USDV Pre Solicitation Conference Charts.pdf

PDF 739 KB Posted

Attached to
International Space Station Deorbit Capability Federal contract opportunity
Solicitation number
80JSC022ISSDeorbit
Issued by
National Aeronautics and Space Administration Johnson Space Center

View the file

Other files for this federal contract opportunity

Other files attached to International Space Station Deorbit Capability, newest first.
File Type Posted
DRFP Question and Answers Part III.pdf PDF
DRFP Question and Answers Part I.pdf PDF
DRFP Question and Answers Part II.pdf PDF
USDV Presolicitation Questions and Answers.pdf PDF
JPR1040.4.pdf PDF
JWI2190.1.pdf PDF
BG-23-076 DRFP 80JSC023R0003 USDV Cover Letter.pdf PDF
Attachment L-10 Prime and Subcontractor Identification and SOW Division of Work Listing.xlsx XLSX spreadsheet
USDV DRFP Comment Template.xlsx XLSX spreadsheet
USDV Statement of Work (SOW)_Draft.pdf PDF
Attachment L-09 Pre-award Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Attachment J-01 - Data Requirements Deliverable Draft.pdf PDF
Attachment J-38 DD Form 254 Department of Defense Contract Security Classification Specification.pdf PDF
Attachment L-03 Technical Resources Template.xlsx XLSX spreadsheet
Draft RFP 80JSC023R0003.pdf PDF
Attachment J-40 Deliverable Items List.xlsx XLSX spreadsheet
Attachment L-01 USDV Hybrid Cost Price Template.xlsx XLSX spreadsheet
Attachment L-07 Past Performance Matrix.xlsx XLSX spreadsheet
USDV Industry Day Questions and Answers.pdf PDF
Industry Day Charts Final.pdf PDF
USDV Industry Day Charts.pdf PDF
Draft USDV Statement of Work.pdf PDF
Draft USDV Safety and Mission Assurance Plan DRD.pdf PDF
SSP 50964 Visiting Vehicle ISS Integration Plan.pdf PDF
Draft SSP XXXX_ USDV Operations Standards.pdf PDF
ISS Deorbit USOS Concept of Operations Overview.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Aeronautics and Space Administration

Welcome to the Johnson Space Center

United States Deorbit Vehicle (USDV) Pre-Solicitation Conference

May 9, 2023

CUI// SP-PROCURE // SP-SSEL

Submit Questions through the QR code

Agenda

• CUI // SP-PROCURE // SP-SSEL

Speaker Subject

Gary Johnson, Requirements Development Team (RDT) Board Chair

Welcome to Pre-Solicitation Conference

Dana Weigel, ISS Deputy Program Manager

Welcome

Rebekah Anchondo, RDT Member USDV Overview

Ashley Chaves, Contracting Officer Draft RFP Walkthrough

Robert Watts, Small Business Specialist Office of Small Business Programs

Ashley Chaves, Contracting Officer Industry Feedback Requested

Ashley Chaves, Contracting Officer Procurement Schedule and Question & Answer

Purpose of Pre-Solicitation Conference

• The purpose of this Pre-Solicitation Conference is to help Industry understand the Government’s requirements.

• It’s also an opportunity to highlight some of the key areas for which the Government is requesting Industry feedback for the final solicitation.

• CUI // SP-PROCURE // SP-SSEL

Submit Questions through the QR code

Questions

• A question and answer period will be hosted at the end of the presentation.

• Official responses to written questions received by the Contracting Officer will be posted to the USDV Special Notice on Sam.gov.

Pre-Solicitation Conference Logistics

• A copy of this presentation has been posted on the U.S. Deorbit Vehicle (USDV) website at: https://www.nasa.gov/jsc/procurement/usdv

• Please ensure microphones are muted during the presentation.

• Please use the Microsoft Teams chat feature for audio and video connection issues only.

• Clarifications and questions on Pre-Solicitation Conference content will be answered in the Question-and-Answer period.

• Please submit all questions via the Q&A application link provided:

https://johnson.cnf.io/sessions/j6my/#!/dashboard (QR code below)

• CUI // SP-PROCURE // SP-SSEL

Submit Questions through the QR code https://www.nasa.gov/jsc/procurement/usdv https://johnson.cnf.io/sessions/j6my/#!/dashboard

Welcome

Dana Weigel, Deputy Manager International Space Station Program

Page | 5

Concept of Operations

• ISS planned end of life is 2030

• Upon completion of the ISS mission, ISS will be deorbited in a controlled manner into an unpopulated region

– Due to its size, the ISS represents a significant risk to the public if it is allowed to deorbit in an uncontrolled manner

• Given the risk to public safety associated with deorbit of the ISS, the USDV must continue to function after suffering two failures and complete the reentry burn

– Two failure tolerance is required

– Reliability is key and use of flight proven systems or robust testing is critical

– High fidelity hardware/software integrated test and verification campaign is required

• No major changes to the driving functional requirements or USDV concept of operations since RFI #3 in November 2022

• CUI // SP-PROCURE // SP-SSEL

Major Highlights

• Hybrid contract structure with Cost Plus through CDR followed by Firm Fixed Price

• NASA will procure the USDV as a supply

– Acceptance following completion of CLIN 2 prior to Launch Vehicle integration

– Tailored DD250 with Certificate of Compliance

– Targeted insight/oversight throughout project life-cycle

• NASA will perform the USDV flight control through the entire USDV mission

– Provide engineering support in the ISS Mission Evaluation Room (MER)

– Provides input to flight preparation activities

• NASA will procure the USDV Launch Vehicle through the NASA Launch Services Program

(LSP)

– Supports Launch Vehicle integration preparation and execution activities

– Performs USDV ground processing and USDV pre-launch preparation activities

Statement of Work (SOW)

• CUI // SP-PROCURE // SP-SSEL

(1.0) Introduction

(2.0) Overall General Requirements

(3.0) DDT&E Through CDR (CLIN 1)

(4.0) Production, Assembly, Integration and Test (CLIN 2)

(5.0) Dwell (CLIN 3)

(6.0) Launch Vehicle Integration and Sustaining (CLIN 4)

(7.0) Special Tasks and Studies (CLIN 5)

(2.0) Overall General Mission Requirements

(3.0) Design, Development, Test and Evaluation (DDT&E) Through Critical Design Review (CDR) (CLIN 1) (CPIF)

2.1 Program Management

2.2 Business Management

2.3 Configuration Management

2.4 Information Technology

2.5 Export Control Management

2.6 NASA Insight and Approval

2.7 Project Life-Cycle Reviews

2.8 Technical and Program Integration Meetings

2.9 Design, Development, Test, and Evaluation (DDT&E)

2.10 Software Management

2.11 Safety, Reliability, Quality and Mission Assurance

2.12 Risk Management

2.13 Launch Vehicle Integration

2.14 ISS Integration

2.15 Flight Operations

3.1 Resource Management

3.2 Launch Vehicle Integration

3.3 Flight Operations Preparation

3.4 Avionics & Software Simulation and Test Preparation

3.5 Contract Kick-Off

3.6 Mission Concept Review (MCR)

3.7 System Requirements Review (SRR)

3.8 System Definition Review (SDR)

3.9 Preliminary Design Review (PDR)

3.10 Critical Design Review (CDR)

• CUI // SP-PROCURE // SP-SSEL

(4.0) Production, Assembly, Integration and Test (CLIN 2) (FFP)

4.1 General Requirements

4.2 Milestone C2-2 Systems Integration

4.3 Milestone C2-3 AI&T Progress

4.4 Milestone C2-4 System Acceptance

4.5 Milestone C2-5 Shipment to Launch Site

(5.0) Dwell (CLIN 3)

(6.0) Launch Vehicle Integration and Sustaining (CLIN 4)

6.1 General Requirements

6.2 Pre-Launch

6.3 Launch and Flight Operations

6.4 Parts

(7.0) Special Tasks and Studies (CLIN 5)

7.1 Special Studies (SUB-CLIN 5A)

7.2 Pre-Priced Evaluation of NASA Mission Requirements (SUB-CLIN 5B)

• Hybrid Contract beginning with Cost Plus (CLIN 1) followed by Firm Fixed Price (CLIN 2 & beyond)

– CLIN 1 (Cost Plus) concludes when RID/RFAs from CDR are jointly dispositioned and forward actions are identified and agreed to

– Forward actions identified at CDR are completed in CLIN 2 (FFP)

• Acceptance of USDV (DD250) occurs after the following:

– Completion of System Acceptance Review (SAR)

– Completion of Dwell and Dwell Release Review (DRR), if required

– Shipment to the Launch Site Payload Processing Facility (LS PPF)

– Completion of corrective actions and mitigations to address issues identified during shipment to LS PPF Page on CDR and Acceptance

SSP 51101 USDV Systems Requirements Document (SRD)

• Transit and dock to ISS at Node 2 Forward

• Perform ISS translational maneuvers (57 m/s)

• Perform attitude control of ISS integrated stack

• Command and Control from MCC-H

• Two-failure tolerant to catastrophic hazard, where failure to perform the orbit shaping burn(s) and reentry burn is catastrophic

• Function with defined constraints (e.g. 1 year mated to ISS, Operate independent of ISS for 4 days)

• Meet design, construction and testing standards

Section J: Data Requirements Descriptions (J-01)

• CUI // SP-PROCURE // SP-SSEL

Item Document Required for all CLINS

DRD USDV-1 Program Management Plan (PMP) DRD USDV-2 Program Management Review (PMR) DRD USDV-3 Project Life-Cycle Review Plan and Data Packages DRD USDV-4 Concept of Operations (ConOps) DRD USDV-5 Insight Management Plan DRD USDV-6 Work Breakdown Structure (WBS) and WBS Dictionary DRD USDV-7 Integrated Program Management Report (IPMR) DRD USDV-8 Contractor Financial Management Report (NF533)

DRD USDV-9 RESERVED

DRD USDV-10 Organizational Conflicts of Interest (OCI) Plan DRD USDV-11 Small Business Subcontracting Plan and Reports DRD USDV-12 Diversity, Equity, Inclusion, and Accessibility (DEIA) Plan DRD USDV-13 Configuration Management Plan DRD USDV-14 Information Technology Security Management Plan (ITSMP) DRD USDV-15 Export Control Plan DRD USDV-16 Government Property Management Plan DRD USDV-17 Financial Reporting Contractor-Held Property DRD USDV-18 Safety and Health Plan DRD USDV-19 Risk Management Plan (RMP) DRD USDV-20 Safety and Mission Assurance (S&MA) Plan DRD USDV-21 Safety Data Package (SDP) DRD USDV-22 Mishap Preparedness and Contingency Plan DRD USDV-23 Technology Readiness Level (TRL) and Technology Maturity

Assessment DRD USDV-24 Software Management Plan (SMP) DRD USDV-25 Design, Development, Test, and Evaluation (DDT&E) Plan

Required for all CLINS

DRD USDV-26 Verification and Validation (V&V) Plan DRD USDV-27 System Engineering Management Plan (SEMP) DRD USDV-28 Imagery Plan DRD USDV-29 US Deorbit Vehicle (USDV) Transportation and Logistics

Requirements Plan DRD USDV-30 USDV Spacecraft Readiness Plan DRD USDV-31 Data Input for NASA Integration and Independent Verification and

Validation (IV&V) DRD USDV-32 Assembly, Integration, and Test (AI&T) Plan DRD USDV-33 NASA Standards and Specifications Compliance and Tailoring DRD USDV-34 Mass Properties Report DRD USDV-35 Engineering Computer-Aided Design (CAD) Models DRD USDV-36 USDV Acceptance Data DRD USDV-37 Command and Telemetry Dictionary DRD USDV-38 Operations Data Book DRD USDV-39 Models and Simulation Plan DRD USDV-40 USDV Launch Site Integration Plan (LSIP) DRD USDV-41 Launch Site Integration & Test Procedures DRD USDV-42 USDV Launch Commit Criteria (LCC) DRD USDV-43 Post Dock Assessment DRD USDV-44 Qualification and Acceptance Plan DRD USDV-45 Guidance, Navigation and Control (GNC) Controller Model DRD USDV-46 Specification for USDV Hardware In The Loop (HITL) Test Bed DRD USDV-47 Specification for USDV Simulator for ISS Integration Testing DRD USDV-48 Flight Operations Review Data Package

Item Document

General Information

• The USDV contract is a single-award Hybrid Cost-Plus-Incentive Fee and Firm Fixed Price core with Indefinite Delivery Indefinite Quantity (IDIQ) Firm Fixed Price (FFP) task orders

• FAR 15 Contracting by Negotiation

• Full and Open Competition

• NAICS Code 336414, Guided Missile and Space Vehicle Manufacturing and Size Standard 1,250 employees

• Period of Performance:

• Base: Contract Award- 03/31/2031

• Option 1 04/01/2031- 09/30/2031

• Option 2 10/01/2031- 09/30/2032

• Option 2 10/01/2032- 09/30/2033

• Option 3 10/01/2033- 09/30/2034

• Option 4 10/01/2034- 09/30/2035

Section B – I: Contract Schedule and Contract Clauses

• Contract Line Item Number (CLIN) Structure

– CLIN 1: DDT&E Through Critical Design Review (Core) (CPIF)

– CLIN 2: Production, Assembly, Integration and Test (Core) (FFP)

– CLIN 3: Dwell (IDIQ) (FFP)

– CLIN 4: Launch Vehicle Integration and Sustaining (IDIQ) (FFP)

– CLINs 5: Special Tasks and Studies (IDIQ) (FFP)

Section B – I: USDV Pricing Schedules

• CLIN 1 DDT&E THROUGH CDR ESTIMATED COST AND INCENTIVE FEE (CORE)

– Offerors will propose the Target Cost, Target, Minimum, and Maximum fee

– The Government has outlined the cost sharing for cost underruns and overruns as follows:

• Government 60 percent; Contractor 40 percent

– 100% Cost incentive

• Industry input requested on technical performance metric for NASA to consider

• CLIN 2 PRODUCTION, ASSEMBLY, INTEGRATION AND TEST (CORE)

– The CLIN 2 Core firm fixed price of this contract is $OFI*.

• Price for CLIN 2 Core is valid for up to one year beyond the proposed CLIN 2 Core Authority to Proceed (ATP) date

– The CLIN 2A Critical Spares firm fixed price of this contract is $OFI.

• CLIN 3 DWELL (IDIQ)

– Includes storing the USDV in the Dwell facility prior to shipment to the Launch Site Payload Processing

Facility (PPF) and reporting on the Dwell status at the quarterly Program Management Review

– Pricing is outlined on a Firm Fixed Price per Quarter

• CLIN 4 LAUNCH VEHICLE (LV) INTEGRATION AND SUSTAINING (IDIQ)

– LV integration and sustaining engineering and operations including final LV integration and testing, pre-launch preparation, flight execution preparation, launch and flight operations, and procurement of hardware

• CLIN 5 SPECIAL TASKS AND STUDIES (IDIQ) (FFP)

– Special studies and analyses, risk reduction activities, provide materials, and/or fabricate incidental hardware in support of this contract

– Sub-CLIN 5A Special Studies (FFP) IDIQ by GFY

– Sub-CLIN 5B Evaluation Requirements (FFP) IDIQ by GFY

– Sub-CLIN 5A Special Studies (FFP) IDIQ by GFY

– Sub-CLIN 5B Evaluation Requirements (FFP) IDIQ by GFY

• JSC PROCUREMENT INSTRUCTION (JPI) 52.216-90 IDIQ MINIMUM AND MAXIMUM

ORDERING LIMITS (NOV 2018)

– Applies to

• CLIN 3: Dwell

• CLIN 4: Launch Vehicle Integration and Sustaining

• CLIN 5: Special Tasks and Studies

– Minimum ordering value $100,000

– Total IDIQ ceiling: $302 million

Section B – I: Contract Clauses – Special Terms and Conditions

• FAR 52.246-15 CERTIFICATE OF CONFORMANCE

• PRELIMINARY INSPECTION AT SOURCE AND FINAL INSPECTION AND ACCEPTANCE AT

DESTINATION

– DD250 Acceptance will occur after successful completion Milestone C2-5 Shipment to Launch Site

• FAR 52.211-8 TIME OF DELIVERY (JUN 1997)

– Completion of Milestone C2-5 Shipment to Launch Site: September 1, 2027

– Assumes required to launch January 1, 2028

• OPTION TO EXTEND

• NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR

52.245-1. (JAN 2011)

– Attachment J-33, Government Furnished Property, Facilities, and Data/Information

• CROSS-WAIVER OF LIABILITY EXTENDED FOR ISS ACTIVITIES

• NASA intends to pursue approval of such requests for indemnification under Public Law 85-804 for unusually hazardous risks identified in fulfilling the requirements of the USDV contract

• FAR 52.232-32 PERFORMANCE-BASED PAYMENTS

• GOVERNMENT’S RIGHT TO REMOTELY SENSED DATA

• CONTRACTOR ACQUIRED PROPERTY TRANSITION TO FIRM FIXED PRICE

• SPECIAL TOOLING, SPECIAL TEST EQUIPMENT, AND MANUFACTURING AIDS FOR USDV

• CONTRACTOR OBJECTIVES ON USDV

– USDV will not include any payloads for commercial use purposes

• FAR 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED LINE ITEM (CLIN

2A CRITICAL SPARES) (MAR 1989)

• FAR 52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE II (DEC 2007)

[(MODIFIED BY NFS 1852.227-14 (APR 2015)] ALTERNATE III (DEC 2007) ALTERNATE V

(DEC 2007)

Section J: List of Documents, Exhibits, And Other Attachments

• CUI // SP-PROCURE // SP-SSEL

Attachment Title J-01 Data Requirements Description (DRD) J-02 DRD Submission Matrix J-03 Acronyms and Abbreviations J-04 Definitions J-05 Applicable and Reference Documents List J-06 Program Management Plan J-07 Project Life-Cycle Review Plan J-08 USDV System Architecture and Concept of Operations J-09 Insight Management Plan J-10 Organizational Conflicts of Interest (OCI) Plan J-11 Small Business Subcontracting Plan J-12 Diversity, Equity, Inclusion, and Accessibility (DEIA) Plan J-13 Configuration Management Plan J-14 Information Technology Security Management Plan (ITSMP) J-15 Export Control Plan J-16 Government Property Management Plan J-17 Safety and Health Plan J-18 Risk Management Plan (RMP) J-19 Safety & Mission Assurance (S&MA) Plan J-20 Mishap Preparedness and Contingency Plan J-21 TRL and Technology Maturity Assessment Plan J-22 Software Management Plan J-23 Design, Development, Test, & Evaluation (DDT&E) Plan J-24 Verification and Validation (V&V) Plan

Bold/Italic = With Offeror Proposal

Attachment Title J-25 System Enginering Management Plan (SEMP) J-26 Assembly, Integration, and Test (AI&T) Plan J-27 NASA Standards and Specifications Compliance and

Tailoring Approach J-28 Qualification and Acceptance Plan J-29 Integrated Master Schedule J-30 Work Plans J-31 Government Task Agreements J-32 Standard Labor Categories J-33 Government-Furnished Property, Facilities, and

Data/Information J-34 Installation Accountable Government Property J-35 Launch Vehicle Compatibility J-36 Authorized Limited Rights in Data and Restricted Computer

Software J-37 Incentive Fee Plan J-38 DD Form 254 Department of Defense Contract Security

Classification Specification J-39 Propulsion System Development Approach J-40 Deliverable Items List (DIL)

Section J: Work Plans & Milestone Payment Schedule

• CUI // SP-PROCURE // SP-SSEL

Milestone Number

Contractual Due Date Program Event

Payment Percentage for

Milestone

Payment Percentage for Milestone (cumulative

CLIN 2 value)

Payment Amount

C2-1 CLIN 2 ATP plus OFI months

Long Lead Parts OFI% OFI% (NTE 10%) $OFI

C2-2 Milestone C2-4 SAR minus OFI months

System Integration Review (SIR) OFI% OFI% (NTE 40%) $OFI

C2-3 Milestone C2-4 SAR minus 12 months

Assembly Test and Integration Progress Review (APR)

OFI% OFI% (NTE 60%) $OFI

C2-4 OFI System Acceptance Review (SAR) 25% OFI% (NTE 90%) $OFI

C2-5 Launch minus 3 months

Shipment to Launch Site OFI% (Not less than 10%)

100% $OFI

Offerors may propose up to 4 additional interim milestones which are performance based and lead to completion of the NASA mandatory milestone, as long as the % value does not exceed the Payment % for Milestone (cumulative and per milestone (if specified)).

Offeror proposed Interim milestone content (equivalent to SOW for NASA mandatory milestones), must be added to the Work Plan, Part C.

ATP – Authority to proceed OFI – Offeror Fill In NTE – Not to Exceed

CLIN2 (FFP) Work Plan (Attachment J-30, Part B)

Section L & M: Representations and Instructions

• The System for Award Management (SAM) is a Federal Government owned and operated free web site that collects data from suppliers, validates and stores this data, and disseminates it to various government acquisition agencies.

• The SAM website is located at: https://sam.gov/SAM/

• You are required to create an account in SAM.

– Verify that your information in this database is current.

https://sam.gov/SAM/

Section L & M: Representations and Instructions

• ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND DELIVERY

THROUGH NASA’S EFSS BOX

• Period for acceptance of offers: Proposals shall be valid for 365 calendar days from the date specified for receipt of offers

• Government to evaluate the proposed approach based on the following proposal volumes required to be submitted:

– Volume I: Cost and Price

– Volume II: Mission Suitability

– Volume III: Past Performance

– Volume IV: Responsibility and Additional Requirements

– Volume V: Model Contract

Section L: Government Furnished Property and Facilities

• How to request:

– Notify the Government as part of proposal of intention to use or not use the property/facilities

– Fill in the applicable "OFIs" in Attachment J-33, Government-Furnished Property, Facilities, and Data/Information

– Provided on a no-charge-for-use basis in accordance with FAR 52.245-1

• Government Furnished Property (GFP):

– NASA Docking System (NDS) Block 1

– NASA Standard Initiators (NSIs)

– ISS Emulator

– C2V2 Test Assets

• Available Government Furnished Facilities:

– KSC Space Station Processing Facility (SSPF) – availability NET GFY25

• Footprint and standard services 45’x 90’, 4, 050 sq. ft.

• Transfer aisle, airlock, hardware inspection area, etc, 2,900 sq. ft.

– SSPF Administrative Space (maximum 1,500 sq. ft.) – availability NET GFY25

Government Task Agreements – Early Engagement

• Understand Industry is well into establishing their approach for development and delivery of their service/product when the acquisition process is formally initiated.

• JSC wants to engage industry as early as possible in this process to provide timely solutions to Industry needs.

• Use GTAs (Government Task Agreement) to start process (RSAAs dropped from process).

• Our objective is to listen to industry needs/risks and provide awareness into JSC’s capabilities that could meet their needs.

• Offerors have time to balance the capabilities of their Industry team and NASA to create their proposal.

• NASA does not want to be in the critical path of system development or delivery of subsystems but to provide guidance and support.

GTA Engagement Process

• Offerors contact Kristi Duplichen/JSC POC to understand JSC competencies (people, processes, tools and facilities) and request an estimated cost using the GTA form.

– kristi.m.duplichen@nasa.gov

• The JSC POC will coordinate the request with the Contracting Officer and Program Management to assure the request is appropriate.

• The JSC POC will coordinate the GTA requests with program and performing organizations.

– Refine GTA form inputs as needed to meet Offeror’s needs and JSC’s commitments.

• Return costed GTAs to Offerors as early as possible for consideration.

• CUI // SP-PROCURE// SP-SSEL

mailto:kristi.m.duplichen@nasa.gov

Section L & M: Evaluation Criteria

• CUI // SP-PROCURE // SP-SSEL

Price ($) Mission Suitability

Past Performance

Price is approximately equal to the combined importance of the Mission Suitability and Past Performance

As Individual Factors, Mission Suitability is more important than Past Performance.

Section L & M: Evaluation Criteria

• Total Evaluated Price will be the summation of:

1. CLIN 1 - DDT&E through CDR (CPIF) Core Contract by GFY

2. CLIN 2 - Production, Assembly, Integration, and Test (FFP) Core Contract by GFY

3. CLIN 2A - Option (FFP) Core Contract by GFY

4. CLIN 3 - Dwell (FFP) IDIQ, Average GFY 2028-2035 x 2yrs

5. CLIN 4 – Launch Vehicle Integration and Sustaining (FFP) IDIQ by GFY

Pre-Priced Task Order Based on CLIN 4 IDIQ by GFY

6. CLIN 5 - Special Task & Studies

Sub-CLIN 5A Special Studies (FFP) IDIQ by GFY

Sub-CLIN 5B Evaluation Requirements (FFP) IDIQ by GFY

7. Government Task Agreements (GTA)

8. Government Provided (Furnished Property, Facilities, & Data/Information)

Section L & M: Evaluation Criteria – Mission Suitability

• Volume II – Mission Suitability (MS) Factors

– Management Approach – Subfactor 1

– Technical Approach – Subfactor 2

– Small Business Utilization – Subfactor 3

• Mission Suitability Subfactor Weighting Management Approach 200 points

Technical Approach 650 points

Small Business Utilization 150 points

TOTAL 1000 points

Page | 35

• Management Approach Mission Suitability Subfactor 1

– Program Management Plan

• Program Management Plan (DRD USDV-1) (paragraphs a-o)

– NASA Insight Approach

• Insight Management Plan (DRD USDV-5)

– Work Plans

• Attachment J-30 Work Plans, with Offeror’s proposed “OFI”

• Project Life-Cycle and Milestone Review Plan and Data Packages (DRD USDV-3) (paragraph a)

Page | 36

Evaluated for overall demonstrated understanding, reasonableness, feasibility, completeness, and effectiveness and any ensuing impacts and risk to the Government.

• Technical Approach Mission Suitability Subfactor 2

– Specific Technical Understanding and Resources

• Labor resources needed to perform requirements

• Narrative for CLIN2A option, Option For Increased Quantity

• Narrative for Fixed Price IDIQ Task Order, CLIN 4 Launch Site Integration and Sustaining Representative Task Order

• Basis of Estimates (BOEs)

• Technical Resources Template (TRT)

• Integrated Master Schedule Format 6 and Format 5 of the Integrated Program Management Report (DRD USDV-7)

• Attachment J-32 Offeror’s Standard Labor Categories

– USDV System Architecture

• USDV System architecture, system description, and subsystem design concepts

• Performance Capabilities

• Flight-proven designs used in relevant environments, and effort to incorporate them into the USDV System architecture

• Approach to integration of the USDV with the Launch Vehicle, Mission Control Center Houston, and ISS

• Concept of Operations (DRD USDV-4)

• Approach to the Dwell and Sustaining phases to maintain readiness of the USDV

• Technical, schedule, and safety-related risks

Page | 37

Evaluated for overall demonstrated understanding, reasonableness, feasibility, completeness, and effectiveness and any ensuing impacts and risk to the Government.

Section L & M: Evaluation Criteria –Mission Suitability

• Technical Approach Mission Suitability Subfactor 2 cont.

– DDT&E Approach & TRL and Technology Maturation Assessment

• Design, Development, Test and Evaluation (DDT&E) Plan (DRD USDV-25) (paragraph a-j)

• TRL and Technology Maturity Assessment (DRD USDV-23)

• Qualification and Acceptance Plan (DRD USDV-44) (part a)

• Approach to avionics and software development and sustaining

• Approach to the qual and acceptance of flight-proven systems/components

• Approach to propulsion system development, including the testing and qualification approach

– NASA Standards and Specifications Compliance and Tailoring Approach

• NASA Standards and Specifications Compliance and Tailoring (USDV DRD-33) (items a-e)

• Encourage the proposed use of flight-proven alternate standards that have proven successful and reliable

– Launch Vehicle Compatibility

• Attachment J-35, Launch Vehicle Compatibility – compatibility of USDV with a Medium Performance Launch Vehicle

Section L & M: Evaluation Criteria –Mission Suitability

• Technical Approach Mission Suitability Subfactor 2 cont.

– Safety and Mission Assurance (S&MA) Plan

• Safety & Mission Assurance (S&MA) Plan (DRD USDV-20) (Volume 1)

• Safety critical systems/components required to complete the mission, including associated plan for complying with the failure tolerance requirement

• Approach for addressing common cause failures, mitigations, and when similar/dissimilar redundancies are necessary

• Safety critical systems/components that do not meet fault tolerate requirements and the proposed mitigation strategy

• Heritage systems/components planned for use within the USDV design that do not meet two fault tolerance (2FT)/design for minimum risk (DFMR) and any redesigns/tests/analyses that would be necessary to meet

2FT/DFMR

• CUI // SP-PROCURE // SP-SSEL

• Small Business Utilization - Mission Suitability Subfactor 3

– Small Business Subcontracting Plan

• Unique Small Business Subcontracting Goaling approach

• NASA Agency Small Business Subcontracting goals are provided for consideration in the development of individual Offeror Small Business Participation goals

• Small Business Subcontracting Plan and Reports (DRD USDV-11)

– Commitment to the Small Business Program

Small Business Category Goal

Small Businesses (SB) 15.7%

Small Disadvantaged Business Concerns (SDB) 5.0%

Women Owned Small Business Concerns (WOSB) 5.0%

Historically Black Colleges and Universities and Other Minority Institutions (HBCU/MI) 1.0%

HUBZone Small Business Concerns (HBZ) 3.0%

Veteran Owned Small Business Concerns (VOSB) 3.5-4.0%

Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB) 3.0%

• CUI // SP-PROCURE // SP-SSEL

ADJECTIVAL RATING

PERCENTILE

DEFINITIONS

Excellent A comprehensive and thorough proposal of exceptional merit with one or more significant strengths. No deficiency or significant weakness exists.

Very Good A proposal having no deficiency and which demonstrates over-all competence. One or more significant strengths have been found, and strengths outbalance any weaknesses that exist.

Good A proposal having no deficiency and which shows a reasonably sound response. There may be strengths or weaknesses, or both. As a whole, weaknesses not off-set by strengths do not significantly detract from the Offeror's response.

Fair A proposal having no deficiency and which has one or more weaknesses. Weaknesses outbalance any strengths.

Poor A proposal that has one or more deficiencies or significant weaknesses that demonstrate a lack of overall competence or would require a major proposal revision to correct.

Mission Suitability subfactors and the total Mission Suitability factor shall be evaluated using the following adjectival ratings and definitions.

Section L & M: Evaluation Criteria – Past Performance

• CUI // SP-PROCURE // SP-SSEL

• Volume III: Past Performance

– Assessment will only consider recent and relevant work efforts

• Recent: Offeror’s will submit 3 past performance citations going back 10 years.

• Relevant: Government will evaluate the past performance efforts size, content, and complexity.

– Considers requirements similar to USDV and performance related to management, development, production, and operations of a flight proven vehicle in a similar operating environment as the USDV

• Performance:

– Quality, Schedule, Cost control, Small Business Subcontracting, and Utilization, and Safety

– Past Performance evaluated for each Offeror using the following confidence ratings:

– Very High Level of Confidence

– High Level of Confidence

– Moderate Level of Confidence

– Low Level of Confidence

– Very Low Level of Confidence

– Neutral

Technical Library

• Key Technical Library Contents:

– SSP 51101 USDV Systems Requirements Document

– SSP 51105 USDV Integration Plan

– Launch Vehicle Summary

– ISS Deorbit Concept of Operations

• Technical Library can be accessed via Sam.gov

Robert Watts, Small Business Specialist

JSC Office of Small Business Programs

Page | 44

Office of Small Business Programs – Johnson Space Center

• Main phone number: (281) 483-4512

• Robert Watts, Senior Small Business Specialist

• All emails should be sent to: jsc-smallbusiness@mail.nasa.gov

• Location:

Building 1, Suite 453

• Address:

NASA Johnson Space Center, Industry Assistance Office Mail Code: BA 2101 NASA Parkway Houston, TX 77058-3696 mailto:jsc-smallbusiness@mail.nasa.gov

Industry Feedback Requested

• SOW requirements

– Requirements that are overly restrictive/prescriptive, cost drivers, or limiters to viable technologies or flight proven capabilities.

– Understanding of exit criteria associated with Hybrid contract (Cost plus to Fixed Price) and final USDV acceptance

– Feasibility to fit on Medium Class Launch Vehicle

– Understanding of Dwell (CLIN 3) and Launch Site Integration & Sustaining (CLIN 4) scope

• Ability to support required delivery date of September 1, 2027 (to support “contingency” January 2028 launch date)

• Wants/needs for Government Furnished Property, Facilities, or Government Task Agreements for USDV, including use of

– NASA Docking System (NDS)

– Space Station Processing Facility (SSPF)

• Understanding of Option for Increased Quantity (CLIN 2A Critical Spares)

• Understanding of pricing requirements

Milestones for the Acquisition

• CUI // SP-PROCURE // SP-SSEL

Milestone Dates* Draft Request for Proposal (RFP) Release May 4, 2023 Pre-solicitation Conference May 9, 2023 Industry Draft RFP Inputs Due May 31, 2023 Presolicitation Synopsis June 26, 2023 Final RFP Release July 12, 2023 Preproposal Conference July 18, 2023 Proposals Due August 28, 2023 Presentation to Source Selection Official December 13, 2023 Contract Award January 9, 2024

* Dates are tentative

Question & Answer

Page | 48

3 Minute Break for Industry to Submit Questions

Page | 49

15 Minute Break

Page | 50

Q&A Site Closed for New Questions

Question and Answer Period

Page | 51

Thank You

DRFP feedback is requested by May, 31, 2023

Page | 52

Welcome to the Johnson Space Center��United States Deorbit Vehicle (USDV) �Pre-Solicitation Conference
Agenda
Purpose of Pre-Solicitation Conference
Pre-Solicitation Conference Logistics
Welcome��Dana Weigel, Deputy Manager�International Space Station Program
Concept of Operations
Major Highlights
Statement of Work (SOW)
Statement of Work (SOW)
Statement of Work (SOW)
Statement of Work (SOW)
SSP 51101 USDV Systems Requirements Document (SRD)
Section J: Data Requirements Descriptions (J-01)
General Information
Section B – I: Contract Schedule and Contract Clauses
Section B – I: USDV Pricing Schedules
Section B – I: USDV Pricing Schedules
Section B – I: USDV Pricing Schedules
Section B – I: USDV Pricing Schedules
Section B – I: USDV Pricing Schedules
Section B – I: USDV Pricing Schedules
Section B – I: USDV Pricing Schedules
Section B – I: Contract Clauses – Special Terms and Conditions
Section B – I: Contract Clauses – Special Terms and Conditions
Section B – I: Contract Clauses – Special Terms and Conditions
Section J: List of Documents, Exhibits, And Other Attachments
Section J: Work Plans & Milestone Payment Schedule
Section L & M: Representations and Instructions
Section L & M: Representations and Instructions
Section L: Government Furnished Property and Facilities
Government Task Agreements – Early Engagement
GTA Engagement Process
Section L & M: Evaluation Criteria
Section L & M: Evaluation Criteria
Section L & M: Evaluation Criteria – Mission Suitability
Section L & M: Evaluation Criteria – Mission Suitability
Section L & M: Evaluation Criteria – Mission Suitability
Section L & M: Evaluation Criteria –Mission Suitability
Section L & M: Evaluation Criteria –Mission Suitability
Section L & M: Evaluation Criteria – Mission Suitability
Section L & M: Evaluation Criteria – Mission Suitability
Section L & M: Evaluation Criteria – Past Performance
Technical Library
Robert Watts, Small Business Specialist��JSC Office of Small Business Programs
Office of Small Business Programs – Johnson Space Center
Industry Feedback Requested
Milestones for the Acquisition
Question & Answer
3 Minute Break for Industry to Submit Questions
15 Minute Break
Question and Answer Period
Thank You��DRFP feedback is requested by May, 31, 2023

Accessibility Report

Filename:

USDV Pre Solicitation Conference Charts.pdf

Report created by:

Organization:

[Enter personal and organization information through the Preferences > Identity dialog.]

Summary

The checker found no problems in this document.

Needs manual check: 0

Passed manually: 2

Failed manually: 0

Skipped: 1

Passed: 29

Failed: 0

Detailed Report

Document

Rule Name Status Description

Accessibility permission flag Passed Accessibility permission flag must be set

Image-only PDF Passed Document is not image-only PDF

Tagged PDF Passed Document is tagged PDF

Logical Reading Order Passed manually Document structure provides a logical reading order

Primary language Passed Text language is specified

Title Passed Document title is showing in title bar

Bookmarks Passed Bookmarks are present in large documents

Color contrast Passed manually Document has appropriate color contrast

Page Content

Rule Name Status Description

Tagged content Passed All page content is tagged

Tagged annotations Passed All annotations are tagged

Tab order Passed Tab order is consistent with structure order

Character encoding Passed Reliable character encoding is provided

Tagged multimedia Passed All multimedia objects are tagged

Screen flicker Passed Page will not cause screen flicker

Scripts Passed No inaccessible scripts

Timed responses Passed Page does not require timed responses

Navigation links Passed Navigation links are not repetitive

Forms

Rule Name Status Description

Tagged form fields Passed All form fields are tagged

Field descriptions Passed All form fields have description

Alternate Text

Rule Name Status Description

Figures alternate text Passed Figures require alternate text

Nested alternate text Passed Alternate text that will never be read

Associated with content Passed Alternate text must be associated with some content

Hides annotation Passed Alternate text should not hide annotation

Other elements alternate text Passed Other elements that require alternate text

Tables

Rule Name Status Description

Rows Passed TR must be a child of Table, THead, TBody, or TFoot

TH and TD Passed TH and TD must be children of TR

Headers Passed Tables should have headers

Regularity Passed Tables must contain the same number of columns in each row and rows in each column

Summary Skipped Tables must have a summary

Lists

Rule Name Status Description

List items Passed LI must be a child of L

Lbl and LBody Passed Lbl and LBody must be children of LI

Headings

Rule Name Status Description

Appropriate nesting Passed Appropriate nesting

Back to Top