Appendix E Performance Requirements Statement.pdf

PDF 776 KB Posted

Attached to
US Coast Guard Base Kodiak Base Operations Support Services
Solicitation number
70Z08423RKODI0001
Issued by

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Base Kodiak BOSS Award Fee Plan_Final.pdf PDF
First page of the 1449.pdf PDF
Remaining RFI 6.22.23.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Revised Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
Attachment 6- Davis Bacon Act WD AK20230005 5.24.23.pdf PDF
Attachment 5- Davis-Bacon Act WD AK20230001 5.24.23.pdf PDF
Final Request for Information 5.24.23.xlsx XLSX spreadsheet
Attachment 2 - Performance Work Statement 5.24.23.pdf PDF
Final Request for Proposal 70Z08423RKODI0001 5.24.23.pdf PDF
Attachment 1 - CLIN Schedule of Prices 5.23.23.xlsx XLSX spreadsheet
Amendment_0007.pdf PDF
Amendment 0002.pdf PDF
Amendment 0006.pdf PDF
Amendment 0003.pdf PDF
Amendment 0005.pdf PDF
Amendment 0001.pdf PDF
Amendment 0004.pdf PDF
Attachment 2 - Performance Work Statement dated 13-MAR-23.pdf PDF
Revised Request for Proposal 70Z08423RKODI0001 3.20.23.pdf PDF
Request for Information 3.20.23.xlsx XLSX spreadsheet
Preproposal Conf-BOSS Kodiak-22-FEB-2023.pptx PPTX presentation
CBA- signed 4 Mar 2022.pdf PDF
Revised REQUEST FOR PROPOSAL 70Z08423RKODI0001.pdf PDF
BOSS Kodiak Preproposal Conference Schedule.pdf PDF
Attendance Sheet page 2.pdf PDF
Revised Attachment 3 - Past Performance Questionnaire.pdf PDF
Attendance Sheet page 1.pdf PDF
Attachment 4 - Service Contract Act WD 2015-5687.pdf PDF
Attachment 1 - CLIN Schedule of Prices.xlsx XLSX spreadsheet
TE 16.4 Coupon Stations (1).pdf PDF
TE 11.1 Drinking Water Monitoring Program.pdf PDF
TE 10.4 2017 Tsunami Readiness Plan - Final PDF.pdf PDF
Appendix I.3 Historical Fuel Transfers.xls XLS spreadsheet
Appendix C Summary Table of Task Area Deliverables Sections_v1.xlsx XLSX spreadsheet
Attachment 7 - CBA 2022-2024 dated 04 Mar 2022.pdf PDF
Appendix F.3 Example PM Schedule.xlsx XLSX spreadsheet
Appendix H Shore Facilities Inventory 2020.xlsx XLSX spreadsheet
TE 1.2 Mapbook_2021.pdf PDF
TE 16.1 CHP System Description (1).pdf PDF
TE 17.2 Oil Water Separators_May_2021 (1).pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Appendix B Government Property.Equipment.and Materials List.xlsx XLSX spreadsheet
Appendix I.2 Hazardous Waste Historical Annual Container and Sampling Costs.pdf PDF
Request for Proposal.pdf PDF
TE 18.1 MBIT Report.xls XLS spreadsheet
TE 17.1 Used Oil System Description_May_2021 (1).pdf PDF
TE 19.1 COM Worksheet.xlsx XLSX spreadsheet
Appendix F.2 Equipment by Category Cat 1-5.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix E QASP/PRS

QUALITY ASSURANCE SURVEILLANCE PLAN/

PERFORMANCE REQUIREMENTS SUMMARY

The Contract Requirements listed in this combined Quality Assurance Surveillance Plan (QASP) and Performance Requirements Summary (PRS) summarize specific firm fixed price tasks that are to be performed under this contract.

QASP

A) Completion of Work. Work must be completed, or be within contractual timelines to be completed, to receive payment. Said another way, late work is not eligible to receive payment.

B) Retainage. The Government shall retain payment for late work monthly. Late work data shall be pulled from the Government CMMS system and any work items still in progress past their target completion date will be put onto a list that will be delivered with the payment of the monthly invoice. The Contractor can request payment for completed work when acceptable items from the list are complete in a subsequent monthly invoice.

Retainage Amounts (per work item) Work Order $ 2,000.00 Performance Directive $ 250.00

PM $ 250.00

a) Late PMs. A PM is only relevant for limited amount of time. As such the government will permanently retain money for PMs not completed within the below timeline.

Maximum Lateness of PM Annual (or more) 3 months Semiannual 1 month Quarterly 1 month Monthly 1 week Weekly 1 day

i) There is a limited allowance for less than 100% completion. If within the Contractor’s allowances, some incomplete PMs can be marked “skipped” with no retainage. For example, if the PRS requires a 90% completion rate, the contractor can mark a small percentage of the work as “skipped” with no retainage.

C) Key and Designated Positions. The Government reserves the right to deduct the CLIN Schedule value or fair market compensation package amount, as determined by the government, for time the Contractor does not provide fully qualified personnel defined in sections 7.2 and 7.4. For example, if an EMCS technician is not employed for six weeks, and the government may find the full compensation package for the technician is $8k/ month, they can deduct $12k from the corresponding monthly invoice payments (e.g. $8k one month and $4k the next month). Timing of the new employee starts as soon as the government accepts the qualification package of the employee (assuming the employee is hired and ready to work), or after 72 hours with no response accepting or denying the employee. The 72 hours with no response is not an acceptance.

PRS Description and Details The Performance Requirements associated with each Contract Requirement are as shown in the PRS and include:

A) Work Requirements. A series of subtasks associated with each particular Contract Requirement is listed in the PRS table. Quality of subtasks not on the document will be handled with other means, including, but not limited to, email, KO letter, and Contract Discrepancy Report (CDR).

B) Weight. The value of each Work Requirement is specified as a percentage of the Contract Requirement with which it is associated in column 3 of the PRS. The percentages are based on the costs incurred by the Contractor in carrying out a particular Work Requirement, the visibility of the service, and the detriment to the Government if the Work Requirement is not satisfied. The Weight multiplied by the total order period value for Lump Sum FFP, or the associated delivery order value for each IDIQ will be the primary basis for deducting for partially performed, unsatisfactorily performed, and non-performed work. However, the total monthly deduct is capped at 10% of the order period value for the Lump Sum FFP requirements. The total PRS weight percentages do not total 100% because not all CLIN items will be managed through the formal PRS process.

C) Performance Measure and Performance Standards. Specific measures and standards associated with each Work Requirement are listed in columns 5 and 6.

D) Maximum Allowable Defect Rate (MADR). The MADR for each Work Requirement is identified in column 7 of the PRS. The MADR is the defect rate for a population of services which, when exceeded, indicates that the Contractor's quality control is unsatisfactory. The MADR as a number of defects per period of time. Incidents reflect a one to one relationship with defects (i.e. they are the same).

E) Acceptable Quality Level (AQL). The AQL for a work requirement is identified in column 8 of the PRS. The AQL is the expected standard of performance based on the ratio of acceptable observed work performed to total work performed. When the observed Quality level is lower than the AQL it indicates that the Contractor’s quality control is unsatisfactory. The AQL is expressed as a percentage of the total population per period of time. Incidents reflect a one to one relationship with defects (i.e. they are the same).

In the event that a PM from any contract section is not completed within the timeline scheduled, it may be counted as a quality defect in addition to a timeliness defect. For example, a monthly preventive maintenance task that is completed three days late is not a quality issue but is a timeliness issue. However, a weekly PM task completed a week late is a quality of work issue since no work was completed and the nature of PM work does not allow a weekly task to be completed twice in close proximity of time with added benefit. See the QASP table for maximum lateness of PMs.

Quality work orders and PMs are defined in section 5.1.4 and 5.2.7 respectively and apply throughout the contract to all CLINS.

F) LOT. Column 9 outlines the prescribed population source eligible for surveillance. The Government is not limited to the population source listed; others may be included as required.

The government shall not deduct based on a population sample smaller than listed in Table 1.

Random samples are allowed Random Sampling/Inspections – Random sampling leverages statistical principals to manage the scope of a surveillance activity. This is done so that the amount of surveillance manageable and if properly applied, represents the conditions of the entire performance area with a high degree of confidence. To perform a random sample the performance area has to be broken down into discrete elements like work orders, an area, or specific sections of performance. Then by using a random number generator in MS Excel, each discrete element is assigned a number. The highest or lowest group based on the appropriate sample size then becomes the performance elements that receive surveillance.

1. To determine a statistically significant sample size Table 1 should be consulted (this is also auto-calculated in the PRS table Sample column once the correct lot number is inputted). Random number generation is typically accomplished using a spreadsheet function.

Table 1

Lot Size Sample Size 2-8 2

9-15 3 16-25 5 26-50 8 51-90 13

91-150 20 151-280 32 281-500 50

501-1200 80 1201-3200 125

3201-10,000 200 10,001-35,000 315

35,001-150,000 500 150,001-500,000 800 500,001 and over 1250

G) Method of Surveillance. Column 10 outlines the evaluation tools and techniques utilized to assess

Contractor performance of Work Requirements to established measures and standards. The Government is not limited to the tools and techniques listed; others may be implemented as required and 100% inspection is acceptable. The government may request to be present to witness any specific work, or type of work (e.g. priority 2 work, carpentry work, work on the Base Commander’s house, work order # 1233000, etc.) at no extra cost to the government. In such case, the COR would call and/or email the help desk and/or shop lead to make the request, and the Contractor will be required to make one contact with the method requested by the COR.

The government shall not delay the trade technician’s work (exluding the notification made to the

COR).

H) The following notes apply to the entire PRS.

1. Timeliness for all work. The MADR reflects units of work per period of time (daily, monthly, quarterly, semi-annual, etc.) and allotted response/completion time. Example: If a response time of 4 hours is required, a MADR of 1 incident would allow for one late response during the performance period. For report submissions, each day the report is late is counted as an additional incident. Example: If the report is due the 15th of the month and it is submitted on the 19th, four incidents will be noted. The AQL reflects the ratios of acceptable units of work to the total population of work evaluated. Example: If a response time of 5 days is required, an AQL of 90% would allow for 10% of the evaluated population to be late. In work orders, where a timely response and completion are required, both will be counted as part of the population and an opportunity to be on time.

2. Quality or documentation for all work. The MADR reflects work units that do not meet specified requirements and standards. Example: If the MADR allows 2 incidents, when the 3rd incident occurs deductions will be made. The AQL reflects the percentage of acceptable work required. Example: If the AQL allows a 2% deviation to the standard, when a deviation of greater than 2% occurs deductions will be made.

3. IDIQ. The PRS does not apply to IDIQ work. However, payment shall not be made until the work is complete. Partial payment may be made for partial work.

I) Method of deduction.

1. Deductions for defects in either safety or security, defects that result in notice of violation, audit findings by EPA or ADEC, major audit findings in other contract sections, fines, damage/flooding to facilities, or failure to comply with Government regulations shall be calculated as specified in the Performance Requirement Summary (PRS) examples. These shall be full deductions.

2. All other deductions shall be calculated as specified in the PRS examples and adjusted as shown below.

i) PRS calculation times 25% for the first month a deduction is invoked for a specific work requirement.

ii) PRS calculation times 50% for the second month and subsequent months a deduction is invoked for the same work requirement.

J) Surveillance Period

1. The Contractor shall choose the period of surveillance, in order to offer prompt payment.

To allow time for the Contractor to enter data into the government CMMS, the COR to assemble reports, and conduct due diligence on possible deductions, the government requires 10 calendar days. As such, the surveillance period can start the 21st of the previous month, and run through to the 20th of the payment month. For example, the government may deduct from the April invoice for poor work found between March 21st and April 20th. Subsequently, work evaluated between April 21st and May 20th will apply to the May bill. Or, the Contractor can choose the surveillance period to remain the true month and allow 10 extra days beyond the prompt payment act.

2. Some work will only be able to be evaluated after it is marked complete, even though some of the work was actually done outside the surveillance period. For example, work evaluated for accurate CMMS entries will be evaluated when marked complete.

3. Timeliness shall be measured in months before the current month, if the work order is late. For example, if a work order became due January 10th, and is still not complete in April, this work order shall apply to timeliness calculations in January, February, March, and April.

Note that increasing deduction adjustment is based on a specific work requirement such as Regulated Waste Management and not the three performance measures for this work requirement.

The adjusted deduction shall not be reset each option year. This means, the recurrence penalty listed in I.2 of this document are not reset each option year and apply to the whole of the contract.

Appendix E Performance Requirements Summary

EXAMPLES OF CONTRACTOR DEDUCTIONS USING ACTUAL PRS AND MADE-UP DOLLAR AMOUNTS

PWS REF CLIN WEIGHT TITLE

PERFORMANCE

MEASURE STANDARD

MAXIMUM ALLOWABLE

DEFECT (Incidents)

ACCEPTIBLE

QUALITY

LEVEL (%) LOT

METHOD OF

SURVEILLANCE

5.12 x012 5% Regulated Waste

5.12.2.B 40% Waste Accumulation Areas (WAA)

Compliance WAAs managed in accordance with the requirements of section 5.12.2.B

100% Waste Accumul ation

Random Sampling

5.12.2.C 15% Collect and Transport Hazardous Waste to

HWSB

Timeliness Regulated waste pickups completed prior to the end of the next normal working day.

1 Incidents Permitted Percent Deducted:

2 Defects = 30% of deduct 3 Defects = 65% of deduct 4 Defects = 100% of deduct

Regulated Waste Collection activities performed per month

COR Verified customer complaints

5.12.3 45% Deliverables Timeliness & Quality

Reports submitted on time and free of defects.

2 Incidents Permitted Percent Deducted:

3 Defects = 30% of deduct 4 Defects = 65% of deduct 5 Defects = 100% of deduct

Reports Direct Observation

Example 1 Assume the Contractor submits a regulated waste report one (1) day late. Upon review by the Government, three (3) errors are noted in the report. The MADR for Deliverables (Reports) is 2 incidents per reporting period. Since four (4) incidents exceed the MADR, the Contractor will be assessed deductions as follows:

Total Contract Billing for One Year is $11,000,000 (excluding IDIQ).

Total Contract Billing for One Month is $11,000,000/12 Months is $917,000 per month.

Maximum total deduct is $917,000 X 0.20 = $183,400/month Value for General Requirements is $917,000 x 5% (overall PWS section weight) = $45,850.00 Total Deduction for this requirement is as follows:

Price for Requirement x Weight x Percent Deduct for Defect Rate = Total Deduction For This Requirement $45,850 x 45% x 65% = $13,411.12 The proposed deduction modification would be applied to Example 1.

If a first month occurrence, $13,411.12 x 25% = $3,352.78 If a second month occurrence of 4 incidents, $13,411.12 x 50% = $6,705.56 If a third month occurrence of 4 incidents, $13,411.12 x 50% = $6,705.56 The $13,411.12 deduct is within the 10% cap and may be included as a full deduct.

Example 2

Assume the EPA issues a notice of violation for Air Management. The performance standard AQL is 100%. Therefore, the AQL was exceeded. This was the first time of this violation. The Contractor will be assessed deductions as follows:

Total Contract Billing for One Year is $11,000,000 (excluding IDIQ).

Total Contract Billing for One Month is $11,000,000/12 Months is $917,000 per month.

Maximum total deduct is $917,000 X 0.20 = $183,400/month Value for Environmental Management & Stewardship Permit Compliance is $917,000 x 5% (weight) = $45,850.00 Total Deduction for this requirement is as follows:

Price for Requirement x Weight x Percent Deduct for Defect Rate= Total Deduction For This Requirement $45,850.00 x 50% x 100% = $22,925.00 The $22,925.00 deduct is within the 10% cap and will be included as a full deduct.

Example 3

Assume the Contractor completed 200 priority 3,4, or 5 work orders in the month of April, and 50 are in progress and late at the end of the surveillance period. Of the work completed in the surveillance period, 15 work orders were late. This is the Contractor’s second month in the contract that Pri 3,4,5 work has been late.

Total Contract Billing for One Year is $11,000,000 (excluding IDIQ).

Total Contract Billing for One Month is $11,000,000/12 Months is $917,000 per month.

Maximum total deduct is $917,000 X 0.20 = $183,400/month Value for Level II Service work is $917,000 x 10% (weight) = $91,700.00 Total Deduction for this requirement is as follows:

Price for Requirement x Weight x Percent Deduct for Defect Rate = Total Deduction For This Requirement $917,000 x 10% x 100% = $9,170 Since this is the third occurrence, multiply by 50% $9,170*0.50=$4,585 The 4,585 deduct is within the 10% cap and will be included as a full deduct.

Example 4

The examples in 1, 2 and 3 above occurred in the same month and example 1, and 2 were a first occurrences and example 3 was a third occurrence.

The deducts are $13,411.12 + $22,925.00 + $4,585 = $40,921.12 The $40,921.12 deduct is within the 10% cap and will be included as a full deduct.

Base Kodiak Base Operation Support Services

Performance Requirements Summary

PWS

REF

CLIN WEIGHT TITLE PERFORMANCE MEASURE STANDARD MAXIMUM ALLOWABLE

DEFECT (Incidents)

ACCEPTIBLE

QUALITY LEVEL (%)

LOT METHOD OF

SURVEILLANCE

5.1 x001 10% Level II Service Work 5.1.2.J 10% Priority 1 Work Timeliness Meet all established response & completion

Timelines 100% # of Level I work orders completed per month

Random Sampling, Customer Complaints

5.1.2.J 10% Priority 2 Work Timeliness Meet all established response & completion Timelines 90% # of Level 2 work orders completed per month Random Sampling, Customer Complaints

5.1.2.J 10% Priority 3, 4, & 5 Work Timeliness Meet all established response & completion Timelines 80% # of Level 3, 4, & 5 work orders completed per month

Random Sampling, Customer Complaints

5.1.2.E 50% Workmanship Quality of Work Work Completed with acceptable materials and workmanship

90% # of Level II work orders completed per month

Spot Checks, Random Sampling, Customer Complaints

5.1.2 (all sections) 15% Work Control Adherence to PWS requirements Work generated correctly in accordance with the

PWS and in a manner that minimizes total work order volume. Customer notifications properly executed. All Work control executed in accordance with Section 5 1 2

95% # of Level II work orders completed per month

Customer Complaint, Spot Checks, Random Sampling

5.1.2.K 5% Maintain CMMS Database Accuracy Level II work maintained in the CMMS database in accordance with section 5.1.2.K 98% # of Level II work orders completed per month Random Sampling, Spot Checks

5.2 x002 10% Preventive Maintenance

5.2.1 30% Completion PM completion vs. PM scheduled of Cat 1 PM work shall be completed as scheduled 99.9% PM Tasks scheduled per month Monthly Report

5.2.1 30% Completion PM completion vs. PM scheduled of Cat 2 ,3, 4 and 5 equipment

PM work shall be completed as scheduled 90% PM Tasks scheduled per month

Monthly Report

5.2.6 30% Workmanship Quality of Work Work completed with acceptable materials and workmanship 90% # of PMs scheduled per month Customer Complaint, Spot Checks, Random Sampling

5.2.7 10% Records Accuracy & Completeness of Records Records are maintained in accordance with section 5.2.1.L

15 Incidents Permitted Percent Deducted:

16 Defects = 30% of deduct 17 Defects = 65% of deduct 18 Defects = 100% of deduct

Category 1, 2, 3, 5, or 5, PM tasks scheduled per month

Random Sampling

5.3 x003 5% Janitorial Services

5.3.1 100% Perform Janitorial Services Effectiveness Work is provided in a manner that delivers all required services to the satisfaction of the COR 5 Incidents Permitted Percent Deducted:

6 Defects = 30% of deduct 7 Defects = 65% of deduct 8 Defects = 100% of deduct

Janitorial services performed per month

COR Verified Customer Complaint

5.4 x004 2% Refuse Collection & Disposal

5.4.2 70% Empty containers Refuse collection schedule is effective Containers are emptied in manner consistent with section 5.4.2 80% Collection Services performed per month

COR Verified Customer Complaint

5.4.3.C 30% Monthly Landfill and Sludge Disposal Fee Reports

Provide weight receipts for secondary contract billing to landfill and recycling center

Monthly landfill and sludge disposal fee report is timely, accurate, and complete

3 Incidents Permitted Percent Deducted:

4 Defects = 30% of deduct 5 Defects = 65% of deduct 6 Defects = 100% of deduct

Disposal services performed per month

Monthly Report

5.5 x005 2% Grounds Maintenance 5.5.1.C 80% Mowing Ground cover maintained as required for

Improved, Semi-Improved, and area T & R Grounds.

Ground cover is not lower or does not exceed specified height standards. 70% Grounds maintenance services performed per month

COR Verified Customer Complaint, Random Sampling

5.5.2.J 20% RCRA Sites Sites Maintained as Specified All work Performed as Specified 0 Incidents Permitted Percent Deducted:

1 Defects = 30% of deduct 2 Defects = 65% of deduct 3 Defects = 100% of deduct

Grounds maintenance services performed per month

COR Verified Customer Complaint, Spot Checks

REF

CLIN WEIGHT TITLE PERFORMANCE MEASURE STANDARD MAXIMUM ALLOWABLE

DEFECT (Incidents)

ACCEPTIBLE

QUALITY LEVEL (%)

LOT METHOD OF

SURVEILLANCE

5.6 x006 3% Snow Removal, Ice Control, and Traction 5.6.2.A.7 40% Priority 1 Areas Effectiveness Maintain a bare surface and a Tapley reading of 25 or higher in all priority 1 areas.

0 incidents permitted Snow removal, Ice Control, and traction services performed per month.

COR Verified complaints, Random inspections

5.6.2.A.7 30% Priority 2, 2A and 3 Areas Effectiveness Maintain to within 1/2 inch of running surface and maintain Tapley reading of 25 or higher on driving surfaces. Designated sidewalks and steps safe for pedestrian foot traffic.

2 incidents permitted (One per zone incomplete)

Snow removal, Ice Control, and traction services performed per month.

COR Verified complaints, Random inspections

5.6.2.A.7 30% Priority 1, 2, 2A and 3 Areas Timeliness Specified Response & completion standards are met for all area.

3 incidents permitted (One per day over) Snow removal, Ice Control, and traction services performed per month.

COR Verified complaints, Random sampling

5.7 x007 2% Roadway & Sewer Maintenance & Repair 5.7.2.A 20% Culvert and Storm Drain Maintenance Effectiveness of Maintenance activities Maintain storm water systemsat 75% of flow capacity at all times.

5 Incidents Permitted Culverts & Storm Drains identified on TE 7.1 COR Verified Complaints, Spot Checks

5.7.2.C 25% Cleaning of Sewer System Effectiveness of 3 year sanitary sewer cleaning program

No instances of sanitary sewer system backups related to maintenance.

2 Incidents Permitted

0 Incidents that damage property permitted

Sanitary sewer manholes identified on TE 7.2

Random Sampling

5.7.2.D 10% Grading Meet U.S DOT and Federal highway Administrations gravel roads maintenance and Design Manual Standards

Road Grading meets the requirements of section 5.7.2.D

10 Incidents Permitted

Grading Activities performed per month COR Verified Complaints, Spot Checks

5.7.2.E.1 25% Flight Line Surface Sweeping Effectiveness of Sweeping activities Flight line surfaces are maintained in a manner so that there are no occurrences of Foreign Object Debris impacting aircraft operations.

100% All flight line surfaces COR Verified Complaints

5.7.2.F 20% Operational & Safety Pavement Curb Marking Quality and Timeliness of pavement marking activities

All required pavement markings are completed prior to July 1 to the standards specified in 5.7.2.F 100% Marking activities performed per month

Random Sampling

5.8 x008 3% Fuel Services

5.8.2 40% Operations and management of the Petroleum, Oil , & Lubricant (POL) systems Compliance of systems operations POL systems and services operated in accordance with the standards specified in section 5.8 and the Fuel Farm Operations Manual (FFOM)

2 incidents permitted 0 incidents that cause an environmental infraction, exceedance, etc.

Logs and records. QC inspection reports.

Physical Plant

Random Sampling of specific task areas, Spot Checks

5.8.2, 5.8.2.M 30% Fuel Systems Maintenance Compliance of systems maintenance Maintenance performed as required in section 5.8, the FFOM, and established maint. plans.

2 incidents permitted

Logs and records. QC inspection reports.

Physical Plant

Random Sampling of specific task areas, Spot Checks

5.8.2, 5.8.2.R 30% Fuel Systems records & deliverables Compliance of records keeping and reporting Records maintained and reports delivered as required in section 5.8 and the FFOM. 100% Logs and records. QC inspection reports.

Physical Records

Random Sampling of specific task areas, Spot Checks

CLIN WEIGHT TITLE PERFORMANCE MEASURE STANDARD MAXIMUM ALLOWABLE

DEFECT (Incidents)

ACCEPTIBLE

QUALITY LEVEL (%)

LOT METHOD OF

SURVEILLANCE

5.10 x010 5% Environmental Management & Stewardship 5.10.2.B 50% Permit Compliance Compliance with Base Kodiak Permits No Notice of Violations or other deficiencies related to permit compliance within the scope of responsibilities of the Contractor.

100% All Contractor Activities Regulatory or other inspections

5.10.3 50% Deliverables Timeliness & Quality Reports submitted on time and free of defects. 2 Incidents Permitted Percent Deducted:

3 Defects = 30% of deduct 4 Defects = 65% of deduct 5 Defects = 100% of deduct

Reports Direct Observation

5.11 x011 5% Water Programs

5.11.3 100% Deliverables Timeliness & Quality Reports submitted on time and free of defects. 2 Incidents Permitted

Percent Deducted:

3 Defects = 30% of deduct 4 Defects = 65% of deduct 5 Defects = 100% of deduct

Reports Direct Observation

5.12 x012 5% Regulated Waste 5.12.2.B 40% Waste Accumulation Area (WAA) Management Compliance WAAs managed in accordance with the requirements of section 5.12.2.B 100% Waste Accumulation areas

Random Sampling

5.13 x013 2% Heating Oil Tank Testing 5.12.2.A.4 10% UST Testing Timeliness UST testing is conducted per the Contractor provided schedule.

5 Incidents Permitted

UST testing services performed per month

Random Sampling

5.12.2.A.4 40% UST Testing Workmanship Tightness & integrity testing is properly conducted. 1 Incidents Permitted UST testing services performed per month

Random Sampling

5.13.2.A.5,

5.13.3 50% AST Testing Timeliness & Quality AST Visual testing report submitted on time & free of defects.

2 Incidents Permitted Report Direct Observation

5.14 x014 6% Disaster & Spill Response 5.14.2.B 30% Spill Response Training Maintenance of Qualifications Contractor personnel maintain the training qualifications required in 5.14.2.B.4 at all times. 90% Quarterly Training & Qualification report.

Direct Observation

5.15 x015 3% Vehicles & Motorized Equipment

5.15.2 20% Scheduled and unscheduled maintenance & services Timeliness Meet all response and completion timelines. 5 Incidents Permitted Vehicle Services performed per month COR Verified complaints

5.15.2 30% Workmanship Quality of Work Work completed with acceptable materials and workmanship 5.1.2.E 90% Vehicle

Services C ompleted per month

5.15.3.C 50% Fire Apparatus and response vehicle readiness Effectiveness Always maintain a 94% Fire apparatus and response vehicle availability rate. 100% Fire Apparatus

Maintenance COR Verified complaints, Direct Observation

CLIN WEIGHT TITLE PERFORMANCE MEASURE STANDARD MAXIMUM ALLOWABLE

DEFECT (Incidents)

ACCEPTIBLE

QUALITY LEVEL (%)

LOT METHOD OF

SURVEILLANCE

5.16 x016 7% Central heating Plant, Waster Water Treatment Plant, and Water Treatment Plant.

5.16.2, 5.16.5, 5.16.6, & 5.16.7

40% Plant operations Compliance of plant operations All plant operations comply with the requirements of section 5.16 and the applicable Operations and Maintenance Manuals.

0 incidents over 4 hours 1 incident under 4 hours

Logs and records. QC inspection reports.

Physical Plant

Random Sampling of specific task areas, Spot Checks

5.16.2, 5.16.5, 5.16.6, & 5.16.7

40% Plants maintenance Compliance of plant systems maintenance All plant maintenance comply with the requirements of section 5.16 and the applicable Operations and Maintenance Manuals.

2 incidents permitted Logs and records. QC inspection reports.

Physical Plant

Random Sampling of specific task areas, Spot Checks

5.16.2, 5.16.5, 5.16.6, & 5.16.7

20% Plants records & deliverables Compliance of records keeping and reporting All plant records and deliverables comply with the requirements of section 5.16 and the applicable Operations and Maintenance Manuals.

0 from WTP or WWTP reports permitted 2 otherwise permitted

Logs and records. QC inspection reports.

Physical Records

Random Sampling of specific task areas, Spot Checks

5.17 x017 5% Liquid Oily Waste System (LOWS)

5.17.2 40% LOWS operations and management Compliance of LOWS operations All LOWS operations comply with the requirements of section 5.17 and the applicable Operations and Maintenance Manuals.

Logs and records. QC inspection reports.

Physical Plant

Random Sampling of specific task areas, Spot Checks

5.16.2, 5.16.5, 5.16.6, &

5.16.7

40% LOWS maintenance Compliance of systems maintenance All LOWS maintenance complies with the requirements of section 5.17 and the applicable Operations and Maintenance Manuals.

2 Logs and records. QC inspection reports.

Physical Plant

Random Sampling of specific task areas, Spot Checks

5.16.2, 5.16.5, 5.16.6, & 5.16.7

20% LOWS records & deliverables Compliance of records keeping and reporting All plant records and deliverables comply with the requirements of section 5.17 and the applicable Operations and Maintenance Manuals.

0 Logs and records. QC inspection reports.

Physical Records

Random Sampling of specific task areas, Spot Checks

5.19 x019 7% Housing Maintenance 5.19.2.E 60% Change of Occupancy Maintenance (COM)

Workmanship Quality Satisfactorily repair and install all COM service 100% COM Maintenance services per month 100% Inspection

5.19.2.H 40% COM Maintenance completion Timeliness Complete all identified work and Contractor damages by completion deadline. 98% COM Maintenance

Services per month 100% Inspection

5.24 x024 5% Air Station Vehicles & Equipment

5.24.2 30% Scheduled Maintenance & Services Timeliness Meet all response and completion timelines 90% Contractor Reports and scheduled maintenance Random Inspection, COR Verified 5.24.2.A 40% Ground Support Equipment Maintenance

Management Quality Maintain ground support equipment in accordance with definition of quality service work 100% Scheduled maintenance COR Verified customer complaints 5.24.2.B 30% Records Accuracy & Completeness of Records CMMS database is accurate and up to date with no 95% CMMS

100% ACMS Scheduled maintenance COR Verified customer complaints