Franklin County EOC Technology Upgrade
Solicitation number
RFP 2026-62-10
Issued by
Franklin County, Ohio

About this file

This is a specification document for a compressed air compressor system installation required by an unnamed county government. The project involves the procurement and installation of a single compressor system unit that must be delivered and installed by August 17, 2026. The vendor is responsible for furnishing all labor, tools, rigging, and materials necessary to set, assemble, level, anchor, and connect the compressor at the designated location, including mechanical assembly of disassembled components, connection to the existing compressed air distribution header, condensate drain line connection, and verification of all safety devices and controls. The scope also includes factory-authorized startup and commissioning with documented commissioning data submitted within five business days, minimum two-hour on-site operator and maintenance training, and delivery via lift-gate equipped truck with F.O.B. destination terms. A critical requirement mandates that all components must pass through a 46-inch wide doorframe without structural building modifications. The vendor must coordinate delivery access with the county not less than five business days in advance of the scheduled delivery date and provide certified weight data at least ten business days before delivery.

The pricing structure is all-inclusive, covering the system, installation, training, and warranty costs in a single line item cost. Warranty coverage includes 24 months for the compressor pump and 12 months parts and labor for the entire system, both commencing from the date of acceptance. An optional extended warranty coverage for years 1-5 is available at an additional annual rate. The county will furnish electrical rough-in work (conduit, disconnect switch, and branch circuit wiring), compressed air distribution piping beyond the outlet connection point, and a level reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. The vendor is responsible for all required permits, licenses, and calibration certificates at vendor expense. The document does not specify an incumbent provider, contract term beyond installation, or renewal options.

View the file

Other files

File Type Posted
6E289AB6-A1A3-D139-AC198FD956FD1A77.pdf PDF
52DB9448-0DA4-58EC-7CC559390BFA917E.pdf PDF
8BE999EA-C1F3-6CAA-1ED2B57E621612FB.pdf PDF
9705A9CE-B76B-3514-2AB6D46F5013FD96.pdf PDF
2D575AB7-B92A-4C61-DE1B68E18F3B1809.pdf PDF
6D302278-A5F3-8508-AEC851283D91EF01.pdf PDF
CCC737E4-C815-7DA9-BAFDD4D8BCA83EAE.pdf PDF
39A8A9E3-F569-C6B6-B9E7BF50CFDC4F51.pdf PDF
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
8CFF3838-EA7E-33CD-42D86D9937F5AFDB.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
FAFB33F1-A49E-7354-6799AC07E5D29DA0.pdf PDF
1DCD1842-B247-5772-E27F53DB3DE27613.pdf PDF
379F0AFD-BC67-5833-47CED9B9F8A77644.pdf PDF
4ADC244E-B24C-BEC2-4654E43F7ACFB8A4.xlsx XLSX spreadsheet
4491B391-0B2C-57F1-169E865F334A5FAD.xlsx XLSX spreadsheet
98B00E89-F3C2-2215-1B6B7A585EA6B903.pdf PDF
1FF7D8D0-C608-E689-8D121B0F5CC22DA9.pdf PDF
471F2B18-FADB-16E3-6A13A124C82D15B3.pdf PDF
47411393-E3B2-7F55-0865EAB909BEF818.xlsx XLSX spreadsheet
1FF834AF-CB60-B607-A9DD3103FF766EDA.pdf PDF
44F2C847-DCDE-D822-A4337D82DBDE228F.xlsx XLSX spreadsheet
BEA8D216-B719-D18D-2A1EF07B83D22C78.xlsx XLSX spreadsheet
E9905CF7-C973-40FC-678D5FD85143E735.pdf PDF
48FFC2CD-AEC5-7A21-3B4F6E3270F0429B.pdf PDF
DE522D80-FE3B-40B1-1C32D6110AF0CD6F.pdf PDF
BEA8B132-08B9-5848-83E1018BFD8D09C5.xlsx XLSX spreadsheet
F13E338C-C030-4C55-2FE32EE64813CA9E.docx DOCX document
56D200B6-A79A-5846-53B374D48289713F.xlsx XLSX spreadsheet
4ADBDA30-A10A-65AC-2585EBF3396EC49F.pdf PDF
3D557BC1-D80F-2E25-C9390E0BF5A59073.pdf PDF
98C3F6F7-A2E4-2584-EE8EB79AF1AA8052.xlsx XLSX spreadsheet
E13134B7-AC80-2A6B-17903505A1365FE4.pdf PDF
1FF70774-E56E-EAC8-88A7694DAF5EB82C.pdf PDF
4764BD72-A4C9-CB3B-C1392F63B1D7AA28.pdf PDF
455CC78D-B78A-EC66-F7D6D71B8AF36042.pdf PDF
471F0983-EB69-959C-3B62A289547CA11E.xlsx XLSX spreadsheet
47649CE8-A0E3-2433-AC9846884D7DA4C4.pdf PDF
E99082A3-014B-96AB-48063D8559F32599.pdf PDF
56D1E25C-D6F7-A070-782594700401C348.docx DOCX document
340E518F-B0A2-92CD-5CE67BE8C5C74ADC.pdf PDF
48FFA356-A619-FDBE-4B4D833D8E7B2589.pdf PDF
D1C75C4E-ACBE-A700-94A3260C246A50BF.pdf PDF
48FFE6B8-C249-DC8C-BA6A621BAD5FF49F.xlsx XLSX spreadsheet
441CA1BC-A59E-E520-9F472E421C5515A7.pdf PDF
4ADBBFB5-F75A-53E0-AE23AAE483992AC8.pdf PDF
4540076D-DA44-888C-413CAB868FEC6141.xlsx XLSX spreadsheet
8F33C1D9-B606-E1D0-F77CFF24E442EF1B.pdf PDF
1FF7B35A-B067-E38B-5984FBC2B840ECE1.pdf PDF
3CA5BBE9-A618-9D6F-45A1FE1B6F58F0BF.pdf PDF
Show 40 more

Latest 50 of 149 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Quantity Units Description Cost

1 1 Each

Installation by August 17, 2026 (Must be installed by date.) Vendor shall furnish all labor, tools, rigging, and incidental materials required to set, assemble, level, anchor, and connect the compressor system at the designated installation location. Installation shall include: mechanical assembly and re-connection of any components disassembled for transport; connection to the existing compressed air distribution header at the point of connection identified by the County; connection of condensate drain lines to the nearest available floor drain; and verification that all safety devices, gauges, and controls are properly mounted and functional. Electrical rough-in (conduit, disconnect, and branch circuit wiring to the single power connection point on the unit) is the responsibility of the County and shall be completed prior to the Vendor’s installation visit.

Installation to be completed by:

Included

2 1 System

Model Type and Number:

BRAND NAME(s) OR EQUAL PURCHASE

DESCRIPTION:

3 1 System

SITE READINESS: The County shall provide a level, reinforced concrete or structural floor adequate for the unit weight prior to the scheduled installation date. Vendor shall provide certified weight data to the County not less than ten

(10) business days in advance of delivery to allow floor-loading verification. Included

ELECTRICAL ROUGH-IN (COUNTY-FURNISHED):

Electrical conduit, disconnect switch, and branch circuit wiring from the County facility panel to the single power connection point on the compressor unit is the responsibility of the County and shall be completed and inspected before the Vendor’s startup visit. County

COMPRESSED AIR DISTRIBUTION PIPING

(COUNTY-FURNISHED): Compressed air distribution piping beyond the system outlet connection point to the laboratory header is the responsibility of the County and shall be completed prior to the startup and commissioning visit. County

FACTORY-AUTHORIZED STARTUP AND

COMMISSIONING: Documentation of all commissioning data on a startup report to be submitted to the County within five (5) business days of completion. Included

6 1 System Training

OPERATOR AND MAINTENANCE TRAINING: The Vendor’s factory-authorized technician shall conduct on-site operator and maintenance training at the time of startup and commissioning. O&M manual is provided. Training shall be a minimum of two (2) hours in duration.

Included

7 24 Months Warranty – compressor pump ≥ 24 months from acceptance

Included

8 12 Months Warranty – system ≥ 12 months parts and labor

Included

CRITICAL:

All components and sub-assemblies of the air compressor package, whether shipped assembled or knocked down, must be capable of passing through a 46-inch (46") wide doorframe without structural modification to the building.

Included

DELIVERY:

F.O.B. – Destination: System shall be delivered via lift-gate equipped truck to the designated delivery point at the County facility. The Vendor shall offload and stage the equipment at the installation site. Any disassembly required for transport through the 46-inch doorframe shall be documented, and re-assembly instructions shall be provided. Vendor shall coordinate delivery access with the County not less than five

(5) business days before the scheduled delivery date.

Any required permits or licenses are the responsibility and cost of Vendor. Any calibration will have a certificate provided to the County at the responsibility and cost of Vendor. Included

12 All Costs Included

Total Costs with System, Installation, Training, and Warranty $

13 1-5 Annual Rate Optional Extended Warranty Coverage $

Vendor Name

Completed By

Date

File details come from the government source that posted it. Updated .