Remaining RFI 6.22.23.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
US Coast Guard Base Kodiak Base Operations Support Services
Solicitation number
70Z08423RKODI0001
Issued by

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Base Kodiak BOSS Award Fee Plan_Final.pdf PDF
First page of the 1449.pdf PDF
Amendment 0008.pdf PDF
Revised Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
Attachment 6- Davis Bacon Act WD AK20230005 5.24.23.pdf PDF
Attachment 5- Davis-Bacon Act WD AK20230001 5.24.23.pdf PDF
Final Request for Information 5.24.23.xlsx XLSX spreadsheet
Attachment 2 - Performance Work Statement 5.24.23.pdf PDF
Final Request for Proposal 70Z08423RKODI0001 5.24.23.pdf PDF
Attachment 1 - CLIN Schedule of Prices 5.23.23.xlsx XLSX spreadsheet
Amendment_0007.pdf PDF
Amendment 0002.pdf PDF
Amendment 0006.pdf PDF
Amendment 0003.pdf PDF
Amendment 0005.pdf PDF
Amendment 0001.pdf PDF
Amendment 0004.pdf PDF
Attachment 2 - Performance Work Statement dated 13-MAR-23.pdf PDF
Revised Request for Proposal 70Z08423RKODI0001 3.20.23.pdf PDF
Request for Information 3.20.23.xlsx XLSX spreadsheet
Preproposal Conf-BOSS Kodiak-22-FEB-2023.pptx PPTX presentation
CBA- signed 4 Mar 2022.pdf PDF
Revised REQUEST FOR PROPOSAL 70Z08423RKODI0001.pdf PDF
BOSS Kodiak Preproposal Conference Schedule.pdf PDF
Attendance Sheet page 2.pdf PDF
Revised Attachment 3 - Past Performance Questionnaire.pdf PDF
Attendance Sheet page 1.pdf PDF
Attachment 4 - Service Contract Act WD 2015-5687.pdf PDF
Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
TE 16.4 Coupon Stations (1).pdf PDF
TE 11.1 Drinking Water Monitoring Program.pdf PDF
TE 10.4 2017 Tsunami Readiness Plan - Final PDF.pdf PDF
Appendix I.3 Historical Fuel Transfers.xls XLS spreadsheet
Appendix C Summary Table of Task Area Deliverables Sections_v1.xlsx XLSX spreadsheet
Attachment 7 - CBA 2022-2024 dated 04 Mar 2022.pdf PDF
Appendix F.3 Example PM Schedule.xlsx XLSX spreadsheet
Appendix H Shore Facilities Inventory 2020.xlsx XLSX spreadsheet
TE 1.2 Mapbook_2021.pdf PDF
TE 16.1 CHP System Description (1).pdf PDF
TE 17.2 Oil Water Separators_May_2021 (1).pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Appendix B Government Property.Equipment.and Materials List.xlsx XLSX spreadsheet
Appendix I.2 Hazardous Waste Historical Annual Container and Sampling Costs.pdf PDF
Appendix E Performance Requirements Statement.pdf PDF
Request for Proposal.pdf PDF
TE 18.1 MBIT Report.xls XLS spreadsheet
TE 17.1 Used Oil System Description_May_2021 (1).pdf PDF
TE 19.1 COM Worksheet.xlsx XLSX spreadsheet
Appendix F.2 Equipment by Category Cat 1-5.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation 70Z08423RKODI0001 Amendment 0008
Industry QuestionGovernment Response
1. In amendment 7, the answer to question 83: states “will name the changes in the specific documents made in regard to the RFIs in this document. Will name other changes specifically in the addendum notes.” There doesn’t seem to be any addendum notes, specifically for the TEs and Attachments making it difficult to ensure all changes are recognized.Changes were noted in the RFI responses. Known additional changes include, CLIN structure changes to no longer pay a separate CLIN item for the transition period, as well as an update to the equipment listed in Appendix B (mostly tabs:"Base Vehicles and Equipment" and "Navy Vehicles". The award fee plan was updated to include a refreshed schedule. Though a best effort was made to note all changes, the final award package takes precedence.

2. In amendment 7 question 37 “Additionally, please provide the requirements for an Alternate PM.?” In the RFP and PWS we do not see this information added. No requirements for the alternate PM. The contractor shall use their best judgement. There were instances with other contractors that left unqualifed people is as "acting" for extended durations and the positions salary was deducted from the monthly invoices.

3. The Government has requested in SUBCLIN x001A pricing for off island travel. The PWS states that this SUBCLIN will be used for off island work, including the off island locations to conduct work. Would the Government please confirm that off island travel is limited to the off island locations identified in the PWS? If the Government is intending to use this SUBCLIN for off island travel to locations outside of those listed in the PWS, would the Government please provide the additional locations where travel will or is expected to occur? The scope of the contract is limited to the locations listed in section 2.2. Section 2.5 lists the only locations within scope. There would have to be a full contract modification to request work elsewhere.

4. Will the Government allow page sizes of 11-inch x 17 inch?
No, we will not accept