CHARLES_RFP_Amendment_6.pdf

PDF 501 KB Posted

Attached to
CompreHensive Aircraft Readiness, Lifecycle, Engineering, and Support (CHARLES) Federal contract opportunity
Solicitation number
80JSC022R0014
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This solicitation requests proposals for the CompreHensive Aircraft Readiness, Lifecycle, Engineering, and Support (CHARLES) contract to provide services including flight operations, maintenance, repairs, alterations and engineering for aircraft at multiple National Aeronautics and Space Administration centers. Offerors must provide three-tier aircraft maintenance for the NASA T-38 fleet, WB-57F fleet, Gulfstream aircraft, and Airbus Super Guppy transport. The contract is set aside for small businesses with a North American Industry Classification System code of 488190 and size standard of $35 million. The proposal due date is June 21, 2022. The solicitation requires flight operations, maintenance, engineering and supply chain support for various aircraft including T-38s, WB-57Fs, Gulfstream IIIs, and a Super Guppy operated by NASA centers at Johnson Space Center, Langley Research Center, Goddard Space Flight Center and Wallops Flight Facility.

View the file

Other files for this federal contract opportunity

Other files attached to CompreHensive Aircraft Readiness, Lifecycle, Engineering, and Support (CHARLES), newest first.
File Type Posted
CHARLES_RFP_Amendment_5_A.pdf PDF
Attachment L-4 CHARLES EPM Version M - (Amendment 5).xlsx XLSX spreadsheet
CHARLES_RFP_Amendment_4.pdf PDF
CHARLES_RFP_Amendment_3.pdf PDF
Attachment L-1 CHARLES Resource Planning Document - (Amendment 3).pptx PPTX presentation
Attachment L-4 CHARLES EPM Version K - (Amendment 3).xlsx XLSX spreadsheet
CHARLES Composite Incumbent Rates (Amendment 2).pdf PDF
Attachment L-2-1 Prime and Subcontractor Past Performance Matrix (Amendment 2).xlsx XLSX spreadsheet
CHARLES_RFP_Amendment_2.pdf PDF
Attachment L-1 CHARLES Resource Planning Document - (Amendment 2).pptx PPTX presentation
Attachment L-2-2 Joint Venture Past Performance Matrix (Amendment 2).xlsx XLSX spreadsheet
CHARLES RFP Amendment 1.pdf PDF
J-3-2 Attachment JSC Calibration Items.pdf PDF
J-3-4 Attachment NAMIS Item Master Report.pdf PDF
Attachment L-1-1 TA2 Resources.pptx PPTX presentation
Attachment L-2-3 Past Performance Narrative.pdf PDF
CHARLES_DRFP_Questions_and_Responses.pdf PDF
J-3-3 Attachment JSC Life Support Asset Listing.pdf PDF
J-3-6 LaRC Property List.pdf PDF
Attachment L-1 CHARLES Resource Planning Document.pptx PPTX presentation
Attachment L-3 Past Performance Questionaire.pdf PDF
J-3-7 Attachment WFF Property List (Code 830 Inventory Final 2022-01-07) Too Large.pdf PDF
CHARLES RFP.pdf PDF
CHARLES_Revisions from DRFP to RFP List.pdf PDF
J-3-5 Attachment JSC NASA IAM Listing.pdf PDF
Attachment L-2-1 Prime and Subcontractor Past Performance Matrix.xlsx XLSX spreadsheet
Attachment L-4 CHARLES EPM.xlsx XLSX spreadsheet
CHARLES Questions RFP Form.pdf PDF
J-3-1 Attachment JSC Support Equipment Assets.pdf PDF
Attachment L-2-2 Joint Venture Past Performance Matrix.xlsx XLSX spreadsheet
Attachment L-5 Past Performance Consent Letter.pdf PDF
Attachment L-6 SF1408-14e Pre-award Survey of Prospective Contractor Accounting System.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

Alice Pursell

This is Amendment 6 to the Request for Proposal entitled CompreHensive Aircraft Readiness, Lifecycle, Engineering, and Support (CHARLES). The due date for the proposal has been extended to 1:30pm CDT on June 21, 2022. The purpose of this amendment is to issue the Questions and Responses for the CHARLES Request for Proposal. Attached is Change Page L-784.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

NASA/Johnson Space Center Attn: Darrell Compton/BR 2101 E NASA Parkway Houston, TX 77058-3696

80JSC022R0014

80JSC022R0014

See Block 16C

04/29/2022

6/14/2022

CHARLES RFP Questions and Responses

# Reference Page No. Question Response

76 L-4 CHARLES

EPM; Section C – Statement of Work JSC Appendix C;Section B Table B-4 & B-5;Section L

IRAP, FBR TOPR-

SR (WFF); Sec B pgs B-18 & B- 19;L-805

The Government has included and excluded varying categories within the worksheets of the EPM, Section B, and Section L in the WFF Location. Notably:- WFF Airfield Management Airfield Operations Specialist IV- WFF Airfield Management Airfield Operations Specialist V- WFF Aircraft Support - Accountatnt II- WFF Aircraft Support - Administrative Support II- WFF Aircraft Support - Project Manager I- WFF Aircraft Support - Project Manager III- WFF Aircraft Support - Site Maintenance Manager Question 1: Will the Government clarify if these categories are to be included or excluded within the EPM and Section B? Question 2: Will the Government align the EPM NASA Standard Labor Categories with the identified categories in Sections B, C, and L or vice versa?

Section B separates the Wallops Flight Facility (WFF) between the two task orders. They are combined in Section L and on the Excel Pricing Model. Amendment 3 fixed discrepancies by adding missing positions to Section B.

77 L-781.

L.32(a)(5). (5)

Large tables, charts, graphs, plans, figures, diagrams, and schematics (not text) may be inserted in 11 x 17 inch pages. These 11 x 17 inch pages shall be counted as two pages against the page limitations and shall have one-inch margin on all sides.

Reference 2. RFP Page MA-2.

Compensation Plan. The Offeror shall provide its Total Compensation Plan as prescribed in DRD-M15. All information proposed in the offeror's Total Compensation Plan shall be fully consistent with the cost or price information it submits in Volume III for evaluation under

A. DRD-M15 Total Compensation Plan (TCP) Item (c) (4) rates should be provided within the L-4 Attachment CHARLES Cost Template on the IRAP tab. This is not included in the Mission Suitability page limit. The narrative explanation of the establishment of the rates and escalation provided within DRD-M15 TCP is included in the Mission Suitability page limit.

B. The DRD-M15 TCP table is included in the Mission Suitability page limit.

C. No, the government will not move DRD- M15 Total Compensation Plan to Volume III Cost and Price Factor.

the Cost and Price Factor. Reference 3.

DRD-M15 Compensation Plan. C.3. State contract year one direct labor rates and planned labor rate escalations for exempt and non-exempt employees. Use the IRAP Template to fulfill this requirement.

Reference 4. DRD-M15 Compensation Plan.

C.7. Discuss the contractor's company's fringe benefit policies and practices. Each Offeror must propose a compensation structure that is sufficient to recruit and retain employees.

Concern:

A. References 1, 2, and 3. The tables required to state contract year one labor rates and planned labor rates for exempt and non-exempt employees, using the provided IRAP template (Attachment+L- 4+CHARLES+EPM), will clearly exceed the 10 page (single TCP) or 20 page (separate TCPs for two JV partners). B. References 1, 2, and 4. Using the table provided in DRD- M15, C.7, for detailing the fringe benefits, will exceed the 10 page (singe TCP) or 20 page (separate TCPs for two JV partners) limit on its own. The number of pages increases significantly using 11X17s due to them counting as 2 pages.

Question:

A. Will the Government consider: 1) making the labor rate tables exempt from page count; 2) including the labor rate tables as a page count exempt attachment;

or 3) allowing the offeror to include a reference to the applicable section of Volume III?

B. Will the Government consider 1) making the benefits table exempt from page count; 2) including the tables as a page count exempt attachment; or 3) allowing the offeror to include a reference to the applicable section of Volume III?

C. To preclude any page count issues within the TCP, would the Government consider moving the TCP from Volume I, Mission Suitability Factor to Volume III, Pricing?

78 DRD-M15 3-5 "The TCP has a 10-page limit and requires the Fringe Benefits table from DRD-M15 to be completed without deleting benefit categories (rows) that are not applicable.

The table provided in the DRD is two 11x17 pages long. Per Section L, each 11x17 counts as two pages toward the 10-page limit.

With the level of detail required for each employee category and the 12pt. Arial font requirement for tables and figures, completing this table in less than 10 pages is difficult. Will the Government consider excluding the Fringe Benefits table from page count?"

The chart provided in DRD-M15 shall NOT be excluded from the TCP page count.

79 DRD-M15 1 “(b) Scope: The Total Compensation Plan (TCP) shall identify and discuss wages, salaries, and fringe benefits for professional employees and non-exempt service employees in all proposed labor categories, including those personnel subject to union agreements, the Service Contract Labor Standards, and those exempt from both of the above.”

Are wage and salary information for all employees required as part of the Volume I TCP submission or is that information to be included only in the Volume III EPM?

DRD-M15 (b) Scope is explaining to the reader the purpose of the TCP. Please refer to DRD- M15 (c) Content (4) for specific instruction on how to provide the requested information.

80 Amendment

2 SF30

1 The Government released the Amendment

2 SF30 with a digital signature that does not allow offerors to complete fill-ins and sign. Request Government release an unsigned version of SF30 for Amendment 2.

The government will not be releasing an unsigned version of the SF30

80JSC022R0014

L-784

L.33.1 INTRODUCTION

The contract provides lifecycle, quality, safety, management, program and project support, flight operations, maintenance, and engineering for JSC, LaRC and WFF aircraft operations and other NASA Centers as required and other Government agencies under agreements with NASA. The IDIQ requirements are dynamic and will vary with missions, program phases, and lifecycle of aircraft. Although the level of support is unknown at this time, the identified tasks are known.

The number of aircraft, number of missions, and number of flight hours will drive the pace of maintenance, engineering, program and project support, and flight operations. The aircraft, missions and flight hours will be driven by the requirements of NASA programs.

In providing these instructions, the Government’s intention is to solicit information that will permit a competitive evaluation of the Offeror’s proposal. The information solicited will demonstrate the Offeror’s competence and capability to successfully complete the requirements specified in the CHARLES Statement of Work (SOW).

L.33.2 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE

DATES

(a) The entire proposal is due by June 21, 2022, at 1:30 PM Central Daylight Time. Proposal Volume II, Past Performance, and the Cognizant Federal Agency and Audit Office Template (CFAOT) of Volume III are requested by May 23, 2022, but not officially due until the proposal submittal date. The delivery location is specified in L.33.2.1 Electronic Submission of Proposals

– Proposal Marking and Delivery through NASA’s EFSS Box

(b) Late proposals will not be accepted in accordance with FAR 52.215-1, “Instructions to Offerors – Competitive Acquisition.”

(c) Offerors shall arrange their proposals as set forth below in Table L-2, Overview of Proposal Volumes, Page Limitations, Copies, and Format. Proposal sections excluded from the page limit shall be placed at the end of each volume.

L.33.2.1 ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING

AND DELIVERY THROUGH NASA’S EFSS BOX (NOV 2021)

(a) The offeror shall submit its proposal via NASA’s Enterprise File Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform. Electronic submissions shall not contain hidden formulas, tables, be locked, be password protected, or contain links to data not included in the electronic copy. All electronic submissions should be searchable and should not contain scanned documents, except those documents that must be provided in their native format (e.g., signature pages, prior award fee letters for past performance, DCAA/DCMA approval letters, as applicable). The offeror shall ensure documents are free from viruses and malware, as documents determined by NASA to contain a virus or malware will not be opened or evaluated.

Subcontractors may submit their required proposal information separately using the instructions in this provision. The offeror shall ensure subcontractor submissions are made no later than the date and time specified for proposal submission and comply with all solicitation instructions.

SF30-16c Amendment 6.pdf
CHARLES_RFP_Questions_and_Responses_Set_3_Rev_5.pdf
CHARLES Section L Page L-784 Amendment 6.pdf
2022-06-14T12:04:11-0500
ALICE PURSELL

File details come from the government source that posted it. Updated .