Attachment_9_-_Drawings-E0.1-E9.8.pdf

PDF 2 MB Posted

Attached to
Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
Solicitation number
AG-82FT-S-16-0015
Issued by
Department of Agriculture Forest Service Research Service Rocky Mountain Research Station

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PS

FS

TS

S S SD

D

FAA WP

FACP SS

D H

F

F s s

X

D-1

PS-X

X

J

X

X

X

J

TV

X

LP100

208/120V 3#. 4W

M

M

M

SPD VFD

LA

PFC G

M CB

Y

ST

X

OS OS

P

PROJECT NOTES:

1. PRIOR TO BID CONTRACTOR SHALL VISIT THE SITE. NOT ALL WORK

REQUIRED TO COMPLETE THE PROJECT IS SHOWN ON THE DRAWINGS.

THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH ALL THE

WORK REQUIRED TO COMPLETE THE PROJECT IN ADDITION TO THE LOCAL

CONDITIONS AND INCLUDE SAID WORK IN THE BID.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF

ALL ELECTRICAL SERVICE WORK WITH UTILITY. OWNER PAYS ALL FEES,

CONTRACTOR DOES ALL SCHEDULING AND COORDINATION OF WORK. IT

IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL

SCHEDULES ARE MET.

3. GENERAL WORK PRACTICES FOR ELECTRICAL CONSTRUCTION SHALL BE

IN ACCORDANCE WITH NECA 1, "STANDARD PRACTICES FOR GOOD

WORKMANSHIP IN ELECTRICAL CONTRACTING." THIS PUBLICATION IS

AVAILABLE FROM NECA BY TELEPHONE AT 301-657-3110 OR ON-LINE AT

WWW.NECANET.ORG.

4. DURING DEMOLITION, THE CONTRACTOR SHALL NOTE ALL EXISTING

RACEWAY (BOTH SURFACE AND CONCEALED) TO THE EXTENT POSSIBLE.

THESE RACEWAYS SHALL BE REUSED TO THE GREATEST EXTENT

POSSIBLE TO INSURE A CLEAN FINISHED PRODUCT. WHERE PRACTICAL,

AND ALLOWED PER CODE, FISHING THROUGH WALLS WITH MC CABLE IS

PREFERRED TO SURFACE-MOUNTED CONDUIT.

5. CONTRACTOR SHALL REMOVE, TRANSPORT, AND LEGALLY DISPOSE OF

LAMPS AND BALLASTS OFF-SITE. IT IS ASSUMED THE THE BALLASTS DO

NOT CONTAIN PCBs. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY IF IT IS SUSPECTED THAT BALLASTS CONTAIN PCBs.

6. ALL POWER INTERRUPTIONS SHALL BE COORDINATED WITH OWNER. ANY

DISRUPTION OF WORKERS IN THE SPACE SHALL BE KEPT TO A MINIMUM

AND BE COORDINATED WITH THE OWNER PRIOR TO WORK COMMENCING

IN THAT SPACE.

7. CONTRACTOR SHALL EXTEND UNSWITCHED HOT LEG FROM EXISTING

EMERGENCY FIXTURE LOCATION TO NEW EMERGENCY FIXTURES. AS

NEEDED. SEE DEMO PLANS FOR AN APPROXIMATION OF EXISTING

EMERGENCY FIXTURE LOCATIONS. FIELD VERIFY EXACT LOCATION PRIOR

TO BID.

8. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE WITH

MECHANICAL FOR PLENUM SPACES AND PROVIDE PLENUM RATED

CABLES WHERE REQUIRED FOR LIGHTING CONTROL, DATA, FIRE ALARM

AND ALL OTHER L.V. SYSTEMS NOT INSTALLED IN CONDUIT. VERIFY

CONDUIT REQUIREMENTS ON DRAWINGS AND SPECIFICATIONS.

9. FIRE-RESISTANCE: PROVIDE A MINIMUM HORIZONTAL DISTANCE OF 24"

BETWEEN OUTLET BOXES LOCATED ON OPPOSITE SIDES OF

FIRE-RESISTANCE RATED WALLS. WHERE THIS IS NOT POSSIBLE INSTALL

UL LISTED PUTTY PADS ON ALL OUTLET BOXES NOT MEETING THE 24"

SEPARATION. PROVIDE A UL LISTED THROUGH -PENETRATION FIRESTOP

FOR PENETRATIONS OF FIRE-RESISTANCE RATED ASSEMBLIES.

10. CONDUCTORS ARE SIZED PER THE 75 DEGREE C RATING COLUMN OF NEC

TABLE 310.16. IF THE TERMINAL USED FOR A TERMINATION OF A

PARTICULAR CONDUCTOR IS NOT MARKED, OR THE TERMINAL IS MARKED

FOR 60 DEGREE C CONDUCTORS, IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO EITHER ADJUST THE AMPACITY OF THE CONDUCTOR TO

MATCH THE 60 DEGREE COLUMN OF TABLE 310.16, OR REPLACE THE

TERMINAL WITH ONE RATED FOR AT LEAST 75 DEGREES C

11. FOR 20A BRANCH CIRCUIT RUNS EXTENDING BEYOND 300 LINEAR FEET.

CONDUCTOR SIZE SHALL BE A MINIMUM OF #10 CU.

12. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH 120V BRANCH

CIRCUIT.

13. ALL PRODUCTS SHALL MEET THE "BUY AMERICAN ACT".

ABBREVIATIONS

A or AMP AMPERES

ABA ARCHITECTURAL BARRIERS ACT

AC ALTERNATING CURRENT

A/C AIR CONDITIONING

AF AMP FUSE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

AL ALUMINUM

AS AMP SWITCH

ATS AUTOMATIC TRANSFER SWITCH

BAS BUILDING AUTOMATION SYSTEM

BKR BREAKER

C RACEWAY/CONDUIT

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

CLG CEILING

C.O. RACEWAY/CONDUIT ONLY, WITH PULL STRING

CNTRL CONTROL

CU COPPER

DISC DISCONNECT

DIST DISTRIBUTION

DPDT DOUBLE POLE DOUBLE THROW

DWG DRAWING

EA EACH

EF EXHAUST FAN

ELEC ELECTRIC

EMT ELECTRICAL METALLIC TUBING

EQUIP EQUIPMENT

EX OR

EXIST EXISTING

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FATC FIRE ALARM TERMINAL CABINET

FD FUSED DISCONNECT

FLR FLOOR

FO FIBER OPTIC

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

GEC GROUNDED ELECTRODE CONDUCTOR

GFI GROUND FAULT INTERRUPTER

GND GROUND

GRC GALVANIZED RIGID CONDUIT

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HPS HIGH PRESSURE SODIUM

HTR HEATER

HVAC HEATING, VENTILATING & AIR CONDITIONING

HZ HERTZ

J-BOX JUNCTION BOX

KVA KILOVOLT AMPERES

KW KILOWATTS

LTG LIGHTING

LPW LUMENS PER WATT

MAG MAGNETIC STARTER

MAN MANUAL

MAX MAXIMUM

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MH METAL HALIDE

MIN MINIMUM

MSS MOTOR STARTER SWITCH

N NEUTRAL

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NFD NON-FUSED DISCONNECT

NIC NOT IN CONTRACT

NO NORMALLY OPEN

# NUMBER

OAE OR APPROVED EQUAL

OC ON CENTER

OCPD OVERCURRENT PROTECTION DEVICE

OH OVERHEAD

P POLE

PB PUSHBUTTON

PNL PANEL

PVC POLYVINYL CHLORIDE CONDUIT

PWR POWER

RECEPT RECEPTACLE

RCPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

RVNR REDUCED VOLTAGE NON-REVERSING

RVR REDUCED VOLTAGE REVERSING

SP SINGLE POLE TOGGLE SWITCH

SPD SURGE PROTECTION DEVICE

SPEC SPECIFICATION

SPST SINGLE POLE SINGLE THROW

SSPB START-STOP PUSHBUTTON

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TB TELEPHONE BOARD

TC TIME CLOCK

TD TIME DELAY

TEL TELEPHONE

TSP TWISTED SHIELDED PAIR

TTB TELEPHONE TERMINAL BOARD

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

V VOLT

VA VOLT AMPERES

VFD VARIABLE FREQUENCY DRIVE

W WATTS

WAO WORK AREA OUTLET

WP WEATHERPROOF

W/O WITHOUT

XFMR TRANSFORMER

Y WYE CONNECTED

DELTA CONNECTED

PHASE

*THESE ABBREVIATIONS COMPRISE A STANDARD LIST;

NOT ALL ABBREVIATIONS APPEAR ON THIS PROJECT.

ELECTRICAL SYMBOL LEGEND: SYSTEM PLANS

SYMBOL DESCRIPTION DESCRIPTION SYMBOL

TELEPHONE OUTLET; PROVIDE ROUGH IN WITH. 2-GANG

BOX W/MUD RING AND 1" STUBBED UP TO ACCESSIBLE

CEILING SPACE. (MOUNT AT +18" AFF. UNO.) RUN CAT5e

CABLE BACK TO C-WING TELEPHONE TERMINAL BOARD IN

SERVER ROOM.

SPRINKLER PRESSURE SWITCH

VOICE-DATA OUTLET; PROVIDE ROUGH IN ONLY. 2-GANG

BOX W/MUD RING AND 1" STUBBED UP TO ACCESSIBLE

CEILING SPACE. (MOUNT AT +18" AFF. UNO.) RUN CAT5e

CABLE BACK TO C-WING SERVER RACKS.

SPRINKLER FLOW SWITCH

DATA OUTLET; PROVIDE ROUGH IN ONLY. 2-GANG BOX

W/MUD RING AND 1" STUBBED UP TO ACCESSIBLE CEILING

SPACE. (MOUNT AT +18" AFF. UNO.)

SPRINKLER TAMPER SWITCH

SPEAKER

SMOKE DETECTOR "D" INDICATES DUCT SMOKE

DETECTOR.

FIRE ALARM ANNUNCIATOR PANEL WIRELESS POINT CONNECTION:

SUPPLY CAT6 CABLING TO THIS LOCATION.

FIRE ALARM CONTROL PANEL SINGLE-STATION SMOKE DETECTOR. PROVIDE 120V AND

MONITOR AT FACP VIA RELAY

DOOR HOLDER HEAT DETECTOR

STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.) AND

CEILING MOUNT

HORN/STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.)

AND CEILING MOUNT

FIRE ALARM MANUAL STATION (MOUNT AT +46" AFF, UNO.)

SPEAKER STROBE WALL MOUNT (MOUNT AT +82" AFF,

UNO.) AND CEILING MOUNT

ELECTRICAL SYMBOL LEGEND: POWER PLANS

SYMBOL DESCRIPTION DESCRIPTION SYMBOL

BRANCH CIRCUIT PANELBOARD RACWAY STUB-OUT OR STUB-UP WITH CAPPED END

PANEL AND CIRCUIT DESIGNATION ARE SHOWN NEXT

TO EACH DEVICE (PANEL NAME - CIRCUIT NUMBER).

BRANCH CIRCUIT WIRE SIZE IS #12 UNLESS NOTED

OTHERWISE. A SINGLE INSULATED GREEN GROUND

CONDUCTOR SHALL BE PROVIDED WITH EACH HOME

RUN. PROVIDE A SEPARATE NEUTRAL FOR EACH

CIRCUIT. HOME RUNS SHALL HAVE NO MORE THAN

THREE CIRCUITS. LINE VOLTAGE AND LOW VOLTAGE

WIRING IS NOT SHOWN ON PLANS. FOR EQUIPMENT

CIRCUITING, SEE MEP COORDINATION SCHEDULE.

SURFACE MOUNTED PLUGSTRIP. SUBSCRIPT DENOTES

TYPE AND STYLE. SEE TABLE BELOW:

TYPE A: PLUGSTRIP, POWER ONLY, OUTLET EVERY 3' OC

TYPE B: WIREMOLD SERIES 4000 POWER AND DATA

TYPE C: WIREMOLD SERIES 5400 POWER AND DATA

DUPLEX RECEPTACLE. (MOUNT AT +18" AFF. UNO.)

X-GFI-GFCI RECEPTACLE

WP-WEATHER PROOF WITH WHILE IN USE COVER

DROP RECEPTACLE. SEE DETAIL #11 ON SHEET E9.3.

4PLEX RECEPTACLE. (MOUNT AT +18" AFF. UNO.)

X-GFI-GFCI RECEPTACLE

WP-WEATHER PROOF WITH WHILE IN USE COVER

LINE BREAK

ABOVE COUNTER DUPLEX RECEPTACLE MOUNTED 4"

ABOVE BACKSPLASH SURFACE MOUNTED RACEWAY

ABOVE COUNTER 4PLEX RECEPTACLE MOUNTED 4"

ABOVE BACKSPLASH

RACEWAY CONCEALED IN WALL, FLOOR, OR CEILING IN

FINISHED SPACES, EXPOSED IN UNFINISHED

SPACES.

FLOOR OUTLET - HUBBEL MODEL #HBLCFB401CB

WITH COVER MODEL #HBLTCGNTBKSW, OR EQUAL. RACEWAY BELOW FLOOR OR BELOW GRADE

FLOOR BOX WITH COMBINATION 4PLEX RECEPTACLE

AND 2 TELEPHONE/DATA OUTLETS. MANF HUBBEL

MODEL #HBLCFB401CB WITH COVER MODEL

#HBLTCGNTBKSW, OR EQUAL.

RACWAY STUB-OUT OR STUB-UP WITH BUSHED END

JUNCTION BOX GROUNDING BUS

FLATSCREEN TV BOX; 2-GANG, FLUSH IN WALL,

HUBBELL RACO NSAV62M WITH NSAV6C COVER.

DUPLEX RECEPTACLE AND SINGLE GANG DATA

PORT. (MOUNT AT +72" AFF. UNO.)

PUSHBUTTON (MOUNT AT +54" AFF, UNO.)

-EPO EMERGENCY POWER OFF

-ADA HANDICAP ACCESSIBLE DOOR (DEVICE BY OTHERS)

-ODO OVERHEAD DOOR OPERATOR (DEVICE BY OTHERS)

SPECIAL PURPOSE OUTLET.

(MOUNT AT +18" AFF. UNO.)

1. THESE SYMBOLS COMPRISE A STANDARD LIST; NOT ALL SYMBOLS APPEAR ON THIS PROJECT.

2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE ABOVE FINISHED FLOOR. MOUNTING HEIGHTS INDICATED ON ARCHITECTURAL WALL ELEVATIONS OR AS NOTED SPECIFICALLY ON THE DRAWINGS OR IN THE SPECIFICATIONS SHALL TAKE PRECEDENCE OVER MOUNTING HEIGHTS LISTED.

ELECTRICAL SYMBOL LEGEND: 1-LINES

SYMBOL DESCRIPTION DESCRIPTION SYMBOL

SWITCH BOARD OR PANEL BOARD; NAME, VOLTAGE,

PHASE, NUMBER OF WIRES WHEN INDICATED DISCONNECT SWITCH ("XXAS' = SWITCH AMP RATING)

CT AND CUSTOMER POWER METER FUSED DISCONNECT SWITCH ("XXAS/XXAF" - SW AND FUSE

AMP RATING)

MOTOR SYMBOL

COMBINATION MOTOR STARTER (STR SIZE, TYPE, AS, AF,

SEE MEP COORD. SCHEDULE)

UTILITY ELECTRIC METER AND BASE (BASE BY

CUSTOMER) AUTOMATIC TRANSFER SWITCH

TRANSIENT VOLTAGE SURGE SUPPRESSION VARIABLE FREQUENCY DRIVE

LIGHTNING ARRESTOR FIXED MOUNT LV BREAKER

STRESS RELIEF CONE FUSED SWITCH ("XXAS/XXAF" = SW AND FUSE AMP RATING)

POWER FACTOR CORRECTION CAPACITOR GENERATOR

MOTOR STARTER SWITCH WITH THERMAL OVERLOADS WALL MOUNTED BREAKER

CONTACTOR NORMALLY OPEN, NORMALLY CLOSED THERMAL OVERLOAD ELEMENT

TRANSFORMER

3-PHASE, 3-WIRE DELTA CONNECTION ∆

3-PHASE, 4 WIRE GROUNDED WYE CONNECTION

SHUNT TRIP BREAKER

ELECTRICAL SYMBOL LEGEND: LIGHTING PLANS

SYMBOL DESCRIPTION DESCRIPTION SYMBOL

1X4 SURFACE WALL MOUNT FLUORESCENT PENDANT FIXTURE; HIGH BAY, LOW BAY, DECORATIVE.

1X4 2X2 2X4 RECESSED FLUORESCENT, 'a', AND 'b'.DESIGNATES SWITCH LEGS.

EXIT SIGN. ARROW(S) INDICATE DIRECTION OF TRAVEL,

SHADED AREA INDICATES ILLUMINATED FACE(S). STEM

INDICATES WALL MOUNTED. CELING MOUNTED

OTHERWISE.

1X4 2X2 2X4 RECESSED EMERGENCY FLUORESCENT,

'a', AND 'b'.DESIGNATES SWITCH.

EMERGENCY EGRESS BATTERY PACK, WALL MOUNT OR

CEILING MOUNT

1X4 2X2 2X4 SURFACE OR PENDANT FLUORESCENT,

'x' DESIGNATES SWITCH LEG. WALL MOUNTED SCONCE OR WALLPACK FIXTURE

1X4 2X2 2X4 SURFACE OR PENDANT EMERGENCY

FLUORESCENT, 'x' DESIGNATES SWITCH LEG. SURFACE MOUNTED DOWNLIGHT

4' FLUORESCENT STRIP OR INDUSTRIAL, SURFACE OR

CHAIN HUNG RECESSED CAN DOWNLIGHT

POLE MOUNTED FIXTURE RECESSED CAN WALLWASHER

STANDARD LIGHTING CONTROLS: SWITCHES AND LINE VOLTAGE DIMMERS

TOGGLE SWITCH (MOUNT AT 46" AFF. UNO.)

SUBSCRIPTS:

3- THREE-WAY

4- FOUR-WAY

D- DIMMER SWITCH - PHILIPS SUNRISE DIMMER -

ON/OFF.

K- KEYED SWITCH

T- TIMER

P- PILOT LIGHT

OS-WALL SWITCH OCC SENSOR. WATTSTOPPER

DW100(SINGLE SWITCH OR DW-200 DUAL SWITCH).

a- SINGLE POLE LIGHTING SWITCH FOR ZONE a b- SINGLE POLE LIGHTING SWITCH FOR ZONE b ab- LIGHTING SWITCHES WITH MULTIPLE ZONES

CEILING MOUNT OCCUPANCY SENSOR. WATT

STOPPER DT-300 DUAL TECHNOLOGY CEILING MOUNT

OR EQUAL WITH BZ-50 POWER PACKS AS NEEDED.

WALL MOUNT OCCUPANCY SENSOR. WATT STOPPER

DT-200 DUAL TECHNOLOGY WALL MOUNT OR EQUAL

WITH BZ-50 POWER PACKS AS NEEDED.

PHOTOCELL. WATT STOPPER LS-301 CEILING MOUNT

OR EQUAL

PROJECT ALTERNATE SCHEDULE

ALTERNATE

NUMBER ALTERNATE DESCRIPTION ADD OR

DEDUCT

EQUIPMENT

AFFECTED

1 EXPERIMENTAL COOLING ADD CU-A1

2 ABA RESTROOM ADD EF-A2

3 MZ AHU UPGRADE TO VAV ADD AHU-A2, CU-A2

4 SMOKE EXHAUST STACK ADD SEF-A1

5 SMOKE ACCUMULATION EXHAUST ADD SEF-A2

6 VCT ABATEMENT ADD

COORDINATE WITH

G.C. & C.O.

7 LV TUNNEL DOOR MOTOR ACCESS ADD

CONTROLS, LV

TUNNEL OVERHEAD

DOOR

8 DESTRATIFICATION FANS ADD DSF-A1 & A2, DSF-$

9 HEATER ALTERNATE ADD ECUH-B6 & B7,

HWCH-B2

10 SMALL BENCH COMBUSTION SMOKE EXHAUST ADD SEF-A3, L-A4

11 (D) RECEIVING 101A CMU WALLS ADD

NEW PHONE LINES

THROUGHOUT A-WING

WITH DEMOED

TELEPHONE PANELS

IN CMU WALL.

12 SUPPLY TO RELIEF BYPASS DAMPER ADD CDA-8

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E0.1

SYMBOLS & ABBREVIATIONSRJH

ACB

KSJ

RJH 58

AA

BBDDEEFFGGHHJJKKLL

UP

UP

UP

MMM

J J

M

REF.

FLAMMABLE CAB.

8A .1

(E) TOILET

108A

(E) JANITOR

107A

(ABA)

UP

DN.

UP

DN.

RAMP DOWN

DN

AA

BBDDEEFFGGHHJJKKLL

J

J

M

J

A

B

C

EX XFMR 'X'

TO REMAIN

EX METER

TO REMAIN

EX XFMR

EX XFMR '2A'

EX MDP

EX FA PANEL

TO BE REMOVED

EX HYDROLIC

ELEVATOR HOIST

TO REMAIN

(E) BOILER ROOM

001 A

(E) TRANSFORMER

RM

003 B

(E) ELEC PANEL RM

002 A

(E) HOIST RM

004 A

UNEXCAVATED

4 A

(E) PIPE TUNNEL

(E) DOCK ABOVE CRAWL SPACE

C R

A W

L S

P A

C E

EX BOILER PUMPS

EX BOILERS

EX

IRRIGATION

CONTROLS

(R)

(R)

(D)

(D)

(D)

(D) (D)

(D)

(D)

(D)

(R)

(R) (R) (R)

(R)

(R) (R)

(R)

(R)9

(R)

(D)

(D)

GFI

OVEN

NEMA 6-30R

HOOD

HOOD

RELOCATE CONDUIT TO

GARAGE DOOR MOTOR

ABOVE DOOR

ABOVE DOOR

TIME CLOCK

EX PANEL Y

EX PANEL 1A

EX PANEL 1AA

EX TELECOM

PANELS

EX 125A

EX PANEL P1

EX PANEL P1A

EX PANEL FOR

ARCH TORCH

EX CONTACT FOR DOOR

TO SHUT OFF LASER TO

RTEMAIN

EX ELEVATOR

TO REMAIN

(E) BOILER RM

001 A

(E) PREPARATION

AND STAGING

106-1A

(E) FUELS LAB

105 A

LASER ROOM

105-1A

CALIBRATION

105-3A

OBSERVATION

ROOM

104 A

(E) COMBUSTION

LAB

103 A

(E) VESTIBULE

100 B

(E) VESTIBULE

102 A

(E) PREPARATION

AND STAGING

106-2A

(E) RECEIVING

101 A

GFI

EX LOAD CENTER

TO REMAIN

TO REMAIN

TO REMAIN

HOOD

W/ SPEED

CONTROL

EX

EX

EX PANEL

(R) (R)

(R) (R)

(R) (R)

(R) (R) (R) (R)

(R) (R) (R) (R)

(R) (R) (R) (R)

(R) (R) (R) (R) (R) (R) (R) (R)

(R) (R) (R) (R)

(R) (R) (R) (R)

(R) (R) (R) (R)

(R) (R)

(R) (R)

(R)

(R)

(R) (R) (R) (R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(D)

(D)

(D)

(D)(D)

(D)

(D)

(D)

(D)

(D)

(D) (D)(D)(D)

(D)

(D)

(D) (D)(R) (R) (D) (D) (D) (D) (D)

(D)

(D)(D)

(D)

(D)

(D)(D)(D)

(D)

(D)

(D)

(D)

(D)

(D) (D) (D) (D) (D)

(D)

(D) (D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D) (D)

(D)

(D)

(D)

(D)

(D)

(R)

(R)

(R)

(D)

(R) (D)

(D)

(R) (R) (R)

(D)

EX PNL

(D)

(D)

(D)

(D)

(R)

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,

WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED

IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL

PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.

3. ALL POWER, RCPTS, MECHANICAL EQUIPMENT & RACEWAYS TO BE DEMOED,

UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE ALARM

ALONG WITH RESPECTIVE RACEWAYS, UNO.

4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.

5. VERIFY MECHANICAL EQUIPMENT TO BE DEMOED WITH MECHANICAL

DRAWINGS AND MECHANICAL CONTRACTOR.

6. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.

7. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE

NOTED.

ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS

OTHERWISE NOTED.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

ED2.0

'A'-WING - ELECT. DEMO PLANSRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A'-WING BASEMENT FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A'-WING 1st FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN12

ED2.0 : ED2.0

ED2.0 : ED2.0

ED2.0 : ED2.0

1. LIGHTING TO REMAIN. RE-CIRCUIT TO PANEL AH1.

2. ALL LIGHTING, EXCEPT FOR EMERGENCY LIGHTING, IN THIS SPACE TO

REMOVED. EMERGENCY LIGHTING TO REMAIN AND BE RE-CIRCUITED.

3. COUNTER-TOP RCPT AND ABOVE GRADE CONDUIT TO BE DEMOED BACK

TO WALL.

4. EX FEEDER TO BE EXTENDED TO NEW MDP IN NEW LOCATION.

5. EXISTING SPECIAL RECEPTACLES ( 240V, 208V, ETC.) TO BE REPLACED

WITH SAME NEMA CONFIGURATION AND VOLTAGE/PHASE.

6. EXISTING SUMP TO REMIAN AND BE RE-CIRCUITED.

7. SMART METER AND TEL/DATA CABLING TO SMART METER TO REMAIN.

8. ALTERNATE #11 REMOVE WALLS AND DEMO TELECOM PANEL.

9. LIGHTING IN THIS SPACE TO REMAIN.

DN.

UP

DN.

AA

BBDDEEFFGGHHJJKKLL

J J

J

J

M

J J

J

M

M

M

M

A

B

C

MOUNTED ON DESK

ABOVE PANEL

EX 60A PANEL

EX PANEL P2A

EX PANEL P2

(E) AIR

CONDITIONING

EQUIP

203 A

(E) WIND TUNNEL

TEST AREA

202 A

(E) LOW FLOW

TUNNEL

(E) CONTROL RM

201 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

EXISTING LIGHTING TO BE REMOVED.

(TYP)

EX LOAD CENTER

TO BE REMOVED

EX LOAD CENTER

TO BE REMOVED

EX COOLING TOWER

EX UNIT HEATER

EX CHILLER

EX COMPRESSOR

EX R.O. TO BE RELOCATED

EX POWERED BENCH

TO BE RE-CIRCUITED

(R) (R)

(D)(D)

(R) (R) (R) (R)

(R)

(R) (R) (R)

(R)

(R)

(R) (R)(R) (R) (R) (R) (R) (R) (R)(R)

(D)(D)(D)(D)

(D)

(D) (D)

(D) (D)

(D)

(D)

(D)

(D)

(D)

(D)

(R)

(D) (D)

(D) (D) (D) (D)

(D) (D) (D) (D)

(D)

(R) (R)

(R) (R)

(R)

(R)

(R)(R)

(R)

(R)

(R)(R)(R)

(R)

(D)

(R)

(D)

(D)

(D) (D) (D)

(R)

(R)

(D)

EX PUMP

(D)

(D)

(D) (D)

(D)(D)

(D)

(R) (R) (R) (R)

(D)

(D)

EX

(D)

(D) (D) (D)

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,

WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED

IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL

PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.

3. ALL POWER, RCPTS, MECHANICAL EQUIPMENT & RACEWAYS TO BE DEMOED,

UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE ALARM

ALONG WITH RESPECTIVE RACEWAYS, UNO.

4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.

5. VERIFY MECHANICAL EQUIPMENT TO BE DEMOED WITH MECHANICAL

DRAWINGS AND MECHANICAL CONTRACTOR.

6. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.

7. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE

NOTED.

ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS

OTHERWISE NOTED.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

ED2.1

'A'-WING - ELECT. DEMO PLANSRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A'-WING 2ND FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

: 1/2" = 1'-0"

5 ENLARGED 1st FLOOR 'A'-WING RESTROOMS DEMO PLAN (ALTERNATE #2)

12 TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

ED2.1 : ED2.0

ED2.1 : ED2.1

ED2.1 : ED2.1

1. DEMO ALL LIGHTING AND POWER DEVICES WITH-IN THIS SPACE.

2. IF ALT #2 IS NOT TAKEN EXISTING EXHAUST FAN TO REMAIN.

AA

BBDDEEFFGGHHJJKKLL

M

M

J

AA

BBDDEEFFGGHH

AA

BBDDEEFF

A

B

C

EX PANEL P3

ON MECH EQUIPMENT

EX PANEL P3b

EX PANEL LA

EX XFMR

EX XFMR

ROOF

(E) MECHANICAL

RM

302 A

(E) MECHANICAL

LOFT

301 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

EX

EX

EX

VFD

EX UNIT HEATER

EX SMART METER

(D) (D)

ALTERNATE #3

(D)

(D) (R)

(D)

(D)

(D)

(D)

(D) (D)

(D)

(D)

(D)

EX TELECOM PANEL

EX PANEL

TO BE REMOVED

(E) BURN CHAMBER

PLATFORM

401 A(E) SMOKE RELIEF

PLENUM

402 A

ROOF

(D)

(D)

(D)

(D) (D) (D) (D)

(D)

(D)

(D)

(D)

(D)

(D)

(R)

(D)(D)(D)

(D)

EX PANEL LB

TO REMAIN

TO REMAIN

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,

WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED

IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL

PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.

3. ALL POWER, RCPTS, MECHANICAL EQUIPMENT & RACEWAYS TO BE DEMOED,

UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE ALARM

ALONG WITH RESPECTIVE RACEWAYS, UNO.

4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.

5. VERIFY MECHANICAL EQUIPMENT TO BE DEMOED WITH MECHANICAL

DRAWINGS AND MECHANICAL CONTRACTOR.

6. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.

7. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE

NOTED.

ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS

OTHERWISE NOTED.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

ED2.2

'A'-WING - ELECT. DEMO PLANSRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A'-WING 3RD FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A'-WING 4TH FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

7 'A'-WING T.O. ROOF DEMO PLAN

12 TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

ED2.2 : ED2.2

ED2.2 : ED2.2

ED2.2 : ED2.2

ED2.2 : ED2.2

1. TO REMAIN IN BASE BID. ALTERNATE #11: PROVIDE (2) PHONE LINES FROM

TELEPHONE TERMINAL BOARD IN SERVER ROOM IN C-WING TO THIS

LOCATION.

2. SMART METER AND TEL/DATA CABLING TO SMART METER TO REMAIN.

(E ) D O O R B

LO

C K E D B Y (E

S E R V E R R M A C C E S S F

LO

O R

K -3551

ARCHE

R

TOILETV

ITREOUS CHINA

K-3551ARCHERTOILET VITREOUS CHINA

K -3551

ARCHE

R

TOILETV

ITREOUS CHINA

U P

D .F

UP

R A M P

D N

D N

D N

U P

DN

GHJ

J

G

EF C

U P

A

B

C

EX TELECOM

EX PANEL 1A1BA

EX PANEL 1B

EX PANEL J

EX PANEL CA

EX PANEL C

(E) INSTRUMENT

DEV. LAB

115 B

(E) OFFICE

113-1B

(E) INSTRUMENT

CALIBRATION

113 B

(E) INTRUMENT

VAULT

114B

(E) OFFICE

111 B

(E) OFFICE

110 B

(E) OFFICE

108 B

(E) RECIEVING &

SHIPPING

106 B

(E) DARK ROOM

109 B

(E) JAN

107 B

(E) OFFICE

107 C

(E) OFFICE

106 C

(E) SERVER ROOM

105 C

(E) OFFICE

108 C

(E) STORAGE

101 C

(E) TOILET

102 C

(E) WOMEN'S RR

127 B

(E) MEN'S RR

126 B

(E) OFFICE

125 B

(E) OFFICE

124 B

(E) OFFICE

123 B

(E) OFFICE

122 B

(E) OFFICE

121 B

(E) OFFICE

120 B

(E) OFFICE

119 B

(E) OFFICE

118 B

(E) LOBBY &

DISPLAY

101 B

PNL X

PNL 1BB

TELECOM PNL

EX LOAD CENTER

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

(R)

EX PANEL 4

EX PANEL 4A

EX XFMR 'B'

A R

E A

W A

Y

A

(E) MECH EQUIP

001 B

(E

E L E V

E Q

U

IP

B

(E

S T O

R A

G E

B

(R)

(R)

(R)

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,

WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED

IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL

PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.

3. ALL POWER, RCPTS, PANELS,TRANSFORMERS & RACEWAYS TO REMAIN FOR

B&C WINGS, UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE

ALARM ALONG WITH RESPECTIVE RACEWAYS, UNO.

4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.

5. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL

INFORMATION.

6. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE

NOTED.

ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS

OTHERWISE NOTED.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

ED2.3

'B' & 'C'-WINGS - DEMO PLANSRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'B' & 'C'-WING - 1ST FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

11 'B'-WING - BASEMENT DEMO PLAN 12 TRUE NORTH BLDG NORTH

'B' WING KEY PLAN

ED2.3 : ED2.3

ED2.3 : ED2.3

ED2.3 : ED2.3

K-5016-ET

DEXTER

C

_URINALS

V

ITRE

OUS C

HINA

K-3551ARCHERTOILET VITREOUS CHINA

K-3551

ARCHERTOILET VITREOUS CHINA

K-3551ARCHERTOILET VITREOUS CHINA

D .F

D.F.

D N

DN.

U P

GHJ

A

B

C

EX PANEL 2BA

EX PANEL 2B

(E) PASSAGE

211 B

(E) OFFICE

212 B

(E) MAIL RM

210 B

(E) OFFICE

213 B

(E) CONF RM

209-2B

(E) OFFICE

214 B

(E) OFFICE

215 B

(E) CONF RM

209-1B

(E) CONF RM

208 B

(E) OFFICE

207 B

(E) OFFICE

206-3B

(E) OFFICE

206-1B

(E) OFFICE

206-2B

(E) JAN

205 B

(E) STOCK ROOM

204 B

(E) OFFICE

216 B

(E) OFFICE

217 B

(E) OFFICE

218 B

(E) OFFICE

219 B

(E) OFFICE

220 B

(E) M TOIL

221 B

W TOIL

222 B

(E) CORRIDOR

200 B

EX PANEL '2BB'

(R)

(R)

(R)

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,

WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED

IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL

PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.

3. ALL POWER, RCPTS, PANELS,TRANSFORMERS & RACEWAYS TO REMAIN FOR

B&C WINGS, UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE

ALARM ALONG WITH RESPECTIVE RACEWAYS, UNO.

4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.

5. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL

INFORMATION.

6. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE

NOTED.

ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS

OTHERWISE NOTED.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

ED2.4

'B' & 'C'-WINGS - DEMO PLANSRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'B' & 'C'-WING 2ND FLOOR DEMO PLAN

TRUE NORTH BLDG NORTH

'B' WING KEY PLAN12

ED2.4 : ED2.4

ED2.4 : ED2.4

GGHHJJKKLL

UP

UP

UP

M M

8A .1

(ABA)

UP

DN.

UP

DN.

RAMP DOWN

DN

AA

BBDDEEFFGGHHJJKKLL

J

J

J

D D

D

M

J

J J

J

A

B

C

EX XFMR

PANEL X

UNEXCAVATED

C R

A W

L S

P A

C E

CRAWL SPACE

(E) DOCK ABOVE

(E) PIPE TUNNEL

(E) HOIST RM

004 A

(E) ELEC PANEL RM

002 A

(E) TRANSFORMER

RM

003 A

(E) BOILER ROOM

001 A

EXISTING LIFT TO BE RE-CIRCUITED

AH1-

7,9,11

AL4- 1 AL4- 1 AL4- 1

AL4- 3

AL4- 3

AL4- 3

AL4- 1

AL4- 5

AL4- 5

AL4- 7

AL4- 7

AL4- 3

E9.3

NEW MDS SWITCHBOARD 8

#8CU

AL4- 1

EX SMART

METER

AH1-

55,57,59EX SUMP

TO BE RECIRCUITED

AL1- 13

AL1- 13

AL1- 13

AL1- 15

AL1- 15

AL1- 15

AL1- 15

GFI

GFI

GFI AL4- 3

RELOCATE LIGHTING

CIRCUITS TO THIS

POINT

AH1

X1

AL1

EX ELEVATOR

DOOR CONTACT1

GFI

AH2

AL2

(E) COMBUSTION

LAB

103 A

(E) BOILER RM

001 A

(E) PREPARATION

AND STAGING

106-1A

(E) PREPARATION

AND STAGING

106-2A

(E) FUELS LAB

105 A

LASER ROOM

105-1A CALIBRATION

105-3A

OBSERVATION

ROOM

104 A

(E) VESTIBULE

102 A

H1

H1

H1

H1

GFI

GFI

GFI

GFI

GFI

GFI GFI GFI

GFI

GFI

NEMA 6-50R

#8CU

NEMA 6-50R

#8CU

NEMA 6-50R

#8CU

NEMA 6-50R

AL4- 67

AL4- 69

AL4- 71

AL4- 71

AL4- 73

AL4- 75

AL4- 75

AL4- 77

AL4- 77

AL4- 72

AL4- 72

AL4- 70AL4- 70

AL4- 76

AL4- 66

AL4- 68

AL4- 62

AL4- 62

AL4- 64AL4- 64

AL4- 52

AL4- 50 AL4- 50

AL4- 40

AL4- 40

AL4- 38

AL4- 38

AL4- 38

AL4- 52

AL4- 4

AL4- 4

AL4- 20

AL4- 8

AL4- 8

AL4- 2

AL4- 2

AL4- 6

AL4- 6

AL4- 30

AL4- 30

AL4- 28

AL4- 26

AL4- 26

AL4- 24

AL4- 28

AL2- 19 AL2- 19 AL2- 17 AL2- 17

AL2- 15

AL2- 15

AL2- 15

AL2- 10,12

AL2- 13

AL2- 11

AL2- 11AL2- 9

AL2- 9

AL2- 5

AL2- 7

AL2- 1

AL2- 19

AL2- 13

AL2- 11

AL2- 3

AL2- 14,16

AL2- 6,8

AL2- 2,4

AL4- 65

AL4- 63

AL4- 69

AL4- 66

AL4- 60

AL4- 54

AL4- 24

AL4- 20

AL4- 9

AL4- 11

AL4- 13 AL4- 13

AL4- 15 AL4- 17

AL4- 21 AL4- 21AL4- 21

AL4- 19

AL4- 19ENVIRONMENTAL

CHAMBER PANEL

L1

L1

L1

L1

H a b a a b b

AL2-

32,34,36

SHUNT TRIP

EX SERVICE XFMR

AH2- 1

AH2- 1

AH2- 1

AH2- 1

AH2- 1

AH2- 1

AH2- 1

AH2- 1

E2.1

GFI GFI

GFI

GFI

NEMA 6-30

#10 CU

NEMA 6-30

#10 CU

NEMA 6-

20 ABOVE

COUNTER

AL4-

14,16,18

AL4- 10,12

AL4- 32,34 NEMA 14-50

NEMA 6-30

#10 CU

NEMA 6-50R

#8CU

AL2- 18,20

AL4- 46,48 AL4- 42,44

ALTERNATE

AL4-

27,29,31

NEMA L21-20

#8CU

NEMA 6-20R

AL4- 33,35

NEMA L10-30

AL4- 37,39

AL4

NEMA 6-20R

AL4- 41,43

NEMA 6-20R

#10CU

AL4- 45,47

NEMA 6-20R

#10CU

AL4- 49,51

AL4- 74

AL1- 1

#8 CU

#8 CU

#10CU

#10CU ABOVE

COUNTER

#10CU ABOVE

COUNTER

NEMA 5-20R

#10CU

AL4- 53,55

AL1- 7

ON CEILING FOR

EXISTING GARAGE

DOOR OPENER

AL2- 15

+15' AFF

AL2- 17

+15' AFF

EX 15" CONCRETE

WALL 13

AL4- 78AL4- 78

14 14

AL1- 9,11

W1

AL4- 21

AL4- 54

AL4- 22

MOUNT ABOVE DOOR

AL1- 17 AL1- 17

WP

GFI

WP

GFI

AL1- 19

AL1- 19AL1- 19

WP

GFI

WP

GFI

WP

GFI

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.0

'A'-WING - ELECT. PLANSRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A'-WING BASEMENT POWER PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A'-WING 1st FLOOR ELECTRICAL PLAN E2.0 : E2.0

E2.0 : E2.0

E2.0 : E2.0

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN12

1. DOOR CONTACT TO SHUT OFF LASER WHEN OPENED. EXISTING

SYSTEM TO REMAIN.

2. PROVIDE POKE THROUGH FLOOR RCPT FOR OVEN. COORDINATE

EXACT LOCATION WITH CONTRACTING OFFICER.

3. HOOD CONNECTIONS FOR EXHAUST FAN, AND HOOD MOUNTED

RCTPS. VERIFY CONNECTIONS PRIOR TO ROUGH-IN.

4. EXISTING LIFT TO BE RECIRCUITED.

5. PROVIDE TRANSFORMER WITH 4" HOUSE KEEPING PAD. MOUNT 2"

OFF WALL PER NEC REQUIREMENTS.

6. PROVIDE ALL RECEPTACLES IN THIS SPACE WITH WEATHER PROOF

COVERS. ALL RECEPTACLES IN THIS SPACE TO BE MOUNTED AT

48"AFF.

7. EXTEND EXISTING MDP FEEDER TO NEW MDP.

8. LIMIT DOWN TIME FOR SWITCH OVER. PLAN FRIDAY THROUGH

SUNDAY SWITCH OVER. NOTIFY CONTRACTING OFFICER 14 DAYS

PRIOR.

9. SECURITY PANEL CIRCUIT. RECIRCUIT AND PROVIDE TEMPORARY

POWER DURING POWER SWITCH OVER.

10. 3-WAY PILOT LIGHT SWITCH TO CONTROL TYPE W1 "ROOM IN USE"

LIGHT.

11. RELOCATE OVEN FROM (E) PREPARATION AND STAGING TO THIS

LOCATION. VERIFY OVEN WILL FIT IN THIS LOCATION PRIOR TO

ROUGH-IN.

12. RECIRCUIT HOOD WITH SPEED CONTROLS.

13. CORE THROUGH EXISTING CEMENT WALL FOR ALL CIRCUITS TO

COMBUSTION LAB 103A OUTLETS. SEAL ALL PENETRATIONS.

14. VERIFY POSSIBILITY OF POKE THROUGH POWER TO CABINET

POWER IN THIS LOCATION. IF NOT POSSIBLE PROVIDE POWER TO

FURNITURE THROUGH CONDUIT ROUTED STRAIGHT TO CEILING.

15. IF ALTERNATE #11 FOR RECIEVING 101 A IS TAKEN: PROVIDE

TELEPHONE OUTLETS AT THIS LOCATION. RUN CAT5e CABLE BACK

TO C-WING TELEPHONE TERMINAL BOARD IN THE SERVER ROOM.

16. SEE NEW ONE-LINE #9 ON SHEET E9.2 FOR MORE CIRCUITING

INFORMATION. IF REQUIRED PROVIDE NEW CAT5e CABLING TO THIS

LOCATION FOR NETWORKING OF SMART METER.

A

B

C

DN.

UP

DN.

AA

BBDDEEFFGGHHJJKKLL

M

J J J

DaDbDc

M

8A .1

K-5016-ETDEXTERC

_URINALS

V

ITRE

OUS C

HINA

os

F os

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

AH3

AL3

(E) OFFICE

212 B

(E) PASSAGE

211 B

(E) LOW VELOCITY

TUNNEL

220 C

(E) WIND TUNNEL

TEST AREA

202 A

(E) CONTROL RM

201 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

D1

D1E

D1ED1

D1

D1

RE-CIRCUIT

EXISTING

DROP RCPT

D1D1

GFI

RE-CIRCUIT EXISTING

GARAGE DOOR MOTOR NEW CONTROLS BY

MECHANICAL. PROVIDE 1/2" C.O. FOR SENSORS.

NEW

DROP RCPT

AL3- 33 AL3- 35 AL3- 37

AL3- 2

AL3- 4

AL3- 21

AL3- 19

AL3- 17

AL3- 15AL3- 13

AL3- 1

AL3- 3

AL3- 25

AL3- 7

AL3- 11AL3- 5

EM

AH3- 13

AH3- 13

AH3- 13

AH3- 13 AH3- 13

AH3- 13

AH3- 13 AH3- 13

GFI

AL3- 21

c c b bb b a a

AL3- 6

AL3- 8

AL3- 10

208V/3P

NEMA L5-50R

#8CU

480V/3P

NEMA L22-50

#8CU

208V/3P

NEMA L5-50R

#8CU

480V/3P

NEMA L22-50

#8CU

AL3- 23 3

AL3- 12

AL3-

14,16,18

AH3- 1,3,5

AL3- 9 AL3- 9

AL3-

20,22,24

AH3-

7,9,11

RE-CIRCUIT EXISTING

OVER HEAD DOOR MOTOR.

EXISTING SENSORS TO REMAIN.

AL3- 27

AL3- 39

AL3- 39

AL3- 39

AL3- 41

AL3- 41

AL3- 41

AL3- 41

(E) AIR

CONDITIONING

EQUIP

203 A

9AL3- 13

AL3- 19

+72" AFF +72" AFF

D2

AL4- 79

V1

F1

AL4- 79

AH2- 3

AH2- 3

AH2- 3

GFI

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.1

'A'-WING - ELECT. PLANSRJH

ACB

KSJ

RJH

E2.1 : E2.0

E2.1 : E2.1

E2.1 : E2.1

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN12

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING 2ND FLOOR ELECTRICAL PLAN

1. MATCH NEW LIGHTING UP WITH EXISTING HOLES IN WIND TUNNEL. CLEAN

GLASS COVER IN TUNNEL PRIOR TO INSTALL.

2. CUT NEW HOLES IN TUNNEL WITH HEAT RESISTANT GLASS. INSTALL

GLASS TO ASSURE AIR-TIGHT SEAL FOR NEW PENETRATION. ALIGN TYPE

D1 FIXTURES DIRECTLY OVER NEW GLASS PENETRATIONS.

3. REPLACE EXISTING FLUSH-MOUNT QUAD RCPT WITH NEW HIGH HEAT

RCPT HUBBEL IG5362WR OR APPROVED EQUAL.

4. EXISTING BOX, ATTACHED TO OUTSIDE OF WIND TUNNEL, TO REMAIN IN

PLACE AND BE RE-FITTED WITH SPECIFIED OUTLETS.

5. RECIRCUIT EXISTING LIGHTING TO THIS PANEL.

6. IF ALTERNATE IS NOT TAKEN AND THIS AREA REMAINS AS IS PROVIDE NEW

RCPT IN EXISTING LOCATION. POWER RCPT AND LIGHTING IN THIS SPACE

USING CIRCUITS SHOWN.

7. 3-WAY PILOT LIGHT SWITCH TO CONTROL TYPE W1 "ROOM IN USE" LIGHT

ON FIRST FLOOR.

8. IF ALTERNATE #11 FOR RECIEVING 101 A IS TAKEN: PROVIDE TELEPHONE

OUTLETS AT THIS LOCATION. RUN CAT5e CABLE BACK TO C-WING

TELEPHONE TERMINAL BOARD IN THE SERVER ROOM.

9. QUAD RECEPTACLES TO BE MOUNTED IN SAME LOCATION AS DEMOED

RECEPTACLES TO AVOID ADDITIONAL PENETRATIONS TO WIND TUNNEL.

TRUE NORTH BLDG NORTH

: 1/2" = 1'-0"

5 ENLARGED 1st FLOOR 'A'-WING RESTROOMS ELECTRICAL PLAN (ALTERNATE #2)

C

AA

BBDDEEFFGGHH

AA

BBDDEEFF

UP

AA

BBDDEEFFGGHHJJKKLL

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

KEY NOTES:

AL2a

(E) BURN CHAMBER

PLATFORM

401 A

(E) SMOKE RELIEF

PLENUM

402 A

ROOF

AL2a- 1

AL2a- 3

AL2a- 5

AL2a- 7

AL2a- 9AL2a- 11AL2a- 13

AL2a- 15

AL2a- 19

AL2a- 21

AL2a- 23

AL2a- 25

AL2a- 27AL2a- 29 AL2a- 31

AL2a- 33AL2a- 17

AL2a- 35

AL2a- 37

AL2a- 39

AL2a- 2,4 AL2a- 6,8

NEMA 6-20 NEMA 6-50

#8CU

WP

GFI

AL5- 34

6EX TELECOM PANEL

CIRCUIT PANEL LB FROM

SUBFED BREAKER IN NEW

PANEL AL5

WP

GFI

AL5- 45

AH5

X5

AL5

(E) BURN CHAMBER

OPEN TO BELOW

201 B

ROOF

220 E

(E) MECHANICAL

RM

302 A

(E) MECHANICAL

LOFT

301 A

F1 F1 F1

F1

F1

F1

F1 F1

F1

F1

AH5- 11

AH5- 11 AH5- 11

AH5- 11

AH5- 11 AH5- 11

AH5- 11

AH5- 11

AH5- 11

AH5- 11

SWITCH FOR

LIGHTING IN PLENUM

ABOVE THIRD FLOOR.

RECIRCUIT EXISTING

LTG TO AH5-31

F1

AH5- 11

AL5- 5

AL5- 5

AL5- 5

AL5- 5

EX SMART METER

AH5a

WP

GFI

AL5- 43

WP

GFI

AL5- 43

M9.4

AL5- 5

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.2

'A'-WING - ELECT. PLANSRJH

ACB

KSJ

RJH

E2.2 : E2.2

E2.2 : E2.2

E2.2 : E2.2

E2.2 : E2.2

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING 4TH FLOOR ELECTRICAL PLAN TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

7 'A' WING ROOF TOP POWER PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING 3RD FLOOR ELECTRICAL PLAN

1. PROVIDE TRANSFORMER WITH 4" HOUSE KEEPING PAD. MOUNT 2" OFF BACK

WALL PER NEC REQUIREMENTS.

2. MOUNT TO RAILING. VERIFY BEST LOCATION FOR LOAD CENTER WITH NEC

REQUIRED CLEARANCES.

3. RE-CIRCUIT FOR NEW PANEL AH5a SUPPLY FAN ARRAY. SEE NEW ONE-LINE #

9 ON SHEET E9.2 FOR MORE CIRCUITING INFORMATION. IF REQUIRED PROVIDE

NEW CAT5e CABLING TO THIS LOCATION FOR NETWORKING.

4. COORDINATE EXACT LOCATION WITH MECHANICAL TO ENSURE WORKSPACE

CLEARANCES ARE KEPT BETWEEN ELECTRICAL AND MECHANICAL

EQUIPMENT.

5. COORDINATE LIGHTING WITH NEW DUCT WORK. CIRCUIT VIA NEW CONTROLS.

6. ALTERNATE #11: PROVIDE (2) PHONE LINES FROM TELEPHONE TERMINAL

BOARD IN SERVER ROOM IN C-WING TO THIS LOCATION FOR NEW PHONE

LINES.

(ABA)

DN.

UP

DN.

RAMP DOWN

DN

AA

BBDDEEFFGGHHJJKKLL

M

M

M

M

J J

M

M

J

M

M

M M

A

B

C

GGHHJJKKLL

UP

UP

UP

M M

M

M M

M M

JJ

JJ

(E) COMBUSTION

LAB

103 A

(E) BOILER RM

001 A

(E) PREPARATION

AND STAGING

106-1A

(E) PREPARATION

AND STAGING

106-2A

(E) FUELS LAB

105 A

LASER ROOM

105-1A

CALIBRATION

105-3A

OBSERVATION

ROOM

104 A

EF-A1

HWUH-A3

HWCH-A1 HWCH-A2

HWCH-B2

HWUH-A1

HWUH-A2

AL5- 31

AL5- 33 AL5- 33

AL5- 33

AL2- 21

AL2- 21

E2.0

AL5- 47

AL5- 47

EXISTING EXHAUST FANS

TO BE RE-CIRCUITED

(E) PREPARATION

AND STAGING

106-1A

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

KEY NOTES:

UNEXCAVATED

(E) PIPE TUNNEL

(E) ELEC PANEL RM

002 A

(E) TRANSFORMER

RM

003 A

(E) BOILER ROOM

001 A

GLF-A1

HWP-A2HWP-A1

AH5-

19,21,23

AH5-

13,15,17

VFD

VFD

AL5- 35

22 AL5- 42

AL5- 42

AL5- 44

AL5- 46

(E) B-4

(E) B-3

(E)

WATER

HEATER

ECUH-B8

AL5- 27AL5- 23

B-A1 B-A2

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.3

'A'-WING-MECH. COORDINATIONRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A'-WING 1st FLOOR MECHANICAL COORDINATION PLANS E2.3 : E2.3

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A'-WING BASEMENT MECHANICAL COORDINATION PLANS

E2.3 : E2.3

1. BOILER EMERGENCY SHUT OFF. CIRCUIT BOILERS VIA SHUNT TRIP

BREAKERS.

2. EXISTING CONNECTIONS, AND DISCONNECTS TO BE RE-CIRCUITED.

E2.3 : E2.3

DN.

DN.

AA

BBDDEEFFGGHHJJKKLL

M

M

J

M

J

M

A

B

C

(E) LOW VELOCITY

TUNNEL

220 C

(E) WIND TUNNEL

TEST AREA

202 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

(E) AIR

CONDITIONING

EQUIP

203 A

HWUH-A4

AL5- 37

AL5- 32

HWCH-A3

EF-A2

AL1- 5

AL1- 5

ALTERNATE #2

EXHAUST FAN 2

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.4

'A'-WING-MECH. COORDINATIONRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING 2ND FLOOR MECHANICAL COORDINATION PLAN

E2.4 : E2.4

E2.4 : E2.0

TRUE NORTH BLDG NORTH

: 1/2" = 1'-0"

13 ENLARGED 1st FLOOR MECHANICAL COORDINATION PLAN - ALTERNATE

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

1. PROVIDE CIRCUIT AND INTERNET CONNECTION FOR DDC PANEL.

COORDINATE QUANTITY AND LOCATION WITH CONTROLS CONTRACTOR.

COORDINATE WITH CONTRACTOR OFFICER FOR DATA CABLING NEEDS

AND LOCATION IN C-WING SERVER ROOM.

2. IF ALT #2 IS NOT TAKEN RE-CIRCUIT EXSITING EXHAUST FAN USING

CIRCUIT SHOWN.

E2.4 : E2.4

AA

BBDDEEFFGGHH

M

M

M J

J

M

M

M

AA

BBDDEEFF

M M

UP

AA

BBDDEEFFGGHHJJKKLL

M

M

M

M

M

M

M

M

M

M

M

M

J

M

M

M M

M

M

M

M

M

M

M

M

M

J

J

J

A

B

C

CU-A2

CU-A1

DSF-A2

DSF-A1

EF-A3

AH5-

31,33,35

AH5-

43,45,47

AL5- 9

AL5- 9

AL5- 39

NEMA 3R

ALT #8

ALT #8

ALT #3

SEF-A1SEF-A2

AH5- 5,7,9

VFD

AH5-

25,27,29

NEMA 3R

ALT #5 ALT #4

(E) BURN CHAMBER

OPEN TO BELOW

201 B

SG-A3

SG-A2

SG-A1

SG-A15

AHU-A1

SEF-A3

HWUH-A5

CA CD-A12

ALT #3

AHU-A2

VFD

AL5- 15

AL5- 17

AL5- 19

AL5- 21

EXISTING TO BE RELOCATED

AL5- 15

AL5- 13

AH5a- 1,3,5

AH5a- 7,9,11

AH5a- 13,15,17

AH5a- 19,21,23

AH5a- 25,27,29 AH5a-

31,33,35

AH5a- 26,28,30

AH5a- 20,22,24

AH5a- 14,16,18

AH5a- 8,10,12

AH5a- 2,4,6

AH5a- 37,39,41

AH5- 2,4,6

AL5- 41

VFD VFD

VFD VFD

#8CU

AL5- 36

S

AL5- 38

GAS SOLENOID

AL5- 15

AL5- 7

ALT #10

AL5- 7

AHU LIGHTING

& RCPT

AHU LIGHTING

& RCPT

M9.4

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.5

'A'-WING-MECH. COORDINATIONRJH

ACB

KSJ

RJH

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING 4TH FLOOR MECHANICAL COORDINATION PLAN

E2.5 : E2.5

E2.5 : E2.5

E2.5 : E2.5

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

7 'A' WING ROOF TOP MECHANICAL COORDINATION PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING 3RD FLOOR MECHANICAL COORDINATION PLAN

1. EXISTING RO SKID TO BE REINSTALLED AND RE-CIRCUITED IN THIS

LOCATION.

2. VFD ARRAY TO BE 4 ACROSS 3 DEEP AND CIRCUITED TO EACH MOTOR

IN AHU-A1 USING #12 CU. VERIFY LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO ROUGH-IN. MAINTAIN NEC CLEARANCES.

3. MAINTAIN NEC REQUIRED CLEARANCES IN FRONT OF PANELS AND

TRANSFORMER. 3' MIN.

4. PROVIDE CIRCUIT AND INTERNET CONNECTION FOR DDC PANEL.

COORDINATE QUANTITY AND LOCATION WITH CONTROLS

CONTRACTOR. COORDINATE WITH CONTRACTOR OFFICER FOR DATA

CABLING NEEDS AND LOCATION IN C-WING SERVER ROOM.

5. GAS SOLENOID EMERGENCY SHUT OFF.

E2.5 : E2.5

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

C

(E ) D O O R B

LO

C K E D B Y (E

S E R V E R R M A C C E S S F

LO

O R

K -3551

ARCHE

R

TOILETV

ITREOUS CHINA

K-3551ARCHERTOILET VITREOUS CHINA

K -3551

ARCHE

R

TOILETV

ITREOUS CHINA

U P

D .F

UP

R A M P

D N

D N

D N

U P

RAMP DOWN

DN

GHJ

J

J

J

J

G

EF C

U P

J

KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

(E) INSTRUMENT

DEV. LAB

115 B

(E) LOBBY &

DISPLAY

101 B

(E) OFFICE

118 B

(E) OFFICE

119 B

(E) OFFICE

120 B

(E) OFFICE

121 B

(E) OFFICE

122 B

(E) OFFICE

123 B

(E) OFFICE

124 B

(E) OFFICE

125 B

(E) MEN'S RR

126 B

(E) WOMEN'S RR

127 B

(E) RECIEVING &

SHIPPING

106 B

(E) JAN

107 B

(E) DARK ROOM

109 B

(E) OFFICE

108 B

(E) OFFICE

110 B

(E) OFFICE

111 B

(E) INTRUMENT

VAULT

114B

(E) INSTRUMENT

CALIBRATION

113 B

(E) OFFICE

113-1B

(E) TOILET

102 C

(E) STORAGE

101 C

(E) SERVER ROOM

105 C

(E) OFFICE

108 C

(E) OFFICE

106 C

(E) OFFICE

107 C

EX PANEL 'X'

EX PANEL '1BB'

EX TELECOM '4B'

EX TELECOM

EX PANEL 1A1BA

EX PANEL 1B

EX PANEL J

EX PANEL C

EX PANEL

ECUH-B3

ECUH-B2

ECUH-B1

HWCH-B1

AL5- 33

AH1-

25,27,29

AH1-

19,21,23

AH1-

31,33,35

(E) STORAGE

002 B

(E) ELEV EQUIP

003 B

(E) MECH EQUIP

001 B

A R

E A

W A

Y

CU-B1

EX PANEL 4

EX PANEL 4A

EX XFMR 'B'

AH1-

26,28,30

CRAWL SPACE ENTRANCE

LB INTO BASEMENT

RUN CONDUIT

THROUGH BASEMENT

& CRAWLSPACE

WP

GFI

AL1- 3

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.6

'B'&'C'-WINGS MECH. COORD.RJH

ACB

KSJ

RJH

E2.6 : E2.6

E2.6 : E2.6

E2.6 : E2.6

TRUE NORTH BLDG NORTH

'B' WING KEY PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'B' & 'C'-WING 1ST FLOOR ELECTRICAL PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

11 'B'-WING BASEMENT ELECTRICAL PLAN

1. RUN BRANCH CIRCUITS THROUGH HALLWAY LAY-IN CEILLING

FROM A-WING.

K-5016-ETDEXTERC

_URINALS

V

ITRE

OUS C

HINA

K-3551ARCHERTOILET VITREOUS CHINA

K-3551ARCHERTOILET VITREOUS CHINA

K-3551ARCHERTOILET VITREOUS CHINA

D .F

D.F.

D N

DN.

U P

GHJ

J

J

J

J

J

A

B

C

(E) PASSAGE

211 B

(E) OFFICE

212 B

(E) CORRIDOR

200 B

(E) MAIL RM

210 B

(E) OFFICE

213 B

(E) OFFICE

214 B

(E) CONF RM

209-2B

(E) OFFICE

215 B

(E) OFFICE

216 B

(E) CONF RM

209-1B

(E) OFFICE

217 B

(E) CONF RM

208 B

(E) OFFICE

207 B

(E) OFFICE

218 B

(E) OFFICE

219 B

(E) OFFICE

220 B

(E) M TOIL

221 B

W TOIL

222 B

(E) JAN

205 B

(E) STOCK ROOM

204 B

(E) OFFICE

206-2B

(E) OFFICE

206-1B

(E) OFFICE

206-3B

EX PANEL '2BA'

EX PANEL '2B'

AH1-

38,40,42

AH1-

32,34,36

ECUH-B6

ECUH-B5

ECUH-B4

AH1-

43,45,47

AH1-

37,39,41

AH1-

49,51,53

EX PANEL '2BB'

ECUH-B7 KEY NOTES:

GENERAL NOTES:

1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO

COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO

CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND

OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT

OF MATERIALS.

2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF

FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED

WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS

RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF

THE CONTRACTING OFFICER.

3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE

BREAKERS IN NEW PANELS.

4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO

THE LIGHT CIRCUIT IN CORRESPONDING SPACE.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

E2.7

'B'&'C'-WINGS MECH. COORD.RJH

ACB

KSJ

RJH

E2.7 : E2.7

E2.7 : E2.7

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'B' & 'C'-WING 2ND FLOOR ELECTRICAL PLAN

TRUE NORTH BLDG NORTH

'B' WING KEY PLAN

1. RUN BRANCH CIRCUITS THROUGH HALLWAY LAY-IN CEILLING FROM A-WING.

EX

SPARE

EX

SPARE

EX

SPARE

EX

SPARE

EX

SPARE

EX

SPARE

EX MDS

480Y/277V, 3 Ø, 4W

ROOF

THIRD FLOOR

SECOND FLOOR

FIRST FLOOR

EX(4) 4" C.O.

PER UTILITY

REQUIREMENTS

EX TRANSFORMER 3 Ø

12.47Y/7.2KV TO 480Y/277V

TO UTILITY

POLE

SPACESPACESPACESPACESPACE

EX

250___

EX

225___

EX

150___

EX

70__

EX

350___

EX

150___

EX

100___

EX

30__

EX

9KVA

XFMR

'X'

BASEMENT

EX

1200____

EX

20__

40__

40__

PANEL

P1A

PANEL

P1

EX

15KVA

XFMR

EX

45KVA

480∆ TO

208Y/120V

XFMR

PANEL

IAA

PANEL

P2A

PANEL

P3

PANEL

P2

PANEL

IA

PANEL

Y

A WING

100A125A

EX

70__

EX

70__

EX

250___

EX

50__

EX

150___

EX 125___

3EX

125___

100___

100___

100___

PANEL

1B

PANEL

2B

PANEL

45KVA

XFMR

'B'

100___

100___

100___

PANEL

1BA

PANEL

2BA

PANEL

1BB

PANEL

2BB

PANEL

X

PANEL

4A

B WING D WING

PANEL

HI

225A

75KVA

XFMR

PANEL

L1A 225A

PANEL

LB

#1 480Y/277V, 3Ø, 4W

1A 1BA

208Y/120V, 3Ø, 4W

EX

15__

M

METER

PANEL

A

PANEL

"P3b"

PANEL

LA

25KVA

480∆ TO

240/120V

XFMR

30KVA

480∆ TO

208Y/120V XFMR

EX

3/4",3W, #10

EX

1-1/2",3W, #2

EX

2",4W, #1/0

EX

3-1/2"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .