This document is Addendum 3 to the Invitation to Bid (ITB) for the Control Room Upgrades project at three Oregon Youth Authority (OYA) regional facilities: the Eastern Oregon Youth Correctional Facility, the Oak Creek Youth Correctional Facility, and the Rogue Valley Youth Correctional Facility. The addendum modifies the solicitation schedule and certain sections of the ITB to adjust deadlines for protests, requests for change, and requests for clarification. It also includes revised drawings for the Oak Creek Facility.
The project involves upgrading the control rooms at the three regional facilities. The deadline for bid submittal is July 30, 2024 at 2:00 PM, with a public opening immediately after. The contract award protest deadline is 7 calendar days after the Intent-to-Award announcement. The ITB does not specify the contract term or renewal options. The document does not provide details on pricing, set asides, incumbents, funding sources, or other financial information.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid
S-DASOBO-00009651
Regional Control Room Upgrades Solicitation Addendum #3
This Solicitation Addendum modifies the Bid Document(s) for Work only to the extent indicated herein. All other areas not specifically mentioned or affected by this Solicitation Addendum shall remain in full force. The Solicitation Addendum shall be added as part of the Original Bidding Document
This Solicitation Addendum must be acknowledged by inserting its number on the appropriate blank lines in Exhibit 1, Bidder Information and Certification Form, Section D, and by providing all required signatures prior to Bid Closing. Failure to do so may result in rejection of Bid.
Requests for clarification, requests for change, and protests of provisions addressed in this Solicitation Addendum must be received by DAS by 12:00P.M. (Pacific time) on July 18, 2024 , or they will not be considered. DAS will not consider requests or protests of matters not added to or modified by this Solicitation Addendum, except as otherwise set forth in the Invitation to Bid.
SECTION 1: PURPOSE
The purpose of this addendum is to modify the Solicitation Schedule and Section C to adjust the deadline for solicitation protests and requests, and Section A, Exhibit 7, and Attachment B to the ITB to include revised drawings for the Oak Creek Facility as detailed below. Except as changed by this Addendum, all terms, conditions, scope of work, requirements, and deadlines in the original ITB and previous addenda remain unchanged.
SECTION 2: MODIFICATIONS
New language is indicated by bold underlined font, deleted language is indicated by strikethrough font.
1. Solicitation Schedule (Page 2) is modified at follows:
ACTIVITY SCHEDULE/DEADLINE
Mandatory Pre-Bid Conference See C.0.1 of ITB Additional Site Access See C.0.2 of ITB Deadline for solicitation protests, requests for change, requests for clarification, requests for brand name/ product substitutions, and questions
July 9 July 22, 2024 at 12:00 PM
Deadline for Bid Submittal July 30, 2024 at 2:00 PM
Public Opening Immediately after Bid Opening Date and time. (See Section C.12.2 for details on attending Public Opening)
Deadline for Award Protest 7 calendar days after issuance of the Intent-to- Award Announcement. See ITB section C.22
Control Room Upgrade Add #3 - Page 1 of 8
2. Section C.5 – Request for Brand Name; Request for Clarification; Request for Change; Solicitation Protest, is modified as follow:
C.5.2 METHOD OF SUBMITTING REQUESTS FOR MODIFICATION OF ITB PROVISIONS AND SOLICITATION PROTESTS: Requests for brand approval, requests for clarification, requests for change, and protests of the ITB provisions shall be made in Writing and marked as follows:
Bid Request for:
Brand Approval/ /Request for Clarification/Request Change/Protest of ITB Provisions ITB Number Bid Opening Date8 and must be received by the appropriate point of contact as identified in Section C.0.3 and in OregonBuys by 12:00 P.M. (Pacific time) on July 9 July 22, 2024. Unless this specific deadline is extended by subsequent Addenda, no requests for brand approval, requests for substitution, requests for clarification, requests for change or protests pertaining to provisions contained in the originally-issued ITB will be considered after the date specified herein.
3. Section A – Table of Contents is modified as follows:
ATTACHMENT B PLANS
- OYA-Regional Facilities, Control Room Upgrade, Eastern Oregon Facility, dated December 2023 and revised
04/04/2024
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023 and revised
04/04/2024
- OYA, Regional Facilities, Control Room Upgrade, Rogue Valley Facility, dated December 2023 and revised
04/04/2024
- OYA-Regional Facilities, Control Room Upgrade, Eastern Oregon Facility, dated December 2023
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023
- OYA, Regional Facilities, Control Room Upgrade, Rogue Valley Facility, dated December 2023
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023 and revised 04/04/2024 and 07/10/2024 (Drawing Nos. OYA-000, OYA-200, OYA-300, OYA-500, OYA-700)-
Attachment B is found as [six] seven separate uploads on OregonBuys.
4. Exhibit 7 – Sample Contract; Section 5. Exhibits and Attachments is modified as follows:
ATTACHMENT B PLANS
- OYA-Regional Facilities, Control Room Upgrade, Eastern Oregon Facility, dated December 2023 and revised
04/04/2024
- OYA, Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023 and revised
04/04/2024
- OYA, Regional Facilities, Control Room Upgrade, Rogue Valley Facility, dated December 2023, and revised
04/04/2024
- OYA-Regional Facilities, Control Room Upgrade, Eastern Oregon Facility, dated December 2023
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023
- OYA, Regional Facilities, Control Room Upgrade, Rogue Valley Facility, dated December 2023
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023 and revised 04/04/2024 and 07/10/2024 (Drawing Nos. OYA-000, OYA-200, OYA-300, OYA-500, OYA-700)
Attachment B is found as six seven separate uploads on OregonBuys.
5. The cover page of Attachment B, Plans, is modified as follows:
Plans listed below are hereby incorporated:
Control Room Upgrade Add #3 - Page 2 of 8
- OYA, -Regional Facilities Control Room Upgrade, Eastern Oregon Facility, ARCH-REV1, dated 04/04/2024
- OYA, Regional Facilities Control Room Upgrade, Oak Creek Facility, ARCH-REV1, dated 04/04/2024
- OYA, Regional Facilities, Control Room Upgrade, Rogue Valley Facility, -ARCH-REV1, dated 04/04/2024
- OYA-Regional Facilities, Control Room Upgrade, Eastern Oregon Facility, dated December
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023
- OYA, Regional Facilities, Control Room Upgrade, Rogue Valley Facility, dated December 2023
- OYA-Regional Facilities, Control Room Upgrade, Oak Creek Facility, dated December 2023 and revised 04/04/2024 and 07/10/2024(Drawing Nos. OYA-000, OYA-200, OYA-300, OYA-500, OYA-700)
Items not indicated in the Plans that can be legitimately and reasonably inferred to complete the Work must be furnished by the Contractor as though it were detailed herein.
For purposes of the ITB, Attachment B is found as three seven separate uploads on OregonBuys.
6. Add the following attached drawings to Attachment B—Plans: OYA, Regional Facilities, Control Room Update, Oak Creek Facility, dated December 2023 and revised 04/04/2024 and 07/10/2024 (Drawing Nos. OYA-000, OYA-200, OYA-300, OYA-500, OYA-700)-
Control Room Upgrade Add #3 - Page 3 of 8
Date:
Proj. No.:
D S
G N
D R
C H
K A
P V
D
A P
V D
B Y
R E
V
IS
IO
N
D A
T E
N O
PLOT DATE/TIME:
Drawing No.:
P ro je c t T it le
D ra w in g T it le
D
C
B
A
1 2 3 4 5 6
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
www.Jacobs.com
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
07/10/2024
7/10/2024 2:55:06 PM BIM 360://US_D3482000_OYA Control Room Upgrade/Oak_Creek_OYA-Control-Room-Upgrade-ARCH_marcin.krzysik.rvt
IS
S
U E
F O
R R
E V
IS
IO
N
D3482000
M K
J
A M
K J
A J B
J B
OYA-000
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y O
A K
C R
E E
K F
A C
IL
IT
Y
OAK CREEK FACILITY
4400 LOCHNER RD SE
ALBANY, OR 97322
PORTLAND OFFICE
PORTLAND, OR 97201
2020 SW 4TH AVE, SUITE 300
C O
V E
R S
H E
E T
/1
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
/0
/2
IS
S
U E
F O
R R
E V
IS
IO
N
/1
/2
IS
S
U E
F O
R R
E V
IS
IO
N
OREGON YOUTH AUTHORITY
REGIONAL FACILITIES
CONTROL ROOM UPGRADE
OAK CREEK YOUTH CORRECTIONAL FACILITY
DECEMBER 2023
JACOBS PROJECT NO. D3482000
SHEET LIST
DRAWING DRAWING TITLE DISCIPLINE REV DATE
OYA-000 COVER SHEET COVER SHEET 2 07/10/2024
OYA-001 LEGENDS & MOUNTING HEIGHTS &
ABBREVIATIONS
ARCHITECTURE 0 12/10/2023
OYA-002 CODE PLAN ARCHITECTURE 0 12/10/2023
OYA-100 FIRST FLOOR PLAN OVERALL ARCHITECTURE 0 12/10/2023
OYA-200 DEMOLITION PLAN ARCHITECTURE 2 07/10/2024
OYA-300 ENLARGED FLOOR PLAN & FINISH ARCHITECTURE 2 07/10/2024
OYA-301 ENLARGED CEILING PLAN ARCHITECTURE 0 12/10/2023
OYA-302 ENLARGED FURNITURE PLAN & EQUIPMENT ARCHITECTURE 0 12/10/2023
OYA-500 INTERIOR ELEVATIONS ARCHITECTURE 2 07/10/2024
OYA-600 DETAILS ARCHITECTURE 1 04/04/2024
OYA-700 DOOR AND ROOM SCHEDULES & FINISH LEGEND ARCHITECTURE 2 07/10/2024
PROJECT LOCATION
OAK CREEK FACILITY
4400 LOCHNER RD SE
ALBANY, OR 97322
VICINITY MAP
OYA-E301 LIGHTING PLAN ELECTRICAL 0 12/10/2023
OYA-E302 POWER PLAN ELECTRICAL 0 12/10/2023
OYA-M100 FLOOR PLAN MECHANICAL 0 12/10/2023
OYA-ES0001 LEGEND ABBREVIATIONS & GENERAL NOTES SECURITY 0 12/10/2023
OYA-ES1000 SECURITY PLAN SECURITY 0 12/10/2023
OYA-ES4701A DOOR CONTROL LOOP TERM. WIRING - PANEL 1 SECURITY 0 12/10/2023
OYA-ES4701C DOOR CONTROL LOOP TERM. WIRING - PANEL 1 SECURITY 0 12/10/2023
OYA-ES4701E DOOR CONTROL LOOP TERM. WIRING - PANEL 1 SECURITY 0 12/10/2023
OYA-ES7201 SECURITY DOOR DETAILS SECURITY 0 12/10/2023
OYA-ES7210 SECURITY DETAILS SECURITY 0 12/10/2023
07/11/2024
Control Room Upgrade Add #3 - Page 4 of 8
DN
CONTROL
ROOM
RESTROOM
(D) RAISED ACCESS FLOOR PANELS,
SEE NEW SCOPE FOR REUSE OF
EXISTING PEDESTALS /
COMPONENTS WHERE POSSIBLE
EXISTING HOUSING UNIT
NOT PART OF PROJECT
SCOPE
EXISTING
ADMINISTRATION
BUILDING
NOT PART OF PROJECT
SCOPE
(D) EXISTING
OBSERVATION
WINDOWS AND
PORTION OF CMU WALL
TO ACCOMMODATE
FOR NEW WINDOWS
(D) EXISTING CMU WALL TO
ACCOMMODATE FOR NEW
DOOR OPENING. SEE NEW
FLOOR PLAN AND DOOR
SCHEDULE FOR DOOR SIZE.
PATCH AND REPAIR.
PREPARE SURFACE
FOR NEW FINISH.
SEE FINISH PLAN
FOR MORE
INFORMATION
(D) EXISTING FURNITURE,
CABINETS, RACKS, SHELVES.
COORDINATE DISPOSITION WITH
OWNER
(D) VCT
(D) VCT
(D) PANELS. (N) FINISH TO
BE INSTALLED ON STEPS
AND RAISED ACCESS
FLOOR SYSTEM
(D) EXISTING HANDRAIL
OYA-200
OYA-200
(D) EXISTING KEY
BOARD
(E) DOOR TO
REMAIN
(D) PORTION OF STAIRS TO
ACCOMMODATE NEW DOOR
OPENING
(D) ACT, LIGHTS
FIXTURES, SMOKE
DETECTORS,
SENSORS AND
CEILING GRIDS.
(E) GYPSUM
CEILING TO
REMAIN. PATCH
AND REPAIR IF
NECESSARY
(E) GYPSUM
CEILING TO
REMAIN. PATCH
AND REPAIR IF
NECESSARY
(D) GYPSUM SOFFIT
EXISTING HOUSING UNIT
NOT PART OF PROJECT
SCOPE
EXISTING
ADMINISTRATION
BUILDING
NOT PART OF PROJECT
SCOPE
(E) SPRINKLER.
REFER TO MEP
DRAWINGS FOR
MORE INFORMATION
(E) DIFFUSER.
REFER TO
MECHANICAL
DRAWINGS FOR
MORE INFORMATION
(D) ALL EXISTING LIGHT
FIXTURES. REFER TO
ELECTRICAL DARWINGS FOR
MORE INFORMATION
(D) EXISTING LIGHT
FIXTURES. REFER TO
ELECTRICAL DARWINGS FOR
MORE INFORMATION
(E) SPRINKLER.
REFER TO MEP
DRAWINGS FOR
MORE INFORMATION
RAISED ACCESS FLOOR
2' - 8"
FINISH FLOOR
0' - 0"
(D) EXISTING
WINDOW. OPENING
LOWERED TO JUST
ABOVE RAF
(E) FIRE ALARM
TO REMAIN
DEMO PART OF EXISTING CMU
WALL TO ACCOMMODATE FOR
NEW WINDOW. REFER TO
WINDOW SCHEDULE FOR SIZE.
(E) CMU WALL
PATCH/ INFILL
OPENING
EDGES WITH
MORTAR/GROUT
AS NECESSARY
EXISTING EXISTING
V
IF
V
IF
FINISH FLOOR
0' - 0"
DEMO EXISTING CMU
WALL TO
ACCOMMODATE FOR
NEW DOOR OPENING.
REFER TO DOOR
SCHEDULE FOR
DOOR SIZE
PATCH/ INFILL
OPENING
EDGES WITH
MORTAR/GROUT
AS NECESSARY
DEMO EXISTING
HANDRAIL
EXISTING PEDESTALS
TO REMAIN
WT5X11
REFER TO DEMO
NOTES AND LINTEL
DETAIL ON SHEET
OYA-600 FOR MORE
INFORMATION
(D) EXISTING PANELS.
PROVIDE NEW.
REFER TO FINISH
SCHEDULE
V
IF
6"
4" MIN.
BOLTS SPACED AT 8"TEMPORARY SHORING.
SEE DETAIL 5
2 BOLTS EA. SIDE IN
CONTINOUS CMU
EXISTING CMU WALL
16"
THRU-BOLTS
SPACED AT 8"
TEMP.
CHANNELS
16" 16"
C6X8.2
CONTROL ROOM
CMU ADMINISTRATION
OFFICE
OPENING
NOTE: SHORING COULD BE 2 CHANNELS
(C6X8.2) SANDWITCHING THE WALL.
SEQUENCE:
1. DRILL HOLES THRU CMU WALL
2. THRU-BOLT AND ATTACH CHANNELS,
EXTENDING 6-8" PAST AREA BEING DEMO-ED
3. DEMO WALL AS SHOWN IN HATCHED AREA
4. INSTALL NEW CHANNEL
5. INFILL WITH BLOCK, RE-GROUT ALL JOINTS
6. REMOVE CHANNELS AND BOLTS
7. PATCH/PAINT WALL TO CONCEAL HOLES
Date:
Proj. No.:
D S
G N
D R
C H
K A
P V
D
A P
V D
B Y
R E
V
IS
IO
N
D A
T E
N O
PLOT DATE/TIME:
Drawing No.:
P ro je c t T it le
D ra w in g T it le
D
C
B
A
1 2 3 4 5 6
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
www.Jacobs.com
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
07/10/2024
7/10/2024 2:55:06 PM BIM 360://US_D3482000_OYA Control Room Upgrade/Oak_Creek_OYA-Control-Room-Upgrade-ARCH_marcin.krzysik.rvt
IS
S
U E
F O
R R
E V
IS
IO
N
D3482000
M K
J
A M
K J
A J B
J B
OYA-200
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y O
A K
C R
E E
K F
A C
IL
IT
Y
OAK CREEK FACILITY
4400 LOCHNER RD SE
ALBANY, OR 97322
PORTLAND OFFICE
PORTLAND, OR 97201
2020 SW 4TH AVE, SUITE 300
A R
C H
IT
E
C T
U R
E D
E M
O L
IT
IO
N F
L O
O R
P L
A N
C O
N T
R O
L R
O O
M
- 1/2" = 1'-0"
1 DEMOLITION FLOOR PLAN - CONTROL ROOM
/1
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
/0
/2
IS
S
U E
F O
R R
E V
IS
IO
N
/1
/2
IS
S
U E
F O
R R
E V
IS
IO
N
- 1/2" = 1'-0"
2 DEMOLITION REFLECTED CEILING PLAN - CONTROL ROOM
1. UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR IN THE
SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY.
2. BEFORE ANY DEMOLITION IS TO BE PERFORMED IN THE AREA OF
WORK, A PROTECTIVE BARRIER WILL HAVE TO BE IN PLACE TO
PROTECT THE WORK AREA FROM THE ADMINISTRATION AREA
SUCH AS A POLYETHYLENE FILM SHEETING.
3. REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION AND
ELECTRICAL DEMOLITION DRAWINGS FOR EXTENT OF
DEMOLITION OF MECHANICAL, PLUMBING, FIRE PROTECTION AND
ELECTRICAL ITEMS.
4. REMOVE AND DISPOSE OF ALL EXISTING EQUIPMENT AS
INDICATED ON THE DRAWINGS AS REQUIRED. EQUIPMENT
DESIGNATED FOR REUSE IS TO BE REMOVED AND STORED PER
OWNER/ CONSTRUCTION MANAGER DIRECTION.
5. DEMOLITION CONTRACTOR TO REVIEW NEW WORK
CONSTRUCTION DOCUMENTS FOR SCOPE, INTENT AND
COORDINATION WITH DEMOLITION.
6. REVIEW AND VERIFY PATH FOR REMOVAL OF TRASH/ DEBRIS
FROM PROJECT LOCATION WITH CONSTRUCTION MANAGER
PRIOR TO BEGINNING WORK.
7. DEMOLITION CONTRACTOR TO REPORT ANY FIELD CONDITIONS
THAT VARY FROM THOSE INDICATED ON THE DOCUMENTS.
8. DEMOLITION CONTRACTOR TO ADVISE CONSTRUCTION
MANAGER OF PARTITIONS OR WALLS REMAINING THAT HAVE
BEEN WEAKENED AFTER DEMOLITION AND ARE UNSAFE OR
UNSALVAGEABLE.
9. DEMOLITION CONTRACTOR TO INDICATE ANY ELECTRICAL RISER
OR PLUMBING RISER UNCOVERED WITHIN A DEMOLISHED
PARTITION. INCLUDES MECHANICAL DUCT SHAFTS NOT
INDICATED ON DOCUMENTS.
10. DEMOLITION CONTRACTOR TO SAFELY SECURE ANY AND ALL
PIPING, WIRING, CABLES OR DEVICES THAT ARE NOT
SCHEDULED FOR DEMOLITION AND WHERE SECURED BY ITEMS
(PARTITIONS) THAT HAVE BEEN OR ARE SCHEDULED FOR
DEMOLITION.
11. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR STRUCTURAL
INTEGRITY OF EXISTING BUILDING WHERE PART OR PORTIONS
OF STRUCTURE/WALLS HAVE BEEN REMOVED.
12. DEMOLITION CONTRACTOR IS RESPONSIBLE FOR PROTECTING
ALL STRUCTURE, WALLS, DOORS, MEP ITEMS, ETC. THAT ARE
REQUIRED TO REMAIN.
13. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO: WALLS,
FLOORS, MECHANICAL CONSTRUCTION, EXISTING
CONSTRUCTION TO REMAIN, EXISTING CONSTRUCTION TO BE
DEMOLISHED.
14. DEMOLITION CONTRACTOR TO VERIFY WITH OWNER AND/ OR
CONSTRUCTION MANAGER THOSE ITEMS THAT ARE TO BE
SALVAGED PER OWNER'S INSTRUCTIONS PRIOR TO BEGINNING
WORK.
15. COORDINATE WITH CONSTRUCTION MANAGER FOR TEMPORARY
PARTITIONS AS REQUIRED BY DEMOLITION WORK.
15. MARK THE OPENING SIZE FOR THE DOOR / WINDOWON BOTH
SIDES OF THE WALL. REFER TO SCHEDULE FOR DOOR/WINDOW
SIZE.
16. SAW CUT USING MASONRY CIRCULAR SAW BLADE. OPENING
SHOULD BE TWO INCHES WIDER THAN THE DOOR
FRAME, AND ABOUT AN INCH TALLER IN HEIGHT. ADD
ANOTHER SET OF MARKS ACROSS THE TOP OF THE
FRAME TO REPRESENT A STEEL LINTEL THAT WILL
SUPPORT THE LOAD ABOVE THE DOOR. THE LINTEL
SHOULD BE CENTERED OVER THE DOOR. IT SHOULD
ALSO EXTEND 6 INCHES PAST THE DOOR FRAME ON
EITHER SIDE. INFILL EACH SIDE OF THE OPENING BELOW LINTEL.
17. COORDINATE STORAGE OR DISPOSAL LOCATION WITH
CONSTRUCTION SUPERINTENDENT.
18. FOR MORE INFORMATION REFER TO SPECIFICATION 02 41 19
SELECTIVE DEMOLITION.
19. PENETRATIONS AND VOIDS THROUGH FIRE RATED ASSEMBLIES
TO BE FIRESTOPPED. SEE SPECIFICATION 07 84 00
GENERAL DEMO NOTES:
- 1/2" = 1'-0"
4 ELEVATION - DEMO NEW WINDOW OPENING
- 1/2" = 1'-0"
3 ELEVATION - DEMO NEW DOOR OPENING
- 1" = 1'-0"
5 SHORING DETAIL
Control Room Upgrade Add #3 - Page 5 of 8
DN
CONTROL ROOM
(E) SECURITY
EQUP. BOARD
OYA-500
OYA-500 4OYA-500
(E) COFFEE MAKER
(E) MICROWAVE
(N) UNDER COUNTER
REFRIGERATOR
RESTROOM
(N) KEY
BOX
(N) STORAGE
/ CUBBY
CABINET
(E) ELEC
PANELS
(N) FLOOR FINISH ON RAISED
ACCESS FLOOR SYSTEM,
REFURBISH EXISTING TILES
IF AVAILABLE
(N) SMALL KITCHEN SINK,
PLUMBING CONNECTIONS
THROUGH ADJACENT TOILET
ROOM CHASE
(N)
WHITEBOARD
MOUNTED ON
(E) DOOR
(N) FLAT SCREEN
MONITOR ON WALL
MOUNT ABOVE
WINDOW. SEE
ELEVATIONS
(E) TRANSACTION
DRAWER, (N)
CUSTOM CASEWORK
BUILT TO FIT. SEE
SHEET OYA-302
(N) DOOR TO ADJACENT
ADMINISTRATION SPACE
MANUALLY KEY LOCKED
WITH DOOR POSITION
MONITORING. REFER TO
SHEET OYA-700 FOR MORE
INFORMATION.
EXISTING HOUSING UNIT
NOT PART OF PROJECT
SCOPE
EXISTING
ADMINISTRATION
BUILDING
NOT PART OF PROJECT
SCOPE
(N) BASE CABINETS. REFER
TO SHEET OYA-302
(N) ELECTRIC
MOTOR SUN
SHADE AT (E)
WINDOW
(N) WALL MOUNTED WASTE BASKET
(N) TOILET SEAT COVER DISPENSER
(N) GLOVE BOX HOLDER - 5 BOX
CAPACITY
PAPER TOWEL DISPENSER (OFOI)
SOAP DISPENSER (OFOI)
TOILET PAPER DISPENSER (OFOI)
EMPTY SPACE FOR SECOND
WORK STATION IF NEEDED
(N) DESK. REFER TO
SHEET OYA-302
(N) INSTANT HOT
WATER DISPENSER
(N) LOWER
WINDOWS, PROVIDE
(N) HORIZONTAL
BLINDS.
(N) BUILT-IN CORNER
CASEWORK WITH
STORAGE. REFER TO
SHEET OYA-302
(E) DOOR TO
REMAIN
(E) STAIRS TO
ACCOMMODATE FOR NEW
DOOR OPENING. NEW
FINISH TO BE INSTALLED
(N) VCT
(E) FIRE ALARM
(R) DATA
RACK
3' - 1 1/8"
C O
U R
T Y
A R
D
101A
101B
102A
01 01
3' - 10 3/8"
3' - 8"
(N) HANDRAIL.
SEE
ELEVATIONS
(N) ELECTRIC
MOTOR SUN
SHADE AT (E)
WINDOW
3' - 8"1' - 4 7/8"
C O
U R
T Y
A R
D
N O
T P
A R
T O
F P
R O
J E
C T
S
O
P E
PATCH AND
REPAIR. SEE
FINISH PLAN
FOR MORE
INFORMATION
V
IF
(N) UPPER CABINETS.
REFER TO SHEET
OYA-302 FOR MORE
INFORMATION
(N) VCT
(N) FACIA TO
BE INSTALLED.
SEE DETAIL
10/OYA-600
(E) FIRE
EXTINGUISHER TO BE
RE-INSTALLED. SEE
OYA-001 FOR
MOUNTING HEIGHTS
OYA-500
OYA-500 4OYA-500
293 SF
CONTROL ROOM
35 SF
RESTROOM
101A
101B
102A
EXISTING
ADMINISTRATION
BUILDING
NOT PART OF PROJECT
SCOPE
PAINT PT1 SEMI-
GLOSS
A. ALL FLOORING TO EXTEND UNDER NEW MILLWORK, SHELVING AND EQUIPMENT.
B. FLOOR MATERIAL TRANSITIONS SHALL OCCUR UNDER THE CENTERLINE OF DOOR IN CLOSED POSITION.
C. NEW BASE THROUGHOUT SHALL BE RB1, UNO.
D. GWB CONSTRUCTION THROUGHOUT SHALL BE PT1 AND PT2 FOR RESTROOM, UNO. SEE SPEC 09 91 26 FOR MORE
INFORMATION
E. CLOSETS SHALL BE FINISHED TO MATCH ADJACENT SPACE, UNO.
F. GWB CEILINGS AND SOFFITS THROUGHOUT SHALL BE PAINTED PT1, UNO. .
G. DOORS, DOOR/ WINDOW FRAMES SHALL BE PAINTED IN SEMI-GLOSS FINISH. UNO. SEE SPEC 09 91 26 FOR MORE
INFORMATION
H. SEAMS IN RESILIENT BASE AT OUTSIDE CORNERS ARE NOT PERMITTED. ALL RESILIENT BASE TO BE PURCHASED IN 100'
ROLLED STOCK, NOT 48" INDIVIDUAL LENGTHS.
I. PROVIDE APPROPRIATE METAL TRANSITION STRIPS CENTERLINE AT EVERY FLOORING TRANSITION, UNLESS OTHERWISE
NOTED.
J. COORDINATE FLOORING INSTALLATION WITH ELECTRICAL DRAWINGS FOR ANY PROPOSED FLOOR POWER / DATA
RECEPTACLES. PATCH FLOOR SLAB AND FIT FLOOR FINISHES AROUND OUTLETS AS REQUIRED.
K. ALL GWB FINISH LEVELS AS INDICATED BY MANUFACTURER OF WALL-APPLIED PRODUCTS INCLUDING MARKERBOARDS, MARKERBOARD PAINTS, WALLCOVERING, AND TILE.
L. AT SOLID SURFACE SURFACES, ALL SEAMS TO BE FILLED W/ MANUFACTURER'S JOINT ADHESIVE. TO BE SANDED AND
BUFFED SMOOTH - NO VISIBLE SEAM, TYP
M. REFER TO SPECIFICATION 09 69 00 ACCESS FLOORING. FOR MORE INFORMATION.
FINISH PLAN GENERAL NOTES
CEILING
WALL
BASE
FLOOR
FINISH SYMBOL LEGEND:
PT2
RB1
VCT1
EXISTING
PT1
RB1
AFP1/VCT1
ACT1/GYP. BD.
Date:
Proj. No.:
D S
G N
D R
C H
K A
P V
D
A P
V D
B Y
R E
V
IS
IO
N
D A
T E
N O
PLOT DATE/TIME:
Drawing No.:
P ro je c t T it le
D ra w in g T it le
D
C
B
A
1 2 3 4 5 6
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
www.Jacobs.com
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
07/10/2024
7/10/2024 2:55:07 PM BIM 360://US_D3482000_OYA Control Room Upgrade/Oak_Creek_OYA-Control-Room-Upgrade-ARCH_marcin.krzysik.rvt
IS
S
U E
F O
R R
E V
IS
IO
N
D3482000
M K
J A
M K
J
A J B
J B
OYA-300
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y O
A K
C R
E E
K F
A C
IL
IT
Y
OAK CREEK FACILITY
4400 LOCHNER RD SE
ALBANY, OR 97322
PORTLAND OFFICE
PORTLAND, OR 97201
2020 SW 4TH AVE, SUITE 300
A R
C H
IT
E
C T
U R
E F
L O
O R
P L
A N
F
IN
IS
H P
L A
N C
O N
T R
O L
R O
O M
- 1/2" = 1'-0"
1 FLOOR PLAN - CONTROL ROOM
/1
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
/0
/2
IS
S
U E
F O
R R
E V
IS
IO
N
/1
/2
IS
S
U E
F O
R R
E V
IS
IO
N
- 1/2" = 1'-0"
2 FLOOR PLAN - CONTROL ROOM FINISH PLAN
Control Room Upgrade Add #3 - Page 6 of 8
RAISED ACCESS FLOOR
2' - 8"
(E) SECURITY EQUP.
BOARD
(N) MINI FRIDGE
(N) BASE CABINETS -
CABINETS TO ACCOMODATE
MISC. STORAGE INCLUDING
BUT NOT LIMITED TO
BINDERS, OFFICE SUPPLIES,
BREAK AREA SUPPLIES, ETC
(N) KEY
BOX
(N) WHITEBOARD
24"x36" MOUNTED ON
(E) DOORS
(N) FLAT SCREEN
MONITORS ON WALL
MOUNT ABOVE WINDOW
EQ EQ
EQ EQ
PT1
PT1
PT1
RB1
((N) UPPER CABINETS TYP. PROVIDE
KEYED CAM LOCK ON ALL WALL
CABINETS EXEPT CORNER CABINET.
CABINETS TO ACCOMODATE MISC.
PERSONAL BELONGINGS. SEE OYA-600
FOR MORE INFO.
18"15" 24"
23"
RAISED ACCESS FLOOR
2' - 8"
A P
P R
O X
/8
(N) WINDOWS
WITH VENETIAN
BLINDS. COLOR
TO MATCH PT1.
SILL LOWERED TO
JUST ABOVE RAF.
REFER TO DETAIL
SHEET OYA-600
FOR MORE INFO.
A V
G S
T A
N D
IN
G
E Y
E H
E
IG
H T
/2
.0
.0
S E
A T
E D
E Y
E H
E
IG
H T
/2
.0
3' - 8"
(E) FIRE ALARM
TO REMAIN
(N) ELECTRIC
MOTOR SUN
SHADE AT (E)
WINDOW
PT1
WF1
WF1
(N) MONITORS.
FOLLOW MFR
RECOMENDATIONS
FOR MOUNTING
AND BLOCKING
RB1
RB1
3' - 0" 1' - 6"
RAISED ACCESS FLOOR
2' - 8"
3' - 0"
(N) BASE CABINETS -
CABINETS TO ACCOMODATE
MISC. STORAGE INCLUDING
BUT NOT LIMITED TO
BINDERS, OFFICE SUPPLIES,
BREAK AREA SUPPLIES, ETC.
SEE OYA-600 FOR MORE
INFO.
(E) WINDOWS
(E) COFFEE
MAKER
(E) MICROWAVE
(N) MINI FRIDGE
PT1
RB1
(N) UPPER CABINETS TYP. WITH ABBILITY
TO PROVIDE EXTERNAL LOCK.
CABINETS TO ACCOMODATE MISC.
STORAGE INCLUDING PERSONAL
BELONGINGS. SEE OYA-600 FOR MORE
INFO.
15"15"15"15"15"24"
PT1
RAISED ACCESS FLOOR
2' - 8"
(N) (4)FLAT SCREEN
MONITORS ON WALL
MOUNT ABOVE
WINDOW
(N) (4) FLAT SCREEN
MONITORS
(N) BUILT-IN
CORNER
CASEWORK.
REFER TO DETAIL
SHEET OYA-600
FOR MORE
INFORMATION
(E) WINDOWS
(N) ACOUSTIC
CEILING @ 8' - 0"
ABOVE RAF
(E) GYPSUM CEILING
ABOVE STAIRS TO
REMAIN. PAINT PT1
FINISH FLOOR
0' - 0"
(E) TRANSACTION
DRAWER, (N)
CUSTOM CASEWORK
BUILT TO FIT
(N) ELECTRIC
MOTOR SUN
SHADE AT (E)
WINDOW
(N) ELECTRIC
MOTOR SUN
SHADE AT (E)
WINDOW
PAINT PT1
PAINT PT1
101B
RB1
(N) HANDRAIL. SEE
DETAIL SHEET
OYA-600
(N) HANDRAIL.
MOUNTED TO THE
WALL IF
NECESSARY
TALL
STORAGE
CABINET
OPEN
CUBBIES OR
PERSONAL
LOCKERS
RAISED ACCESS FLOOR
2' - 8"
(N) WALL MOUT
TRASH CAN.
REFER TO
SHEET OYA-001
FOR MOUNTING
HEIGHTS
2' - 6"
11 1/4"
E Q
E Q
E Q
PT2
RB1
RAISED ACCESS FLOOR
2' - 8"
(N) GLOW BOX.
REFER TO
SHEET OYA-001
FOR MOUNTING
HEIGHTS
(N) TOILET SEAT
DISPENSER.
REFER TO
SHEET OYA-001
FOR MOUNTING
HEIGHTS
(N) WALL MOUT
TRASH CAN
(E) MIRROR
PT2
RB1
RAISED ACCESS FLOOR
2' - 8"
FINISH FLOOR
0' - 0"
101A
(E) SECURITY EQUP.
BOARD
(N) DOOR TO
ADMINISTRATION
BUILDING. REFER TO
DOOR SCHEDULE
FOR MORE
INFORMATION
(E) STAIRS TO
REMAIN. PROVIDE
NEW FINISH PANELS
IF NECESSARY AND
REUSE EXISTING
PEDESTALS
(N) NEW RAILING. SEE
DETAIL SHEET
OYA-600
(E) GYP. BD. SOFFIT
PT1
RB1
36"
Date:
Proj. No.:
D S
G N
D R
C H
K A
P V
D
A P
V D
B Y
R E
V
IS
IO
N
D A
T E
N O
PLOT DATE/TIME:
Drawing No.:
P ro je c t T it le
D ra w in g T it le
D
C
B
A
1 2 3 4 5 6
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
www.Jacobs.com
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
07/10/2024
7/10/2024 2:55:07 PM BIM 360://US_D3482000_OYA Control Room Upgrade/Oak_Creek_OYA-Control-Room-Upgrade-ARCH_marcin.krzysik.rvt
IS
S
U E
F O
R R
E V
IS
IO
N
D3482000
M K
J
A M
K J
A J B
J B
OYA-500
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y O
A K
C R
E E
K F
A C
IL
IT
Y
OAK CREEK FACILITY
4400 LOCHNER RD SE
ALBANY, OR 97322
PORTLAND OFFICE
PORTLAND, OR 97201
2020 SW 4TH AVE, SUITE 300
A R
C H
IT
E
C T
U R
E
IN
T E
R
IO
R E
L E
V A
T
IO
N S
/1
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
/0
/2
IS
S
U E
F O
R R
E V
IS
IO
N
/1
/2
IS
S
U E
F O
R R
E V
IS
IO
N
- 1/2" = 1'-0"
1 ELEVATION - CONTROL ROOM NORTH
- 1/2" = 1'-0"
3 ELEVATION - CONTROL ROOM SOUTH
- 1/2" = 1'-0"
4 ELEVATION - CONTROL ROOM EAST
- 1/2" = 1'-0"
5 ELEVATION - CONTROL ROOM WEST
- 1/2" = 1'-0"
6 ELEVATION - RESTROOM NORTH
- 1/2" = 1'-0"
7 ELEVATION - RESTROOM EAST
- 1/2" = 1'-0"
2 ELEVATION - CONTROL ROOM NORTH 1A
Control Room Upgrade Add #3 - Page 7 of 8
A
O U
S T
IC
A
L C
E
IL
IN
G
T
IL
E
G
R
ID
ACT 1
GRID
MANUFACTURER
MODEL
NUMBER / SIZE
COLOR
REMARKS
CLASSIFICATION
MANUFACTURER
STYLE NAME
NUMBER / SIZE
COLOR
AMSTRONG
CALLA
24" X 24"
BLACK
@ CONTROL ROOM
CLASS A
AMSTRONG
INTERLUDE XL
9/16"
BLACK
F L
O O
R
VCT1
AFP1
MANUFACTURER
MODEL
NUMBER / SIZE
COLOR
REMARKS
MANUFACTURER
MODEL
SIZE
TARKETT
12" X 12"
CORTINA GRANDE - BLACK & WHITE
@ RESTROOM / CONTROL ROOM
TATE
STONEWORKS DECORATIV CONCRETE
ACCESS FLOOR PANEL
24" X 24"
FINISH MIDNIGHT
R E
S
IL
IE
N
T B
A S
E
RB1
MANUFACTURER
MODEL
NUMBER / SIZE
COLOR
REMARKS
NOTES
FLEXCO
4"
BLACK
@ RESTROOM / CONTROL ROOM
RUBBER, STRAIGHT
P A
IN
T
PT1
MANUFACTURER
FINISH
NUMBER
COLOR
NOTES
SHERWIN WILLIAMS
SNOWBOUND
@ CONTROL ROOM
EGGSHELL
SW 7004
PT2
MANUFACTURER
FINISH
NUMBER
COLOR
NOTES
SHERWIN WILLIAMS
SNOWBOUND
@ RESTROOM
SATIN
SW 7004
PT3
MANUFACTURER
FINISH
NUMBER
COLOR
NOTES
SHERWIN WILLIAMS
MATCH WITH EXISTING HM FRAMES
@ HM FRAMES
SEMI - GLOSS
TBD
S O
L
ID
S
U R
F A
C E
SS1
MANUFACTURER
FINISH
SIZE
NOTES
CORIAN
1 1/4"
@ COUNTERTOP
SPARKLING GRANITA
R E
S
IL
IE
N
T B
A S
E
RB1
MANUFACTURER
MODEL
NUMBER / SIZE
COLOR
REMARKS
NOTES
FLEXCO
4"
BLACK
@ RESTROOM / CONTROL ROOM
RUBBER, STRAIGHT
W
IN
D O
W F
IL
M
WF1
MANUFACTURER
MODEL
NUMBER / SIZE
COLOR
NOTES
3M
@ CONTROL ROOM
PRIVACY FILM (ONE-WAY)
F
IN
IS
H
LT1
MANUFACTURER
MODEL
NUMBER / SIZE
COLOR
NOTES
FORMICA
@ CABINETS
FINISH OAK
1. VERIFY ALL EXISTING DOOR SIZES, DISCREPANCIES WITH SCHEDULE
SHOULD BE NOTED AND REVIEWED WITH ARCHITECT.
2. HARDWARE SCHEDULE HAS BEEN DEVELOPED FOR DESIGN INTENT ONLY.
HARDWARE PROVIDER IS RESPONSIBLE FOR VERIFYING THE FUNCTION AND
COMPATIBILITY OF ALL COMPONENTS.
3. UNLESS OTHERWISE NOTED, THE HEIGHT OF DOOR HARDWARE HANDSETS
ARE TO MATCH ADJACENT EXISTING HARDWARE.
4. DOOR HARDWARE TO BE COMPLETE IN ORDER TO FUNCTION AS
DESCRIBED IN THESE NOTES, SCHEDULES AND SPECIFICATIONS
5. PROVIDE ALL HARDWARE ACCESSORIES NOT LIMITED TO HINGES,
ASTRAGALS, BOLTS, AUTOMATIC BOLTS, FLUSH BOLTS, AUTOMATIC FLUSH
BOLTS, SMOKE SEALS, COORDINATORS, LOCK SETS, LATCHES, LEVERS
STRIKE PLATES, CLOSERS, KEYS CYLINDERS, STOPS, FLOOR AND WALL
STOPS, SILENCERS, BOTTOMS, SADDLES, TRIM, KICK PLATES, ETC. REFER
TO SPECIFICATIONS.
6. PROVIDE ELECTRIC CAPABILITY FOR DOOR CONTACTS, ACCESS CONTROL,
READERS, ELECTRIC HINGES AND ANY OTHER ELECTRIC REQUIREMENT TO
SATISFY THE FUNCTION OF THE DOORS AS DESCRIBED IN THESE NOTES,
SCHEDULES AND SPECIFICATIONS.
7. SECURITY INTEGRATOR TO INSTALL CARD READER HARDWARE. GC IS
RESPONSIBLE FOR COORDINATING AND INSTALLATION OF HARDWARE WITH
SECURITY AND ELECTRICAL REQUIREMENTS FOR DOORS. GC IS
RESPONSBILE FOR PROVIDING POWER & PATHWAYS AS NEEDED.
8. ALL DOORS AND FRAMES TO BE FACTORY PREPPED TO RECEIVE INTENDED
DOOR HARDWARE, RATED DOORS TO MAINTAIN FIRE RATING.
9. ARCHITECT IS NOT RESPONSIBLE FOR KEYING REQUIREMENTS. GC IS
RESPONSIBLE FOR PROCURING AND INSTALLING ALL CORES & LOCKSETS.
GC TO COORDINATE WITH OWNER'S PM AND BUILDING FACILITIES FOR
KEYING REQUIREMENTS.
10. LOCATION OF DOOR IS DETERMINED BY THE DOOR NUMBER, EXAMPLE:
101A (ROOM NUMBER- 101 DOOR- A).
11. SEE SPECIFICATION 08 34 60 DETENTION DOORS AND FRAMES, 08 71 00
DOOR HARDWARE, 08 80 00 GLAZING AND 08 51 00 METAL WINDOWS FOR
MORE INFORMATION.
WINDOW, DOOR & HARDWARE GENERAL NOTES:
ABS ABS PLASTIC
AL ALUMINIUM
(E) EXISTING
FGR FIRE RATED CERAMIC GLASS
FACT FACTORY FINISH
GL GLASS
HM HOLLOW METAL
MIN MINUTE
MATL MATERIAL
LSS LIFE SAFETY SYSTEM
NR NOT RATED
N/A NOT APPLICABLE
P PAINT
PT PAINTED FINISH
PR PAIR
(R) RELOCATED
SIM SIMILAR
STL STEEL
TEMP TEMPERED
SS STAINLESS STEEL
WD WOOD
WG WIRE GLASS
VN VENEER
DOOR SCHEDULE ABBREVIATIONS:
1. BY MANUFACTURER
2. PANIC HARDWARE
3. 90° SWING
4. 180° SWING
5. CARD READER
6. PROVIDE AUTOMATIC DOOR OPERATOR AND DOOR
ACTUATORS.
7. ELECTRIFIED HARDWARE FOR FUTURE USE.
8. CARD ACCESS CONTROLLED W/ADJACENT DOOR.
9. DOOR IS PART OF GLAZING ASSEMBLY. HARDWARE,
PULLS, AND HINGES PROVIDED BY GLASS VENDOR.
10. DOOR TYPE TO MATCH EXISTING.
11. FIRERATED 90 MIN.
DOOR SCHEDULE KEYNOTES:
STEEL FRAME TYPE
2" 2"
SEE DOOR
SCHEDULE
S E
E D
O O
R S
C H
E D
U L E
STEEL DETENTION
FRAME, TYP.
REFER SPEC
08 34 60 FOR MORE
INFORMATION
WINDOW ELEVATION
DESCRIPTION:
FIXED
S E
E W
IN
D
O W
S C
H E
D U
L E
SEE WINDOW SCHEDULE
2"TYP.
1 3/8" SECURE-
TEM+POLY(SP035).
REFER TO SPEC 08 80 00
FOR MORE INFORMATION
STEEL DETENTION
FRAMES, TYP.
REFER TO WINDOW
SCHEDULE
OYA-600
Sim
OYA-600
Sim
STEEL FRAME TYPE
8" 2"
SEE DOOR
SCHEDULE
S E
E D
O O
R S
C H
E D
U L E
STEEL DETENTION
FRAMES, TYP.
REFER SPEC
08 34 60 FOR
MORE
INFORMATION
1A
STEEL DETENTION
DOOR, TYP.
REFER SPEC
08 34 60 FOR
MORE
INFORMATION
3/4 DIM. CONDUIT;
SEE ELECT FOR
MORE
INFORMATION
AIRTEQ
HARDWARE
9724 x K2S
KEYSWITCH
BOTH SIDES
A B C
FLUSH PANEL FULL VISION LIGHT
PANEL
NARROW LIGHT
VISION PANEL -
TEMP. GLASS
/2
/2
8" 6 1/2"6" 6"
S E
E D
O O
R S
C H
E D
U L E
SEE DOOR SCHEDULE
S E
E D
O O
R S
C H
E D
U L E
SEE DOOR SCHEDULE
S E
E D
O O
R S
C H
E D
U L E
SEE DOOR SCHEDULE
4" x 25"
CLEAR
OPENING
.970" SECURE-
TEM+POLY(SP028). REFER
TO SPEC 08 80 00 FOR
MORE INFORMATION
Date:
Proj. No.:
D S
G N
D R
C H
K A
P V
D
A P
V D
B Y
R E
V
IS
IO
N
D A
T E
N O
PLOT DATE/TIME:
Drawing No.:
P ro je c t T it le
D ra w in g T it le
D
C
B
A
1 2 3 4 5 6
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
www.Jacobs.com
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
07/10/2024
7/10/2024 2:55:07 PM BIM 360://US_D3482000_OYA Control Room Upgrade/Oak_Creek_OYA-Control-Room-Upgrade-ARCH_marcin.krzysik.rvt
IS
S
U E
F O
R R
E V
IS
IO
N
D3482000
M K
J
A M
K J
A J B
J B
OYA-700
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y O
A K
C R
E E
K F
A C
IL
IT
Y
OAK CREEK FACILITY
4400 LOCHNER RD SE
ALBANY, OR 97322
PORTLAND OFFICE
PORTLAND, OR 97201
2020 SW 4TH AVE, SUITE 300
A R
C H
IT
E
C T
U R
E D
O O
R A
N D
R O
O M
F
IN
IS
H
S C
H E
D U
L E
S
F
IN
IS
H
L E
G E
N D
/1
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
/0
/2
IS
S
U E
F O
R R
E V
IS
IO
N
/1
/2
IS
S
U E
F O
R R
E V
IS
IO
N
Level Number Name Area Floor Finish Base Finish North Wall - Finish East Wall - Finish South Wall - Finish West Wall - Finish Ceiling Finish
Level 1 101 CONTROL ROOM 297 SF AFP1 / VCT1 RB1 PT1 PT1 PT1 PT1 ACT1
Level 1 102 RESTROOM 33 SF VCT1 RB1 PT2 PT2 PT2 PT2 PT2
FINISH LEGEND ROOM FINISH SCHEDULE
Mark Room Name Width Height Door Type Door Finish Frame Type Head Detail Sill Detail Frame Finish Hardware Keynote
101A CONTROL ROOM 3' - 0" 7' - 0" C PT2 1A 1/ OYA-600 4/ OYA-600 PT3 7, 11
101B CONTROL ROOM 3' - 0" 7' - 0" EXISTING PT2 EXISTING PT3 (E)
102A RESTROOM 3' - 0" 7' - 0" EXISTING PT2 EXISTING PT3 (E)
DOOR SCHEDULE
Mark Width Height Count Frame Type Glazing Thickness Glazing Type Sill Jamb Comments
01 3' - 8" 5' - 2" 1 2 1 3/8" SECUR-TEM + POLY 7/ OYA-600 7/ OYA-600 MANUAL OPERATED HORIZONTAL VENETIAN BLINDS
01 3' - 8" 5' - 2" 1 2 1 3/8" SECUR-TEM + POLY 7/ OYA-600 7/ OYA-600 MANUAL OPERATED HORIZONTAL VENETIAN BLINDS
WINDOW SCHEDULE
DOOR & WINDOW FRAME TYPE
DOOR TYPE
Control Room Upgrade Add #3 - Page 8 of 8
| Oak_Creek_OYA-Control-Room-Upgrade-ARCH_REV2_Signed.pdf |
| Sheets |
| OYA-000 - COVER SHEET |
| OYA-200 - DEMOLITION PLAN |
| OYA-300 - ENLARGED FLOOR PLAN & FINISH |
| OYA-500 - INTERIOR ELEVATIONS |
| OYA-700 - DOOR AND ROOM SCHEDULES & FINISH LEGEND |