AG-82FT-S-16-0015AME000003.pdf
PDF 93 KB Posted
- Attached to
- Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
- Solicitation number
- AG-82FT-S-16-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82FT-S-16-0015AME000007.pdf | ||
| AG-82FT-S-16-0015AME000006.pdf | ||
| AG-82FT-S-16-0015AME000005.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| AG-82FT-S-16-0015AME000002.pdf | ||
| AG-82FT-S-16-0015AME000001.pdf | ||
| Attachment_9_-_Drawings-E0.1-E9.8.pdf | ||
| Attachment_2_-_Volume_2_Divisions_22-26.pdf | ||
| Attachment_1_-_Volume_1_Divisions_0-22.pdf | ||
| Attachment_12_-_AsbestosLeadHazMaterial-_C_Wing.pdf | ||
| Attachment_13_-_Wage_Determination.pdf | ||
| Attachment_5_-_Drawings-A2.0-A9.1.pdf | ||
| Attachment_7_-_Drawings-M0.1-M9.7.pdf | ||
| Attachment_8_-_Drawings-P0.1-P9.1.pdf | ||
| Attachment_10_-_AsbestosLeadHazMaterial-_A_Wing.pdf | ||
| Attachment_11_-_AsbestosLeadHazMaterial-_B_Wing.pdf | ||
| Attachment_4_-_Drawings-Arch_AD2.0-AD5.2.pdf | ||
| Attachment_3_-_Drawings-COVER.pdf | ||
| Solicitation_AG-82FT-S-16-0015.doc.pdf | ||
| Attachment_6_-_Drawings-S0.1-S2.0.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-82FT-S-16-0015
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82FT
FORT COLLINS CO 80526
240 W PROSPECT STREET
ROCKY MOUNTAIN RESEARCH STATION
USDA FOREST SERVICE
06/14/2016000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/14/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 000003 MISSOULA FIRE SCIENCES LAB MECHANICAL UPGRADE
The purpose of Amendment 000003 is as follows:
1. Provide responses to questions that were submitted after June 23, 2016.
Period of Performance: 12/05/2016 to 06/30/2017
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANTHONY O. SALAS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-82FT-S-16-0015/000003
001 Missoula Fire Sciences Lab Mechanical Upgrade
Missoula Fire Sciences Lab Mechanical Upgrade
Requisition No: 804339
Delivery: 06/30/2017
FOB: Destination
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AG-82FT-S-16-0015
Missoula Fire Sciences Lab Mechanical Upgrade Project
Amendment No. 000003, dated 06/27/2016 Page 1 of 2
Missoula Fire Sciences Lab Mechanical Upgrade Project Solicitation Number AG-82FT-S-16-0015
Amendment 000003 – Questions and Answers
Q1.) Is the Low Voltage wiring required to be in conduit?
A1.) Yes, all low voltage wiring is required to be in 1” conduit where exposed. Low voltage communication cabling above layin celing can be hung from J-Hooks.
Q2.) Where is rigid conduit required? The specification states mechanical room, loading docks, etc. but since the entire space is mechanical in nature, please clarify.
A2.)Ridgid is not required in mechanical spaces. EMT inside the building is acceptable.
Q3.) Where is the applied fireproofing (specified in 078100) needed?
A3.) Applied Fireproofing is required when penetrating between Wing A and Wing B.
| SF-30 |
| S160015DraftAmendmen0003QAs |
File details come from the government source that posted it. Updated .