International Space Station Deorbit Capability Federal contract opportunity
Solicitation number
80JSC022ISSDeorbit
Issued by
National Aeronautics and Space Administration Johnson Space Center

View the file

Other files for this federal contract opportunity

Other files attached to International Space Station Deorbit Capability, newest first.
File Type Posted
DRFP Question and Answers Part III.pdf PDF
DRFP Question and Answers Part I.pdf PDF
DRFP Question and Answers Part II.pdf PDF
USDV Presolicitation Questions and Answers.pdf PDF
JPR1040.4.pdf PDF
JWI2190.1.pdf PDF
USDV Pre Solicitation Conference Charts.pdf PDF
BG-23-076 DRFP 80JSC023R0003 USDV Cover Letter.pdf PDF
Attachment L-10 Prime and Subcontractor Identification and SOW Division of Work Listing.xlsx XLSX spreadsheet
Draft RFP 80JSC023R0003.pdf PDF
Attachment J-40 Deliverable Items List.xlsx XLSX spreadsheet
Attachment L-01 USDV Hybrid Cost Price Template.xlsx XLSX spreadsheet
Attachment L-07 Past Performance Matrix.xlsx XLSX spreadsheet
USDV DRFP Comment Template.xlsx XLSX spreadsheet
USDV Statement of Work (SOW)_Draft.pdf PDF
Attachment L-09 Pre-award Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Attachment J-01 - Data Requirements Deliverable Draft.pdf PDF
Attachment J-38 DD Form 254 Department of Defense Contract Security Classification Specification.pdf PDF
Attachment L-03 Technical Resources Template.xlsx XLSX spreadsheet
USDV Industry Day Questions and Answers.pdf PDF
USDV Industry Day Charts.pdf PDF
Draft SSP XXXX_ USDV Operations Standards.pdf PDF
Draft USDV Statement of Work.pdf PDF
Draft USDV Safety and Mission Assurance Plan DRD.pdf PDF
SSP 50964 Visiting Vehicle ISS Integration Plan.pdf PDF
ISS Deorbit USOS Concept of Operations Overview.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Welcome to the Johnson Space Center

U.S. Deorbit Vehicle (USDV) Industry Day

December 7, 2022 Virtual via Microsoft Teams

9:00 AM Central Time

Submit Industry Day Questions through the QR code

Welcome to the U.S. Deorbit Vehicle Industry Day

Ashley Chaves Contracting Officer

Submit Questions through the QR code

Agenda

Speaker Subject

Ashley Chaves, Contracting Officer Welcome to Industry Day, Introductions

Eric Schell, Office of Procurement Welcome

Robert Watts, Small Business Specialist Small Business Introduction

Dana Weigel, Bill Spetch, Rebekah Anchondo, and Teresa Tan Technical Overview

Ron Diftler, JSC Partnership Office NASA Facilities and Resources

Ashley Chaves, Contracting Officer Procurement Details and Schedule

Ashley Chaves, Contracting Officer Question & Answer Period

All Industry Day questions submitted; ~15-minute break

Disclaimer

• These slides are for information and planning purposes only. No solicitation exists at this time.

• This presentation shall not be construed as a commitment by the Government or as a comprehensive description of any future requirements.

• If a solicitation is released, it will be synopsized on the Government-wide point of entry (GPE), as defined by FAR 2.101.

Goals of Industry Day

• Promote competition on the proposed acquisition

• Develop Industry’s understanding of the Government’s objectives and

Concept of Operations

• Provide Industry with the opportunity to meet with the Government early enough in the procurement process to provide input into the U.S. Deorbit Vehicle (USDV) procurement strategy

• Encourage offerors to submit questions and comments electronically via an email to the Contracting Officer, or via the Q&A application during Industry Day.

– The Government will respond officially to all questions submitted by posting them to the Government-wide point of entry (GPE) and USDV websites.

Industry Day Logistics

• A copy of this presentation has been posted on the U.S. Deorbit Vehicle (USDV) website at: https://www.nasa.gov/jsc/procurement/usdv

• Please ensure microphones are muted during the presentation.

• Please use the Microsoft Teams chat feature for audio and video connection issues only.

• Clarifications and questions on Industry Day content will be answered in the Question-and-Answer period.

Submit Questions https://www.nasa.gov/jsc/procurement/usdv

Responses to Questions

• Please submit all questions via the Q&A application link provided:

https://johnson.cnf.io/sessions/pzfb/#!/dashboard (QR code below)

• Questions are encouraged. Industry is requested to submit the questions timely to ensure NASA receives them.

• NASA will take a ~15-min break during this presentation to review the questions received before returning to the meeting to answer them.

• Questions will be addressed verbally by NASA during the Questions and Answer period of the presentation and subsequently posted to both the GPE and the USDV Procurement website.

• Verbal answers will not be considered official.

• If a difference exists between verbal and written responses to questions, the written responses shall govern.

Submit Questions https://johnson.cnf.io/sessions/pzfb/#!/dashboard

Welcome

Eric Schell, Executive Officer Office of Procurement

Welcome

Robert Watts, Small Business Specialist Office of Small Business Programs

Office of Small Business Programs Johnson Space Center Contact Information

• Main phone number: (281) 483-4512

• Robert Watts, Senior Small Business Specialist

• Monica Craft, Small Business Specialist

• Tumarrow Romain, Small Business Specialist

• All emails should be sent to: jsc-industry-assistance@mail.nasa.gov

• Location: Building 1, Suite 453

• Address:

NASA Johnson Space Center, Industry Assistance Office Mail Code: BA 2101 NASA Parkway Houston, TX 77058-3696 mailto:jsc-industry-assistance@mail.nasa.gov

Technical Overview

Dana Weigel, Deputy Manager, ISS Program Bill Spetch, Manager, ISS Vehicle Office Rebekah Anchondo, ISS Vehicle Office

Teresa Tan, Executive Officer, ISS Safety Review Panel

ISS Introduction

Dana Weigel, Deputy Manager International Space Station Program

International Space Station Program

• For over 2 decades the International Space Station (ISS) has been a world-renowned laboratory in Low Earth Orbit

– ISS weighs ~450,000 kgs and is 357 ft long (about the size of a football field)

– Over 3000 experiments conducted by over 4400 investigators representing 109 countries/areas

ISS Deorbit Introduction

• ISS planned end of life is 2030

• Upon completion of the ISS mission, the vehicle must be deorbited in a controlled manner

– Due to its size, the ISS represents a significant risk to the public if it is allowed to deorbit in an uncontrolled manner

• Given the risk to public safety associated with deorbit of the ISS, the USDV must continue to function in the case of failures and complete the reentry burn

– High reliability is a must as fault tolerance will only provide so much

– Reliability is key and use of flight proven systems or robust testing is critical

– System must fail functional

ISS End of Life Concept of Operations

Bill Spetch, Manager ISS Vehicle Office

• NASA will notify USDV of the needed launch date one year in advance.

– The USDV will provide a contingency capability to deorbit ISS earlier than the planned end of life should it become necessary

– To support this capability, the USDV would enter a dwell period until launch call up

• USDV will dock to ISS Node 2 Forward approximately 1 year prior to reentry

– ISS is designed to be maintained by crew and thus the plan is to dock the USDV prior to the ISS final crew departure

– 1 year ensures deorbit vehicle arrival prior to ISS dropping below reasonably maintainable altitude

– Current ISS operating altitude ~416 km; deorbit vehicle arrival above ~370-400 km

• ISS altitude will naturally lower over the course of months to 1 year until the USDV performs a series of final deorbit burns

– Decrewing of ISS should occur as late as possible to mitigate ISS maintenance risks

– The Russian Segment is prime for providing attitude control, altitude maintenance, active lowering of ISS altitude, and debris avoidance however USDV will have the capability to perform these functions in a contingency scenario

– The USDV will be responsible for the delta-v necessary for controlled reentry (including final orbit shaping), as well as attitude control at lower altitudes

• NASA will identify the target reentry for an uninhabited area of the ocean with a capture perigee of 50 km, ensuring a debris footprint of less than 6,000 km

– For all deorbit operations, NASA will perform the analysis to determine burn targets and durations the USDV will execute

Con Ops – Nominal Deorbit Timeline

IS

S

A lti tu de

(k ilo m et er s)

Final Reentry Burn (~150km)

Propulsive ACS Required (220km)

Deorbit Shaping Burn (~220km)

Min. USCV Rendezvous Altitude (333km)

~1 year

Min. ISS Maintenance Altitude (370km)

USDV Rendezvous (370- 400km)

Note: ISS altitude decay, deorbit timeframe, and ISS altitude at time of deorbit vehicle rendezvous varies with solar cycle.

Potential Active Orbit Lowering Burns (RS Support)

•Decrew ISS as late as possible to minimize crit system risk •Russians provide attitude control, altitude maintenance and debris avoidance up to the final deorbit activities

Current ISS Operating Altitude (416km)

Final ISS Crew Departure (333km) https://www.nasa.gov/msfcsolar

Con Ops – Orbit Lowering Strategy

ISS Altitude (km) Approximate Time to ReentryApogee Perigee Description

270 40-50 days Phase repeat orbit (4-day ground track repeat). Natural orbital decay for ISS from this altitude is expected to be approximately two months.

220 3-4 days

ISS attitude control accomplished via thrusters only. ISS Control Moment Gyros (CMGs) are no longer able to provide attitude control. Initiate shaping burn to establish a 220 x 165 km elliptical orbit.

220 165 3-4 days Performing initial shaping burn at 220 km reduces total duration on propulsive attitude control. Will naturally decay until perigee reaches approximately 145 km before performing final burn.

170 150 ≤ 2 orbits Approximate altitude of final deorbit burn. NASA plans no more than two orbits with perigees below this value.

130 < 1 orbit Estimated minimum operational altitude of USOS external avionics and systems.

110-120 Altitude at which US solar arrays and radiators are expected to separate (based on observed Mir re-entry).

84-100 Estimated module rupture altitude. [TBC]

70-75 Maximum allowable vacuum perigee that will cause ISS fragments to lie within a 6000 km footprint [TBC].

Guaranteed capture. 50 km vacuum perigee is the NASA Std

8719.14 requirement for re-entry targeting in all new NASA programs.

• Propulsive attitude control is required at altitudes below 220 km. Beyond this point, CMGs can no longer control attitude

• USDV will establish an elliptical orbit of 220 x 165 km through a series of burns to minimize duration of propulsive attitude control (~17 m/s)

• Final deorbit burn initiated and completed prior to reaching altitudes of concern for ISS systems such as avionics function or appendage separation

• Final burn will target 30 m/s within 30 minutes

– Supports perigee of 50 km

– Guarantee atmospheric capture

• The thrust for deorbit operations is bounded by the limits that ISS structure can tolerate (maximum thrust), and the thrust necessary to complete the reentry burn of 30 m/s within 30 minutes (minimum thrust)

ISS End of Life – Alternate Options Considered

• Boost ISS to a stable parking orbit

– Typical parking orbits are above 40,000 km

Requires greater than 3900 m/s delta V as compared to ~47 m/s for deorbit

– Total propellant required for this would be over 900,000 kg

Equivalent to the payload capacity of ~150-250 ISS cargo vehicles

• Partial disassembly of ISS elements for return or disposal

– ISS has complex hardware and avionics integration and would require significant investment for removal of any elements.

– Would require multiple vehicle launches and returns/disposals to support

– No transportation system to safely deorbit or return modules exists today

Development of this capability is more complex than the USDV due to complexity of disassembly ops and surviving entry and landing for a return case

Alternate concepts were evaluated and determined not to be feasible.

USDV Requirements Overview

Rebekah Anchondo ISS Vehicle Office

• SSP 51101 USDV Systems Requirements Document (SRD) defines the requirements for the USDV to deliver a robust and reliable ISS deorbit service

• USDV SRD and safety requirements apply to the entire USDV mission beginning to LV separation

• Key functions required of the USDV:

– Transit and dock to ISS

– Impart a total of 57 m/s for translational maneuvers

– Attitude Control of ISS integrated stack

– Detect Attitude and Translational Faults

– Communication between USDV and USDV control center

Maneuver Delta-V (m/s) Debris Avoidance/Orbit Phasing Burn Reserve 2 Deboost – Altitude Lowering Reserve 8 Orbit Shaping Burn(s) – Perigee Lowering 17 Reentry Burn (completed in 30 minutes) 30

USDV SRD

released in RFI #3 https://sam.gov/opp/88ba9920f5684d06aacfd7c416d3d510/view

• USDV must account for the following constraints:

– Function during and after exposure to ISS Environments for at least 1 year

– Operate independent of ISS services for 4 days during the deorbit sequence

Higher risk posture of ISS functionality below this altitude

– Limit thrust loads for translational maneuvers at ISS interface

– Limit loading from attitude control and translational maneuvers such that it does not cause ISS components to exceed limit loads Complex ISS structure requires close collaboration on integrated controller development to ensure USDV propulsive control does not cause loads exceedances

• ISS interfaces are unchanged and well defined, and are levied in the SSP

51101 USDV SRD

Safety & Reliability

Teresa Tan, Executive Officer ISS Safety Review Panel

Safety and Reliability

• Reliability of a first flown unique vehicle is key and relies on flight proven systems or robust testing

• Using existing ISS Safety Review Process with significant focus on reliability on the USDV

– Reliability Data will be a key part of the deliverables and safety assessment

– USDV participation in Probability Risk Assessment (PRA) is also critical

• Implementation of standard two fault tolerant (2FT) to a catastrophic hazard is required

– For USDV mission, fail safe means fail functional. Mission success = public safety

• Lack of ability to meet 2FT will have rigorous reliability standards focusing on testing of margins in the environments (natural and induced), flight pedigree, number of qualification units tested, testing to failure, life cycle tests, etc.

• NASA will institute thorough insight/oversight model into safety critical items and processes

• Heritage hardware with flight proven history in relevant environments has the highest reliability

Launch Vehicle and Operations Requirement Summary

Dana Weigel, Deputy Manager International Space Station Program

Launch Vehicle

• Launch vehicle will be required to have an LSP Cat 3 certification

• Current generation of Category 3 Launch Vehicles is phasing out, with replacements in early development

– Presents a challenge with launch vehicle selection this early

• Options under consideration for the Launch Vehicle procurement strategy:

– USDV contractor to provide full range of services including Launch Services Program

(LSP) Category 3 certified Launch Vehicle

– USDV procured separately, with NASA utilizing NASA Launch Services II (NLS II) contract to provide the Launch Vehicle

USDV Operations NASA is seeking industry feedback on multiple procurement approaches for operations of the

USDV

• Option 1: Services: End-to-End Operations

– Government procures the USDV as a service, including operation and real-time flight control of the USDV

– NASA insight and approval over USDV operations and integrated ISS/USDV operations

• Option 2: Services: Support to NASA Operations

– Government procures the USDV as a service, but NASA operates and performs real-time flight control of the

USDV, with contractor providing real-time engineering support.

– NASA develops USDV operations products, performs USDV crew / flight controller training and performs USDV real-time flight control

• Option 3: Supply: Support to NASA Operations

– Government procures USDV as supply and NASA operates and performs real-time flight control of the USDV, with contractor providing real-time engineering support.

– NASA develops USDV operations products, performs USDV crew / flight controller training and performs USDV real-time flight control

NASA Partnering Overview

Ron Diftler, NASA Center USDV Partnership Lead

Early Engagement on Potential GTAs for USDV

• We understand industry is establishing their approach for development and delivery of their service/product when the acquisition process is formally initiated

• NASA wants to engage industry as early as possible in this process to provide timely solutions to industry needs – draft Government Task Agreements (GTAs)

• Our objective is to listen to industry needs/risks and provide awareness into NASA’s capabilities that could meet their needs

• Offerors have time to balance the capabilities of their industry team and NASA to create their proposal

• NASA does not want to be in the critical path of system development or delivery of services, but to provide guidance and support

Engagement Process

• Offerors may contact the NASA Center USDV Partnership Lead (PL) to understand NASA Center Capabilities (people, processes, tools and facilities) and request an estimated cost using the GTA form

• The NASA Center USDV Partnership Lead will:

– coordinate the request with the Contracting Officer and the technical POC for partnerships to assure the request is appropriate

– coordinate the GTA requests with ISS Program and Performing Organizations

– return costed GTAs to Offerors as early as possible for consideration

Procurement Details & Schedule

Ashley Chaves, Contracting Officer

The procurement strategy for USDV is still being developed.

All details and comments discussed in the following charts are tentative and subject to change prior to the release of the Draft RFP.

Procurement Details

• This is not a follow-on procurement; no current contract exists.

• NAICS Code: 336414, Guided Missile and Space Vehicle Manufacturing

• Small Business Size Standard: 1,250 employees

• PSC Code: V126, Transportation/Travel/Relocation- Transportation: Space Transportation/Launch

• A Request for Information (RFI) related to the USDV procurement was released on August 19, 2022. Reference: 80JSC022ISSDeorbit.

• The contemplated Period of Performance is 8 years.

• The Government is contemplating multiple contract types

– Industry input is requested in RFI #3 concerning acquisition strategy

Questions to Industry

• Responses to RFI #3 are due by December 21, 2022, at 3:00PM Central

Submit Questions

Procurement Schedule

• The Government does intend to issue a Draft Request For Proposal

(RFP).

• Following the release of the draft RFP, Industry will have an opportunity to submit anonymous questions in writing so that the Government may officially respond.

• Current Schedule:

• Draft RFP – March 2023

• Final RFP release –May 2023

• Pre-Proposal Conference –May 2023

• Proposals due – 60 days after final RFP

• Contract Award – November 2023

• The procurement schedule will be posted to the procurement website as soon as it is available.

Question & Answer

Ashley Chaves, Contracting Officer

3 Minute Break for Industry to Submit Questions

15 Minute Break

Q&A Site Closed For New Questions

Question and Answer Period

One-on-One Communication with Industry

• December 7th - 8th, with Dec 9th reserved as a backup.

• No more than six (6) individuals may represent any party or team of parties.

• Only one meeting will be allowed per company.

• Meetings will not exceed 50 minutes in length.

How to Get Connected

• USDV Procurement Website https://www.nasa.gov/jsc/procurement/usdv

• NASA/JSC Contract Opportunities https://sam.gov/

• JSC Procurement Website http://procurement.jsc.nasa.gov/

• JSC Partnerships Office https://www.nasa.gov/centers/johnson/partnerships/jsc-capabilities

• Industry Assistance Office, JSC Bldg. 1 jsc-industry-assistance@mail.nasa.gov https://www.nasa.gov/jsc/procurement/usdv https://sam.gov/ http://procurement.jsc.nasa.gov/ https://www.nasa.gov/centers/johnson/partnerships/jsc-capabilities mailto:jsc-industry-assistance@mail.nasa.gov

Thank you for attending!

Visit:

https://www.nasa.gov/jsc/procurement/usdv https://www.nasa.gov/jsc/procurement/usdv

������Welcome to the �Johnson Space Center �U.S. Deorbit Vehicle (USDV)� Industry Day���December 7, 2022�Virtual via Microsoft Teams�9:00 AM Central Time����������
������Welcome to the U.S. Deorbit Vehicle Industry Day��Ashley Chaves�Contracting Officer����������
Agenda
Disclaimer
Goals of Industry Day
Industry Day Logistics
Responses to Questions
Welcome��Eric Schell, Executive Officer�Office of Procurement�
Welcome��Robert Watts, Small Business Specialist�Office of Small Business Programs
Office of Small Business Programs �Johnson Space Center Contact Information
Technical Overview��Dana Weigel, Deputy Manager, ISS Program�Bill Spetch, Manager, ISS Vehicle Office�Rebekah Anchondo, ISS Vehicle Office�Teresa Tan, Executive Officer, ISS Safety Review Panel�
ISS Introduction��Dana Weigel, Deputy Manager�International Space Station Program
International Space Station Program
ISS Deorbit Introduction
ISS End of Life Concept of Operations��Bill Spetch, Manager�ISS Vehicle Office
ISS End of Life Concept of Operations
ISS End of Life Concept of Operations
Con Ops – Nominal Deorbit Timeline
Con Ops – Orbit Lowering Strategy
ISS End of Life – Alternate Options Considered
USDV Requirements Overview��Rebekah Anchondo�ISS Vehicle Office
USDV Requirements Overview
USDV Requirements Overview
Safety & Reliability��Teresa Tan, Executive Officer �ISS Safety Review Panel
Safety and Reliability
Launch Vehicle and Operations�Requirement Summary��Dana Weigel, Deputy Manager�International Space Station Program
Launch Vehicle
USDV Operations
NASA Partnering Overview
Early Engagement on Potential GTAs for USDV
Engagement Process
Procurement Details & Schedule��Ashley Chaves, Contracting Officer
Procurement Details
Questions to Industry
Procurement Schedule
Question & Answer��Ashley Chaves, Contracting Officer
3 Minute Break for Industry �to Submit Questions
15 Minute Break
Question and Answer Period
One-on-One Communication with Industry
How to Get Connected
Thank you for attending!��Visit:��https://www.nasa.gov/jsc/procurement/usdv �

Accessibility Report

Filename:

Industry-Day-Charts-Final.pdf

Report created by:

Organization:

[Enter personal and organization information through the Preferences > Identity dialog.]

Summary

The checker found no problems in this document.

Needs manual check: 2

Passed manually: 0

Failed manually: 0

Skipped: 1

Passed: 29

Failed: 0

Detailed Report

Document

Rule Name Status Description

Accessibility permission flag Passed Accessibility permission flag must be set

Image-only PDF Passed Document is not image-only PDF

Tagged PDF Passed Document is tagged PDF

Logical Reading Order Needs manual check Document structure provides a logical reading order

Primary language Passed Text language is specified

Title Passed Document title is showing in title bar

Bookmarks Passed Bookmarks are present in large documents

Color contrast Needs manual check Document has appropriate color contrast

Page Content

Rule Name Status Description

Tagged content Passed All page content is tagged

Tagged annotations Passed All annotations are tagged

Tab order Passed Tab order is consistent with structure order

Character encoding Passed Reliable character encoding is provided

Tagged multimedia Passed All multimedia objects are tagged

Screen flicker Passed Page will not cause screen flicker

Scripts Passed No inaccessible scripts

Timed responses Passed Page does not require timed responses

Navigation links Passed Navigation links are not repetitive

Forms

Rule Name Status Description

Tagged form fields Passed All form fields are tagged

Field descriptions Passed All form fields have description

Alternate Text

Rule Name Status Description

Figures alternate text Passed Figures require alternate text

Nested alternate text Passed Alternate text that will never be read

Associated with content Passed Alternate text must be associated with some content

Hides annotation Passed Alternate text should not hide annotation

Other elements alternate text Passed Other elements that require alternate text

Tables

Rule Name Status Description

Rows Passed TR must be a child of Table, THead, TBody, or TFoot

TH and TD Passed TH and TD must be children of TR

Headers Passed Tables should have headers

Regularity Passed Tables must contain the same number of columns in each row and rows in each column

Summary Skipped Tables must have a summary

Lists

Rule Name Status Description

List items Passed LI must be a child of L

Lbl and LBody Passed Lbl and LBody must be children of LI

Headings

Rule Name Status Description

Appropriate nesting Passed Appropriate nesting

Back to Top

File details come from the government source that posted it. Updated .