Amended Form D - Pricing Response RFP63-26 Hazardous Waste.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
RFP 63-26 Removal and Disposal of Hazardous Waste
Solicitation number
BD-26-1206-40000-40000-129945
Issued by
Suffolk County, Massachusetts

About this file

This is an Amended Form D Pricing Response document for RFP 63-26, issued by the Massachusetts Bay Transportation Authority (MBTA) for the removal, transportation, and disposal of hazardous waste and materials across MBTA properties in the Great Boston Metropolitan area and Southeastern Massachusetts. The RFP encompasses both emergency response services available 24/7 with a two-hour response time and scheduled services during normal business hours, covering petroleum products, antifreeze, PCBs, elevator and escalator materials, and miscellaneous hazardous and non-hazardous waste streams at 28 designated MBTA facilities. The pricing form requires bidders to submit firm fixed unit costs for specified waste disposal categories including oil-based paint (10 drums annually), latex-based paint (10 drums), mineral spirits/lacquer thinner (8 drums), waste flammable liquids (4 drums), grease buckets (24 cubic yards), expired paint containers (12 cubic yards), and aerosol deflator waste for both solvent-based and spray paint cans (10 drums each). Proposals were due June 19, 2026, with a pre-bid conference on June 2, 2026, and contract execution estimated for June 30, 2026. The MBTA anticipates awarding a four-year base contract with two optional one-year renewal periods, with service commencement on August 1, 2026.

All quoted prices must be inclusive of ancillary charges including labor, tooling, equipment, transportation costs, customs, duty charges, and other associated charges, with separate pricing required for Years 1 through 4 and optional renewal years. Bidders must complete all individual line items, as the MBTA reserves the right to reject any bid with blank items. The MBTA reserves the right to increase or diminish quantities up to 125 percent of the sum of all unit prices without change to the per-unit cost. Contingencies may be used at the MBTA's sole discretion for conditions not included in the scope of work or unforeseen circumstances, with the contractor submitting a proposal for approval by the MBTA representative; the MBTA retains the right to self-perform contingency work or solicit alternative proposals. Evaluation will be based on technical qualifications (40% weight), supplier diversity goals (25% weight), and price competitiveness, with award on a best-value basis to one or multiple contractors.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form C Pricing Form

Form C: Requested RFP Pricing Form
Management, Removal, Transportation and Disposal of Hazardous Waste and Materials, and Emergency Response ServicesVENDOR

NAME

DATE:
Bidders to complete green cells
1. Bidders are required to quote firm fixed Unit Cost(s) in the Unit Cost column below. The quoted prices shall be inclusive of ancillary charges including but not limited to labor, tooling, equipment, transportation costs, customs, duty charges, and other associated charges. Bidders shall quote only on goods and services in strict accordance with the specifications/requirements. Bidders must fill in each individual item. The MBTA reserves the right to reject any bid if one or more individual item is left blank.

2. The quantities set forth herein are merely estimates of what may be required under the contract, and the MBTA reserves the right to increase or diminish the quantities in any of the items as necessary, without change of price per unit, provided the increase of the sum of all said items does not exceed one hundred and twenty-five (125%) percent of the sum of all said items of all unit prices.

3. Contingencies are used at the sole discretion of the MBTA. Contingencies are used when conditions are not included in the scope of work, unforseen conditions or not clearly defined. Contractor will submit a proposal for the use of contingency to be approved by the MBTA representative. The MBTA reserves the right to self-perform the contingency work or solict other proposals.

No.Item DescriptionTotal Estimated Annual QuantityUnitUnit Cost Year 1Unit Cost Year 2Unit Cost Year 3Unit Cost Year 4Base Contract Cost (Year 1 - Year 3)Unit Cost Option Year 1Unit Cost Option Year 2
MATERIAL DISPOSAL
Oil Based Paint1055 Gallon Drum
$ - 0
Latex Based Paint1055 Gallon Drum$ - 0
Mineral Spirits/Lacquer Thinner855 Gallon Drum$ - 0
Waste Flammable Liquids455 Gallon drum
$ - 0
5-gallon grease buckets24Cubic Yard Flexible Waste Container$ - 0
Miscellaneous Size Expired/No Good Paint Containers12Cubic Yard Flexible Waste Container$ - 0
Aerosol Deflator Waste (Solvent Based Aerosol Cans)1055 Gallon Drum$ - 0
Aerosol Deflator Waste (Spray Paint Aerosol Cans)1055 Gallon Drum$ - 0
PCB Contaminated Wash Water <50 ppm6,000Gallon$ - 0
PCB Solids <50 PPM4Drum$ - 0
Battery Acid Solutions/Absorbent Material555 Gallon Drum
$ - 0
Polyester/Epoxy Resins455 Gallon drum$ - 0
Gasoline/Water Mixture455 Gallon drum$ - 0
Used Antifreeze455 Gallon Drum$ - 0
Antifreeze/Oil mixture455 Gallon Drum$ - 0
Diesel Fuel455 Gallon Drum$ - 0
Absorbent Material (Booms, Pads, Speedi-Dry)855 Gallon Drum$ - 0
Oily Debris/Solids (Collected in Drum)2555 Gallon Drum$ - 0
Oily Debris/Solids (Collected using Vactor Truck)20Ton$ - 0
Oily Water (Collected in a Drum)5055 Gallon Drum$ - 0
Oily Water (Collected using Pump Truck)12000Gallon$ - 0
Waste Oil (Collected in Drum)455 Gallon Drum$ - 0
Waste Oil (Pumped from Drum or Tank using Pump Truck)1500Gallon$ - 0
Obsolete Gas Cylinders8Each$ - 0
Miscellanous Matrial DisposalLump sum1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 40,000.00$ 10,000.00$ 10,000.00
$ 40,000.00$ - 0$ - 0
SUPPLIES & SUPPORT SERVICES
55-Gallon Steel Drum 2 Bung System Bolted Lid and GasketEach100
85-Gallon Poly Overpack DrumEach6
Sorbent Boom (10' x 8')Bale25
Sorbent Pads (100 GRADE)Bale50
40 lb. Bag Speedi Dry Clay SorbentBale50
Poly Roll (6 Mil)Bale2
Cubic Yard Flexible Waste ContainerEach40
Tyvek SuitEach75
Miscellanous Supplies and Support ServicesLump sum1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 40,000.00$ 10,000.00$ 10,000.00
$ 40,000.00
CREW LABOR HOURS
Licensed Site ProfessionalHour20
CDL With Hazardous Materials Endorsement (Emergency Response)Hour50
CDL With Hazardous Materials Endorsement (Scheduled Service)Hour1500
Laborers/Technician (Emergency Response)Hour50
Laborers/Technician (Scheduled Service)Hour1,500
Foreman (Emergency Response)Hour50
Foreman (Scheduled Service)Hour1,500
Miscellanous LaborLump sum1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 40,000.00$ 10,000.00$ 10,000.00
$ 40,000.00

Randall, Kate: Randall, Kate:

Sum J47:J54 Randall, Kate: Randall, Kate:

Sum I36:I44 Randall, Kate: Randall, Kate:

Sum J36:J44 Randall, Kate: Randall, Kate:

Sum I47:I54EQUIPMENT AND RATES
Vactor Truck (6,000 cfm)500Hour
Vacuum Pump Truck (750 cfm)500Hour
Material Transport Box Truck800Hour
Service Truck500Hour
High Pressure Washer40Hour
Hand Pump (Drum)100Hour
Confined Space Entry5Day
Waste Disposal Characterization50Each
Miscellaneous Equipment and RatesLump sum1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 40,000.00$ 10,000.00$ 10,000.00
$ 40,000.00$ 10,000.00$ 10,000.00
Total Base ContractTotal Option Year 1Total Option Year 2
$ 160,000.00$ 10,000.00$ 10,000.00
Line Item Notes:
Notes:
1. PCB materials largely includes various materials located at the Cabot RTL Red Line Maintenance Facility, which operates under a Long-Term Maintenance and Monitoring Plan mandated by TSCA.
Materials requiring disposal as PCB waste generally includes wash water generated from the floor scrubbers, vacuum waste (debris, bags and filters) and rags. Other PCB liquids and solids
may also be generated at other MBTA locations.
2. Sludge includes, but is not limited to, sludge collected in wash alley and fuel alley trenches and other drainage systems (floor drains, oil/water separators, trenches) at maintenance facilities,
elevator pits and escalator pits at service stations, pits at maintenance facilities and electric manholes.
3. Oily water includes, but is not limited to, oil/water mixture from elevator pits and escalator pits at the service stations, flooded pits at maintenance facilities, electric manholes, pump stations
and oil/water separators throughout the system.
4. The above listed quantities are an estimate only; the MBTA does not guarantee any of these quantities. The estimate may change based on the procurement of new vehicles, facility
improvements, allocated funds and other unforseen circumstances.
5. The cost for all administrative efforts should be included.