Attachment_8_-_Drawings-P0.1-P9.1.pdf
PDF 1 MB Posted
- Attached to
- Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
- Solicitation number
- AG-82FT-S-16-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82FT-S-16-0015AME000007.pdf | ||
| AG-82FT-S-16-0015AME000006.pdf | ||
| AG-82FT-S-16-0015AME000005.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| AG-82FT-S-16-0015AME000003.pdf | ||
| AG-82FT-S-16-0015AME000002.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| Attachment_12_-_AsbestosLeadHazMaterial-_C_Wing.pdf | ||
| Attachment_13_-_Wage_Determination.pdf | ||
| Attachment_9_-_Drawings-E0.1-E9.8.pdf | ||
| Attachment_2_-_Volume_2_Divisions_22-26.pdf | ||
| Attachment_1_-_Volume_1_Divisions_0-22.pdf | ||
| Attachment_6_-_Drawings-S0.1-S2.0.pdf | ||
| Attachment_5_-_Drawings-A2.0-A9.1.pdf | ||
| Attachment_7_-_Drawings-M0.1-M9.7.pdf | ||
| Attachment_10_-_AsbestosLeadHazMaterial-_A_Wing.pdf | ||
| Attachment_11_-_AsbestosLeadHazMaterial-_B_Wing.pdf | ||
| Attachment_4_-_Drawings-Arch_AD2.0-AD5.2.pdf | ||
| Attachment_3_-_Drawings-COVER.pdf | ||
| Solicitation_AG-82FT-S-16-0015.doc.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
38110 PE
POTCHAK
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
PLUMBING GENERAL NOTES
A. ALL NEW PIPING AND EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH THE
2012 UNIFORM PLUMBING CODE AND THE 2012 INTERNATIONAL BUILDING CODE
REQUIREMENTS.
B. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY SHOW
EXACT LOCATIONS AND SIZES OF ALL EXISTING DUCTWORK, PIPING, SYSTEM
AND EQUIPMENT UNLESS SPECIFICALLY DIMENSIONED. IT IS NOT THE INTENT
OF THESE DRAWINGS TO GRAPHICALLY REPRESENT ALL OF THE WORK
REQUIRED FOR A COMPLETE INSTALLATION IN EVERY RESPECT. THE PURPOSE
OF THESE PLANS IS TO INDICATE THE INTENDED SIZES, APPROXIMATE
LOCATION AND ROUTING OF MAJOR COMPONENTS. ADJUST TO FIELD
CONDITIONS. ACTUAL CONDITIONS AND LOCATIONS SHALL BE FIELD VERIFIED.
C. EXAMINE AND REFER TO ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL,
MECHANICAL, FIRE PROTECTION AND SITE CIVIL DRAWINGS FOR
CONSTRUCTION CONDITIONS WHICH MAY AFFECT THE CONTRACTORS WORK.
INSPECT THE EXISTING FACILITIES (IF EXIST) FOR VERIFICATION OF EXISTING
CONDITIONS AND SYSTEMS WHICH MAY HAVE AN EFFECT ON HIS/HER WORK
PRIOR TO SUBMISSION OF BID.
D. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION
OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS THROUGHOUT
THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. REFER TO
ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
AND FIRE PROTECTION SHOP DRAWINGS FOR ADDITIONAL DETAILS
NECESSARY FOR COORDINATION.
E. THE CONTRACTOR IS TO PROVIDE MATERIALS, LABOR, TRANSPORTATION,
TOOLS, PERMITS, FEES, INSPECTIONS, UTILITIES AND INCIDENTALS
NECESSARY FOR THE COMPLETE INSTALLATION OF THE WORK INDICATED AND
DESCRIBED IN THESE CONTRACT DOCUMENTS.
F. LOCATIONS AND DIMENSIONS OF EXISTING FACILITIES IDENTIFIED ON THIS
DRAWING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE
INFORMATION BASED ON A COMBINATION OF FIELD INVESTIGATIONS AND
VARIOUS DESIGN AND RECORD DRAWINGS AVAILABLE AT THE TIME OF
DESIGN. FIELD VERIFY LOCATIONS AND DIMENSIONS PRIOR TO ORDERING
EQUIPMENT AND DURING PERFORMANCE OF THE WORK. PROVIDE ALL
DEMOLITION WORK, NECESSARY FITTINGS, TRANSITIONS, AND OTHER
COMPONENTS AS REQUIRED FOR A COMPLETE AND FUNCTIONAL
INSTALLATION OF NEW SYSTEMS AT NO ADDITIONAL COST TO THE OWNER.
G. THE CONTRACTOR IS TO BE RESPONSIBLE FOR ANY ADDITIONAL DETAILS OR
SPECIAL CONSTRUCTION REQUIRED IN ORDER TO COMPLETE THE
INSTALLATION, WHETHER MENTIONED OR NOT. THE CONTRACTOR IS TO
PROVIDE ALL MATERIALS AND EQUIPMENT THAT ARE TO BE FURNISHED FOR
THE PROPER INSTALLATION OF THE TYPE OF EQUIPMENT AND SYSTEMS
INDICATED.
H. ALL EQUIPMENT SHALL BE INSTALLED LEVEL, PLUMB, AND FIRMLY ANCHORED
IN LOCATIONS INDICATED. OBSERVE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT
PRODUCTS SERVE THEIR INTENDED FUNCTION.
I. FOLLOW MANUFACTURES WRITTEN INSTALLATION INSTRUCTION FOR RUNNING
THE COMBUSTION AIR AND VENT PIPING AS WELL AS THE TERMINATION
THROUGH THE ROOF. FOLLOW ALL SAFETY INSTRUCTIONS.
J. PROVIDE SEISMIC BRACING OF ALL EQUIPMENT AND PIPING AS REQUIRED BY
LOCAL, STATE, AND NATIONAL CODES.
K. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL FIRE BARRIERS,
FIRE PARTITIONS, FIRE WALLS OR ANY OTHER FIRE AND/OR SMOKE
SEPARATION WITHIN THE BUILDING WITH A UL LISTED FIRE AND/OR SMOKE
STOP SYSTEM AS REQUIRED TO MEET LOCAL, STATE, AND NATIONAL CODES.
CONTRACTOR IS DIRECTED TO THE ARCHITECTURAL CODE PLAN.
L. ALL MATERIAL IN A PLENUM RATED SPACE SHALL HAVE A SPREAD NOT
EXCEEDING 25 AND A SMOKE DEVELOPMENT RATING NOT EXCEEDING 50.
M. PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF
EQUIPMENT, VALVES, DAMPERS, DEVICES INSTALLED ABOVE NON-REMOVABLE
CEILINGS.
N. ALL ELEMENTS PENETRATING BUILDING COMPONENTS (ROOF ASSEMBLIES,
WALL ASSEMBLIES, ETC.) SHALL BE SEALED WEATHER AND WATER TIGHT.
O. ALL NEW PIPING SHALL BE IDENTIFIED WITH SETON SETMARK PIPE MARKERS,
LETTERED TO MATCH EXISTING AND MARKED AT A MAXIMUM OF EVERY 25 FT.
ALSO, ALL NEW VALVES SHALL BE IDENTIFIED WITH BRASS OR ALUMINUM
VALVE TAGS.
P. PROVIDE AND INSTALL PIPE GUIDES, EXPANSION JOINTS, AND HANGERS PER
MANUFACTURER'S RECOMMENDATIONS.
Q. ALL PIPING WALL PENETRATIONS SHALL HAVE A CHROME ESCUTCHEON
PLATE. ALL SOLDER TO BE LEAD-FREE TYPE. AT THE CONTRACTORS OPTION
MECHANICAL COMPRESSION TYPE FITTING (I.E. PRO-PRESS) MAY BE USED.
R. INSTALL PLUMBING EQUIPMENT AND FIXTURES PER MANUFACTURER'S
WRITTEN INSTALLATION INSTRUCTIONS.
S. ABSOLUTELY NO FITTINGS OR PIPING CONNECTIONS ARE ALLOWED UNDER
THE CONCRETE SLAB.
T. ALL NATURAL GAS PIPING IS TO BE WELDED IN CONCEALED SPACES.
U. PROVIDE TRAP SEAL DEVICES AND TRAP PRIMERS FOR ALL FLOOR DRAINS.
V. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO INDIVIDUAL
FIXTURES.
W. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL DRAWINGS
TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.
X. ALL PIPING THAT IS EXPOSED MUST BE PAINTED TO MATCH SURROUNDINGS.
Y. SANITARY SEWER AND DRAIN PIPING SHALL BE INSTALLED AT A MINIMUM 1/4"
PER FOOT (2%) SLOPE IN DIRECTION OF FLOW.
Z. ALL MATERIAL THAT IS IN CONTACT WITH POTABLE DOMESTIC WATER SHALL
BE 100% LEAD FREE.
AA. THIS CONTRACTOR SHALL PROVIDE THE OWNER REPRESENTATIVE WITH UP
TO 4 HOURS OF TRAINING TO ENSURE PROPER OPERATION AND MAINTENANCE
OF THE SYSTEMS.
AB. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS,
CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE
DOCUMENTS. IN ADDITION, THE CONTRACTOR IS RESPONSIBLE FOR
COORDINATION WITH THE GENERAL CONTRACTOR FOR ALL PATCHING OF
HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.
AC. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY,A ND PCB'S ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.
AD. PLUMBING CONTRACTOR SHALL COORDINATE WITH MECHANICAL
CONTRACTOR TO PROVIDE ALL EQUIPMENT, SYSTEMS & ACCESSORIES
NECESSARY FOR A COMPLETE SYSTEM. SEE MECHANICAL DRAWINGS &
SPEC'S FOR SOME DETAILS IN PLUMBING CONTRACTOR'S SCOPE OF WORK.
AE. MAIN COMPRESSED AIR PIPING & DEMOLITION, AIR COMPRESSOR RELOCATION
& ACCESSORIES ARE BY P.C. BRANCH PNEUMATIC TUBING & DEMO IS BY M.C.
COORDINATE ALL WORK W/ T.C. CONTRACTOR TO ENSURE PROPER
FUNCTIONING OF NEW & EXISTING CONTROLS.
AF. PLUMBING CONTRACTOR SHALL PROVIDE PIPING, CONNECTIONS, AND
SPECIALTIES FOR MECHANICAL EQUIPMENT IN THIS PROJECT INCLUDING
NATURAL GAS, DOMESTIC & RO WATER, CONDENSATE, DRAINS, AND
COMPRESSED AIR PIPING IN ADDITION TO THE PLUMBING DRAWINGS. ALSO
SEE MECHANICAL SCHEDULES, DRAWINGS, SECTIONS, & DETAILS FOR THE
COMPLETE SCOPE OF THE PLUMBING CONTRACTOR'S WORK.
PLUMBING DEMO GEN'L NOTES
A. LOCATIONS AND DIMENSIONS OF EXISTING FACILITIES IDENTIFIED ON THIS
DRAWING ARE APPROXIMATE AND REPRESENT THE BEST AVAILABLE
INFORMATION BASED ON A COMBINATION OF FIELD INVESTIGATIONS AND
VARIOUS DESIGN AND RECORD DRAWINGS AVAILABLE AT THE TIME OF DESIGN.
FIELD VERIFY LOCATIONS AND DIMENSIONS PRIOR TO ORDERING EQUIPMENT
AND DURING PERFORMANCE OF THE WORK. PROVIDE ALL DEMOLITION WORK,
NECESSARY FITTINGS, TRANSITIONS, AND OTHER COMPONENTS AS REQUIRED
FOR A COMPLETE AND FUNCTIONAL INSTALLATION OF NEW SYSTEMS AT NO
ADDITIONAL COST TO THE OWNER.
B. IT IS THE INTENT OF THIS PROJECT TO DEMOLISH PORTIONS OF THE EXISTING
PLUMBING SYSTEMS. ALL UTILITY OUTAGES MUST BE SUBMITTED IN AN
OPERATION PLAN TO THE C.O. FOR APPROVAL WITHIN 14 DAYS OF THE NOTICE
TO PROCEED.
C. ALL EXISTING PLUMBING EQUIPMENT AND PIPING SHOWN BLACK OR UNDER
CROSSHATCH SHALL BE DEMOLISHED. EXISTING EQUIPMENT AND PIPING
SHOWN FRAY IS TO REMAIN UNCHANGED AND IN PLACE.
D. PRESENT ALL DEMOLISHED EQUIPMENT TO THE C.O. FOR SALVAGE. REMOVE
FROM SITE ANY UNWANTED EQUIPMENT.
E. PLUMBING CONTRACTOR IS RESPONSIBLE FOR THE CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN
THESE DOCUMENTS.
F. COORDINATE WITH GENERAL CONTRACTOR TO PATCH AND REPAIR ROOF AND
WALL ASSEMBLIES ASSOCIATED WITH PLUMBING DEMOLITION. THE
CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLE TO THE
SATISFACTION OF THE ARCHITECT/ENGINEER.
G. PROTECT EXISTING BUILDING ELEMENTS DURING DEMOLITION WORK.
COORDINATE WITH OTHER TRADES TO ENSURE NO EXISTING
EQUIPMENT/PIPING TO REMAIN IS DAMAGED DURING THE DEMOLITION WORK.
H. THIS SITE CONTAINS ASBESTOS, LEAD PAINT, MERCURY, AND PCB'S. ANY
EQUIPMENT BEING REMOVED, CONTAINING THESE MATERIALS MUST BE
DISPOSED LEGALLY. ALL ASBESTOS ABATEMENT WILL BE REQUIRED BY THE
GENERAL CONTRACTOR, REFER TO REPORTS FOR ADDITIONAL INFORMATION.
PROJECT SPECIFICATIONS
A. ALL WORK ON THE PROJECT SHALL CONFORM TO ALL LOCAL CITY, STATE AND
NATIONAL CODES AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THE
N.F.P.A., N.E.C., U.B.C., I.E.C.C., I.M.C., U.P.C., THE LOCAL UTILITY SERVING
COMPANIES AND THE AUTHORITY HAVING JURISDICTION.
B. THE WORK ON THIS PROJECT SHALL CONSIST OF ALL ITEMS, ARTICLES,
MATERIALS, EQUIPMENT, AND LABOR FURNISHED TOGETHER ALONG WITH ALL
INCIDENTAL ITEMS REQUIRED BY GOOD PRACTICE AND WORKMANSHIP TO
PROVIDE A SATISFACTORY, COMPLETE AND FUNCTIONAL SYSTEM IN
ACCORDANCE WITH THE DRAWINGS AT NO ADDITIONAL COST TO THE OWNER.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL FEES AND
PERMITS REQUIRED FOR WORK UNDER THEIR CONTRACT AND UNDER THEIR
SUPERVISION BY SUBCONTRACT.
D. MANUFACTURER'S TRADE NAMES AND CATALOG NUMBERS ARE LISTED TO
INDICATE SPECIAL CONDITIONS AND QUALITY OF MATERIALS OR EQUIPMENT
SUPPLIED. ALTERNATIVE EQUIPMENT OR MATERIALS MAY BE SUBMITTED FOR
REVIEW & APPROVAL DURING THE SUBMITTAL PROCESS.
E. ALL WORK BY THE CONTRACTOR IS SUBJECT TO REVIEW AT ANY TIME BY THE
ARCHITECT/ENGINEER.
F. ALL WORK TO BE PERFORMED SHALL FIRST BE SCHEDULED AND SUBMITTED TO
THE OWNER'S REPRESENTATIVE FOR ACCEPTANCE.
G. SMOKING SHALL NOT BE PERMITTED ANYWHERE IN THIS FACILITY OR WITHIN 25
FT OF THE BUILDING.
H. THE CONTRACTOR SHALL BE CAREFUL NOT TO BLOCK ANY PATHS OF EGRESS
WHILE PERFORMING THE WORK SPECIFIED.
I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ALL MATERIALS
RESULTING FROM HIS/HER WORK. CLEANUP SHALL BE PERFORMED TO THE
LEVEL OF ACCEPTANCE OF THE OWNER'S REPRESENTATIVE & THE ENGINEER.
J. THE CONTRACTOR SHALL AND HEREBY DOES WARRANT AND GUARANTEE THAT
ALL WORK EXECUTED UNDER HIS/HER CONTRACT SHALL BE FREE OF DEFECTS
OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE(1) YEAR FROM THE
DATE OF SUBSTANTIAL COMPLETION.
K. SUBMIT ALL SHOP DRAWINGS FOR ALL EQUIPMENT ASSOCIATED WITH THIS
PROJECT TO THE ARCHITECT/ENGINEER FOR REVIEW/APPROVAL PRIOR TO
ORDERING ANY EQUIPMENT. ALL MATERIALS AND OR EQUIPMENT SHALL BE NEW.
L. UPON SUBSTANTIAL COMPLETION THE CONTRACTOR SHALL SUBMIT AN
OPERATIONS AND MAINTENANCE (O&M) MANUAL/BROCHURE OF ALL EQUIPMENT
TO THE ENGINEER FOR REVIEW/APPROVAL. AFTER RECEIVING APPROVAL FROM
ENGINEER, PROVIDE (2 COPIES) TO OWNER AND PROVIDE THE NECESSARY
TRAINING TO THE FACILITIES PERSONNEL REGARDING ALL EQUIPMENT
ASSOCIATED WITH THIS PROJECT.
M. ALL EQUIPMENT & MATERIALS PROVIDED SHALL MEET THE BUY AMERICAN ACT.
BACKFLOW PREVENTER
BALL VALVE
BUTTERFLY VALVE
CALIBRATED BALANCING VALVE
CHECK VALVE
CLEAN-OUT - FLOOR
CLEAN-OUT - WALL
HOSE END DRAIN
FLOW SWITCH
GATE VALVE
HOSE BIB
MIXING VALVE
STRAINER
PIPE WELL- EMPTY
PRESSURE GAUGE AND COCK
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE SENSOR
PRESSURE SWITCH
PRESSURE/TEMPERATURE PORT
SOLENOID VALVE
TEMPERATURE SENSOR
THERMOMETER
THREE-WAY VALVE
QUICK DISCONNECT
PLUMBING SPECIALTIES LEGEND
PIPE SCHEDULE
SYSTEM PIPE MATERIAL SIZE
INSULATION
THICKNESS REMARKS
DOMESTIC WATER - BELOW GRADE HDPE ALL NONE NO FITTINGS UNDERSLAB
DOMESTIC WATER - BELOW GRADE DUCTILE IRON ALL NONE DOMESTIC WATER SERVICE
DOMESTIC COLD WATER 'L' COPPER ALL 1/2" PRESS SEAL JOINTS/SWEAT
DOMESTIC HOT WATER 'L' COPPER ALL 1" PRESS SEAL JOINTS/SWEAT
DOM. HOT WATER RECIRC. 'L' COPPER ALL 1" PRESS SEAL JOINTS/SWEAT
WASTE PVC ALL NONE NEW SANITARY WASTE
WASTE CAST IRON ALL 1/2" RAINWATER LEADERS
VENT PVC ALL NONE NEW VENT PIPING
COMPRESSED AIR THREADED BLACK IRON ALL NONE VALVE AS REQUIRED
NATURAL GAS - ABOVE GRADE THREADED BLACK IRON ALL NONE PAINT TO MATCH EXISTING - INCLUDE PRIME COAT
NOTE:
1. INSULATION THICKNESS IS BASED ON A CONDUCTIVITY NOT EXCEEDING .27 BTU PER INCH/H * FT^2 * °F
2. PLASTIC PIPE SHALL NOT BE INSTALL WITHIN THE FIRST 18" OF A WATER HEATER.
DOMESTIC COLD WATER OR RO
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRC
SANITARY SEWER
VENT
RAIN WATER LEADER
RAIN WATER OVERFLOW
CONDENSATE DRAIN
FIRE
NATURAL GAS
COMPRESSED AIR
PLUMBING SYSTEMS LEGEND
GENERAL SYMBOLS LEGEND
SYMBOL DESCRIPTION
KEY NOTE SYMBOL
TERMINATION POINT OF DEMOLITION WORK
POINT OF CONNECTION TO EXISTING WORK
HATCH DENOTES EQUIPMENT OR DUCTWORK TO BE DEMOLISHED
EQUIPMENT TAG
X
XX-X
ALTERNATE
NUMBER ALTERNATE DESCRIPTION ADD OR DEDUCT EQUIPMENT AFFECTED
1 EXPERIMENTAL COOLING ADD CU-A1
2 ABA RESTROOM ADD EF-A2, EM1
3 MZ AHU UPGRADE TO VAV ADD AHU-A2, CU-A2, CD-A13 THROUGH CD-A17
4 SMOKE EXHAUST STACK ADD SEF-A1, CD-A9
5 SMOKE ACCUMULATION EXHAUST ADD SEF-A2
6 VCT ABATEMENT ADD COORDINATE WITH G.C. & C.O.
7 LV TUNNEL DOOR MOTOR ACCESS ADD CONTROLS, LV TUNNEL OVERHEAD DOOR
8 DESTRATIFICATION FANS ADD DSF-A1 & A2, DSF-$
9 HEATER ALTERNATE ADD ECUH-B6 & B7, HWCH-B2
AIR CONDITIONING EQUIPMENT
EXHAUST ADD SEF-A3, L-A4, CD-A11
11 (D) RECEIVING 101A CMU WALLS ADD COORDINATE WITH G.C. & C.O.
12 SUPPLY-TO-RELIEF BYPASS DAMPER ADD CD-A8
PROJECT ALTERNATE SCHEDULEPLUMBING ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
AHU AIR HANDLING UNIT
AS ATMOSPHERIC STEAM
BFP BACK FLOW PREVENTER
BOD BASIS OF DESIGN
BTU/HR BRITISH THERMAL UNITS PER HOUR
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CHW CHILLED WATER
CW CONDENSER WATER
(D) DEMOLISH / DEMOLITION
DCW DOMESTIC COLD WATER
DN DOWN
DWH DOMESTIC HOT WATER
(E) EXISTING
EC ELECTRICAL CONTRACTOR
ET EXPANSION TANK
(F) FUTURE
FD FLOOR DRAIN
FS FIRE SPRINKLER
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
ID INNER DIAMETER
ID INDIRECT DRAIN
MBH THOUSANDS OF BTU/HR
MC MECHANICAL CONTRACTOR
MDPE MEDIUM DENSITY POLYETHYLENE
MZ MULTI-ZONE
(N) NEW
NG NATURAL GAS
N.T.S. NOT TO SCALE
OD OUTER DIAMETER
PC PLUMBING CONTRACTOR
PRV PRESSURE REDUCING VALVE
PSIG POUNDS PER SQUARE INCH (GAGE)
PVC POLYVINYL CHLORIDE
QD QUICK DISCONNECT
RD ROOF DRAIN
RO REVERSE OSMOSIS
SAM STEAM ABSORPTION MANIFOLD
SG STEAM GENERATOR
SS SANITARY SEWER (WASTE)
SS STAINLESS STEEL
TC TEMPERATURE CONTROLS
U.N.O. UNLESS NOTED OTHERWISE
V VENT
VTR VENT THROUGH ROOF
W SANITARY WASTE
W/ WITH
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
P0.1
PLUMBING NOTES & LEGENDS
JW
DMP
SGH
JW 49
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION MANUF MODEL NUMBER
MOUNTING /
MOUNTING
HEIGHT
MATERIAL & FINISH TRIM
SIZE AT FINAL CONNECTION TO FIXTURE
REMARKS
DRAIN VENT COLD HOT
BV1 BALL VALVE - TWO PIECE - FULL PORT - LEAD FREE WATTS LFB6081G2 PIPE BRONZE CONSTRUCTION - LEAD FREE SOLDER ENDS - - - - LINE SIZE LINE SIZE BRONZE BALL VALVE - TWO PIECE - FULL PORT - 600 PSIG WOG - BLOW-OUT PROOF STEM
BV2 BALL VALVE - TWO PIECE - FULL PORT - WITH DRAIN - LEAD FREE WATTS LFIS6301 PIPE BRONZE CONSTRUCTION - LEAD FREE SOLDER ENDS - - - - LINE SIZE LINE SIZE BRONZE BALL VALVE - TWO PIECE - STANDARD PORT - 600 PSIG WOG - BLOW-OUT PROOF STEM - WITH DRAIN VALVE
CV1 CHECK VALVE - WYE PATTERN WATTS LFWCVS PIPE BRASS CONSTRUCTION - LEAD FREE BRONZE DISK - - - - LINE SIZE LINE SIZE WYE PATTERN BRONZE CHECK VALVE - 200 PSIG WOG
EM1 DECK MOUINTED EMERGENCY EYE/FACE WASH W/ MIXING
VALVE HAWS 8904 DECK 8 FOOT HOSE 9201EFE MIXING VALVE - SP212
VACUUM BREAKER - - - - 3 / 4" 3 / 4"
PROVIDE COMPLETE WITH THERMOSTATIC MIXING VALVE AND ALL REQUIRED ACCESSORIES FOR A COMPLETE INSTALLATION. MOUNT THERMOSTATIC MIXING VALVE FOR THE EYEWASH UNDER THE CABINET AND TAMPER-PROOF PER UPC REQUIREMENTS WITH LOCK OR REMOVE THE SHUT OFF VALVE
HANDLE AND GIVE TO C.O.
FC0 FLOOR CLEAN OUT JR SMITH 4021S FLOOR CAST IRON BODY / BRONZE PLUG / NICKEL
BRONZE TOP
TWIST ADJUSTMENT - CARPET
CLAMP WHERE REQUIRED 2" - 4" SEE PLANS - - - - - - PROVIDE WITH CARPET CLAMP AT CARPET AREAS
FD1 FLOOR DRAIN WITH ADJUSTABLE HEIGHT ROUND STRAINER JR SMITH 2005 FLOOR CAST IRON BODY / NICKEL BRONZE STRAINER TRAP PRIMER CONNECTION 2" - 4" SEE PLANS 1-1/2"-2"SEE PLANS - - - - PROVIDE COMPLETE WITH PRO SEAL "TRAP GUARD" TRAP SEAL PRIMER
GBV1 GAS BALL VALVE WATTS GBV PIPE BRASS PTFE SEATS - - - - - - - - 2 PIECE BRASS BALL VALVE MADE FOR NATURAL GAS AND LP GAS
GC1 GAS CONNECTOR LSP 63 SERIES PIPE STAINLESS STEEL WITH FITTINGS - - - - - - - - SIZE FOR APPLIANCE CONNECTION
GPR4 GAS PRESSURE REGULATOR - NATURAL GAS MAXITROL 210 SERIES PIPE CAST ALUMINUM BODY & BONNET DUCTILE IRON INLET BODY - - - - - - - - NATURAL GAS PRESSURE REGULATOR - UP TO 50,000,000 CUBIC FEET PER HOUR - SEE DRAWINGS FOR CAPACITY - 10 PSIG INLET - 8" W.C. OUTLET - 2" INLET
AND OUTLET SIZE
GV1 GAS SHUT-OFF VALVE - UP TO 1" WATTS GBV PIPE BRASS BODY PTFE SEATS - - - - - - - - 2 PIECE BRASS GAS (NATURAL OR LP) BALL VALVE - UL APPROVED
GV2 GAS SHUT-OFF VALVE - UP TO 3" APOLLO 80-100 SERIES PIPE BRONZE BODY RPTFE SEATS - - - - - - - - 2 PIECE BRASS GAS (NATURAL OR LP) BALL VALVE - UL APPROVED
HB1 HOSE BIBB - STANDARD WOODFORD MODEL 24 WALL / 18" CHROME FINISH WITH VACUUM BREAKER - - - - 3 / 4" - - AUTOMATIC DRAINING WALL FAUCET WITH ANTI-SIPHON VACUUM BREAKER
ID1 INDIRECT DRAIN FLOOR SINK - 12" SQUARE JR SMITH 3421 FLOOR CAST IRON BODY / NICKEL BRONZE STRAINER SEDIMENT BUCKET - 4" FUNNEL 4" 2" - - - - PROVIDE COMPLETE WITH PRO SEAL "TRAP GUARD" TRAP SEAL PRIMER - ABS SEDIMENT BUCKET
L1 LAVATORY - HAND SINK - WALL MOUNTED - TOUCHLESS FAUCET KOHLER K-2027 WALL / RIM 31" VITREOUS CHINA W/ MOEN #8554 FAUCET-GRID DRAIN 2" 1 - 1 / 2" 1 / 2" 1 / 2" WITH ELECTRONIC FAUCET - PROVIDE JR SMITH #700 SERIES CARRIER, BRASSCRAFT #KTCR STOPS, OFFSET DRAIN W/ TRUEBRO LAV GUARD II PIPE
INSULATION
PG1 PRESSURE GAUGE ERNST TL35P PIPE STEEL CASE - BRONZE TUBE BRASS MOVEMENT - - - - - - - - ACCURACY = 2% OF MIDDLE OF RANGE - USE PRESSURE RANGE SO THAT NEEDLE IS IN MIDRANGE DURING NORMAL OPERATION
QD1 COMPRESSED AIR QUICK DISCONNECT MILTON #715 VARIES BRASS COUPLERS W/ BRASS SLEEVES BUNA-N SEAL - - - - - - - - M-STYLE COUPLER, 1/4" FEMALE NPT. MAX RATING: 300 PSI & 250°F. 40 SCF M AT 100 PSI. PROVIDE REDUCER AS REQUIRED & SHUT-OFF VALVE.
S1 SINK - SINGLE COMPARTMENT - DEEP - PULL OUT FAUCET JUST SLX-2125-A-GR COUNTER STAINLESS STEEL
MOEN #7560 FAUCET WITH PULL-OUT
SPRAY 2" 1 - 1 / 2" 1 / 2" 1 / 2"
PROVIDE BRASSCRAFT #KT STOPS - VERIFY DIMENSIONS WITH DRAWINGS PRIOR TO ORDERING - VERIFY HOLE PUNCH REQUIREMENTS - 10.5" OR 12" DEEP -
BRASSCRAFT #KTCR STOP
TP1 TRAP PRIMER - DIFFERENTIAL PRESSURE WATTS LFTP300 PIPE BRASS - LEAD FREE - EPDM SEALS 695-Y52 SPLITTER IF REQUIRED 1 / 2" - - - - - - DIFFERENTIAL PRESSURE TYPE - ACTIVATES ON 10 PSIG DROP IN PRESSURE - MIN / MAX WORKING PRESSURE IS 30 / 250 PSIG - RUN TUBING TO FLOOR
DRAIN - PROVIDE ACCESS BOX IN WALL
TP2 TRAP PRIMER - FROM TAILPIECE WATTS 764 253TP TAILPIECE CHROME - - 3 / 8" - - - - - - MOUNT IN LAVATORY TAILPIECE - RUN TUBING TO FLOOR DRAIN
UR1 URINAL - TOP SPUD - MANUAL FLUSH VALVE - STANDARD HEIGHT KOHLER K-4904-ET WALL / LIP 24" VITREOUS CHINA SLOAN #186HEU HIGH EFFICIENCY
MANUAL FLUSH VALVE 2" 1 - 1 /2" 3 / 4" - -
VITREOUS CHINA 1 / 8 GALLON PER FLUSH URINAL WITH TOP SPUD - STANDARD HEIGHT MOUNTING - BATTERY OPERATED FLUSH VALVE. PROVIDE WATER
HAMMER ARRESTER WHA-1 IN DCW LINE TO FIXTURE WHERE ACCESSIBLE.
WCO WALL CLEAN OUT JR SMITH 4432 WALL / 18" STEEL WITH CHROME COVER LINE SIZE - - - - - - CAST IRON CAULK FERULE WITH CASE IRON LEAD SEAL PLUG
WC1 WATER CLOSET - FLOOR MNTD - K-4467 TANK - ADA HT KOHLER K-3999 FLOOR / RIM 16.5" VITREOUS CHINA CLASS FIVE FLUSH W/ CHROME TRIP LEVER 4" 2" 1 / 2" - - KOHLER #K-4731-C COMMERCIAL HEAVY DUTY ELONGATED OPEN FRONT SEAT - 1.28 GALLON PER FLUSH WITH CLASS FIVE FLUSH - BRASSCRAFT #KTCR
STOP.
WHA1 WATER HAMMER ARRESTER SIOUX CHIEF 653-B PIPE COPPER - - - - - - 3/4' - - 3/4" CONNECTION TO PIPING
NOTES: PROVIDE ALL FIXTURES WITH APPROPRIATE COMMERCIAL GRADE SUPPORTS/CARRIERS, P-TRAPS, STOP VALVES, COMMERCIAL GRADE BRAIDED STAINLESS STEEL FLEXIBLE SUPPLIES, UNDER FIXTURE PIPING INSULATION AND WATER HAMMER ARRESTORS. PROVIDE AND INSTALL TRAP PRIMERS FOR ALL FLOOR DRAINS AND FLOOR SINKS UNLESS OTHERWISE INDICATED. INSTALL ALL TRAP PRIMERS IN RECESSED WALL MOUNTED BOXES IN AN ACCESSIBLE LOCATION. FIELD COORDINATE INSTALLATION LOCATION WITH ARCHITECT/ENGINEER. FIELD COORDINATE LOCATION AND NUMBER OF FAUCET MOUNTING HOLES WITH GENERAL CONTRACTOR. INSTALL ALL FIXTURES AS PER THE MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
P0.2
PLUMBING FIXTURE SCHEDULE
JTW
DMP
DMP
JTW 50
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
REF.
FLAMMABLE CAB.
(E) TOILET
108A
(E) JANITOR
107A
UP
DN.
UP
DN.
RAMP DOWN
DN
AA
BBDDEEFFGGHHJJKKLL
AA
BBDDEEFFGGHHJJKKLL
UP
UP
UP
A
B
C
(E) BOILER RM
001 A
(E) PREPARATION
AND STAGING
106-1A
(E) FUELS LAB
105 A
LASER ROOM
105-1A
CALIBRATION
105-3A
OBSERVATION
ROOM
104 A
(E) COMBUSTION
LAB
103 A
(E) VESTIBULE
100 B
(E) VESTIBULE
102 A
(E) PREPARATION
AND STAGING
106-2A
(E) RECEIVING
101 A
PD2.1
21 19
(E) CA DN FROM THIRD
FLOOR TO REMAIN.
(E) CA ALONG WALL
(E) CA DN TO
FLOOR LEVEL
(D)(E) CA
THROUGH
BURN
CHAMBER
WALL BACK
TO RISER
(E) QD
(E) HB
(E) DCW
UP FROM
RETURN
PLENUM
BELOW TO
(E) HB.
(E) V FROM SINK
(E) DOMESTIC
WATER HEATER
TANK, WATER
SOFTENER, DHW
RECIRC. PUMP TO
REMAIN.
(E
C A
(D) ONLY EXTENT REQUIRED
TO COORDINATE (N) WORK
11 11
(E
D C
W
(E) DHW TO 'B'-WING
TO REMAIN
(E) BOILER ROOM
001 A
(E) TRANSFORMER
RM
003 B
(E) ELEC PANEL RM
002 A
(E) HOIST RM
004 A
UNEXCAVATED
4 A
(E) PIPE TUNNEL
(E) DOCK ABOVE
CRAWL SPACE
C R
A W
L S
P A
C E
(E) DOMESTIC WATER
HEATER TANK, WATER
SOFTENER, DHW RECIRC.
PUMP TO REMAIN.
(E) DCW UP & OVER TO DCW
SERVICE ENTRY TO REMAIN.
(E) DHW UP & OVER TO
DHW TANK TO REMAIN.
(E) FS UP & OVER TO DCW
SERVICE ENTRY TO REMAIN.
(E) NG UP & OVER TO GAS
SERVICE ENTRY TO REMAIN.
(E) CA UP TO
REMAIN. SEE
KEYNOTE 19
THIS SHEET.
8 8
(E) CA
(E) CA UP
THROUGH
FLOOR TO
BURN
CHAMBER
(E) DCW UP
THROUGH
FLOOR TO
BURN
CHAMBER
(E) DCW
KEY NOTES:
1. U.N.O, PROTECT (E) NATURAL GAS METER & REGULATORS, AND (E) 5" GAS
SERVICE ENTERING 'A' WING TO REMAIN.
2. (D) (E) 5" GAS PIPING SERVING (E) STEAM BOILERS BACK TO REGULATOR. SEE
DETAIL 3/P9.1.
3. (E) EMERGENCY SHOWER TO REMAIN.
4. ALTERNATE 2 - ABA RESTROOM: (D) (E) EMERGENCY EYE WASH.
5. (E) FLOOR SINK TO REMAIN.
6. ALTERNATE 2 - ABA RESTROOM: (D) (E) JANITOR'S SINK. CAP PIPING AT FLOOR
& WALL.
7. (E) SINK TO REMAIN.
8. (E) INDIRECT DRAIN TO REMAIN.
9. ALTERNATE 2 - ABA RESTROOM: (D) (E) WATER CLOSET, URINAL, & LAVATORY.
SEE 13/PD2.1
10. (E) DCW SERVICE ENTRY THROUGH FLOOR TO REMAIN. SEE DETAIL 2/P9.1.
11. (D) (E) 4" GAS BRANCH PIPING SERVING (E) STEAM BOILER & (D) VENT TO
OUTDOORS (TYP. 2)
12. ALTERNATE 2 - ABA RESTROOM: (D) (E) SINK.
13. (D) (E) 2" NG BRANCH UP THROUGH SECOND FLOOR.
14. (E) 2" DCW UP & OVER TO PIPE TUNNEL TO REMAIN.
15. (E) FLOOR DRAIN TO REMAIN.
16. (E) 2" V. UP TO REMAIN.
17. (E) DCW & DHW TO REMAIN.
18. (E) F.S. RISER UP FROM SERVICE ENTRY AND OVER TO PIPE TUNNEL TO
REMAIN.
19. (E) CA DOWN TO PIPE TUNNEL TO REMAIN.
20. (E) CA UP TO 2ND FLOOR TO REMAIN.
21. (D) (E) CA FROM TEE FITTING UP THROUGH 2ND FLOOR. CAP AT (E) TEE TO
REMAIN IN BOILER ROOM.
22. (E) DCW & CD LINES TO & FROM ENVIRONMENTAL CHAMBER TO REMAIN.
23. (D) (E) DCW BRANCHES SERVING (E) STEAM BOILERS B-1 & B-2.
24. (D) (E) 1-1/2" DCW UP FROM SERVICE ENTRY TO "A" WING LAB FIXTURES TO
REMAIN.
25. (E) DCW FROM SERVICE ENTRY TO DHW @ TANK & HW MAKE-UP TO REMAIN.
26. ALTERNATE 2 - ABA RESTROOM: (D) (E) SINK AND CAP DCW, DHW, WASTE, &
VENT LINES.
27. (D) (E) 1" DCW UP THROUGH FLOOR.
28. ALTERNATE 2 - ABA RESTROOM: DISCONNECT & REMOVE (E) CA & NG PIPING
ALONG LAB BENCHES. SALVAGE COUNTER-TOP SUPPLY VALVES & QD'S.
29. (D) PORTION OF (E) FP PIPE BACK TO RISER TO REMAIN AS REQUIRED FOR
LOCATION OF NEW ELECTRICAL PANELS. COORDINATE W/ E.C. SEE NEW
WORK PLAN.
30. REMOVE AND SALVAGE (E) SPRINKLER HEAD.
31. (E) RISERS TO REMAIN.
32. EXISTING AFTERCOOLER / DRYER SYSTEM SERVING C.A. SYSTEM SHALL
REMAIN.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
PD2.0
'A' WING PLUMB DEMO PLANS
JW
DMP
SGH
JW
PD2.0 : PD2.0
PD2.0 : PD2.0
PD2.0 : PD2.0
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING - PLUMBING FIRST FLOOR DEMOLITION PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING - PLUMBING BASEMENT DEMOLITION PLAN
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN12
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
A
B
C
(E) AIR
CONDITIONING
EQUIP
203 A
(E) WIND TUNNEL
TEST AREA
202 A
(E) LOW FLOW
TUNNEL
(E) CONTROL RM
201 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
11 10
(E) Q.D. (E) Q.D.
(D) (E) RO
(D) (E) DCW
(D) (E) NG
(E) VTR TO REMAIN
(E) V UP FROM BELOW
(E) CA
4 5
15(E) CA QD, TYP. 3
(E) NG SUPPLY VALVE,
TYP. 3
(E) CA QD
(E) NG SUPPLY VALVE
(E) CA
(E) DCW
(E) NG
(E) DHW
(E) V
KEY NOTES:
1. (E) SINK TO REMAIN.
2. ALTERNATE 2 - ABA RESTROOM: (D) (E) JANITOR'S SINK. (D) DCW, WASTE, &
VENT BACK TO MAINS & CAP.
3. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) WATER CLOSET.
4. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) URINAL.
5. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) LAVATORY.
6. ALTERNATE 2 - ABA RESTROOM: DEMOLISH (E) SINK & DCW, DHW, WASTE, &
VENT BACK TO MAINS & CAP.
7. (E) FLOOR SINK TO REMAIN.
8. ALTERNATE 2 - ABA RESTROOM: (D) (E) EMERGENCY EYE WASH.
9. (E) FLOOR DRAIN TO REMAIN.
10. (E) DHW TO "B" WING TO REMAIN.
11. (D) (E) RO WATER UP THROUGH FLOOR.
12. REMOVE & SALVAGE (E) RO WATER TREATMENT SKID. SEE NEW WORK
PLANS FOR RELOCATION. (D) ALL PIPING & DRAIN CONNECTIONS.
13. (E) CA UP & DN TO REMAIN
14. (E) CA DN TO 1ST FLOOR TO REMAIN.
15. ALTERNATE 2 - ABA RESTROOM: (D) (E) SINK & DCW, DHW, WASTE & VENT
BACK TO MAINS & CAP.
16. (D) (E) RO WATER PIPING FROM (E) RO SKID TO (E) SG'S ON 3RD FLOOR
17. DISCONNECT & REMOVE (E) AIR COMPRESSOR & ALL ACCESSORIES,
CONTROLS, & WIRING. PRESENT TO C.O. FOR SALVAGE. DISPOSE AS
DIRECTED BY C.O.
18. (D) (E) CA DN TO 1ST FLOOR.
19. (D) (E) DCW RISER UP THROUGH FLOOR, TYP. 2.
20. (D) (E) DCW DOWN THROUGH FLOOR & ALL MAKE-UP CONNECTIONS TO CHW
& CW SYSTEMS, & ALL CONDENSATE IN CHILLER ROOM.
21. (E) INDIRECT DRAIN TO REMAIN. (D) (E) P-TRAP ONLY, BELOW FLOOR
22. (E) FD TO REMAIN, (D) (E) P-TRAP ONLY, BELOW FLOOR, TYP. 2.
23. (D) (E) NG UP THOUGH FLOOR.
24. (D) (E) NG DOWN THROUGH FLOOR.
25. (E) 4" WASTE RISER UP & DN TO REMAIN.
26. (D) (E) 2" DRAIN FROM FD ABOVE TO (E) STACK TO REMAIN.
27. ALTERNATE 2 - ABA RESTROOM: DISCONNECT & REMOVE CA & NG PIPING
ALONG LAB BENCHES BACK TO MAIN. SALVAGE COUTER TOP SUPPLY
VALVES & QD'S.
28. (E) HORIZONTAL MAINS TO REMAIN INCLUDING DCW, DHW, V, CA, & NG.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
PD2.1
'A' WING PLUMB DEMO PLANS
JW
DMP
SGH
JW
PD2.1 : PD2.1
PD2.1 : PD2.1
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING - PLUMBING SECOND FLOOR DEMOLITION PLAN
TRUE NORTH BLDG NORTH
: 1/2" = 1'-0"
13 'A' WING - PLUMBING FIRST FLOOR RESTROOMS DEMOLITION PLAN
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
PD2.1 : PD2.0
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
AA
BBDDEEFFGGHH
AA
BBDDEEFF
UP
AA
BBDDEEFFGGHHJJKKLL
A
B
C
(E) BURN CHAMBER
PLATFORM
401 A
(E
S M
O K
E R
E L
IE
F
P L E N
U M
A
ROOF
(E) 3" DRAIN DN
(E
S A
P
LE
N U
M
ROOF
(E) MECHANICAL
RM
302 A
(E) MECHANICAL
LOFT
301 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
(E) 3" DRAIN DN
FROM ABOVE
TO REMAIN
(E) VTR
13 15
(D) (E) CD
& DCW
(D) (E) NG
(D) (E) NG
KEY NOTES:
1. (D) (E) 3/4" DCW DN THROUGH FLOOR & UP TO (E) AHU, & ALL
CONNECTIONS.
2. (D) (E) SPRAY WATER PUMP INCLUDING ALL PIPING, WIRING, & CONTROLS.
3. (D) ALL (E) DRAIN LINES FROM (E) SG'S, UNDER (E) AHU TO (E) INDIRECT
DRAIN.
4. (E) ROOF DRAIN TO REMAIN.
5. (D) (E) NG & RO WATER TO (E) SG, TYP. 2.
6. DISCONNECT & REMOVE (E) AIR COMPRESSOR, WALL-MOUNTED MANIFOLD,
WATER SEPARATOR, & ALL ACCESSORIES & CONTROLS. SALVAGE FOR
RELOCATION.
7. (E) QD & CA RISER DN THROUGH FLOOR TO REMAIN.
8. (D)(E) CA BRANCH SERVING (E) ATOMIZATION HUMIDIFICATION SYSTEM IN AHU
BACK TO CA MAIN RISER & CAP AT MAIN.
9. (E) 3" RD ABOVE TO REMAIN.
10. (E) 4" WASTE STACK DOWN TO REMAIN.
11. (D) (E) 3/4" DCW FROM MAKEUP CONNECTION FROM CHILLED WATER
EXPANSION TANK DOWN THROUGH FLOOR.
12. (D) (E) RO WATER DN THROUGH FLOOR.
13. (D) (E) NG DN THROUGH FLOOR.
14. (D) (E) ID DN THROUGH FLOOR.
15. ALTERNATE 3 - VAV AHU: (D) (E) CD FROM (E) MZ AHU TO I.D. BASE BID: (E)
CD SHALL REMAIN.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
PD2.2
'A' WING PLUMB DEMO PLANS
JW
DMP
SGH
JW
PD2.2 : PD2.2
PD2.2 : PD2.2
PD2.2 : PD2.2
PD2.2 : PD2.2
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING - PLUMBING FOURTH FLOOR DEMO PLAN TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
7 'A' WING - PLUMBING ROOF DEMO PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING - PLUMBING THIRD FLOOR DEMOLITION PLAN
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
AA
BBDDEEFFGGHHJJKKLL
UP
UP
UP
(E) TOILET
108A
(E) JANITOR
107A
UP
DN.
UP
DN.
RAMP DOWN
DN
AA
BBDDEEFFGGHHJJKKLL
A
B
C
UNEXCAVATED
4 A
C R
A W
L S
P A
C E
CRAWL SPACE
(E) DOCK ABOVE
(E) PIPE TUNNEL
(E) HOIST RM
004 A
(E) ELEC PANEL RM
002 A
(E) TRANSFORMER
RM
003 A
(E) BOILER ROOM
001 A
(E) DOMESTIC
WATER HEATER &
WATER SOFTENER
(E) DCW UP
(N) 1" CA DN FROM
FIRST FLOOR
(N) 3/4" CA
3/4" CA UP THROUGH
FLOOR, TYP 3.
P9.1
(E) CA UP
(N) 1" CA UP
DCW UP THROUGH
FLOOR, TYP 3.
(N) 3/4" DCW
11 11
(N) 1" DCW
(N) 3/4" CA
3 4
(N) 3/4" CA
(N) 3/4" DCW
(E
1" D
C W
(E
3/ 4"
C A
(N
1" C
A
(E) 1" DCW
(E) 3/4" CA
(E) DCW UP
& OVER TO
TUNNEL
(E) COMBUSTION
LAB
103 A
(E) BOILER RM
001 A
(E) PREPARATION
AND STAGING
106-1A
(E) PREPARATION
AND STAGING
106-2A
(E) FUELS LAB
105 A
LASER ROOM
105-1A
CALIBRATION
105-3A
OBSERVATION
ROOM
104 A
(E) VESTIBULE
102 A
(E) CA UP
THROUGH FLOOR
TO (E) QD
(E) 3/4" DCW UP
THROUGH FLOOR TO
(E) HB TO REMAIN
P2.1
4 3
UR-1 L-1
WC-1
(E) F.S. UP
& OVER TO
TUNNEL
HB1
HB1
HB1
QD1
QD1
QD1
S-1
P9.1
19 20
(E)QD
(E)HB
(E) DHW
21 2322
(E) CA DN
FROM ABOVE
(N) 5" NG
(N) 2" DCW
(N) 3" NG
RECONNECT FP
TO (E) RISER
(E
1- 1/
2" D
C W
(E
3/ 4"
C A
(E) EMERGENCY
SHOWER
CABINET HEATER
BY DIV. 23
UH BY
DIV. 23
(E) DCW UP
& OVER TO
TUNNEL
KEY NOTES:
1. (N) 5" NG DOWN TO (E) MAIN SERVICE. PROVIDE (N) REGULATOR AS
REQUIRED FOR (N) CONNECTED GAS LOAD: 6,680 MBH. UPSTREAM
PRESSURE = 10 PSI (CONTRACTOR TO VERIFY W/ UTILITY PROVIDER).
DOWNSTREAM PRESSURE = 8.0 IN WG. SEE DETAIL 11/P9.1.
2. (N) 2" NG DOWN TO (N) BOILER, TYP. 2. INPUT = 2,500 MBH AT 4-14 IN W.G.,
TYP. 2. SEE DETAIL 5/P9.1.
3. 3/4" CA UP THROUGH FLOOR FROM UNDER FLOOR RETURN AIR PLENUM TO
(N) WALL-MOUNTED QD AS SCHEDULED, TYP. 3. ROUTE IN CORRUGATED
WALL CHANNEL.
4. 3/4" DCW UP THROUGH FLOOR FROM UNDER FLOOR RETURN AIR PLENUM TO
(N) WALL-MOUNTED HOSE BIBB, TYP. 3. ROUTE IN CORRUGATED WALL
CHANNEL.
5. ALTERNATE 2 - ABA RESTROOM: PROVIDE (N) EMERGENCY EYEWASH EM1 &
CONNECT EXISTING DCW, DRAIN, AND VENT.
6. ALTERNATE 2 - ABA RESTROOM: (N) SINK S1 AS SCHEDULED.
7. (E) FLOOR DRAIN.
8. (E) FLOOR SINK.
9. (N) 1-1/2" CD W/ P-TRAP FROM BOILER TYP. 2. SEE BOILER CONNECTION
DETAILS ON M9.3. P.C. SHALL INSTALL NEUTRALIZATION KITS SUPPLIED BY
M.C.
10. (E) SINK TO REMAIN.
11. TERMINATE BOILER CD W/ AIR GAP AT (E) ID, TYP. 2.
12. (N) 1" CA UP THROUGH FLOOR FROM BELOW. SEE 7/P9.1 FOR CONNECTION
TO (E) CA.
13. (E) V UP.
14. (E) ID.
15. PROTECT (E) DCW SERVICE ENTERING THROUGH FLOOR FROM BELOW.
16. PROTECT (E) NG METER & 5" SERVICE INTO BUILDING TO REMAIN.
17. (N) 3" NG UP THROUGH 2ND FLOOR. SEE 5/P2.1 FOR CONTINUATION.
18. (E) CA UP.
19. EXTEND (N) 1" CA DN THROUGH FLOOR FROM (E) RISER IN ROOM.
20. EXTEND (N) 3/4" CA FROM (N) QD UP ALONG WALL. SEE P2.1 FOR
CONTINUATION.
21. (N) 2" DCW UP FROM (E) SERVICE ENTRY. SEE DETAIL 10/P9.1.
22. RECONNECT TO (E) 1-1/2" DCW SERVING "A" WING FIXTURES. PROVIDE
REDUCER AS REQUIRED.
23. (N) 1-1/2" DCW UP THROUGH FLOOR. SEE 5/P2.1 FOR CONTINUATION.
24. ALTERNATE 2 - ABA RESTROOM: RE-ROUTE (N) NG & CA LINES ALONG LAB
COUNTERS. REINSTALL SUPPLY VALVES & QD'S WHERE DIRECTED BY C.O.
25. CONNECT (E) 1" NG TO (N) 3" NG. PROVIDE REDUCER AS REQUIRED.
26. REROUTE FP PIPE & RELOCATE SPRINKLER HEAD ONLY AS REQUIRED FOR
LOCATION OF (N) ELECRICAL PANELS. PIPE & SPRINKLER SHALL NOT BE
LOCATED DIRECTLY ABOVE PANELS. COORDINATE WITH E.C.
27. RE-CONNECT EXISTING AFTERCOOLER / DRYER SYSTEM TO C.A. MAIN AS
REQUIRED
28. HW BOILERS, PUMPS, AIR SEPARATOR, EXPANSION TANK, & GLYCOL
FEEDER BY DIV. 23.
29. COORDINATE WITH M.C. TO SEAL AIR TIGHT ALL (N) & (E) PENETRATIONS &
OPENINGS TO UNDERFLOOR PLENUM.
30. (E) DCW, CA, NG, FP, & DHW TO 'B'-WING.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
P2.0
'A' WING PLUMB PLANS
JW
DMP
SGH
JW
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING - PLUMBING BASEMENT PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING - PLUMBING FIRST FLOOR PLAN
P2.0 : P2.0
P2.0 : P2.0
P2.0 : P2.0
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN12
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
A
B
C
(E) OFFICE
212 B
(E) PASSAGE
211 B
(E) LOW VELOCITY
TUNNEL
220 C
(E) WIND TUNNEL
TEST AREA
202 A
(E) CONTROL RM
201 A
(E) BURN CHAMBER
OPEN TO BELOW
201 B
5 5
(E) CA
(N) 3/4" CA UP & DN ON WALL
IN CORRIGATED CHANNEL
(E) CA DN
QD-1
(E) CA UP & DN
(E) VTR
(E) V UP FROM BELOW
1817 23
QD-1
QD-1
QD-1
(N) 3" NG
(N) 1-1/2" DCW
(E) SINK
(E) STACK UP & DN
UNIT HEATER
BY DIV. 23
(E) ID 26
(E) FD 26
(E) FD26
(E
C A
(E
V
(E
D H
W
(E
D C
W
(E) CA
(E) V
(E) DHW
(E) DCW
(E) NG
(N) NG
(E) NG
TYP. 3
CABINET HEATER BY DIV. 23
(E) FD
KEY NOTES:
1. ALTERNATE 2 - ABA RESTROOM: (N) URINAL UR-1 AS SCHEDULED. PROVIDE
(N) DCW & WHA-1 & WASTE & VENT CONNECTIONS TO (E) LINES.
2. ALTERNATE 2 - ABA RESTROOM: (N) WATER CLOSET WC-1 AS SCHEDULED.
PROVIDE (N) DCW & WASTE CONNECTIONS TO (E) LINES.
3. ALTERNATE 2 - ABA RESTROOM: (N) LAVATORY L-1 AS SCHEDULED.
PROVIDE (N) DCW & DHW & DRAIN CONNECTIONS TO (E) LINES.
4. ALTERNATE 2 - ABA RESTROOM: (N) SINK S-1 AS SCHEDULED. ROUTE (N)
DCW & DHW FROM (E) MAINS ABOVE RESTROOM CEILING.
5. 3/4" CA UP ON TUNNEL EXTERIOR WALL TO (N) Q.D. MOUNTED AT 5'0" AFF.
SEAL PENETRATIONS THROUGH TUNNEL, TYP. 4.
6. ALTERNATE 2 - ABA RESTROOM: (N) 3/4" DHW FROM (E) MAIN ABOVE
RESTROOM TO EACH (N) FIXTURE AS REQUIRED, TYP. ALL.
7. ALTERNATE 2 - ABA RESTROOM: (N) 3/4" DCW FROM (E) MAIN ABOVE
RESTROOM TO EACH (N) FIXTURE AS REQUIRED, TYP. ALL.
8. (E) FLOOR SINK TO REMAIN.
9. (E) V UP.
10. ALTERNATE 2 - ABA RESTROOM: (N) 2" V UP ABOVE CEILING FROM (N) WC.
SEE NOTE 11 THIS SHEET.
11. ALTERNATE 2 - ABA RESTROOM: COLLECT VENTS FROM ALL (N) FIXTURES
ABOVE CEILING, INTO COMBINED 3" V UP THROUGH FLOOR ABOVE.
12. (E) DOMESTIC COLD WATER.
13. (E) DOMESTIC HOT WATER.
14. ALTERNATE 2 - ABA RESTROOM: (N) 1-1/2" V UP ABOVE RESTROOM CEILING.
SEE NOTE 11 THIS SHEET.
15. (E) DHW TO "B" WING.
16. (E) DHW DOWN THROUGH FLOOR TO BOILER ROOM.
17. (N) 3" NG DOWN THROUGH FLOOR. SEE 5/P2.0 FOR CONTINUATION.
18. (N) 3" NG UP THROUGH FLOOR. SEE 13/P2.2.2 FOR CONTINUATION.
19. (N) 1-1/2" DCW DOWN THROUGH FLOOR. SEE 5/P2.0 FOR CONTINUATION.
20. (N) 1-1/2" DCW UP THROUGH FLOOR. SEE 13/P2.2.2 FOR CONTINUATION.
21. (N) 3/4" CA ROUTED UNDER LV TUNNEL, TYP 2.
22. (N) 4" DRAIN W/ P-TRAP UP TO (N) ID ABOVE. CONNECT TO (E) WASTE
STACK.
23. ALTERNATE 3 - VAV AHU: (N) 4" DRAIN W/ P-TRAP TO (N) ID ABOVE.
CONNECT TO (E) WASTE STACK.
24. ALTERNATE 2 - ABA RESTROOM: RELOCATE COUNTER-TOP SUPPLY
VALVES & Q.D.'S AND RECONNECT TO (E) NG & CA LINES. COORDINATE
MOUNTING LOCATIONS OF SUPPLY VALVES & Q.D.'S W/ C.O.
25. ALTERNATE 2 - ABA RESTROOM: PROVIDE (N) EMERGENCY EYEWASH EM1 &
CONNECT EXISTING DCW, DRAIN, AND VENT.
26. PROVIDE (N) 2" P-TRAP BELOW FLOOR. CONNECT TO (E) DRAIN & PIPING,
TYP. 3.
27. ALTERNATE 2 - ABA RESTROOM: (N) 3" VTR.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
P2.1
'A' WING PLUMB PLANS
JW
DMP
SGH
JW
P2.1 : P2.1
P2.1 : P2.0
P2.1 : P2.1
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING - PLUMBING SECOND FLOOR PLAN
TRUE NORTH BLDG NORTH
: 1/2" = 1'-0"
13 'A' WING - PLUMBING FIRST FLOOR RESTROOMS PLAN
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN
UR-1
L-1
WC-1
S-1
MATTHEW
A
S
NO
P
I S
S
E F
O R
I G
E R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
AA
BBDDEEFFGGHH
AA
BBDDEEFF
UP
AA
BBDDEEFFGGHHJJKKLL
A
B
C
QD-1
3/ 4"
C
A(N) ROOF -MOUNTED
CONDENSERS BY
DIV. 23, TYP. 2.
(N) ROOF -MOUNTED
CONDENSERS BY
DIV. 23, TYP. 2.
ROOF-MOUNTED
FAN BY DIV. 23
ROOF-MOUNTED
FAN BY DIV. 23
3 3
(N) 3" NG
(N) 1-1/2" DCW
SG-A1
SG-A2
SG-A3
(N
1" C
A
1-1/2" DCW TO RO SKID
1" CD FROM RO SKID
1-1/2" RO FROM RO SKID
(N) ID-1
(N) ID-1
18 19
M9.4
7 8
(N) STEAM GENERATOR
BY DIV. 23, TYP. 3.
(E) QD
BASE BID: (E) AHU.
ALT. 3: (N) AHU-A2 BY DIV. 23.
(N) AHU-A1 & WALL-
MOUNTED VFD'S BY DIV. 23
6 7 8
6 7 8
BASE BID: (E) CD TO ID.
ROOF-MOUNTED
FAN BY DIV. 23
KEY NOTES:
1. (N) 3" NG UP FROM BELOW. SEE 5/P2.1 FOR CONTINUATION.
2. ALRTERNATE 3 - VAV AHU: (N) 1-1/2" CD W/ P-TRAP FROM (N) AHU-A2 TO (N)
4" ID TERMINATE WITH AIR GAP. SEE M3.1 FOR ALTERNATE SCOPE.
3. (E) ROOF DRAIN.
4. PROVIDE (N) CA QD AT BENCH ON PLATFORM.
5. ROUTE (N) 3/4" CA DOWN ALONG WALL FROM PLATFORM IN CORRUGATED
WALL CHANNEL.
6. 1-1/2" NG BRANCH TO SG, TYP. 3. SEE M9.4 FOR DETAILS.
7. 1" RO WATER BRANCH TO SG, TYP. 3. SEE M9.4 FOR DETAILS.
8. PROVIDE CD LINES FOR SG BLOWDOWN, AUX. DRAIN, & FLUE EXHAUST,
TYP. 3. SEE M9.4 FOR DETAILS.
9. 2" COMBINED CD FROM SG'S & RO SKIDTO ID. TERMINATE W/ AIR GAP. DO
NOT BLOCK AHU ACCESS DOORS.
10. (N) 4" ID-1 AS SCHEDULED.
11. (E) RD ABOVE.
12. (E) DRAIN DN FROM ABOVE.
13. (E) DRAIN DN.
14. (E) WASTE STACK DN.
15. (N) 3/4" CA UP & DN ON WALL. SEE KEYNOTE 5 THIS SHEET & VIEW 5/P2.1
FOR CONTINUATION.
16. RELOCATE (E) AIR COMPRESSOR & WALL-MOUNTED MANIFOLD AND
WATER SEPARATOR. ROUTE (N) 1" CA BACK TO FEED (E) RISER.
17. RECONNECT 1" CA MAIN TO (E) RISER DN THROUGH FLOOR.
18. PROVIDE 2" P-TRAP FOR AHU-A1 DX DRAIN. ROUTE TO (N) ID & TERMINATE
WITH AIR GAP.
19. PROVIDE 2" P-TRAP FOR AHU-A1 HUMIDIFIER SECTION. ROUTE TO (N) ID &
TERMINATE WITH AIR GAP.
20. PROVIDE 2" P-TRAP FOR AHU-A1 SA PLENUM SECTION. ROUTE TO (N) ID &
TERMINATE WITH AIR GAP.
21. PROVIDE 3/4" P-TRAP FOR EACH A.S. SEE M9.4 FOR DETAILS. ROUTE TO ID
& TERMINATE WITH AIR GAP, TYP 3. DO NOT BLOCK ACCESS DOORS OR
MAIN DOORS.
22. PROVIDE 3/4" P-TRAP FOR EACH SAM. SEE M9.4 FOR DETAILS. ROUTE TO
ID & TERMINATE WITH AIR GAP, TYP. 3
23. RELOCATE RO SKID. CONNECT (N) 1-1/2" DCW, 1-1/2" RO, & 1" DRAIN.
24. CONNECT 1" DRAIN FROM RO TO 2" SG COMMON DRAIN.
25. (N) 1-1/2" DCW DOWN. SEE 5/P2.1 FOR CONTINUATION.
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
P2.2
'A' WING PLUMB PLANS
JW
DMP
SGH
JW
P2.2 : P2.2
P2.2 : P2.2
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
5 'A' WING - PLUMBING FOURTH FLOOR PLAN TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
7 'A' WING - PLUMBING ROOF PLAN
TRUE NORTH BLDG NORTH
: 1/8" = 1'-0"
13 'A' WING - PLUMBING THIRD FLOOR PLAN
TRUE NORTH BLDG NORTH
'A' WING KEY PLAN12
P2.2 : P2.2 P2.2 : P2.2
MATTHEW
A
S
NO
P
I S
S
E F
O R
IG
E
R
NO
M
L
E E R
EN
G
I
ND
E
RET
A
NAT
DAVID
UNISTRUT CHANNELSHIELD FOR PIPE 3"
AND LARGER
PROVIDE A SECTION OF HIGH
INSULATION AT EACH HANGER
POINT. INSULATION MAY BE
HALF ROUND OR FULL ROUND
PIPE (TYP.)
INSULATION (TYP.)
GALVANIZED IRON SHEET SHIELD
H.W. PIPE 3" AND
PIPE ROLLER FOR
FOR ALL SUPPORTS)
LOCK NUTS(TYP.
FLAT WASHERS
DOUBLE NUTS OR
LARGER
AND SMALLER
FOR PIPE 2 1/2"INSULATION
PIPE 2-1/2" &
PIPE CLAMP FOR
SMALLER
PIPE
SINGLE PIPE RUNS
CLEVIS HANGER FOR
COMPRESSION STRENGTH
AND INSULATION SHALL
EXTEND 2" BEYOND
GALV. SHIELD EACH WAY.
HANGER ROD
SEE SPEC'S FOR
SIZE & SPACING.
PROVIDE SEISMIC
HANGERS &
RESTRAINTS PER
CODE & SPEC.
220548.
(D) (E) 5" GAS TO (E) STEAM BOILERS BACK TO REGULATOR
(E) VENT TO OUTDOORS
(E) REGULATOR
(E) 1-1/2" UNREGULATED GAS
TO PIPE TUNNEL
(E) VENT TO OUTDOORS
(E) REGULATOR
(E) VENT TO OUTDOORS (E) 2" GAS TO (E) BOILERS B-3 & B-4
(E) 1" UNREGULATED
GAS TO 'A' WING
(E) VENT TO OUTDOORS
(E) REGULATOR
(E) 3/4" GAS TO
(E) DHW TANK
(E) 5" GAS MAIN ENTRY THRU WALL
(E) 5" GAS HEADER TO REMAIN
P
(E) 3" DCW SERVICE TO BUILDING
UP THROUGH FLOOR
(E) F.S. UP TO REMAIN
(E) 2" DCW TO PIPE
TUNNEL TO REMAIN
(D) (E) 1-1/2" DCW TO POINT SHOWN ON PLANS.
(E) 1-/2" DCW TO
HOSE BIBBS, HW
MAKE-UP, WATER
SOFTENER, & DHW
TANK TO REMAIN
(E) BOILER ROOM
FLOOR
(E) BFP & PRV TO
REMAIN
(E) GAUGE
PIPING FROM
NATURAL GAS MAIN
ISOLATION VALVE SEE
SPECIFICATIONS FOR TYPE
DIRT LEG 3" LONG MIN.
GAS PIPING TO
EQUIPMENT
GROUND JOINT UNION
TRAP PRIMER IN
WALL BOX. SECURE
TO WALL FRAMING
1/2'' GV
"LOCKABLE"
ACCESS
PANEL
UNION
1/2'' CW
FLOOR DRAIN W/TRAP
PRIMER CONNECTION
FIN FLOOR
CONNECT TO CW
PIPE IN WALL
FRAMED WALL
SEAL WATERTIGHT
1/2'' CW TO TRAP
CONNECT AS REQ'D
COOLING COIL,
HUMIDIFICATION SECTION,
OR PLENUM SUPPLY
CONDENSATE DRAIN PAN
OPEN VENT
DRAIN OUTLET
ALL PIPING SAME SIZE AS DRAIN PAN
CONNECTION (3/4" MINIMUM)
U.N.O. ON PLANS
J"
H"
L"
H" = STATIC PRESSURE + 1"
J" = 1/2 x H"
L" = H" + J" + PIPE DIAMETER
NOTE: SEE M9.4 FOR ATMOSPHERIC STEAM
CONDENSATE TRAP DETAILS
(N) 2" DCW BRANCH. SEE PLANS
FOR CONTINUATION.
P
(E) 3" DCW SERVICE TO BUILDING
UP THROUGH FLOOR
(E) F.S. UP
(E) 2" DCW TO PIPE
TUNNEL
(E) 1-/2" DCW TO
HOSE BIBBS, HW
MAKE-UP, WATER
SOFTENER, & DHW
TANK
(E) BOILER ROOM
FLOOR
(E) BFP & PRV
(N) REGULATOR AS REQ'D FOR (N) GAS LOAD = 6,680 MBH,
UPSTREAM PRESSURE = 10 PSI (CONTRACTOR TO VERIFY
W/ UTILITY PROVIDER), DOWNSTREAM PRESSURE = 8.0 IN
WG. VENT (N) REGULATOR TO OUTDOORS PER LOCAL
CODE REQ'S.
(E) 1-1/2" GAS TO PIPE TUNNEL
(E) VENT TO OUTDOORS
(E) REGULATOR
(E) VENT TO OUTDOORS (E) 2" GAS TO (E) BOILERS B-3 & B-4
(E) 1" GAS TO 'A'
WING
(E) VENT TO OUTDOORS
(E) REGULATOR
(E) 3/4" GAS TO
(E) DHW TANK
(E) 5" GAS MAIN ENTRY THRU WALL
(E) 5" GAS HEADER
(N) 5" NG. SEE 5/P2.0 FOR CONTINUATION.
TRAP PRIMER
4"
MIN 2"FIN. FLOOR
FLOOR SINK
DISCHARGE, TYPICAL
AS POSSIBLE TOWARD
DRAIN PIPING
GRAVITY OR PUMPED
(SEE PLANS)
4" "P" TRAP W/
(E) DCW
MANUAL SHUT-OFF
VALVE, TYP 2.
(N) 1" CA
BURN CHAMBER FLOOR
RETURN AIR PLENUM
TO (E) QDTO (E) HB
FIRST FLOOR
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
15044.10
FIRE SCIENCES LABORATORY
MECHANICAL UPGRADES
USFS / ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10 W
MISSOULA, MT 59808
AG-0343-C-13-0017
AG-03R6-D-15-0211
795.16.16C O N S T R U C T
IO
N D O C U M E N T S
PKG 1
P9.1
PLUMBING DETAILSJTW
DMP
DMP
JTW
: N.T.S.
1 PIPE HANGER & SUPPORT DETAILS
: N.T.S.
3 EXISTING GAS SERVICE ENTRY DETAIL
: N.T.S.
2 EXISTING DCW ENTRY DETAIL
: N.T.S.
5 EQUIPMENT GAS CONNECTION DETAIL
: N.T.S.
9 TRAP PRIMER TO FLOOR DRAIN
: N.T.S.
6 GENERAL CONDENSATE TRAP DETAIL
: N.T.S.
7 COMPRESSED AIR BURN CHAMBER ENTRY DETAIL
: N.T.S.
10 NEW WORK DCW ENTRY DETAIL
: N.T.S.
11 NEW WORK GAS SERVICE ENTRY DETAIL
P9.1 : P2.0 P9.1 : PD2.0 P9.1 : PD2.0
P9.1 : P2.0 P9.1 : P2.2 P9.1 : P2.0
P9.1 : P2.0 P9.1 : P2.0 P9.1 : P2.0
: N.T.S.
13 INDIRECT DRAIN DETAIL
P9.1 : P2.0
| COVER |
| AD2.0 |
| AD2.1 |
| AD2.2 |
| AD2.3 |
| AD2.4 |
| AD5.1 |
| AD5.2 |
| A2.0 |
| A2.1 |
| A2.2 |
| A2.3 |
| A2.4 |
| A5.1 |
| A5.2 |
| A5.3 |
| A6.1 |
| A9.1 |
File details come from the government source that posted it. Updated .