Attachment_8_-_Drawings-P0.1-P9.1.pdf

PDF 1 MB Posted

Attached to
Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
Solicitation number
AG-82FT-S-16-0015
Issued by
Department of Agriculture Forest Service Research Service Rocky Mountain Research Station

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

38110 PE

POTCHAK

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

PLUMBING GENERAL NOTES

A. ALL NEW PIPING AND EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH THE

2012 UNIFORM PLUMBING CODE AND THE 2012 INTERNATIONAL BUILDING CODE

REQUIREMENTS.

B. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW

EXACT LOCATIONS AND SIZES OF ALL EXISTING DUCTWORK, PIPING, SYSTEM

AND EQUIPMENT UNLESS SPECIFICALLY DIMENSIONED. IT IS NOT THE INTENT

OF THESE DRAWINGS TO GRAPHICALLY REPRESENT ALL OF THE WORK

REQUIRED FOR A COMPLETE INSTALLATION IN EVERY RESPECT. THE PURPOSE

OF THESE PLANS IS TO INDICATE THE INTENDED SIZES, APPROXIMATE

LOCATION AND ROUTING OF MAJOR COMPONENTS. ADJUST TO FIELD

CONDITIONS. ACTUAL CONDITIONS AND LOCATIONS SHALL BE FIELD VERIFIED.

C. EXAMINE AND REFER TO ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL,

MECHANICAL, FIRE PROTECTION AND SITE CIVIL DRAWINGS FOR

CONSTRUCTION CONDITIONS WHICH MAY AFFECT THE CONTRACTORS WORK.

INSPECT THE EXISTING FACILITIES (IF EXIST) FOR VERIFICATION OF EXISTING

CONDITIONS AND SYSTEMS WHICH MAY HAVE AN EFFECT ON HIS/HER WORK

PRIOR TO SUBMISSION OF BID.

D. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE

WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION

OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT

THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. REFER TO

ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS

AND FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS

NECESSARY FOR COORDINATION.

E. THE CONTRACTOR IS TO PROVIDE MATERIALS, LABOR, TRANSPORTATION,

TOOLS, PERMITS, FEES, INSPECTIONS, UTILITIES AND INCIDENTALS

NECESSARY FOR THE COMPLETE INSTALLATION OF THE WORK INDICATED AND

DESCRIBED IN THESE CONTRACT DOCUMENTS.

F. LOCATIONS AND DIMENSIONS OF EXISTING FACILITIES IDENTIFIED ON THIS

DRAWING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE

INFORMATION BASED ON A COMBINATION OF FIELD INVESTIGATIONS AND

VARIOUS DESIGN AND RECORD DRAWINGS AVAILABLE AT THE TIME OF

DESIGN. FIELD VERIFY LOCATIONS AND DIMENSIONS PRIOR TO ORDERING

EQUIPMENT AND DURING PERFORMANCE OF THE WORK. PROVIDE ALL

DEMOLITION WORK, NECESSARY FITTINGS, TRANSITIONS, AND OTHER

COMPONENTS AS REQUIRED FOR A COMPLETE AND FUNCTIONAL

INSTALLATION OF NEW SYSTEMS AT NO ADDITIONAL COST TO THE OWNER.

G. THE CONTRACTOR IS TO BE RESPONSIBLE FOR ANY ADDITIONAL DETAILS OR

SPECIAL CONSTRUCTION REQUIRED IN ORDER TO COMPLETE THE

INSTALLATION, WHETHER MENTIONED OR NOT. THE CONTRACTOR IS TO

PROVIDE ALL MATERIALS AND EQUIPMENT THAT ARE TO BE FURNISHED FOR

THE PROPER INSTALLATION OF THE TYPE OF EQUIPMENT AND SYSTEMS

INDICATED.

H. ALL EQUIPMENT SHALL BE INSTALLED LEVEL, PLUMB, AND FIRMLY ANCHORED

IN LOCATIONS INDICATED. OBSERVE MANUFACTURER'S INSTALLATION

INSTRUCTIONS AND RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT

PRODUCTS SERVE THEIR INTENDED FUNCTION.

I. FOLLOW MANUFACTURES WRITTEN INSTALLATION INSTRUCTION FOR RUNNING

THE COMBUSTION AIR AND VENT PIPING AS WELL AS THE TERMINATION

THROUGH THE ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.

J. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT AND PIPING AS REQUIRED BY

LOCAL, STATE, AND NATIONAL CODES.

K. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL FIRE BARRIERS,

FIRE PARTITIONS, FIRE WALLS OR ANY OTHER FIRE AND/OR SMOKE

SEPARATION WITHIN THE BUILDING WITH A UL LISTED FIRE AND/OR SMOKE

STOP SYSTEM AS REQUIRED TO MEET LOCAL, STATE, AND NATIONAL CODES.

CONTRACTOR IS DIRECTED TO THE ARCHITECTURAL CODE PLAN.

L. ALL MATERIAL IN A PLENUM RATED SPACE SHALL HAVE A SPREAD NOT

EXCEEDING 25 AND A SMOKE DEVELOPMENT RATING NOT EXCEEDING 50.

M. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF

EQUIPMENT, VALVES, DAMPERS, DEVICES INSTALLED ABOVE NON-REMOVABLE

CEILINGS.

N. ALL ELEMENTS PENETRATING BUILDING COMPONENTS (ROOF ASSEMBLIES,

WALL ASSEMBLIES, ETC.) SHALL BE SEALED WEATHER AND WATER TIGHT.

O. ALL NEW PIPING SHALL BE IDENTIFIED WITH SETON SETMARK PIPE MARKERS,

LETTERED TO MATCH EXISTING AND MARKED AT A MAXIMUM OF EVERY 25 FT.

ALSO, ALL NEW VALVES SHALL BE IDENTIFIED WITH BRASS OR ALUMINUM

VALVE TAGS.

P. PROVIDE AND INSTALL PIPE GUIDES, EXPANSION JOINTS, AND HANGERS PER

MANUFACTURER'S RECOMMENDATIONS.

Q. ALL PIPING WALL PENETRATIONS SHALL HAVE A CHROME ESCUTCHEON

PLATE. ALL SOLDER TO BE LEAD-FREE TYPE. AT THE CONTRACTORS OPTION

MECHANICAL COMPRESSION TYPE FITTING (I.E. PRO-PRESS) MAY BE USED.

R. INSTALL PLUMBING EQUIPMENT AND FIXTURES PER MANUFACTURER'S

WRITTEN INSTALLATION INSTRUCTIONS.

S. ABSOLUTELY NO FITTINGS OR PIPING CONNECTIONS ARE ALLOWED UNDER

THE CONCRETE SLAB.

T. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED SPACES.

U. PROVIDE TRAP SEAL DEVICES AND TRAP PRIMERS FOR ALL FLOOR DRAINS.

V. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO INDIVIDUAL

FIXTURES.

W. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL DRAWINGS

TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.

X. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH SURROUNDINGS.

Y. SANITARY SEWER AND DRAIN PIPING SHALL BE INSTALLED AT A MINIMUM 1/4"

PER FOOT (2%) SLOPE IN DIRECTION OF FLOW.

Z. ALL MATERIAL THAT IS IN CONTACT WITH POTABLE DOMESTIC WATER SHALL

BE 100% LEAD FREE.

AA. THIS CONTRACTOR SHALL PROVIDE THE OWNER REPRESENTATIVE WITH UP

TO 4 HOURS OF TRAINING TO ENSURE PROPER OPERATION AND MAINTENANCE

OF THE SYSTEMS.

AB. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS,

CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE

DOCUMENTS. IN ADDITION, THE CONTRACTOR IS RESPONSIBLE FOR

COORDINATION WITH THE GENERAL CONTRACTOR FOR ALL PATCHING OF

HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.

AC. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY,A ND PCB'S ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.

AD. PLUMBING CONTRACTOR SHALL COORDINATE WITH MECHANICAL

CONTRACTOR TO PROVIDE ALL EQUIPMENT, SYSTEMS & ACCESSORIES

NECESSARY FOR A COMPLETE SYSTEM. SEE MECHANICAL DRAWINGS &

SPEC'S FOR SOME DETAILS IN PLUMBING CONTRACTOR'S SCOPE OF WORK.

AE. MAIN COMPRESSED AIR PIPING & DEMOLITION, AIR COMPRESSOR RELOCATION

& ACCESSORIES ARE BY P.C. BRANCH PNEUMATIC TUBING & DEMO IS BY M.C.

COORDINATE ALL WORK W/ T.C. CONTRACTOR TO ENSURE PROPER

FUNCTIONING OF NEW & EXISTING CONTROLS.

AF. PLUMBING CONTRACTOR SHALL PROVIDE PIPING, CONNECTIONS, AND

SPECIALTIES FOR MECHANICAL EQUIPMENT IN THIS PROJECT INCLUDING

NATURAL GAS, DOMESTIC & RO WATER, CONDENSATE, DRAINS, AND

COMPRESSED AIR PIPING IN ADDITION TO THE PLUMBING DRAWINGS. ALSO

SEE MECHANICAL SCHEDULES, DRAWINGS, SECTIONS, & DETAILS FOR THE

COMPLETE SCOPE OF THE PLUMBING CONTRACTOR'S WORK.

PLUMBING DEMO GEN'L NOTES

A. LOCATIONS AND DIMENSIONS OF EXISTING FACILITIES IDENTIFIED ON THIS

DRAWING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE

INFORMATION BASED ON A COMBINATION OF FIELD INVESTIGATIONS AND

VARIOUS DESIGN AND RECORD DRAWINGS AVAILABLE AT THE TIME OF DESIGN.

FIELD VERIFY LOCATIONS AND DIMENSIONS PRIOR TO ORDERING EQUIPMENT

AND DURING PERFORMANCE OF THE WORK. PROVIDE ALL DEMOLITION WORK,

NECESSARY FITTINGS, TRANSITIONS, AND OTHER COMPONENTS AS REQUIRED

FOR A COMPLETE AND FUNCTIONAL INSTALLATION OF NEW SYSTEMS AT NO

ADDITIONAL COST TO THE OWNER.

B. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH PORTIONS OF THE EXISTING

PLUMBING SYSTEMS. ALL UTILITY OUTAGES MUST BE SUBMITTED IN AN

OPERATION PLAN TO THE C.O. FOR APPROVAL WITHIN 14 DAYS OF THE NOTICE

TO PROCEED.

C. ALL EXISTING PLUMBING EQUIPMENT AND PIPING SHOWN BLACK OR UNDER

CROSSHATCH SHALL BE DEMOLISHED. EXISTING EQUIPMENT AND PIPING

SHOWN FRAY IS TO REMAIN UNCHANGED AND IN PLACE.

D. PRESENT ALL DEMOLISHED EQUIPMENT TO THE C.O. FOR SALVAGE. REMOVE

FROM SITE ANY UNWANTED EQUIPMENT.

E. PLUMBING CONTRACTOR IS RESPONSIBLE FOR THE CUTTING OF FLOORS,

WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN

THESE DOCUMENTS.

F. COORDINATE WITH GENERAL CONTRACTOR TO PATCH AND REPAIR ROOF AND

WALL ASSEMBLIES ASSOCIATED WITH PLUMBING DEMOLITION. THE

CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLE TO THE

SATISFACTION OF THE ARCHITECT/ENGINEER.

G. PROTECT EXISTING BUILDING ELEMENTS DURING DEMOLITION WORK.

COORDINATE WITH OTHER TRADES TO ENSURE NO EXISTING

EQUIPMENT/PIPING TO REMAIN IS DAMAGED DURING THE DEMOLITION WORK.

H. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB'S. ANY

EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE

DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE

GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.

PROJECT SPECIFICATIONS

A. ALL WORK ON THE PROJECT SHALL CONFORM TO ALL LOCAL CITY, STATE AND

NATIONAL CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE

N.F.P.A., N.E.C., U.B.C., I.E.C.C., I.M.C., U.P.C., THE LOCAL UTILITY SERVING

COMPANIES AND THE AUTHORITY HAVING JURISDICTION.

B. THE WORK ON THIS PROJECT SHALL CONSIST OF ALL ITEMS, ARTICLES,

MATERIALS, EQUIPMENT, AND LABOR FURNISHED TOGETHER ALONG WITH ALL

INCIDENTAL ITEMS REQUIRED BY GOOD PRACTICE AND WORKMANSHIP TO

PROVIDE A SATISFACTORY, COMPLETE AND FUNCTIONAL SYSTEM IN

ACCORDANCE WITH THE DRAWINGS AT NO ADDITIONAL COST TO THE OWNER.

C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL FEES AND

PERMITS REQUIRED FOR WORK UNDER THEIR CONTRACT AND UNDER THEIR

SUPERVISION BY SUBCONTRACT.

D. MANUFACTURER'S TRADE NAMES AND CATALOG NUMBERS ARE LISTED TO

INDICATE SPECIAL CONDITIONS AND QUALITY OF MATERIALS OR EQUIPMENT

SUPPLIED. ALTERNATIVE EQUIPMENT OR MATERIALS MAY BE SUBMITTED FOR

REVIEW & APPROVAL DURING THE SUBMITTAL PROCESS.

E. ALL WORK BY THE CONTRACTOR IS SUBJECT TO REVIEW AT ANY TIME BY THE

ARCHITECT/ENGINEER.

F. ALL WORK TO BE PERFORMED SHALL FIRST BE SCHEDULED AND SUBMITTED TO

THE OWNER'S REPRESENTATIVE FOR ACCEPTANCE.

G. SMOKING SHALL NOT BE PERMITTED ANYWHERE IN THIS FACILITY OR WITHIN 25

FT OF THE BUILDING.

H. THE CONTRACTOR SHALL BE CAREFUL NOT TO BLOCK ANY PATHS OF EGRESS

WHILE PERFORMING THE WORK SPECIFIED.

I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ALL MATERIALS

RESULTING FROM HIS/HER WORK. CLEANUP SHALL BE PERFORMED TO THE

LEVEL OF ACCEPTANCE OF THE OWNER'S REPRESENTATIVE & THE ENGINEER.

J. THE CONTRACTOR SHALL AND HEREBY DOES WARRANT AND GUARANTEE THAT

ALL WORK EXECUTED UNDER HIS/HER CONTRACT SHALL BE FREE OF DEFECTS

OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE(1) YEAR FROM THE

DATE OF SUBSTANTIAL COMPLETION.

K. SUBMIT ALL SHOP DRAWINGS FOR ALL EQUIPMENT ASSOCIATED WITH THIS

PROJECT TO THE ARCHITECT/ENGINEER FOR REVIEW/APPROVAL PRIOR TO

ORDERING ANY EQUIPMENT. ALL MATERIALS AND OR EQUIPMENT SHALL BE NEW.

L. UPON SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL SUBMIT AN

OPERATIONS AND MAINTENANCE (O&M) MANUAL/BROCHURE OF ALL EQUIPMENT

TO THE ENGINEER FOR REVIEW/APPROVAL. AFTER RECEIVING APPROVAL FROM

ENGINEER, PROVIDE (2 COPIES) TO OWNER AND PROVIDE THE NECESSARY

TRAINING TO THE FACILITIES PERSONNEL REGARDING ALL EQUIPMENT

ASSOCIATED WITH THIS PROJECT.

M. ALL EQUIPMENT & MATERIALS PROVIDED SHALL MEET THE BUY AMERICAN ACT.

BACKFLOW PREVENTER

BALL VALVE

BUTTERFLY VALVE

CALIBRATED BALANCING VALVE

CHECK VALVE

CLEAN-OUT - FLOOR

CLEAN-OUT - WALL

HOSE END DRAIN

FLOW SWITCH

GATE VALVE

HOSE BIB

MIXING VALVE

STRAINER

PIPE WELL- EMPTY

PRESSURE GAUGE AND COCK

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

PRESSURE SENSOR

PRESSURE SWITCH

PRESSURE/TEMPERATURE PORT

SOLENOID VALVE

TEMPERATURE SENSOR

THERMOMETER

THREE-WAY VALVE

QUICK DISCONNECT

PLUMBING SPECIALTIES LEGEND

PIPE SCHEDULE

SYSTEM PIPE MATERIAL SIZE

INSULATION

THICKNESS REMARKS

DOMESTIC WATER - BELOW GRADE HDPE ALL NONE NO FITTINGS UNDERSLAB

DOMESTIC WATER - BELOW GRADE DUCTILE IRON ALL NONE DOMESTIC WATER SERVICE

DOMESTIC COLD WATER 'L' COPPER ALL 1/2" PRESS SEAL JOINTS/SWEAT

DOMESTIC HOT WATER 'L' COPPER ALL 1" PRESS SEAL JOINTS/SWEAT

DOM. HOT WATER RECIRC. 'L' COPPER ALL 1" PRESS SEAL JOINTS/SWEAT

WASTE PVC ALL NONE NEW SANITARY WASTE

WASTE CAST IRON ALL 1/2" RAINWATER LEADERS

VENT PVC ALL NONE NEW VENT PIPING

COMPRESSED AIR THREADED BLACK IRON ALL NONE VALVE AS REQUIRED

NATURAL GAS - ABOVE GRADE THREADED BLACK IRON ALL NONE PAINT TO MATCH EXISTING - INCLUDE PRIME COAT

NOTE:

1. INSULATION THICKNESS IS BASED ON A CONDUCTIVITY NOT EXCEEDING .27 BTU PER INCH/H * FT^2 * °F

2. PLASTIC PIPE SHALL NOT BE INSTALL WITHIN THE FIRST 18" OF A WATER HEATER.

DOMESTIC COLD WATER OR RO

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRC

SANITARY SEWER

VENT

RAIN WATER LEADER

RAIN WATER OVERFLOW

CONDENSATE DRAIN

FIRE

NATURAL GAS

COMPRESSED AIR

PLUMBING SYSTEMS LEGEND

GENERAL SYMBOLS LEGEND

SYMBOL DESCRIPTION

KEY NOTE SYMBOL

TERMINATION POINT OF DEMOLITION WORK

POINT OF CONNECTION TO EXISTING WORK

HATCH DENOTES EQUIPMENT OR DUCTWORK TO BE DEMOLISHED

EQUIPMENT TAG

X

XX-X

ALTERNATE

NUMBER ALTERNATE DESCRIPTION ADD OR DEDUCT EQUIPMENT AFFECTED

1 EXPERIMENTAL COOLING ADD CU-A1

2 ABA RESTROOM ADD EF-A2, EM1

3 MZ AHU UPGRADE TO VAV ADD AHU-A2, CU-A2, CD-A13 THROUGH CD-A17

4 SMOKE EXHAUST STACK ADD SEF-A1, CD-A9

5 SMOKE ACCUMULATION EXHAUST ADD SEF-A2

6 VCT ABATEMENT ADD COORDINATE WITH G.C. & C.O.

7 LV TUNNEL DOOR MOTOR ACCESS ADD CONTROLS, LV TUNNEL OVERHEAD DOOR

8 DESTRATIFICATION FANS ADD DSF-A1 & A2, DSF-$

9 HEATER ALTERNATE ADD ECUH-B6 & B7, HWCH-B2

AIR CONDITIONING EQUIPMENT

EXHAUST ADD SEF-A3, L-A4, CD-A11

11 (D) RECEIVING 101A CMU WALLS ADD COORDINATE WITH G.C. & C.O.

12 SUPPLY-TO-RELIEF BYPASS DAMPER ADD CD-A8

PROJECT ALTERNATE SCHEDULEPLUMBING ABBREVIATIONS

ABA ARCHITECTURAL BARRIERS ACT

AHU AIR HANDLING UNIT

AS ATMOSPHERIC STEAM

BFP BACK FLOW PREVENTER

BOD BASIS OF DESIGN

BTU/HR BRITISH THERMAL UNITS PER HOUR

CA COMPRESSED AIR

CD CONDENSATE DRAIN

CFH CUBIC FEET PER HOUR

CHW CHILLED WATER

CW CONDENSER WATER

(D) DEMOLISH / DEMOLITION

DCW DOMESTIC COLD WATER

DN DOWN

DWH DOMESTIC HOT WATER

(E) EXISTING

EC ELECTRICAL CONTRACTOR

ET EXPANSION TANK

(F) FUTURE

FD FLOOR DRAIN

FS FIRE SPRINKLER

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

ID INNER DIAMETER

ID INDIRECT DRAIN

MBH THOUSANDS OF BTU/HR

MC MECHANICAL CONTRACTOR

MDPE MEDIUM DENSITY POLYETHYLENE

MZ MULTI-ZONE

(N) NEW

NG NATURAL GAS

N.T.S. NOT TO SCALE

OD OUTER DIAMETER

PC PLUMBING CONTRACTOR

PRV PRESSURE REDUCING VALVE

PSIG POUNDS PER SQUARE INCH (GAGE)

PVC POLYVINYL CHLORIDE

QD QUICK DISCONNECT

RD ROOF DRAIN

RO REVERSE OSMOSIS

SAM STEAM ABSORPTION MANIFOLD

SG STEAM GENERATOR

SS SANITARY SEWER (WASTE)

SS STAINLESS STEEL

TC TEMPERATURE CONTROLS

U.N.O. UNLESS NOTED OTHERWISE

V VENT

VTR VENT THROUGH ROOF

W SANITARY WASTE

W/ WITH

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

P0.1

PLUMBING NOTES & LEGENDS

JW

DMP

SGH

JW 49

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MANUF MODEL NUMBER

MOUNTING /

MOUNTING

HEIGHT

MATERIAL & FINISH TRIM

SIZE AT FINAL CONNECTION TO FIXTURE

REMARKS

DRAIN VENT COLD HOT

BV1 BALL VALVE - TWO PIECE - FULL PORT - LEAD FREE WATTS LFB6081G2 PIPE BRONZE CONSTRUCTION - LEAD FREE SOLDER ENDS - - - - LINE SIZE LINE SIZE BRONZE BALL VALVE - TWO PIECE - FULL PORT - 600 PSIG WOG - BLOW-OUT PROOF STEM

BV2 BALL VALVE - TWO PIECE - FULL PORT - WITH DRAIN - LEAD FREE WATTS LFIS6301 PIPE BRONZE CONSTRUCTION - LEAD FREE SOLDER ENDS - - - - LINE SIZE LINE SIZE BRONZE BALL VALVE - TWO PIECE - STANDARD PORT - 600 PSIG WOG - BLOW-OUT PROOF STEM - WITH DRAIN VALVE

CV1 CHECK VALVE - WYE PATTERN WATTS LFWCVS PIPE BRASS CONSTRUCTION - LEAD FREE BRONZE DISK - - - - LINE SIZE LINE SIZE WYE PATTERN BRONZE CHECK VALVE - 200 PSIG WOG

EM1 DECK MOUINTED EMERGENCY EYE/FACE WASH W/ MIXING

VALVE HAWS 8904 DECK 8 FOOT HOSE 9201EFE MIXING VALVE - SP212

VACUUM BREAKER - - - - 3 / 4" 3 / 4"

PROVIDE COMPLETE WITH THERMOSTATIC MIXING VALVE AND ALL REQUIRED ACCESSORIES FOR A COMPLETE INSTALLATION. MOUNT THERMOSTATIC MIXING VALVE FOR THE EYEWASH UNDER THE CABINET AND TAMPER-PROOF PER UPC REQUIREMENTS WITH LOCK OR REMOVE THE SHUT OFF VALVE

HANDLE AND GIVE TO C.O.

FC0 FLOOR CLEAN OUT JR SMITH 4021S FLOOR CAST IRON BODY / BRONZE PLUG / NICKEL

BRONZE TOP

TWIST ADJUSTMENT - CARPET

CLAMP WHERE REQUIRED 2" - 4" SEE PLANS - - - - - - PROVIDE WITH CARPET CLAMP AT CARPET AREAS

FD1 FLOOR DRAIN WITH ADJUSTABLE HEIGHT ROUND STRAINER JR SMITH 2005 FLOOR CAST IRON BODY / NICKEL BRONZE STRAINER TRAP PRIMER CONNECTION 2" - 4" SEE PLANS 1-1/2"-2"SEE PLANS - - - - PROVIDE COMPLETE WITH PRO SEAL "TRAP GUARD" TRAP SEAL PRIMER

GBV1 GAS BALL VALVE WATTS GBV PIPE BRASS PTFE SEATS - - - - - - - - 2 PIECE BRASS BALL VALVE MADE FOR NATURAL GAS AND LP GAS

GC1 GAS CONNECTOR LSP 63 SERIES PIPE STAINLESS STEEL WITH FITTINGS - - - - - - - - SIZE FOR APPLIANCE CONNECTION

GPR4 GAS PRESSURE REGULATOR - NATURAL GAS MAXITROL 210 SERIES PIPE CAST ALUMINUM BODY & BONNET DUCTILE IRON INLET BODY - - - - - - - - NATURAL GAS PRESSURE REGULATOR - UP TO 50,000,000 CUBIC FEET PER HOUR - SEE DRAWINGS FOR CAPACITY - 10 PSIG INLET - 8" W.C. OUTLET - 2" INLET

AND OUTLET SIZE

GV1 GAS SHUT-OFF VALVE - UP TO 1" WATTS GBV PIPE BRASS BODY PTFE SEATS - - - - - - - - 2 PIECE BRASS GAS (NATURAL OR LP) BALL VALVE - UL APPROVED

GV2 GAS SHUT-OFF VALVE - UP TO 3" APOLLO 80-100 SERIES PIPE BRONZE BODY RPTFE SEATS - - - - - - - - 2 PIECE BRASS GAS (NATURAL OR LP) BALL VALVE - UL APPROVED

HB1 HOSE BIBB - STANDARD WOODFORD MODEL 24 WALL / 18" CHROME FINISH WITH VACUUM BREAKER - - - - 3 / 4" - - AUTOMATIC DRAINING WALL FAUCET WITH ANTI-SIPHON VACUUM BREAKER

ID1 INDIRECT DRAIN FLOOR SINK - 12" SQUARE JR SMITH 3421 FLOOR CAST IRON BODY / NICKEL BRONZE STRAINER SEDIMENT BUCKET - 4" FUNNEL 4" 2" - - - - PROVIDE COMPLETE WITH PRO SEAL "TRAP GUARD" TRAP SEAL PRIMER - ABS SEDIMENT BUCKET

L1 LAVATORY - HAND SINK - WALL MOUNTED - TOUCHLESS FAUCET KOHLER K-2027 WALL / RIM 31" VITREOUS CHINA W/ MOEN #8554 FAUCET-GRID DRAIN 2" 1 - 1 / 2" 1 / 2" 1 / 2" WITH ELECTRONIC FAUCET - PROVIDE JR SMITH #700 SERIES CARRIER, BRASSCRAFT #KTCR STOPS, OFFSET DRAIN W/ TRUEBRO LAV GUARD II PIPE

INSULATION

PG1 PRESSURE GAUGE ERNST TL35P PIPE STEEL CASE - BRONZE TUBE BRASS MOVEMENT - - - - - - - - ACCURACY = 2% OF MIDDLE OF RANGE - USE PRESSURE RANGE SO THAT NEEDLE IS IN MIDRANGE DURING NORMAL OPERATION

QD1 COMPRESSED AIR QUICK DISCONNECT MILTON #715 VARIES BRASS COUPLERS W/ BRASS SLEEVES BUNA-N SEAL - - - - - - - - M-STYLE COUPLER, 1/4" FEMALE NPT. MAX RATING: 300 PSI & 250°F. 40 SCF M AT 100 PSI. PROVIDE REDUCER AS REQUIRED & SHUT-OFF VALVE.

S1 SINK - SINGLE COMPARTMENT - DEEP - PULL OUT FAUCET JUST SLX-2125-A-GR COUNTER STAINLESS STEEL

MOEN #7560 FAUCET WITH PULL-OUT

SPRAY 2" 1 - 1 / 2" 1 / 2" 1 / 2"

PROVIDE BRASSCRAFT #KT STOPS - VERIFY DIMENSIONS WITH DRAWINGS PRIOR TO ORDERING - VERIFY HOLE PUNCH REQUIREMENTS - 10.5" OR 12" DEEP -

BRASSCRAFT #KTCR STOP

TP1 TRAP PRIMER - DIFFERENTIAL PRESSURE WATTS LFTP300 PIPE BRASS - LEAD FREE - EPDM SEALS 695-Y52 SPLITTER IF REQUIRED 1 / 2" - - - - - - DIFFERENTIAL PRESSURE TYPE - ACTIVATES ON 10 PSIG DROP IN PRESSURE - MIN / MAX WORKING PRESSURE IS 30 / 250 PSIG - RUN TUBING TO FLOOR

DRAIN - PROVIDE ACCESS BOX IN WALL

TP2 TRAP PRIMER - FROM TAILPIECE WATTS 764 253TP TAILPIECE CHROME - - 3 / 8" - - - - - - MOUNT IN LAVATORY TAILPIECE - RUN TUBING TO FLOOR DRAIN

UR1 URINAL - TOP SPUD - MANUAL FLUSH VALVE - STANDARD HEIGHT KOHLER K-4904-ET WALL / LIP 24" VITREOUS CHINA SLOAN #186HEU HIGH EFFICIENCY

MANUAL FLUSH VALVE 2" 1 - 1 /2" 3 / 4" - -

VITREOUS CHINA 1 / 8 GALLON PER FLUSH URINAL WITH TOP SPUD - STANDARD HEIGHT MOUNTING - BATTERY OPERATED FLUSH VALVE. PROVIDE WATER

HAMMER ARRESTER WHA-1 IN DCW LINE TO FIXTURE WHERE ACCESSIBLE.

WCO WALL CLEAN OUT JR SMITH 4432 WALL / 18" STEEL WITH CHROME COVER LINE SIZE - - - - - - CAST IRON CAULK FERULE WITH CASE IRON LEAD SEAL PLUG

WC1 WATER CLOSET - FLOOR MNTD - K-4467 TANK - ADA HT KOHLER K-3999 FLOOR / RIM 16.5" VITREOUS CHINA CLASS FIVE FLUSH W/ CHROME TRIP LEVER 4" 2" 1 / 2" - - KOHLER #K-4731-C COMMERCIAL HEAVY DUTY ELONGATED OPEN FRONT SEAT - 1.28 GALLON PER FLUSH WITH CLASS FIVE FLUSH - BRASSCRAFT #KTCR

STOP.

WHA1 WATER HAMMER ARRESTER SIOUX CHIEF 653-B PIPE COPPER - - - - - - 3/4' - - 3/4" CONNECTION TO PIPING

NOTES: PROVIDE ALL FIXTURES WITH APPROPRIATE COMMERCIAL GRADE SUPPORTS/CARRIERS, P-TRAPS, STOP VALVES, COMMERCIAL GRADE BRAIDED STAINLESS STEEL FLEXIBLE SUPPLIES, UNDER FIXTURE PIPING INSULATION AND WATER HAMMER ARRESTORS. PROVIDE AND INSTALL TRAP PRIMERS FOR ALL FLOOR DRAINS AND FLOOR SINKS UNLESS OTHERWISE INDICATED. INSTALL ALL TRAP PRIMERS IN RECESSED WALL MOUNTED BOXES IN AN ACCESSIBLE LOCATION. FIELD COORDINATE INSTALLATION LOCATION WITH ARCHITECT/ENGINEER. FIELD COORDINATE LOCATION AND NUMBER OF FAUCET MOUNTING HOLES WITH GENERAL CONTRACTOR. INSTALL ALL FIXTURES AS PER THE MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

P0.2

PLUMBING FIXTURE SCHEDULE

JTW

DMP

DMP

JTW 50

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

REF.

FLAMMABLE CAB.

(E) TOILET

108A

(E) JANITOR

107A

UP

DN.

UP

DN.

RAMP DOWN

DN

AA

BBDDEEFFGGHHJJKKLL

AA

BBDDEEFFGGHHJJKKLL

UP

UP

UP

A

B

C

(E) BOILER RM

001 A

(E) PREPARATION

AND STAGING

106-1A

(E) FUELS LAB

105 A

LASER ROOM

105-1A

CALIBRATION

105-3A

OBSERVATION

ROOM

104 A

(E) COMBUSTION

LAB

103 A

(E) VESTIBULE

100 B

(E) VESTIBULE

102 A

(E) PREPARATION

AND STAGING

106-2A

(E) RECEIVING

101 A

PD2.1

21 19

(E) CA DN FROM THIRD

FLOOR TO REMAIN.

(E) CA ALONG WALL

(E) CA DN TO

FLOOR LEVEL

(D)(E) CA

THROUGH

BURN

CHAMBER

WALL BACK

TO RISER

(E) QD

(E) HB

(E) DCW

UP FROM

RETURN

PLENUM

BELOW TO

(E) HB.

(E) V FROM SINK

(E) DOMESTIC

WATER HEATER

TANK, WATER

SOFTENER, DHW

RECIRC. PUMP TO

REMAIN.

(E

C A

(D) ONLY EXTENT REQUIRED

TO COORDINATE (N) WORK

11 11

(E

D C

W

(E) DHW TO 'B'-WING

TO REMAIN

(E) BOILER ROOM

001 A

(E) TRANSFORMER

RM

003 B

(E) ELEC PANEL RM

002 A

(E) HOIST RM

004 A

UNEXCAVATED

4 A

(E) PIPE TUNNEL

(E) DOCK ABOVE

CRAWL SPACE

C R

A W

L S

P A

C E

(E) DOMESTIC WATER

HEATER TANK, WATER

SOFTENER, DHW RECIRC.

PUMP TO REMAIN.

(E) DCW UP & OVER TO DCW

SERVICE ENTRY TO REMAIN.

(E) DHW UP & OVER TO

DHW TANK TO REMAIN.

(E) FS UP & OVER TO DCW

SERVICE ENTRY TO REMAIN.

(E) NG UP & OVER TO GAS

SERVICE ENTRY TO REMAIN.

(E) CA UP TO

REMAIN. SEE

KEYNOTE 19

THIS SHEET.

8 8

(E) CA

(E) CA UP

THROUGH

FLOOR TO

BURN

CHAMBER

(E) DCW UP

THROUGH

FLOOR TO

BURN

CHAMBER

(E) DCW

KEY NOTES:

1. U.N.O, PROTECT (E) NATURAL GAS METER & REGULATORS, AND (E) 5" GAS

SERVICE ENTERING 'A' WING TO REMAIN.

2. (D) (E) 5" GAS PIPING SERVING (E) STEAM BOILERS BACK TO REGULATOR. SEE

DETAIL 3/P9.1.

3. (E) EMERGENCY SHOWER TO REMAIN.

4. ALTERNATE 2 - ABA RESTROOM: (D) (E) EMERGENCY EYE WASH.

5. (E) FLOOR SINK TO REMAIN.

6. ALTERNATE 2 - ABA RESTROOM: (D) (E) JANITOR'S SINK. CAP PIPING AT FLOOR

& WALL.

7. (E) SINK TO REMAIN.

8. (E) INDIRECT DRAIN TO REMAIN.

9. ALTERNATE 2 - ABA RESTROOM: (D) (E) WATER CLOSET, URINAL, & LAVATORY.

SEE 13/PD2.1

10. (E) DCW SERVICE ENTRY THROUGH FLOOR TO REMAIN. SEE DETAIL 2/P9.1.

11. (D) (E) 4" GAS BRANCH PIPING SERVING (E) STEAM BOILER & (D) VENT TO

OUTDOORS (TYP. 2)

12. ALTERNATE 2 - ABA RESTROOM: (D) (E) SINK.

13. (D) (E) 2" NG BRANCH UP THROUGH SECOND FLOOR.

14. (E) 2" DCW UP & OVER TO PIPE TUNNEL TO REMAIN.

15. (E) FLOOR DRAIN TO REMAIN.

16. (E) 2" V. UP TO REMAIN.

17. (E) DCW & DHW TO REMAIN.

18. (E) F.S. RISER UP FROM SERVICE ENTRY AND OVER TO PIPE TUNNEL TO

REMAIN.

19. (E) CA DOWN TO PIPE TUNNEL TO REMAIN.

20. (E) CA UP TO 2ND FLOOR TO REMAIN.

21. (D) (E) CA FROM TEE FITTING UP THROUGH 2ND FLOOR. CAP AT (E) TEE TO

REMAIN IN BOILER ROOM.

22. (E) DCW & CD LINES TO & FROM ENVIRONMENTAL CHAMBER TO REMAIN.

23. (D) (E) DCW BRANCHES SERVING (E) STEAM BOILERS B-1 & B-2.

24. (D) (E) 1-1/2" DCW UP FROM SERVICE ENTRY TO "A" WING LAB FIXTURES TO

REMAIN.

25. (E) DCW FROM SERVICE ENTRY TO DHW @ TANK & HW MAKE-UP TO REMAIN.

26. ALTERNATE 2 - ABA RESTROOM: (D) (E) SINK AND CAP DCW, DHW, WASTE, &

VENT LINES.

27. (D) (E) 1" DCW UP THROUGH FLOOR.

28. ALTERNATE 2 - ABA RESTROOM: DISCONNECT & REMOVE (E) CA & NG PIPING

ALONG LAB BENCHES. SALVAGE COUNTER-TOP SUPPLY VALVES & QD'S.

29. (D) PORTION OF (E) FP PIPE BACK TO RISER TO REMAIN AS REQUIRED FOR

LOCATION OF NEW ELECTRICAL PANELS. COORDINATE W/ E.C. SEE NEW

WORK PLAN.

30. REMOVE AND SALVAGE (E) SPRINKLER HEAD.

31. (E) RISERS TO REMAIN.

32. EXISTING AFTERCOOLER / DRYER SYSTEM SERVING C.A. SYSTEM SHALL

REMAIN.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

PD2.0

'A' WING PLUMB DEMO PLANS

JW

DMP

SGH

JW

PD2.0 : PD2.0

PD2.0 : PD2.0

PD2.0 : PD2.0

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING - PLUMBING FIRST FLOOR DEMOLITION PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING - PLUMBING BASEMENT DEMOLITION PLAN

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN12

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

A

B

C

(E) AIR

CONDITIONING

EQUIP

203 A

(E) WIND TUNNEL

TEST AREA

202 A

(E) LOW FLOW

TUNNEL

(E) CONTROL RM

201 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

11 10

(E) Q.D. (E) Q.D.

(D) (E) RO

(D) (E) DCW

(D) (E) NG

(E) VTR TO REMAIN

(E) V UP FROM BELOW

(E) CA

4 5

15(E) CA QD, TYP. 3

(E) NG SUPPLY VALVE,

TYP. 3

(E) CA QD

(E) NG SUPPLY VALVE

(E) CA

(E) DCW

(E) NG

(E) DHW

(E) V

KEY NOTES:

1. (E) SINK TO REMAIN.

2. ALTERNATE 2 - ABA RESTROOM: (D) (E) JANITOR'S SINK. (D) DCW, WASTE, &

VENT BACK TO MAINS & CAP.

3. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) WATER CLOSET.

4. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) URINAL.

5. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) LAVATORY.

6. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) SINK & DCW, DHW, WASTE, &

VENT BACK TO MAINS & CAP.

7. (E) FLOOR SINK TO REMAIN.

8. ALTERNATE 2 - ABA RESTROOM: (D) (E) EMERGENCY EYE WASH.

9. (E) FLOOR DRAIN TO REMAIN.

10. (E) DHW TO "B" WING TO REMAIN.

11. (D) (E) RO WATER UP THROUGH FLOOR.

12. REMOVE & SALVAGE (E) RO WATER TREATMENT SKID. SEE NEW WORK

PLANS FOR RELOCATION. (D) ALL PIPING & DRAIN CONNECTIONS.

13. (E) CA UP & DN TO REMAIN

14. (E) CA DN TO 1ST FLOOR TO REMAIN.

15. ALTERNATE 2 - ABA RESTROOM: (D) (E) SINK & DCW, DHW, WASTE & VENT

BACK TO MAINS & CAP.

16. (D) (E) RO WATER PIPING FROM (E) RO SKID TO (E) SG'S ON 3RD FLOOR

17. DISCONNECT & REMOVE (E) AIR COMPRESSOR & ALL ACCESSORIES,

CONTROLS, & WIRING. PRESENT TO C.O. FOR SALVAGE. DISPOSE AS

DIRECTED BY C.O.

18. (D) (E) CA DN TO 1ST FLOOR.

19. (D) (E) DCW RISER UP THROUGH FLOOR, TYP. 2.

20. (D) (E) DCW DOWN THROUGH FLOOR & ALL MAKE-UP CONNECTIONS TO CHW

& CW SYSTEMS, & ALL CONDENSATE IN CHILLER ROOM.

21. (E) INDIRECT DRAIN TO REMAIN. (D) (E) P-TRAP ONLY, BELOW FLOOR

22. (E) FD TO REMAIN, (D) (E) P-TRAP ONLY, BELOW FLOOR, TYP. 2.

23. (D) (E) NG UP THOUGH FLOOR.

24. (D) (E) NG DOWN THROUGH FLOOR.

25. (E) 4" WASTE RISER UP & DN TO REMAIN.

26. (D) (E) 2" DRAIN FROM FD ABOVE TO (E) STACK TO REMAIN.

27. ALTERNATE 2 - ABA RESTROOM: DISCONNECT & REMOVE CA & NG PIPING

ALONG LAB BENCHES BACK TO MAIN. SALVAGE COUTER TOP SUPPLY

VALVES & QD'S.

28. (E) HORIZONTAL MAINS TO REMAIN INCLUDING DCW, DHW, V, CA, & NG.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

PD2.1

'A' WING PLUMB DEMO PLANS

JW

DMP

SGH

JW

PD2.1 : PD2.1

PD2.1 : PD2.1

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING - PLUMBING SECOND FLOOR DEMOLITION PLAN

TRUE NORTH BLDG NORTH

: 1/2" = 1'-0"

13 'A' WING - PLUMBING FIRST FLOOR RESTROOMS DEMOLITION PLAN

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

PD2.1 : PD2.0

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

AA

BBDDEEFFGGHH

AA

BBDDEEFF

UP

AA

BBDDEEFFGGHHJJKKLL

A

B

C

(E) BURN CHAMBER

PLATFORM

401 A

(E

S M

O K

E R

E L

IE

F

P L E N

U M

A

ROOF

(E) 3" DRAIN DN

(E

S A

P

LE

N U

M

ROOF

(E) MECHANICAL

RM

302 A

(E) MECHANICAL

LOFT

301 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

(E) 3" DRAIN DN

FROM ABOVE

TO REMAIN

(E) VTR

13 15

(D) (E) CD

& DCW

(D) (E) NG

(D) (E) NG

KEY NOTES:

1. (D) (E) 3/4" DCW DN THROUGH FLOOR & UP TO (E) AHU, & ALL

CONNECTIONS.

2. (D) (E) SPRAY WATER PUMP INCLUDING ALL PIPING, WIRING, & CONTROLS.

3. (D) ALL (E) DRAIN LINES FROM (E) SG'S, UNDER (E) AHU TO (E) INDIRECT

DRAIN.

4. (E) ROOF DRAIN TO REMAIN.

5. (D) (E) NG & RO WATER TO (E) SG, TYP. 2.

6. DISCONNECT & REMOVE (E) AIR COMPRESSOR, WALL-MOUNTED MANIFOLD,

WATER SEPARATOR, & ALL ACCESSORIES & CONTROLS. SALVAGE FOR

RELOCATION.

7. (E) QD & CA RISER DN THROUGH FLOOR TO REMAIN.

8. (D)(E) CA BRANCH SERVING (E) ATOMIZATION HUMIDIFICATION SYSTEM IN AHU

BACK TO CA MAIN RISER & CAP AT MAIN.

9. (E) 3" RD ABOVE TO REMAIN.

10. (E) 4" WASTE STACK DOWN TO REMAIN.

11. (D) (E) 3/4" DCW FROM MAKEUP CONNECTION FROM CHILLED WATER

EXPANSION TANK DOWN THROUGH FLOOR.

12. (D) (E) RO WATER DN THROUGH FLOOR.

13. (D) (E) NG DN THROUGH FLOOR.

14. (D) (E) ID DN THROUGH FLOOR.

15. ALTERNATE 3 - VAV AHU: (D) (E) CD FROM (E) MZ AHU TO I.D. BASE BID: (E)

CD SHALL REMAIN.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

PD2.2

'A' WING PLUMB DEMO PLANS

JW

DMP

SGH

JW

PD2.2 : PD2.2

PD2.2 : PD2.2

PD2.2 : PD2.2

PD2.2 : PD2.2

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING - PLUMBING FOURTH FLOOR DEMO PLAN TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

7 'A' WING - PLUMBING ROOF DEMO PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING - PLUMBING THIRD FLOOR DEMOLITION PLAN

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

AA

BBDDEEFFGGHHJJKKLL

UP

UP

UP

(E) TOILET

108A

(E) JANITOR

107A

UP

DN.

UP

DN.

RAMP DOWN

DN

AA

BBDDEEFFGGHHJJKKLL

A

B

C

UNEXCAVATED

4 A

C R

A W

L S

P A

C E

CRAWL SPACE

(E) DOCK ABOVE

(E) PIPE TUNNEL

(E) HOIST RM

004 A

(E) ELEC PANEL RM

002 A

(E) TRANSFORMER

RM

003 A

(E) BOILER ROOM

001 A

(E) DOMESTIC

WATER HEATER &

WATER SOFTENER

(E) DCW UP

(N) 1" CA DN FROM

FIRST FLOOR

(N) 3/4" CA

3/4" CA UP THROUGH

FLOOR, TYP 3.

P9.1

(E) CA UP

(N) 1" CA UP

DCW UP THROUGH

FLOOR, TYP 3.

(N) 3/4" DCW

11 11

(N) 1" DCW

(N) 3/4" CA

3 4

(N) 3/4" CA

(N) 3/4" DCW

(E

1" D

C W

(E

3/ 4"

C A

(N

1" C

A

(E) 1" DCW

(E) 3/4" CA

(E) DCW UP

& OVER TO

TUNNEL

(E) COMBUSTION

LAB

103 A

(E) BOILER RM

001 A

(E) PREPARATION

AND STAGING

106-1A

(E) PREPARATION

AND STAGING

106-2A

(E) FUELS LAB

105 A

LASER ROOM

105-1A

CALIBRATION

105-3A

OBSERVATION

ROOM

104 A

(E) VESTIBULE

102 A

(E) CA UP

THROUGH FLOOR

TO (E) QD

(E) 3/4" DCW UP

THROUGH FLOOR TO

(E) HB TO REMAIN

P2.1

4 3

UR-1 L-1

WC-1

(E) F.S. UP

& OVER TO

TUNNEL

HB1

HB1

HB1

QD1

QD1

QD1

S-1

P9.1

19 20

(E)QD

(E)HB

(E) DHW

21 2322

(E) CA DN

FROM ABOVE

(N) 5" NG

(N) 2" DCW

(N) 3" NG

RECONNECT FP

TO (E) RISER

(E

1- 1/

2" D

C W

(E

3/ 4"

C A

(E) EMERGENCY

SHOWER

CABINET HEATER

BY DIV. 23

UH BY

DIV. 23

(E) DCW UP

& OVER TO

TUNNEL

KEY NOTES:

1. (N) 5" NG DOWN TO (E) MAIN SERVICE. PROVIDE (N) REGULATOR AS

REQUIRED FOR (N) CONNECTED GAS LOAD: 6,680 MBH. UPSTREAM

PRESSURE = 10 PSI (CONTRACTOR TO VERIFY W/ UTILITY PROVIDER).

DOWNSTREAM PRESSURE = 8.0 IN WG. SEE DETAIL 11/P9.1.

2. (N) 2" NG DOWN TO (N) BOILER, TYP. 2. INPUT = 2,500 MBH AT 4-14 IN W.G.,

TYP. 2. SEE DETAIL 5/P9.1.

3. 3/4" CA UP THROUGH FLOOR FROM UNDER FLOOR RETURN AIR PLENUM TO

(N) WALL-MOUNTED QD AS SCHEDULED, TYP. 3. ROUTE IN CORRUGATED

WALL CHANNEL.

4. 3/4" DCW UP THROUGH FLOOR FROM UNDER FLOOR RETURN AIR PLENUM TO

(N) WALL-MOUNTED HOSE BIBB, TYP. 3. ROUTE IN CORRUGATED WALL

CHANNEL.

5. ALTERNATE 2 - ABA RESTROOM: PROVIDE (N) EMERGENCY EYEWASH EM1 &

CONNECT EXISTING DCW, DRAIN, AND VENT.

6. ALTERNATE 2 - ABA RESTROOM: (N) SINK S1 AS SCHEDULED.

7. (E) FLOOR DRAIN.

8. (E) FLOOR SINK.

9. (N) 1-1/2" CD W/ P-TRAP FROM BOILER TYP. 2. SEE BOILER CONNECTION

DETAILS ON M9.3. P.C. SHALL INSTALL NEUTRALIZATION KITS SUPPLIED BY

M.C.

10. (E) SINK TO REMAIN.

11. TERMINATE BOILER CD W/ AIR GAP AT (E) ID, TYP. 2.

12. (N) 1" CA UP THROUGH FLOOR FROM BELOW. SEE 7/P9.1 FOR CONNECTION

TO (E) CA.

13. (E) V UP.

14. (E) ID.

15. PROTECT (E) DCW SERVICE ENTERING THROUGH FLOOR FROM BELOW.

16. PROTECT (E) NG METER & 5" SERVICE INTO BUILDING TO REMAIN.

17. (N) 3" NG UP THROUGH 2ND FLOOR. SEE 5/P2.1 FOR CONTINUATION.

18. (E) CA UP.

19. EXTEND (N) 1" CA DN THROUGH FLOOR FROM (E) RISER IN ROOM.

20. EXTEND (N) 3/4" CA FROM (N) QD UP ALONG WALL. SEE P2.1 FOR

CONTINUATION.

21. (N) 2" DCW UP FROM (E) SERVICE ENTRY. SEE DETAIL 10/P9.1.

22. RECONNECT TO (E) 1-1/2" DCW SERVING "A" WING FIXTURES. PROVIDE

REDUCER AS REQUIRED.

23. (N) 1-1/2" DCW UP THROUGH FLOOR. SEE 5/P2.1 FOR CONTINUATION.

24. ALTERNATE 2 - ABA RESTROOM: RE-ROUTE (N) NG & CA LINES ALONG LAB

COUNTERS. REINSTALL SUPPLY VALVES & QD'S WHERE DIRECTED BY C.O.

25. CONNECT (E) 1" NG TO (N) 3" NG. PROVIDE REDUCER AS REQUIRED.

26. REROUTE FP PIPE & RELOCATE SPRINKLER HEAD ONLY AS REQUIRED FOR

LOCATION OF (N) ELECRICAL PANELS. PIPE & SPRINKLER SHALL NOT BE

LOCATED DIRECTLY ABOVE PANELS. COORDINATE WITH E.C.

27. RE-CONNECT EXISTING AFTERCOOLER / DRYER SYSTEM TO C.A. MAIN AS

REQUIRED

28. HW BOILERS, PUMPS, AIR SEPARATOR, EXPANSION TANK, & GLYCOL

FEEDER BY DIV. 23.

29. COORDINATE WITH M.C. TO SEAL AIR TIGHT ALL (N) & (E) PENETRATIONS &

OPENINGS TO UNDERFLOOR PLENUM.

30. (E) DCW, CA, NG, FP, & DHW TO 'B'-WING.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

P2.0

'A' WING PLUMB PLANS

JW

DMP

SGH

JW

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING - PLUMBING BASEMENT PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING - PLUMBING FIRST FLOOR PLAN

P2.0 : P2.0

P2.0 : P2.0

P2.0 : P2.0

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN12

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

A

B

C

(E) OFFICE

212 B

(E) PASSAGE

211 B

(E) LOW VELOCITY

TUNNEL

220 C

(E) WIND TUNNEL

TEST AREA

202 A

(E) CONTROL RM

201 A

(E) BURN CHAMBER

OPEN TO BELOW

201 B

5 5

(E) CA

(N) 3/4" CA UP & DN ON WALL

IN CORRIGATED CHANNEL

(E) CA DN

QD-1

(E) CA UP & DN

(E) VTR

(E) V UP FROM BELOW

1817 23

QD-1

QD-1

QD-1

(N) 3" NG

(N) 1-1/2" DCW

(E) SINK

(E) STACK UP & DN

UNIT HEATER

BY DIV. 23

(E) ID 26

(E) FD 26

(E) FD26

(E

C A

(E

V

(E

D H

W

(E

D C

W

(E) CA

(E) V

(E) DHW

(E) DCW

(E) NG

(N) NG

(E) NG

TYP. 3

CABINET HEATER BY DIV. 23

(E) FD

KEY NOTES:

1. ALTERNATE 2 - ABA RESTROOM: (N) URINAL UR-1 AS SCHEDULED. PROVIDE

(N) DCW & WHA-1 & WASTE & VENT CONNECTIONS TO (E) LINES.

2. ALTERNATE 2 - ABA RESTROOM: (N) WATER CLOSET WC-1 AS SCHEDULED.

PROVIDE (N) DCW & WASTE CONNECTIONS TO (E) LINES.

3. ALTERNATE 2 - ABA RESTROOM: (N) LAVATORY L-1 AS SCHEDULED.

PROVIDE (N) DCW & DHW & DRAIN CONNECTIONS TO (E) LINES.

4. ALTERNATE 2 - ABA RESTROOM: (N) SINK S-1 AS SCHEDULED. ROUTE (N)

DCW & DHW FROM (E) MAINS ABOVE RESTROOM CEILING.

5. 3/4" CA UP ON TUNNEL EXTERIOR WALL TO (N) Q.D. MOUNTED AT 5'0" AFF.

SEAL PENETRATIONS THROUGH TUNNEL, TYP. 4.

6. ALTERNATE 2 - ABA RESTROOM: (N) 3/4" DHW FROM (E) MAIN ABOVE

RESTROOM TO EACH (N) FIXTURE AS REQUIRED, TYP. ALL.

7. ALTERNATE 2 - ABA RESTROOM: (N) 3/4" DCW FROM (E) MAIN ABOVE

RESTROOM TO EACH (N) FIXTURE AS REQUIRED, TYP. ALL.

8. (E) FLOOR SINK TO REMAIN.

9. (E) V UP.

10. ALTERNATE 2 - ABA RESTROOM: (N) 2" V UP ABOVE CEILING FROM (N) WC.

SEE NOTE 11 THIS SHEET.

11. ALTERNATE 2 - ABA RESTROOM: COLLECT VENTS FROM ALL (N) FIXTURES

ABOVE CEILING, INTO COMBINED 3" V UP THROUGH FLOOR ABOVE.

12. (E) DOMESTIC COLD WATER.

13. (E) DOMESTIC HOT WATER.

14. ALTERNATE 2 - ABA RESTROOM: (N) 1-1/2" V UP ABOVE RESTROOM CEILING.

SEE NOTE 11 THIS SHEET.

15. (E) DHW TO "B" WING.

16. (E) DHW DOWN THROUGH FLOOR TO BOILER ROOM.

17. (N) 3" NG DOWN THROUGH FLOOR. SEE 5/P2.0 FOR CONTINUATION.

18. (N) 3" NG UP THROUGH FLOOR. SEE 13/P2.2.2 FOR CONTINUATION.

19. (N) 1-1/2" DCW DOWN THROUGH FLOOR. SEE 5/P2.0 FOR CONTINUATION.

20. (N) 1-1/2" DCW UP THROUGH FLOOR. SEE 13/P2.2.2 FOR CONTINUATION.

21. (N) 3/4" CA ROUTED UNDER LV TUNNEL, TYP 2.

22. (N) 4" DRAIN W/ P-TRAP UP TO (N) ID ABOVE. CONNECT TO (E) WASTE

STACK.

23. ALTERNATE 3 - VAV AHU: (N) 4" DRAIN W/ P-TRAP TO (N) ID ABOVE.

CONNECT TO (E) WASTE STACK.

24. ALTERNATE 2 - ABA RESTROOM: RELOCATE COUNTER-TOP SUPPLY

VALVES & Q.D.'S AND RECONNECT TO (E) NG & CA LINES. COORDINATE

MOUNTING LOCATIONS OF SUPPLY VALVES & Q.D.'S W/ C.O.

25. ALTERNATE 2 - ABA RESTROOM: PROVIDE (N) EMERGENCY EYEWASH EM1 &

CONNECT EXISTING DCW, DRAIN, AND VENT.

26. PROVIDE (N) 2" P-TRAP BELOW FLOOR. CONNECT TO (E) DRAIN & PIPING,

TYP. 3.

27. ALTERNATE 2 - ABA RESTROOM: (N) 3" VTR.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

P2.1

'A' WING PLUMB PLANS

JW

DMP

SGH

JW

P2.1 : P2.1

P2.1 : P2.0

P2.1 : P2.1

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING - PLUMBING SECOND FLOOR PLAN

TRUE NORTH BLDG NORTH

: 1/2" = 1'-0"

13 'A' WING - PLUMBING FIRST FLOOR RESTROOMS PLAN

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN

UR-1

L-1

WC-1

S-1

MATTHEW

A

S

NO

P

I S

S

E F

O R

I G

E R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

AA

BBDDEEFFGGHH

AA

BBDDEEFF

UP

AA

BBDDEEFFGGHHJJKKLL

A

B

C

QD-1

3/ 4"

C

A(N) ROOF -MOUNTED

CONDENSERS BY

DIV. 23, TYP. 2.

(N) ROOF -MOUNTED

CONDENSERS BY

DIV. 23, TYP. 2.

ROOF-MOUNTED

FAN BY DIV. 23

ROOF-MOUNTED

FAN BY DIV. 23

3 3

(N) 3" NG

(N) 1-1/2" DCW

SG-A1

SG-A2

SG-A3

(N

1" C

A

1-1/2" DCW TO RO SKID

1" CD FROM RO SKID

1-1/2" RO FROM RO SKID

(N) ID-1

(N) ID-1

18 19

M9.4

7 8

(N) STEAM GENERATOR

BY DIV. 23, TYP. 3.

(E) QD

BASE BID: (E) AHU.

ALT. 3: (N) AHU-A2 BY DIV. 23.

(N) AHU-A1 & WALL-

MOUNTED VFD'S BY DIV. 23

6 7 8

6 7 8

BASE BID: (E) CD TO ID.

ROOF-MOUNTED

FAN BY DIV. 23

KEY NOTES:

1. (N) 3" NG UP FROM BELOW. SEE 5/P2.1 FOR CONTINUATION.

2. ALRTERNATE 3 - VAV AHU: (N) 1-1/2" CD W/ P-TRAP FROM (N) AHU-A2 TO (N)

4" ID TERMINATE WITH AIR GAP. SEE M3.1 FOR ALTERNATE SCOPE.

3. (E) ROOF DRAIN.

4. PROVIDE (N) CA QD AT BENCH ON PLATFORM.

5. ROUTE (N) 3/4" CA DOWN ALONG WALL FROM PLATFORM IN CORRUGATED

WALL CHANNEL.

6. 1-1/2" NG BRANCH TO SG, TYP. 3. SEE M9.4 FOR DETAILS.

7. 1" RO WATER BRANCH TO SG, TYP. 3. SEE M9.4 FOR DETAILS.

8. PROVIDE CD LINES FOR SG BLOWDOWN, AUX. DRAIN, & FLUE EXHAUST,

TYP. 3. SEE M9.4 FOR DETAILS.

9. 2" COMBINED CD FROM SG'S & RO SKIDTO ID. TERMINATE W/ AIR GAP. DO

NOT BLOCK AHU ACCESS DOORS.

10. (N) 4" ID-1 AS SCHEDULED.

11. (E) RD ABOVE.

12. (E) DRAIN DN FROM ABOVE.

13. (E) DRAIN DN.

14. (E) WASTE STACK DN.

15. (N) 3/4" CA UP & DN ON WALL. SEE KEYNOTE 5 THIS SHEET & VIEW 5/P2.1

FOR CONTINUATION.

16. RELOCATE (E) AIR COMPRESSOR & WALL-MOUNTED MANIFOLD AND

WATER SEPARATOR. ROUTE (N) 1" CA BACK TO FEED (E) RISER.

17. RECONNECT 1" CA MAIN TO (E) RISER DN THROUGH FLOOR.

18. PROVIDE 2" P-TRAP FOR AHU-A1 DX DRAIN. ROUTE TO (N) ID & TERMINATE

WITH AIR GAP.

19. PROVIDE 2" P-TRAP FOR AHU-A1 HUMIDIFIER SECTION. ROUTE TO (N) ID &

TERMINATE WITH AIR GAP.

20. PROVIDE 2" P-TRAP FOR AHU-A1 SA PLENUM SECTION. ROUTE TO (N) ID &

TERMINATE WITH AIR GAP.

21. PROVIDE 3/4" P-TRAP FOR EACH A.S. SEE M9.4 FOR DETAILS. ROUTE TO ID

& TERMINATE WITH AIR GAP, TYP 3. DO NOT BLOCK ACCESS DOORS OR

MAIN DOORS.

22. PROVIDE 3/4" P-TRAP FOR EACH SAM. SEE M9.4 FOR DETAILS. ROUTE TO

ID & TERMINATE WITH AIR GAP, TYP. 3

23. RELOCATE RO SKID. CONNECT (N) 1-1/2" DCW, 1-1/2" RO, & 1" DRAIN.

24. CONNECT 1" DRAIN FROM RO TO 2" SG COMMON DRAIN.

25. (N) 1-1/2" DCW DOWN. SEE 5/P2.1 FOR CONTINUATION.

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

P2.2

'A' WING PLUMB PLANS

JW

DMP

SGH

JW

P2.2 : P2.2

P2.2 : P2.2

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

5 'A' WING - PLUMBING FOURTH FLOOR PLAN TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

7 'A' WING - PLUMBING ROOF PLAN

TRUE NORTH BLDG NORTH

: 1/8" = 1'-0"

13 'A' WING - PLUMBING THIRD FLOOR PLAN

TRUE NORTH BLDG NORTH

'A' WING KEY PLAN12

P2.2 : P2.2 P2.2 : P2.2

MATTHEW

A

S

NO

P

I S

S

E F

O R

IG

E

R

NO

M

L

E E R

EN

G

I

ND

E

RET

A

NAT

DAVID

UNISTRUT CHANNELSHIELD FOR PIPE 3"

AND LARGER

PROVIDE A SECTION OF HIGH

INSULATION AT EACH HANGER

POINT. INSULATION MAY BE

HALF ROUND OR FULL ROUND

PIPE (TYP.)

INSULATION (TYP.)

GALVANIZED IRON SHEET SHIELD

H.W. PIPE 3" AND

PIPE ROLLER FOR

FOR ALL SUPPORTS)

LOCK NUTS(TYP.

FLAT WASHERS

DOUBLE NUTS OR

LARGER

AND SMALLER

FOR PIPE 2 1/2"INSULATION

PIPE 2-1/2" &

PIPE CLAMP FOR

SMALLER

PIPE

SINGLE PIPE RUNS

CLEVIS HANGER FOR

COMPRESSION STRENGTH

AND INSULATION SHALL

EXTEND 2" BEYOND

GALV. SHIELD EACH WAY.

HANGER ROD

SEE SPEC'S FOR

SIZE & SPACING.

PROVIDE SEISMIC

HANGERS &

RESTRAINTS PER

CODE & SPEC.

220548.

(D) (E) 5" GAS TO (E) STEAM BOILERS BACK TO REGULATOR

(E) VENT TO OUTDOORS

(E) REGULATOR

(E) 1-1/2" UNREGULATED GAS

TO PIPE TUNNEL

(E) VENT TO OUTDOORS

(E) REGULATOR

(E) VENT TO OUTDOORS (E) 2" GAS TO (E) BOILERS B-3 & B-4

(E) 1" UNREGULATED

GAS TO 'A' WING

(E) VENT TO OUTDOORS

(E) REGULATOR

(E) 3/4" GAS TO

(E) DHW TANK

(E) 5" GAS MAIN ENTRY THRU WALL

(E) 5" GAS HEADER TO REMAIN

P

(E) 3" DCW SERVICE TO BUILDING

UP THROUGH FLOOR

(E) F.S. UP TO REMAIN

(E) 2" DCW TO PIPE

TUNNEL TO REMAIN

(D) (E) 1-1/2" DCW TO POINT SHOWN ON PLANS.

(E) 1-/2" DCW TO

HOSE BIBBS, HW

MAKE-UP, WATER

SOFTENER, & DHW

TANK TO REMAIN

(E) BOILER ROOM

FLOOR

(E) BFP & PRV TO

REMAIN

(E) GAUGE

PIPING FROM

NATURAL GAS MAIN

ISOLATION VALVE SEE

SPECIFICATIONS FOR TYPE

DIRT LEG 3" LONG MIN.

GAS PIPING TO

EQUIPMENT

GROUND JOINT UNION

TRAP PRIMER IN

WALL BOX. SECURE

TO WALL FRAMING

1/2'' GV

"LOCKABLE"

ACCESS

PANEL

UNION

1/2'' CW

FLOOR DRAIN W/TRAP

PRIMER CONNECTION

FIN FLOOR

CONNECT TO CW

PIPE IN WALL

FRAMED WALL

SEAL WATERTIGHT

1/2'' CW TO TRAP

CONNECT AS REQ'D

COOLING COIL,

HUMIDIFICATION SECTION,

OR PLENUM SUPPLY

CONDENSATE DRAIN PAN

OPEN VENT

DRAIN OUTLET

ALL PIPING SAME SIZE AS DRAIN PAN

CONNECTION (3/4" MINIMUM)

U.N.O. ON PLANS

J"

H"

L"

H" = STATIC PRESSURE + 1"

J" = 1/2 x H"

L" = H" + J" + PIPE DIAMETER

NOTE: SEE M9.4 FOR ATMOSPHERIC STEAM

CONDENSATE TRAP DETAILS

(N) 2" DCW BRANCH. SEE PLANS

FOR CONTINUATION.

P

(E) 3" DCW SERVICE TO BUILDING

UP THROUGH FLOOR

(E) F.S. UP

(E) 2" DCW TO PIPE

TUNNEL

(E) 1-/2" DCW TO

HOSE BIBBS, HW

MAKE-UP, WATER

SOFTENER, & DHW

TANK

(E) BOILER ROOM

FLOOR

(E) BFP & PRV

(N) REGULATOR AS REQ'D FOR (N) GAS LOAD = 6,680 MBH,

UPSTREAM PRESSURE = 10 PSI (CONTRACTOR TO VERIFY

W/ UTILITY PROVIDER), DOWNSTREAM PRESSURE = 8.0 IN

WG. VENT (N) REGULATOR TO OUTDOORS PER LOCAL

CODE REQ'S.

(E) 1-1/2" GAS TO PIPE TUNNEL

(E) VENT TO OUTDOORS

(E) REGULATOR

(E) VENT TO OUTDOORS (E) 2" GAS TO (E) BOILERS B-3 & B-4

(E) 1" GAS TO 'A'

WING

(E) VENT TO OUTDOORS

(E) REGULATOR

(E) 3/4" GAS TO

(E) DHW TANK

(E) 5" GAS MAIN ENTRY THRU WALL

(E) 5" GAS HEADER

(N) 5" NG. SEE 5/P2.0 FOR CONTINUATION.

TRAP PRIMER

4"

MIN 2"FIN. FLOOR

FLOOR SINK

DISCHARGE, TYPICAL

AS POSSIBLE TOWARD

DRAIN PIPING

GRAVITY OR PUMPED

(SEE PLANS)

4" "P" TRAP W/

(E) DCW

MANUAL SHUT-OFF

VALVE, TYP 2.

(N) 1" CA

BURN CHAMBER FLOOR

RETURN AIR PLENUM

TO (E) QDTO (E) HB

FIRST FLOOR

0 1 2 3 4 5 6 7 8 9 10 inches

PROJECT NO:

DESIGNED

CADD

TECH. REVIEW

DATE

SUB SHEET NO. DRAWING NO.

PKG.

NO.

SHEET

OF

TITLE OF SHEET

REVISIONS

15044.10

FIRE SCIENCES LABORATORY

MECHANICAL UPGRADES

USFS / ROCKY MOUNTAIN RESEARCH STATION

5775 US HIGHWAY 10 W

MISSOULA, MT 59808

AG-0343-C-13-0017

AG-03R6-D-15-0211

795.16.16C O N S T R U C T

IO

N D O C U M E N T S

PKG 1

P9.1

PLUMBING DETAILSJTW

DMP

DMP

JTW

: N.T.S.

1 PIPE HANGER & SUPPORT DETAILS

: N.T.S.

3 EXISTING GAS SERVICE ENTRY DETAIL

: N.T.S.

2 EXISTING DCW ENTRY DETAIL

: N.T.S.

5 EQUIPMENT GAS CONNECTION DETAIL

: N.T.S.

9 TRAP PRIMER TO FLOOR DRAIN

: N.T.S.

6 GENERAL CONDENSATE TRAP DETAIL

: N.T.S.

7 COMPRESSED AIR BURN CHAMBER ENTRY DETAIL

: N.T.S.

10 NEW WORK DCW ENTRY DETAIL

: N.T.S.

11 NEW WORK GAS SERVICE ENTRY DETAIL

P9.1 : P2.0 P9.1 : PD2.0 P9.1 : PD2.0

P9.1 : P2.0 P9.1 : P2.2 P9.1 : P2.0

P9.1 : P2.0 P9.1 : P2.0 P9.1 : P2.0

: N.T.S.

13 INDIRECT DRAIN DETAIL

P9.1 : P2.0

COVER
AD2.0
AD2.1
AD2.2
AD2.3
AD2.4
AD5.1
AD5.2
A2.0
A2.1
A2.2
A2.3
A2.4
A5.1
A5.2
A5.3
A6.1
A9.1

File details come from the government source that posted it. Updated .