Attachment_7_-_Drawings-M0.1-M9.7.pdf
PDF 4 MB Posted
- Attached to
- Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
- Solicitation number
- AG-82FT-S-16-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82FT-S-16-0015AME000007.pdf | ||
| AG-82FT-S-16-0015AME000006.pdf | ||
| AG-82FT-S-16-0015AME000005.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| AG-82FT-S-16-0015AME000003.pdf | ||
| AG-82FT-S-16-0015AME000002.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| Attachment_12_-_AsbestosLeadHazMaterial-_C_Wing.pdf | ||
| Attachment_13_-_Wage_Determination.pdf | ||
| Attachment_6_-_Drawings-S0.1-S2.0.pdf | ||
| Attachment_9_-_Drawings-E0.1-E9.8.pdf | ||
| Attachment_2_-_Volume_2_Divisions_22-26.pdf | ||
| Attachment_1_-_Volume_1_Divisions_0-22.pdf | ||
| Attachment_5_-_Drawings-A2.0-A9.1.pdf | ||
| Attachment_8_-_Drawings-P0.1-P9.1.pdf | ||
| Attachment_10_-_AsbestosLeadHazMaterial-_A_Wing.pdf | ||
| Attachment_11_-_AsbestosLeadHazMaterial-_B_Wing.pdf | ||
| Attachment_4_-_Drawings-Arch_AD2.0-AD5.2.pdf | ||
| Attachment_3_-_Drawings-COVER.pdf | ||
| Solicitation_AG-82FT-S-16-0015.doc.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
38110 PE
POTCHAK
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
T
C
H
D S
V
T
H
18x12
16 �
X
XX-X
TEMPERATURE SENSOR
CARBON DIOXIDE SENSOR
HUMIDITY SENSOR
WALL SWITCH
SP STATIC PRESSURE SENSOR
DUCT SMOKE DETECTOR
VELOCITY SENSOR
THERMOSTAT
HUMIDISTAT
DIFFERENTIAL PRESSURE SENSOR
HVAC CONTROLS LEGEND
AUTOMATIC AIR VENT
MANUAL AIR VENT
AUTOFLOW VALVE
BACKFLOW PREVENTER
BALL VALVE
BUTTERFLY VALVE
CALIBRATED BALANCING VALVE
CHECK VALVE
COMBINATION FLOW CONTROL
VALVE
COMBINATION STRAINER VALVE
SHUT-OFF VALVE
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
HOSE END DRAIN
FLEXIBLE CONNECTOR
FLOW METERING STATION
FLOW SWITCH
GATE VALVE
MULTI-PURPOSE VALVE
PIPE WELL- EMPTY
PRESSURE GAUGE AND COCK
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE SENSOR
PRESSURE SWITCH
PRESSURE/TEMPERATURE PORT
SOLENOID VALVE
STRAINER
STRAINER W/ BLOWOUT
TEMPERATURE SENSOR
THERMOMETER
DRAIN VALVE W/ HOSE THREAD END
CONNECTION
AUTOFLOW VALVE OR MANUAL
BALANCING VALVE
HVAC PIPING SPECIALTIES LEGEND
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
REFRIGERANT LIQUID, SUCTION, & HOT GAS
BYPASS
STEAM- LOW PRESSURE OR ATMOSPHERIC
CONDENSATE
HVAC PIPING SYSTEMS LEGEND
RECTANGULAR DUCTWORK
ROUND DUCTWORK
AIR TERMINAL MARK, CFM, &
NECK SIZE
CEILING SUPPLY DIFFUSER
CEILING RETURN GRILLE
CEILING EXHAUST GRILLE
CEILING SLOT DIFFUSER
FLOOR REGISTER
SIDEWALL DIFFUSER OR GRILLE
VERTICAL TRANSITION-
RECTANGULAR SUPPLY DUCT
VERTICAL TRANSITION-
ROUND SUPPLY DUCT
VERTICAL TRANSITION-
RECTANGULAR RETURN DUCT
VERTICAL TRANSITION-
ROUND RETURN DUCT
VERTICAL TRANSITION-
RECTANGULAR EXHAUST DUCT
VERTICAL TRANSITION-
ROUND EXHAUST DUCT
TURNING VANE
MANUAL VOLUME DAMPER
REMOTE VOLUME DAMPER
MOTORIZED DAMPER
ZONE DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
CFM NECK
HVAC LEGEND
TEMP. CONTROL GEN'L NOTES
A. THIS PROJECT WILL INCLUDE THE INSTALLATION OF A BUILDING MANAGEMENT
SYSTEM (BMS). SEE SPECIFICATION SECTIONS 230900 "INSTRUMENTATION AND
CONTROL FOR HVAC", 230993 "SEQUENCE OF OPERATIONS FOR HVAC
CONTROLS" FOR ADDITIONAL INFORMATION.
B. IT SHALL BE THE RESPONSIBILITY OF THE TEMPERATURE CONTROLS
CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND
SOFTWARE NOT SPECIFICALLY REFERRED TO ON THE PLANS OR IN THE
SPECIFICATION TO ACHIEVE THE SEQUENCE OF OPERATIONS DESCRIBED IN
SPECIFICATION SECTION 230993 "SEQUENCE OF OPERATIONS FOR HVAC
CONTROLS".
C. THE GENERAL CONTRACTOR, MECHANICAL CONTRACTORS, AND ELECTRICAL
CONTRACTOR, SHALL PROVIDE ALL LABOR AND INCIDENTAL MATERIALS
REQUIRED TO COORDINATE THE INSTALLATION OF THE BMS.
D. THE TEMPERRATURE CONTROLS CONTRACTOR SHALL HAVE LOCAL
REPRESENTATION, AND SHALL PROVIDE SERVICES TO SET UP THE CONTROL
INTERFACE TO THE SATISFACTION OF THE CONTRACTING OFFICER, AND SHALL
PROVIDE TRAINING TO THE USERS OF THE EQUIPMENT. THE TEMPERATURE
CONTROL CONTRACTOR SHALL PROVIDE UP TO FIVE DAYS OF THESE
SERVICES AFTER THE DATE OF SUBSTANTIAL COMPLETION, EACH SESSION
LASTING UP TO EIGHT HOURS.
E. T.C. CONTRACTOR SHALL COORDINATE THE LOCATIONS AND MOUNTING
HEIGHTS OF ALL SENSORS WITH THE C.O.
PROJECT SPECIFICATIONS
A. ALL WORK ON THE PROJECT SHALL CONFORM TO ALL LOCAL, STATE AND
NATIONAL CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE
N.F.P.A., N.E.C., U.B.C., I.E.C.C., I.M.C., U.P.C., THE LOCAL UTILITY COMPANIES
AND THE AUTHORITY HAVING JURISDICTION.
B. THE WORK ON THIS PROJECT SHALL CONSIST OF ALL ITEMS, ARTICLES,
MATERIALS, EQUIPMENT, AND LABOR FURNISHED TOGETHER ALONG WITH ALL
INCIDENTAL ITEMS REQUIRED BY GOOD PRACTICE AND WORKMANSHIP TO
PROVIDE A SATISFACTORY, COMPLETE AND FUNCTIONAL SYSTEM IN
ACCORDANCE WITH THE DRAWINGS AT NO ADDITIONAL COST TO THE OWNER.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL FEES AND
PERMITS REQUIRED FOR WORK UNDER THIS CONTRACT AND UNDER THE
CONTRACTOR'S SUPERVISION BY SUBCONTRACT.
D. MANUFACTURER'S TRADE NAMES AND CATALOG NUMBERS ARE LISTED TO
INDICATE SPECIAL CONDITIONS AND QUALITY OF MATERIALS OR EQUIPMENT
SUPPLIED. ALTERNATIVE EQUIPMENT OR MATERIALS MAY BE SUBMITTED FOR
REVIEW AND APPROVAL DURING THE SUBMITTAL PROCESS.
E. ALL WORK BY THE CONTRACTOR IS SUBJECT TO REVIEW AT ANY TIME BY THE
CONTRACTING OFFICER.
F. ALL WORK TO BE PERFORMED SHALL FIRST BE SCHEDULED AND SUBMITTED TO
THE CONTRACTING OFFICER'S REPRESENTATIVE FOR ACCEPTANCE.
G. SMOKING SHALL NOT BE PERMITTED ANYWHERE IN THIS FACILITY.
H. THE CONTRACTOR SHALL BE CAREFUL NOT TO BLOCK ANY PATHS OF EGRESS
WHILE PERFORMING THE WORK SPECIFIED.
I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ALL MATERIALS
RESULTING FROM THE WORK. CLEANUP SHALL BE PERFORMED TO THE LEVEL
OF ACCEPTANCE OF THE C.O.'S REPRESENTATIVE.
J. THE CONTRACTOR SHALL AND HEREBY DOES WARRANT AND GUARANTEE THAT
ALL WORK EXECUTED UNDER THIS CONTRACT SHALL BE FREE OF DEFECTS OF
MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE
OF SUBSTANTIAL COMPLETION.
K. SUBMIT ALL SHOP DRAWINGS FOR ALL EQUIPMENT ASSOCIATED WITH THIS
PROJECT TO THE CONTRACTING OFFICER FOR REVIEW & APPROVAL PRIOR TO
ORDERING ANY EQUIPMENT. ALL MATERIALS AND OR EQUIPMENT SHALL BE NEW
UNLESS STATED OTHERWISE IN THE DESIGN DOCUMENTS.
L. UPON SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL SUBMIT AN
OPERATIONS & MAINTENANCE (O&M) MANUAL OF ALL EQUIPMENT TO THE C.O.
FOR REVIEW & APPROVAL. AFTER RECEIVING APPROVAL FROM, PROVIDE TWO
COPIES TO THE CONTRACTING OFFICER. PROVIDE THE NECESSARY TRAINING
TO THE FACILITIES PERSONNEL REGARDING ALL EQUIPMENT ASSOCIATED WITH
THIS PROJECT.
M. ALL EQUIPMENT & MATERIALS PROVIDED SHALL MEET THE BUY AMERICAN ACT.
HVAC GENERAL NOTES
A. ALL NEW PIPING, DUCTWORK, EQUIPMENT AND INSULATION SHALL BE
INSTALLED IN ACCORDANCE WITH THE 2012 REQUIREMENTS OF THE
INTERNATIONAL MECHANICAL CODE, THE INTERNATIONAL ENERGY
CONSERVATION CODE, AND THE INTERNATIONAL BUILDING CODE.
B. LOCATIONS AND DIMENSIONS OF EXISTING COMPONENTS IDENTIFIED ON THIS
DRAWING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE
INFORMATION AT THE TIME OF DESIGN. VERIFY ACTUAL LOCATIONS AND
DIMENSIONS OF EXISTING COMPONENTS IN THE FIELD PRIOR TO ORDERING
NEW EQUIPMENT AND THROUGHOUT THE EXECUTION OF THE WORK FOR
COORDINATION PURPOSES. PROVIDE ALL DEMOLITION WORK, NECESSARY
FITTINGS, OFFSETS AND TRANSITIONS, AND OTHER COMPONENTS AS REQUIRED
FOR A COMPLETE AND FUNCTIONAL INSTALLATION OF NEW SYSTEMS AT NO
ADDITIONAL COST TO THE C.O.
C. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW
EXACT LOCATIONS AND SIZES OF ALL EXISTING DUCTWORK, PIPING, SYSTEMS
AND EQUIPMENT UNLESS SPECIFICALLY DIMENSIONED. THE CONTRACTOR IS
RESPONSIBLE FOR VERIFICATION OF ACTUAL CONDITIONS AND LOCATIONS IN
THE FIELD, AND TO MAKE ADJUSTMENTS ACCORDINGLY. SEEK THE C.O.'S
APPROVAL PRIOR TO MAKING ANY ADJUSTMENTS THAT MAY AFFECT THE
ORIGINAL DESIGN INTENT OR SPECIFIED PERFORMANCE.
D. IT IS NOT THE INTENT OF THESE DRAWINGS TO GRAPHICALLY REPRESENT ALL
OF THE WORK REQUIRED FOR A COMPLETE INSTALLATION IN EVERY RESPECT.
THE PURPOSE OF THESE PLANS IS TO INDICATE THE INTENDED SIZES,
APPROXIMATE LOCATION AND ROUTING OF MAJOR COMPONENTS.
E. EXAMINE AND REFER TO ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL,
MECHANICAL, PLUMBING, FIRE PROTECTION AND SITE / CIVIL DRAWINGS FOR
CONSTRUCTION CONDITIONS WHICH MAY AFFECT THE CONTRACTOR'S WORK.
INSPECT THE EXISTING FACILITIES FOR VERIFICATION OF EXISTING CONDITIONS
AND SYSTEMS WHICH MAY HAVE AN EFFECT ON WORK PRIOR TO SUBMISSION
OF BID.
F. IT IS ABSOLUTELY NECESSARY TO COORDINATE WITH ALL TRADES INVOLVED TO
ELIMINATE CONFLICTS IN LOCATION OF DUCTS, PIPES, CONDUITS, DIFFUSERS,
SENSORS AND ALL OTHER EQUIPMENT THROUGHOUT THIS PROJECT BEFORE
FINAL PLACEMENT OF MATERIALS. REFER TO ARCHITECTURAL, STRUCTURAL,
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS AND FIRE PROTECTION
SHOP DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR COORDINATION.
G. THE CONTRACTOR IS TO PROVIDE MATERIALS, LABOR, TRANSPORTATION,
TOOLS, PERMITS, FEES, INSPECTIONS, UTILITIES AND INCIDENTALS NECESSARY
FOR THE COMPLETE INSTALLATION OF THE WORK INDICATED AND DESCRIBED
IN THESE CONTRACT DOCUMENTS.
H. THE CONTRACTOR SHALL PROVIDE ANY ADDITIONAL DETAILS INCLUDING
MATERIALS OR SPECIAL CONSTRUCTION REQUIRED IN ORDER TO COMPLETE
THE PROPER INSTALLATION OF THE SPECIFIED SYSTEMS & EQUIPMENT.
I. ALL EQUIPMENT SHALL BE INSTALLED LEVEL, PLUMB, AND FIRMLY ANCHORED IN
LOCATIONS INDICATED. OBSERVE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND RECOGNIZED INDUSTRY PRACTICES TO ENSURE THAT
PRODUCTS SERVE THEIR INTENDED FUNCTION.
J. FOLLOW THE MANUFACTURE'S WRITTEN INSTALLATION INSTRUCTIONS FOR
ROUTING COMBUSTION AIR AND FLUE PIPING, INCLUDING FOR SEPARATE
TERMINATION THROUGH THE WALL OR ROOF. FOLLOW ALL SAFETY
INSTRUCTIONS.
K. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT, PIPING, AND DUCTWORK AS
REQUIRED BY LOCAL CODES. SEE SPECIFICATION SECTION 230548 FOR MORE
INFORMATION.
L. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL FIRE AND/OR
SMOKE BARRIERS, PARTITIONS, & WALLS, SUCH AS BETWEEN THE A & B WING,
AND ANY OTHER FIRE / SMOKE SEPARATION WITHIN THE BUILDING, AS DEFINED
BY THE ARCHITECTURAL CODE PLAN WITH A UL LISTED FIRE AND/OR SMOKE
STOP SYSTEM.
M. ALL MATERIAL IN A PLENUM RATED SPACE SHALL HAVE A FLAME SPREAD NOT
EXCEEDING 25 AND A SMOKE DEVELOPMENT RATING NOT EXCEEDING 50.
N. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF EQUIPMENT,
VALVES, DAMPERS, AND DEVICES INSTALLED ABOVE NON-REMOVABLE CEILINGS.
O. ALL ELEMENTS PENETRATING BUILDING ENVELOPE COMPONENTS SUCH AS
ROOF AND WALL ASSEMBLIES SHALL BE SEALED WEATHER AND WATER TIGHT.
P. ALL NEW PIPING SHALL BE IDENTIFIED WITH SETON SETMARK PIPE MARKERS,
LETTERED TO MATCH EXISTING AND MARKED AT A MAXIMUM OF EVERY 25 FT.
ALL NEW VALVES SHALL BE IDENTIFIED WITH BRASS OR ALUMINUM VALVE TAGS.
Q. PROVIDE PIPE GUIDES, ANCHORS, EXPANSION JOINTS, AND HANGERS PER
MANUFACTURER'S RECOMMENDATIONS.
R. ALL PIPING WALL PENETRATIONS SHALL HAVE A CHROME ESCUTCHEON PLATE.
ALL SOLDER TO BE LEAD-FREE TYPE.
S. VERIFY THE LOCATION OF ALL THERMOSTATS, HUMIDITSTATS, AND SENSORS
WITH THE CONTRACTING OFFICER PRIOR TO INSTALLATION. INSTALL
THERMOSTATS & HUMIDISTATS PER ADA REQUIREMENTS.
T. U.N.O., ALL DUCT WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
LATEST REQUIREMENTS OF SMACNA DUCT WORK CONSTRUCTION MANUALS,
MINIMUM GAUGE OF 24, GALVANIZED STEEL. DUCTWORK SHALL BE AIRTIGHT
(5% LEAKAGE). ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS SHALL BE
SEALED. FABRICATE ELBOWS WITH CENTERLINE RADIUS EQUAL TO 1.5 TIMES
THE DUCT WIDTH IN THE PLANE OF THE TURN; AND FABRICATE TO INCLUDE
FACTORY MANUFACTURED TURNING VANES IN ELBOWS WHERE SHORTER
RADIUS IS NECESSARY. SEE DUCT MATERIAL SCHEDULE & SPECS.
U. PROVIDE FLEX CONNECTIONS FROM ALL DUCT WORK TO EQUIPMENT
CONNECTIONS ON THIS PROJECT. FLEXIBLE DUCT SHALL NOT BE USED IN PLACE
OF ELBOWS.
V. THE MECHANICAL CONTRACTOR SHALL PROVIDE THE OWNER'S
REPRESENTATIVE WITH UP TO 16 HOURS OF TRAINING TO ENSURE PROPER
OPERATION AND MAINTENANCE OF THE SYSTEMS. REFER TO DIV. 1
SPECIFICATIONS
W. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN
THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF
HOLES TO THE SATISFACTION OF THE CONTRACTING OFFICER.
X. PROVIDE INSULATED MOUNTING SPACERS FOR ALL TEMPERATURE & HUMIDITY
SENSORS AND T-STATS & H-STATS MOUNTED ON EXTERIOR WALLS.
COMMISSIONING GEN'L NOTES
A. A THIRD-PARTY COMMISSIONING AGENT (CxA) SHALL BE HIRED BY THE
CONTRACTING OFFICER FOR THIS PROJECT. AS PART OF THIS CONTRACT, THE
MECHANICAL CONTRACTOR & T & B CONTRACTOR SHALL ABIDE BY ALL
REQUESTS MADE BY THE COMMISSIONING AGENT TO ACHIEVE THE SPECIFIED
CONTROL POINTS AND SEQUENCE OF OPERATIONS WITH NO ADDITIONAL
CHARGES TO THE OWNER. THE MECHANICAL CONTRACTOR SHALL OBTAIN
APPROVAL FROM THE C.O. PRIOR TO ANY MODIFICATIONS, ALTERATIONS OR
CHANGES TO ANY MECHANICAL OR ELECTRICAL SYSTEM.
HVAC DEMO GENERAL NOTES
A. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH PORTIONS OF THE EXISTING
MECHANICAL SYSTEMS. ALL UTILITY OUTAGES MUST BE SUBMITTED FOR
APPROVAL TO THE CONTRACTING OFFICER WITHIN 14 DAYS OF THE NOTICE TO
PROCEED.
B. U.N.O. ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, & PIPING SHOWN AS
HATCHED AND NOTED FOR DEMOLITION SHALL BE DEMOLISHED. EXISTING
MECHANICAL EQUIPMENT SHOWN UNHATCHED AND NOT NOTED FOR
DEMOLITION IS TO REMAIN UNCHANGED.
C. PRESENT ALL DEMOLISHED EQUIPMENT TO THE CONTRACTING OFFICER FOR
SALVAGE. REMOVE ANY UNWANTED EQUIPMENT FROM SITE.
D. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN
THESE DOCUMENTS.
E. COORDINATE WITH THE GENERAL CONTRACTOR TO PATCH AND REPAIR THE
FLOORS, ROOF AND WALLS ASSOCIATED WITH THE MECHANICAL DEMOLITION.
THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
F. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB'S. ANY
EQUIPMENT BEING REMOVED CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.
FREEZE PROTECTION NOTES
A. THE MECHANICAL CONTRACTOR SHALL FILL THE NEW HYDRONIC SYSTEMS
WITH THE FOLLOWING SOLUTION:
• NEW HEATING HOT WATER SYSTEM: 40% PROPYLENE GLYCOL & 60%
DISTILLED WATER - GLYCOL SHALL INCLUDE CORROSION INHIBITORS.
B. HEATING HOT WATER SYSTEMS WITH BOILERS THAT HAVE ALUMINUM HEAT
EXCHANGERS SHALL USE HERCULES CRYO-TEK 100 / AL PROPYLENE GLYCOL
OR APPROVED EQUAL PRODUCT.
C. SEE SPECIFICATION SECTION 232113 FOR ADDITIONAL CHEMICAL TREATMENT
REQUIREMENTS.
TEST AND BALANCE NOTES
A. A COMPLETE AIR AND WATER SYSTEM TEST AND BALANCE (T&B) SHALL BE
PERFORMED BY A NEBB OR AABC CERTIFIED T&B CONTRACTOR FOR ALL NEW
AND MODIFIED DEVICES & SYSTEMS. MECHANICAL CONTRACTOR SHALL MODIFY
EQUIPMENT AS DIRECTED BY THE T&B CONTRACTOR TO ACHIEVE DESIGN
PARAMETERS WITH NO EXTRA COST TO THE OWNER. A T&B REPORT SHALL BE
PREPARED AND SUBMITTED TO THE O.C. THE REPORT SHALL INCLUDE ALL AIR &
WATER FLOW READINGS, ALL TEMPERATURE AND PRESSURE SETPOINTS, AND
ALL ELECTRICAL CONDITIONS FOR ALL DEVICES. REPORT SHALL ALSO VERIFY
PROPER SEQUENCE OF OPERATION FOR THE ENTIRE CONTROL SYSTEM.
INSTALL ADDITIONAL MANUAL VOLUME DAMPERS AND BALANCING VALVES AS
REQUIRED.
B. SEE SPECIFICATION SECTION 230593 "TESTING, ADJUSTING, & BALANCING FOR
HVAC" FOR MORE INFORMATION.
GENERAL SYMBOLS LEGEND
SYMBOL DESCRIPTION
KEY NOTE SYMBOL
TERMINATION POINT OF DEMOLITION WORK
POINT OF CONNECTION TO EXISTING WORK
HATCH DENOTES EQUIPMENT OR DUCTWORK TO BE DEMOLISHED
EQUIPMENT TAG
SECTION
DETAIL
DP
ALTERNATE
NUMBER ALTERNATE DESCRIPTION ADD OR DEDUCT EQUIPMENT AFFECTED
1 EXPERIMENTAL COOLING ADD CU-A1
2 ABA RESTROOM ADD EF-A2, EM1
3 MZ AHU UPGRADE TO VAV ADD AHU-A2, CU-A2, CD-A13 THROUGH CD-A17
4 SMOKE EXHAUST STACK ADD SEF-A1
5 SMOKE ACCUMULATION EXHAUST ADD SEF-A2
6 VCT ABATEMENT ADD COORDINATE WITH G.C. & C.O.
7 LV TUNNEL DOOR MOTOR ACCESS ADD CONTROLS, LV TUNNEL OVERHEAD DOOR
8 DESTRATIFICATION FANS ADD DSF-A1 & A2, DSF-$
9 HEATER ALTERNATE ADD ECUH-B6 & B7, HWCH-B2
10 AIR CONDITIONING EQUIPMENT
SMOKE EXHAUST ADD SEF-A3, L-A4, CD-A11
11 (D) RECEIVING 101A CMU WALLS ADD COORDINATE WITH G.C. & C.O.
12 SUPPLY-TO-RELIEF BYPASS DAMPER ADD CD-A8
PROJECT ALTERNATE SCHEDULE
M
M
X X
X X
SECTION
DRAWING #
DETAIL
DRAWING #
MECHANICAL ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
AC ALTERNATING CURRENT (OR) AIR CONDITIONING
AHU AIR HANDLING UNIT
AI ANALOG INPUT
ADJ ADJUSTABLE
AO ANALOG OUTPUT
A.S. ATMOSPHERIC STEAM
AV AIR VENT OR ANALOG VALUE
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
B.D.D. BACKDRAFT DAMPER
BI BINARY INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY OUTPUT
BOD BASIS OF DESIGN
BTU/HR BRITISH THERMAL UNITS PER HOUR
BV BINARY VALUE
C COMMON
CD CONDENSATE DRAIN (OR ) CONTROL DAMPER
CFM CUBIC FEET PER MINUTE
C.O. CONTRACTING OFFICER
CxA COMMISSIONING AUTHORITY / AGENT
(D) DEMOLISH / DEMOLITION
DDC DIRECT DIGITAL CONTROL
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CUH CABINET UNIT HEATER
DSF DESTRATIFICATION FAN
(E) EXISTING
EA EXHAUST AIR / EACH
EAT ENTERING AIR TEMPERATURE
E.C. ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
EWH ELECTRIC WALL HEATER
EWT ENTERING WATER TEMPERATURE
(F) FUTURE
FPM FEET PER MINUTE
F.S. FAR SIDE
FTR FINNED TUBE RADIATION
G.C. GENERAL CONTRACTOR
H HUMIDITY
HGB HOT GAS BYPASS
HV HIGH VELOCITY
HW S/R HOT WATER SUPPLY/RETURN
HWP HOT WATER PUMP
IN INCHES
IN WG INCHES WATER GAUGE
LAT LEAVING AIR TEMPERATURE
LPS LOW PRESSURE STEAM
LV LOW VELOCITY
LWT LEAVING WATER TEMPERATURE
M.C. MECHANICAL CONTRACTOR
MBH THOUSANDS OF BTU/HR
MZ MULTI-ZONE
(N) NEW
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
N.S. NEAR SIDE
N.T.S. NOT TO SCALE
OA OUTDOOR AIR
O&M OPERATIONS & MAINTENANCE
P/E PNEUMATIC / ELECTRIC
PG PROPYLENE GLYCOL
PSIG POUNDS PER SQUARE INCH (GAUGE)
RA RETURN AIR
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
SA SUPPLY AIR
SAM STEAM ABSORPTION MANIFOLD
SEF SMOKE EXHAUST FAN
SG (ATMOSPHERIC) STEAM GENERATOR
T TEMPERATURE
T.C. TEMPERATURE CONTROL
T.B.D. TO BE DETERMINED
TSP TOTAL STATIC PRESSURE
T-STAT THERMOSTAT
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
UV UNIT VENTILATOR
V VELOCITY
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VUV VERTICAL UNIT VENTILATOR
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
M0.1
MECH NOTES & LEGENDS
JTW
DMP
DMP
JTW
Ø
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
AIR-COOLED CONDENSING UNIT SCHEDULE
MARK BASE BID OR ALTERNATE SERVES MANUFACTURER MODEL NUMBER CAPACITY
(MBH)
EER
REFRIGERANT SUCTION
TEMPERATURE COOLING STAGES CONDENSER
FANS
UNIT PHYSICAL DATA
ADDITIONAL
DETAILSAHRI DESIGN LENGTH TOP
(IN)
LENGTH BASE
(IN)
WIDTH
(IN)
HEIGHT
(IN)
WEIGHT
(LBS)
CU-A1 ALTERNATE 1 AHU-A1 AAON CNA-105 1,169 12.9 21 R-410A 40°F 2 VARIABLE SPEED 8 152 152 142 104 5,905 SEE BELOW
CU-A2 BASE BID OR ALT. 3 AHU-A2 AAON CFA-025 282.5 - 11.2 R-410A 44°F 1 VAR. + 1 ON/OFF 4 91 58.25 61.25 62 1,519 SEE BE LOW
CU-B1 BASE BID (E) B WING MZ
AHU AAON CFA-050 566.7 - 11.5 R-410A 44°F 1 VAR. + 1 ON/OFF 4 120 .5 104.5 82.25 68.5 2,547 SEE BELOW
ACCESSORIES (ALL UNITS U.N.O.):
1. TIME DELAY RELAY
2. EVAP. FREEZE T-STAT
3. CYCLE PROTECTOR
4. THERMOSTATIC EXP. VALVE (HARD SHUT OFF)
5. FILTER / DRYER
6. HIGH & LOW PRESSURE SWITCH.
7. LIQUID LINE SOLENOID VALVE.
8. SINGLE-POINT POWER CONNECTION W/ NON-FUSED
DISCONNECT.
9. CU-A1 ONLY: SUCTION PRESSURE TRANSDUCER ON
EACH REFRIGERANT SYSTEM.
LOW AMBIENT ACCESSORIES:
1. WINTER START CONTROL
2. CRANKCASE HEATER
3. START ASSIST CAPACITOR
4. LOW AMBIENT PRESSURE SWITCH
5. LOW AMBIENT CONTROLLER
CONTROLS:
1. CU-A1 (EXPERIMENTAL COOLING ALTERNATE): DDC CONTROLS.
2. CU-A2 (BASE BID): (E) PNEUMATIC CONTROL SYSTEM SHALL ENABLE COOLING SIGNAL
INPUT TO DDC. PROVIDE P/E SWITCH TO SEND LOW VOLTAGE ENABLE SIGNAL TO DDC AT 9
PSI PNEUMATIC PRESSURE. DDC SHALL OUTPUT CONTROL SIGNAL(S) TO STAGE AND
MODULATE COMPRESSORS AS REQUIRED.
3. CU-A2 (VAV AHU ALTERNATE): DDC CONTROLS.
4. CU-B1 (BASE BID): (E) PNEUMATIC CONTROL SYSTEM SHALL ENABLE COOLING SIGNAL
INPUT TO DDC. PROVIDE P/E SWITCH TO SEND LOW VOLTAGE ENABLE SIGNAL TO DDC AT 9
PSI PNEUMATIC PRESSURE. DDC SHALL OUTPUT CONTROL SIGNAL(S) TO STAGE AND
MODULATE COMPRESSORS AS REQUIRED.
5. SEE SPEC. SECTION 230993 "INSTRUMENTATION & CONTROL FOR HVAC," SEQUENCE OF
OPERATION, & DDC CONTROL POINTS LIST.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER ELEC.
DATA.
CUSTOM AIR HANDLING UNIT SCHEDULE
MARK MANUFACTURER
OPERATING
WEIGHT
(LBS)
FILTERS
SUPPLY FAN(S) DX COOLING COIL (R-410A) HOT WATER HEATING COIL ATMOSPHERIC STEAM HUMIDIFICATION
RETURN
FANTYPE
NO. OF
FANS
HP
(EACH) MAX CFM MIN CFM
TSP
(IN
WG)
ROWS
AIRFLOW
(CFM)
AIR ∆P
(IN WG)
VELOCITY
(FPM)
CAPACITY (MBH) ENTERING
AIR
LEAVING
AIR ALTERNATE
OUTDOOR
UNIT
ROWS MBH
WATERSIDE AIRSIDE
NO. OF
SAMs MATERIAL CFM LB/HR
WIDTH
(IN)
HEIGHT
(IN)
DEPTH
(IN)
ABSORPTION
DISTANCE
(IN)
HEADER INLET
DIAMETER
(IN)
AIR ∆P
(IN WG)
ENTERING
AIR
LEAVING
AIR
TYPE
AIR ∆P
(IN WG) TOTAL SENSIBLE
DB
(°F)
WB
(°F)
DB
(°F)
WB
(°F)
WORKING
FLUID GPM
∆P
(FT WC)
EWT
(°F)
LWT
(°F) CFM
∆P
(FT WG)
VELOCITY
(FPM)
EAT
(°F)
LAT
(°F)
DB
(°F) RH %
DB
(°F) RH %
AHU-A1 TEMTROL 23,931 2" MERV 8 0.63
PLENUM
ARRAY 4W x 3H 7.5 75,000 2,000 4.8 6
48,400 0.56 375.0 1,008.4 687 57.7 52.3 43.3 43.2
CU-A1 2
3,912 40%
PROPYLENE
GLYCOL
280 6.51 160 129.9
48,000 0.15 380 15 90
INSULATED
STAINLESS STEEL
48,400 999 168 103.5 9.5
9.8
0.05 90 4 90 20
NONE
75,000 0.79 500 963.9 963.9 93 64 79.2 59.5 4,600 75,000 0.29 589 15 71.8 75,000 1,175 - 0.15 71.8 7.2 71.8 28
ACCESSORIES:
1. RETURN DUCT SMOKE DETECTOR OMITTED.
2. PROVIDE SNAP-IN FILTER ACCESS FROM THE AIR INLET OF THE CABINET, A NEW FILTER SET AT THE COMPLETION OF CONSTRUCTION, AND (2) COMPLETE SETS
OF SPARE FILTERS.
3. PROVIDE INSULATED CABINET.
4. PROVIDE VIBRATION ISOLATION PER SPEC. SECTION 230548.
5. PROVIDE HSS6"X6"x5/16" STEEL FRAME (PERPENDICULAR) AT 2'-0" O.C. MAX. ANCHOR AT CORNERS TO EXISTING CONCRETE W/ 5/8" DIAMETER EPOXY BOLT W/
4"x4"x1/4"x0'-4" CLIP ANGLES. CONTRACTOR TO FULLY COORDINATE WITH STRUCTURAL ENGINEER OF RECORD, UNIT MANUFACTURER & VIBRATION & SEISMIC REQUIREMENTS DURING THE SHOP DRAWING PROCESS PRIOR TO FABRICATION. COORDINATE NEW PLATFORM TO MAINTAIN EXISTING PENETRATION
THROUGH FLOOR.
6. PROVIDE OUTWARD HINGED, GASKETED ACCESS DOOR, 2.5' W x 5' H IN INLET PLENUM IMMEDIATELY UPSTREAM OF UNIT FOR FILTER ACCESS, TYP. 2.
7. PROVIDE 6" STEEL TUBE CABINET BASE.
8. PROVIDE DRAIN PANS & CD CONNECTIONS FOR DX, HUMIDIFIER, & SA PLENUM SECTIONS.
9. PROVIDE INDIVIDUAL P-TRAPS FOR DX COIL DRAIN (2"), HUMIDIFIER SECTION DRAIN (2"), SUPPLY PLENUM DRAIN (2"), AND INDIVIDUAL SAMS (3/4"). SEE DETAILS.
FAN DATA:
1. PROVIDE INDIVIDUALLY CONTROLLED VFD FOR EACH SUPPLY FAN, TYP. 12.
2. B.O.D.: SIEMENS BT300 FS4 W/ H/O/A & DISCONNECT. BYPASS NOT
REQUIRED. TYP. 12.
HEATING DATA:
1. SCHEDULED PERFORMANCE IS BASED ON A WATER AND
PG MIXTURE OF 40%.
2. PROVIDE 3-WAY MODULATING CONTROL VALVE BY T.C.
CONTRACTOR. SEE 9/M9.2
ELECTRICAL DATA:
1. SEE MEP COORDINATION SCHEDULE FOR STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
2. PROVIDE 115 VOLT CONVENIENCE OUTLET. (FACTORY WIRED, ELEC. CONTR.
TO CONNECT)
3. PROVIDE VAPOR-PROOF 23W COMPACT FLR LIGHT IN ALL ACCESSIBLE
SECTIONS OF AHU. (FACTORY WIRED, ELEC. CONTR. TO CONNECT), TYP. 3.
CONTROLS DATA:
1. SEE SPEC. SECTION 230900 “INSTRUMENTATION AND CONTROL FOR HVAC”
FOR MORE INFORMATION.
2. PROVIDE TERMINAL STRIP FOR DIRECT CONNECTION TO DDC CONTROLS.
3. SEE SEQUENCE OF OPERATION SPEC. SECTION 230993, DIAGRAMS, &
CONTROL POINTS LIST.
COOLING DATA:
1. REFRIGERANT: R-410A
2. SEE CU-A1 SCHEDULE FOR CONDENSER.
3. PROVIDE STAINLESS STEEL DRAIN PAN.
4. TOP TWO COIL SECTIONS SHALL BE CIRCUITED
TOGETHER & BOTTOM TWO COIL SECTIONS SHALL BE
CIRCUITED TOGETHER.
5. SIZE & ROUTE REFRIGERANT PIPING PER
MANUFACTURER'S RECOMMENDATIONS.
ACCESSORIES:
1. RETURN DUCT SMOKE DETECTOR FURNISHED BY ELEC. CONTR., INSTALLED BY MECH. CONTR. AND WIRED BY ELEC. CONTR. SEE PLANS FOR LOCATION.
2. PROVIDE VIBRATION ISOLATION PER SPEC. SECTION 230548.
3. PROVIDE 4"X4"x5/16" STEEL FRAME W/ INTERMEDIATE MEMBERS WELDED TO FRAME (PERPENDICULAR) AT 2'-0" O.C. MAX. ANCHOR CORNERS TO EXISTING
CONCRETE W/ 5/8" DIAMETER EPOXY BOLT W/ 4"x4"x1/4"x0'-4" CLIP ANGLES. CONTRACTOR TO FULLY COORDINATE WITH STRUCTURAL ENGINEER OF RECORD, UNIT MANUFACTURER & VIBRATION & SEISMIC REQUIREMENTS DURING THE SHOP DRAWING PROCESS PRIOR TO FABRICATION.
4. PROVIDE NEW MERV 8 PRE-FILTERS AT COMPLETION OF CONSTRUCTION PLUS (1) COMPLETE SPARE SET.
5. PROVIDE MIN. R-13 INSULATED CABINET.
6. PROVIDE 1-1/2" CONDENSATE DRAIN W/ P-TRAP BY P.C. TERMINATE W/ AIR GAP AT NEW INDIRECT DRAIN.
CONTROLS:
1. SEE SPEC SECTION 230993 FOR SEQUENCE OF
OPERATION AND CONTROL POINTS ETC.
2. PROVIDE LOW-VOLTAGE OUTDOOR AIR, RETURN, & RELIEF
DAMPERS & ACTUATORS INTEGRAL TO AHU TO BE WIRED
& CONTROLLED BY T.C. CONTRACTOR.
3. FULL ECONOMIZER COOLING MODE WITH POWER RELIEF.
4. PROVIDE CHANGEOVER CONTROL BY T.C. ACCORDING TO
MAJORITY OF ZONE VOTING. SEE 5/M9.6.
ALTERNATE 3 - VAV AHU: COMFORT AIR HANDLING UNIT SCHEDULE
MARK MANUFACTURER MODEL
NUMBER
OPERATING
WEIGHT
(LBS)
OUTSIDE AIR PRE-FILTERS
SUPPLY FAN RETURN FAN DX COOLING COIL (R-410A) HOT WATER HEATING COIL
TYPE MAX
CFM ESP (IN WG) HP ELEC VFD TYPE MAX CFM ESP (IN WG) HP ELEC VFD ROWS AIR ∆P
(IN WG)
VELOCITY
(FPM)
CAPACITY (MBH) ENTERING AIR LEAVING AIR
OUTDOOR UNITROWS MBH
WATERSIDE AIRSIDE
MIN CFM MAX CFM TYPE
AIR ∆P
(IN WG) TOTAL SENSIBLE DB (°F) WB (°F) DB (°F) WB (°F)
WORKING
FLUID GPM ∆P (FT WC) EWT (°F) LWT (°F) CFM ∆P (IN WG)
VELOCITY
(FPM) EAT (°F) LAT (°F)
AHU-A2 DAIKIN CAH017GDGC 3,667 1,350 8,000 MERV 8 0.65 PLENUM 8,000 3.5 15.0 460 V / 3 PH / 60 HZ YES PLENUM 8,000 2.0 5.0 460 V / 3 PH / 60 HZ YES 4 0.84 478 250.8 185.2 78.5 64 54.6 52.9 CU-A2 2 228.0 40%
PROPYLENE
GLYCOL
15.9 1.0 160 129.1 4,000 0.19 250 38 96.8
NOTES:
1. FOR ALL CONDENSING UNITS, PROVIDE VARIABLE SPEED DIGITAL SCROLL COMPRESSOR FOR FULLY
MODULATING STAGE(S) WHERE SCHEDULED.
2. MOUNT CU-A1 & A2 ON CONCRETE PADS ON ROOF.
3. MOUNT CU-B1 ON CONCRETE PAD ON GRADE.
4. DESIGN OA CONDITIONS FOR CU-A1: 57.7°F DB / 52.3° F WB.
5. DESIGN OA CONDITIONS FOR ALL OTHER: 95°F DB / 64° F WB.
3. CU-A1 & A2: PROVIDE 4"X4"x5/16" STEEL FRAME W/ INTERMEDIATE MEMBERS WELDED TO FRAME
(PERPENDICULAR) AT 2'-0" O.C. MAX. ANCHOR CORNERS TO EXISTING CONCRETE W/ 5/8" DIAMETER EPOXY BOLT W/ 4"x4"x1/4"x0'-4" CLIP ANGLES. CONTRACTOR TO FULLY COORDINATE WITH STRUCTURAL ENGINEER OF RECORD, UNIT MANUFACTURER & VIBRATION & SEISMIC REQUIREMENTS DURING THE
SHOP DRAWING PROCESS PRIOR TO FABRICATION.
4. CU-B1: PROVIDE 6" CONCRETE HOUSEKEEPING PAD WITH #4 REBAR @12" O.C. IN EACH DIRECTION.
PLACE REBAR AT A DEPTH OF 3" (MIDDLE OF PAD).
NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, INCLUDING AHU CABINET DIMENSIONS BEFORE ORDERING COILS.
2. SIZE & ROUTE REFRIGERANT PIPING PER MANUFACTURER'S RECOMMENDATIONS.
4. PROVIDE VIBRATION ISOLATION PER SPEC. SECTION 230548.
5. PROVIDE 6" CONCRETE HOUSEKEEPING PAD WITH #4 REBAR @12" O.C. IN EACH DIRECTION. PLACE REBAR AT A DEPTH OF 3"
(MIDDLE OF PAD).
CONTROLS:
1. SEE SPEC SECTION 230993 FOR SEQUENCE OF OPERATION AND CONTROL POINTS.
2. SEE CONTROL DIAGRAM 13/M9.6
3. PROVIDE DISCHARGE AIR TEMPERATURE SENSOR FOR ANALOG INPUT TO DDC.
EXISTING PNEUMATIC CONTROL SYSTEM SHALL ENABLE COOLING AT 9 PSI. PROVIDE
P/E SWITCH AS REQUIRED. SEE AIR-COOLED CONDENSING UNIT SCHEDULE.
BASE BID: MULTI-ZONE AHU DX COOLING COIL SCHEDULE
MARK SERVES MANUFACTURER
MODEL
NUMBER
OPERATING
WEIGHT
(LBS)
FINNED DIMENSIONS (E) FAN DX COOLING COIL (R-410A)
ASSOCIATED
OUTDOOR UNITLENGTH (IN) HEIGHT (IN) DEPTH (IN) MAX CFM ROWS AIR ∆P
(IN WG)
VELOCITY
(FPM)
CAPACITY (MBH) ENTERING AIR LEAVING AIR
TOTAL SENSIBLE DB (°F) WB (°F) DB (°F) WB (°F)
CC-A2 (E) A WING MZ AHU DAIKIN 5EJ1204C 225 73.25 33.0 8.5 6,400 4 0.89 495.5 218.5 184.1 85.0 65.0 55.3 53.0 CU-A2
BASE BID
CC-B1 (E) B WING MZ AHU DAIKIN 5EJ1404B 465 111.25 42.0 8.5 18,000 4 0.96 664.6 456.1 390.0 78.6 62.8 56.3 53.7 CU-B1
CONTROLS:
1. SEE SPEC SECTION 230900 FOR SEQUENCE OF OPERATION AND CONTROL POINTS.
2. PROVIDE 2-WAY MODULATING CONTROL VALVE BY T.C. CONTRACTOR, SEE 11/M9.2.
3. PROVIDE FREEZE-STAT. SEE CONTROL DIAGRAM 13/M9.6
4. PROVIDE DISCHARGE AIR TEMPERATURE SENSOR FOR ANALOG INPUT TO DDC. EXISTING PNEUMATIC CONTROL
SYSTEM SHALL ENABLE HEATING AT 8 PSI. PROVIDE P/E SWITCH AS REQUIRED.
BASE BID: MULTI-ZONE AHU HOT WATER HEATING COIL SCHEDULE
MARK SERVES MANUFACTURER MODEL
NUMBER
OPERATING WEIGHT
(LBS)
FINNED DIMENSIONS HOT WATER HEATING COIL
LENGTH
(IN)
HEIGHT
(IN)
DEPTH
(IN) ROWS MBH
WATERSIDE AIRSIDE
WORKING
FLUID GPM ∆P (FT WC) EWT (°F) LWT (°F) CFM ∆P (IN WG) VELOCITY
(FPM)
EAT
(°F) LAT (°F)
HWC-A2 (E) A WING MZ AHU DAIKIN 5WH1103B 97 75.75 15.0 6.0 3 283.9
40%
PROPYLENE
GLYCOL
20.1 11.2 160 129.5 6,400 1.18 1,181.5 50 95.8
NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, INCLUDING AHU CABINET DIMENSIONS BEFORE ORDERING COILS.
ELECTRICAL DATA :
1. SEE MEP COORDINATION SCHEDULE FOR STARTER/DISCONNECT AND ALL OTHER ELEC. DATA.
2. PROVIDE 115 VOLT CONVENIENCE OUTLET. (FACTORY WIRED, ELEC. CONTR. TO CONNECT)
3. PROVIDE LIGHT IN ALL ACCESSIBLE SECTIONS OF AHU (TYP. 6). LIGHTS SHALL BE FACTORY-WIRED TO A JUNCTION BOX ON THE EXTERIOR OF THE CABINET. E.C. TO CONNECT TO JUNCTION BOX.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
M0.2
MECH SCHEDULES
JTW
DMP
DMP
JTW 22
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR STARTER/DISCONNECT AND ALL OTHER
ELEC. DATA.
CONTROL:
1. PROVIDE LINE-VOLTAGE-INPUT TO WALL-MOUNTED ROTARY SPEED
CONTROLLER & LOW VOLTAGE CONTROL SIGNAL OUTPUT. SEE DETAIL 13/M9.5.
2. PROVIDE MANUAL OVERRIDE CONTROL AT WALL-MOUNTED HAND / AUTO / OFF
SWITCH. "HAND" MODE SHALL ENABLE MANUAL SPEED CONTROL.
3. FAN SHALL BE CONTROLLED BY LIGHTS IN CORRESPONDING ROOMS. DIV. 26
SHALL PROVIDE CONTROLS. COORDINATE W/ DIV. 26 FOR INSTALLATION.
4. PROVIDE INTERLOCK TO INTAKE CONTROL DAMPER IN BOTH AUTO & HAND
MODES. SEE PLANS FOR LOCATIONS.
5. PROVIDE WALL-MOUNTED SPEED CONTROLLER.
6. PROVIDE DDC INTERFACE.
7. PROVIDE VFD
8. PROVIDE INTERLOCK (OVERRIDABLE) TO AHU-A1 FOR ROOM-NEUTRAL
MAKE-UP AIR.
9. SEE DETAIL 14/M9.5.
NOTES:
1. PROVIDE MAIN CABLE, STABILIZATION CABLE, AND ATTACHMENT HARDWARE BY MANUFACTURER AS REQUIRED.
SUPPORT FROM ROOF SLAB & HANG BELOW (E) SA PREFORATED GRILLE.
2. PROVIDE BIRD SCREEN, PRE-WIRED NEMA1 DISCONNECT, INTEGRAL 2-POSITION LINE VOLTAGE MOTORIZED
DAMPER INTERLOCKED W/ FAN, WALL-MOUNTED SPEED CONTROLLER & SIDEWALL GRILLE BY FAN
MANUFACTURER.
3. MOUNT IN VERTICAL CONFIGURATION. PROVIDE GRAVITY B.D.D. & DISCONNECT, & ROOF CAP BY MANUFACTURER. PROVIDE PIPE PORTAL, CURB, & FLASHING SYSTEM BY RPS OR APPROVED EQUAL. SEE DETAIL 1/M9.1.
4. PROVIDE BIRD SCREEN, PRE-WIRED NEMA1 DISCONNECT, INTEGRAL 2-POSITION LINE-VOLTAGE MOTORIZED
DAMPER INTERLOCKED W/ FAN, CURB, SPEED CONTROLLER AND DRAIN PAN.
5. PROVIDE PREWIRED DISCONNECT, MDSG GALVANIZED 2-POSITION LINE-VOLTAGE MOTORIZED DAMPER INTERLOCKED WITH FAN, UL LISTED TO OPERATE CONTINUOUSLY AT 500°F W/ HIGH TEMPERATURE PAINT, HIGH TEMPERATURE BEARINGS, HIGH TEMPERATURE OSHA BELT GUARD W/ COVER, SHAFT COOLER, NO ALUMINUM
CONSTRUCTION, MOTOR HEAT SHIELD AS REQUIRED BY FAN MANUFACTURER.
6. PROVIDE PREWIRED NEMA3 DISCONNECT, GALVANIZED 14" CURB, GALVANIZED 2-POSITION LINE-VOLTAGE MOTORIZED DAMPER INTERLOCKED WITH FAN, UL LISTED TO OPERATE CONTINUOUSLY AT 500°F W/ HIGH TEMPERATURE PAINT, HIGH TEMPERATURE BEARINGS, SHAFT COOLER, NO ALUMINUM CONSTRUCTION, MOTOR
HEAT SHIELD AS REQUIRED BY FAN MANUFACTURER.
HVAC FAN SCHEDULE
MARK BASE BID OR ALTERNATE AREA SERVED MANUF. MODEL
NUMBER CFM SOUND E.S.P.
(IN WG) DRIVE TYPE MOUNTING WEIGHT
(LBS) CONTROL NOTES
DSF-A1 ALTERNATE 8 BURN CHAMBER ZOO FANS H60 1,200 38.8 dBA 0 DIRECT DESTRATIFICATION
MAIN CABLE &
STABILIZATION TETHER 23 1, 2, 5, 6 1
DSF-A2 ALTERNATE 8 BURN CHAMBER ZOO FANS H60 1,200 38.8 dBA 0 DIRECT DESTRATIFICATION
MAIN CABLE &
STABILIZATION TETHER 23 1, 2, 5, 6 1
EF-A1 BASE BID
BOILER ROOM
EXHAUST COOK 101W15DH 600 8.4 SONES 0.4 DIRECT CENTRIFUGAL SIDEWALL 38 2, 4, 5, 6, 9 2
EF-A2 ALTERNATE 2
RESTROOM AND
JANITOR EXHAUST COOK GN-186 200 4.5 SONES 0.25 DIRECT CENTRIFUGAL INLINE 16 3 3
EF-A3 BASE BID MECHANICAL
PENTHOUSE EXHAUST COOK 120C15D 1,200 9.7 0.35 DIRECT CENTRIFUGAL
DOWNBLAST ROOF 67 2, 4, 5, 6, 9 4
SEF-A1 ALTERNATE 4
BURN CHAMBER
EXHAUST STACK COOK 330 CPS-A 17,500 71 dBA 0.75 BELT
CW / SWSI
CENTRIFUGAL
ROOF UTILITY SET ON
PAD 1176 6, 7, 8 5
SEF-A2 ALTERNATE 5
BURN CHAMBER
SMOKE
ACCUMULATION
COOK 300 ACSC 10,000 68 dBA 0.75 BELT CENTRIFUGAL
UPBLAST ROOF CURB 581 6, 8 6
SEF-A3 ALTERNATE 10
AIR CONDITIONING
EQUIPMENT EXHAUST COOK 100ACSC 900 13.9 SONES 0.5 BELT
CENTRIFUGAL
UPBLAST ROOF CURB 99 2, 4, 5, 6, 9 6 LOUVER SCHEDULE
MARK
BASE BID OR
ALT. MANF. MODEL NUMBER SIZE TYPE FUNCTION MAX CFM MOUNTING FREE AREA (FT2)
FREE AREA VELOCITY
(FPM)
∆P
(IN WG) NOTES
L-A1 BASE BID RUSKIN ELF6350DMP 204"x84" STATIONARY LOUVER OUTDOOR AIR INTAKE FOR AHU-A1 75,000 WALL 78.64 954 0.13 SEE BELOW L-A2 ALT. 3 RUSKIN ELF6350DMP 72"x32" STATIONARY LOUVER OUTDOOR AIR INTAKE FOR AHU-A2 8,000 WALL 9.47 845 0.10 SEE BELOW L-A3 ALT. 3 RUSKIN ELF6350DMP 72"x32" STATIONARY LOUVER RELIEF AIR FOR AHU-A2 8,000 WALL 9.47 845 0.10 SEE BELOW L-A4 ALT. 10 RUSKIN ELF6350DMP 18"x24" STATIONARY LOUVER OUTDOOR AIR INTAKE FOR SEF-A3 900 WALL 1.53 589 0.05 SEE BELOW L-A5 BASE BID RUSKIN ELF6350DMP 14"x24" STATIONARY LOUVER OUTDOOR AIR INTAKE FOR EF-A1 600 WALL 1.15 523 0.04 SEE BELOW L-A6 BASE BID RUSKIN ELF6350DMP 24"x24" STATIONARY LOUVER OUTDOOR AIR INTAKE FOR EF-A3 1,200 WALL 2.1 571 0.05 SEE BELOW
NOTES:
1. 6" DEPTH LOUVER.
2. DRAINABLE LOUVER.
3. CONTRACTING OFFICER TO SELECT COLOR.
4. PROVIDE BIRD SCREEN & EXTENDED SILL.
5. SEE CONTROL DAMPER SCHEDULE.
NOTES:
1. APPROXIMATE OVERALL SIZE IS SCHEDULED. FIELD-VERIFY ALL SIZES & CONDITIONS BEFORE ORDERING.
2. PROVIDE MULTIPLE SECTIONS, ACTUATORS, & LINKAGE AS REQUIRED TO ACHIEVE TOTAL SIZE.
3. PROVIDE END SWITCH TO VERIFY POSITION. SEE SPECIFICATIONS FOR SEQUENCE OF OPERATION AND CONTROL POINTS LIST.
4. PROVIDE DUCT TRANSITIONS TO DAMPER AND/OR MOUNTING SLEEVE AS REQUIRED FOR EACH INSTANCE.
5. PROVIDE ACTUATOR(S) FOR EACH DAMPER TO APPLY THE TORQUE NECESSARY FOR THE SPECIFIC INSTALLATION PER THE MANUFACTURER'S
RECOMMENDATIONS. U.N.O., THE T.C. CONTRACTOR SHALL PROVIDE LOW OR LINE VOLTAGE POWER (CONTRACTOR'S OPTION) & LOW VOLTAGE CONTROL.
6. ALTERNATE 3 - VAV AHU: OUTDOOR AIR, RETURN AIR, & RELIEF AIR DAMPERS ARE SUPPLIED INTEGRAL TO AHU-A2 BY THE M.C., AND SHALL BE SUPPLIED
WITH POWER & LOW VOLTAGE CONTROL BY THE T.C. CONTRACTOR.
7. INTEGRATE CONTROL OF (E) DAMPERS SCHEDULED INTO THE NEW DDC SYSTEM. PROVIDE (N) LINKAGE, ELECTRONIC ACTUATORS, POWER, END-SWITCHES, &
CONTROLS AS REQUIRED. PROVIDE (N) BLADE & JAMB SEALS TO MATCH TEMPERATURE RATING & PERFORMANCE OF (E) MATERIALS. REPAIR OR REPLACE
(E) BLADES OR OTHER COMPONENTS AS REQUIRED. CONTRACTOR SHALL GUARANTEE FUNCTIONING PERFORMANCE OF (E) DAMPERS AS OUTLINED IN THESE DOCUMENTS FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION.
CONTROL DAMPER SCHEDULE
MARK BASE, ALT.,
OR (E) MANF. MODEL NUMBER SIZE TYPE FUNCTION MAX CFM MOUNTING CONTROL NOTES
CD-A1 BASE RUSKIN CD40x2 17'-0" x 7'-0" TWO-ROW, OPPOSED BLADE, LOW-LEAKAGE, INSULATED
OUTDOOR AIR INTAKE
FOR AHU-A1
75,000 WALL MODULATING,
FAIL-CLOSED SEE BELOW
CD-A2 (E) - - 10'-0" x 10'-0" VERIFY IN FIELD
LOW VELOCITY WIND
TUNNEL ISOLATION 75,000
DUCT IN-LINE
BELOW ROOF
TWO-POSITION,
FAIL-OPEN SEE BELOW
CD-A3 (E) - - 5'-0" x 5'-0" VERIFY IN FIELD HIGH VELOCITY WIND
TUNNEL ISOLATION 75,000 DUCT IN-LINE
BELOW ROOF
TWO-POSITION,
FAIL-OPEN SEE BELOW
CD-A4 BASE RUSKIN CD60 3'-0" x 2'-6" OPPOSED BLADE, LOW-LEAKAGE
BURN CHAMBER
RECIRCULATION 30,000 DUCT ABOVE
FLOOR
MODULATING,
FAIL-OPEN SEE BELOW
CD-A5 BASE RUSKIN CD60 17'-0" x 4'-0" OPPOSED BLADE, LOW-LEAKAGE
WIND TUNNEL
COMMON
RECIRCULATION
75,000 WALL MODULATING,
FAIL-OPEN SEE BELOW
CD-A6 BASE RUSKIN CD60 17'-0" x 4'-0" OPPOSED BLADE, LOW-LEAKAGE SMOKE RELIEF DAMPER 75,000 WALL MODULATING, FAIL-OPEN SEE BELOW
CD-A7 (E) - - 40'-0" x 2'-6" VERIFY IN FIELD SUPPLY AIR PLENUM 75,000 WALL MODULATING, FAIL
LAST POSITION SEE BELOW
CD-A8 ALT. 12 RUSKIN CD60 30'-0" x 1'-0"
OPPOSED BLADE,
LOW-LEAKAGE
SUPPLY TO RELIEF
BYPASS 30,000 PLENUM
MODULATING,
FAIL-CLOSED SEE BELOW
CD-A9 (E) - - 11'-0" x 8'-0" VERIFY IN FIELD FLUE STACK SMOKE
EXHAUST 17,500 ROOF
VENTILATOR
MODULATING, FAIL
LAST POSITION SEE BELOW
CD-A10 BASE RUSKIN CD60 14"x24" OPPOSED BLADE, LOW-LEAKAGE
BOILER ROOM INTAKE
LOUVER 600 WALL TWO-POSITION,
FAIL-CLOSED SEE BELOW
CD-A11 ALT. 10 RUSKIN CD60 18"x24"
OPPOSED BLADE,
LOW-LEAKAGE
AIR CONDITIONING
EQUIPMENT INTAKE
LOUVER
900 WALL
TWO-POSITION,
FAIL-CLOSED SEE BELOW
CD-A12 BASE RUSKIN CD60 24"x24" OPPOSED BLADE, LOW-LEAKAGE
MECHANICAL LOFT
INTAKE LOUVER 1,200 WALL TWO-POSITION,
FAIL-CLOSED SEE BELOW
CD-A13 ALT. 3 RUSKIN CD60 14"x12" OPPOSED BLADE, LOW-LEAKAGE VAV SA ZONE 1 1,240 DUCT MODULATING, FAIL
LAST POSITION SEE BELOW
CD-A14 ALT. 3 RUSKIN CD60 20"x12"
OPPOSED BLADE,
LOW-LEAKAGE VAV SA ZONE 2 1,590 DUCT
MODULATING, FAIL
LAST POSITION SEE BELOW
CD-A15 ALT. 3 RUSKIN CD60 24"x12" OPPOSED BLADE, LOW-LEAKAGE VAV SA ZONE 3 2,460 DUCT MODULATING, FAIL
LAST POSITION SEE BELOW
CD-A16 ALT. 3 RUSKIN CD60 14"x12"
OPPOSED BLADE,
LOW-LEAKAGE VAV SA ZONE 4 905 DUCT
MODULATING, FAIL
LAST POSITION SEE BELOW
CD-A17 ALT. 3 RUSKIN CD60 10"x8" OPPOSED BLADE, LOW-LEAKAGE VAV SA ZONE 5 205 DUCT MODULATING, FAIL
LAST POSITION SEE BELOW
ELECTRICAL DATA:
SEE MEP COORDINATION
SCHEDULE FOR
STARTER/DISCONNECT AND ALL
OTHER ELEC. DATA.
ACCESSORIES:
1. PROVIDE 2-STAGE INTEGRAL THERMOSTAT, TRANSFORMER, AND RELAYS AS REQUIRED FOR LOW VOLTAGE CONTROL.
2. PROVIDE INTEGRAL DISCONNECT SWITCH AND THERMAL OVERLOADS.
3. PROVIDE SUMMER FAN SWITCH AND PERMANENT WASHABLE FILTERS.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER ELEC.
DATA.
ELECTRIC UNIT HEATER SCHEDULE
MARK
BASE BID
OR ALT. AREA SERVED MANUF. TYPE MODEL NUMBER kW STAGES CFM
DIMENSION
FINISH MOUNTING RETURN SUPPLY NOTESLENGTH
(IN)
DEPTH
(IN)
HEIGHT
(IN)
ECUH-B1 BASE BID 1ST FLOOR WOMENS BRASCH CABINET BCUH3305 5 2 250 33" 9.5" 25"
POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
ECUH-B2 BASE BID 1ST FLOOR MENS BRASCH CABINET BCUH3305 5 2 250 33" 9.5" 25" POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
ECUH-B3 BASE BID 1ST FLOOR SHPG &
RCVG BRASCH CABINET BCUH3305 5 2 250 33" 9.5" 25" POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
ECUH-B4 BASE BID 2ND FLOOR WOMENS BRASCH CABINET BCUH3305 5 2 250 33" 9.5" 25" POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
ECUH-B5 BASE BID 2ND FLOOR MENS BRASCH CABINET BCUH3305 5 2 250 33" 9.5" 25" POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
ECUH-B6 ALT. 9 2ND FLOOR STOCK RM BRASCH CABINET BCUH3305 5 2 250 33" 9.5" 25"
POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
ECUH-B7 ALT. 9 2ND FLOOR PASSAGE BRASCH CABINET BCUH4610 10 2 500 46" 9.5" 25" POWDER
COAT
VERTICAL/
FLOOR FRONT BOTTOM FRONT TOP SEE BELOW
DUCT MATERIAL SCHEDULE
DESCRIPTION SHAPE APPLICATION MATERIAL PRESSURE CLASS INSULATION JACKET R-VALUE ADDITIONAL DETAILS
GENERAL & COMFORT APPLICATIONS
SUPPLY AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 4" WRAP FACTORY APPLIED R-5 SEE BELOW
SUPPLY AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 4" WRAP FACTORY APPLIED R-5 SEE BELOW
RETURN AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
RETURN AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
EXHAUST AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
EXHAUST AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-5 SEE BELOW
OUTSIDE AIR RECTANGULAR INDOOR - CONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
OUTSIDE AIR ROUND INDOOR - CONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
5' LENGTH MAX - SUPPLY ONLY ROUND INDOOR - CONDITIONED FLEX 2" INTEGRAL FACTORY APPLIED R-5 SEE BELOW
ALL DUCTWORK IN UNCONDITIONED SPACE RECTANGULAR INDOOR - UNCONDITIONED SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
ALL DUCTWORK IN UNCONDITIONED SPACE ROUND INDOOR - UNCONDITIONED SPIRAL SHEET METAL 2" WRAP FACTORY APPLIED R-8 SEE BELOW
ALL EXTERIOR DUCTWORK RECTANGULAR EXTERIOR SHEET METAL 2" WRAP FIELD APPLIED EXTERIOR R-8 SEE BELOW
ALL EXTERIOR DUCTWORK ROUND EXTERIOR SPIRAL SHEET METAL 2" WRAP FIELD APPLIED EXTERIOR R-8 SEE BELOW
HIGH TEMPERATURE & SMOKE EXHAUST APPLICATIONS
ALL AHU-A1 DUCT EXCEPT AS NOTED BELOW RECTANGULAR INDOOR - CONDITIONED WELDED - STEEL (16 GA) OR STAINLESS STEEL (18 GA) SEE BELOW WRAP FACTORY APPLIED R-8 SEE BELOW
ALL AHU-A1 DUCT EXCEPT AS NOTED BELOW ROUND INDOOR - CONDITIONED WELDED - STEEL (16 GA) OR STAINLESS STEEL (18 GA) SEE BELOW WRAP FACTORY APPLIED R-8 SEE BELOW
SMOKE EXHAUST - INTERIOR & EXTERIOR RECTANGULAR SMOKE EXHAUST WELDED - STEEL (16 GA) OR STAINLESS STEEL (18 GA) SEE BELOW EXTERNAL FIRE WRAP SEE BELOW N/A SEE BELOW
SMOKE EXHAUST - INTERIOR & EXTERIOR ROUND SMOKE EXHAUST WELDED - STEEL (16 GA) OR STAINLESS STEEL (18 GA) SEE BELOW EXTERNAL FIRE WRAP SEE BELOW N/A SEE BELOW
WIND TUNNEL RECIRCULATION - EXTERIOR RECTANGULAR WIND TUNNEL RECIRC. WELDED - STEEL (16 GA) OR STAINLESS STEEL (18 GA) SEE BELOW WRAP FIELD APPLIED EXTERIOR R-8 SEE BELOW
WIND TUNNEL RECIRCULATION - EXTERIOR ROUND WIND TUNNEL RECIRC. WELDED - STEEL (16 GA) OR STAINLESS STEEL (18 GA) SEE BELOW WRAP FIELD APPLIED EXTERIOR R-8 SEE BELOW
HIGH TEMPERATURE & SMOKE EXHAUST DUCT NOTES:
1. ALL DUCTWORK TO AND FROM AHU-A1 INCLUDING OUTDOOR AIR, SUPPLY AIR, RETURN AIR, RELIEF AIR & TUNNEL RECIRCULATION DUCTWORK, SHALL BE CONSIDERED HIGH TEMPERATURE
APPLICATION.
2. HIGH TEMPERATURE & SMOKE EXHAUST DUCT SHALL BE MADE A CONTINUOUS LIQUID-TIGHT
WELD. DUCTWORK SHALL BE SLOPED AT 2% DOWN TOWARD THE NEAREST ACCESS POINT FOR
CLEANOUT.
3. SMOKE EXHAUST SHALL BE INSULATED W/ 2HR FIRE RESISTANT 3M OR EQUAL, UL LISTED W/
INTEGRAL JACKET.
FACTORY-APPLIED JACKET:
ALL SERVICE JACKETS (ASJ) SHALL BE FOIL SCRIM KRAFT (FSK). SEAL SEAMS
W/ FSK ADHESIVE TAPE ACCORDING TO SPECIFICATIONS.
FIELD-APPLIED EXTERIOR JACKET:
PROVIDE EXTERIOR ALUMINUM JACKET RATED FOR OUTDOOR USE. (POLYGUARD,
ALUMAGUARD 60 OR APPROVED EQUAL). SEE SPECIFICATIONS.
MINIMUM REQUIREMENTS (U.N.O.):
1. PROVIDE SEISMIC BRACING OF ALL DUCTWORK AS REQUIRED BY LOCAL CODES.
2. ALL SHEET METAL DUCTWORK SHALL BE A MINIMUM OF 24 GAGE GALVANIZED STEEL.
3. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED PER SMACNA GUIDELINES.
4. SEAL AND INSULATE ALL DUCTWORK PER 2012 I.E.C.C.
5. INSULATE EXHAUST DUCTWORK FROM EXTERIOR TERMINATION TO ISOLATION
DAMPER, BUT NO LESS THAN WITHIN 15 FT OF PENETRATION THROUGH BUILDING
ENVELOPE.
AIR TERMINAL SCHEDULE
MARK MODULE SIZE NECK SIZE FUNCTION TYPE
PERFORMANCE DATA AT MAX CFM BASIS OF DESIGN
MOUNTING MATERIAL FINISH ADDITIONAL DETAILS
MAX CFM ∆P (IN WG) THROW (FT) VELOCITY
(FPM) MAX NC MANF. MODEL
NUMBER PATTERN
EG-1 DUCT SIZE + 1-3/4" SEE PLANS EXHAUST EXHAUST GRILLE 100 0.02 - 274 - KRUEGER S80 3/4" FIXED 35°
DEFLECTION SURFACE STEEL STANDARD SEE BELOW
EG-2
DUCT HEIGHT +
1-3/4"
DUCT WIDTH + 1-1/2"
SEE PLANS EXHAUST EXHAUST GRILLE 300 0.114 - 500 - TITUS SF8 PERFORATED
FACE DUCT-MOUNTED ALUMINUM STANDARD SEE BELOW
RG-1 DUCT SIZE + 1-3/4" SEE PLANS RETURN RETURN GRILLE 900 0.04 - 436 21 KRUEGER S80
3/4" FIXED 35°
DEFLECTION DUCT-MOUNTED STEEL STANDARD SEE BELOW
NOTES:
1. PROVIDE TRANSITION FROM DUCT SIZE SHOWN ON PLANS TO NECK OF AIR TERMINAL AS REQUIRED.
2. PROVIDE MANUAL VOLUME DAMPER ON EACH BRANCH DUCT TO BALANCE TO AIRFLOWS SHOWN ON PLANS.
3. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR CEILING TYPES, AND COORDINATE MOUNTING OF EACH INSTANCE AS REQUIRED
4. SUBMITTAL DATA SHALL INCLUDE N.C., THROW, VELOCITY, PRESSURE DROP, AND ALL PHYSICAL & INSTALLATION DATA.
5. FOR EG-2, PROVIDE RADIUS END-CAP TO MATCH DUCT DIAMETER.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
M0.3
MECH SCHEDULES CONTINUED
JTW
DMP
JTW 23
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
PIPE MATERIAL SCHEDULE
SYSTEM MATERIAL SIZES INSULATION THICKNESS** ADDITIONAL DETAILS
REFRIGERANT PIPING 'ACR' COPPER ALL 11/2" ARMAFLEX ON ALL LINES SEE BELOW
CONDENSATE PIPING TYPE "L"COPPER ALL NONE SEE BELOW
HOT WATER SUPPLY & RETURN 'L' COPPER / STEEL
(SEE SPECS FOR SIZES)
<=11/2" 11/2" WRAP WITH ASJ
SEE BELOW
>11/2" 2" WRAP WITH ASJ
STEAM PIPING BLACK STEEL 'SCHEDULE 40'
<=11/2" 11/2" WRAP SEE BELOW
>11/2" 3" WRAP SEE BELOW
PIPE MATERIAL REMARKS:
1. PROVIDE SEISMIC BRACING OF PIPING AS REQUIRED BY LOCAL CODES.
2 NO PLASTIC PIPING IS ALLOWED IN AIR PLENUMS. INSULATION IN PLENUMS MUST BE PLENUM-RATED.
3. ANY CONNECTIONS THAT ARE DISSIMILAR METALS SHALL REQUIRE DIELECTRIC COUPLING.
** BASED ON INSULATION HAVING A CONDUCTIVITY (K) NOT EXCEEDING 0.27 BTU PER INCH/H*FT^2*DEG F
HOT WATER UNIT HEATER SCHEDULE
MARK AREA SERVED MANF. MODEL NUMBER WEIGHT (LB) GPM
FAN HEATING COIL
ADDITIONAL
DETAILSCFM HP MBH
EWT
(°F)
LWT
(°F)
∆P
(FT W.C.) WORKING FLUID
HWUH-A1 BURN CHAMBER STERLING HS-240 143 10.3 3,500 1/3 96 160 130 0.5 40% PROPYLENE GLYCOL SEE BELOW
HWUH-A2 BURN CHAMBER STERLING HS-240 143 10.3 3,500 1/3 96 160 130 0.5 40% PROPYLENE GLYCOL SEE BELOW
HWUH-A3 BOILER ROOM STERLING HS-240 143 10.3 3,500 1/3 96 160 130 0.5 40% PROPYLENE GLYCOL SEE BELOW
HWUH-A4 AIR CONDITIONING EQUIPMENT STERLING HS-240 143 10.3 3,500 1/3 96 160 130 0.5 40% PROPYLENE GLYCOL SEE BELOW
HWUH-A5 3RD FLOOR MECHANICAL
PENTHOUSE STERLING HS-240 143 10.3 3,500 1/3 96 160 130 0.5 40% PROPYLENE GLYCOL SEE BELOW
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER
ELEC. DATA.
ACCESSORIES:
1. ALL STANDARD ACCESSORIES
2. FOUR-POINT CEILING SUSPENSION KIT
OR WALL BRACKET. SEE PLANS FOR
LOCATIONS.
3. TOTALLY ENCLOSED FAN MOTOR
NOTES:
1. SELECTIONS MADE AT 60°F EAT, 160°F EWT, AND A 30° F HW ∆T.
2. SEE DETAIL 11/M9.2 FOR PIPING CONNECTION.
CONTROLS:
1. DDC CONTROLS. SEE DETAIL 13/M9.7
2. PROVIDE DISCONNECT, LOW-TO-LINE VOLTAGE RELAY, WALL-MOUNTED FAN
SPEED CONTROLLER, & MODULATING CONTROL VALVE BY T.C. CONTRACTOR.
3. SEE CONTROL POINTS LIST & SEQUENCE OF OPERATION.
CONDENSING BOILER SCHEDULE
MARK INPUT (MBH) OUTPUT (MBH)
AHRI
THERMAL
EFFICIENCY
TYPE MANF. MODEL NUMBER COMB. AIR VENT TURNDOWN
GAS
CONNECTION
(TRANSITION AS REQ'D)
WORKING FLUID WET WEIGHT
(LBS)
ADDITIONAL
DETAILS
B-A1 2,500 2,300 92.0% FIRE-TUBE LOCHINVAR CREST FBN2500 8" 9" 20:1 2" 40% PROPYLENE GLYCOL 3652 SEE BELOW
B-A2 2,500 2,300 92.0% FIRE-TUBE LOCHINVAR CREST FBN2500 8" 9" 20:1 2" 40% PROPYLENE GLYCOL 3652 SEE BELOW
NOTES:
1. PROVIDE STANDARD OPTION FOR ZERO CLEARANCE TO COMBUSTIBLES.
2. PROVIDE 4" HOUSEKEEPING PAD 6" WIDER THAN EACH BOILER.
3. BOILERS SHALL BE SEALED COMBUSTION. CONTRACTOR SHALL PROVIDE PIPING
FOR AIR & FLUE TO EXTERIOR PER MANUFACTURER'S RECOMMENDATIONS. SEE
PLANS.
4. PROVIDE HIGH AND LOW GAS PRESSURE SWITCHES WITH MANUAL RESET.
PROVIDE REGULATOR AS REQUIRED & VENT TO EXTERIOR.
5. SUPPLY CONDENSATE NEUTRALIZATION KITS BY BOILER MANUFACTURER TO P.C.
P.C. SHALL ROUTE CONDENSATE PIPING TO NEAREST FLOOR DRAIN, TYP. 2.
COORDINATE W/ P.C.
6. BOILERS MUST BE ASME CSD-1 COMPLIANT TO INTERRUPT FUEL & POWER SUPPLY
TO UNIT.
7. PROVIDE SELKIRK HEATFAB SAF-T VENT CI PLUS DOUBLE-WALL VENT SYSTEM, UL
1738 LISTED FOR CONDENSING APPLIANCES, OR APPROVED EQUAL.
CONTROLS:
1. PROVIDE DDC GATEWAY, OA TEMPERATURE SENSOR, AND MOTORIZED ISOLATION
VALVES FOR VARIABLE PRIMARY PUMPING CONFIGURATION.
2. PROVIDE ADJUSTABLE HIGH LIMIT W/ MANUAL RESET.
3. PROVIDE LOW WATER CUTOFF W/ MANUAL RESET & TEST.
4. PROVIDE COMBUSTION AIR PROVING SWITCH.
5. SEE CONTROL DIAGRAM ON 5/M9.\7.
6. USER SHALL BE CAPABLE OF OVERRIDING HWS TEMPERATURE & RESET SCHEDULE.
SEE POINTS LIST.
7. PROVIDE WALL-MOUNTED ASME CSD-1 MANUAL EMERGENCY SHUT-DOWN SWITCH
INSIDE EXIT DOORS FROM BOILER ROOM TO EXTERIOR, TYP. 2. COORDINATE WITH
P.C. & E.C. TO CLOSE GAS VALVE WITH SWITCH AS REQUIRED.
ELECTRICAL DATA :
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER
ELEC. DATA.
PUMP SCHEDULE
MARK SYSTEM MANUFACTURER MODEL NUMBER TYPE WORKING FLUID FLOW RATE (GPM) HEAD LOSS (FT) MOTOR SPEED (RPM) IMPELLER DIA. (IN) VARIABLE SPEED ADDITIONAL DETAILS
HWP-1 HOT WATER TACO FI 2510C
BASE-MOUNTED,
END-SUCTION 40% PROPYLENE GLYCOL 162.5 50 1750 7 VFD SEE BELOW
HWP-2 HOT WATER TACO FI 2510C BASE-MOUNTED,
END-SUCTION 40% PROPYLENE GLYCOL 162.5 50 1750 7 VFD SEE BELOW
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER ELEC. DATA.
REMARKS:
1. PROVIDE 4" CONCRETE HOUSEKEEPING PAD UNDER EACH PUMP
2. PROVIDE VFD BY T.C. CONTRACTOR, TYP. 2. MOUNT VFD'S WHERE ACCESSABLE ON WALL OR ON (E) VERTICAL SUPPORTS FOR CONDENSATE RECEIVER
TANK.
3. E.C. SHALL PROVIDE CONDUIT AND WIRING BETWEEN PANELBOARD AND VFD, AND BETWEEN VFD AND MOTOR. COORDINATE W/ E.C.
4. PUMPS SHALL BE CONTRILLED BY DDC. SEE POINTS LIST & SEQUENCE OF OPERATION.
5. SEE CONNECTION DETAILS ON M9.3 & CONTROL DIAGRAM ON M9.7.
EXPANSION TANK SCHEDULE
MARK MANUFACTURER MODEL NUMBER TYPE WORKING FLUID
DIMENSIONS
PRESSURE RAITING (PSI) ADDITIONAL DETAILS
ACCEPTANCE VOLUME(GAL) HEIGHT (IN) DIAMETER (IN)
ET-A1 TACO CA140-125 VERTICAL BLADDER 40% PROPYLENE GLYCOL 37 40-1/8" 20" 125 ASME CONSTRUCTION
AIR/DIRT SEPARATOR SCHEDULE
MARK MANF. MODEL NUMBER TYPE MAX FLUID FLOW RATE
(GPM) WORKING FLUID TANK DIMENSIONS DRY WEIGHT (LBS) APPROX. OPERATING WEIGHT
(LBS) ADDITIONAL DETAILS
AS-A1 TACO 4905ADH-125 TANK - HIGH VELOCITY 686 40% PROPYLENE GLYCOL 57-1/2" H x 20" DIA. 225 907 ASME CONSTUCTION
AUTOMATIC GLYCOL FEEDER SCHEDULE
MARK MANUFACTURER MODEL NUMBER TANK VOLUME (GAL) PUMP GPM @ 100 PSI WEIGHT (LBS) ADDITIONAL DETAILS
GLF-A1 GENERAL TREATMENT PRODUCTS GP55-E4-1 55 1/3 HP 1.3 148 SEE BELOW
NOTES:
1. PROVIDE LOCKABLE NEMA 4X CONTROL PANEL AND ELECTRICAL DISCONNECT.
2. PROVIDE DRY CONTACTS TO ALARM DDC IN THE EVENT OF LOW LEVEL & TO ALLOW FOR MONITORING OF "HAND" STATUS.
SEE POINTS LIST.
3. PROVIDE PUMP H/O/A SWITCH, AUTOMATIC PUMP PRESSURE SWITCH, & LOW LEVEL FLOAT & PUMP SHUT-OFF SWITCH.
4. PROVIDE PRESSURE RELIEF VALVE, CHECK VALVE, & STRAINER BY UNIT MANUFACTURER.
5. SEE M9.3 & M9.6 FOR DETAILS & CONTROL DIAGRAMS.
ELECTRICAL DATA:
SEE MEP COORDINATION SCHEDULE FOR
STARTER/DISCONNECT AND ALL OTHER
ELEC. DATA.
NOTES:
1. PROVIDE AIR VENT AT TOP OF TANK AND SEPERATE FLUSH VALVE.
2. PROVIDE 2" MANUAL BLOWDOWN VALVE AT BASE OF TANK W/ HOSE THREAD END.
3. PROVIDE LIFTING LUGS. MOUNT IN-LINE. SUPPORT FROM FLOOR & BRACE FROM WALL AS REQUIRED.
GAS-FIRED STEAM GENERATOR SCHEDULE
MARK SERVES MANUF. MODEL
NUMBER
GAS INPUT STEAM OUTPUT
WEIGHT (LB) NOTESMAX
(MBH) IGNITION VENT/ FLUE
SIZE
MAX
(LB/HR)
MIN
(LB/HR) PRESSURE OUTLET
DIA.
SG-A1 SAM-A1
IN AHU-A1 NORTEC GSTC-400 560 HOT SURFACE 5" 420 25 ATMOSPHERIC 4" 992 ALL BELOW
SG-A2 SAM-A2
IN AHU-A1 NORTEC GSTC-400 560 HOT SURFACE 5" 420 25 ATMOSPHERIC 4" 992 ALL BELOW
SG-A3
SAM-A3
IN AHU-A1 NORTEC GSTC-400 560 HOT SURFACE 5" 420 25 ATMOSPHERIC 4" 992 ALL BELOW
NOTES:
1. PROVIDE APPLIANCE REGULATOR AS REQUIRED TO SUPPLY GAS PRESSURE IN MANUFACTURER'S ACCEPTABLE RANGE: 4.5-9.0 IN W.C.
2. PROVIDE MOUNTING STAND BY UNIT MANUFACTURER AND BOLT STAND TO FLOOR OF MECHANICAL LOFT.
3. PROVIDE WALL-MOUNTED DISCONNECT SWITCH FOR EACH UNIT.
4. PROVIDE STAINLESS STEEL HEAT…