Addendum 5_CMPS Structural Upgrades_final.pdf
PDF 11 MB Posted
- Solicitation number
- S-10700-00013306
- Issued by
- Marion County, Oregon
About this file
Solicitation Addendum #005 is issued by the Department of Administrative Services (DAS) for the Capitol Mall Parking Structure Seismic Upgrade project in Salem, Oregon. This addendum modifies the original bid documents for structural upgrades to the existing parking structure, specifically replacing Attachment C – Plans and Drawings with a new version. The addendum requires bidders to acknowledge the changes by signing and returning the document prior to the bid closing date. Requests for clarification or protests must be received by DAS by 2:00 P.M. Pacific time on 5/2/2025, with the solicitation constituting a material change to the original bid.
The addendum does not include specific pricing details or set-aside information. However, the accompanying project documents indicate a comprehensive seismic retrofitting initiative involving carbon fiber wrapping of approximately 35 columns, epoxy injection of 1,000 linear feet of slab cracks, and selective concrete wall replacements. The project requires detailed technical expertise in structural rehabilitation, with specific guidelines for fiber-reinforced polymer (FRP) composite system applications. Bidders must demonstrate qualifications in advanced structural engineering techniques and compliance with the detailed engineering specifications provided in the comprehensive bid documents. The project appears to be a standard public infrastructure improvement procurement aimed at enhancing the structural integrity of a government-owned parking facility.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
S-10700-00013306
SOLICITATION ADDENDUM #005
CMPS Structural Upgrades, S-10700-00013306 ADDENDUM # 5 Page 1 of 1
This Solicitation Addendum modifies the Bid Document(s) for Work only to the extent indicated herein. All other areas not specifically mentioned or affected by this Solicitation Addendum shall remain in full force. This Solicitation Addendum shall be added as a part of the Original Bidding Document.
This Solicitation Addendum must be acknowledged by providing the required signature prior to Bid Closing. Failure to do so may result in rejection of Bid.
Requests for clarification, requests for change, and protests of Solicitation Addendum provisions addressed in this Solicitation Addendum must be received by DAS by 2:00 P.M. (Pacific time) on 5/2/2025, or they will not be considered. DAS will not consider requests or protests of matters not added to or modified by this Solicitation Addendum.
New language is indicated by bold print and underline, deleted language is indicated by brackets [ ].
1 Deletion/Addition
Attachment C – Plans and Drawings are deleted in its entirety and replaced with the attached Addendum #5 Attachment C – Plans and Drawings
This Solicitation Addendum constitutes a MATERIAL CHANGE to the bid; and it MUST BE SIGNED AND RETURNED PRIOR TO THE BID CLOSING DATE AND TIME. ITS RECEIPT MUST ALSO BE ACKNOWLEDGED BY INSERTING ITS NUMBER ON THE APPROPRIATE BLANK LINES IN ATTACHMENT A-1 OF THE BID
DOCUMENT.
Signature: ___________________________________________________ Date: ____________________
Bidder Name: __________________________________________________________________________ (Please Print)
1.
2.
3.
4.
5.
6.
7.
8.
9.
GENERAL:
THESE STRUCTURAL NOTES SUPPLEMENT THE SPECIFICATIONS. ANY DISCREPANCY FOUND AMONG THE DRAWINGS, SPECIFICATIONS, THESE NOTES, AND ANY SITE CONDITIONS SHALL BE REPORTED IN A TIMELY MANNER TO THE ARCHITECT/ENGINEER DESIGN TEAM, WHO SHALL RESPOND TO ANY DISCREPANCY IN WRITING. ANY WORK DONE BY THE CONTRACTOR AFTER DISCOVERY OF SUCH DISCREPANCY SHALL BE DONE AT THE CONTRACTOR'S OWN RISK.
THE CONTRACTOR SHALL VERIFY AND COORDINATE THE DIMENSIONS AMONG ALL DRAWINGS PRIOR TO PROCEEDING WITH ANY WORK OR
FABRICATION.
THE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION AND CONSTRUCTION METHODS, TECHNIQUES, SEQUENCING, AND SAFETY REQUIRED FOR THE WORK.
THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF ALL ERECTION BRACING, FORM WORK, AND TEMPORARY SHORING REQUIRED FOR
THE WORK.
THESE NOTES SET MINIMUM STANDARDS FOR CONSTRUCTION. THE DRAWINGS GOVERN OVER THE STRUCTURAL NOTES TO THE EXTENT SHOWN.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS ON DRAWINGS AND IN THE FIELD. COORDINATE LOCATIONS OF OPENINGS THROUGH FLOOR, ROOFS AND WALLS WITH ARCHITECTURAL, MECHANICAL, AND ELECTRICAL PLANS. NOTIFY OWNER'S REPRESENTATIVE OF ANY
DISCREPANCIES.
DETAILS SHOWN ON THE DRAWINGS ARE INTENDED TO APPLY AT ALL SIMILAR CONDITIONS AND LOCATIONS.
DO NOT SCALE INFORMATION FROM STRUCTURAL DRAWINGS.
ALL NEW WORK AND RE-INSTALLED ELEMENTS SHALL COMPLY WITH THE MATERIRALS AND METHODS REQUIRED IN CURRENT CODES AND ORS REQUIREMENTS.
REFERENCE DESIGN CODE SECTION BELOW FOR ADDITIONAL INFORMATION.
1.
2.
3.
4.
DESIGN CODE:
OREGON STRUCTURAL SPECIALTY CODE 2022
INTERNATIONAL EXISTING BUILDING CODE 2021
ALL REFERENCE TO OTHER CODES AND STANDARDS (ACI, ASTM, ETC...) SHALL BE PER THE LATEST OR MOST CURRENT EDITION AVAILABLE.
DESIGN LOADS:
SEISMIC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CATEGORY=D, R=5.0, SS=0.824, S1=0.413, SD1=0.413, SDS=0.659, CS=0.132
CONCRETE (CAST IN PLACE):
1.ALL CONCRETE SHALL BE NORMAL WEIGHT AND SHALL DEVELOP A MINIMUM 28 DAY LABORATORY CURED
COMPRESSIVE-CYLINDER STRENGTH OF: 4,000 PSI
2.COLUMNS THAT ARE AN INTEGRAL PART OF A WALL MUST HAVE CONCRETE STRENGTH AS REQUIRED FOR COLUMNS.
3.CONCRETE EXPOSED TO FREEZE/THAW CYCLES SHALL HAVE 5% +- 1% ENTRAINED AIR.
4.CONCRETE SHALL HAVE A MAXIMUM SLUMP OF 4 INCHES.
5.A MINIMUM OF 4 CONCRETE TEST CYLINDERS SHALL BE PROVIDED FOR EACH 100 CU. YARDS OF EACH CONCRETE STRENGTH, EACH DAY.
SLUMP, AIR ENTRAINMENT, LOCATION IN STRUCTURE, ETC., SHALL BE MEASURED AND RECORDED FOR EACH SET OF
CYLINDERS, PER
ASTM. CYLINDERS SHALL BE TESTED AS FOLLOWS:
1 AT 7 DAYS:
2 AT 28 DAYS
1 PRIOR TO REMOVAL OF FORMS FOR SLABS AND BEAMS.
6.CONCRETE CYLINDER MAKING AND TESTING SHALL CONFORM WITH ASTM SPECIFICATIONS.
7.CONCRETE, FORMS, MIXING, PLACING AND CURING SHALL CONFORM TO ACI MANUAL OF CONCRETE PRACTICE, LATEST
EDITION, AND
SPECIFICATIONS.
8.CONCRETE SHALL BE PLACED IN ONE CONTINUOUS OPERATION.
CONCRETE REINFORCING STEEL:
1.REINFORCING BARS SHALL BE NEW BILLET STEEL AND SHALL CONFORM TO:
ASTM A615 GRADE 60 FOR ALL REINFORCEMENT
2.ALL WELDED REINFORCING STEEL, METAL INSERTS AND CONNECTIONS SHALL CONFORM TO ALL APPLICABLE CODES AND STANDARDS.
3.WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185.
4.REINFORCEMENT SHALL BE DETAILED, FABRICATED AND PLACED IN ACCORDANCE WITH ACI CODE 318 AND ACI MANUAL 315, U.N.O.
5.ALL REINFORCEMENT SHALL BE FREE OF LOOSE MILL AND RUST SCALE, OIL, DIRT AND COATINGS OF ANY MANNER THAT WILL
REDUCE BOND.
6.ALL REINFORCEMENT IS CONTINUOUS WITH ADEQUATE LAPS.
7.REINFORCEMENT SHALL BE SECURED IN FORMS WITH SUITABLE TIES AND ANCHORAGE TO PREVENT DISPLACEMENT. BARS ADJACENT TO
EARTH SHALL BE SUPPORTED BY CEMENT MORTAR CUBES.
8.THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT:
A. CONCRETE CAST AGAINST EARTH . . . . . . . . . . . . . . . . . . . . . . . . . . . 3"
B. CONCRETE EXPOSED TO EARTH OR WEATHER
#6 AND LARGER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2" #5 AND SMALLER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1/2"
C. CONCRETE NOT EXPOSED TO EARTH OR WEATHER
SLABS, WALLS AND JOISTS, #11 AND SMALLER . . . . . . . . . . . . . . . 3/4"
BEAMS AND COLUMNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1/2"
9.PLACE 2'-0" x 2'-0" BARS AT CORNERS AND INTERSECTIONS FOR WALLS AND FOUNDATIONS EQUAL IN SIZE AND SPACING TO HORIZONTAL
REINFORCING.
10. REINFORCEMENT SPLICES, SHALL BE 42 BAR DIAMETER (24" MIN.) LAPS.
STRUCTURAL STEEL:
1.STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING:
MISC. PLATE, BAR, ANGLE, CHANNEL:
ASTM A-36 (Fy = 36 KSI)
2.ALL FABRICATION, ERECTION IDENTIFICATION OF STRUCTURAL STEEL SHALL CONFORM TO AISC SPECIFICATIONS.
3.ALL WELDING SHALL CONFORM TO AWS SPECIFICATIONS. ALL WELDERS SHALL BE CERTIFIED UNDER AWS SPECIFICATIONS.
4.WELDS SHALL BE MADE WITH E70 SERIES ELECTRODES UNLESS OTHERWISE NOTED. WELD TESTING AND INSPECTION SHALL CONFORM TO THE
MINIMUM REQUIREMENTS OF THE AWS D1.1 AND AISC.
5.THE STEEL FABRICATOR AND ERECTOR SHALL DEVELOP A WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1, FOR ALL WELDS SUBMIT
WRITTEN COPIES TO THE INSPECTOR FOR APPROVAL.
STRUCTURAL SUBMITTALS:
1. SUBMITTAL PROCEDURE:
A. DELIVER TO THE ENGINEER OF RECORD A MINIMUM OF (4) COPIES OF EACH SUBMITTAL ITEM
2. FOR EACH SUBMITTAL ITEM ALLOW (15) DAYS EXCLUDING DELIVERY TIME TO AND FROM THE CONTRACTOR.
3. SCHEDULE OF SUBMITTAL ITEMS:
A. CONCRETE MIX DESIGNS
B. SHOP DRAWINGS:
B1.1 MILD REINFORCING STEEL
B1.2 STRUCTURAL STEEL
B1.3 CARBON FIBER WRAP ICC APPROVAL REPORT
B1.4 EPOXY INJECTION ICC APPROVAL REPORT
C. PRODUCT DATA
D. SAMPLES OR ADDITIONAL PRODUCT DATA MAY BE REQUESTED
1.
A.
B.
C.
D.
2.
A.
B.
3.
SPECIAL INSPECTION:
INSPECTOR IS TO BE CONTRACTED BY OWNER, ENGINEER OR ARCHITECT PER OSSC CODE REQUIREMENTS, AND LOCAL ORDINANCES. A RE- CONSTRUCTION MEETING SHALL TAKE PLACE PRIOR TO FOUNDATION INSTALLATION. THE CONTRACTOR, ARCHITECT, ENGINEER AND INSPECTOR SHALL
ATTEND. SPECIAL INSPECTIONS SHALL BE PERFORME ON THE FOLLOWING WORK:
CONCRETE:
REINFORCING STEEL - PERIODIC
FORM WORK FOR SHAPE, LOCATION, AND DIMENSION - PERIODIC
TAKING OF TEST SPECIMENS-AIR, STRENGTH AND SLUMP - CONTINUOUS
EPOXY - PER MANUFACTURER'S APPROVED ICC REPORT
STEEL: FABRICATOR/ERECTOR SUBMIT WPS TO INSPECTOR, WITH THE EXCEPTION OF SHOP WELDING PERFORMED BY AN APPROVED FABRICATORS
SHOP.
SINGLE PASS FILLET WELDS NOT EXCEEDING 5/16" - PERIODIC
GROOVE, COMPLETE JOINT PENETRATION - CONTINUOUS
FRP WRAP - PERIODIC SPECIAL INSPECTION PER ICC DOCUMENT AC178.
IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT THE INSPECTOR, (24 HR. MINIMUM NOTICE), FOR INSPECTION SERVICES. THE INSPECTOR SHALL BE PRESENT AT THE PRE-CONSTRUCTION MEETING TO COORDINATE WORK WITH THE CONTRACTOR, ENGINEER AND OWNER. ALL INSPECTORS SHALL BE CERTIFIED TO PERFORM NECESSARY INSPECTION PER OSSC, ACI, AWS OR OTHER APPROVED GOVERNING INSTITUTION.
STRUCTURAL OBSERVATION:
1. STRUCTURAL OBSERVATION SHALL BE PERFORMED ON THE PROJECT. OBSERVATION WILL BE REQUIRED AT THE FOLLOWING STAGES:
A. DURING TO APPLICATOIN OF CARBOR FIBER WRAP
B. DURING TO APPLICATOIN OF EPOXY INJECTION
C. AT COMPLETION OF ALL OF STRUCTURAL UPGRADES
2.THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AT LEAST FOUR (4) DAYS IN ADVANCE OF COMPLETION REQUIRING SITE OBSERVATION.
ABBREVIATIONS
AB ANCHORBOLT
ABT ABOUT
AC ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INST.
ADD'L ADDITIONAL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BBO BEAM BY OTHERS
BO BY OTHERS
BP BASE PLATE
BLDG BUILDING
BM BEAM
BOT BOTTOM
CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS, CONTINUITY
CONT'D CONTINUED
DB DROP BEAM
DET, DTL DETAIL
DIA, Ø DIAMETER
DIM DIMENSION
DWG DRAWING
DWL DOWEL
EA EACH
EF EACH FACE
ELECT ELECTRICAL
ELEV ELEVATION
EQIP EQUIPMENT
ETC ET CETERA
EW EACH WAY
(E), EXIST EXISTING
FB FLUSHBEAM
f'c COMPRESSIVE STRENGTH
OF CONCRETE, PSI
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDN FLR FOUNDATION FLOOR
FOS FACE OF STEEL
FS FAR SIDE
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GRD GRADE
HGR HANGER
CL
BREAK INDICATOR
DRAWING TITLE
SHEET NUMBER
DETAIL NUMBER
ELEVATION VIEW
DETAIL CUT
LEGEND AND SYMBOLS
X
SX
X
SX
SHEET NUMBER
ELEVATION NUMBER
X
SX
HORZ HORIZONTAL
HS HIGH STRENGTH
HSV HIGH STRENGTH BOLT
HT HEIGHT
N INCH OR INCHES
LBS POUNDS
LG LONG
LL LIVELOAD
MAX MAXIMUM
MB MACHINEBOLT
MECH MECHANICAL
MIN MINIMUM
MISC MISCELLANEOUS
NIC NOT IN CONTRACT
NO. or # NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O.C. ON CENTER
PCF POUNDS PER CUBIC FOOT
PLCS PLACES
PL, PLATE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
R RADIUS
REINF REINFORCING
REQ'D REQUIRED
RET W RETAINING WALL
REV REVISION
SCHD SHT SCHEDULE SHEET
SIM SIMILAR
SPECS SPECIFICATIONS
SQ SQUARE
STD STANDARD
STIF STIFFENER
STL STEEL
STRUCT STRUCTURAL
T & B TOP & BOTTOM
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TS TUBE STEEL
TYP TYPICAL
UBC UNIFORM BUILDING CODE
U.N.O. UNLESS NOTED OTHERWISE
VERT VERTICAL
W or W/ WITH
1.
2.
3.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
4.
5.
6.
7.
A.
a.
b.
c.
d.
e.
f.
g.
H.
B.
a.
b.
c.
d.
E.
C.
a.
b.
c.
FIBER-REINFORCED POLYMER (FRP) SYSTEMS:
ALL FRP SYSTEMS SHALL COMPLY WITH ACI 440.2R-17
CONTRACTOR TO SUBMIT DESIGN DOCUMENTS AND DRAWINGS BEARING THE STAMP OF A PROFESSIONAL ENGINEER (PE) LICENSED IN THE
STATE OF OREGON PER ACI 440.2R-17 SECTION 15.2.
THE LICENSED FRP DESIGN PROFESSIONAL SHOULD DOCUMENT CALCULATIONS SUMMARIZING THE ASSUMPTIONS AND PARAMETERS USED TO DESIGN THE FRP STRENGTHENING SYSTEM AND SHOULD PREPARE DESIGN DRAWINGS AND PROJECT SPECIFICATIONS. THE DRAWINGS AND SPECIFICATIONS SHOULD SHOW, AT A MINIMUM, THE FOLLOWING INFORMATION SPECIFIC TO EXTERNALLY APPLIED FRP SYSTEMS
FRP SYSTEM TO BE USED
LOCATION OF THE FRP SYSTEM RELATIVE TO THE EXISTING STRUCTURE
DIMENSIONS AND ORIENTATION OF EACH PLY, LAMINATE, OR NEAR-SURFACE-MOUNTED (NSM) BAR
NUMBER OF PLIES AND BARS AND THE SEQUENCE OF INSTALLATION
LOCATION OF SPLICES AND LAP LENGTH
GENERAL NOTES LISTING DESIGN LOADS AND ALLOWABLE STRAINS IN THE FRP LAMINATES
MATERIAL PROPERTIES OF THE FRP LAMINATES AND CONCRETE SUBSTRATE
CONCRETE SURFACE PREPARATION REQUIREMENTS, INCLUDING CORNER PREPARATION, GROOVE DIMENSIONS FOR NSM BARS, AND
MAXIMUM IRREGULARITY LIMITATIONS
INSTALLATION PROCEDURES, INCLUDING SURFACE TEMPERATURE AND MOISTURE LIMITATIONS, AND APPLICATION TIME LIMITS BETWEEN
SUCCESSIVE PLIES
CURING PROCEDURES FOR FRP SYSTEMS
PROTECTIVE COATINGS AND SEALANTS, IF REQUIRED
SHIPPING, STORAGE, HANDLING, AND SHELF-LIFE GUIDELINES
QUALITY CONTROL AND INSPECTION PROCEDURES, INCLUDING ACCEPTANCE CRITERIA
ALL PROVIDED FRP SYSTEMS SHALL CONFORM TO THE EQUIVALENT OF #3 SPIRAL REINFORCING AT A 3" PITCH WITHIN A 22" DIAMETER
CONCRETE COLUMN.
CONCRETE COLUMNS WITH CRACKS LARGER THAN 1/16" SHALL HAVE EPOXY INJECTION COMPLETED IN CONFORMANCE WITH ACI 503.7-7 PRIOR
TO APPLICATION OF FRP SYSTEM.
ALL CONCRETE SURFACE PREPARATION REQUIREMENTS SHALL BE COMPLETED IN STRICT CONFORMANCE WITH FRP MANUFACTURER.
THE FRP SYSTEM MANUFACTURER, INSTALLATION CONTRACTOR, AND INSPECTION AGENCY SHALL TO SUBMIT PRODUCT INFORMATION AND EVIDENCE OF THEIR QUALIFICATIONS AND EXPERIENCE TO THE EOR FOR REVIEW AND APPROVAL PRIOR TO ANY INSTALLATION.
FRP SYSTEM MANUFACTURER — THE FRP SYSTEM MANUFACTURER SUBMITTALS SHALL INCLUDE:
INDICATION OF COMPLIANCE WITH EXISTING SPECIFICATIONS (SUCH AS ACI 440.8) AS APPLICABLE PRODUCT DATA SHEETS INDICATING THE PHYSICAL, MECHANICAL, AND CHEMICAL CHARACTERISTICS OF THE FRP SYSTEM AND ALL
ITS CONSTITUENT MATERIALS
TENSILE PROPERTIES OF THE FRP SYSTEM, INCLUDING THE METHOD OF REPORTING PROPERTIES (NET FIBER OR GROSS LAMINATE), TEST METHODS USED, AND THE STATISTICAL BASIS USED FOR DETERMINING THE PROPERTIES (4.3) INSTALLATION INSTRUCTIONS, MAINTENANCE INSTRUCTIONS, AND GENERAL RECOMMENDATIONS REGARDING EACH MATERIAL TO BE
USED; INSTALLATION PROCEDURES SHOULD INCLUDE SURFACE PREPARATION REQUIREMENTS
MANUFACTURER’S SAFETY DATA SHEETS (SDSS) FOR ALL MATERIALS TO BE USED
QUALITY CONTROL PROCEDURE FOR TRACKING FRP MATERIALS AND MATERIAL CERTIFICATIONS
DURABILITY TEST DATA FOR THE FRP SYSTEM IN THE TYPES OF ENVIRONMENTS EXPECTED
STRUCTURAL TEST REPORTS PERTINENT TO THE PROPOSED APPLICATION
REFERENCE PROJECTS
FRP SYSTEM INSTALLATION CONTRACTOR ’S SUBMITTALS SHALL INCLUDE:
DOCUMENTATION FROM THE FRP SYSTEM MANUFACTURER OF HAVING BEEN TRAINED TO INSTALL THE PROPOSED FRP SYSTEM PROJECT REFERENCES, INCLUDING INSTALLATIONS SIMILAR TO THE PROPOSED INSTALLATION (FOR EXAMPLE, FOR AN OVERHEAD APPLICATION, THE CONTRACTOR SHOULD SUBMIT A LIST OF PREVIOUS INSTALLATIONS INVOLVING THE INSTALLATION OF THE
PROPOSED FRP SYSTEM IN AN OVERHEAD APPLICATION)
EVIDENCE OF COMPETENCY IN SURFACE PREPARATION TECHNIQUES
QUALITY CONTROL TESTING PROCEDURES INCLUDING VOIDS AND DELAMINATIONS, FRP BOND TO CONCRETE, AND FRP TENSILE
PROPERTIES
DAILY LOG OR INSPECTION FORMS USED BY THE CONTRACTOR
FRP SYSTEM INSPECTION AGENCY SHALL SUBMIT:
A LIST OF INSPECTORS TO BE USED ON THE PROJECT AND THEIR QUALIFICATIONS
SAMPLE INSPECTION FORMS
A LIST OF PREVIOUS PROJECTS INSPECTED BY THE INSPECTOR
1.
2.
3.
CRACK REPAIR:
ALL CONCRETE CRACK REPAIR WITH EPOXY INJECTION SHALL CONFORM TO ACI 503.7-7
CONTRACTOR SHALL SUBMIT ICC REPORTS AND MANUFACTURER'S APPLICATION AND INSTALLATION GUIDELINES OF ALL EPOXY PRODUCTS
FOR REVIEW AND APPROVAL PRIOR TO ANY APPLICATION.
ALL CONCRETE SURFACE PREPARATION REQUIREMENTS SHALL BE COMPLETED IN STRICT CONFORMANCE WITH CONCRETE EPOXY
MANUFACTURER.
BELOW GRADE CONTRACTOR STAGING AREAS:
THE OWNER WILL PROVIDE FOUR (4) PARKING SPACES FOR THE CONTRACTOR'S USE AS A
STAGING AREA ADJACENT TO THE EXISTING WALL OF WATER MECHANICAL ROOM FOR A
PERIOD OF 2 MONTHS MAXIMUM. THIS WILL BE PROVIDED AT NO COST TO THE
CONTRACTOR.
CONTRACTOR SHALL NOTE ANY
DISCPRENACIES BETWEEN BOTH THIS
SHEET AND THE SPECIFICATIONS AND
REPORT TO DESIGN TEAM FOR
RESOLUTION
CAPITOL MALL PARKING GARAGE
900 CHEMEKETA STREET NE
SALEM, OREGON
VICINITY MAP
R
E
V
I
S
O
N
DE
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre et
Su ite
Po rtl an d, O R ph on e:
.2
.1 w w .h hp r.c om fa x:
.2
.1
E N
G I
N E
E
P
L A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
EC
TS
U R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
ST
RU
CT
UR
AL
N
OT
ES
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-001
DAS-05PERMIT
SHEET INDEX
S-001 STRUCTURAL NOTES
S-002 SPECIFICATIONS
S-003 OVERALL PROJECT SITE PLAN
S-004 PHOTO REFERENCES
S-101 PARKING STRUCTURE – OVERALL PLAN
S-102 PARKING STRUCTURE – LOWER LEVEL SECTOR 1
S-103 PARKING STRUCTURE – LOWER LEVEL SECTOR 2
S-104 UPPER LEVEL SLAB / LOWER LEVEL COLUMNS - SECTOR 3
S-105 PARKING STRUCTURE – LOWER LEVEL SECTOR 4
S-106 PARKING STRUCTURE – UPPER LEVEL SECTOR 1
S-107 PARKING STRUCTURE – UPPER LEVEL SECTOR 2
S-108 PARKING STRUCTURE – UPPER LEVEL SECTOR 3
S-109 PARKING STRUCTURE – UPPER LEVEL SECTOR 4
S-301 PARKING STRUCTURE – BUILDING SECTIONS
S-401 PARKING STRUCTURE – DETAILS
/0
1/
AD
D
EN
D
U M
N
EXPIRES: 06-30-2026
Addendum #5 Attachment C
Plans & Drawings
A.
1.
2.
A.
B.
C.
A.
1.
B.
1.
2.
3.
C.
1.
2.
3.
4.
A.
1.
2.
3.
4.
B.
1.
2.
3.
4.
A.
1.
2.
3.
4.
B.
1.
2.
A.
1.
B.
1.
2.
C.
1.
2.
1.
A.
1.
2.
B.
C.
D.
E.
F.
A.
A.
1.
2.
3.
B.
1.
A.
1.
2.
3.
4.
B.
1.
2.
3.
4.
C.
1.
2.
D.
1.
2.
3.
4.
5.
A.
1.
2.
B.
1.
2.
a.
b.
3.
a.
b.
4.
a.
b.
5.
C.
1.
A.
1.
2.
B.
03 07 20 EXTERNALLY BONDED FRP
PART 1 GENERAL
1.1 SUMMARY
SECTION INCLUDES:
INSTALLATION OF EXTERNALLY BONDED FIBER REINFORCED POLYMER (FRP) REINFORCEMENT APPLIED BY THE WET LAY-UP TECHNIQUE TO CONCRETE
MEMBERS.
WORK INCLUDING:
INSPECTION OF THE STRUCTURAL MEMBERS SPECIFIED ON THE CONTRACT DRAWINGS TO BE REINFORCED WITH FRP. INSPECTION SHALL CHECK THE LOCATION AND INSPECT CRACKS AND EXISTING CONDITIONS OF THE CONCRETE SUBSTRATE.
FURNISHING OF MATERIALS, LABOR, EQUIPMENT AND ALL ITEMS NECESSARY FOR REPAIR OF EXISTING CONCRETE MEMBERS AND STRENGTHENING BY THE APPLICATION OF EXTERNALLY BONDED FRP REINFORCEMENT AS SPECIFIED ON THE CONTRACT DRAWINGS AND SPECIFICATIONS, COMPLETE.
COOPERATION AND COORDINATION WITH ALL OTHER TRADES IN EXECUTING THE WORK DESCRIBED IN THE CONTRACT.
1.2 REFERENCES
AMERICAN CONCRETE INSTITUTE (ACI):
440.2R-17 GUIDE FOR THE DESIGN AND CONSTRUCTION OF EXTERNALLY BONDED FRP SYSTEMS FOR STRENGTHENING CONCRETE STRUCTURES
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM):
D 3039-93 TEST METHOD FOR TENSILE PROPERTIES OF FIBER RESIN COMPOSITES
D 7565-10 TEST METHOD FOR DETERMINING TENSILE PROPERTIES OF FIBER REINFORCED POLYMER MATRIX COMPOSITES USED FOR STRENGTHENING
OF CIVIL STRUCTURES
D 7522-09 STANDARD TEST METHOD FOR PULL-OFF STRENGTH FOR FRP BONDED TO CONCRETE SUBSTRATE
INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI):
210.3-04 GUIDE FOR USING IN-SITU TENSILE PULL-OFF TESTS TO EVALUATE BOND OF CONCRETE SURFACE MATERIALS 310.1R-08 GUIDE FOR SURFACE PREPARATION FOR THE REPAIR OF DETERIORATED CONCRETE RESULTING FROM REINFORCING STEEL CORROSION 310.2-97 SELECTING AND SPECIFYING CONCRETE SURFACE PREPARATION FOR SEALERS, COATINGS, AND POLYMER OVERLAYS 320.2R-09 GUIDE FOR SELECTING AND SPECIFYING MATERIALS FOR REPAIRS OF CONCRETE SURFACES
1.3 SUBMITTALS
PRODUCT INFORMATION
MANUFACTURER’S PRODUCT DATA SHEETS INDICATING PHYSICAL, MECHANICAL, AND CHEMICAL CHARACTERISTICS OF ALL MATERIALS USED IN FRP
SYSTEM.
TEST DATA INDICATING THAT THE PRODUCT MEET THE REQUIREMENTS OF SECTION 2.02 OF THIS SPECIFICATION.
INSTALLATION INSTRUCTIONS, MAINTENANCE INSTRUCTIONS, AND GENERAL RECOMMENDATIONS REGARDING EACH MATERIAL TO BE USED.
MANUFACTURER’S MATERIAL SAFETY DATA SHEETS (MSDS) FOR ALL MATERIALS TO BE USED.
PROJECT INFORMATION
WORKING DRAWINGS DETAILING THE TYPE, LOCATIONS, DIMENSIONS, NUMBER OF LAYERS, AND ORIENTATIONS OF ALL FRP MATERIALS TO BE
INSTALLED.
ANY CALCULATIONS PREPARED BY OR ON BEHALF OF THE CONTRACTOR TO DETERMINE THE LAYOUT OF THE FRP MATERIALS TO BE INSTALLED. ALL CALCULATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS OF ACI 440.2R-17.
WORKING DRAWINGS AND CALCULATIONS SUBMITTED SHALL BE STAMPED BY A PROFESSIONAL ENGINEER LICENSED IN THE PROJECT STATE/PROVINCE.
A QUALITY CONTROL PLAN INDICATING THE TESTING THAT WILL BE PERFORMED TO SATISFY ITEM 3.04 IN THIS SECTION AND IDENTIFYING THE PARTY OR
PARTIES RESPONSIBLE FOR THIS TESTING.
1.4 QUALITY ASSURANCE
MANUFACTURER / SUPPLIER QUALIFICATIONS:
THE MANUFACTURER / SUPPLIER MUST SPECIALIZE IN THE MANUFACTURING OF THE PRODUCTS SPECIFIED IN THIS SECTION WITH DOCUMENTED
EXPERIENCE.
THE MANUFACTURER / SUPPLIER MUST HAVE A MINIMUM OF 50 DOCUMENTED SUCCESSFUL FIELD INSTALLATIONS.
THE MANUFACTURER / SUPPLIER MUST SUPPORT A TRAINING PROGRAM TO INSTRUCT APPLICATORS IN THE INSTALLATION OF THE PRODUCTS
SPECIFIED IN THIS SECTION.
MANUFACTURER / SUPPLIER SHALL BE ISO 9001:2000 CERTIFIED
APPLICATOR QUALIFICATIONS:
APPLICATOR MUST BE APPROVED BY THE MANUFACTURER / SUPPLIER.
A FIELD REPRESENTATIVE WHO HAS COMPLETED THE COURSE OF INSTRUCTION (SUPPORTED BY THE MANUFACTURER / SUPPLIER) IN THE INSTALLATION OF THE PRODUCTS SPECIFIED IN THIS SECTION MUST BE PRESENT ON SITE DURING INSTALLATION OF THE FRP SYSTEM.
1.5 DELIVERY, STORAGE, AND HANDLING
DELIVERY:
THE PRODUCTS SHALL BE DELIVERED AND STORED IN ORIGINAL, UNOPENED CONTAINERS. CONTAINERS MUST BE CLEARLY MARKED WITH LEGIBLE AND INTACT LABELS LISTING THE MANUFACTURER’S NAME, BRAND NAME, PRODUCT IDENTIFICATION AND BATCH NUMBER.
STORAGE
STORED FIBER REINFORCEMENT AND EPOXIES MUST BE PROTECTED FROM DUST, MOISTURE, AND CHEMICAL EXPOSURE.
EPOXIES MUST BE STORED IN AREAS WITH AN AMBIENT TEMPERATURE BETWEEN 50 AND 75 °F (10 AND 24 °C) AND AWAY FROM DIRECT SUNLIGHT, FLAME SOURCES, OR OTHER HAZARDS. EPOXY RESINS MUST BE STORED SEPARATELY FROM HARDENERS.
HANDLING:
THE FIBER REINFORCEMENT MUST NOT BE HANDLED ROUGHLY.
CONSULT THE MANUFACTURER’S MSDS FOR SPECIFIC HANDLING HAZARDS OF RESIN COMPONENTS.
PART 2 PRODUCTS
2.1 MANUFACTURERS AND PRODUCTS
A. THE FOLLOWING MANUFACTURERS AND PRODUCTS ARE CONSIDERED TO MEET OR EXCEED THE REQUIREMENTS OF THIS SPECIFICATION AND ARE
ACCEPTABLE FOR USE.
SIMPSON STRONG-TIE COMPOSITE STRENGTHENING SYSTEMS. PO BOX 10789. PLEASANTON, CA 94588 (800) 999-5099 https://www.strongtie.com/products/rps/css/repair-strengthen-concrete-structures
2.2 MATERIALS
FRP COMPOSITE SYSTEM
ALL FRP COMPOSITE SYSTEMS MUST BE PROPRIETARY SYSTEMS CONSISTING OF ALL ASSOCIATED FIBER REINFORCEMENT AND POLYMER ADHESIVES/RESINS. FRP COMPOSITES CONSISTING OF FIBER REINFORCEMENT AND POLYMERS PROVIDED BY MORE THAN ONE MANUFACTURER
ARE NOT ALLOWED.
THE FRP COMPOSITE SYSTEM SHALL POSSESS THE MINIMUM PROPERTIES GIVEN IN THE TABLE BELOW. ULTIMATE TENSILE STRENGTH AND RUPTURE STRAIN VALUES SHALL BE DETERMINED BY SUBTRACTING THREE (3) STANDARD DEVIATIONS FROM THE AVERAGE VALUES OF TWENTY (20) OR MORE TENSILE TESTS. ALL VALUES ARE FOR ONE PLY (LAYER) OF FABRIC IN THE PRIMARY DIRECTION.
PRIMER - PRIMER SHALL BE PER APPROVED FRP MANUFACTURER
PUTTY - PUTTY SHALL BE PER APPROVED FRP MANUFACTURER
SATURANTING RESIN - SATURATING RESIN SHALL BE PER APPROVED FRP MANUFACTURER
FIBER REINFORCEMENT - FIBER REINFORCEMENT SHALL BE PER APPROVED FRP MANUFACTURER . THE FABRIC SHALL BE UNIDIRECTIONAL WITH HIGH STRENGTH CARBON FIBER IN THE PRIMARY DIRECTION AND HAVE A MAXIMUM AREAL WEIGHT OF 18-OZ/YD 2.
PROTECTIVE COATINGS - FRP SYSTEM SHALL BE TOP COATED WITH A COATING APPROVED BY THE FRP SYSTEM MANUFACTURER.
PART 3 EXECUTION
3.1 EXAMINATION
EXAMINE EXISTING CONDITIONS TO ASSESS QUALITY OF CONCRETE SUBSTRATE, IDENTIFY POTENTIAL OBSTRUCTIONS, AND VERIFY
DIMENSIONS/GEOMETRY SHOWN ON SHOP DRAWINGS.
3.2 PREPARATION
ENVIRONMENTAL CONDITIONS
DO NOT INSTALL FRP WHEN THE AMBIENT TEMPERATURE IS BELOW 40 °F (5 °C) OR ABOVE 130 °F (55 °C). IN COLD CONDITIONS, AUXILIARY HEAT MAY BE APPLIED TO RAISE THE AMBIENT TEMPERATURE TO A SUITABLE LEVEL. UTILIZE CLEAN HEAT SOURCES FOR THIS PURPOSE (E.G., ELECTRIC OR
PROPANE) THAT DO NOT CONTAMINATE THE SUBSTRATE WITH CARBONATION.
THE PRESENCE OF MOISTURE INHIBITS THE ADHESION OF THE EPOXIES TO THE SUBSTRATE. DO NOT INSTALL FRP WHEN SURFACE MOISTURE IS PRESENT ON THE SUBSTRATE OR WHEN RAINFALL OR CONDENSATION IS ANTICIPATED IN THE WORK AREAS.
IF WATER LEAKAGE EXISTS THROUGH CRACKS OR CONCRETE JOINTS, WATER FLOW MUST BE STOPPED PRIOR TO FRP INSTALLATION.
SITE CONDITIONS
MAINTAIN CONTROL OF CONCRETE CHIPS, DUST, AND DEBRIS IN EACH AREA OF WORK. CLEAN UP AND REMOVE SUCH MATERIAL AT THE COMPLETION
OF EACH DAY OF BLASTING.
3.3 INSTALLATION
CONCRETE REPAIR
UNSOUND AREAS OF THE CONCRETE SUBSTRATE (SUCH AS BROKEN PIECES, DELAMINATED AREAS, ETC.) MUST BE REMOVED TO REVEAL SOUND MATERIAL. IF PRESENT, MATERIALS WITH LOW COMPRESSIVE STRENGTH AND ELASTIC MODULUS, LIKE PLASTER, SHALL BE REMOVED FROM THE
SUBSTRATE.
IF CORROSION OF THE EXISTING STEEL REINFORCEMENT EXISTS, THE STEEL AND CONCRETE MUST BE REPAIRED BEFORE INSTALLATION OF THE FRP. ANY DETERIORATED CONCRETE OR CORRODING REINFORCING STEEL MUST BE REPAIRED PER ICRI GUIDELINE 310.1R.
VOIDS IN THE CONCRETE SUBSTRATE MUST BE FILLED. LARGE VOIDS (GREATER THAN 0.50 IN (500 MM) IN DEPTH) MAY BE FILLED WITH AN APPROPRIATE REPAIR MORTAR. THE REPAIR MATERIAL SHALL BE SELECTED PER ICRI GUIDELINE 320.2R AND SHALL BE COMPATIBLE WITH THE FRP SYSTEM. IF REQUIRED, THE BOND STRENGTH OF THE REPAIR MATERIAL TO THE EXISTING CONCRETE MAY BE VERIFIED WITH PULL TESTING PER ICRI
GUIDELINE 210.3. MINIMUM DIRECT PULL-OFF STRENGTH REQUIRED IS 200 PSI (1.4 MPA).
CRACKS IN THE CONCRETE SUBSTRATE GREATER THAN 0.010 IN (0.25 MM) WIDE MUST BE PRESSURE INJECTED WITH EPOXY OR SIMILAR MATERIAL
APPROVED BY THE ENGINEER OF RECORD.
SURFACE PREPARATION
PRIOR TO INITIATING SURFACE PREPARATION PROCEDURES, THE CONTRACTOR SHALL FIRST PREPARE A REPRESENTATIVE SAMPLE AREA. THE SAMPLE AREA SHALL BE PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SPECIFICATION, AND SHALL BE USED AS A REFERENCE
STANDARD DEPICTING A SATISFACTORILY PREPARED SUBSTRATE.
UNEVEN CONCRETE SURFACE IRREGULARITIES (OFFSETS) MUST BE GROUND AND SMOOTHED TO LESS THAN 0.04 IN (1 MM).
WHEN FIBER REINFORCEMENT IS RUN AROUND OUTSIDE CORNERS OR EDGES, THESE CORNERS MUST BE ROUNDED TO A RADIUS OF NO LESS THAN
0.75 IN (20 MM). APPLICATION OF FIBER REINFORCEMENT AROUND INSIDE CORNERS SHALL BE AVOIDED. NO DETAILING IS REQUIRED IF FIBER IS RUN
PARALLEL TO CORNERS.
THE SURFACE THE CONCRETE SUBSTRATE MUST PROFILED USING ABRASIVE BLASTING AND/OR DISC GRINDING TO AN MINIMUM ICRI CSP 3 (REFER TO ICRI GUIDELINE 310.2). SURFACE CONTAMINATES (LAITANCE, SURFACE LUBRICANTS, BROKEN MORTAR PIECES, PAINT COATINGS, STAINING, ETC.) MUST BE REMOVED BY ABRASIVE BLASTING AND/OR DISC GRINDING. DUST GENERATED FROM SURFACE GRINDING MUST BE REMOVED USING A CLEAN AIR BLOWER OR OTHER SUITABLE MEANS. IF THE DUST HAS BEEN REMOVED BY MEANS OF WATER WASHING, THE SURFACE MUST BE THOROUGHLY DRIED.
MIXING OF POLYMER RESINS AND ADHESIVES
RESINS (INCLUDING PRIMERS, PUTTIES, AND SATURATING RESINS) SHALL BE MIXED ACCORDING TO THE FRP SYSTEM MANUFACTURER'S INSTRUCTIONS. ALL RESIN COMPONENTS SHALL BE AT A PROPER TEMPERATURE AND MIXED IN THE MANUFACTURER ’S PRESCRIBED MIX RATIO UNTIL THERE IS A UNIFORM AND COMPLETE MIXING OF COMPONENTS. RESIN COMPONENTS ARE OFTEN CONTRASTING COLORS, SO FULL MIXING IS ACHIEVED WHEN COLOR STREAKS ARE ELIMINATED. RESINS SHOULD BE MIXED FOR THE MANUFACTURER ’S PRESCRIBED MIXING TIME AND
VISUALLY INSPECTED FOR UNIFORMITY OF COLOR.
MIXED RESIN THAT EXCEEDS THE POT LIFE SPECIFIED BY THE MANUFACTURER SHALL NOT BE USED.
APPLICATION OF FRP SYSTEM BY THE WET LAY-UP TECHNIQUE
THE APPLICATION OF THE FRP SYSTEM (INCLUDING TOPCOATS) SHOULD BE PERFORMED IN ACCORDANCE WITH THE MANUFACTURER ’S PUBLISHED
INSTRUCTIONS.
PRIMER: THE FRP SYSTEM PRIMER SHALL BE APPLIED TO ALL AREAS ON THE CONCRETE SURFACE WHERE THE FRP SYSTEM IS TO BE PLACED. THE PRIMER SHALL BE PLACED UNIFORMLY ON THE PREPARED SURFACE AT THE MANUFACTURER ’S SPECIFIED RATE OF COVERAGE.
THE PRIMER SHALL BE ALLOWED TO CURE PER THE FRP MANUFACTURER ’S INSTALLATION INSTRUCTIONS BEFORE APPLYING SUBSEQUENT
MATERIALS.
PUTTY: THE FRP SYSTEM PUTTY (OR FILLER) SHALL BE USED ONLY TO FILL VOIDS IN THE SUBSTRATE AND SMOOTH SURFACE DISCONTINUITIES PRIOR TO APPLICATION OF OTHER MATERIALS. ROUGH EDGES OR TROWEL LINES OF CURED PUTTY SHALL BE GROUND SMOOTH PRIOR TO CONTINUING THE INSTALLATION. THE PUTTY SHALL BE ALLOWED TO CURE PER THE FRP
MANUFACTURER’S INSTALLATION INSTRUCTIONS BEFORE APPLYING SUBSEQUENT MATERIALS.
FIBER REINFORCEMENT AND SATURATING RESIN: THE REINFORCING FIBERS SHALL BE PLACED WITH SUFFICIENT SATURATING RESIN TO ACHIEVE FULL SATURATION OF THE FIBERS. SUFFICIENT SATURATING RESIN SHALL BE PRESCRIBED BY THE FRP SYSTEM MANUFACTURER. THE FIBER REINFORCEMENT SHALL BE PRESSED ONTO THE CONCRETE SURFACE TO ACHIEVE INTIMATE CONTACT. ENTRAPPED AIR BETWEEN LAYERS SHOULD BE
RELEASED OR ROLLED OUT BEFORE THE RESIN SETS.
PROTECTIVE TOPCOATS: COATINGS SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER ’S RECOMMENDATIONS.
3.4 FIELD QUALITY CONTROL
A TRAINED FIELD SUPERVISOR SHALL OBSERVE ALL ASPECTS OF ONSITE PREPARATION AND MATERIAL APPLICATION INCLUDING SURFACE PREPARATION, RESIN COMPONENT MIXING, APPLICATION OF PRIMER, APPLICATION OF RESIN AND FIBER SHEET, CURING OF COMPOSITE, AND THE APPLICATION OF
PROTECTIVE COATINGS.INSPECTION FOR VOIDS/DELAMINATIONS
AFTER ALLOWING AT LEAST 24 HOURS FOR INITIAL RESIN CURE TO OCCUR, PERFORM A VISUAL AND ACOUSTIC TAP TEST INSPECTION OF THE LAYERED SURFACE. OTHER METHODS FOR DETECTING VOIDS MAY BE EMPLOYED; ALL PARTIES CONCERNED SHALL AGREE UPON THESE METHODS PRIOR TO THE
SUBMISSION OF BIDS OR PROPOSALS.
VOIDS REQUIRING CORRECTIVE ACTION SHALL BE MARKED AND REPAIRED IN ACCORDANCE WITH ITEM 3.05 OF THIS SECTION.
BOND TESTING
DIRECT TENSION PULL-OFF TESTING SHALL BE CONDUCTED PER ASTM D 7522.
DIRECT TENSION PULL-OFF TESTS SHALL BE CONDUCTED UNDER THE FOLLOWING TEST CONDITIONS:
THE FRP SYSTEM SHALL BE ALLOWED TO CURE A MINIMUM OF 72 HOURS BEFORE EXECUTION OF THE DIRECT TENSION PULL-OFF TEST THE LOCATIONS OF THE PULL-OFF TEST SHALL BE REPRESENTATIVE AND ON FLAT SURFACES. IF POSSIBLE, PULL-OFF TESTS SHALL BE CONDUCTED
ON AREAS OF THE FRP SYSTEM SUBJECTED TO RELATIVELY LOW STRESS DURING SERVICE.
TEST FREQUENCY
PERFORM A MINIMUM OF THREE DIRECT TENSION PULL-OFF TESTS
PULL-OFF TESTS MUST BE PERFORMED ON EACH TYPE OF CONCRETE SUBSTRATE OR FOR EACH SURFACE PREPARATION TECHNIQUE USED IF
VARIATIONS IN SUCH CONDITIONS EXIST.
CONDITIONS OF ACCEPTANCE
THE FAILURE MODE MUST BE COHESIVE FAILURE WITHIN THE CONCRETE
THE TENSILE BOND STRENGTH MUST BE IN EXCESS OF 200 PSI (1.4 MPA)
REPAIR THE TESTED AREAS IN ACCORDANCE WITH SECTION 3.05 OF THIS SPECIFICATION.
REPORT:
THE TRAINED FIELD SUPERVISOR SHALL SUBMIT A QUALITY CONTROL REPORT TO THE ENGINEER OF RECORD DESCRIBING THE INSPECTION OF THE
COMPLETED INSTALLATION AND DETAILING THE RESULTS OF THE BOND TESTING.
3.5 REPAIR OF DAMAGED OR DEFECTIVE AREAS
REPAIR OF DELAMINATED AREAS OF INSTALLED FRP REINFORCEMENT
MODERATE SIZED DELAMINATIONS, LESS THAN 25 IN.2 (16,000 MM2), MAY BE REPAIRED BY FILLING THE DELAMINATION BY LOW-PRESSURE INJECTION OF
THE SATURANT OR BY THE PROCEDURE SPECIFIED FOR LARGE DELAMINATIONS.
LARGE DELAMINATIONS, GREATER THAN 25 IN.2 (16,000 MM2), SHALL BE REPAIRED BY SELECTIVELY CUTTING AWAY THE AFFECTED SHEET, REAPPLYING PRIMER AND PUTTY LAYERS, AND APPLYING AN OVERLAPPING FRP PATCH OF EQUIVALENT PLIES AND FIBER ORIENTATIONS. CONSULT FRP SYSTEM
MANUFACTURE FOR APPROPRIATE DETAILS OF REPAIR.
REPAIR PROCEDURES FOR CONDITIONS THAT ARE NOT SPECIFICALLY ADDRESSED IN THIS SPECIFICATION SHALL BE APPROVED BY THE OWNER ’S
REPRESENTATIVE.
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
SP
EC
IF
IC
AT
IO
NS
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-002
DAS-05PERMIT
/0
1/
AD
D
EN
D
U M
/1 0/
AD
D
EN
D U
M
EXPIRES: 06-30-2026
A A
M M
15A
15A
26A
26A
B B
C C
D D
E E
F F
G G
H H
J J
K K
L L
CAPITOL MALL PARKING GARAGE
(BELOW), SEE SHEET S-101
LABOR AND INDUSTRIES BUILDING
STATE LIBRARY OF OREGON
PUBLIC SERVICES BUILDING
OREGON DEPARTMENT OF
TRANSPORTATION
C H
E M
E K
E T
A S
T N
E
C E
N T
E R
S T
N E
C O
U R
T S
T N
E
C H
E M
E K
E T
A S
T N
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
OV
ER
AL
L P
RO
JE
CT
S
IT
E
PL
AN
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-003
DAS-05PERMIT
S-003 1" = 30'-0"
1 OVERALL PROJECT SITE PLAN
N
/0
1/
AD
D
EN
D
U M
NOTES:
THE IMAGES PROVIDED ON THIS SHEET ARE
SPECIFICALLY RELATED TO THE SLAB COATING
SCOPE OF WORK AND ARE INDICATIVE OF THE
CONDITION OF THE EXISTING STRUCTURE AND ARE
PROVIDED FOR REFERENCE.
THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO
SUBMISSION OF FORMAL QUOTE AND CONFIRM
CONDITIONS IN PERSON AND INCLUDE INFORMATION
GATHERED IN FINAL SUBMISSION
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PH
OT
O
RE
FE
RE
NC
ES
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-004
DAS-05PERMIT
N.T.S.S-004
C TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
G TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
H TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
B TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
A TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
D TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
E TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
E.1 TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
F TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
I TYPICAL SLAB CRACK CONDITION
N.T.S.S-004
J TYPICAL SLAB CRACK CONDITION
/0
1/
AD
D
EN
D
U M
1 27
A
M
2 3 4 5 6 7 8 9 10 11 12 13 1415 15A16 17 18 19 20 21 22 23 24 26A25 26
B
C
D
E
F
G
H
J
K
L
S-301
S-301
S-301
17' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 25' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 19' - 6" 9' - 0" 24' - 0" 9' - 0" 19' - 6" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 25' - 0" 27' - 0" 27' - 0" 27' - 0" 27' - 0" 17' - 6"
706' - 0"
7'
0"
S-102
S-106
S-104
S-108
S-107
S-103
S-109
S-105
C H
EM
EK
ET
A
ST
R
EE
T
S-301 2
S-301
S-301
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– O
VE
RA
LL
P
LA
N
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-101
DAS-05PERMIT
S-101 1" = 30'-0"
1 UPPER LEVEL STRUCTURAL PLAN
N
/0
1/
AD
D
EN
D
U M
FLOOR SLAB CRACKS (BLUE PEN)
A
2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
C
D
E
F
RAMP DOWN
1 1
1 1
S-401
S-401
TYP
TYP
MATCH LINE
M
AT
C H
L
IN
E
J J J J J J J J J J J
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
K
K
K
K
K
EXISTING CARBON
FIBER WRAPPED
COLUMNS (4) TOTAL
SLAB CLOSURE POUR
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYP
SLAB CLOSURE POUR
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYP
CURB
CRACKS
ATOP P1
SLAB
EXISTING TRENCH DRAIN
6 6
3 3 3 3 3 3
C H
EM
EK
ET
A
ST
R
EE
T
MATCH LINE
C H
EM
EK
ET
A
ST
R
EE
T
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
APPLICATIONS.
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– L
OW
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-102
DAS-05PERMIT
S-102 3/32" = 1'-0"
1 UPPER LEVEL SLAB / LOWER LEVEL COLUMNS - SECTOR 1
N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
A
15A 16 17 18 19 20 21 22 23 24 26A25 26
B
C
D
E
F
RAMP DOWN
S-401
TYP
S-401
TYP
M
AT
C H
L
IN
E
MATCH LINE
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
N
N
N
N
N
SLAB CLOSURE POUR
JOINT, TYP
SLAB CLOSURE POUR
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYP
EXISTING COLUMN
LABEL, TYP
CRACKS ATOP P1 SLAB
CRACKS ATOP
P1 SLAB
CURB
EXISTING TRENCH DRAIN
3 3
C H
EM
EK
ET
A
ST
R
EE
T
C H
EM
EK
ET
A
ST
R
EE
T
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– L
OW
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-103
DAS-05PERMIT
S-103 3/32" = 1'-0"
1 UPPER LEVEL SLAB / LOWER LEVEL COLUMNS - SECTOR 2
N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15
G
H
J
K
L
RAMP DOWN
1 1
1 1
1 1
1 1
1 1
S-401
TYP
S-401
TYP
MATCH LINE
M
AT
C H
L
IN
E
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
K
K
K
K
K
SLAB CLOSURE POUR
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYP
SLAB CLOSURE POUR
JOINT, TYP
EXISTING COLUMN
LABELS, TYP
CRACKS ATOP
P1 SLAB
SLAB CONSTRUCTION
JOINT, TYP
CRACKS ATOP
P1 SLAB
EXISTING TRENCH DRAIN
1 1
S-401
TYP
6 6 66
3 3
MATCH LINE
C H
EM
EK
ET
A
ST
R
EE
T
C H
EM
EK
ET
A
ST
R
EE
T
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
UP
PE
R
LE
VE
L S
LA
B
/ L
OW
ER
LE
VE
L C
OL
UM
NS
SE
CT
OR
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-104
DAS-05PERMIT
S-104 3/32" = 1'-0"
1 UPPER LEVEL SLAB / LOWER LEVEL COLUMNS - SECTOR 3N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
M
15A 16 17 18 19 20 21 22 23 24 26A25 26
G
H
J
K
L
RAMP DOWN
S-401
TYP
S-401
_TYP
MATCH LINE
M
AT
C H
L
IN
E
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
N
N
N
N
N
SLAB CLOSURE POUR
JOINT, TYP
SLAB CLOSURE POUR
JOINT, TYP
SLAB CONSTRUCTION
JOINT, TYPSLAB CONSTRUCTION
JOINT, TYP
EXISTING COLUMN
LABELS, TYP
CRACKS ATOP
P1 SLAB
CRACKS ATOP
P1 SLAB
EXISTING TRENCH DRAIN
3 3
C H
EM
EK
ET
A
ST
R
EE
T
C H
EM
EK
ET
A
ST
R
EE
T
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– L
OW
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-105
DAS-05PERMIT
S-105 3/32" = 1'-0"
1 UPPER LEVEL SLAB / LOWER LEVEL COLUMNS - SECTOR 4
N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
C
D
E
F
1 1
1 1
1 1
S-401
S-401
TYP
TYP
MATCH LINE
M
AT
C H
L
IN
E
J J J J J J J J J J L
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
I
H
G
F
K
K
K
K
K
L
L
L
L
CURB
BELOW
CONCRETE
REPAIR PER
7/S-401
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– U
PP
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-106
DAS-05PERMIT
S-106 3/32" = 1'-0"
1 PLAZA LEVEL SLAB / UPPER LEVEL COLUMNS - SECTOR 1N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
15A 16 17 18 19 20 21 22 23 24 26A
25 26
B
C
D
E
F
S-401
S-401
TYP
TYP
M
AT
C H
L
IN
E
MATCH LINE
M J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
J
I
H
G
F
N
N
N
N
N
M
M
M
M
CURB
BELOW
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– U
PP
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-107
DAS-05PERMIT
S-107 3/32" = 1'-0"
1 PLAZA LEVEL SLAB / UPPER LEVEL COLUMNS - SECTOR 2
N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15
G
H
J
K
L
S-401
S-401
TYP
TYP
MATCH LINE
M
AT
C H
L
IN
E M
AT
C
H L
IN
E
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
L
L
L
L
L
K
K
K
K
K
CURB
BELOW
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– U
PP
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-108
DAS-05PERMIT
S-108 3/32" = 1'-0"
1 PLAZA LEVEL SLAB / UPPER LEVEL COLUMNS - SECTOR 3N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
M
15A 16 17 18 19 20 21 22 23 24 26A25 26
G
H
J
K
L
S-401
S-401
TYP
TYP
MATCH LINE
M
AT
C H
L
IN
E
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
N
N
N
N
N
M
M
M
M
M
CURB
BELOW
CARBON FIBER WRAP CONCRETE COLUMNS WITH DIAGONAL CRACKING, SEE SHEET S-001 FOR
DESIGN REQUIREMENTS. ASSUME (35) MIN COLUMNS FOR BID PURPOSES.
NOT USED
EPOXY INJECT CONCRETE SLAB ATOP PARKING AREA. SEE SHEET S-001 FOR DESIGN
REQUIREMENTS, 1,000 LINEAL FEET OF CRACKS 1/16" TO 1/8" REQUIRING EPOXY INJECTION.
REMOVE AND REPLACE PORTION OF CONCRETE WALL ADJACENT TO TRANSFORMER ROOM.
SEE 6 & 7 ON S-401 SIM
REMOVE AND REPLACE PORTION OF CONCRETE WALL AT SELECT AREAS THROUGHOUT
PARKING STRUCTURE. SEE 6 & 7 ON S-401 SIM
PROVIDE EPOXY INJECTION IN CRACKS AT COLUMNS PRIOR TO CARBON FIBER WRAP. SEE
SHEET S-001 FOR ADDITIONAL INFORMATION.
NOT USED
NOT USED
NOT USED
REMOVAL AND REPLACEMENT OF SELECT PORTIONS OF CMU WALL MAY BE REQUIRED FOR THE
INSTALLATION OF STRUCTURAL CONNECTIONS, REVIEW LOCATION AND EXTENT WITH OWNER
PRIOR TO ANY CONSTRUCTION.
KEYNOTES
PLAN NOTES
1.
2.
3.
SEE SHEET S-001 FOR GENERAL PROJECT NOTES.
CONTRACTOR SHALL FIELD VERIFY (F.V.) ALL EXISTING CONDITIONS
PRIOR TO ALL NEW CONSTRUCTION.
ALL EXISTING TRAFFIC AND PARKING PAINTED MARKINGS LOCATED
WITHIN ZONES REQUIRING NEW SURFACE TREATMENTS SHALL BE
REPAINTED IN KIND TO MATCH EXISTING CONDITIONS, CONTRACTOR
TO CONFIRM EXTEND OF PAINTING WITH OWNER PRIOR TO ANY
SC
RI
PT
IO
N
DE
SI
GN
ED
DR
AW
N:
CH
EC
KE
D:
DA
TE
DA
TE
NO
SHEET NO.
JOB NO.
SE
S po ka ne S tre an d, O R ph on e:
.2
.1 w .h hp
.2
.1
E N
G I
N E
E
A
N N
E R
S
LA
N D
SC
AP
E
AR
C H
IT
R
VE
YO
R S
H ar pe r
H ou f P et er so n R ig he lli s I nc
H H
PR
PLAN VIEW SECTOR KEY
1-BLUE 2-PURPLE
3-ORANGE 4-GREEN
N
PA
RK
IN
G
ST
RU
CT
UR
E
– U
PP
ER
LE
VE
L S
EC
TO
R
CA
PIT
OL
MA
LL
PA
RK
ING
ST
RU
CT
UR
E S
EIS
MIC
UP
GR
AD
E
SA
LE
M, O R
JM
D
/ J
AS
HH
PR
JM
D
/ J
AS
/21
/20
S-109
DAS-05PERMIT
S-109 3/32" = 1'-0"
1 PLAZA LEVEL SLAB / UPPER LEVEL COLUMNS - SECTOR 4N
P2
P1
PLAZA
NOTE:
CROSS HATCHED AREA DENOTES AREA OF WORK
CROSS-SECTIONAL KEY
/0
1/
AD
D
EN
D
U M
/3 0/
AD
D
EN
D U
M
P2 0"
P1 9'-4"
A MB C D E F G H J K L
T.O.S.
19'-8"
PLAZA
P2 0"
P1 9'-4"
A MB C D E F G H J K L
T.O.S.
19'-8"
PLAZA
P2 0"
P1 9'-4"