Attach 19 - MACC Onboard Pre-Proposal Conference Powerpoint.pdf
PDF 4 MB Posted
- Attached to
- AOC MACC Onboarding Federal contract opportunity
- Solicitation number
- AOCACB25R0006
- Issued by
- Architect of the Capitol
About this file
This is a pre-proposal conference presentation from the Architect of the Capitol (AOC) for their 2024 Multiple Award Construction Contract (MACC) onboarding opportunity. The presentation outlines key details of the MACC IDIQ procurement including schedule milestones: RFP issued on November 28, 2024, RFIs due December 13, 2024, Step One proposals due January 9, 2025, Step One notifications by March 20, 2025, Step Two proposals due May 1, 2025, with final awards planned for August 2025.
The MACC has a cumulative ceiling of $250 million, with individual task orders ranging from $1 million to $50 million. The AOC plans to award to approximately 5 firms through a two-step best value tradeoff evaluation process. The scope includes maintenance, repair, alterations, mechanical/electrical work, historical preservation, and new construction across the Capitol Complex and outlying facilities. Key requirements include safety protocols, quality control management, historic preservation considerations, and security requirements. Upcoming projects highlighted include the US Capitol East Front preservation ($25M-$50M), Capitol Power Plant tunnel work ($10M-$20M), fire alarm upgrades ($15M-$30M), and House kitchen renovations ($25M-$50M). The AOC notes it is not subject to FAR but generally aligns with FAR principles, and requires E-Verify participation while not being subject to small business set-aside requirements.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architect of the Capitol 2024 On-Boarding MACC Pre-Proposal Conference
December 11, 2024
WWW.AOC.GOV 2
Meeting Protocols
• Please ask questions in the Chat feature tab at the bottom left of the presentation. More detailed questions can be emailed to matthew.hutcherson@aoc.gov
• Q&A, Attendance Sheet, and Presentation will be posted to SAM.gov as an amendment
WWW.AOC.GOV 3
Agenda
• Welcome
• 2025 MACC On-boarding Solicitation
• 2025 MACC On-boarding Requirements Overview
• Questions and Answers
WWW.AOC.GOV 4
AOC Procurement Process Chief, Design & Construction Acquisition (DCA) Branch
John Lingamfelter
AOC and the Federal Acquisition Regulation (FAR)
• The FAR was developed for use by the Executive Branch
• AOC is not subject to the FAR, but generally aligns with the FAR
• E-Verify is required for AOC contracts www.aoc.gov 5
6 www.aoc.gov
Legislative Branch Differences
Applicable Laws
• Davis-Bacon Act
• Service Contract Act
• Walsh-Healey Public Contracts Act
• Buy American Act
• Underlying trade agreements do not apply
• Contract Disputes Act
• Certain provisions have been made applicable to the AOC by Congress
• Javits-Wagner-O’Day (JWOD) Act
• Equal Employment Opportunity
• Fair Labor Standards Act
• Anti-Deficiency Act
7 www.aoc.gov
Legislative Branch Differences (cont.)
Non-Applicable Laws:
• Small Business Act (i.e. FAR 19)
• Brooks Act (for Architect/Engineering services)
• Competition in Contracting Act
• Federal Acquisition Streamlining Act
• North American Free Trade Agreement
• Prompt Payment Act
8 www.aoc.gov
Small Business Policy
• Small Business Set-Aside Program
– Projects less than $250,000
• Small Business Subcontracting Program
– Requires subcontracting plan on all construction awards exceeding $1.5M and A/E services exceeding $650,000
WWW.AOC.GOV 9
Solicitation Overview
MACC Acquisition Point of Contacts
WWW.AOC.GOV 10
Contracting Officer/Source Selection Authority
• Jerrod Whittington, Head of Contracting Activity
Administrative Contracting Officer
• John Lingamfelter; john.lingamfelter@aoc.gov
Project Manager/Contracting Officer’s Representative
• Ann Marie Irwin
Contract Specialist
• Matthew Hutcherson; Matthew.hutcherson@aoc.gov
*All contact during the solicitation phase should be through John Lingamfelter and Matthew Hutcherson
MACC Solicitation Overview www.aoc.gov 11
28 Nov 2024
RFP Issued
13 Dec 2024
RFIs Due
9 Jan 2025
Step One Proposals Due
20 Mar 2025*
Successful/Unsuccessful Step One Offerors
Notified
1 May 2025*
Step Two Proposals Due
Aug 2025
Successful/Unsuccessful Step Two Offerors
Notification
Aug 2025
Award
*On or About
12 www.aoc.gov
Ordering Period: Four (4), one (1) year options
Ordering Amounts:
The cumulative amount of all task orders against each IDIQ Contract shall not exceed
$250,000,000
Minimum Task Order amount is $1,000,000
Maximum Task Order amount is $50,000,000
This MACC will not have a Job Order Contracting (JOC) component. A separate procurement will be conducted for the JOC later in the calendar year. The JOC will focus on smaller or rapid projects under $3,000,000
Awardees: A target of 5 firms will be onboarded
Source Selection: Two Step, RFP with a Best-Value Tradeoff evaluation in accordance with AOC Order 34-1, Section 9.1.2.(a) Tradeoff Process
13 www.aoc.gov
MACC Task Order and Change Order Pricing:
Confusion on the current MACC persists over how markups are to be applied on new task order awards and how they are to be applied to subsequent change orders to those task orders.
Section B clarifies the relationship while providing more instructions for how to apply Prime Contractor markups to change orders while remaining consistent with contract clause AOC52.243-1 (Changes Supplement)
Note – Offerors will not submit pricing until Step Two of the evaluation
On/Off Ramp Procedures:
Section H includes procedures that allow the AOC to off-ramp MACC holders and on-ramp new contractors.
These procedures are intended to provide the AOC a full complement of MACC holders actively participating in Task Order Requests for Proposals throughout the life of the contract.
Evaluation Criteria (Section L and M):
Please review carefully, follow instructions, and provide the information and formatting exactly as prescribed in Section L/M
WWW.AOC.GOV 14
MACC Requirements Overview
Project Manager and MACC IDIQ COR Ann Marie Irwin
Upcoming Work
WWW.AOC.GOV 15
Cost RangeProject $25M<C<$50MExterior Stone and Metal Preservation, US Capitol, Phase IV, East Front
$10M<C<$20MG-Tunnel Expansion Joint Replacement & Piping Modifications, Capitol Power Plant (CPP)
$15M<C<$30MFire Alarm and Audibility Upgrade, Phase I, JMMB3
$25M<C<$50MHouse Kitchen and Exhaust, Capitol Building4
$15M<C<$30MY-Tunnel Expansion Joint Replacement & Piping Modifications, Phase 1, CPP
$10M<C<$30M Main Steam Distribution Room, Rayburn6
20www.aoc.gov
Working with the AOC Challenges & Rewards
• Customer Focused
• We serve Congress and the Supreme Court
• Highly sensitive to meet schedule dates
• Client Expectations
• Must not interfere with Legislative and Judicial Branch work
• Historic Preservation/Stewardship
• Security Requirements
• Jurisdictions
• 9 Different Facility Managers
• Partnering
19www.aoc.gov
• Importance of Safety
• Safety First
• Zero Incidents
• Quality Control Management
• Three phases of quality control
• All contracts will require project-specific quality control management plan
• Collaborative Risk Management
• AOC Division 1 Specifications
High Visibility Projects
WWW.AOC.GOV 18
CVC Exhibition Hall Redesign
House of Representatives Child Care Center - West
Russell Exterior Envelope Project (multiple phases)
Cannon Renewal (multiple phases)
Calder Clouds U.S. Capitol Exterior
Stone (multiple phases)
Thurgood Marshall Federal Judiciary Building (Façade and
Garage) Projects
Book Module 6 Storage Facility (Fort Meade)
Senate Underground Garage Renovation Design-Build
Garage Structural Repairs, JAB
1. LOC Energy Savings Performance Contract
2. Visitor Experience
Senate Employee Child Care Center
Types of Projects – Stone Restoration and Exterior Envelope Repair
Exterior Envelope Repair www.aoc.gov 27
Types of Projects – Interior Build Out, Renovations
Types of Projects – Roof Repairs www.aoc.gov 25
Types of Projects – Sustainable
Types of Projects – Building Controls, Elevators, Life Safety Upgrades
Types of Projects – Electrical Upgrades, Energy Savings www.aoc.gov 25
Types of Projects – Heavy Industrial Work
Power Plant and Distribution Systems
WWW.AOC.GOV 26
Questions
***Please ask questions in the chat box***