Attachment_2_-_Volume_2_Divisions_22-26.pdf

PDF 4 MB Posted

Attached to
Missoula Fire Sciences Lab Mechanical Upgrade Project Federal contract opportunity
Solicitation number
AG-82FT-S-16-0015
Issued by
Department of Agriculture Forest Service Research Service Rocky Mountain Research Station

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCKY MOUNTAIN RESEARCH STATION (RMRS)

FIRE SCIENCES LAB MECHANICAL UPGRADE

MISSOULA, MONTANA

TABLE OF CONTENTS TBC-1

TABLE OF CONTENTS – VOLUME 2 DIVISIONS 23-26

The following listed documents comprise the Project Manual for Forest Service and Rocky Mountain Research Station Fire Science Lab Mechanical Upgrade, Missoula, Montana. Numbering of Divisions conforms to CSI Format for Building Specifications; Divisions and Sections not appearing are not applicable.

TECHNICAL SPECIFICATIONS

DIVISION 23 – HEATING, VENTILATION AND AIR-CONDITIONING

230130 HVAC AIR-DISTRIBUITION SYSTEM CLEANING

230516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

230519 METERS AND GAGES FOR HVAC PIPING

230523 GENERAL DUTY VALVES FOR HVAC PIPING

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230719 HVAC PIPING INSULATION

230900 INSTRUMENTATION AND CONTROL FOR HVAC

230993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

231123 FACILITY NATURAL-GAS PIPING

232113 HYDRONIC PIPING

232123 HYDRONIC PUMPS

232213 STEAM HUMIDIFICATION PIPING

232300 REFRIGERANT PIPING

232500 HVAC WATER TREATMENT

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233423 HVAC POWER VENTILATORS

233713 DIFFUSERS, REGISTERS, AND GRILLES

235216 CONDENSING BOILERS

236313 AIR-COOLED REFRIGERANT CONDENSERS

237313 INDOOR CENTRAL STATION AIR HANDLING UNITS

238239 UNIT HEATERS

238413 HUMIDIFIERS

DIVISION 26 – ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICALSYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260548 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

262200 LOW-VOLTAGE TRANSFORMERS

262413 SWITCHBOARDS

262416 PANELBOARDS

262726 WIRING DEVICES

262813 FUSES

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

262913 ENCLOSED CONTROLLERS

TABLE OF CONTENTS TBC-2

264313 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

265100 LIGHTING

END OF TABLE OF CONTENTS – DIVISIONS 23-26

HVAC AIR-DISTRIBUTION SYSTEM CLEANING 230130 - 1

SECTION 230130 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes cleaning HVAC air-distribution equipment, ducts, plenums, and system components.

1.2 QUALITY ASSURANCE

A. Comply with the National Air Duct Cleaners Association publication entitled, NADCA ACR 2006.

This document is available on-line at:

http://www.nadca.com/sites/default/files/userfiles/ACR%202006.pdf

B. UL Compliance: Comply with UL 181 and UL 181A for fibrous-glass ducts.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 PREPARATION

A. Use the existing service openings, as required for proper cleaning, at various points of the HVAC system for physical and mechanical entry and for inspection.

B. Comply with NADCA ACR 2006, "Guidelines for Constructing Service Openings in HVAC Systems" Section.

3.2 CLEANING

A. Comply with NADCA ACR 2006.

B. Remove visible surface contaminants and deposits from within the HVAC system.

C. Systems and Components to Be Cleaned:

1. Existing air devices for supply and return air to remain.

2. Existing air-terminal units to remain.

3. Existing ductwork to remain:

a. Supply-air ducts, including turning vanes and reheat coils, from the air devices back to the air-handling unit.

b. Return-air ducts from the air devices and experimental spaces back to the air-handling unit.

http://www.nadca.com/sites/default/files/userfiles/ACR%202006.pdf

HVAC AIR-DISTRIBUTION SYSTEM CLEANING 230130 - 2

c. Exhaust-air and relief air ducts and plenums in their entirety to the outdoors.

d. Outdoor-air ducts from the intake to the air handling unit.

4. Air-Handling Units:

a. Interior surfaces of the unit casing.

b. Coil surfaces compartment.

c. Condensate drain pans.

d. Fans, fan blades, and fan housings.

5. Filters and filter housings.

D. Collect debris removed during cleaning. Ensure that debris is not dispersed outside the HVAC system during the cleaning process.

E. Particulate Collection:

1. For particulate collection equipment, include adequate filtration to contain debris removed. Locate equipment downwind and away from all air intakes and other points of entry into the building.

2. HEPA filtration with 99.97 percent collection efficiency for particles sized 0.3 micrometer or larger shall be used where the particulate collection equipment is exhausting inside the building, F. Control odors and mist vapors during the cleaning and restoration process.

G. Mark the position of manual volume dampers and air-directional mechanical devices inside the system prior to cleaning. Restore them to their marked position on completion of cleaning.

H. System components shall be cleaned so that all HVAC system components are visibly clean.

On completion, all components must be returned to those settings recorded just prior to cleaning operations.

I. Clean all air-distribution devices, registers, grilles, and diffusers.

J. Clean visible surface contamination deposits according to NADCA ACR 2006 and the following:

1. Clean air-handling units, airstream surfaces, components, condensate collectors, and drains.

2. Ensure that a suitable operative drainage system is in place prior to beginning wash-down procedures.

3. Clean evaporator coils, reheat coils, and other airstream components.

K. Duct Systems:

1. Create service openings in the HVAC system as necessary to accommodate cleaning.

2. Mechanically clean duct systems specified to remove all visible contaminants so that the systems are capable of passing the HVAC System Cleanliness Tests (see

NADCA ACR 2006).

L. Debris removed from the HVAC system shall be disposed of according to applicable Federal, state, and local requirements.

HVAC AIR-DISTRIBUTION SYSTEM CLEANING 230130 - 3

M. Mechanical Cleaning Methodology:

1. Source-Removal Cleaning Methods: The HVAC system shall be cleaned using source-removal mechanical cleaning methods designed to extract contaminants from within the HVAC system and to safely remove these contaminants from the facility. No cleaning method, or combination of methods, shall be used that could potentially damage components of the HVAC system or negatively alter the integrity of the system.

a. Use continuously operating vacuum-collection devices to keep each section being cleaned under negative pressure.

b. Cleaning methods that require mechanical agitation devices to dislodge debris that is adhered to interior surfaces of HVAC system components shall be equipped to safely remove these devices. Cleaning methods shall not damage the integrity of HVAC system components or damage porous surface materials such as duct and plenum liners.

2. Cleaning Mineral-Fiber Insulation Components:

a. Fibrous-glass thermal or acoustical insulation elements present in equipment or ductwork shall be thoroughly cleaned with HEPA vacuuming equipment while the HVAC system is under constant negative pressure and shall not be permitted to get wet according to NADCA ACR 2006.

b. Cleaning methods used shall not cause damage to fibrous-glass components and will render the system capable of passing the HVAC System Cleanliness Tests (see NADCA ACR 2006).

c. Fibrous materials that become wet shall be discarded and replaced.

N. Coil Cleaning:

1. Measure static-pressure differential across each coil.

2. See NADCA ACR 2006, "Coil Surface Cleaning" Section. Type 1, or Type 1 and Type 2, cleaning methods shall be used to render the coil visibly clean and capable of passing Coil Cleaning Verification (see applicable NADCA ACR 2006).

3. Coil drain pans shall be subject to NADCA ACR 2006, "Non-Porous Surfaces Cleaning Verification." Ensure that condensate drain pans are operational.

4. Electric-resistance coils shall be de-energized, locked out, and tagged before cleaning.

5. Cleaning methods shall not cause any appreciable damage to, cause displacement of, inhibit heat transfer, or cause erosion of the coil surface or fins, and shall comply with coil manufacturer's written recommendations when available.

6. Rinse thoroughly with clean water to remove any latent residues.

3.3 RESTORATION

A. Restore and repair HVAC air-distribution equipment, ducts, plenums, and components according to NADCA ACR 2006, "Restoration and Repair of Mechanical Systems" Section.

B. Comply with Section 233113 "Metal Ducts" and Section 233300 "Air Duct Accessories" for duct materials, accessories, and hardware required for Work of this Section.

C. Ensure that closures do not hinder or alter airflow.

HVAC AIR-DISTRIBUTION SYSTEM CLEANING 230130 - 4

D. New closure materials, including insulation, shall match opened materials and shall have removable closure panels fitted with gaskets and fasteners.

E. Reseal fibrous-glass ducts. Comply with requirements in Section 233116 "Nonmetal Ducts."

END OF SECTION 230130.51

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 1

SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Flexible, ball-joint, packed expansion joints.

2. Slip-joint packed expansion joints.

3. Expansion-compensator packless expansion joints.

4. Flexible-hose packless expansion joints.

5. Metal-bellows packless expansion joints.

6. Rubber packless expansion joints.

7. Grooved-joint expansion joints.

8. Pipe loops and swing connections.

9. Alignment guides and anchors.

1.3 PERFORMANCE REQUIREMENTS

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

B. Capability: Products to absorb 200 percent of maximum axial movement between anchors.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Delegated-Design Submittal: For each anchor and alignment guide indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1. Design Calculations: Calculate requirements for thermal expansion of piping systems and for selecting and designing expansion joints, loops, and swing connections.

2. Anchor Details: Detail fabrication of each anchor indicated. Show dimensions and methods of assembly and attachment to building structure.

3. Alignment Guide Details: Detail field assembly and attachment to building structure.

4. Schedule: Indicate type, manufacturer's number, size, material, pressure rating, end connections, and location for each expansion joint.

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 2

1.5 INFORMATIONAL SUBMITTALS

A. Welding certificates.

B. Product Certificates: For each type of expansion joint, from manufacturer.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For expansion joints to include in maintenance manuals.

1.7 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following:

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."

2. ASME Boiler and Pressure Vessel Code: Section IX.

PART 2 - PRODUCTS

2.1 PACKED EXPANSION JOINTS

A. Flexible, Ball-Joint, Packed Expansion Joints:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or approved equal:

a. Advanced Thermal Systems, Inc.

b. Hyspan Precision Products, Inc.

2. Standards: ASME Boiler and Pressure Vessel Code: Section II, "Materials"; and ASME B31.9, "Building Services Piping," for materials and design of pressure-containing parts and bolting.

3. Material: Carbon-steel assembly with asbestos-free composition packing.

4. Design: For 360-degree rotation and angular deflection.

5. Minimum Pressure Rating: 250 psig at 400 deg F.

6. Angular Deflection for NPS 6 and Smaller: 30 degree minimum.

7. Angular Deflection for NPS 8 and Larger: 15 degree minimum.

8. End Connections for NPS 2 and Smaller: Threaded.

9. End Connections for NPS 2-1/2 and Larger: Flanged.

B. Slip-Joint Packed Expansion Joints:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Adsco Manufacturing LLC.

b. Advanced Thermal Systems, Inc.

c. Hyspan Precision Products, Inc.

http://www.specagent.com/LookUp/?uid=123456811611&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811612&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811613&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811614&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811615&mf=04&src=wd

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 3

2. Standard: ASTM F 1007.

3. Material: Carbon steel with asbestos-free PTFE packing.

4. Design: With internal guide and injection device for repacking under pressure. Include drip connection if used for steam piping.

5. Configuration: Single joint with base and double joint with base class(es) unless otherwise indicated.

6. End Connections: Flanged or weld ends to match piping system.

2.2 PACKLESS EXPANSION JOINTS

A. Metal, Expansion-Compensator Packless Expansion Joints:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Adsco Manufacturing LLC.

b. Flexicraft Industries.

c. Flex Pression Ltd.

d. Flex-Weld, Inc.

e. Metraflex, Inc.

f. Unisource Manufacturing, Inc.

2. Minimum Pressure Rating: 175 psig unless otherwise indicated.

3. Configuration for Copper Tubing: Two-ply, phosphor-bronze bellows with copper pipe ends.

a. End Connections for Copper Tubing NPS 2 and Smaller: Solder joint or threaded.

b. End Connections for Copper Tubing NPS 2-1/2 to NPS 4: Threaded.

4. Configuration for Steel Piping: Two-ply, stainless-steel bellows; steel-pipe end connections; and carbon-steel shroud.

a. End Connections for Steel Pipe NPS 2 and Smaller: Threaded.

b. End Connections for Steel Pipe NPS 2-1/2 to NPS 4: Flanged.

B. Rubber, Expansion-Compensator Packless Expansion Joints:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Amber/Booth Company, Inc.; a div. of Vibration Isolation Products of Texas, Inc.

b. Flexicraft Industries.

c. General Rubber Corporation.

d. Mason Industries, Inc.; Mercer Rubber Co.

e. Unisource Manufacturing, Inc.

2. Material: Twin reinforced-rubber spheres with external restraining cables.

3. Minimum Pressure Rating: 150 psig at 170 deg F unless otherwise indicated.

4. End Connections for NPS 2 and Smaller: Threaded.

C. Flexible-Hose Packless Expansion Joints:

http://www.specagent.com/LookUp/?uid=123456811616&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811617&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811618&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811619&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811621&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811624&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824690&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811626&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811627&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824691&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811631&mf=04&src=wd

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 4

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Flexicraft Industries.

b. Flex Pression Ltd.

c. Metraflex, Inc.

d. Unisource Manufacturing, Inc.

2. Description: Manufactured assembly with inlet and outlet elbow fittings and two flexible-metal-hose legs joined by long-radius, 180-degree return bend or center section of flexible hose.

3. Flexible Hose: Corrugated-metal inner hoses and braided outer sheaths.

4. Expansion Joints for Copper TubingNPS 2 and Smaller: Copper-alloy fittings with solder-joint end connections.

a. Bronze hoses and single-braid bronze sheaths with 450 psig at 70 deg F and 340 psig at 450 deg F ratings.

b. Bronze hoses and double-braid bronze sheaths with 700 psig at 70 deg F and 500 psig at 450 deg F ratings.

5. Expansion Joints for Copper TubingNPS 2-1/2 to NPS 4: Copper-alloy fittings with threaded end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 300 psig at 70 deg F and 225 psig at 450 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 420 psig at 70 deg F and 315 psig at 450 deg F ratings.

6. Expansion Joints for Steel PipingNPS 2 and Smaller: Carbon-steel fittings with threaded end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 450 psig at 70 deg F and 325 psig at 600 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 700 psig at 70 deg F and 515 psig at 600 deg F ratings.

7. Expansion Joints for Steel PipingNPS 2-1/2 to NPS 6: Carbon-steel fittings with flanged end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 200 psig at 70 deg F and 145 psig at 600 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 275 psig at 70 deg F and 200 psig at 600 deg F ratings.

8. Expansion Joints for Steel Piping NPS 8 to NPS 12: Carbon-steel fittings with flanged end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 125 psig at 70 deg F and 90 psig at 600 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 165 psig at 70 deg F and 120 psig at 600 deg F ratings.

9. Expansion Joints for Steel PipingNPS 14 and Larger: Carbon-steel fittings with flanged end connections.

http://www.specagent.com/LookUp/?uid=123456811633&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811634&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811635&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811636&mf=04&src=wd

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 5

a. Stainless-steel hoses and double-braid, stainless-steel sheaths with 165 psig at 70 deg F and 120 psig at 600 deg F ratings.

D. Metal-Bellows Packless Expansion Joints:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Badger Industries, Inc.

b. Flexicraft Industries.

c. Metraflex, Inc.

d. Senior Flexonics Pathway.

e. Tozen Corporation.

f. Unaflex.

g. Unisource Manufacturing, Inc.

h. Universal Metal Hose; a subsidiary of Hyspan Precision Products, Inc.

i. U.S. Bellows, Inc.

2. Standards: ASTM F 1120 and EJMA's "Standards of the Expansion Joint Manufacturers Association, Inc."

3. Type: Circular, corrugated bellows with external tie rods.

4. Minimum Pressure Rating: 175 psig unless otherwise indicated.

5. Configuration: Single joint with base and double joint with base class(es) unless otherwise indicated.

6. Expansion Joints for Copper Tubing: Single- or multi-ply phosphor-bronze bellows, copper pipe ends, and brass shrouds.

a. End Connections for Copper Tubing NPS 2 and Smaller: Solder joint or threaded.

b. End Connections for Copper Tubing NPS 2-1/2 to NPS 4: Solder joint or threaded.

c. End Connections for Copper Tubing NPS 5 and Larger: Flanged.

7. Expansion Joints for Steel Piping: Single- or multi-ply stainless-steel bellows, steel pipe ends, and carbon-steel shroud.

a. End Connections for Steel Pipe NPS 2 and Smaller: Threaded.

b. End Connections for Steel Pipe NPS 2-1/2 and Larger: Flanged.

E. Rubber Packless Expansion Joints:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Amber/Booth Company, Inc.; a div. of Vibration Isolation Products of Texas, Inc.

b. Flex-Weld, Inc.

c. Mason Industries, Inc.; Mercer Rubber Co.

d. Metraflex, Inc.

e. Red Valve Company, Inc.

f. Unaflex.

g. Unisource Manufacturing, Inc.

2. Standards: ASTM F 1123 and FSA's "Technical Handbook: Non-Metallic Expansion Joints and Flexible Pipe Connectors."

3. Material: Fabric-reinforced rubber complying with FSA-NMEJ-703.

4. Arch Type: Single or multiple arches with external control rods.

http://www.specagent.com/LookUp/?uid=123456811639&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811642&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811647&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811649&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811650&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811651&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811652&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824692&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811653&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824693&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811657&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824694&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811660&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811662&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811664&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811665&mf=04&src=wd

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 6

5. Spherical Type: Single or multiple spheres with external control rods.

6. Minimum Pressure Rating for NPS 1-1/2 to NPS 4: 150 psig at 220 deg F.

7. Minimum Pressure Rating for NPS 5 and NPS 6: 140 psig at 200 deg F.

8. Minimum Pressure Rating for NPS 8 to NPS 12: 140 psig at 180 deg F.

9. Material for Fluids Containing Acids, Alkalies, or Chemicals: BR or CSM or EPDM.

10. Material for Fluids Containing Gas, Hydrocarbons, or Oil: Buna-N or CR.

11. End Connections: Full-faced, integral steel flanges with steel retaining rings.

2.3 GROOVED-JOINT EXPANSION JOINTS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Anvil International, Inc.

2. Shurjoint Piping Products.

3. Victaulic Company.

B. Description: Factory-assembled expansion joint made of several grooved-end pipe nipples, couplings, and grooved joints.

C. Standard: AWWA C606, for grooved joints.

D. Nipples: ASTM A 53/A 53M, Schedule 40, Type E or S, steel pipe with grooved ends.

E. Couplings: 12, flexible type for steel-pipe dimensions. Include ferrous housing sections, Buna- N gasket suitable for diluted acid, alkaline fluids, and cold and hot water EPDM gasket suitable for cold and hot water, and bolts and nuts.

2.4 ALIGNMENT GUIDES AND ANCHORS

A. Alignment Guides:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Adsco Manufacturing LLC.

b. Advanced Thermal Systems, Inc.

c. Flex-Hose Co., Inc.

d. Flexicraft Industries.

e. Flex-Weld, Inc.

f. Hyspan Precision Products, Inc.

g. Metraflex, Inc.

h. Senior Flexonics Pathway.

i. Unisource Manufacturing, Inc.

j. U.S. Bellows, Inc.

2. Description: Steel, factory-fabricated alignment guide, with bolted two-section outer cylinder and base for attaching to structure; with two-section guiding spider for bolting to pipe.

B. Anchor Materials:

http://www.specagent.com/LookUp/?uid=123456811666&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811667&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811668&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811669&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811670&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811671&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811672&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811673&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811674&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811675&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811676&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811677&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811678&mf=04&src=wd

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 7

1. Steel Shapes and Plates: ASTM A 36/A 36M.

2. Bolts and Nuts: ASME B18.10 or ASTM A 183, steel hex head.

3. Washers: ASTM F 844, steel, plain, flat washers.

4. Mechanical Fasteners: Insert-wedge-type stud with expansion plug anchor for use in hardened portland cement concrete, with tension and shear capacities appropriate for application.

a. Stud: Threaded, zinc-coated carbon steel.

b. Expansion Plug: Zinc-coated steel.

c. Washer and Nut: Zinc-coated steel.

5. Chemical Fasteners: Insert-type-stud, bonding-system anchor for use with hardened portland cement concrete, with tension and shear capacities appropriate for application.

a. Bonding Material: ASTM C 881/C 881M, Type IV, Grade 3, two-component epoxy resin suitable for surface temperature of hardened concrete where fastener is to be installed.

b. Stud: ASTM A 307, zinc-coated carbon steel with continuous thread on stud unless otherwise indicated.

c. Washer and Nut: Zinc-coated steel.

PART 3 - EXECUTION

3.1 EXPANSION-JOINT INSTALLATION

A. Install expansion joints of sizes matching sizes of piping in which they are installed.

B. Install packed-type expansion joints with packing suitable for fluid service.

C. Install metal-bellows expansion joints according to EJMA's "Standards of the Expansion Joint Manufacturers Association, Inc."

D. Install rubber packless expansion joints according to FSA-NMEJ-702.

E. Install grooved-joint expansion joints to grooved-end steel piping

3.2 PIPE LOOP AND SWING CONNECTION INSTALLATION

A. Install pipe loops cold-sprung in tension or compression as required to partly absorb tension or compression produced during anticipated change in temperature.

B. Connect risers and branch connections to mains with at least five pipe fittings including tee in main.

C. Connect risers and branch connections to terminal units with at least four pipe fittings including tee in riser.

D. Connect mains and branch connections to terminal units with at least four pipe fittings including tee in main.

EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 230516 - 8

3.3 ALIGNMENT-GUIDE AND ANCHOR INSTALLATION

A. Install alignment guides to guide expansion and to avoid end-loading and torsional stress.

B. Install one guide(s) on each side of pipe expansion fittings and loops. Install guides nearest to expansion joint not more than four pipe diameters from expansion joint.

C. Attach guides to pipe and secure guides to building structure.

D. Install anchors at locations to prevent stresses from exceeding those permitted by ASME B31.9 and to prevent transfer of loading and stresses to connected equipment.

E. Anchor Attachments:

1. Anchor Attachment to Steel Pipe: Attach by welding. Comply with ASME B31.9 and ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."

2. Anchor Attachment to Copper Tubing: Attach with pipe hangers. Use MSS SP-69, Type 24, U-bolts bolted to anchor.

F. Fabricate and install steel anchors by welding steel shapes, plates, and bars. Comply with ASME B31.9 and AWS D1.1/D1.1M.

1. Anchor Attachment to Steel Structural Members: Attach by welding.

2. Anchor Attachment to Concrete Structural Members: Attach by fasteners. Follow fastener manufacturer's written instructions.

G. Use grout to form flat bearing surfaces for guides and anchors attached to concrete.

END OF SECTION 230516

SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 230517 - 1

SECTION 230517 - SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Sleeves.

2. Sleeve-seal systems.

3. Grout.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 SLEEVES

A. Galvanized-Steel Wall Pipes: ASTM A 53/A 53M, Schedule 40, with plain ends and welded steel collar; zinc coated.

B. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, zinc coated, with plain ends.

2.2 SLEEVE-SEAL SYSTEMS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Advance Products & Systems, Inc.

2. CALPICO, Inc.

3. Metraflex Company (The).

4. Pipeline Seal and Insulator, Inc.

5. Proco Products, Inc.

B. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.

1. Sealing Elements: EPDM-rubber or NBR interlocking links shaped to fit surface of pipe.

Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Carbon steel.

3. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements.

http://www.specagent.com/LookUp/?uid=123456804938&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456804939&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456804940&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456804941&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456804942&mf=04&src=wd

SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 230517 - 2

2.3 GROUT

A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi, 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION

A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.

1. Sleeves are not required for core-drilled holes.

C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.

1. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.

2. Using grout, seal the space outside of sleeves in slabs and walls without sleeve-seal system.

D. Install sleeves for pipes passing through interior partitions.

1. Cut sleeves to length for mounting flush with both surfaces.

2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint.

E. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials.

3.2 SLEEVE-SEAL-SYSTEM INSTALLATION

A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.

SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 230517 - 3

B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.3 SLEEVE AND SLEEVE-SEAL SCHEDULE

A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Exterior Concrete Walls above Grade:

a. Galvanized-steel wall sleeves.

2. Exterior Concrete Walls below Grade:

a. Galvanized-steel wall sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

3. Concrete Slabs-on-Grade:

a. Galvanized-steel-pipe sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

4. Concrete Slabs above Grade:

a. Galvanized-steel-pipe sleeves.

5. Interior Partitions:

a. Galvanized-steel-pipe sleeves.

END OF SECTION 230517

METERS AND GAGES FOR HVAC PIPING 230519 - 1

SECTION 230519 - METERS AND GAGES FOR HVAC PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Bimetallic-actuated thermometers.

2. Thermowells.

3. Dial-type pressure gages.

4. Gage attachments.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

1.3 INFORMATIONAL SUBMITTALS

A. Product certificates.

1.4 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

PART 2 - PRODUCTS

2.1 BIMETALLIC-ACTUATED THERMOMETERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or an approved equal:

1. Ernst Flow Industries.

2. Trerice, H. O. Co.

3. Watts Regulator Co.; a div. of Watts Water Technologies, Inc.

4. Weiss Instruments, Inc.

B. Standard: ASME B40.200.

C. Case: Liquid-filled and sealed type(s); stainless steel with 3-inch nominal diameter.

D. Dial: Nonreflective aluminum with permanently etched scale markings and scales in deg F.

E. Connector Type(s): Union joint, adjustable angle, with unified-inch screw threads.

F. Connector Size: 1/2 inch, with ASME B1.1 screw threads.

http://www.specagent.com/LookUp/?uid=123456804944&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456825365&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456819902&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456804952&mf=04&src=wd

METERS AND GAGES FOR HVAC PIPING 230519 - 2

G. Stem: 0.25 or 0.375 inch in diameter; stainless steel.

H. Window: Plain glass.

I. Ring: Stainless steel.

J. Element: Bimetal coil.

K. Pointer: Dark-colored metal.

L. Accuracy: Plus or minus 1 percent of scale range.

2.2 THERMOWELLS

A. Thermowells:

1. Standard: ASME B40.200.

2. Description: Pressure-tight, socket-type fitting made for insertion into piping tee fitting.

3. Material for Use with Copper Tubing: CNR or CUNI.

4. Material for Use with Steel Piping: CRES or CSA.

5. Type: Stepped shank unless straight or tapered shank is indicated.

6. External Threads: NPS 1/2, NPS 3/4, or NPS 1, ASME B1.20.1 pipe threads.

7. Internal Threads: 1/2, 3/4, and 1 inch, with ASME B1.1 screw threads.

8. Bore: Diameter required to match thermometer bulb or stem.

9. Insertion Length: Length required to match thermometer bulb or stem.

10. Lagging Extension: Include on thermowells for insulated piping and tubing.

11. Bushings: For converting size of thermowell's internal screw thread to size of thermometer connection.

B. Heat-Transfer Medium: Mixture of graphite and glycerin.

2.3 PRESSURE GAGES

A. Direct-Mounted, Metal-Case, Dial-Type Pressure Gages:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or an approved equal:

a. Ernst Flow Industries.

b. Trerice, H. O. Co.

c. Watts Regulator Co.; a div. of Watts Water Technologies, Inc.

d. Weiss Instruments, Inc.

2. Standard: ASME B40.100.

3. Case: Liquid-filled Sealed type(s); cast aluminum or drawn steel; 4-1/2-inch nominal diameter.

4. Pressure-Element Assembly: Bourdon tube unless otherwise indicated.

5. Pressure Connection: Brass, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and bottom-outlet type unless back-outlet type is indicated.

6. Movement: Mechanical, with link to pressure element and connection to pointer.

7. Dial: Nonreflective aluminum with permanently etched scale markings graduated in psi.

8. Pointer: Dark-colored metal.

http://www.specagent.com/LookUp/?uid=123456804969&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456825367&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456819905&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456804977&mf=04&src=wd

METERS AND GAGES FOR HVAC PIPING 230519 - 3

9. Window: Glass or plastic.

10. Ring: Metal.

11. Accuracy: Grade B, plus or minus 2 percent of middle half of scale range.

2.4 GAGE ATTACHMENTS

A. Snubbers: ASME B40.100, brass; with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and piston-type surge-dampening device. Include extension for use on insulated piping.

B. Valves: Brass or stainless-steel needle, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install thermowells with socket extending to center of pipe and in vertical position in piping tees.

B. Install thermowells of sizes required to match thermometer connectors. Include bushings if required to match sizes.

C. Install thermowells with extension on insulated piping.

D. Fill thermowells with heat-transfer medium.

E. Install direct-mounted thermometers in thermowells and adjust vertical and tilted positions.

F. Install remote-mounted thermometer bulbs in thermowells and install cases on panels; connect cases with tubing and support tubing to prevent kinks. Use minimum tubing length.

G. Install direct-mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position.

H. Install valve and snubber in piping for each pressure gage for fluids.

I. Install thermometers in the following locations:

1. Inlet and outlet of each boiler.

2. Inlets and outlets of each water heat exchanger.

3. Inlet and outlet of each hot-water storage tank.

4. Where shown on plans and details.

J. Install pressure gages in the following locations:

1. Suction and discharge of each water pump.

2. Where shown on plans and details.

K. Install meters and gages adjacent to machines and equipment to allow service and maintenance of meters, gages, machines, and equipment.

L. Adjust faces of meters and gages to proper angle for best visibility.

METERS AND GAGES FOR HVAC PIPING 230519 - 4

3.2 THERMOMETER SCHEDULE

A. Thermometers at inlet and outlet of each boiler shall be the following:

1. Liquid-filled Sealed, bimetallic-actuated type.

B. Thermometers at inlets and outlets of each water heat exchanger shall be the following:

1. Liquid-filled Sealed, bimetallic-actuated type.

C. Thermometers at inlet and outlet of each hot-water storage tank shall be the following:

1. Liquid-filled Sealed, bimetallic-actuated type.

D. Thermometer stems shall be of length to match thermowell insertion length.

3.3 THERMOMETER SCALE-RANGE SCHEDULE

A. Scale Range for Hot -Water Piping: 0 to 220 deg F

3.4 PRESSURE-GAGE SCHEDULE

A. Pressure gages at suction and discharge of each water pump shall be the following:

1. Liquid-filled Sealed, direct-mounted, metal case.

3.5 PRESSURE-GAGE SCALE-RANGE SCHEDULE

A. Scale Range for Hot Water Service Piping: 0 to 100 psi.

END OF SECTION 230519

GENERAL-DUTY VALVES FOR HVAC PIPING 230523 - 1

SECTION 230523 - GENERAL-DUTY VALVES FOR HVAC PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Brass ball valves.

2. Bronze ball valves.

3. Iron, single-flange butterfly valves.

4. Bronze swing check valves.

5. Iron swing check valves.

6. Iron globe valves.

B. Related Sections:

1. Section 230553 "Identification for HVAC Piping and Equipment" for valve tags and schedules.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of valve indicated.

1.3 QUALITY ASSURANCE

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance: ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS FOR VALVES

A. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

B. Valve Sizes: Same as upstream piping unless otherwise indicated.

C. Valves in Insulated Piping: With 2-inch stem extensions and the following features:

1. Ball Valves: With extended operating handle of non-thermal-conductive material, and protective sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation.

2. Butterfly Valves: With extended neck.

GENERAL-DUTY VALVES FOR HVAC PIPING 230523 - 2

2.2 BRASS BALL VALVES

A. Two-Piece, Full-Port, Brass Ball Valves with Stainless-Steel Trim:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or an approved equal:

a. Crane Co.; Crane Valve Group; Crane Valves.

b. Hammond Valve.

c. Milwaukee Valve Company.

d. Nibco

e. RuB Inc.

f. Watts.

2. Description:

a. Standard: MSS SP-110.

b. SWP Rating: 150 psig.

c. CWP Rating: 600 psig.

d. Body Design: Two piece.

e. Body Material: Forged brass.

f. Ends: Threaded.

g. Seats: PTFE or TFE.

h. Stem: Stainless steel.

i. Ball: Stainless steel, vented.

j. Port: Full.

2.3 IRON, SINGLE-FLANGE BUTTERFLY VALVES

A. 150 CWP, Iron, Single-Flange Butterfly Valves with EPDM Seat and Aluminum-Bronze Disc:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or an approved equal:

a. ABZ Valve and Controls; a division of ABZ Manufacturing, Inc.

b. Bray Controls; a division of Bray International.

c. Conbraco Industries, Inc.; Apollo Valves.

d. Cooper Cameron Valves; a division of Cooper Cameron Corp.

e. Crane Co.; Crane Valve Group; Jenkins Valves.

f. Crane Co.; Crane Valve Group; Stockham Division.

g. DeZurik Water Controls.

h. Hammond Valve.

i. Kitz Corporation.

j. Milwaukee Valve Company.

k. NIBCO INC.

l. Norriseal; a Dover Corporation company.

m. Red-White Valve Corporation.

n. Spence Strainers International; a division of CIRCOR International.

o. Tyco Valves & Controls; a unit of Tyco Flow Control.

p. Watts Regulator Co.; a division of Watts Water Technologies, Inc.

2. Description:

http://www.specagent.com/LookUp/?ulid=6112&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829588&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829591&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829597&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829598&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=6116&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829645&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829646&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829647&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829648&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829649&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829650&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829651&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829652&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829653&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829654&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829655&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829656&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829657&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829658&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829659&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829660&mf=04&src=wd

GENERAL-DUTY VALVES FOR HVAC PIPING 230523 - 3

a. Standard: MSS SP-67, Type I.

b. CWP Rating: 150 psig.

c. Body Design: Lug type; suitable for bidirectional dead-end service at rated pressure without use of downstream flange.

d. Body Material: ASTM A 126, cast iron or ASTM A 536, ductile iron.

e. Seat: EPDM.

f. Stem: One- or two-piece stainless steel.

g. Disc: Aluminum bronze.

2.4 IRON SWING CHECK VALVES

A. Class 125, Iron Swing Check Valves with Metal Seats:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or an approved equal:

a. Crane Co.; Crane Valve Group; Crane Valves.

b. Hammond Valve.

c. Milwaukee Valve Company.

d. NIBCO INC.

e. Red-White Valve Corporation.

f. Sure Flow Equipment Inc.

g. Watts Regulator Co.; a division of Watts Water Technologies, Inc.

2. Description:

a. Standard: MSS SP-71, Type I.

b. NPS 2-1/2 to NPS 12, CWP Rating: 200 psig.

c. Body Design: Clear or full waterway.

d. Body Material: ASTM A 126, gray iron with bolted bonnet.

e. Ends: Flanged.

f. Trim: Bronze.

g. Gasket: Asbestos free.

2.5 IRON GLOBE VALVES

A. Class 125, Iron Globe Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or an approved equal:

a. Crane Co.; Crane Valve Group; Crane Valves.

b. Hammond Valve.

c. Milwaukee Valve Company.

d. NIBCO INC.

e. Red-White Valve Corporation.

f. Watts Regulator Co.; a division of Watts Water Technologies, Inc.

2. Description:

a. Standard: MSS SP-85, Type I.

http://www.specagent.com/LookUp/?ulid=6140&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456829997&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830003&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830012&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830014&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830021&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830025&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830028&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=6183&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830375&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830390&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830400&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830404&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830414&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830419&mf=04&src=wd

GENERAL-DUTY VALVES FOR HVAC PIPING 230523 - 4

b. CWP Rating: 200 psig.

c. Body Material: ASTM A 126, gray iron with bolted bonnet.

d. Ends: Flanged.

e. Trim: Bronze.

f. Packing and Gasket: Asbestos free.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves.

3.2 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

E. Install swing check valves for proper direction of flow and in horizontal position with hinge pin level.

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valve applications are not indicated, use the following:

GENERAL-DUTY VALVES FOR HVAC PIPING 230523 - 5

1. Shutoff Service: Ball or butterfly valves.

2. Throttling Service, Except Steam: Globe, ball, or butterfly valves.

3. Throttling Service, Steam: Globe or butterfly valves.

4. Pump-Discharge Check Valves:

a. NPS 2 and Smaller: Bronze swing check valves with bronze disc.

b. NPS 2-1/2 and Larger: Iron, silent, swing check valves with lever and weight or with spring.

B. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP classes or CWP ratings may be substituted.

C. Select valves, except wafer types, with the following end connections:

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.

2. For Copper Tubing, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.

3. For Steel Piping, NPS 2 and Smaller: Threaded ends.

4. For Steel Piping, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.

5. For Steel Piping, NPS 5 and Larger: Flanged ends.

3.5 HEATING-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller:

1. Ball Valves:

B. Pipe NPS 2-1/2 and Larger:

1. Iron Valves, NPS 2-1/2 to NPS 4: May be provided with threaded ends instead of flanged ends.

2. Iron, Single-Flange Butterfly Valves.

3.6 LOW-PRESSURE STEAM VALVE SCHEDULE (15 PSIG OR LESS)

A. Pipe NPS 2 and Smaller:

1. Ball Valves.

B. Pipe NPS 2-1/2 and Larger:

1. Iron Valves, NPS 2-1/2 to NPS 4: May be provided with threaded ends instead of flanged ends.

2. Iron Swing Check Valves:

3. Iron Globe Valves, NPS 2-1/2 to NPS 12: Class 125.

3.7 STEAM-CONDENSATE VALVE SCHEDULE

A. Pipe NPS 2 and Smaller:

GENERAL-DUTY VALVES FOR HVAC PIPING 230523 - 6

1. Ball Valves:

B. Pipe NPS 2-1/2 and Larger:

1. Iron Valves, NPS 2-1/2 to NPS 4: May be provided with threaded ends instead of flanged ends.

2. Iron Swing Check Valves

END OF SECTION 230523

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529 - 1

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Thermal-hanger shield inserts.

4. Fastener systems.

5. Equipment supports.

1.2 PERFORMANCE REQUIREMENTS

A. Structural Performance: Hangers and supports for HVAC piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.

1. Design supports for multiple pipes capable of supporting combined weight of supported systems, system contents, and test water.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Show fabrication and installation details and include calculations for the following; include Product Data for components:

1. Trapeze pipe hangers.

2. Equipment supports.

C. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.4 INFORMATIONAL SUBMITTALS

A. Welding certificates.

1.5 QUALITY ASSURANCE

A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529 - 2

B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS

A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS…