USDV Industry Day Questions and Answers.pdf

PDF 123 KB Posted

Attached to
International Space Station Deorbit Capability Federal contract opportunity
Solicitation number
80JSC022ISSDeorbit
Issued by
National Aeronautics and Space Administration Johnson Space Center

View the file

Other files for this federal contract opportunity

Other files attached to International Space Station Deorbit Capability, newest first.
File Type Posted
DRFP Question and Answers Part III.pdf PDF
DRFP Question and Answers Part I.pdf PDF
DRFP Question and Answers Part II.pdf PDF
USDV Presolicitation Questions and Answers.pdf PDF
JPR1040.4.pdf PDF
JWI2190.1.pdf PDF
USDV Pre Solicitation Conference Charts.pdf PDF
USDV DRFP Comment Template.xlsx XLSX spreadsheet
USDV Statement of Work (SOW)_Draft.pdf PDF
Attachment L-09 Pre-award Survey of Prospective Contractor Accounting System Checklist.pdf PDF
BG-23-076 DRFP 80JSC023R0003 USDV Cover Letter.pdf PDF
Attachment L-10 Prime and Subcontractor Identification and SOW Division of Work Listing.xlsx XLSX spreadsheet
Attachment J-01 - Data Requirements Deliverable Draft.pdf PDF
Attachment J-38 DD Form 254 Department of Defense Contract Security Classification Specification.pdf PDF
Attachment L-03 Technical Resources Template.xlsx XLSX spreadsheet
Draft RFP 80JSC023R0003.pdf PDF
Attachment J-40 Deliverable Items List.xlsx XLSX spreadsheet
Attachment L-01 USDV Hybrid Cost Price Template.xlsx XLSX spreadsheet
Attachment L-07 Past Performance Matrix.xlsx XLSX spreadsheet
Industry Day Charts Final.pdf PDF
USDV Industry Day Charts.pdf PDF
Draft USDV Statement of Work.pdf PDF
Draft USDV Safety and Mission Assurance Plan DRD.pdf PDF
SSP 50964 Visiting Vehicle ISS Integration Plan.pdf PDF
Draft SSP XXXX_ USDV Operations Standards.pdf PDF
ISS Deorbit USOS Concept of Operations Overview.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Deorbit Vehicle Industry Day Questions and Answers

1. Question: Does NASA expect the U.S. Deorbit Vehicle (USDV) to remain attached to International

Space Station (ISS) throughout the deorbit process?

Answer: Yes. The Final Deorbit Burn will end with a Vacuum Perigee of 50 km or lower, well below the altitude where the USDV could safely undock.

2. Question: In the Launch Vehicle Certification and Procurement section of the Request for Information (RFI), was it NASA’s intent to ask, “If the launch vehicle was [NOT] included with the USDV contract, what is industry’s input into the most effective method of handling the launch service procurement?”

Answer: No. The question is correct as written in the RFI.

3. Question: Did NASA consider active orbit maintenance at a lower altitude rather than passive orbit life at 40,000 km for keeping ISS on orbit?

Answer: Yes, NASA did consider active orbit maintenance at lower altitude. The vehicle altitude limit is 460km which requires continued delivery of propellant resources to maintain and thus requires active control of the ISS. At the end of ISS program, NASA’s intent is to reduce operational costs. NASA does not want to have active oversight of the vehicle due to the required workforce and resources to actively maintain ISS at any altitude beyond ISS End of Life.

4. Question: Can you share your trajectory calculations, assumptions, and flight performance reserve that go into 57m/s and assumptions on attitude control dead bands?

Answer: Yes. The ISS Deorbit Concept of Operations, located in the 80JSC022ISSDeorbit Technical Library Attachments list, includes the overall deorbit plan, including the breakdown of the 57 m/s delta-V to accomplish the target reentry. The attitude control performance requirements are included in SSP 51101, United States Deorbit Vehicle Systems Requirements Document. Information is also outlined in the Industry day Charts, Slide 22 titled “USDV Requirements Overview”.

Accessibility Report

Filename:

USDV Industry Day Questions and Answers.pdf

Report created by:

Organization:

[Enter personal and organization information through the Preferences > Identity dialog.]

Summary

The checker found no problems in this document.

Needs manual check: 2

Passed manually: 0

Failed manually: 0

Skipped: 1

Passed: 29

Failed: 0

Detailed Report

Document

Rule Name Status Description

Accessibility permission flag Passed Accessibility permission flag must be set

Image-only PDF Passed Document is not image-only PDF

Tagged PDF Passed Document is tagged PDF

Logical Reading Order Needs manual check Document structure provides a logical reading order

Primary language Passed Text language is specified

Title Passed Document title is showing in title bar

Bookmarks Passed Bookmarks are present in large documents

Color contrast Needs manual check Document has appropriate color contrast

Page Content

Rule Name Status Description

Tagged content Passed All page content is tagged

Tagged annotations Passed All annotations are tagged

Tab order Passed Tab order is consistent with structure order

Character encoding Passed Reliable character encoding is provided

Tagged multimedia Passed All multimedia objects are tagged

Screen flicker Passed Page will not cause screen flicker

Scripts Passed No inaccessible scripts

Timed responses Passed Page does not require timed responses

Navigation links Passed Navigation links are not repetitive

Forms

Rule Name Status Description

Tagged form fields Passed All form fields are tagged

Field descriptions Passed All form fields have description

Alternate Text

Rule Name Status Description

Figures alternate text Passed Figures require alternate text

Nested alternate text Passed Alternate text that will never be read

Associated with content Passed Alternate text must be associated with some content

Hides annotation Passed Alternate text should not hide annotation

Other elements alternate text Passed Other elements that require alternate text

Tables

Rule Name Status Description

Rows Passed TR must be a child of Table, THead, TBody, or TFoot

TH and TD Passed TH and TD must be children of TR

Headers Passed Tables should have headers

Regularity Passed Tables must contain the same number of columns in each row and rows in each column

Summary Skipped Tables must have a summary

Lists

Rule Name Status Description

List items Passed LI must be a child of L

Lbl and LBody Passed Lbl and LBody must be children of LI

Headings

Rule Name Status Description

Appropriate nesting Passed Appropriate nesting

Back to Top

File details come from the government source that posted it. Updated .