AG-82FT-S-16-0015

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82FT

FORT COLLINS CO 80526

240 W PROSPECT STREET

ROCKY MOUNTAIN RESEARCH STATION

USDA FOREST SERVICE

06/14/2016000004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/14/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 000004 MISSOULA FIRE SCIENCES LAB MECHANICAL UPGRADE

The purpose of Amendment 000004 is as follows:

1. Provide responses to questions that were submitted after June 27, 2016.

2. Provide specification 226700.

3. Provide sign in sheet for the scheduled alternate site visits.

Period of Performance: 12/05/2016 to 06/30/2017

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ANTHONY O. SALAS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

AG-82FT-S-16-0015AME000004

Missoula Fire Sciences Lab Mechanical Upgrade Project

Amendment No. 000004, dated 07/08/16 Page 1 of 2

Missoula Fire Sciences Lab Mechanical Upgrade Project Solicitation Number AG-82FT-S-16-0015

Amendment 0004 – Questions and Answers

Q1.) I wanted to touch base on this project and see if we could submit pricing for the interior or exterior sign packages.

A1.) Refer to drawings, specifications and bid schedule for work items. For a proposal to be considered, the contractor must submit a complete package per solicitation requirements. To submit pricing for a portion of the work, coordinate with a bidding General Contractor.

Q2.) I don’t see a material specification for the RO water piping, can you please get me something on that?

A2.) Refer to Specificaion section 226700 REVERSE OSMOSIS WATER PIPING SYSTEMS included in this amendment.

Q3.) Solicitation Section B – Schedule of Items includes item 008 (Division 21 – Fire Suppression), Item 012 (Division 27 – Communications) and Item 013 (Division 28 – Alarm Systems). However, there are no specifications provided in the documents for divisions 21, 27 or 28. Is there any work associated with these items?

A3.) Division 21 Fire Suppression: Contractor shall field-verify to match existing piping materials, fittings, joining methods, and sizes. Types and spacing of hangers and supports shall be per Spec. section 220529. Division 21 scope of work only includes re-routing one section of existing piping and re-using existing sprinkler head. Before proceeding with the work, the Contractor shall notify the Contracting Officer if it appears that supporting the pipe from the wind tunnel above may be required.

Division 27 Telecommunications: Work under Division 27 is shown on the drawings and is a part of the project. All tel/data cabling shall be in 1” conduit where exposed. Above lay-in ceilings the cabling can be run from J-Hooks. Terminations at the tel/data jack with faceplate are to be included in the project. Coil cable with 10ft slack at the telephone terminal board in the C-Wing for the owner to terminate.

Division 28000 Fire Alarm: There are minor modifications to the fire alarm system for the remodeled spaces.

Match the existing system type using the current fire alarm system and provider that is currently maintaining the fire alarm system within the building. Current system is maintained by Dynamark.

Q4.) In 015000, item 3.2.I.1.a mandates that we have dedicated phone lines for each fax machine and computer in our field office. We typically use wireless technology in offices for projects that are less than a year. We also use Air Cards for our cellular service. Document transfer is completed using e mail and FTP sites. Are these satisfactory equivalents for the purposes of this contract?

A4.) Yes.

Q5.) Can we use an existing hose bib to obtain construction water? Since there is minimal civil scope on this project, minimal water should be required.

A5.) Yes.

Q6.) Can you please review the attached for prior-approval?

A6.) Refer to Question 2, Amendment 002.

ROCKY MOUNTAIN RESEARCH STATION (RMRS)

FIRE SCIENCES LAB MECHANICAL UPGRADE

MISSOULA, MONTANA

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 1

SECTION 226700 – REVERSE OSMOSIS WATER PIPING SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes reverse-osmosis-water piping.

1.2 PERFORMANCE REQUIREMENTS

A. Minimum Working Pressure Ratings:

1. Reverse-Osmosis-Water Piping: 100 psig unless otherwise indicated.

B. Seismic Performance: Water piping shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

1.4 INFORMATIONAL SUBMITTALS

A. Seismic Qualification Certificates: For water piping, accessories, and components, from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Detailed description of piping anchorage devices on which the certification is based and their installation requirements.

B. Field quality-control reports.

1.5 QUALITY ASSURANCE

A. ASME Compliance: Comply with ASME B31.3, "Process Piping," for piping conveying fluid at a pressure of 15 psig or greater.

PART 2 - PRODUCTS

2.1 PLASTIC PIPE AND FITTINGS

A. PP Pipe and Fittings for Heat-Fusion Joints: Made from ASTM D 4101, PP resin.

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 2

1. Schedule 40, Pipe and Fittings: Pipe made to ASTM D 2447, Schedule 40 or SDR 11 dimensions; with socket- or butt-fusion fittings matching pipe dimensions.

B. PP Pipe and Fittings for Electro-Fusion Joints: Made from ASTM D 4101, PP resin.

1. Schedule 80, Pipe and Fittings: Pipe made to ASTM D 2447, Schedule 80 dimensions;

with socket fittings matching pipe dimensions.

2. Electro-Fusion Fitting: Electrical-resistance heating coil for PP piping joints.

C. PVDF Pipe and Fittings: Made from ASTM D 3222, PVDF resin.

1. Schedule 40, Pipe and Fittings: Pipe made to ASTM D 2447, Schedule 40 or SDR 11 dimensions; with socket- or butt-fusion fittings matching pipe dimensions.

2.2 TRANSITION FITTINGS

A. Transition Fittings: Couplings, flanges, or other manufactured fittings; same size as, with pressure rating at least equal to and ends compatible with, piping to be joined.

2.3 PP VALVES

A. PP Ball Valves:

1. Description:

a. Standard: MSS SP-122.

b. Pressure Rating: 150 psig at 73 deg F.

c. Body Material: ASTM D 4101, PP resin.

d. Body Design: Union type.

e. End Connections: Detachable, butt or socket.

f. Ball: ASTM D 4101, PP resin.

g. Port: Full.

h. Seats: PTFE.

i. Stem: ASTM D 4101, PP resin.

j. Stem Seals: FKM-rubber O-rings.

k. Handle: Tee shaped.

B. PP Ball-Check Valves:

1. Description:

a. Pressure Rating: 150 psig at 73 deg F.

b. Body Material: ASTM D 4101, PP resin.

c. Body Design: Union type.

d. End Connections: Detachable, socket.

e. Ball: ASTM D 4101, PP resin.

f. Seat and Seals: FKM-rubber O-rings.

2.4 PVDF VALVES

A. PVDF Ball Valves:

1. Description:

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 3

a. Standard: MSS SP-122.

b. Pressure Rating: 150 psig at 73 deg F.

c. Body Material: ASTM D 3222, PVDF resin.

d. Body Design: Union type.

e. End Connections: Detachable, butt or socket.

f. Ball: ASTM D 3222, PVDF resin.

g. Port: Full.

h. Seats: PTFE.

i. Stem: ASTM D 3222, PVDF resin.

j. Stem Seals: FKM-rubber O-rings.

k. Handle: Tee shaped.

B. PVDF Ball-Check Valves:

1. Description:

a. Pressure Rating: 150 psig at 73 deg F.

b. Body Material: ASTM D 3222, PVDF resin.

c. Body Design: Union type.

d. End Connections: Detachable, socket.

e. Ball: ASTM D 3222, PVDF resin.

f. Seat and Seals: FKM-rubber O-rings.

PART 3 - EXECUTION

3.1 PIPING INSTALLATION

A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of water piping. Location and arrangement of piping layout take design considerations into account. Install piping as indicated, to extent practical. Where specific installation is not indicated, follow piping manufacturer's written instructions.

B. Install seismic restraints on piping. Comply with requirements for seismic-restraint devices specified in Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment."

C. Install piping concealed from view and protected from physical contact by building occupants unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for removal of ceiling panel, and coordinate with other services occupying that space.

F. Where installing piping adjacent to equipment, allow space for service and maintenance of equipment.

G. Install piping to permit valve and equipment servicing.

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 4

H. Install nipples, unions, special fittings, and valves with pressure ratings the same as or higher than system pressure ratings unless otherwise indicated.

I. Install piping free of sags and bends.

J. Install fittings for changes in direction and branch connections.

K. Install sleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements for sleeves specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."

L. Install sleeve seals for piping penetrations of concrete walls and slabs. Comply with requirements for sleeve seals specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."

M. Install escutcheons for piping penetrations of walls, ceilings, and floors into occupied spaces, where piping is exposed. Comply with requirements for escutcheons specified in Section 220518 "Escutcheons for Plumbing Piping."

3.2 JOINT CONSTRUCTION

A. Where specific joint construction is not indicated, follow piping manufacturer's written instructions.

B. PP Piping Electro-Fusion Joints: Make according to ASTM F 1290.

C. PP Piping Heat-Fusion Joints: Make according to ASTM D 2657.

D. PVDF Piping Heat-Fusion Joints: Make according to ASTM D 2657.

E. Join dissimilar pipe materials with transition fittings compatible with pipe materials being joined.

3.3 VALVE INSTALLATION

A. Install sectional valves close to mains on each branch and riser serving equipment.

B. Install shutoff valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

C. Locate valves for easy access and provide separate support where necessary.

D. Install valves of same size as the pipe or tube in which they are installed unless otherwise indicated.

E. Install plastic valves of the same material as the plastic pipe in which they are installed.

F. Install valves in horizontal piping with stem at or above center of pipe.

G. Install valves in position to allow full movement of stem and lever handle.

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 5

H. Install ball-check valves in horizontal or vertical position so ball will unseat during normal flow.

3.4 HANGER AND SUPPORT INSTALLATION

A. Comply with requirements for seismic-restraint devices specified in Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment."

B. Comply with requirements for pipe hanger and support devices and installation specified in Section 220529 "Hangers and Supports for Plumbing Piping and Equipment."

1. Install carbon-steel pipe hangers for horizontal piping in noncorrosive environments.

2. Install stainless-steel pipe hangers for horizontal piping in corrosive environments.

3. Install carbon-steel pipe support clamps for vertical piping in noncorrosive environments.

4. Install stainless-steel pipe support clamps for vertical piping in corrosive environments.

5. Clamps for Vertical Piping: MSS Type 8 or Type 42.

6. Individual, Straight, Horizontal Piping Runs:

a. 100 Feet and Less: MSS Type 1, adjustable clevis hangers.

b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.

c. Longer Than 100 Feet if Indicated: MSS Type 49, spring cushion rolls.

7. Multiple, Straight, Horizontal Piping Runs, 100 Feet or Longer: MSS Type 44, pipe rolls.

Support pipe rolls on trapeze.

8. Base of Vertical Piping: MSS Type 52, spring hangers.

C. Support horizontal piping and tubing within 12 inches of each fitting, valve, and coupling.

D. Support vertical piping and tubing at base and at each floor.

E. Rod diameter may be reduced one size for double-rod hangers, to minimum 3/8 inch.

F. Install padded hangers for PP piping with the following maximum horizontal spacing and minimum rod diameter: 32 inches with 3/8-inch rod.

G. Install padded supports for vertical PP piping at midstory for NPS 2 and smaller.

H. Install padded hangers for PVDF piping with the following maximum horizontal spacing and minimum rod diameter: 30 inches with 3/8-inch rod.

I. Install padded supports for vertical PVDF piping at midstory for NPS 2 and smaller.

J. Support piping and tubing not listed above according to MSS SP-69 and manufacturer's written instructions.

3.5 CONNECTIONS

A. Drawings indicate general arrangement of piping, fittings, and specialties.

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 6

B. Where installing piping adjacent to equipment, allow space for service and maintenance of equipment.

C. Connect reverse-osmosis-water piping to equipment and service outlets with unions or flanges.

3.6 IDENTIFICATION

A. Comply with requirements for identification specified in Section 220553 "Identification for Plumbing Piping and Equipment."

3.7 FIELD QUALITY CONTROL

A. Test new piping, and parts of existing piping that have been altered, extended, or repaired, for leaks and defects.

1. Schedule tests and their inspections by authorities having jurisdiction and Contracting Officer, with at least 24 hours' advance notice.

2. Do not cover piping or put into service before inspection and approval.

3. Test completed piping according to authorities having jurisdiction. If authorities having jurisdiction do not have published procedures, perform tests as follows:

a. Hydrostatic Tests: Test piping at pressure not less than 1-1/2 times the maximum system operating pressure, but not less than 100 psig.

4. Replace leaking joints with new materials and retest until no leaks exist.

5. Submit separate reports for each test.

3.8 CLEANING

A. Use procedures prescribed by authorities having jurisdiction or, if not prescribed, use procedures described below:

1. Before using, purge new piping and parts of existing piping that have been altered, extended, or repaired.

2. Clean piping by flushing with system reverse-osmosis water.

3.9 PIPING SCHEDULE

A. Transition and special fittings with pressure ratings at least equal to piping, and of same or compatible material, may be used in applications below.

B. Reverse-Osmosis-Water Piping: Use any of the following piping materials for each pipe size range:

1. PP pipe and fittings and heat-fusion joints.

2. PP pipe and fittings and electro-fusion joints.

3. PVDF pipe and fittings and heat-fusion joints.

REVERSE OSMOSIS WATER PIPING SYSTEMS 226700 - 7

3.10 VALVE SCHEDULE

A. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply:

1. Shutoff Duty: Install ball valves in piping NPS 2 and smaller.

2. Throttling Duty: Install ball valves in piping NPS 2 and smaller.

END OF SECTION 226700

clkegel Rectangle clkegel Rectangle clkegel Rectangle clkegel Typewritten Text Attendees for 2-additional site visits. (Other non-project related Fire Lab visitors have been deleted.)

SF-30
S160015DraftAmendmen0004QAs
226700 SF - REVERSE OSMOSIS WATER PIPING SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes reverse-osmosis-water piping.
1.2 PERFORMANCE REQUIREMENTS
A. Minimum Working Pressure Ratings:
1. Reverse-Osmosis-Water Piping: 100 psig unless otherwise indicated.

B. Seismic Performance: Water piping shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.4 INFORMATIONAL SUBMITTALS
A. Seismic Qualification Certificates: For water piping, accessories, and components, from manufacturer.
1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.
2. Detailed description of piping anchorage devices on which the certification is based and their installation requirements.

B. Field quality-control reports.

1.5 QUALITY ASSURANCE
A. ASME Compliance: Comply with ASME B31.3, "Process Piping," for piping conveying fluid at a pressure of 15 psig or greater.
PART 2 - PRODUCTS
2.1 PLASTIC PIPE AND FITTINGS
A. PP Pipe and Fittings for Heat-Fusion Joints: Made from ASTM D 4101, PP resin.
1. Schedule 40, Pipe and Fittings: Pipe made to ASTM D 2447, Schedule 40 or SDR 11 dimensions; with socket- or butt-fusion fittings matching pipe dimensions.
B. PP Pipe and Fittings for Electro-Fusion Joints: Made from ASTM D 4101, PP resin.
1. Schedule 80, Pipe and Fittings: Pipe made to ASTM D 2447, Schedule 80 dimensions; with socket fittings matching pipe dimensions.
2. Electro-Fusion Fitting: Electrical-resistance heating coil for PP piping joints.
C. PVDF Pipe and Fittings: Made from ASTM D 3222, PVDF resin.
1. Schedule 40, Pipe and Fittings: Pipe made to ASTM D 2447, Schedule 40 or SDR 11 dimensions; with socket- or butt-fusion fittings matching pipe dimensions.
2.2 TRANSITION FITTINGS
A. Transition Fittings: Couplings, flanges, or other manufactured fittings; same size as, with pressure rating at least equal to and ends compatible with, piping to be joined.
2.3 PP VALVES
A. PP Ball Valves:
1. Description:
a. Standard: MSS SP-122.
b. Pressure Rating: 150 psig at 73 deg F.
c. Body Material: ASTM D 4101, PP resin.
d. Body Design: Union type.
e. End Connections: Detachable, butt or socket.
f. Ball: ASTM D 4101, PP resin.
g. Port: Full.
h. Seats: PTFE.
i. Stem: ASTM D 4101, PP resin.
j. Stem Seals: FKM-rubber O-rings.
k. Handle: Tee shaped.
B. PP Ball-Check Valves:
1. Description:
a. Pressure Rating: 150 psig at 73 deg F.
b. Body Material: ASTM D 4101, PP resin.
c. Body Design: Union type.
d. End Connections: Detachable, socket.
e. Ball: ASTM D 4101, PP resin.
f. Seat and Seals: FKM-rubber O-rings.
2.4 PVDF VALVES
A. PVDF Ball Valves:
1. Description:
a. Standard: MSS SP-122.
b. Pressure Rating: 150 psig at 73 deg F.
c. Body Material: ASTM D 3222, PVDF resin.
d. Body Design: Union type.
e. End Connections: Detachable, butt or socket.
f. Ball: ASTM D 3222, PVDF resin.
g. Port: Full.
h. Seats: PTFE.
i. Stem: ASTM D 3222, PVDF resin.
j. Stem Seals: FKM-rubber O-rings.
k. Handle: Tee shaped.
B. PVDF Ball-Check Valves:
1. Description:
a. Pressure Rating: 150 psig at 73 deg F.
b. Body Material: ASTM D 3222, PVDF resin.
c. Body Design: Union type.
d. End Connections: Detachable, socket.
e. Ball: ASTM D 3222, PVDF resin.
f. Seat and Seals: FKM-rubber O-rings.
PART 3 - EXECUTION
3.1 PIPING INSTALLATION
A. General Locations and Arrangements: Drawing plans and details indicate general location and arrangement of water piping. Location and arrangement of piping layout take design considerations into account. Install piping as indicated, to extent pract...
B. Install seismic restraints on piping. Comply with requirements for seismic-restraint devices specified in Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment."
C. Install piping concealed from view and protected from physical contact by building occupants unless otherwise indicated and except in equipment rooms and service areas.
D. Install piping indicated to be exposed and in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
E. Install piping above accessible ceilings to allow sufficient space for removal of ceiling panel, and coordinate with other services occupying that space.
F. Where installing piping adjacent to equipment, allow space for service and maintenance of equipment.
G. Install piping to permit valve and equipment servicing.
H. Install nipples, unions, special fittings, and valves with pressure ratings the same as or higher than system pressure ratings unless otherwise indicated.
I. Install piping free of sags and bends.
J. Install fittings for changes in direction and branch connections.
K. Install sleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements for sleeves specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."
L. Install sleeve seals for piping penetrations of concrete walls and slabs. Comply with requirements for sleeve seals specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping."
M. Install escutcheons for piping penetrations of walls, ceilings, and floors into occupied spaces, where piping is exposed. Comply with requirements for escutcheons specified in Section 220518 "Escutcheons for Plumbing Piping."
3.2 JOINT CONSTRUCTION
A. Where specific joint construction is not indicated, follow piping manufacturer's written instructions.
B. PP Piping Electro-Fusion Joints: Make according to ASTM F 1290.
C. PP Piping Heat-Fusion Joints: Make according to ASTM D 2657.
D. PVDF Piping Heat-Fusion Joints: Make according to ASTM D 2657.
E. Join dissimilar pipe materials with transition fittings compatible with pipe materials being joined.
3.3 VALVE INSTALLATION
A. Install sectional valves close to mains on each branch and riser serving equipment.
B. Install shutoff valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
C. Locate valves for easy access and provide separate support where necessary.
D. Install valves of same size as the pipe or tube in which they are installed unless otherwise indicated.
E. Install plastic valves of the same material as the plastic pipe in which they are installed.
F. Install valves in horizontal piping with stem at or above center of pipe.
G. Install valves in position to allow full movement of stem and lever handle.
H. Install ball-check valves in horizontal or vertical position so ball will unseat during normal flow.
3.4 HANGER AND SUPPORT INSTALLATION
A. Comply with requirements for seismic-restraint devices specified in Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment."
B. Comply with requirements for pipe hanger and support devices and installation specified in Section 220529 "Hangers and Supports for Plumbing Piping and Equipment."
1. Install carbon-steel pipe hangers for horizontal piping in noncorrosive environments.
2. Install stainless-steel pipe hangers for horizontal piping in corrosive environments.
3. Install carbon-steel pipe support clamps for vertical piping in noncorrosive environments.
4. Install stainless-steel pipe support clamps for vertical piping in corrosive environments.
5. Clamps for Vertical Piping: MSS Type 8 or Type 42.
6. Individual, Straight, Horizontal Piping Runs:
a. 100 Feet and Less: MSS Type 1, adjustable clevis hangers.
b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.
c. Longer Than 100 Feet if Indicated: MSS Type 49, spring cushion rolls.
7. Multiple, Straight, Horizontal Piping Runs, 100 Feet or Longer: MSS Type 44, pipe rolls. Support pipe rolls on trapeze.
8. Base of Vertical Piping: MSS Type 52, spring hangers.
C. Support horizontal piping and tubing within 12 inches of each fitting, valve, and coupling.
D. Support vertical piping and tubing at base and at each floor.
E. Rod diameter may be reduced one size for double-rod hangers, to minimum 3/8 inch.
F. Install padded hangers for PP piping with the following maximum horizontal spacing and minimum rod diameter: 32 inches with 3/8-inch rod.
G. Install padded supports for vertical PP piping at midstory for NPS 2 and smaller.
H. Install padded hangers for PVDF piping with the following maximum horizontal spacing and minimum rod diameter: 30 inches with 3/8-inch rod.
I. Install padded supports for vertical PVDF piping at midstory for NPS 2 and smaller.
J. Support piping and tubing not listed above according to MSS SP-69 and manufacturer's written instructions.
3.5 CONNECTIONS
A. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Where installing piping adjacent to equipment, allow space for service and maintenance of equipment.
C. Connect reverse-osmosis-water piping to equipment and service outlets with unions or flanges.
3.6 IDENTIFICATION
A. Comply with requirements for identification specified in Section 220553 "Identification for Plumbing Piping and Equipment."
3.7 FIELD QUALITY CONTROL
A. Test new piping, and parts of existing piping that have been altered, extended, or repaired, for leaks and defects.
1. Schedule tests and their inspections by authorities having jurisdiction and Contracting Officer, with at least 24 hours' advance notice.
2. Do not cover piping or put into service before inspection and approval.
3. Test completed piping according to authorities having jurisdiction. If authorities having jurisdiction do not have published procedures, perform tests as follows:
a. Hydrostatic Tests: Test piping at pressure not less than 1-1/2 times the maximum system operating pressure, but not less than 100 psig.
4. Replace leaking joints with new materials and retest until no leaks exist.
5. Submit separate reports for each test.
3.8 CLEANING
A. Use procedures prescribed by authorities having jurisdiction or, if not prescribed, use procedures described below:
1. Before using, purge new piping and parts of existing piping that have been altered, extended, or repaired.
2. Clean piping by flushing with system reverse-osmosis water.
3.9 PIPING SCHEDULE
A. Transition and special fittings with pressure ratings at least equal to piping, and of same or compatible material, may be used in applications below.
B. Reverse-Osmosis-Water Piping: Use any of the following piping materials for each pipe size range:
1. PP pipe and fittings and heat-fusion joints.
2. PP pipe and fittings and electro-fusion joints.
3. PVDF pipe and fittings and heat-fusion joints.
3.10 VALVE SCHEDULE
A. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply:
1. Shutoff Duty: Install ball valves in piping NPS 2 and smaller.
2. Throttling Duty: Install ball valves in piping NPS 2 and smaller.

Additional Site Visit Attendees