Contractor shall consider potential impacts to historic properties and support USCG compliance with the requirements of Section 106 of the National Historic Preservation Act. That Contractor shall provide an annual summary of work outlined in Exhibit A of the PA at each historic property.”Will the Government please supply TE 10.3 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 7: PWS 5.12.1. states: “SCOPE. The Contractor is responsible for the management of contractor generated hazardous waste. Base Kodiak is regulated as a Large Quantity Generator (LQG) by hazardous waste regulations and operates an EPA permitted Treatment, Storage, and Disposal Facility (TSDF) (commonly referred to as the Hazardous Waste Storage Building – HWSB). The work in this section is standing work, unless otherwise specified. RCRA Permit TE 10.6.” Will the Government please supply TE 10.6 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 8: PWS 5.15.1.A. states: “Vehicle Service Work (i.e., Level II Work) shall include work on the vehicles and equipment listed in Appendix B, in TE 15.1, as well as other vehicles and equipment not specifically listed on either of these attachments (e.g., equipment from remote stations, GSA-leased vehicles). Vehicle WOs are included in Level II Work identified in Section 5.1. Vehicle service WOs follow the same priority assignments as in Section 5.1. The USCG must approve all vehicle WOs.”Will the Government please supply TE 15.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 9: During the Preproposal Conference on 23 Feb 2023, vendors inquired what Coast Guard services and/or concessions to which BOSS employees will be granted access.BOSS Contract Employees have access to the following on Base Kodiak with appropriate RAPIDGate identification: CGES for food/snack/beverage items for daily immediate consumption only, MWR facilities, and CG Dining Facility. Employees must be full time employees at the Base and access is subject to change at any time by Base Commanding Officer.
Question 10: PWS 5.15.5 States: "WORK SPECIFICATIONS FOR U.S. NAVY. Provide all work described in this task area that specifically pertain to the Navy vehicle inventory included TE 5.1". Will the Government please supply TE 5.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 11: PWS 5.19.1.A.1. states: “BASIC COM PACKAGE. This is CLIN x019AA, which is a package of standard maintenance items as described in TE 19.3, which includes providing utility system checks and accomplishing various maintenance, repair, and cleaning tasks requiring various trades and materials. CLIN x019AX is the same work, but in a five (5) day period.” Will the Government please supply TE 19.3 identified in this requirement as we are unable to locate the missing Technical Exhibit to Posted Solicitation Files on Sam.gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 12: PWS 5.19.1.C. States: “General housing unit specifications are provided in TE 19.5. Current housing materials including siding, gutter & downspout, and mini & vertical blinds are provided in Appendix B.” Will the Government please supply TE 19.5 indentified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 13. PWS 5.20.2.B.7. states: “The Contractor shall provide support for power outages, including poor power quality issues, twenty-four (24) hours a day, 365 days a year, without USCG direction within Priority 1 response times (see section 5.1.2.W.1.) The Contractor shall perform checks during and after outages, as detailed in TE 20.1. After outages, the Contractor shall perform tasks listed in TE 20.2. The Contractor shall complete all necessary repairs resulting from outage within five business days. Will the Government please supply TE 20.1 and TE 20.2 identified in this requirment as we are unable to locate the missing Technical Exhibit in the Posted Soliciation Files on Sam.gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 14: PWS 5.22.2.A.1. states: “MRI UNIT PRICED WORK ORDERS AND SCHEDULING. The USCG will provide the information required for each MRI unit priced task ordered on a MRI Work Sheet (TE 22.1) and IDIQ Ordering Form. Upon receipt of the MRI work sheet, the Contractor shall develop a work schedule for each task. The schedule will include the projected work start and completion date for each task.” Will the Government please supply TE 22.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Soliciation Files on Sam.gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 15: PWS 5.22.4. States: “IDIQ. All Contractor work performed in this section shall be done in accordance with manufacturer’s instructions and meet industry standards. See TE 22.2 for product specifications.” Will the Government please supply TE 22.2 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 16: PWS 5.23.1. states: “SCOPE. The Contractor shall maintain, repair, and operate air station vehicles and equipment. This includes scheduled maintenance, tire service, fleet management, vehicle recovery services, and performing vehicle and equipment service work. Some examples of air station vehicles and equipment are aircraft tow trailers, scissor lifts, towable heaters, jacks, and mobile hydraulic supply carts. TE 23.1 contains the full inventory of vehicles and equipment to be maintained and repaired. The work in this section is standing work, unless otherwise specified.”Will the Government please supply TE 23.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 17: PWS 7.2. States: “PERSONNEL QUALIFICATIONS AND CERTIFICATIONS. The Contractor shall employ personnel who possess the appropriate certificate or license as required in the locality or, as an alternative, with the skills and qualifications specified in the latest edition of the DOL Service Contract Act Directory of Occupations unless otherwise indicated in 29 CFR 4, where specific certifications or license is not required. A list of licenses and certifications required by the previous BOSS contract has been provided for reference only in TE 26.1. Note that TE 26.1 is being provided for assistance with proposals but is up to the Contractor to make sure they have what they need during the course of the contract to comply with all local, State, and Federal licenses, permits, and certifications.”Will the Government please supply TE 26.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 18: PWS 10.2.7.A. States: “CRITICAL SPARES. The USCG shall provide a critical spares list at contract start the current critical spares list has been provided as TE 26.3, and shall be responsible for the initial stock of critical spares if the critical spare part is not already included in the consumable inventory. Throughout the course of the contract, the KO may add or delete items from the critical spare list. When the KO adds a new item to the critical spare list that is not already in the consumable inventory, the USCG will purchase and provide the part to the Contractor. The Contractor shall order and replace critical spare parts, regardless of unit price cost, that are maintained in the inventory on a one for one basis within fifteen (15) working days of when a critical spare was issued from stock. When the item cannot be restocked within fifteen (15) working days, the Contractor shall request an extension from the KO in writing. The extension request shall explain the circumstances why the part cannot be restocked in accordance with the requirements of this section.” Will the Government please supply TE 26.3 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 19: PWS 10.3.9.F.2. states: “PROVIDE RW CONTAINERS. Provide containers for accumulating, storing, and transporting regulated wastes in accordance with minimum stocking requirements of TE 12.4, RCRA Permit Attachment 5, and 49 CFR Part 178 DOT Specifications for Packaging. Appendix I provides estimated historical waste management costs. Containers must be in sound condition, DOT-shippable, and compatible with each waste type stored therein. The physical and chemical properties of the waste to be stored determine the container used.”Will the Government please supply TE 12.4 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 20: PWS 2.7.2. states: “BUILDINGS, STRUCTURES, HOUSING, ROADS, AND GROUNDS. Base Kodiak has approximately 400 buildings and structures listed in the Shore Facilities Inventory (SFI) (Appendix H). Square footages of housing units are in TE 19.5, and TE 1.0 has links to individual building floor plans.” Will the Government please supply TE 19.5 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 21: PWS 3.16. states: “CRITICAL SYSTEM WORK AND NOTIFICATIONS. The Contractor shall perform work on critical systems and equipment listed in TE 26.2. Whenever performing work on the systems listed in TE 26.2, the Contractor shall verbally notify the COR of actions taken and the status of work every time the systems or equipment are discovered or rendered by the Contractor as compromised or inoperative.” Will the Government please supply TE 26.2 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 22: PWS 3.17.3. states: “PHASE-IN. During the sixty (60) calendar days immediately prior to the contract start date, the incoming Contractor’s personnel may observe any operations of the incumbent Contractor to include office functions, procedures, and operations; repair and maintenance operations; and any other operations as deemed necessary by the incoming Contractor that will enable their personnel to become both knowledgeable in, and familiar with, their assigned areas of responsibility. The incumbent Contractor shall fully cooperate with the incoming Contractor and the Government. The incoming Contractor shall fully corporate with the incumbent Contractor so as not to interfere with operations or duty responsibilities. The incoming Contractor is responsible to provide any temporary office spaces required for this transition. The incoming Contractor may have a surge of work from the incumbent Contractor as the incumbent Contractor will not be required to complete work that has a priority deadline past their contract period. The USCG shall provide a grace period of 90 days to the incoming Contractor to complete this work. Before the new contract period begins, the incumbent and incoming Contractors must complete a GFE, GFM, and GFF sign off and submit to the COR for approval. The contractor shall follow the schedule provided in TE 26.4, or propose a new schedule to the KO for their approval or denial.” Will the Government please supply TE 26.4 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 23: PWS 3.17.4. states: “PHASE-OUT. During the ninety (90) calendar day period immediately prior to the end of this contract, the incumbent Contractor shall permit the incoming Contractor or Government employees to observe and become familiar with any and all operations under this contract. The incumbent Contractor shall not defer any needed repairs or maintenance for the purpose of avoiding responsibility to the incoming Contractor. The incoming Contractor shall fully cooperate with the incumbent Contractor and the Government so as not to interfere with their work or duties. The incumbent Contractor shall develop a phase-out plan to ensure a smooth and orderly transfer of responsibilities to a succeeding Contractor and submit to the COR 120 calendar days prior to the end of the existing contract. The incumbent Contractor’s plan shall identify all subcontractors involved in the transition including a statement of their role and service to be provided. At the end of contract performance, the incumbent Contractor shall comply with the requirements of FAR 52.237-3 (Continuity of Services). The contractor shall follow the schedule provided in TE 26.5, or propose a new schedule to the KO for their approval or denial.” Will the Government please supply TE 26.5 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 24: PWS 5.2.3.A. states: “ANNUAL PM PLAN. Contractor shall develop a detailed and comprehensive annual PM plan. The Contractor shall submit the initial plan for KO's approval within sixty (60) days after contract start date. The Contractor shall prepare and submit updates for review and approval fifteen (15) calendar days before the new ordering period start date. The Contractor shall ensure annual PM plans shall continuously track information pertaining to each specific system, piece of equipment, and PM task listed in 5.2.2.K. The Contractor shall assign appropriate category number to all newly enrolled equipment following already established convention described in TE 2.1.”Will the Government please supply TE 2.1 identified in this requirement as we are unable to locate the missing Technical Exhibit in the Posted Solicitation Files on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 25: PWS 10.5 states: “LIST OF TECHNICAL EXHIBITS (TES)” and goes on to provide all the TEs; however, many of the TEs are either missing altogether, or not contained in the inclusive list, e.g. TE 12.4 from our Question 18, and other TE’s in Questions 1, 3, 9, 4, 12, etc. Will the Government please provide a definitive list of all TEs in this proposal at PWS 10.5 and then provide all the TE missing from the Solicitation Documentation posted on Sam.Gov?A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 26:The PWS section 5.1.2.A.4 describes a DDC system for use monitoring and controlling building HVAC systems. a.Is the DDC system comprised of one or more different software systems?
b.What software does the DDC system use?
c.How old is the DDC software?
d.Does the DDC software have vendor warranty support?
e.Are there any network connectivity issues with the DDC system?
f.What facilities are connected to the DDC system, or if it is easier to answer in the negative, what facilities are not connected to the DDC system?

Will remote cyber-secure connections to the DDC system server be allowed for expert troubleshooting support?

a. two centrally located systems. R2 and R4.

b. Niagra

c. old enough the software is is unsupported

d. Not warranty support, but there is an outside contract for DDC programming

e. No known systemic ones, but the system has maintenance issues similar to any installation

f. Most housing is not, most industrial buildings are. Remote access is possible for a qualified SCADA tech (but not every HVAC technician )

Question 26: Will remote cyber-secure connections to the WWTP and WTP SCADA system servers be allowed for expert troubleshooting support.Yes
Question 27: The RFP Attachment i.8+PM-Master.xlsx spreadsheet notes that "This BOSS contractor was only required to complete 50% of PMs in 5.2, and sometime did not meet that mark."a. Will the new BOSS contractor be requirement to also complete only 50% of PMs or will this expectation increase or decrease?No, see PRS (appendix E) for perfomance metric requirements
Question 28: Section I.5 and III -States the page margins as “¾” on the sides for all pages” but Section III states “page margins of 1” on top, bottom, and both sides of each page”. Please clarify what the page margins should be for the sides of a page.Government Response will be provided in future amendment
Question 29: Section III states that mandatory forms are excluded from page count in the Volume I: Factor 1.

Please confirm if a signed SF1449, Reps and Certs, and subsequent Amendment forms are to be included in Volume I: Factor 1 or Volume IV – Factor 4 as currently listed.

Government Response will be provided in future amendment
Question 30: Reference: Section III. The following attachments are listed in Section III but were not provided with the solicitation files:
TE 1.0 - GIS Layer Package
TE 2.0 Forms
TE 2.1 - Equipment Enrollment Business Rules
TE 3.1 - Level of Service Cleaning Frequency
TE 4.1 - Refuse Container Locations and Frequency
TE 5.1 - Sports Fields
TE 5.2 - Grounds Maintenance and RCRA Sites Map
TE 8.1 - Aviation Fuel Farm Equipment Records and Forms
TE 10.3 - Integrated Cultural Resource Management Plan
TE 10.6 - RCRA Permit
TE 19.3 -Unit Priced Work Description
TE 19.4 - Additional Housing Maintenance Line Items Sign-Offs Sheet
TE 19.5 - Basic Specifications for Housing Unit Types

Please provide the attachments listed in Section III but not provided with the solicitation.

A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 31: Reference Secton III- Proposal Instructions state that “Each evaluation factor shall be addressed in a separate proposal volume and provided in separate electronic files as specified above, to include separate electronic files for the Technical Capability subfactors.”

Please clarify whether Volume I – Factor 1 should be a single file with all 7 Subfactors or whether Volume I-Factor 1 should be 7 separate files, one to address each Subfactor.

Governement response will be provided in future amendment
Question 32: Language in Factor 2, Subfactor 2.2 states that Corporate Experience “must have been performed by the prime contractor or primary member of a JV.

Language in Factor 3 states that “the past performance of a parent or affiliated/sister company will be attributed to an offeror of a JV in an equal manner where the firm's proposal demonstrates that the resources of the parent or affiliated/sister company have affected the performance of the offeror.”

Please confirm that Prime Offerors that are not part of a JV teaming arrangement may also cite Corporate Experience and past performance references for any of the Prime Offeror’s sister subsidiary companies and subcontractors.The intention is to get the past performance of the company or companies associated in a parntership, as well as asses if the partnership is lasting through the contract and not a "bait and switch" partnership to meet the terms of the proposal and change later. Also, parent companies show mixed results on ability to support their subsidiaries
Question 33: Reference 5.17.3.A.2: The PWS states that the “Contractor shall provide the [Operations] plan with the proposal comprehensive and detailed step-by-step procedures covering all requirements specified in supplied publications and technical exhibits.”

Please confirm that an Operations Plan is a post-award deliverable.

See deliverables table (appendix c)
Question 34: Reference: 7.1.3A Requirements for the Utility Systems Manager state that the individual “must currently hold at least one State of Alaska license or certification as defined in Section 5.17”. However, no license information is provided in PWS section 5.17. Reference: Requirements for the Utility Systems Manager state that the individual “must currently hold at least one State of Alaska license or certification as defined in Section 5.17”. However, no license information is provided in PWS section 5.17.

Please provide the license requirements for the Utility Systems Manager role.

Government response - Its should say 5.16, plants certifications. Either a state water, waste water, or steam boiler cert as listed in 5.16. PWS will be updated in future amendment
Question 35: Instructions to offerors state that “Details of how things will be established and operate shall be included. Each CLIN shall be covered”.

Please provide information on how CLIN Groups as identified in Attachment 1 shall be established and operate.

Government response will be provided in future amendment
Question 36: RFP Section III, RFP subfacor 1.7, Instructions to offerors on pg. 67 state that “The cover, title page, tables of contents, acronym lists, divider pages (used to separate proposal sections), and mandatory forms will not be counted against the maximum page limit.” Requirements for Subfactor 1.7 state that “Objective evidence that the Offeror’s Quality Management System (QMS) complies with ISO 9001:2015” must be provided as part of an offeror’s response. Question: factor 1.7 such as ISO certifications from the total page count for Volume I?
No, ISO cerificaiton does not count toward the page limit. Also, ISO 9001:2015 cerification is a great way to show compliance, but it is not required.

Question 36: Reference: PWS 7.1.1.A, 196. The PWS Requirements for the Project Manager states that a “Bachelor’s degree from an accredited university.”

In order to have a larger candidate pool for this role, would the Government update the requirement to allow for the equivalent years of managerial experience in place of a degree?

RFP requirement stands
Question 37: Reference: RFP Subfactor 2:1 Organzational and Staffing Plan. Position Descriptions identifies PWS 7.2.1 for the On-Site Project Manager (PM) and PWS 7.2.1 for the Alternate Project Manager. The PWS section for the On-Site Project Manager requirements is 7.1.1 and there is no PWS 7.2.1.

Please update the reference in the RFP to reflect the correct PWS reference for the On-Site Project Manager. Additionally, please provide the requirements for an Alternate PM.

Correct. Update will be provided in future amendment.
Question 38: Reference: PWS 7.2, 202. Section states that TE 26.1 with list of licenses and certifications was provided to assist with the proposal but the TE was not included in the attachments/TEs provided with the solicitation.

Please provide TE 26.1

A full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 39: Reference: RFP Section III List of Attachments

Appendix F - USCG CMMS Enrolled Kodiak Equipment – DATE Appendix H - Shore Facilities Inventory – DATE

Please confirm that Appendix F and H are current and provide the date of the last update.

Please submit request via DODsafe for updated Addendums package
Question 40: Reference PWS 3.13.3 Please confirm that meters for the Central Heating Plant are all currently functioning properlyThey are not and require maintenance. Plan appropriately
Question 41: The section states that “Contractor shall maintain the remote metering system read the water meters on the last working day of each month, to include annual subscription costs with three (3) Government user accounts.”
Please clarify who will incur the costs for the three user accounts.The Contractor
Question 42: Reference TE 16.1, 16.2 and 16.3. Please confirm when the TEs were last updated and whether the TEs provided with the solicitation show current technical informationA full and complete package of TE's will be provided via DODsafe by request to the Contract Specialist.
Question 43: Reference TE 16.2. Question: Please specify the condition of Lift Stations such as N6A, and whether they are operational or if there are flooding or equipment issuesN6A is in poor condition, but working with no current equipment flooding as of 3-7-23. Construction for a new lift station replacement is scheduled to begin MAy 2023 (subject to change).
Question 44: Reference 16.3 Please confirm known issues with the Utility system SCADA software, SCADA Hardware, fiber optic, telecom, or radio network communications and please specify the severity of each issue as minor, medium, or majorNearly all of these systems are old and past their service life. The SCADA software for the WTP was recently updated. There is no known document listing all issues and the definition of "issues" is spotty. The systems are working to obtain the their objectives as of 3-7-2023 but could use real attention.
Question 45: ReferenceAttachment 7. The CBA provided in attachment 7 is titled as “dated 04 Mar 2022” however the document expired 12-31-2021.

Please provide the current CBA.

Please see Amendment 0001 for the revised CBA
Question 46: Reference Attachment 1. CLIN Schedule worksheet does not include a formula for all the ordering period (row 237) for the totals of each ordering period.

In Attachment 1 CLIN X-0040 Labor rates worksheet, there is no formula in row N162.

Please provide an updated Attachment 1

Government response will be provided in future amendment
Question 47: Reference: The Contractor Fleet is known to be aged and insufficient.

Please specify the percentage of incumbent vehicles that will need to be replaced at the time of award.

The UCSG is not involved in the incumbent contractor's fleet or its exchange to the incoming contractor
Question 48: Reference: There are several large pieces of Contractor equipment that are completely unsalvageable (trash truck for example) and some that are insufficient (paint sprayer for example).

Please provide a list of Equipment that needs to be purchased and shipped to the Island and included in offeror’s price, in order to facilitate the mission. ?

The UCSG is not involved in the incumbent contractor's fleet or its exchange to the incoming contractor. See GFE in Appendix B for what the government does offer.
Question 49: Reference Appendix B. Please confirm when the GFE information was last updated and whether the Appendix provided with the solicitation shows current informationIt is always changing, but current as possible
Question 50: Reference Factor 1: Subfactor 1.7 Quality. Please specify the requirements of the "quality manual" in Section 8.1 of the PWS.
Is the “quality manual” the technical approach of the Subfactor or is it a separate file? If it is a separate file, please specify when it is due.See deliverables table (appendix c). A quality manual is not a proposal, they are different documents.
Question 51: Reference PWS Section 5.0, Attachment E Performance Management Summary is missing the following PWS areas: 5.9.AIR PROGRAMS.

5.18.MAIL, SHIPPING, AND RECEIVING.

5.20.SUPPORT SERVICES.

5.21.PEST CONTROL SERVICES.

5.22.MAINTENANCE, REPAIR, AND IMPROVEMENT UNIT PRICED WORK.

5.23.AIR STATION VEHICLES AND EQUIPMENT.

5.25.LOCKSMITH SERVICES.

5.26.DIG PERMITS AND OUTAGES

Please provide these in an update PRS Attachment E.The Appendix E is not in the Performance Requirements Summary. Poor performance in these task areas would be handled through typical contracting methods. The were not included because poor performace is historically not an issue and/or the performance is difficult to quantify.
Question 52: Reference PWS 5.0. 5.24. ALARM AND FIRE SUPPRESSION SYSTEMS in the PWS but is called "Air Station Vehicles & Equipment" in Attachment E PRS.

Please clarify PRS criteria for 5.24 as it relates to Section 5.24 of the PWS.

Correct. Update will be provided in future amendment.
Question 53. Reference PWS 3.10.3, section 5.1.2.L of the PWS. Please confirm if the reference in section 3.10.3 should be 5.26.2 on page 193 of the PWS.Correct. Update will be provided in future amendment.
Question 54: Reference Section I. The RFP includes the FAR Clause 52.219-71 Section 8(a) Direct Awards (Deviation). (NOV 2005)

Please confirm this solicitation is not a Direct Award and therefore, the FAR Clause should not be included

As prescribed in 19.811-3(c) The contracting officer shall insert the clause at 52.219-17, Section 8(a) Award, in competitive solicitations and contracts when the acquisition is accomplished using the procedures of 19.805 and in sole source awards which utilize the alternative procedure in 19.811-1(c).
Question 55: Reference Section PWS 5.15. PWS section and subsections reference Appendix B.

Are any of the vehicles in Appendix F.2 also to be supported through these requirements?

The equipment in 5.15 is also in the more inclusive CMMS inventory document in Appendix F.
Question 56: Reference PWS 5.18.1. Mail, Shipping, and Receiving requirements state that “The Contractor shall maintain all mail and shipping and receiving records for six (6) years and three (3) months.” This exceeds the period of performance stated in the Attachment 1 Pricing spreadsheet and the RFP.

Please confirm that the incumbent will be leaving mail and shipping/receiving records following the end of their contract.

The incumbent is responsible for their records, the incoming contractor is responsible for the records of their performance and the records the government is able to turn over to them.
Question 57: Reference PWS 5.18.2.A.2.a. Requirement states that the contractor is responsible for metering all outgoing mail that does not have sufficient postage.

Please clarify who will incur the cost for metering mail.

5.18.2.B.1.i "...The Contractor shall not be responsible for making the financial obligation in the USCG financial system. The requesting unit will be responsible to verify funds availability and obligate funds." Metered mail is the same, USCG pays the postage portion
Question 58: Reference Attachment 3-Past performance questionnaire. In the header of each page of the RFP, in the instructions on page 68 for submitting questions, and in Attachment 3 it references solicitation number 70Z08422RA1750400. However, SF 1449 Block 5, references solicitation number 70Z08423RKODI0001.

Question: Please clarify the solicitation number and update Attachment 3 and the RFP accordingly.

Attachment 3 has been updated with the correct soliciation number -70Z08423RKODI000I. Please see Amendment 0001.
Question 59: Reference Appendix 1.8. PM Master excel sheet states that the current BOSS Contractor was only required to complete 50% of the PMs.

Please confirm if the PM completion rate will remain the same for the new contractor See question 27, repeat https://www.acquisition.gov/far/part-19