98C3F6F7-A2E4-2584-EE8EB79AF1AA8052.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Franklin County EOC Technology Upgrade
- Solicitation number
- RFP 2026-62-10
- Issued by
- Franklin County, Ohio
About this file
This is a Pricing Response Form from the County, associated with sewer lateral installation services in Columbus, Ohio. The project encompasses sewer connection work for nine residential properties located in the Hague area, with addresses on North Hague Avenue and Britton Avenue. The scope of work includes sewer lateral installation from the lateral stub to the rear of each home, gray and black water lines connection, clear water lines connection, sewer connection permitting and capacity fees, sewage system abandonment, septic tank system (STS) abandonment permitting, residential plumbing permitting, and miscellaneous costs as justified. The properties vary in their linear footage requirements, ranging from 83 to 230 linear feet from the lateral stub to the rear of the home.
The pricing structure requires bidders to provide unit costs and extended costs for each line item. The cost per linear foot for sewer lateral installation is standardized at $3,433.00 across all properties, with an additional cost of $75.00 per linear foot. All other cost categories—including gray and black water lines connection, clear water lines connection, permit and capacity fees, system abandonment costs, plumbing permits calculated at $60.00 plus $15.00 per fixture, and miscellaneous costs—must be itemized by the bidder. The form notes that the County is not responsible for calculation errors resulting from spreadsheet use and requires bidders to verify all values independently. The document also references pre-construction video and photo documentation requirements and specifications for septic tank content pumping and disposal per FCPH standards.
View the file
Other files
Show 40 more
Latest 50 of 149 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hague Approved_Electronic
| APPENDIX B – PRICING RESPONSE FORM | |||||||||||||||
| No. | Address | Property Owner | Area | Estimate of Linear Feet from Lateral Stub to Rear of Home | Cost per Linear Foot for Sewer Lateral Installation(1) | Extended Cost to Install Sewer Lateral (Linear Feet x Cost per Foot) | Cost of Gray & Black Water Lines Connection | Cost of Clear Water Lines Connection | Cost of Sewer Connection Permit & Capacity Fees | Cost of Sewage System Abandonment(2) | Cost of STS Abandonment Permit | Cost of Residential Plumbing Permit ($60.00 plus $15.00 per Fixture) | Miscellaneous Costs (Attach Justification)(1) | TOTAL COST PER PROPERTY | |
| 1 | 1390 N. Hague Ave, Columbus, OH 43204 | Hubert Seifert | |||||||||||||
| Helga Seifert | Hague | 230 | $ 3,433.00 | $ 75.00 | |||||||||||
| 2 | 1487 N. Hague Ave, Columbus, OH 43204 | Kathryn Yazel | Hague | 165 | $ 3,433.00 | $ 75.00 | |||||||||
| 3 | 1580 N. Hague Ave, Columbus, OH 43204 | Jeff Nelson | Hague | 149 | $ 3,433.00 | $ 75.00 | |||||||||
| 4 | 1583 N. Hague Ave, Columbus, OH 43204 | Brian Truitt | |||||||||||||
| Karten Truitt | Hague | 152 | $ 3,433.00 | $ 75.00 | |||||||||||
| 5 | 1685 N. Hague Ave, Columbus, OH 43204 | Sue Turner | Hague | 136 | $ 3,433.00 | $ 75.00 | |||||||||
| 6 | 1763 N. Hague Ave, Columbus, OH 43204 | Bradford Thompson | |||||||||||||
| Linda Thompson | Hague | 132 | $ 3,433.00 | $ 75.00 | |||||||||||
| 7 | 3621 Britton Ave, Columbus, OH 43204 | Lisa Swank | Hague | 83 | $ 3,433.00 | $ 75.00 | |||||||||
| 8 | 3631 Britton Ave, Columbus, OH 43205 | Cheryl Launer | Hague | 84 | $ 3,433.00 | $ 75.00 | |||||||||
| 9 | 3641 Britton Ave, Columbus, OH 43206 | Shirley Skaggs | Hague | 142 | $ 3,433.00 | $ 75.00 | |||||||||
| THE COUNTY IS NOT RESPOSIBLE FOR ANY CALCULATION ERRORS AS A RESULT OF USING THIS SPREADSHEET. ALL VALUES SHOULD BE VERIFED BY THE BIDDER. | Pre-Construction Video/Photo Documentation | ||||||||||||||
| Notes: |
(1) Include total costs of labor, equipment, and materials.
(2) lnclude costs of labor, equipment, and materials to pump and dispose of contents of tank, crush, and fill tank per FCPH specifications.
TOTAL PROJECT COST
File details come from the government source that posted it. Updated .