Attachment_12_-_AsbestosLeadHazMaterial-_C_Wing.pdf

PDF 5 MB Posted

Attached to
Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
Solicitation number
AG-82FT-S-16-0015
Issued by
Department of Agriculture Forest Service Research Service Rocky Mountain Research Station

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract AG-82FT-P-15-0058 ACM Project NO.: IH-15-101 December 15, 2015

Report of Pre-Renovation Hazardous Materials Assessment – Rocky Mountain Research Station C Wing

Subject Property:

Rocky Mountain Research Station 5775 U.S. Hwy 10 W.

Missoula, MT 59808

Contract: AG-82FT-P-15-0058

Prepared For:

United States Department of Agriculture U.S. Forest Service Rocky Mountain Research Station 240 W Prospect Street Fort Collins, CO 80526

Prepared By:

Abatement Contractors of Montana, LLC 208 Commerce St Missoula, MT 59807 Office: 406-549-8489 www.acm-contracting.com

Page 1 Contract AG-82FT-P-15-0058 Report for a Comprehensive Pre-Renovation Asbestos and Lead Hazardous Materials Assessment C wing of the RMRS –Missoula, Montana. Project No.: IH 15-101

Table of Contents

1.0 INTRODUCTION

2.0 Scope of Work

3.0 Site Description

4.0 Asbestos Inspection

5.0 LEAD-BASED PAINT INSPECTION

5.1 Introduction

5.2 Methods

5.3 Findings

6.0 Mercury

7.0 Assumed PCBs

8.0 Quality Control & Quality Assurance

9.0 XRF

10.0 Summary of Findings:

10.1 Asbestos

10.2 Lead Based Paint

10.3 PCB-Containing Equipment

10.4 Mercury -Containing Equipment

11.0 Limitations

List of Tables

Table 1: Summary of ACM Section A

Table 2: Summary of LBP from XRF Analysis

Page 2 Contract AG-82FT-P-15-0058

APPENDICIES

Appendix A – Sample Location Drawings Appendix B – ACBM & LBP Location Drawings Appendix C – Documentation of Accreditation Appendix D – XRF Performance characteristic sheet Appendix E –Data Summary Tables Appendix F – Analytical Reports Appendix G – PCB & Mercury Material List Appendix H– Photo Log of ACM and LBP

Page 3 Contract AG-82FT-P-15-0058

December 15, 2015

USDA Forest Service Attn: Corrie Kegel, PE 5775 U.S. Hwy 10 W.

Missoula, MT 59808

RE: Pre-renovation Inspection report for Asbestos, Lead & PCB Identification for

‘C’ Wing of the Rocky Mountain Research Station Located at 5775 U.S. Hwy 10 W, Missoula, MT 59808

Attn: Corrie Kegel, Abatement Contractors of Montana, LLC (ACM) is pleased to provide the findings of the asbestos and lead-based paint inspection completed at the Rocky Mountain Research Station (RMRS), in Missoula, Montana. The inspection was performed from October through December, 2015 by Mr. Christopher Casas and Mr. Mike Foust; Montana Department of Environmental Quality (DEQ) accredited asbestos inspectors (MTA-4459) (MTA-2741) and Environmental Protection Agency (EPA) accredited lead based paint inspectors (MT-I-I148223-1) (MT-S-28404-2). Credentials are attached.

1.0 INTRODUCTION

The pre-renovation hazardous material assessment for the above referenced project was completed to confirm or deny the presence of asbestos. ACM collected a total of 31 bulk samples representing 11 homogeneous areas (HAs) of suspected asbestos-containing building materials (ACBM). Floor plan drawings with bulk sample locations are presented in Appendix A. Samples listed in Table 1 tested positive for asbestos.

Identification of regulated hazardous materials at the RMRS ‘C’ Wing was accomplished through physical inspection, bulk sampling, and collection of X-Ray Fluorescence (XRF) screening data of building materials within the site.

The inspection for asbestos-containing material (ACM) was conducted using the protocol developed for schools under the Asbestos Hazard Emergency Response Act (AHERA), as promulgated in Title 40, Code of Federal Regulations, Part 763 (40 CFR, Part 763.354). Classification of the identified asbestos-containing materials was performed under the guidelines for National Emission Standards for Hazardous Air Pollutants (NESHAP).

The lead-based paint inspection was conducted using the protocols developed by the United States Department of Housing and Urban Development (HUD). ACM used a field XRF analyzer to determine the presence or absence of LBP. HUD recognizes the XRF analyzer as the recommended method to determine lead in paint (HUD 1995, revised 1997 and 2000).

ACM completed an inspection for Polychlorinated Biphenyls (PCBs) within RMRS’s ‘C’ Wings by an observational investigation to assess the quantity of PCBs.

Page 4 Contract AG-82FT-P-15-0058

ACM completed an inspection for mercury-containing equipment within the RMRS’s ‘C’ Wing by an observational investigation to assess the quantity of mercury-containing equipment.

Our methods and findings for the Inspection and overall hazard assessment are presented in the following sections of this report.

A total of 10 separate HAs of suspect lead-containing surface coatings were identified at the site during the assessment. One (1) HA was determined through on-site XRF analysis to be Lead-Based Paint (LBP). These surface coatings contain lead in concentrations greater than the Housing and Urban

Development (HUD) LBP criterion of one milligram per square centimeter (1.00 𝑚𝑔/𝑐𝑚2) of sampled area. Nine (9) HAs were determined through on-site XRF analysis to be NON-Lead-Based Paint and NON-LCP and therefore contain no amount of detectable lead.

HA’s listed in Table 2-0 tested POSITIVE for Lead in concentrations equal to or greater than the HUD LBP criterion and therefore are considered LBP.

Prior to initiating renovation activities at the site, an abatement plan should be prepared to address the containment, packaging handling, transport, and disposal of the regulated asbestos-containing materials, lead-containing materials, PCBs containing materials, and mercury-containing equipment identified at the site in order to satisfy regulatory requirements, as described in this report.

2.0 Scope of Work

The scope of work for this project included a hazardous materials assessment of building components throughout the accessible interior and exterior spaces of ‘C’ Wing. This work included visual assessment, sampling, and documentation of suspect and confirmed/assumed asbestos containing-building materials, lead-containing surface coatings, PCB’s, Mercury light tubes, thermostats as defined by the Environmental Protection Agency and State & local codes for Montana. This work also included recording the locations of the materials, estimated quantities +/- 10% of hazardous materials and recommendations for abatement of asbestos containing material and other hazardous materials. The scope of work included visual inspection for, but no sample collection of potential mercury-containing materials and potential PCB-containing equipment and materials. The purpose for conducting the inspection is to ensure all local, state and federal regulations related to hazardous waste are complied with during the upcoming renovation of Wing C. ACM’s scope of work for this project did not include preparation of abatement plans or specification documents.

3.0 Site Description

The Rocky Mountain Research Station (RMRS) houses the Fire, Fuel and Smoke science program as well as the Missoula Fire Sciences Laboratory. The RMRS was constructed in 1960 complete with a combustion laboratory, a wet laboratory, maintenance garage spaces, and office spaces. The building is divided into A, B and C Wings. Wing A houses the combustion laboratory, the wet laboratory, the boiler room, the ac/refrigeration room, and the low velocity and high velocity wind tunnel laboratory.

Page 5 Contract AG-82FT-P-15-0058

Assessment C wing of the RMRS –Missoula, Montana. Project No.: IH 15-101 Wing B houses the office spaces and Wing C houses the server room, office space, and a printing room.

Exterior of the Building:

The foundation is poured concrete; the exterior structural walls of the ‘C’ Wing are finished with face brick over concrete/CMU structure. The roof over C Wing is comprised of river rock, rubber membrane (EPDM), grey celotex, brown fiber board, tar, and rosen paper over timber decking.

Interior of the Building:

The interior flooring of Wing C consists of a resilient floor covering, self-adhesive carpet squares over concrete). The server room flooring is made from a built up floor framed with metal, vinyl floor tiles are laid down over the metal frame. The ceilings of Wing C are completed with a drop down ceiling with 2x4 fiber glass ceiling tiles and sections of cement asbestos board (CAB). The walls consist of plaster over wire mesh and areas of drywall.

4.0 Asbestos Inspection

Samples were obtained by trained and experienced individuals using techniques such as wet slicing, wet boring, and/or similar methods designed to limit contamination of the area during sampling. When applicable, the sampled area was sealed using duct tape or spry encapsulates as appropriate to the material being sampled.

The asbestos inspection was performed in accordance with the Administrative Rules of Montana (ARM), Occupational Health and Safety Administration (OSHA) 29 Code of Federal Regulation (CFR) 1926.1101(k), DEQ and the National Emission Standards for Hazardous Air Pollutants (NESHAP) 40 CFR 61, Subparts A and M.

As required prior to renovation or demolition of building materials, the asbestos inspection consisted of a detailed survey of all materials which will be disturbed during the demolition process. Suspect ACBM were visually identified and touched prior to sampling. The samples were placed into HA groups using a coding method to classify each material by type, texture, and date of application. Components of the inspection included:

• Identification of homogeneous suspect materials on a room-by-room basis

• Collection and analyses of bulk samples to confirm or deny the presence of asbestos

• Bulk samples were not collected from any homogeneous material made of fiberglass, wood, foam, glass, or rubber.

A minimum of three (3) samples were collected from random locations of each HA of suspect material.

Samples were collected from existing damaged materials, as applicable. Samples were placed in pre-labeled plastic containers for transport to the laboratory.

Samples were shipped, under chain-of-custody protocol for standard analyses to Sanair Technologies Laboratory, Inc. in Powhatan, Virginia, for bulk asbestos analysis utilizing Polarized Light Microscopy

(PLM). The samples were analyzed in accordance with EPA method 600/R93/116 and EPA 600/m4- 82/020.

Page 6 Contract AG-82FT-P-15-0058

Assessment C wing of the RMRS –Missoula, Montana. Project No.: IH 15-101 The DEQ defines ACM as material containing more than 1% asbestos based on laboratory analysis for the material using the EPA method 600/R-93/116 (“Method for the Determination of Asbestos in Bulk Building Materials’) by Polarized Light Microscopy (PLM). Three categories of ACM have been defined in the

National Emissions Standards for Hazardous Air Pollutants (NESHAP) standard, which is established in Title 40, part 61, of the Code of Federal Regulations (40 CFR 61.141) and adopted by the DEQ in Title 17, Chapter 74, Subchapter 3, of the Administrative Rules of Montana (ARM 17.74.351). The NESHAP Category definitions are as follows;

• Category I Non-friable ACM - asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than one (1) percent (%) asbestos as determined using the method specified in appendix E, subpart E, 40 CFR 763, section 1 (PLM)

• Category II Non-friable ACM - any material, excluding Category I Non-friable ACM, containing more than 1% asbestos as determined using the method specified in appendix E, subpart E, 40 CFR 763, section 1, PLM that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.

• Regulated ACM (RACM) - a) friable asbestos material; b) Category I Non-friable ACM that has become friable; c) Category I Non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; or d) category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by the subpart.

ACM collected 31 bulk samples representing 11 HAs of suspected ACBM. Table 1 summarizes analytical results for the building materials collected within the site. Additional information in Table 1 includes sample ID, building material description, sample location, and recommended response actions.

Table 1: Summary of ACM C Wing

HA No. HA Description Location

Asbestos Condition SQFT/LF Response Action

VFT.2

white/pink vinyl floor tile server room 2% good condition non friable

30 SF

(Intact Removal) prior to renovation

TRNST.1

cement asbestos board men’s shower room

20% good condition non friable

150 SF

(Intact Removal) prior to renovation

WG.1

window glazing (Samples collected From B-wing) youth hall 2% good condition non friable

38 LF

(Intact Removal) prior to renovation

Page 7 Contract AG-82FT-P-15-0058

Assessment C wing of the RMRS –Missoula, Montana. Project No.: IH 15-101

5.0 LEAD-BASED PAINT INSPECTION

The purpose of a lead assessment is to identify lead-containing surface coatings. Identification of Lead Containing Paint (LCP) and/or Lead Based Paint (LBP) is necessary to determine whether renovation/demolition workers may potentially be exposed to airborne lead concentrations exceeding permissible exposure limits (PEL) established by the OSHA. Characterization of leachable lead in the overall potential waste stream is necessary to determine proper handling and disposal of renovation waste materials required by the Resource Conservation and Recovery Act (RCRA).

HUD defines LBP as a surface coating containing lead in concentration greater than 1.0. The presence of LBP on surfaces scheduled to be impacted during the renovation activities increases the potential for workers to be exposed to airborne lead in concentrations greater than the OSHA PEL of 50 micrograms per cubic meter (µg/m3), which is established in 29 CFR 1926.62. However, it is important to note that the presence of LCP’s (i.e. coatings which contain lead at concentrations less than the HUD criterion of 1.0) may also present a potential exposure hazard for renovation workers.

As a result of the lead-based paint assessment conducted at the site, lead-based surface coatings (paints) were confirmed on the subject property as of the date of the assessment. The analytical results from this assessment effort identified the following lead-based paint (LBP) as defined by the EPA and/ or HUD standards.

5.1 Introduction

A LBP assessment was conducted at Wing C of the RMRS for the client. The inspection was conducted by Mr. Christopher Casas, a certified Lead-Based Paint Inspector. The purpose for the inspection was to confirm or deny the presence of lead-based paint. As part of the inspection, a visual survey of the property and structure was conducted and all painted surfaces were inventoried.

The comprehensive LBP testing, conformed to HUD guide lines 24 CFR 35 section 35.930 (c), (d). LBP is defined by EPA regulations under Title X (Residential Lead-Based Paint Hazard Reduction Act of 1992) as containing lead concentrations above 1.0 mg/cm² when measured by a portable XRF instrument or 0.5% by weight (5,000 parts per million) when measured by laboratory analysis.

Since this project is non-HUD target housing, HUD Rules & regulations do not apply.

Explanations of regulations are detailed for workers that will be on the site as follows:

The Occupational Safety and Health Administration (OSHA) 29 CFR 1926.62 - Lead in Construction Standard does not define lead based coatings or materials but does establish safe airborne exposure limits for employees working with lead containing materials by permissible exposure limit (PEL). In summary; if any material or coating contains lead above 100 ppm then abatement, renovation, or demolition contractors must demonstrate worker health and safety due diligence.

This includes: lead awareness training for all affected employees, establishment of proper personal protective equipment (PPE), proper demarcation of effected work area(s), and performance of negative exposure assessment (NEA) lead air monitoring prior to downgrading any established PPE.

Page 8 Contract AG-82FT-P-15-0058

Assessment C wing of the RMRS –Missoula, Montana. Project No.: IH 15-101 Relating to disposal of lead-containing waste, RCRA regulatory criteria for “total” lead in a waste stream is established in 40 CFR 261, Subpart C. The regulatory criteria are listed in milligrams per liter (mg/l) of dissolved lead in a solution (“wet basis”), as determined using the Toxicity Characteristic Leaching Procedure (TCLP) by EPA Method 1311.

5.2 Methods

ACM identified HAs of suspect LBP on interior and exterior surfaces for each of the site buildings, as described above, in general accordance with American Standards for Testing and Materials (ASTM) Method E 1729-05. ACM’s inspector distinguished HAs of suspect LBP visually and through field review of analytical data obtained using a Innov-X-Systems alpha-4000 XRF analyzer. As deemed appropriate by the inspector, multiple tests were taken within a given HA; in such instances, the highest observed concentration for tests representing a respective HA were reported.

The XRF utilizes an ionizing electrical source and internal calculations to provide direct-read lead data.

Analytical data obtained from a field-calibrated XRF are accepted as accurate by the EPA.

It should be noted that this instrument performs its own detector calibration upon startup, and it’s accuracy was checked against known standards set forth by the National Institute of Standards and Technology (NIST) prior to, during (at a four (4) hour interval), and following testing. The Performance Characteristic Sheet (PCS) is included in Appendix D.

5.3 Findings

ACM collected a total of forty one (41) XRF suspect lead coating assays & calibration readings for the lead based inspection of Wing C. Any paint films with lead concentrations of 1.0 or greater were classified as Regulated Lead Containing Materials. In addition, the substrate condition was visually assessed at each assay test site. Additional paint or glaze coatings on the interior of the buildings were bulk sampled using destructive methods to verify the lead content in parts per million (ppm), summarized in Table 2. Results from ACM’s LBP assessment are summarized in the following sections for the site buildings.

ACM identified a total of One (1) HAs of suspect LBP, the HA was determined to be LBP as summarized below:

Table 2: Summary of LBP from XRF Analysis C Wing

Component Location Material Description Quantity XRF Results

Sinks

C Section bathroom & shower room white bathroom sink and janitors sink glazing

2 5.00

Toilet bowl C Section bathroom white bathroom toilet glazing 1 5.00

% = Percentage < = Less Than Bold = LBP 0.5% by weight = HUD definition of lead-based paint

Page 9 Contract AG-82FT-P-15-0058

6.0 Mercury

A total of 27 suspected mercury-containing pieces of equipment were identified through visual observation associated with the site and were identified as being mercury-containing equipment during the assessment that include fluorescent light tubes, CFL’s, thermostats, thermometers in mechanical rooms, hallways, offices throughout the building.

Due to the age of the structure, a visual inspection for potential mercury-containing equipment such as mercury switches, thermostats and thermometers was conducted at the site. Mercury-containing equipment is listed in the universal waste regulated under the Resource Conservation and Recovery Act (RCRA) hazardous waste regulations. EPA’s universal waste regulations streamline hazardous waste management standards for designated “universal waste” which includes mercury-containing equipment to prevent the item from entering municipal trash; instead it can be collected and disposed of at a hazardous facility. The federal universal waste regulations are set forth in 40 CFR (273.9).

Mercury-containing equipment is a device or part of a device (including thermostats, temperature and pressure gauges. Universal waste regulations apply to mercury-containing equipment. Personal handling of this type of waste (i.e. disposed fluorescent light bulbs) must be trained regarding the proper handling and emergency response actions for the waste (mercury). It is recommended that the facility where the mercury-containing equipment is present participates in a management plan for the proper disposal and recycling of the hazardous waste. The hazardous waste must be containerized to protect it from damage and/or leakage, and the containers must be properly labeled to identify the type of universal waste (e.g. “Universal Waste – Mercury Thermostats” or ‘Waste-Mercury thermostat(s)’or “Used Mercury Thermostats”).

The transport of universal waste must include adequate packing materials to prevent breakage during storage, and handling in accordance with EPA and DOT regulations. Universal wastes may only be transported to other universal waste handlers, destinations facilities (e.g. disposal or recycling facilities).

Handling and transport of small quantities of universal waste do not need to be reported to the EPA;

however it is prudent to collect and document all receipts generated by the destination facilities.

ACM recommends the abatement design specification document be prepared to include requirements for removal, handling, and disposal of these materials. These tasks should be completed by the abatement contractor or other trained personnel.

7.0 Assumed PCBs

No suspected PCB-Containing Equipment was found or identified during the visual observation to be associated with Wing C and was not identified as being PCB-Containing Equipment during the assessment.

Current PCB regulations can be referenced in CFR 40 761. PCB-Containing equipment is currently listed under as a chemical substance under the Toxic substances Control Act (TSCA). The TSCA was established to control any substance determined to cause unreasonable risk to public health or the environment. PCB-Containing Fluorescent light ballasts identified in the assessment must be considered to be “PCB Bulk Product Waste”. The Ballast all were mark (no PCBs)

Page 10 Contract AG-82FT-P-15-0058

8.0 Quality Control & Quality Assurance

ACM utilized a unique sample ID number to each bulk sample to help with elimination of microscopist’s potential bias. For example, if a numbering system indicates that seven samples are from the same room, a microposist may not be objective with each individual sample. Bulk samples obtained during the site inspection were identified and entered on sample summary sheets.

8.1 Chain-of-Custody Forms

In order to ensure that the samples are properly identified and tracked from the point of sample collection through receipt by the analytical laboratory, EPA requires that a chain-of-custody (COC) form be completed and accompany the samples. The COC contains essential items such as identification number, date, name of sampler and signature of recipient. Some laboratories request that COC forms they supply be used. These forms must be completed in the field and accompany the samples when they leave possession of the inspector. Inspectors should fill in a new COC form if mistakes have been made (i.e. incorrect information transferred from sample containers to COC form).

8.2 Quality Control (QC) Samples

Collections of side-by-side duplicates are recommended at the rate of 1 QC sample/building or 1 QC sample/20 samples, whichever is larger. The laboratory should analyze duplicates without knowing which are the QC samples. The results of duplicates are compared to determine sampling analytical precision.

8.3 Accredited Laboratories

To diminish the likelihood of challenges to the accuracy of laboratory results ACM utilized an accredited laboratories for the analysis of bulk samples (per AHERA 40 CFR Part 763, Subpart E). A listing of accredited laboratories published by the EPA twice a year is available through the EPA regional Asbestos Coordinator or the TSCA hotline (202)-554-1404.

9.0 XRF

The XRF instrument was calibrated to the manufacturer’s standards prior to collecting field measurements and was checked periodically throughout the testing period against known NIST standards. All checks performed throughout the assessment were within 5% of one another. Overall, the precision, accuracy, method compliance, and completeness of the data set were determined to be acceptable based on the data submitted and reported. The XRF Performance Characteristic Sheet for the XRF used by ACM specifies the ranges where XRF results are positive, negative, or inconclusive. The Performance Characteristic Sheet for this instrument is attached in Appendix D.

Page 11 Contract AG-82FT-P-15-0058

10.0 Summary of Findings:

10.1 Asbestos

• Eight (8) building materials suspected of containing asbestos were confirmed to not contain asbestos. If future renovation or demolition activities are planned these non-ACBM materials may remain in-place and be demolished with the reminder of the building.

• Three (3) building materials suspected of containing asbestos were confirmed to contain greater than one percent (>1%) asbestos and are considered Asbestos Containing Building Materials. These materials will require special abatement considerations prior to commencing renovation/selective demolition activates. Several options for asbestos abatement, in conjunction with demolition operations, may be considered for this project. The owner’s representative should work with the owner to develop a cost effective abatement/renovation/demolition plan, with considerations for the health and safety of the abatement workers, the demolition personnel, and residents within the immediate vicinity of the demolition project.

• If abatement or renovation/selective demolition of the property is completed in accordance with current EPA and MDEQ-ACP guidelines, the services completed throughout the project will require asbestos qualified contractors and consultants to complete the work.

10.2 Lead Based Paint

• LBP was confirmed on 1 representative painted surface tested at the referenced site. The painted surface should be treated as lead hazardous waste and abated prior to removal, renovation, or salvage that may disturb the lead based paint. Therefore this material would require special considerations for pre-renovation lead abatement.

• The Federal Dangerous Waste Regulation (40 CFR Part 261) requires that lead containing materials with a lead content above 5,000 ppm threshold be treated as lead hazardous waste until toxic characterization leeching procedure (TCLP) bulk waste stream sampling by EPA method 1311 proves otherwise. The TCLP lead characterization threshold is 5 ppm. TCLP lead waste stream bulk sampling and analysis was not conducted as part of this survey project.

• The regulatory action level for lead, as defined under RCRA is 5 mg/L; therefore, a result above 5mg/L using the TCLP analytical method is defined as “hazardous waste” and must be transported by a hazardous waste transporter and disposed of at a hazardous waste facility.

Page 12 Contract AG-82FT-P-15-0058

Lead Based Paint Recommendations

• All coatings identified as containing greater than 100 ppm lead by XRF Assay Testing, associated with this project are governed by Federal regulations. Explanations of regulations are outlined in sections of this report.

• The LBP coated surfaces will require special abatement considerations prior to commencing renovation and/or selective demolition activities. Several options for abatement in conjunction with renovation/selective demolition operations may be considered for this project. The owner’s representative should work with the owner to develop a cost effective abatement/demolition plan, with considerations for the health and safety of the abatement workers, the demolition personnel, volunteers, and residents within the immediate vicinity of the renovation/selective demolition project.

• If abatement or demolition of the property is completed in accordance with current EPA guidelines, the services completed throughout the project would require lead qualified contractors and consultants to complete the work. The removal and containerization of the lead contaminated material should be completed during the lead abatement portion of the project.

10.3 PCB-Containing Equipment

• Confirmed PCB-containing components are listed by room on the PCB and Mercury containing equipment drawing and a complete summary of all identified PCBs are listed in Appendix G.

Identified PCB-containing components shall be disposed of as described in this report.

Specifically identified “PCB Bulk Product Waste” will require manifesting and labeling for disposal in accordance with CFR 761.62(b). Furthermore disposal options for this waste include disposal in a TSCA Incinerator, disposal in a TSCA/RCRA landfill, or a state-approved landfill (leach test required). Each load of PCB waste must be transported using the waste manifest protocol stipulated in 40 CFR 716.207

10.4 Mercury -Containing Equipment

• Confirmed mercury-containing equipment is listed by room on the PCB and Mercury containing equipment drawing, and a complete summary of all identified PCBs are listed in Appendix G.

Identified MCP shall be disposed of at a hazardous facility, as stipulated in 40 CFR (273.9). The Mercury-Containing Equipment must be containerized to protect it from damage and/or leakage, and the containers must be properly labeled to identify the type of universal waste.

The transport of Mercury-Containing Equipment must include adequate packing materials to prevent breakage during storage, and handling. Handling and transport of small quantities of Mercury-Containing Equipment do not need to be reported to the EPA; however it is prudent to collect and document all receipts generated by the destination facilities.

Page 13 Contract AG-82FT-P-15-0058

11.0 Limitations

This asbestos and lead inspection summary was prepared based on information gathered during our site visits, phone conversations with the client and interpretations of laboratory results of bulk samples collected during the inspection. The inspection was comprehensive to the referenced building.

Supplemental inspection and sampling may be required if additional asbestos HAs are exposed during excavation, demolition, or if the scope of work is expanded to include additional buildings or buried/underground piping that have not been inspected or analyzed for asbestos or lead content.

If you have any questions regarding this report, please call me at 406.549.8489. We look forward to working with you in the future.

Sincerely, Christopher Casas Mike Foust Environmental Technician Project Manager

APPENDIX A

Sample Location Drawings

Facility Map

("A" Wing) ("C" Wing)

("D" Wing) ("B" Wing)

DNUP

D.F.

UP

RAMP

DN

DN

UP

UP

DN

RAMP

DN

D N

(E) VESTIBULE

100 B

(E) PASSAGE

116 B

(E) SECURITY

SYST. EQUIP. RM

117 B

(E) LOBBY

& DISPLAY

101 B

(E) OFFICE

118 B

(E) OFFICE

119 B

(E) OFFICE

120 B

(E) OFFICE

121 B

(E) OFFICE

122 B

(E) OFFICE

123 B

(E) OFFICE

124 B

(E) OFFICE

125 B

(E) OFFICE

128 B

(E) OFFICE

129 B

(E) OFFICE

104 B

(E) OFFICE

105 B

(E) RECEIVING

& SHIPPING

106 B

(E) DARK ROOM

109 B

(E) OFFICE

108 B

(E) OFFICE

110 B

(E) OFFICE

111 B

(E) INSTRUMENT

CALIBRATION

113 B

(E) INSTRUMENT

VAULT

114 B

(E) OFFICE

113 -1 B

(E) INSTRUMENT

DEV. LAB

115 B

(E) MEN'S RR

126 B

(E) WOMEN'S RR

127 B

(E) JANITOR

CLOSET

107 B

(E) TOILET

102 C(E) JAN.

CLOSET

103 C

(E) HALL

104 C

(E) STORAGE

101 C

(E) LOADING PLATFORM

(E) OFFICE

105 C

(E) OFFICE

108 C

(E) OFFICE

106 C

(E) OFFICE

107 C

E F

C

UP

(E) MECH EQUIP

001 B

(E) STORAGE

002 B

(E) ELEV

EQUIP

003 B

AREAWAY

64 532

1/8" = 1'-0"

BLDG NORTHTRUE NORTH'C' - Wing 1ST Floor

1/8" = 1'-0"

'B' WING - BASEMENT

1'-0" 4'-6"

12'-0"

3' -0

"6"

7"

TYP.

7"

TYP.

5' -0

O

PE

N

IN

G

W

PL

YW

O O

D A

CC

ES

S

D O

O R

SØ2'-6"CONC. PIPE7' DP

36'-3"

6'-11 2"

8' -9

3' -4

6' -4

'-1

0"

BLDG NORTHTRUE NORTH

PLS.1 B PLS.1 C GRT.2 A VFT.5 A VFT.5 B VFT.5 C VFT.5 D VFT.5 E VFT.4 A

CT.1 B

LC.1 B CB.2 A

CB.1 B

CB.1 A

LC.1 A

CT.1 A

GRT.1 A,B,C

VFT.1 A

VFT.2- A,B,C

VFT.1 C

VFT.1 B

VFT.4 B

VFT.3 B

VFT.3 C

VFT.4 C

TRNST.1 C

VFT.3 B

TRNST.1 B

PLS.1 A

CT.1 B

Asbestos Sample Location Drawing - 'C' Wing

CRT.1 A

CRT.1 B

CRT.1 C

DW.1 A

M.1 A,B,C

DW.1 B

VFT.1 A

VFT.2 A

DW.1 A

VFT.1 B

JT.1 A,B,C

M.3 A,B,C

CRPTG.1

M.2 A,B,C

VSF.1 A,B,C

VFT.2 B

VFT.2 C

VFT.1 C

BM.1 A

BM.1 B

BM.1 C

VFT.4 D

VFT.4 E

Asbestos Bulk Sample Location

Note* Bulk Sample Locations Are Approximate Note* Sample Locations In RED Contain Detectable Amounts of Asbestos

APPENDIX B

ACBM, LBP & Mercury PCB Location Drawings

'C' WING - Location of Asbestos Containing Building Materials

LEGEND

105 C

106 C

101 C

102 C 104 C

White Asbestos Floor Tile (2x2) 30 SQFT

Cement Asbestos Board Ceiling 150 SQFT

Window Glazing & Caulking

38 LF 7 50 LF

DEF: Glazing is Windw to Frame DEF: Caulking is Frame to Building Component DEF: Joint Sealant is Building to Building

LOCATION OF LEAD BASED PAINT - C WING

LEGEND

105 C

106 C

101 C

102 C 104 C

Lead Based Coatings or Glazings

APPENDIX C

Documentation of Accreditation

APPENDIX D

XRF Performance characteristic sheet

APPENDIX E

XRF Data Summary Tables

Summary of XRF Field Data- Rocky Mountain Research Station- C Wing

Missoula, MT

Shot Pass Fail Standard Date Pb Pb +/- Side Quadrant ComponentSubstrate Color ConditionNotes Time

NIST STD Pass 19-Nov-15 1 0.01 NIST Standard - Red SRM 2573

NIST- STND

CAL 10:33:49

2 Negative 24-Nov-15 0 0 South Middle Wall Plaster White Intact

Fire Lab Sec C-

01 Rm-106 walls 14:44:07

3 Negative 24-Nov-15 0 0 West Middle Wall Plaster White Intact

Fire Lab Sec C-

01 Rm-106 walls 14:45:21

4 Negative 24-Nov-15 0 0 North Middle Wall Plaster White Intact

Fire Lab Sec C-

01 Rm-106 walls 14:46:16

5 Negative 24-Nov-15 0 0 East Middle Wall Plaster White Intact

Fire Lab Sec C-

01 Rm-106 walls 14:47:04

6 Negative 24-Nov-15 0 0 North Middle Wall Drywall White Intact

Fire Lab Sec C-

01 105 walls 14:49:55

7 Negative 24-Nov-15 0 0 East Middle Wall Drywall White Intact

Fire Lab Sec C-

01 105 walls 14:51:04

8 Negative 24-Nov-15 0 0 West Middle Wall Drywall White Intact

Fire Lab Sec C-

01 105 walls 14:51:51

9 Negative 24-Nov-15 0 0 South Middle Wall Drywall White Intact

Fire Lab Sec C-

01 105 walls 14:52:59

10 Negative 24-Nov-15 0 0 North Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 108 walls 14:54:46

11 Negative 24-Nov-15 0 0 West Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 106 walls 14:55:48

12 Negative 24-Nov-15 0 0 East Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 108 walls 14:56:25

13 Negative 24-Nov-15 0 0 South Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 108 walls 14:57:10

14 Negative 24-Nov-15 0 0 South Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 107 walls 14:58:20

15 Negative 24-Nov-15 0 0 West Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 107 walls 14:58:59

16 Negative 24-Nov-15 0 0 North Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rm 107 walls 14:59:30

17 Negative 24-Nov-15 0 0 North Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rest

Room walls 15:02:10

18 Negative 24-Nov-15 0 0 South Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rest

Room walls 15:03:06

19 Negative 24-Nov-15 0 0 West Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rest

Room walls 15:04:14

20 Negative 24-Nov-15 0.06 0.07 North Middle Wall Drywall White Intact

Fire Lab Sec C-

01 Rest

Room stall door 15:05:04

21 Negative 24-Nov-15 0.02 0.03 North Middle Wall Metal Green Intact

Fire Lab Sec C-

01 Rest

Room stall door 15:05:38

22 Positive 24-Nov-15 5 0.37 North Middle Wall ceramic White Intact

Fire Lab Sec C-

01 Rest

Room sink 15:06:22

23 Positive 24-Nov-15 5 0.34 North Middle Wall Ceramic White Intact

Fire Lab Sec C-

01 Rest

Room sink 15:07:28

24 Negative 24-Nov-15 0 0 North Middle Wall Plastic White Intact

Fire Lab Sec C-

01 Rest

Room shower wall 15:08:39

25 Negative 24-Nov-15 0.1 0.02 East Middle Door Metal White Intact

Fire Lab Sec C-

01 Rest

Room door 15:09:44

26 Negative 24-Nov-15 0.15 0.02 North Middle Door Metal White Intact

Fire Lab Sec C-

01 Rest

Room closet door 15:10:37

27 Insufficient Test Time 24-Nov-15 0.12 0.03 North Middle Door Metal White Intact

Fire Lab Sec C-

01 Rest

Room closet door 15:11:39

28 Negative 24-Nov-15 0.12 0.02 North Middle Furnace Metal Grey Intact

Fire Lab Sec C-

01 Rm 101 furnace 15:11:50

29 Negative 24-Nov-15 0 0 North Middle Floor Vinyl White Intact

Fire Lab Sec C-

01 Rm 105 C 15:39:34

30 Insufficient Test Time 24-Nov-15 0.29 0.36 East Middle Cabinet CasingMetal Grey Intact

Fire Lab Sec C-

01 Rm 106 C

Cabinet 15:43:25

31 Negative 24-Nov-15 0.06 0.02 East Middle Furnace Metal Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 15:54:19

32 Negative 24-Nov-15 0 0 East Middle Furnace Vinyl Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 16:09:10

33 Insufficient Test Time 24-Nov-15 0.11 0.17 East Middle Furnace Plaster Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 16:12:37

35 Insufficient Test Time 24-Nov-15 0.09 0.03 East Middle Furnace Plaster Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 16:15:54

36 Negative 24-Nov-15 0.08 0.03 East Middle Furnace Plaster Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 16:16:17

1 PASS 25-Nov-15 8:32:41

NIST STD Pass 25-Nov-15 1 0.01 NIST Standard - Red SRM 2573

NIST- STND

CAL 8:33:49

2 Negative 25-Nov-15 0 0 East Middle Furnace Wood Off WhiteIntact

Fire Lab Sec B-

01 tree stand 8:34:34

3 Negative 25-Nov-15 0 0 East Middle Furnace Ceramic Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 8:50:16

4 Negative 25-Nov-15 0 0.01 East Middle Furnace Ceramic Off WhiteIntact

Fire Lab Sec C-

01 hallway base furnace 8:51:04

5 Negative 25-Nov-15 0 0 East Middle Furnace Plastic Off WhiteIntact

Fire Lab Sec C-

01 ceiling tile 8:53:47

20 Negative 25-Nov-15 0 0 North Middle Floor Concrete Off WhiteIntact

Fire Lab Sec C-

01 Rm 106-C 9:23:18

21 Negative 25-Nov-15 0.12 0.16 North Middle Cabinet Metal Beige Intact

Fire Lab Sec C-

01 Rm 106-C 9:24:28

22 Negative 25-Nov-15 0.28 0.04 North Middle Door Metal Beige Intact

Fire Lab Sec C-

01 Rm 107-C 9:41:22

23 Negative 25-Nov-15 0 0 North Middle Window Metal Beige Intact

Fire Lab Sec C-

01 Rm 107-C window on door 9:41:48

24 Negative 25-Nov-15 0.26 0.04 North Middle Door Metal Beige Intact

Fire Lab Sec C-

01 Rm 106-C 9:42:20

25 Negative 25-Nov-15 0.02 0.01 North Middle Electric PanelMetal Beige Intact

Fire Lab Sec C-

01 Hallway

104-C electrical panel 9:46:46

26 Insufficient Test Time 25-Nov-15 0.06 0.04 North Middle Door Metal White Intact

Fire Lab Sec C-

01 Hallway

104-C Door 9:47:44

27 Negative 25-Nov-15 0.24 0.05 North Middle Door Metal White Intact

Fire Lab Sec C-

01 Hallway

104-C Door trim 9:49:55

28 Negative 25-Nov-15 0.02 0.01 North Middle Door Metal Beige Intact

Fire Lab Sec C-

01 Rm 106-C

Door trim 9:52:21

Indicats that the lead concentration of the HA is below the HUD definition of LBP

(1.00 mg/cm^2). It is important to note that if this material is disturbed during the renovation process potential lead containing dust may be created.

Indicats the surface coating was determined to be greater than or equal to the HUD definition of LBP (1.00 mg/cm^2). Therefore this material is considered LBP. If planned renovation activities disturb the material then potential lead dust exposure may occur.

Therefore the material must be handled according to OSHA regulations.

APPENDIX F

Analytical Reports

SanAir Technologies LaboratorySanAir Technologies Laboratory

Analysis Report prepared for

Abatement Contractors of Montana, LLC

Report Date: 12/24/2015 Project Name: RMRS Project #: IH 15-101 SanAir ID#: 15040498

804.897.1177 www.sanair.com804.897.1177 www.sanair.com

SanAir Technologies Laboratory, Inc.

1551 Oakbridge Drive, Suite B, Powhatan, VA 23139

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

December 24, 2015

SanAir ID # 15040498 Project Name: RMRS Project Number: IH 15-101

Dear Christopher Casas, We at SanAir would like to thank you for the work you recently submitted. The 8 sample(s) were received on Wednesday, December 23, 2015 via FedEx. The final report(s) is enclosed for the following sample(s): M.3, M.4, FH.1, FH.2.

These results only pertain to this job and should not be used in the interpretation of any other job.

This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information sample conditions:

8 sample(s) in Good condition

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Name:

Address:

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

Project Number:

P.O. Number:

Project Name:

IH 15-101

RMRS A Wing- B Wing -CWing micelanous samples

Collected Date:

Received Date:

Report Date:

Analyst:

12/3/2015

12/23/2015 12:45:00 PM

12/24/2015 11:48:27 AM

Toth, Elizabeth

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components Asbestos

SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.3 / 15040498-001 Beige 100% Other None Detected Mastic Behind Styrofoam/ C-01 A Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.4 / 15040498-002 Tan 98% Other 2% Chrysotile Mastic Behind FG Insul./ A-03 A Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers FH.1 / 15040498-003 White 100% Other None Detected Fume Hood Material/ B-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers FH.2 / 15040498-004 Grey 40% Glass 50% Other None Detected Fume Hood Material/ B-01 Fibrous 10% Cellulose

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.3 / 15040498-005 Beige 100% Other None Detected Mastic behind Styrofoam/ C-01 B Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.3 / 15040498-006 Beige 100% Other None Detected Mastic behind Styrofoam/ C-01 C Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.4 / 15040498-007 Tan 100% Other < 1% Chrysotile Mastic Behind FG Insul./ A-03 B Non-Fibrous

Homogeneous

15040498 SanAir ID Number

FINAL REPORT

Certification

Analyst: Approved Signatory:

Analysis Date: 12/24/2015 Date: 12/24/2015 Page 1 of 2

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Name:

Address:

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

Project Number:

P.O. Number:

Project Name:

IH 15-101

RMRS

Collected Date:

Received Date:

Report Date:

Analyst:

12/3/2015

12/23/2015 12:45:00 PM

12/24/2015 11:48:27 AM

Toth, Elizabeth

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components Asbestos

SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.4 / 15040498-008 Tan 98% Other 2% Chrysotile Mastic Behind FG Insul./ A-03 C Non-Fibrous

Homogeneous

15040498 SanAir ID Number

FINAL REPORT

Certification

Analysis Date: 12/24/2015 Date: 12/24/2015 Page 2 of 2

Disclaimer

The final report cannot be reproduced, except in full, without written authorization from SanAir.

Fibers smaller than 5 microns cannot be seen with this method due to scope limitations. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample and information provided by the client. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government.

For NY state samples, method EPA 600/M4-82-020 is performed.

Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing.

NY ELAP lab ID 11983 prepared for

Abatement Contractors of Montana, LLC

Report Date: 12/10/2015 Project Name: Rocky Mnt Stn - C-01 Project #: IH 15-101 SanAir ID#: 15038709

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

December 10, 2015

SanAir ID # 15038709 Project Name: Rocky Mnt Stn - C-01 Project Number: IH 15-101

Dear Christopher Casas, We at SanAir would like to thank you for the work you recently submitted. The 1 sample(s) were received on Wednesday, December 09, 2015 via FedEx. The final report(s) is enclosed for the following sample(s): CRPTG.1A.

These results only pertain to this job and should not be used in the interpretation of any other job.

This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information

1 sample(s) in Good condition

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Name:

Address:

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

Project Number:

P.O. Number:

Project Name:

IH 15-101

Rocky Mnt Stn - C-01

Collected Date:

Received Date:

Report Date:

Analyst:

12/8/2015

12/9/2015 11:25:00 AM

12/10/2015 10:06:42 AM

Toth, Elizabeth

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components Asbestos

SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers CRPTG.1A / 15038709-001 Brown 3% Cellulose 97% Other None Detected Carpet Glue/C-01 Flooring Non-Fibrous

Homogeneous

15038709 SanAir ID Number

FINAL REPORT

Certification

Analysis Date: 12/10/2015 Date: 12/10/2015 Page 1 of 1 accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample and information provided by the client. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government.

For NY state samples, method EPA 600/M4-82-020 is performed.

Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or prepared for

Abatement Contractors of Montana, LLC

Report Date: 12/1/2015 Project Name: Rocky Mnt Station C-01 Project #: IH 15-101 SanAir ID#: 15037566

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

December 1, 2015

SanAir ID # 15037566 Project Name: Rocky Mnt Station C-01 Project Number: IH 15-101

Dear Christopher Casas, We at SanAir would like to thank you for the work you recently submitted. The 21 sample(s) were received on Monday, November 30, 2015 via FedEx. The final report(s) is enclosed for the following sample(s): DW.1A, DW.1B, DW.1C, M.2A, M.2B, M.2C, JT.1A, JT.1B, JT.1C, VFT.1, VFT.B, VFT.C, M.1A, M.1B, M.1C, VSF.1A, VSF.1B, VSF.1C, VFT.2A, VFT.2B, VFT.2C.

These results only pertain to this job and should not be used in the interpretation of any other job.

This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information

21 sample(s) in Good condition

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Name:

Address:

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

Project Number:

P.O. Number:

Project Name:

IH 15-101

Rocky Mnt Station C-01

Collected Date:

Received Date:

Report Date:

Analyst:

11/24/2015

11/30/2015 8:30:00 AM

12/1/2015 2:44:53 PM

Fleming, Christopher

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components Asbestos

SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers DW.1A / 15037566-001 Off-White 100% Other None Detected Drywall System/C-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers DW.1B / 15037566-002 Off-White 100% Other None Detected Drywall System/C-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers DW.1C / 15037566-003 Off-White 100% Other None Detected Drywall System/C-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.2A / 15037566-004 Yellow 100% Other None Detected Mastic/C-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.2B / 15037566-005 Yellow 100% Other None Detected Mastic/C-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers M.2C / 15037566-006 Yellow 100% Other None Detected Mastic/C-01 Non-Fibrous

Homogeneous

Stereoscopic Components Asbestos SanAir ID / Description Appearance % Fibrous % Non-Fibrous Fibers JT.1A / 15037566-007 White 70% Cellulose 30% Other None Detected Joint Cloth/C-01 Fibrous

Heterogeneous

15037566 SanAir ID Number

FINAL REPORT

Certification

Analysis Date: 12/1/2015 Date: 12/1/2015 Page 1 of 4

804.897.1177 Toll Free: 888.895.1177 Fax: 804.897.0070

Web: http://www.sanair.com E-mail: iaq@sanair.com

Name:

Address:

Abatement Contractors of Montana, LLC PO Box 8747 Missoula, MT 59807

Project Number:

P.O. Number:

Project Name:

IH 15-101

Rocky Mnt Station C-01

Collected Date:

Received Date:

Report Date:

Analyst:

11/24/2015

11/30/2015 8:30:00 AM

12/1/2015 2:44:53 PM

Fleming, Christopher

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components Asbestos