This addendum to a price proposal form for contract MAA-MC-26-014 is issued by the Maryland Aviation Administration (MAA) for the design, installation, and support of airport data and information display systems at BWI Marshall Airport. The base preventative maintenance bid includes annual service and maintenance contracts plus annual software licensing fees for five contract years, with a one-year commencement following substantial completion of the installation phase. The contract structure includes a $1,000,000 extra work allowance for Year One that will be used solely at MAA's discretion for specific work requested in writing; contractors are not entitled to any unspent portion of these allowance funds.

The price proposal form requires bidders to provide unit prices for various labor categories including field technicians and systems administrators available during normal business hours (8:00 AM to 8:00 PM Monday-Friday), evening hours (8:00 PM to 8:00 AM), weekend coverage (Saturdays and Sundays), and holidays/emergencies across Years Two through Five. Additional pricing is required for training services and custom report development on an hourly basis. Bidders must also complete a representative extra work allowance breakdown for Years Two through Five showing approximate quantities of labor hours, a life cycle cost analysis form covering a ten-year period (for informational purposes only and not included in the total bid price), and maintenance costs associated with listed add alternates. The document emphasizes that hourly rates provided by the contractor are binding throughout the contract term, though MAA does not guarantee consistent utilization of services.

View the file

Other files

File Type Posted
eMMA Addendum No. 8.pdf PDF
eMMA addendum No. 3.pdf PDF
eMMA addendum No. 5.pdf PDF
Pre-Proposal RSVP.docx DOCX document
eMMA Addendum No. 10.pdf PDF
eMMA Addendum No. 9.pdf PDF
V2.pdf PDF
eMMA addendum No. 1.pdf PDF
eMMA addendum No. 2.pdf PDF
Addendum No. 10 MAA-MC-26-014 Price Proposal tab.xlsx jr.xlsx XLSX spreadsheet
eMMA addendum No. 4.pdf PDF
eMMA Addendum No. 11.pdf PDF
V1.pdf PDF
MAA-CO-26-001 Price ProposalTab.xlsx XLSX spreadsheet
eMMA Addendum No. 7.pdf PDF
Site Inspection RSVP.docx DOCX document
eMMA Addendum No. 12.pdf PDF
eMMA Addendum No. 6.pdf PDF
eMMA Addendum No. 6.pdf PDF
eMMA Addendum No. 6.pdf PDF
eMMA Addendum No. 6.pdf PDF
eMMA Addendum No. 6.pdf PDF
eMMA Addendum No. 6.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

NOTE: ITEMS LABELED ALLOWANCE OR CONTINGENCY WILL BE USED AT THE SOLE DISCRETION OF THE MAA. THE OFFERER WILL BE PAID FROM THESE ITEMS FOR SPECIFIC WORK REQUESTED IN WRITING BY MAA. THE OFFERER IS NOT ENTITLED TO ANY UNSPENT PORTION OF THE MONIES FROM THESE ITEMS.
MAA-MC-26-014

DESIGN, INSTALLATION AND SUPPORT OF AIRPORT DATA AND

INFORMATION DISPLAY SYSTEMS FOR

BWI MARSHALL AIRPORT

BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYUNIT PRICETOTAL PRICE
1TS2ANNUAL SERVICE AND MAINTENANCE CONTRACT →YEAR ONE (TO COMMENCE AFTER SUBSTANTIAL COMPLETION)YR1$ - 0$ - 0
1.1TS2ANNUAL SOFTWARE LICENSING FEE →YEAR ONEYR1$ - 0$ - 0
2TS2ANNUAL SERVICE AND MAINTENANCE CONTRACT →YEAR TWOYR1$ - 0$ - 0
2.1TS2ANNUAL SOFTWARE LICENSING FEE →YEAR TWOYR1$ - 0$ - 0
3TS2ANNUAL SERVICE AND MAINTENANCE CONTRACT →YEAR THREEYR1$ - 0$ - 0
3.1TS2ANNUAL SOFTWARE LICENSING FEE →YEAR THREEYR1$ - 0$ - 0
4TS2ANNUAL SERVICE AND MAINTENANCE CONTRACT →YEAR FOURYR1$ - 0$ - 0
4.1TS2ANNUAL SOFTWARE LICENSING FEE →YEAR FOURYR1$ - 0$ - 0
5TS2ANNUAL SERVICE AND MAINTENANCE CONTRACT →YEAR FIVEYR1$ - 0$ - 0
5.1TS2ANNUAL SOFTWARE LICENSING FEE →YEAR FIVEYR1$ - 0$ - 0
6TS2EXTRA WORK ALLOWANCEALLOW1$ 1,000,000.00$ 1,000,000.00
GRAND TOTAL PREVENTATIVE MAINTENANCE BASE BIDDollars$ 1,000,000.00
NOTE: ITEMS LABELED ALLOWANCE OR CONTINGENCY WILL BE USED AT THE SOLE DISCRETION OF THE MAA. THE OFFERER WILL BE PAID FROM THESE ITEMS FOR SPECIFIC WORK REQUESTED IN WRITING BY MAA. THE OFFERER IS NOT ENTITLED TO ANY UNSPENT PORTION OF THE MONIES FROM THESE ITEMS.

CONTRACT NUMBER MAA-MC-26-014

DESIGN, INSTALLATION AND SUPPORT OF AIRPORT DATA AND INFORMATION DISPLAY SYSTEMS FOR

BWI MARSHALL AIRPORT

BID TABULATION FORMS

GRAND TOTAL OF PREVENTATIVE MAINTENANCE BASE BID

FOR

DESIGN, INSTALLATION AND SUPPORT OF AIRPORT DATA INFORMATION DISPLAY SYSTEMS FOR BWI MARSHALL AIRPORT

(Written in Numerals)

(Written in Words)

CONTRACTOR:

By:

Signature of Authorized Representative

NOTE: ITEMS LABELED ALLOWANCE OR CONTINGENCY WILL BE USED AT THE SOLE DISCRETION OF THE MAA. THE OFFERER WILL BE PAID FROM THESE ITEMS FOR SPECIFIC WORK REQUESTED IN WRITING BY MAA. THE OFFERER IS NOT ENTITLED TO ANY UNSPENT PORTION OF THE MONIES FROM THESE ITEMS.
REPRESENTATIVE EXTRA WORK ALLOWANCE – The following represents the items that will be paid for using the Extra Work Allowance included in the Preventative Maintenance Base Bid. The labor hours reflect a cost model prepared by MDOT MAA based on a one-year level of effort for evaluation purposes only. The Contractor shall be bound by the hourly rates throughout the term of the contract. The MDOT MAA does not guarantee the Contractor that its services will be used consistently. Approval of actual work is at the sole discretion of the MDOT MAA.
BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYUNIT PRICETOTAL PRICE
C1TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR TWOHR100$ - 0$ - 0
C2TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR TWOHR20$ - 0$ - 0
C3TS2-2.01EaFIELD TECHNICIANS, SATURDAYS → YEAR TWOHR20$ - 0$ - 0
C4TS2-2.01EaFIELD TECHNICIANS, SUNDAYS → YEAR TWOHR20$ - 0$ - 0
C5TS2-2.01EaFIELD TECHNICIAN, HOLIDAYS AND EMERGENCIES → YEAR TWOHR20$ - 0$ - 0
C6TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR TWOHR20$ - 0$ - 0
C7TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR TWOHR10$ - 0$ - 0
C8TS2-2.01EaSYSTEMS ADMINISTRATOR, SATURDAYS → YEAR TWOHR10$ - 0$ - 0
C9TS2-2.01EaSYSTEMS ADMINISTRATOR, SUNDAYS → YEAR TWOHR10$ - 0$ - 0
C10TS2-2.01EaSYSTEMS ADMINISTRATOR, HOLIDAYS AND EMERGENCIES → YEAR TWOHR10$ - 0$ - 0
C11TS2-2.01EaHOURLY TRAINING RATES → YEAR TWOHR10$ - 0$ - 0
C12TS2-2.01EaCUSTOM REPORT DEVELOPMENT, HOURLY RATE→ YEAR TWOHR20$ - 0$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR TWODollars$ - 0
REPRESENTATIVE EXTRA WORK ALLOWANCE – The following represents the items that will be paid for using the Extra Work Allowance included in the Preventative Maintenance Base Bid. The labor hours reflect a cost model prepared by MDOT MAA based on a one-year level of effort for evaluation purposes only. The Contractor shall be bound by the hourly rates throughout the term of the contract. The MDOT MAA does not guarantee the Contractor that its services will be used consistently. Approval of actual work is at the sole discretion of the MDOT MAA.
BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYUNIT PRICETOTAL PRICE
D1TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR THREEHR100$ - 0$ - 0
D2TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR THREEHR20$ - 0$ - 0
D3TS2-2.01EaFIELD TECHNICIANS, SATURDAYS → YEAR THREEHR20$ - 0$ - 0
D4TS2-2.01EaFIELD TECHNICIANS, SUNDAYS → YEAR THREEHR20$ - 0$ - 0
D5TS2-2.01EaFIELD TECHNICIAN, HOLIDAYS AND EMERGENCIES → YEAR THREEHR20$ - 0$ - 0
D6TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR THREEHR20$ - 0$ - 0
D7TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR THREEHR10$ - 0$ - 0
D8TS2-2.01EaSYSTEMS ADMINISTRATOR, SATURDAYS → YEAR THREEHR10$ - 0$ - 0
D9TS2-2.01EaSYSTEMS ADMINISTRATOR, SUNDAYS → YEAR THREEHR10$ - 0$ - 0
D10TS2-2.01EaSYSTEMS ADMINISTRATOR, HOLIDAYS AND EMERGENCIES → YEAR THREEHR10$ - 0$ - 0
D11TS2-2.01EaHOURLY TRAINING RATES → YEAR THREEHR10$ - 0$ - 0
D12TS2-2.01EaCUSTOM REPORT DEVELOPMENT, HOURLY RATE→ YEAR THREEHR20$ - 0$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR THREEDollars$ - 0
REPRESENTATIVE EXTRA WORK ALLOWANCE – The following represents the items that will be paid for using the Extra Work Allowance included in the Preventative Maintenance Base Bid. The labor hours reflect a cost model prepared by MDOT MAA based on a one-year level of effort for evaluation purposes only. The Contractor shall be bound by the hourly rates throughout the term of the contract. The MDOT MAA does not guarantee the Contractor that its services will be used consistently. Approval of actual work is at the sole discretion of the MDOT MAA.
BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYUNIT PRICETOTAL PRICE
E1TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR FOURHR100$ - 0$ - 0
E2TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR FOURHR20$ - 0$ - 0
E3TS2-2.01EaFIELD TECHNICIANS, SATURDAYS → YEAR FOURHR20$ - 0$ - 0
E4TS2-2.01EaFIELD TECHNICIANS, SUNDAYS → YEAR FOURHR20$ - 0$ - 0
E5TS2-2.01EaFIELD TECHNICIAN, HOLIDAYS AND EMERGENCIES → YEAR FOURHR20$ - 0$ - 0
E6TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR FOURHR20$ - 0$ - 0
E7TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR FOURHR10$ - 0$ - 0
E8TS2-2.01EaSYSTEMS ADMINISTRATOR, SATURDAYS → YEAR FOURHR10$ - 0$ - 0
E9TS2-2.01EaSYSTEMS ADMINISTRATOR, SUNDAYS → YEAR FOURHR10$ - 0$ - 0
E10TS2-2.01EaSYSTEMS ADMINISTRATOR, HOLIDAYS AND EMERGENCIES → YEAR FOURHR10$ - 0$ - 0
E11TS2-2.01EaHOURLY TRAINING RATES → YEAR FOURHR10$ - 0$ - 0
E12TS2-2.01EaCUSTOM REPORT DEVELOPMENT, HOURLY RATE→ YEAR FOURHR20$ - 0$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR FOURDollars$ - 0
REPRESENTATIVE EXTRA WORK ALLOWANCE – The following represents the items that will be paid for using the Extra Work Allowance included in the Preventative Maintenance Base Bid. The labor hours reflect a cost model prepared by MDOT MAA based on a one-year level of effort for evaluation purposes only. The Contractor shall be bound by the hourly rates throughout the term of the contract. The MDOT MAA does not guarantee the Contractor that its services will be used consistently. Approval of actual work is at the sole discretion of the MDOT MAA.
BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYUNIT PRICETOTAL PRICE
F1TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR FIVEHR100$ - 0$ - 0
F2TS2-2.01EaFIELD TECHNICIAN, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR FIVEHR20$ - 0$ - 0
F3TS2-2.01EaFIELD TECHNICIANS, SATURDAYS → YEAR FIVEHR20$ - 0$ - 0
F4TS2-2.01EaFIELD TECHNICIANS, SUNDAYS → YEAR FIVEHR20$ - 0$ - 0
F5TS2-2.01EaFIELD TECHNICIAN, HOLIDAYS AND EMERGENCIES → YEAR FIVEHR20$ - 0$ - 0
F6TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR FIVEHR20$ - 0$ - 0
F7TS2-2.01EaSYSTEMS ADMINISTRATOR, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR FIVEHR10$ - 0$ - 0
F8TS2-2.01EaSYSTEMS ADMINISTRATOR, SATURDAYS → YEAR FIVEHR10$ - 0$ - 0
F9TS2-2.01EaSYSTEMS ADMINISTRATOR, SUNDAYS → YEAR FIVEHR10$ - 0$ - 0
F10TS2-2.01EaSYSTEMS ADMINISTRATOR, HOLIDAYS AND EMERGENCIES → YEAR FIVEHR10$ - 0$ - 0
F11TS2-2.01EaHOURLY TRAINING RATES → YEAR FIVEHR10$ - 0$ - 0
F12TS2-2.01EaCUSTOM REPORT DEVELOPMENT, HOURLY RATE→ YEAR FIVEHR20$ - 0$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR FIVEDollars$ - 0
REPRESENTATIVE EXTRA WORK ALLOWANCE TABULATION SUMMARY
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR ONE$ 1,000,000.00
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR TWO$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR THREE$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR FOUR$ - 0
TOTAL REPRESENTATIVE EXTRA WORK ALLOWANCE → YEAR FIVE$ - 0
GRAND TOTAL REPRESENTATIVE WORK ALLOWANCE (Total Representative Extra Work Allowance → Year 1 + Total Representative Extra Work Allowance → Year 2 + Total Representative Extra Work Allowance → Year 3 + Total Representative Extra Work Allowance → Year 4 + Total Representative Extra Work Allowance → Year 5)$ 1,000,000.00
LIFE CYCLE COST ANALYSIS FORM – The following supplements the bid tabulation forms by providing a 10-year total life cycle cost for the proposed system. This form is not a price proposal for a 10-year contract or for additional services above and beyond the items requested in the bid tabulation forms. This form is informational only but is required to be completed by proposers/offerors. The cost listed here will not be included in the total bid price
BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYTOTAL ESTIMATED COST
LCC1274216-2.2.A.3FIELD TECHNICIAN, MONDAY-FRIDAY NORMAL BUSINESS HOURS (8:00AM TO 8:00PM) → YEAR FIVELS1$ - 0
LCC2274216-2.2.A.1FIELD TECHNICIAN, MONDAY-FRIDAY EVENINGS (8:00PM TO 8:00AM) → YEAR FIVELS1$ - 0
LCC3274216- ALLFIELD TECHNICIANS, SATURDAYS → YEAR FIVELS1$ - 0
LCC4TS2-2.01EaFIELD TECHNICIANS, SUNDAYS → YEAR FIVELS1$ - 0
TOTAL ESTIMATED SYSTEM LIFECYCLE COST - YEARS 6 THROUGH 10$ - 0
ADDITIONAL MAINTENANCE COSTS ASSOCIATED WITH ADD ALTERNATES – The following represents the additional total cost, if any, during the 5-year maintenance contract term associated with the listed add alternates as defined in the Construction Contract Bid Tabulation Forms.
BID ITEM NO.ITEM NO.
(spec ref.)DESCRIPTIONUNITAPPROX. QUANTITYUNIT PRICETOTAL PRICE
A1274216-2.2.AAlternate 1 - Additional EVIDS Displays and LocationsLS1$ - 0$ - 0
A2274217Alternate 4 - Airport Resource Management SystemLS1$ - 0$ - 0
TOTAL MAINTENACE COSTS ASSOCIATED WITH ADD ALTERNATES A1 + A2Dollars$ - 0

&"Times New Roman,Bold"&14Section 6 &"Times New Roman,Bold"&11SUPPLEMENTAL FORM &"Times New Roman,Bold"&14Bid Proposal

&"Times New Roman,Bold"&14Section 6&"Times New Roman,Bold"SUPPLEMENTAL FORM
&"Times New Roman,Bold"&14Bid Proposal

&8MAA-MC-26-014

Design, Installation and Support of Data and Information Display Systems at BWI Marshall Airport Addendum No. 7 BF - &P &8Request for Proposal Bid Proposals October&K000000 2025

MAA-MC-26-014

Design, Installation and Support of Data and Information Display Systems at BWI Marshall Airport

BF - &P Request for Proposal Bid Proposals Octoberer, 2025

File details come from the government source that posted it. Updated .