Attachment_9_-_Drawings-E0.1-E9.8.pdf
PDF 2 MB Posted
- Attached to
- Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
- Solicitation number
- AG-82FT-S-16-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82FT-S-16-0015AME000007.pdf | ||
| AG-82FT-S-16-0015AME000006.pdf | ||
| AG-82FT-S-16-0015AME000005.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| AG-82FT-S-16-0015AME000003.pdf | ||
| AG-82FT-S-16-0015AME000002.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| Attachment_6_-_Drawings-S0.1-S2.0.pdf | ||
| Attachment_2_-_Volume_2_Divisions_22-26.pdf | ||
| Attachment_1_-_Volume_1_Divisions_0-22.pdf | ||
| Attachment_12_-_AsbestosLeadHazMaterial-_C_Wing.pdf | ||
| Attachment_13_-_Wage_Determination.pdf | ||
| Attachment_5_-_Drawings-A2.0-A9.1.pdf | ||
| Attachment_7_-_Drawings-M0.1-M9.7.pdf | ||
| Attachment_8_-_Drawings-P0.1-P9.1.pdf | ||
| Attachment_10_-_AsbestosLeadHazMaterial-_A_Wing.pdf | ||
| Attachment_11_-_AsbestosLeadHazMaterial-_B_Wing.pdf | ||
| Attachment_4_-_Drawings-Arch_AD2.0-AD5.2.pdf | ||
| Attachment_3_-_Drawings-COVER.pdf | ||
| Solicitation_AG-82FT-S-16-0015.doc.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PS
FS
TS
S S SD
D
FAA WP
FACP SS
D H
F
F s s
X
D-1
PS-X
X
J
X
X
X
J
TV
X
LP100
208/120V 3#. 4W
M
M
M
SPD VFD
LA
PFC G
M CB
Y
ST
X
OS OS
P
PROJECT NOTES:
1. PRIOR TO BID CONTRACTOR SHALL VISIT THE SITE. NOT ALL WORK
REQUIRED TO COMPLETE THE PROJECT IS SHOWN ON THE DRAWINGS.
THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH ALL THE
WORK REQUIRED TO COMPLETE THE PROJECT IN ADDITION TO THE LOCAL
CONDITIONS AND INCLUDE SAID WORK IN THE BID.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF
ALL ELECTRICAL SERVICE WORK WITH UTILITY. OWNER PAYS ALL FEES,
CONTRACTOR DOES ALL SCHEDULING AND COORDINATION OF WORK. IT
IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL
SCHEDULES ARE MET.
3. GENERAL WORK PRACTICES FOR ELECTRICAL CONSTRUCTION SHALL BE
IN ACCORDANCE WITH NECA 1, "STANDARD PRACTICES FOR GOOD
WORKMANSHIP IN ELECTRICAL CONTRACTING." THIS PUBLICATION IS
AVAILABLE FROM NECA BY TELEPHONE AT 301-657-3110 OR ON-LINE AT
WWW.NECANET.ORG.
4. DURING DEMOLITION, THE CONTRACTOR SHALL NOTE ALL EXISTING
RACEWAY (BOTH SURFACE AND CONCEALED) TO THE EXTENT POSSIBLE.
THESE RACEWAYS SHALL BE REUSED TO THE GREATEST EXTENT
POSSIBLE TO INSURE A CLEAN FINISHED PRODUCT. WHERE PRACTICAL,
AND ALLOWED PER CODE, FISHING THROUGH WALLS WITH MC CABLE IS
PREFERRED TO SURFACE-MOUNTED CONDUIT.
5. CONTRACTOR SHALL REMOVE, TRANSPORT, AND LEGALLY DISPOSE OF
LAMPS AND BALLASTS OFF-SITE. IT IS ASSUMED THE THE BALLASTS DO
NOT CONTAIN PCBs. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY IF IT IS SUSPECTED THAT BALLASTS CONTAIN PCBs.
6. ALL POWER INTERRUPTIONS SHALL BE COORDINATED WITH OWNER. ANY
DISRUPTION OF WORKERS IN THE SPACE SHALL BE KEPT TO A MINIMUM
AND BE COORDINATED WITH THE OWNER PRIOR TO WORK COMMENCING
IN THAT SPACE.
7. CONTRACTOR SHALL EXTEND UNSWITCHED HOT LEG FROM EXISTING
EMERGENCY FIXTURE LOCATION TO NEW EMERGENCY FIXTURES. AS
NEEDED. SEE DEMO PLANS FOR AN APPROXIMATION OF EXISTING
EMERGENCY FIXTURE LOCATIONS. FIELD VERIFY EXACT LOCATION PRIOR
TO BID.
8. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE WITH
MECHANICAL FOR PLENUM SPACES AND PROVIDE PLENUM RATED
CABLES WHERE REQUIRED FOR LIGHTING CONTROL, DATA, FIRE ALARM
AND ALL OTHER L.V. SYSTEMS NOT INSTALLED IN CONDUIT. VERIFY
CONDUIT REQUIREMENTS ON DRAWINGS AND SPECIFICATIONS.
9. FIRE-RESISTANCE: PROVIDE A MINIMUM HORIZONTAL DISTANCE OF 24"
BETWEEN OUTLET BOXES LOCATED ON OPPOSITE SIDES OF
FIRE-RESISTANCE RATED WALLS. WHERE THIS IS NOT POSSIBLE INSTALL
UL LISTED PUTTY PADS ON ALL OUTLET BOXES NOT MEETING THE 24"
SEPARATION. PROVIDE A UL LISTED THROUGH -PENETRATION FIRESTOP
FOR PENETRATIONS OF FIRE-RESISTANCE RATED ASSEMBLIES.
10. CONDUCTORS ARE SIZED PER THE 75 DEGREE C RATING COLUMN OF NEC
TABLE 310.16. IF THE TERMINAL USED FOR A TERMINATION OF A
PARTICULAR CONDUCTOR IS NOT MARKED, OR THE TERMINAL IS MARKED
FOR 60 DEGREE C CONDUCTORS, IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO EITHER ADJUST THE AMPACITY OF THE CONDUCTOR TO
MATCH THE 60 DEGREE COLUMN OF TABLE 310.16, OR REPLACE THE
TERMINAL WITH ONE RATED FOR AT LEAST 75 DEGREES C
11. FOR 20A BRANCH CIRCUIT RUNS EXTENDING BEYOND 300 LINEAR FEET.
CONDUCTOR SIZE SHALL BE A MINIMUM OF #10 CU.
12. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH 120V BRANCH
CIRCUIT.
13. ALL PRODUCTS SHALL MEET THE "BUY AMERICAN ACT".
ABBREVIATIONS
A or AMP AMPERES
ABA ARCHITECTURAL BARRIERS ACT
AC ALTERNATING CURRENT
A/C AIR CONDITIONING
AF AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AL ALUMINUM
AS AMP SWITCH
ATS AUTOMATIC TRANSFER SWITCH
BAS BUILDING AUTOMATION SYSTEM
BKR BREAKER
C RACEWAY/CONDUIT
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CKT CIRCUIT
CLG CEILING
C.O. RACEWAY/CONDUIT ONLY, WITH PULL STRING
CNTRL CONTROL
CU COPPER
DISC DISCONNECT
DIST DISTRIBUTION
DPDT DOUBLE POLE DOUBLE THROW
DWG DRAWING
EA EACH
EF EXHAUST FAN
ELEC ELECTRIC
EMT ELECTRICAL METALLIC TUBING
EQUIP EQUIPMENT
EX OR
EXIST EXISTING
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FATC FIRE ALARM TERMINAL CABINET
FD FUSED DISCONNECT
FLR FLOOR
FO FIBER OPTIC
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
GEC GROUNDED ELECTRODE CONDUCTOR
GFI GROUND FAULT INTERRUPTER
GND GROUND
GRC GALVANIZED RIGID CONDUIT
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HPS HIGH PRESSURE SODIUM
HTR HEATER
HVAC HEATING, VENTILATING & AIR CONDITIONING
HZ HERTZ
J-BOX JUNCTION BOX
KVA KILOVOLT AMPERES
KW KILOWATTS
LTG LIGHTING
LPW LUMENS PER WATT
MAG MAGNETIC STARTER
MAN MANUAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH METAL HALIDE
MIN MINIMUM
MSS MOTOR STARTER SWITCH
N NEUTRAL
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NFD NON-FUSED DISCONNECT
NIC NOT IN CONTRACT
NO NORMALLY OPEN
# NUMBER
OAE OR APPROVED EQUAL
OC ON CENTER
OCPD OVERCURRENT PROTECTION DEVICE
OH OVERHEAD
P POLE
PB PUSHBUTTON
PNL PANEL
PVC POLYVINYL CHLORIDE CONDUIT
PWR POWER
RECEPT RECEPTACLE
RCPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
RVNR REDUCED VOLTAGE NON-REVERSING
RVR REDUCED VOLTAGE REVERSING
SP SINGLE POLE TOGGLE SWITCH
SPD SURGE PROTECTION DEVICE
SPEC SPECIFICATION
SPST SINGLE POLE SINGLE THROW
SSPB START-STOP PUSHBUTTON
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TB TELEPHONE BOARD
TC TIME CLOCK
TD TIME DELAY
TEL TELEPHONE
TSP TWISTED SHIELDED PAIR
TTB TELEPHONE TERMINAL BOARD
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
V VOLT
VA VOLT AMPERES
VFD VARIABLE FREQUENCY DRIVE
W WATTS
WAO WORK AREA OUTLET
WP WEATHERPROOF
W/O WITHOUT
XFMR TRANSFORMER
Y WYE CONNECTED
DELTA CONNECTED
PHASE
*THESE ABBREVIATIONS COMPRISE A STANDARD LIST;
NOT ALL ABBREVIATIONS APPEAR ON THIS PROJECT.
ELECTRICAL SYMBOL LEGEND: SYSTEM PLANS
SYMBOL DESCRIPTION DESCRIPTION SYMBOL
TELEPHONE OUTLET; PROVIDE ROUGH IN WITH. 2-GANG
BOX W/MUD RING AND 1" STUBBED UP TO ACCESSIBLE
CEILING SPACE. (MOUNT AT +18" AFF. UNO.) RUN CAT5e
CABLE BACK TO C-WING TELEPHONE TERMINAL BOARD IN
SERVER ROOM.
SPRINKLER PRESSURE SWITCH
VOICE-DATA OUTLET; PROVIDE ROUGH IN ONLY. 2-GANG
BOX W/MUD RING AND 1" STUBBED UP TO ACCESSIBLE
CEILING SPACE. (MOUNT AT +18" AFF. UNO.) RUN CAT5e
CABLE BACK TO C-WING SERVER RACKS.
SPRINKLER FLOW SWITCH
DATA OUTLET; PROVIDE ROUGH IN ONLY. 2-GANG BOX
W/MUD RING AND 1" STUBBED UP TO ACCESSIBLE CEILING
SPACE. (MOUNT AT +18" AFF. UNO.)
SPRINKLER TAMPER SWITCH
SPEAKER
SMOKE DETECTOR "D" INDICATES DUCT SMOKE
DETECTOR.
FIRE ALARM ANNUNCIATOR PANEL WIRELESS POINT CONNECTION:
SUPPLY CAT6 CABLING TO THIS LOCATION.
FIRE ALARM CONTROL PANEL SINGLE-STATION SMOKE DETECTOR. PROVIDE 120V AND
MONITOR AT FACP VIA RELAY
DOOR HOLDER HEAT DETECTOR
STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.) AND
CEILING MOUNT
HORN/STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.)
AND CEILING MOUNT
FIRE ALARM MANUAL STATION (MOUNT AT +46" AFF, UNO.)
SPEAKER STROBE WALL MOUNT (MOUNT AT +82" AFF,
UNO.) AND CEILING MOUNT
ELECTRICAL SYMBOL LEGEND: POWER PLANS
SYMBOL DESCRIPTION DESCRIPTION SYMBOL
BRANCH CIRCUIT PANELBOARD RACWAY STUB-OUT OR STUB-UP WITH CAPPED END
PANEL AND CIRCUIT DESIGNATION ARE SHOWN NEXT
TO EACH DEVICE (PANEL NAME - CIRCUIT NUMBER).
BRANCH CIRCUIT WIRE SIZE IS #12 UNLESS NOTED
OTHERWISE. A SINGLE INSULATED GREEN GROUND
CONDUCTOR SHALL BE PROVIDED WITH EACH HOME
RUN. PROVIDE A SEPARATE NEUTRAL FOR EACH
CIRCUIT. HOME RUNS SHALL HAVE NO MORE THAN
THREE CIRCUITS. LINE VOLTAGE AND LOW VOLTAGE
WIRING IS NOT SHOWN ON PLANS. FOR EQUIPMENT
CIRCUITING, SEE MEP COORDINATION SCHEDULE.
SURFACE MOUNTED PLUGSTRIP. SUBSCRIPT DENOTES
TYPE AND STYLE. SEE TABLE BELOW:
TYPE A: PLUGSTRIP, POWER ONLY, OUTLET EVERY 3' OC
TYPE B: WIREMOLD SERIES 4000 POWER AND DATA
TYPE C: WIREMOLD SERIES 5400 POWER AND DATA
DUPLEX RECEPTACLE. (MOUNT AT +18" AFF. UNO.)
X-GFI-GFCI RECEPTACLE
WP-WEATHER PROOF WITH WHILE IN USE COVER
DROP RECEPTACLE. SEE DETAIL #11 ON SHEET E9.3.
4PLEX RECEPTACLE. (MOUNT AT +18" AFF. UNO.)
X-GFI-GFCI RECEPTACLE
WP-WEATHER PROOF WITH WHILE IN USE COVER
LINE BREAK
ABOVE COUNTER DUPLEX RECEPTACLE MOUNTED 4"
ABOVE BACKSPLASH SURFACE MOUNTED RACEWAY
ABOVE COUNTER 4PLEX RECEPTACLE MOUNTED 4"
ABOVE BACKSPLASH
RACEWAY CONCEALED IN WALL, FLOOR, OR CEILING IN
FINISHED SPACES, EXPOSED IN UNFINISHED
SPACES.
FLOOR OUTLET - HUBBEL MODEL #HBLCFB401CB
WITH COVER MODEL #HBLTCGNTBKSW, OR EQUAL. RACEWAY BELOW FLOOR OR BELOW GRADE
FLOOR BOX WITH COMBINATION 4PLEX RECEPTACLE
AND 2 TELEPHONE/DATA OUTLETS. MANF HUBBEL
MODEL #HBLCFB401CB WITH COVER MODEL
#HBLTCGNTBKSW, OR EQUAL.
RACWAY STUB-OUT OR STUB-UP WITH BUSHED END
JUNCTION BOX GROUNDING BUS
FLATSCREEN TV BOX; 2-GANG, FLUSH IN WALL,
HUBBELL RACO NSAV62M WITH NSAV6C COVER.
DUPLEX RECEPTACLE AND SINGLE GANG DATA
PORT. (MOUNT AT +72" AFF. UNO.)
PUSHBUTTON (MOUNT AT +54" AFF, UNO.)
-EPO EMERGENCY POWER OFF
-ADA HANDICAP ACCESSIBLE DOOR (DEVICE BY OTHERS)
-ODO OVERHEAD DOOR OPERATOR (DEVICE BY OTHERS)
SPECIAL PURPOSE OUTLET.
(MOUNT AT +18" AFF. UNO.)
1. THESE SYMBOLS COMPRISE A STANDARD LIST; NOT ALL SYMBOLS APPEAR ON THIS PROJECT.
2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE ABOVE FINISHED FLOOR. MOUNTING HEIGHTS INDICATED ON ARCHITECTURAL WALL ELEVATIONS OR AS NOTED SPECIFICALLY ON THE DRAWINGS OR IN THE SPECIFICATIONS SHALL TAKE PRECEDENCE OVER MOUNTING HEIGHTS LISTED.
ELECTRICAL SYMBOL LEGEND: 1-LINES
SYMBOL DESCRIPTION DESCRIPTION SYMBOL
SWITCH BOARD OR PANEL BOARD; NAME, VOLTAGE,
PHASE, NUMBER OF WIRES WHEN INDICATED DISCONNECT SWITCH ("XXAS' = SWITCH AMP RATING)
CT AND CUSTOMER POWER METER FUSED DISCONNECT SWITCH ("XXAS/XXAF" - SW AND FUSE
AMP RATING)
MOTOR SYMBOL
COMBINATION MOTOR STARTER (STR SIZE, TYPE, AS, AF,
SEE MEP COORD. SCHEDULE)
UTILITY ELECTRIC METER AND BASE (BASE BY
CUSTOMER) AUTOMATIC TRANSFER SWITCH
TRANSIENT VOLTAGE SURGE SUPPRESSION VARIABLE FREQUENCY DRIVE
LIGHTNING ARRESTOR FIXED MOUNT LV BREAKER
STRESS RELIEF CONE FUSED SWITCH ("XXAS/XXAF" = SW AND FUSE AMP RATING)
POWER FACTOR CORRECTION CAPACITOR GENERATOR
MOTOR STARTER SWITCH WITH THERMAL OVERLOADS WALL MOUNTED BREAKER
CONTACTOR NORMALLY OPEN, NORMALLY CLOSED THERMAL OVERLOAD ELEMENT
TRANSFORMER
3-PHASE, 3-WIRE DELTA CONNECTION ∆
3-PHASE, 4 WIRE GROUNDED WYE CONNECTION
SHUNT TRIP BREAKER
ELECTRICAL SYMBOL LEGEND: LIGHTING PLANS
SYMBOL DESCRIPTION DESCRIPTION SYMBOL
1X4 SURFACE WALL MOUNT FLUORESCENT PENDANT FIXTURE; HIGH BAY, LOW BAY, DECORATIVE.
1X4 2X2 2X4 RECESSED FLUORESCENT, 'a', AND 'b'.DESIGNATES SWITCH LEGS.
EXIT SIGN. ARROW(S) INDICATE DIRECTION OF TRAVEL,
SHADED AREA INDICATES ILLUMINATED FACE(S). STEM
INDICATES WALL MOUNTED. CELING MOUNTED
OTHERWISE.
1X4 2X2 2X4 RECESSED EMERGENCY FLUORESCENT,
'a', AND 'b'.DESIGNATES SWITCH.
EMERGENCY EGRESS BATTERY PACK, WALL MOUNT OR
CEILING MOUNT
1X4 2X2 2X4 SURFACE OR PENDANT FLUORESCENT,
'x' DESIGNATES SWITCH LEG. WALL MOUNTED SCONCE OR WALLPACK FIXTURE
1X4 2X2 2X4 SURFACE OR PENDANT EMERGENCY
FLUORESCENT, 'x' DESIGNATES SWITCH LEG. SURFACE MOUNTED DOWNLIGHT
4' FLUORESCENT STRIP OR INDUSTRIAL, SURFACE OR
CHAIN HUNG RECESSED CAN DOWNLIGHT
POLE MOUNTED FIXTURE RECESSED CAN WALLWASHER
STANDARD LIGHTING CONTROLS: SWITCHES AND LINE VOLTAGE DIMMERS
TOGGLE SWITCH (MOUNT AT 46" AFF. UNO.)
SUBSCRIPTS:
3- THREE-WAY
4- FOUR-WAY
D- DIMMER SWITCH - PHILIPS SUNRISE DIMMER -
ON/OFF.
K- KEYED SWITCH
T- TIMER
P- PILOT LIGHT
OS-WALL SWITCH OCC SENSOR. WATTSTOPPER
DW100(SINGLE SWITCH OR DW-200 DUAL SWITCH).
a- SINGLE POLE LIGHTING SWITCH FOR ZONE a b- SINGLE POLE LIGHTING SWITCH FOR ZONE b ab- LIGHTING SWITCHES WITH MULTIPLE ZONES
CEILING MOUNT OCCUPANCY SENSOR. WATT
STOPPER DT-300 DUAL TECHNOLOGY CEILING MOUNT
OR EQUAL WITH BZ-50 POWER PACKS AS NEEDED.
WALL MOUNT OCCUPANCY SENSOR. WATT STOPPER
DT-200 DUAL TECHNOLOGY WALL MOUNT OR EQUAL
WITH BZ-50 POWER PACKS AS NEEDED.
PHOTOCELL. WATT STOPPER LS-301 CEILING MOUNT
OR EQUAL
PROJECT ALTERNATE SCHEDULE
ALTERNATE
NUMBER ALTERNATE DESCRIPTION ADD OR
DEDUCT
EQUIPMENT
AFFECTED
1 EXPERIMENTAL COOLING ADD CU-A1
2 ABA RESTROOM ADD EF-A2
3 MZ AHU UPGRADE TO VAV ADD AHU-A2, CU-A2
4 SMOKE EXHAUST STACK ADD SEF-A1
5 SMOKE ACCUMULATION EXHAUST ADD SEF-A2
6 VCT ABATEMENT ADD
COORDINATE WITH
G.C. & C.O.
7 LV TUNNEL DOOR MOTOR ACCESS ADD
CONTROLS, LV
TUNNEL OVERHEAD
DOOR
8 DESTRATIFICATION FANS ADD DSF-A1 & A2, DSF-$
9 HEATER ALTERNATE ADD ECUH-B6 & B7,
HWCH-B2
10 SMALL BENCH COMBUSTION SMOKE EXHAUST ADD SEF-A3, L-A4
11 (D) RECEIVING 101A CMU WALLS ADD
NEW PHONE LINES
THROUGHOUT A-WING
WITH DEMOED
TELEPHONE PANELS
IN CMU WALL.
12 SUPPLY TO RELIEF BYPASS DAMPER ADD CDA-8
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E0.1
SYMBOLS & ABBREVIATIONSRJH
ACB
KSJ
RJH 58
AA
BBDDEEFFGGHHJJKKLL
UP
UP
UP
MMM
J J
M
REF.
FLAMMABLE CAB.
8A .1
(E) TOILET
108A
(E) JANITOR
107A
(ABA)
UP
DN.
UP
DN.
RAMP DOWN
DN
AA
BBDDEEFFGGHHJJKKLL
J
J
M
J
A
B
C
EX XFMR 'X'
TO REMAIN
EX METER
TO REMAIN
EX XFMR
EX XFMR '2A'
EX MDP
EX FA PANEL
TO BE REMOVED
EX HYDROLIC
ELEVATOR HOIST
TO REMAIN
(E) BOILER ROOM
001 A
(E) TRANSFORMER
RM
003 B
(E) ELEC PANEL RM
002 A
(E) HOIST RM
004 A
UNEXCAVATED
4 A
(E) PIPE TUNNEL
(E) DOCK ABOVE CRAWL SPACE
C R
A W
L S
P A
C E
EX BOILER PUMPS
EX BOILERS
EX
IRRIGATION
CONTROLS
(R)
(R)
(D)
(D)
(D)
(D) (D)
(D)
(D)
(D)
(R)
(R) (R) (R)
(R)
(R) (R)
(R)
(R)9
(R)
(D)
(D)
GFI
OVEN
NEMA 6-30R
HOOD
HOOD
RELOCATE CONDUIT TO
GARAGE DOOR MOTOR
ABOVE DOOR
ABOVE DOOR
TIME CLOCK
EX PANEL Y
EX PANEL 1A
EX PANEL 1AA
EX TELECOM
PANELS
EX 125A
EX PANEL P1
EX PANEL P1A
EX PANEL FOR
ARCH TORCH
EX CONTACT FOR DOOR
TO SHUT OFF LASER TO
RTEMAIN
EX ELEVATOR
TO REMAIN
(E) BOILER RM
001 A
(E) PREPARATION
AND STAGING
106-1A
(E) FUELS LAB
105 A
LASER ROOM
105-1A
CALIBRATION
105-3A
OBSERVATION
ROOM
104 A
(E) COMBUSTION
LAB
103 A
(E) VESTIBULE
100 B
(E) VESTIBULE
102 A
(E) PREPARATION
AND STAGING
106-2A
(E) RECEIVING
101 A
GFI
EX LOAD CENTER
TO REMAIN
TO REMAIN
TO REMAIN
HOOD
W/ SPEED
CONTROL
EX
EX
EX PANEL
(R) (R)
(R) (R)
(R) (R)
(R) (R) (R) (R)
(R) (R) (R) (R)
(R) (R) (R) (R)
(R) (R) (R) (R) (R) (R) (R) (R)
(R) (R) (R) (R)
(R) (R) (R) (R)
(R) (R) (R) (R)
(R) (R)
(R) (R)
(R)
(R)
(R) (R) (R) (R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(D)
(D)
(D)
(D)(D)
(D)
(D)
(D)
(D)
(D)
(D) (D)(D)(D)
(D)
(D)
(D) (D)(R) (R) (D) (D) (D) (D) (D)
(D)
(D)(D)
(D)
(D)
(D)(D)(D)
(D)
(D)
(D)
(D)
(D)
(D) (D) (D) (D) (D)
(D)
(D) (D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D) (D)
(D)
(D)
(D)
(D)
(D)
(R)
(R)
(R)
(D)
(R) (D)
(D)
(R) (R) (R)
(D)
EX PNL
(D)
(D)
(D)
(D)
(R)
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION
OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT
THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED
IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.
3. ALL POWER, RCPTS, MECHANICAL EQUIPMENT & RACEWAYS TO BE DEMOED,
UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE ALARM
ALONG WITH RESPECTIVE RACEWAYS, UNO.
4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.
5. VERIFY MECHANICAL EQUIPMENT TO BE DEMOED WITH MECHANICAL
DRAWINGS AND MECHANICAL CONTRACTOR.
6. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.
7. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE
NOTED.
ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS
OTHERWISE NOTED.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
ED2.0
'A'-WING - ELECT. DEMO PLANSRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A'-WING BASEMENT FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A'-WING 1st FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN12
ED2.0 : ED2.0
ED2.0 : ED2.0
ED2.0 : ED2.0
1. LIGHTING TO REMAIN. RE-CIRCUIT TO PANEL AH1.
2. ALL LIGHTING, EXCEPT FOR EMERGENCY LIGHTING, IN THIS SPACE TO
REMOVED. EMERGENCY LIGHTING TO REMAIN AND BE RE-CIRCUITED.
3. COUNTER-TOP RCPT AND ABOVE GRADE CONDUIT TO BE DEMOED BACK
TO WALL.
4. EX FEEDER TO BE EXTENDED TO NEW MDP IN NEW LOCATION.
5. EXISTING SPECIAL RECEPTACLES ( 240V, 208V, ETC.) TO BE REPLACED
WITH SAME NEMA CONFIGURATION AND VOLTAGE/PHASE.
6. EXISTING SUMP TO REMIAN AND BE RE-CIRCUITED.
7. SMART METER AND TEL/DATA CABLING TO SMART METER TO REMAIN.
8. ALTERNATE #11 REMOVE WALLS AND DEMO TELECOM PANEL.
9. LIGHTING IN THIS SPACE TO REMAIN.
DN.
UP
DN.
AA
BBDDEEFFGGHHJJKKLL
J J
J
J
M
J J
J
M
M
M
M
A
B
C
MOUNTED ON DESK
ABOVE PANEL
EX 60A PANEL
EX PANEL P2A
EX PANEL P2
(E) AIR
CONDITIONING
EQUIP
203 A
(E) WIND TUNNEL
TEST AREA
202 A
(E) LOW FLOW
TUNNEL
(E) CONTROL RM
201 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
EXISTING LIGHTING TO BE REMOVED.
(TYP)
EX LOAD CENTER
TO BE REMOVED
EX LOAD CENTER
TO BE REMOVED
EX COOLING TOWER
EX UNIT HEATER
EX CHILLER
EX COMPRESSOR
EX R.O. TO BE RELOCATED
EX POWERED BENCH
TO BE RE-CIRCUITED
(R) (R)
(D)(D)
(R) (R) (R) (R)
(R)
(R) (R) (R)
(R)
(R)
(R) (R)(R) (R) (R) (R) (R) (R) (R)(R)
(D)(D)(D)(D)
(D)
(D) (D)
(D) (D)
(D)
(D)
(D)
(D)
(D)
(D)
(R)
(D) (D)
(D) (D) (D) (D)
(D) (D) (D) (D)
(D)
(R) (R)
(R) (R)
(R)
(R)
(R)(R)
(R)
(R)
(R)(R)(R)
(R)
(D)
(R)
(D)
(D)
(D) (D) (D)
(R)
(R)
(D)
EX PUMP
(D)
(D)
(D) (D)
(D)(D)
(D)
(R) (R) (R) (R)
(D)
(D)
EX
(D)
(D) (D) (D)
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION
OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT
THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED
IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.
3. ALL POWER, RCPTS, MECHANICAL EQUIPMENT & RACEWAYS TO BE DEMOED,
UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE ALARM
ALONG WITH RESPECTIVE RACEWAYS, UNO.
4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.
5. VERIFY MECHANICAL EQUIPMENT TO BE DEMOED WITH MECHANICAL
DRAWINGS AND MECHANICAL CONTRACTOR.
6. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.
7. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE
NOTED.
ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS
OTHERWISE NOTED.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
ED2.1
'A'-WING - ELECT. DEMO PLANSRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A'-WING 2ND FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
: 1/2" = 1'-0"
5 ENLARGED 1st FLOOR 'A'-WING RESTROOMS DEMO PLAN (ALTERNATE #2)
12 TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
ED2.1 : ED2.0
ED2.1 : ED2.1
ED2.1 : ED2.1
1. DEMO ALL LIGHTING AND POWER DEVICES WITH-IN THIS SPACE.
2. IF ALT #2 IS NOT TAKEN EXISTING EXHAUST FAN TO REMAIN.
AA
BBDDEEFFGGHHJJKKLL
M
M
J
AA
BBDDEEFFGGHH
AA
BBDDEEFF
A
B
C
EX PANEL P3
ON MECH EQUIPMENT
EX PANEL P3b
EX PANEL LA
EX XFMR
EX XFMR
ROOF
(E) MECHANICAL
RM
302 A
(E) MECHANICAL
LOFT
301 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
EX
EX
EX
VFD
EX UNIT HEATER
EX SMART METER
(D) (D)
ALTERNATE #3
(D)
(D) (R)
(D)
(D)
(D)
(D)
(D) (D)
(D)
(D)
(D)
EX TELECOM PANEL
EX PANEL
TO BE REMOVED
(E) BURN CHAMBER
PLATFORM
401 A(E) SMOKE RELIEF
PLENUM
402 A
ROOF
(D)
(D)
(D)
(D) (D) (D) (D)
(D)
(D)
(D)
(D)
(D)
(D)
(R)
(D)(D)(D)
(D)
EX PANEL LB
TO REMAIN
TO REMAIN
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION
OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT
THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED
IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.
3. ALL POWER, RCPTS, MECHANICAL EQUIPMENT & RACEWAYS TO BE DEMOED,
UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE ALARM
ALONG WITH RESPECTIVE RACEWAYS, UNO.
4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.
5. VERIFY MECHANICAL EQUIPMENT TO BE DEMOED WITH MECHANICAL
DRAWINGS AND MECHANICAL CONTRACTOR.
6. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.
7. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE
NOTED.
ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS
OTHERWISE NOTED.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
ED2.2
'A'-WING - ELECT. DEMO PLANSRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A'-WING 3RD FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A'-WING 4TH FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
7 'A'-WING T.O. ROOF DEMO PLAN
12 TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
ED2.2 : ED2.2
ED2.2 : ED2.2
ED2.2 : ED2.2
ED2.2 : ED2.2
1. TO REMAIN IN BASE BID. ALTERNATE #11: PROVIDE (2) PHONE LINES FROM
TELEPHONE TERMINAL BOARD IN SERVER ROOM IN C-WING TO THIS
LOCATION.
2. SMART METER AND TEL/DATA CABLING TO SMART METER TO REMAIN.
(E ) D O O R B
LO
C K E D B Y (E
S E R V E R R M A C C E S S F
LO
O R
K -3551
ARCHE
R
TOILETV
ITREOUS CHINA
K-3551ARCHERTOILET VITREOUS CHINA
K -3551
ARCHE
R
TOILETV
ITREOUS CHINA
U P
D .F
UP
R A M P
D N
D N
D N
U P
DN
GHJ
J
G
EF C
U P
A
B
C
EX TELECOM
EX PANEL 1A1BA
EX PANEL 1B
EX PANEL J
EX PANEL CA
EX PANEL C
(E) INSTRUMENT
DEV. LAB
115 B
(E) OFFICE
113-1B
(E) INSTRUMENT
CALIBRATION
113 B
(E) INTRUMENT
VAULT
114B
(E) OFFICE
111 B
(E) OFFICE
110 B
(E) OFFICE
108 B
(E) RECIEVING &
SHIPPING
106 B
(E) DARK ROOM
109 B
(E) JAN
107 B
(E) OFFICE
107 C
(E) OFFICE
106 C
(E) SERVER ROOM
105 C
(E) OFFICE
108 C
(E) STORAGE
101 C
(E) TOILET
102 C
(E) WOMEN'S RR
127 B
(E) MEN'S RR
126 B
(E) OFFICE
125 B
(E) OFFICE
124 B
(E) OFFICE
123 B
(E) OFFICE
122 B
(E) OFFICE
121 B
(E) OFFICE
120 B
(E) OFFICE
119 B
(E) OFFICE
118 B
(E) LOBBY &
DISPLAY
101 B
PNL X
PNL 1BB
TELECOM PNL
EX LOAD CENTER
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
EX PANEL 4
EX PANEL 4A
EX XFMR 'B'
A R
E A
W A
Y
A
(E) MECH EQUIP
001 B
(E
E L E V
E Q
U
IP
B
(E
S T O
R A
G E
B
(R)
(R)
(R)
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION
OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT
THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED
IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.
3. ALL POWER, RCPTS, PANELS,TRANSFORMERS & RACEWAYS TO REMAIN FOR
B&C WINGS, UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE
ALARM ALONG WITH RESPECTIVE RACEWAYS, UNO.
4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.
5. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL
INFORMATION.
6. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE
NOTED.
ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS
OTHERWISE NOTED.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
ED2.3
'B' & 'C'-WINGS - DEMO PLANSRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'B' & 'C'-WING - 1ST FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
11 'B'-WING - BASEMENT DEMO PLAN 12 TRUE NORTH BLDG NORTH
'B' WING KEY PLAN
ED2.3 : ED2.3
ED2.3 : ED2.3
ED2.3 : ED2.3
K-5016-ET
DEXTER
C
_URINALS
V
ITRE
OUS C
HINA
K-3551ARCHERTOILET VITREOUS CHINA
K-3551
ARCHERTOILET VITREOUS CHINA
K-3551ARCHERTOILET VITREOUS CHINA
D .F
D.F.
D N
DN.
U P
GHJ
A
B
C
EX PANEL 2BA
EX PANEL 2B
(E) PASSAGE
211 B
(E) OFFICE
212 B
(E) MAIL RM
210 B
(E) OFFICE
213 B
(E) CONF RM
209-2B
(E) OFFICE
214 B
(E) OFFICE
215 B
(E) CONF RM
209-1B
(E) CONF RM
208 B
(E) OFFICE
207 B
(E) OFFICE
206-3B
(E) OFFICE
206-1B
(E) OFFICE
206-2B
(E) JAN
205 B
(E) STOCK ROOM
204 B
(E) OFFICE
216 B
(E) OFFICE
217 B
(E) OFFICE
218 B
(E) OFFICE
219 B
(E) OFFICE
220 B
(E) M TOIL
221 B
W TOIL
222 B
(E) CORRIDOR
200 B
EX PANEL '2BB'
(R)
(R)
(R)
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION
OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT
THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED
IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL
PATCHING OF HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.
3. ALL POWER, RCPTS, PANELS,TRANSFORMERS & RACEWAYS TO REMAIN FOR
B&C WINGS, UNO. ALL LOW VOLTAGE SIGNAL TO REMAIN, TEL/DATA AND FIRE
ALARM ALONG WITH RESPECTIVE RACEWAYS, UNO.
4. ALL LIGHTING, INCLUDING ALL EMERGENCY LIGHTING, TO REMAIN UNO.
5. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB’S. ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL
INFORMATION.
6. ITEMS TAGGED WITH (R) ARE EXISTING TO REMAIN, UNLESS OTHERWISE
NOTED.
ITEMS TAGGED WITH (D) ARE EXISTING TO BE DEMO'D COMPLETELY, UNLESS
OTHERWISE NOTED.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
ED2.4
'B' & 'C'-WINGS - DEMO PLANSRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'B' & 'C'-WING 2ND FLOOR DEMO PLAN
TRUE NORTH BLDG NORTH
'B' WING KEY PLAN12
ED2.4 : ED2.4
ED2.4 : ED2.4
GGHHJJKKLL
UP
UP
UP
M M
8A .1
(ABA)
UP
DN.
UP
DN.
RAMP DOWN
DN
AA
BBDDEEFFGGHHJJKKLL
J
J
J
D D
D
M
J
J J
J
A
B
C
EX XFMR
PANEL X
UNEXCAVATED
C R
A W
L S
P A
C E
CRAWL SPACE
(E) DOCK ABOVE
(E) PIPE TUNNEL
(E) HOIST RM
004 A
(E) ELEC PANEL RM
002 A
(E) TRANSFORMER
RM
003 A
(E) BOILER ROOM
001 A
EXISTING LIFT TO BE RE-CIRCUITED
AH1-
7,9,11
AL4- 1 AL4- 1 AL4- 1
AL4- 3
AL4- 3
AL4- 3
AL4- 1
AL4- 5
AL4- 5
AL4- 7
AL4- 7
AL4- 3
E9.3
NEW MDS SWITCHBOARD 8
#8CU
AL4- 1
EX SMART
METER
AH1-
55,57,59EX SUMP
TO BE RECIRCUITED
AL1- 13
AL1- 13
AL1- 13
AL1- 15
AL1- 15
AL1- 15
AL1- 15
GFI
GFI
GFI AL4- 3
RELOCATE LIGHTING
CIRCUITS TO THIS
POINT
AH1
X1
AL1
EX ELEVATOR
DOOR CONTACT1
GFI
AH2
AL2
(E) COMBUSTION
LAB
103 A
(E) BOILER RM
001 A
(E) PREPARATION
AND STAGING
106-1A
(E) PREPARATION
AND STAGING
106-2A
(E) FUELS LAB
105 A
LASER ROOM
105-1A CALIBRATION
105-3A
OBSERVATION
ROOM
104 A
(E) VESTIBULE
102 A
H1
H1
H1
H1
GFI
GFI
GFI
GFI
GFI
GFI GFI GFI
GFI
GFI
NEMA 6-50R
#8CU
NEMA 6-50R
#8CU
NEMA 6-50R
#8CU
NEMA 6-50R
AL4- 67
AL4- 69
AL4- 71
AL4- 71
AL4- 73
AL4- 75
AL4- 75
AL4- 77
AL4- 77
AL4- 72
AL4- 72
AL4- 70AL4- 70
AL4- 76
AL4- 66
AL4- 68
AL4- 62
AL4- 62
AL4- 64AL4- 64
AL4- 52
AL4- 50 AL4- 50
AL4- 40
AL4- 40
AL4- 38
AL4- 38
AL4- 38
AL4- 52
AL4- 4
AL4- 4
AL4- 20
AL4- 8
AL4- 8
AL4- 2
AL4- 2
AL4- 6
AL4- 6
AL4- 30
AL4- 30
AL4- 28
AL4- 26
AL4- 26
AL4- 24
AL4- 28
AL2- 19 AL2- 19 AL2- 17 AL2- 17
AL2- 15
AL2- 15
AL2- 15
AL2- 10,12
AL2- 13
AL2- 11
AL2- 11AL2- 9
AL2- 9
AL2- 5
AL2- 7
AL2- 1
AL2- 19
AL2- 13
AL2- 11
AL2- 3
AL2- 14,16
AL2- 6,8
AL2- 2,4
AL4- 65
AL4- 63
AL4- 69
AL4- 66
AL4- 60
AL4- 54
AL4- 24
AL4- 20
AL4- 9
AL4- 11
AL4- 13 AL4- 13
AL4- 15 AL4- 17
AL4- 21 AL4- 21AL4- 21
AL4- 19
AL4- 19ENVIRONMENTAL
CHAMBER PANEL
L1
L1
L1
L1
H a b a a b b
AL2-
32,34,36
SHUNT TRIP
EX SERVICE XFMR
AH2- 1
AH2- 1
AH2- 1
AH2- 1
AH2- 1
AH2- 1
AH2- 1
AH2- 1
E2.1
GFI GFI
GFI
GFI
NEMA 6-30
#10 CU
NEMA 6-30
#10 CU
NEMA 6-
20 ABOVE
COUNTER
AL4-
14,16,18
AL4- 10,12
AL4- 32,34 NEMA 14-50
NEMA 6-30
#10 CU
NEMA 6-50R
#8CU
AL2- 18,20
AL4- 46,48 AL4- 42,44
ALTERNATE
AL4-
27,29,31
NEMA L21-20
#8CU
NEMA 6-20R
AL4- 33,35
NEMA L10-30
AL4- 37,39
AL4
NEMA 6-20R
AL4- 41,43
NEMA 6-20R
#10CU
AL4- 45,47
NEMA 6-20R
#10CU
AL4- 49,51
AL4- 74
AL1- 1
#8 CU
#8 CU
#10CU
#10CU ABOVE
COUNTER
#10CU ABOVE
COUNTER
NEMA 5-20R
#10CU
AL4- 53,55
AL1- 7
ON CEILING FOR
EXISTING GARAGE
DOOR OPENER
AL2- 15
+15' AFF
AL2- 17
+15' AFF
EX 15" CONCRETE
WALL 13
AL4- 78AL4- 78
14 14
AL1- 9,11
W1
AL4- 21
AL4- 54
AL4- 22
MOUNT ABOVE DOOR
AL1- 17 AL1- 17
WP
GFI
WP
GFI
AL1- 19
AL1- 19AL1- 19
WP
GFI
WP
GFI
WP
GFI
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.0
'A'-WING - ELECT. PLANSRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A'-WING BASEMENT POWER PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A'-WING 1st FLOOR ELECTRICAL PLAN E2.0 : E2.0
E2.0 : E2.0
E2.0 : E2.0
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN12
1. DOOR CONTACT TO SHUT OFF LASER WHEN OPENED. EXISTING
SYSTEM TO REMAIN.
2. PROVIDE POKE THROUGH FLOOR RCPT FOR OVEN. COORDINATE
EXACT LOCATION WITH CONTRACTING OFFICER.
3. HOOD CONNECTIONS FOR EXHAUST FAN, AND HOOD MOUNTED
RCTPS. VERIFY CONNECTIONS PRIOR TO ROUGH-IN.
4. EXISTING LIFT TO BE RECIRCUITED.
5. PROVIDE TRANSFORMER WITH 4" HOUSE KEEPING PAD. MOUNT 2"
OFF WALL PER NEC REQUIREMENTS.
6. PROVIDE ALL RECEPTACLES IN THIS SPACE WITH WEATHER PROOF
COVERS. ALL RECEPTACLES IN THIS SPACE TO BE MOUNTED AT
48"AFF.
7. EXTEND EXISTING MDP FEEDER TO NEW MDP.
8. LIMIT DOWN TIME FOR SWITCH OVER. PLAN FRIDAY THROUGH
SUNDAY SWITCH OVER. NOTIFY CONTRACTING OFFICER 14 DAYS
PRIOR.
9. SECURITY PANEL CIRCUIT. RECIRCUIT AND PROVIDE TEMPORARY
POWER DURING POWER SWITCH OVER.
10. 3-WAY PILOT LIGHT SWITCH TO CONTROL TYPE W1 "ROOM IN USE"
LIGHT.
11. RELOCATE OVEN FROM (E) PREPARATION AND STAGING TO THIS
LOCATION. VERIFY OVEN WILL FIT IN THIS LOCATION PRIOR TO
ROUGH-IN.
12. RECIRCUIT HOOD WITH SPEED CONTROLS.
13. CORE THROUGH EXISTING CEMENT WALL FOR ALL CIRCUITS TO
COMBUSTION LAB 103A OUTLETS. SEAL ALL PENETRATIONS.
14. VERIFY POSSIBILITY OF POKE THROUGH POWER TO CABINET
POWER IN THIS LOCATION. IF NOT POSSIBLE PROVIDE POWER TO
FURNITURE THROUGH CONDUIT ROUTED STRAIGHT TO CEILING.
15. IF ALTERNATE #11 FOR RECIEVING 101 A IS TAKEN: PROVIDE
TELEPHONE OUTLETS AT THIS LOCATION. RUN CAT5e CABLE BACK
TO C-WING TELEPHONE TERMINAL BOARD IN THE SERVER ROOM.
16. SEE NEW ONE-LINE #9 ON SHEET E9.2 FOR MORE CIRCUITING
INFORMATION. IF REQUIRED PROVIDE NEW CAT5e CABLING TO THIS
LOCATION FOR NETWORKING OF SMART METER.
A
B
C
DN.
UP
DN.
AA
BBDDEEFFGGHHJJKKLL
M
J J J
DaDbDc
M
8A .1
K-5016-ETDEXTERC
_URINALS
V
ITRE
OUS C
HINA
os
F os
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
AH3
AL3
(E) OFFICE
212 B
(E) PASSAGE
211 B
(E) LOW VELOCITY
TUNNEL
220 C
(E) WIND TUNNEL
TEST AREA
202 A
(E) CONTROL RM
201 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
D1
D1E
D1ED1
D1
D1
RE-CIRCUIT
EXISTING
DROP RCPT
D1D1
GFI
RE-CIRCUIT EXISTING
GARAGE DOOR MOTOR NEW CONTROLS BY
MECHANICAL. PROVIDE 1/2" C.O. FOR SENSORS.
NEW
DROP RCPT
AL3- 33 AL3- 35 AL3- 37
AL3- 2
AL3- 4
AL3- 21
AL3- 19
AL3- 17
AL3- 15AL3- 13
AL3- 1
AL3- 3
AL3- 25
AL3- 7
AL3- 11AL3- 5
EM
AH3- 13
AH3- 13
AH3- 13
AH3- 13 AH3- 13
AH3- 13
AH3- 13 AH3- 13
GFI
AL3- 21
c c b bb b a a
AL3- 6
AL3- 8
AL3- 10
208V/3P
NEMA L5-50R
#8CU
480V/3P
NEMA L22-50
#8CU
208V/3P
NEMA L5-50R
#8CU
480V/3P
NEMA L22-50
#8CU
AL3- 23 3
AL3- 12
AL3-
14,16,18
AH3- 1,3,5
AL3- 9 AL3- 9
AL3-
20,22,24
AH3-
7,9,11
RE-CIRCUIT EXISTING
OVER HEAD DOOR MOTOR.
EXISTING SENSORS TO REMAIN.
AL3- 27
AL3- 39
AL3- 39
AL3- 39
AL3- 41
AL3- 41
AL3- 41
AL3- 41
(E) AIR
CONDITIONING
EQUIP
203 A
9AL3- 13
AL3- 19
+72" AFF +72" AFF
D2
AL4- 79
V1
F1
AL4- 79
AH2- 3
AH2- 3
AH2- 3
GFI
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.1
'A'-WING - ELECT. PLANSRJH
ACB
KSJ
RJH
E2.1 : E2.0
E2.1 : E2.1
E2.1 : E2.1
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN12
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING 2ND FLOOR ELECTRICAL PLAN
1. MATCH NEW LIGHTING UP WITH EXISTING HOLES IN WIND TUNNEL. CLEAN
GLASS COVER IN TUNNEL PRIOR TO INSTALL.
2. CUT NEW HOLES IN TUNNEL WITH HEAT RESISTANT GLASS. INSTALL
GLASS TO ASSURE AIR-TIGHT SEAL FOR NEW PENETRATION. ALIGN TYPE
D1 FIXTURES DIRECTLY OVER NEW GLASS PENETRATIONS.
3. REPLACE EXISTING FLUSH-MOUNT QUAD RCPT WITH NEW HIGH HEAT
RCPT HUBBEL IG5362WR OR APPROVED EQUAL.
4. EXISTING BOX, ATTACHED TO OUTSIDE OF WIND TUNNEL, TO REMAIN IN
PLACE AND BE RE-FITTED WITH SPECIFIED OUTLETS.
5. RECIRCUIT EXISTING LIGHTING TO THIS PANEL.
6. IF ALTERNATE IS NOT TAKEN AND THIS AREA REMAINS AS IS PROVIDE NEW
RCPT IN EXISTING LOCATION. POWER RCPT AND LIGHTING IN THIS SPACE
USING CIRCUITS SHOWN.
7. 3-WAY PILOT LIGHT SWITCH TO CONTROL TYPE W1 "ROOM IN USE" LIGHT
ON FIRST FLOOR.
8. IF ALTERNATE #11 FOR RECIEVING 101 A IS TAKEN: PROVIDE TELEPHONE
OUTLETS AT THIS LOCATION. RUN CAT5e CABLE BACK TO C-WING
TELEPHONE TERMINAL BOARD IN THE SERVER ROOM.
9. QUAD RECEPTACLES TO BE MOUNTED IN SAME LOCATION AS DEMOED
RECEPTACLES TO AVOID ADDITIONAL PENETRATIONS TO WIND TUNNEL.
TRUE NORTH BLDG NORTH
: 1/2" = 1'-0"
5 ENLARGED 1st FLOOR 'A'-WING RESTROOMS ELECTRICAL PLAN (ALTERNATE #2)
C
AA
BBDDEEFFGGHH
AA
BBDDEEFF
UP
AA
BBDDEEFFGGHHJJKKLL
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
KEY NOTES:
AL2a
(E) BURN CHAMBER
PLATFORM
401 A
(E) SMOKE RELIEF
PLENUM
402 A
ROOF
AL2a- 1
AL2a- 3
AL2a- 5
AL2a- 7
AL2a- 9AL2a- 11AL2a- 13
AL2a- 15
AL2a- 19
AL2a- 21
AL2a- 23
AL2a- 25
AL2a- 27AL2a- 29 AL2a- 31
AL2a- 33AL2a- 17
AL2a- 35
AL2a- 37
AL2a- 39
AL2a- 2,4 AL2a- 6,8
NEMA 6-20 NEMA 6-50
#8CU
WP
GFI
AL5- 34
6EX TELECOM PANEL
CIRCUIT PANEL LB FROM
SUBFED BREAKER IN NEW
PANEL AL5
WP
GFI
AL5- 45
AH5
X5
AL5
(E) BURN CHAMBER
OPEN TO BELOW
201 B
ROOF
220 E
(E) MECHANICAL
RM
302 A
(E) MECHANICAL
LOFT
301 A
F1 F1 F1
F1
F1
F1
F1 F1
F1
F1
AH5- 11
AH5- 11 AH5- 11
AH5- 11
AH5- 11 AH5- 11
AH5- 11
AH5- 11
AH5- 11
AH5- 11
SWITCH FOR
LIGHTING IN PLENUM
ABOVE THIRD FLOOR.
RECIRCUIT EXISTING
LTG TO AH5-31
F1
AH5- 11
AL5- 5
AL5- 5
AL5- 5
AL5- 5
EX SMART METER
AH5a
WP
GFI
AL5- 43
WP
GFI
AL5- 43
M9.4
AL5- 5
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.2
'A'-WING - ELECT. PLANSRJH
ACB
KSJ
RJH
E2.2 : E2.2
E2.2 : E2.2
E2.2 : E2.2
E2.2 : E2.2
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING 4TH FLOOR ELECTRICAL PLAN TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
7 'A' WING ROOF TOP POWER PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING 3RD FLOOR ELECTRICAL PLAN
1. PROVIDE TRANSFORMER WITH 4" HOUSE KEEPING PAD. MOUNT 2" OFF BACK
WALL PER NEC REQUIREMENTS.
2. MOUNT TO RAILING. VERIFY BEST LOCATION FOR LOAD CENTER WITH NEC
REQUIRED CLEARANCES.
3. RE-CIRCUIT FOR NEW PANEL AH5a SUPPLY FAN ARRAY. SEE NEW ONE-LINE #
9 ON SHEET E9.2 FOR MORE CIRCUITING INFORMATION. IF REQUIRED PROVIDE
NEW CAT5e CABLING TO THIS LOCATION FOR NETWORKING.
4. COORDINATE EXACT LOCATION WITH MECHANICAL TO ENSURE WORKSPACE
CLEARANCES ARE KEPT BETWEEN ELECTRICAL AND MECHANICAL
EQUIPMENT.
5. COORDINATE LIGHTING WITH NEW DUCT WORK. CIRCUIT VIA NEW CONTROLS.
6. ALTERNATE #11: PROVIDE (2) PHONE LINES FROM TELEPHONE TERMINAL
BOARD IN SERVER ROOM IN C-WING TO THIS LOCATION FOR NEW PHONE
LINES.
(ABA)
DN.
UP
DN.
RAMP DOWN
DN
AA
BBDDEEFFGGHHJJKKLL
M
M
M
M
J J
M
M
J
M
M
M M
A
B
C
GGHHJJKKLL
UP
UP
UP
M M
M
M M
M M
JJ
JJ
(E) COMBUSTION
LAB
103 A
(E) BOILER RM
001 A
(E) PREPARATION
AND STAGING
106-1A
(E) PREPARATION
AND STAGING
106-2A
(E) FUELS LAB
105 A
LASER ROOM
105-1A
CALIBRATION
105-3A
OBSERVATION
ROOM
104 A
EF-A1
HWUH-A3
HWCH-A1 HWCH-A2
HWCH-B2
HWUH-A1
HWUH-A2
AL5- 31
AL5- 33 AL5- 33
AL5- 33
AL2- 21
AL2- 21
E2.0
AL5- 47
AL5- 47
EXISTING EXHAUST FANS
TO BE RE-CIRCUITED
(E) PREPARATION
AND STAGING
106-1A
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
KEY NOTES:
UNEXCAVATED
(E) PIPE TUNNEL
(E) ELEC PANEL RM
002 A
(E) TRANSFORMER
RM
003 A
(E) BOILER ROOM
001 A
GLF-A1
HWP-A2HWP-A1
AH5-
19,21,23
AH5-
13,15,17
VFD
VFD
AL5- 35
22 AL5- 42
AL5- 42
AL5- 44
AL5- 46
(E) B-4
(E) B-3
(E)
WATER
HEATER
ECUH-B8
AL5- 27AL5- 23
B-A1 B-A2
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.3
'A'-WING-MECH. COORDINATIONRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A'-WING 1st FLOOR MECHANICAL COORDINATION PLANS E2.3 : E2.3
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A'-WING BASEMENT MECHANICAL COORDINATION PLANS
E2.3 : E2.3
1. BOILER EMERGENCY SHUT OFF. CIRCUIT BOILERS VIA SHUNT TRIP
BREAKERS.
2. EXISTING CONNECTIONS, AND DISCONNECTS TO BE RE-CIRCUITED.
E2.3 : E2.3
DN.
DN.
AA
BBDDEEFFGGHHJJKKLL
M
M
J
M
J
M
A
B
C
(E) LOW VELOCITY
TUNNEL
220 C
(E) WIND TUNNEL
TEST AREA
202 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
(E) AIR
CONDITIONING
EQUIP
203 A
HWUH-A4
AL5- 37
AL5- 32
HWCH-A3
EF-A2
AL1- 5
AL1- 5
ALTERNATE #2
EXHAUST FAN 2
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.4
'A'-WING-MECH. COORDINATIONRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING 2ND FLOOR MECHANICAL COORDINATION PLAN
E2.4 : E2.4
E2.4 : E2.0
TRUE NORTH BLDG NORTH
: 1/2" = 1'-0"
13 ENLARGED 1st FLOOR MECHANICAL COORDINATION PLAN - ALTERNATE
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
1. PROVIDE CIRCUIT AND INTERNET CONNECTION FOR DDC PANEL.
COORDINATE QUANTITY AND LOCATION WITH CONTROLS CONTRACTOR.
COORDINATE WITH CONTRACTOR OFFICER FOR DATA CABLING NEEDS
AND LOCATION IN C-WING SERVER ROOM.
2. IF ALT #2 IS NOT TAKEN RE-CIRCUIT EXSITING EXHAUST FAN USING
CIRCUIT SHOWN.
E2.4 : E2.4
AA
BBDDEEFFGGHH
M
M
M J
J
M
M
M
AA
BBDDEEFF
M M
UP
AA
BBDDEEFFGGHHJJKKLL
M
M
M
M
M
M
M
M
M
M
M
M
J
M
M
M M
M
M
M
M
M
M
M
M
M
J
J
J
A
B
C
CU-A2
CU-A1
DSF-A2
DSF-A1
EF-A3
AH5-
31,33,35
AH5-
43,45,47
AL5- 9
AL5- 9
AL5- 39
NEMA 3R
ALT #8
ALT #8
ALT #3
SEF-A1SEF-A2
AH5- 5,7,9
VFD
AH5-
25,27,29
NEMA 3R
ALT #5 ALT #4
(E) BURN CHAMBER
OPEN TO BELOW
201 B
SG-A3
SG-A2
SG-A1
SG-A15
AHU-A1
SEF-A3
HWUH-A5
CA CD-A12
ALT #3
AHU-A2
VFD
AL5- 15
AL5- 17
AL5- 19
AL5- 21
EXISTING TO BE RELOCATED
AL5- 15
AL5- 13
AH5a- 1,3,5
AH5a- 7,9,11
AH5a- 13,15,17
AH5a- 19,21,23
AH5a- 25,27,29 AH5a-
31,33,35
AH5a- 26,28,30
AH5a- 20,22,24
AH5a- 14,16,18
AH5a- 8,10,12
AH5a- 2,4,6
AH5a- 37,39,41
AH5- 2,4,6
AL5- 41
VFD VFD
VFD VFD
#8CU
AL5- 36
S
AL5- 38
GAS SOLENOID
AL5- 15
AL5- 7
ALT #10
AL5- 7
AHU LIGHTING
& RCPT
AHU LIGHTING
& RCPT
M9.4
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.5
'A'-WING-MECH. COORDINATIONRJH
ACB
KSJ
RJH
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING 4TH FLOOR MECHANICAL COORDINATION PLAN
E2.5 : E2.5
E2.5 : E2.5
E2.5 : E2.5
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
7 'A' WING ROOF TOP MECHANICAL COORDINATION PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING 3RD FLOOR MECHANICAL COORDINATION PLAN
1. EXISTING RO SKID TO BE REINSTALLED AND RE-CIRCUITED IN THIS
LOCATION.
2. VFD ARRAY TO BE 4 ACROSS 3 DEEP AND CIRCUITED TO EACH MOTOR
IN AHU-A1 USING #12 CU. VERIFY LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO ROUGH-IN. MAINTAIN NEC CLEARANCES.
3. MAINTAIN NEC REQUIRED CLEARANCES IN FRONT OF PANELS AND
TRANSFORMER. 3' MIN.
4. PROVIDE CIRCUIT AND INTERNET CONNECTION FOR DDC PANEL.
COORDINATE QUANTITY AND LOCATION WITH CONTROLS
CONTRACTOR. COORDINATE WITH CONTRACTOR OFFICER FOR DATA
CABLING NEEDS AND LOCATION IN C-WING SERVER ROOM.
5. GAS SOLENOID EMERGENCY SHUT OFF.
E2.5 : E2.5
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
C
(E ) D O O R B
LO
C K E D B Y (E
S E R V E R R M A C C E S S F
LO
O R
K -3551
ARCHE
R
TOILETV
ITREOUS CHINA
K-3551ARCHERTOILET VITREOUS CHINA
K -3551
ARCHE
R
TOILETV
ITREOUS CHINA
U P
D .F
UP
R A M P
D N
D N
D N
U P
RAMP DOWN
DN
GHJ
J
J
J
J
G
EF C
U P
J
KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
(E) INSTRUMENT
DEV. LAB
115 B
(E) LOBBY &
DISPLAY
101 B
(E) OFFICE
118 B
(E) OFFICE
119 B
(E) OFFICE
120 B
(E) OFFICE
121 B
(E) OFFICE
122 B
(E) OFFICE
123 B
(E) OFFICE
124 B
(E) OFFICE
125 B
(E) MEN'S RR
126 B
(E) WOMEN'S RR
127 B
(E) RECIEVING &
SHIPPING
106 B
(E) JAN
107 B
(E) DARK ROOM
109 B
(E) OFFICE
108 B
(E) OFFICE
110 B
(E) OFFICE
111 B
(E) INTRUMENT
VAULT
114B
(E) INSTRUMENT
CALIBRATION
113 B
(E) OFFICE
113-1B
(E) TOILET
102 C
(E) STORAGE
101 C
(E) SERVER ROOM
105 C
(E) OFFICE
108 C
(E) OFFICE
106 C
(E) OFFICE
107 C
EX PANEL 'X'
EX PANEL '1BB'
EX TELECOM '4B'
EX TELECOM
EX PANEL 1A1BA
EX PANEL 1B
EX PANEL J
EX PANEL C
EX PANEL
ECUH-B3
ECUH-B2
ECUH-B1
HWCH-B1
AL5- 33
AH1-
25,27,29
AH1-
19,21,23
AH1-
31,33,35
(E) STORAGE
002 B
(E) ELEV EQUIP
003 B
(E) MECH EQUIP
001 B
A R
E A
W A
Y
CU-B1
EX PANEL 4
EX PANEL 4A
EX XFMR 'B'
AH1-
26,28,30
CRAWL SPACE ENTRANCE
LB INTO BASEMENT
RUN CONDUIT
THROUGH BASEMENT
& CRAWLSPACE
WP
GFI
AL1- 3
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.6
'B'&'C'-WINGS MECH. COORD.RJH
ACB
KSJ
RJH
E2.6 : E2.6
E2.6 : E2.6
E2.6 : E2.6
TRUE NORTH BLDG NORTH
'B' WING KEY PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'B' & 'C'-WING 1ST FLOOR ELECTRICAL PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
11 'B'-WING BASEMENT ELECTRICAL PLAN
1. RUN BRANCH CIRCUITS THROUGH HALLWAY LAY-IN CEILLING
FROM A-WING.
K-5016-ETDEXTERC
_URINALS
V
ITRE
OUS C
HINA
K-3551ARCHERTOILET VITREOUS CHINA
K-3551ARCHERTOILET VITREOUS CHINA
K-3551ARCHERTOILET VITREOUS CHINA
D .F
D.F.
D N
DN.
U P
GHJ
J
J
J
J
J
A
B
C
(E) PASSAGE
211 B
(E) OFFICE
212 B
(E) CORRIDOR
200 B
(E) MAIL RM
210 B
(E) OFFICE
213 B
(E) OFFICE
214 B
(E) CONF RM
209-2B
(E) OFFICE
215 B
(E) OFFICE
216 B
(E) CONF RM
209-1B
(E) OFFICE
217 B
(E) CONF RM
208 B
(E) OFFICE
207 B
(E) OFFICE
218 B
(E) OFFICE
219 B
(E) OFFICE
220 B
(E) M TOIL
221 B
W TOIL
222 B
(E) JAN
205 B
(E) STOCK ROOM
204 B
(E) OFFICE
206-2B
(E) OFFICE
206-1B
(E) OFFICE
206-3B
EX PANEL '2BA'
EX PANEL '2B'
AH1-
38,40,42
AH1-
32,34,36
ECUH-B6
ECUH-B5
ECUH-B4
AH1-
43,45,47
AH1-
37,39,41
AH1-
49,51,53
EX PANEL '2BB'
ECUH-B7 KEY NOTES:
GENERAL NOTES:
1. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO
COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO
CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND
OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT
OF MATERIALS.
2. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF
FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED
WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS
RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
3. EXISTING LIGHTING TO BE RE-CIRCUITED VIA PROVIDED SPARE
BREAKERS IN NEW PANELS.
4. ALL EMERGENCY FIXTURES TO BE RE-INSTALLED AND RE-CIRCUITED TO
THE LIGHT CIRCUIT IN CORRESPONDING SPACE.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
E2.7
'B'&'C'-WINGS MECH. COORD.RJH
ACB
KSJ
RJH
E2.7 : E2.7
E2.7 : E2.7
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'B' & 'C'-WING 2ND FLOOR ELECTRICAL PLAN
TRUE NORTH BLDG NORTH
'B' WING KEY PLAN
1. RUN BRANCH CIRCUITS THROUGH HALLWAY LAY-IN CEILLING FROM A-WING.
EX
SPARE
EX
SPARE
EX
SPARE
EX
SPARE
EX
SPARE
EX
SPARE
EX MDS
480Y/277V, 3 Ø, 4W
ROOF
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
EX(4) 4" C.O.
PER UTILITY
REQUIREMENTS
EX TRANSFORMER 3 Ø
12.47Y/7.2KV TO 480Y/277V
TO UTILITY
POLE
SPACESPACESPACESPACESPACE
EX
250___
EX
225___
EX
150___
EX
70__
EX
350___
EX
150___
EX
100___
EX
30__
EX
9KVA
XFMR
'X'
BASEMENT
EX
1200____
EX
20__
40__
40__
PANEL
P1A
PANEL
P1
EX
15KVA
XFMR
EX
45KVA
480∆ TO
208Y/120V
XFMR
PANEL
IAA
PANEL
P2A
PANEL
P3
PANEL
P2
PANEL
IA
PANEL
Y
A WING
100A125A
EX
70__
EX
70__
EX
250___
EX
50__
EX
150___
EX 125___
3EX
125___
100___
100___
100___
PANEL
1B
PANEL
2B
PANEL
45KVA
XFMR
'B'
100___
100___
100___
PANEL
1BA
PANEL
2BA
PANEL
1BB
PANEL
2BB
PANEL
X
PANEL
4A
B WING D WING
PANEL
HI
225A
75KVA
XFMR
PANEL
L1A 225A
PANEL
LB
#1 480Y/277V, 3Ø, 4W
1A 1BA
208Y/120V, 3Ø, 4W
EX
15__
M
METER
PANEL
A
PANEL
"P3b"
PANEL
LA
25KVA
480∆ TO
240/120V
XFMR
30KVA
480∆ TO
208Y/120V XFMR
EX
3/4",3W, #10
EX
1-1/2",3W, #2
EX
2",4W, #1/0
EX
3-1/2"…
This is the start of the file's text. The full file is on GovTribe.