Attachment L-10 Prime and Subcontractor Identification and SOW Division of Work Listing.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
International Space Station Deorbit Capability
Solicitation number
80JSC022ISSDeorbit
Issued by

View the file

Other files

File Type Posted
DRFP Question and Answers Part III.pdf PDF
DRFP Question and Answers Part II.pdf PDF
DRFP Question and Answers Part I.pdf PDF
JWI2190.1.pdf PDF
JPR1040.4.pdf PDF
USDV Presolicitation Questions and Answers.pdf PDF
USDV Pre Solicitation Conference Charts.pdf PDF
Attachment J-38 DD Form 254 Department of Defense Contract Security Classification Specification.pdf PDF
Attachment L-09 Pre-award Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Attachment L-01 USDV Hybrid Cost Price Template.xlsx XLSX spreadsheet
USDV Statement of Work (SOW)_Draft.pdf PDF
USDV DRFP Comment Template.xlsx XLSX spreadsheet
Draft RFP 80JSC023R0003.pdf PDF
Attachment L-07 Past Performance Matrix.xlsx XLSX spreadsheet
Attachment J-40 Deliverable Items List.xlsx XLSX spreadsheet
BG-23-076 DRFP 80JSC023R0003 USDV Cover Letter.pdf PDF
Attachment J-01 - Data Requirements Deliverable Draft.pdf PDF
Attachment L-03 Technical Resources Template.xlsx XLSX spreadsheet
USDV Industry Day Questions and Answers.pdf PDF
Industry Day Charts Final.pdf PDF
USDV Industry Day Charts.pdf PDF
SSP 50964 Visiting Vehicle ISS Integration Plan.pdf PDF
Draft USDV Statement of Work.pdf PDF
Draft SSP XXXX_ USDV Operations Standards.pdf PDF
Draft USDV Safety and Mission Assurance Plan DRD.pdf PDF
ISS Deorbit USOS Concept of Operations Overview.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 ATTACHMENT L-10: PRIME/SUBCONTRACTOR IDENDIFICATION AND STATEMENT OF WORK (SOW) DIVISION OF WORK LISTING

Contract Responsibility CAGE Code Contractor Size Classification (LB, SB, WOSB, etc) Subcontract Value ($) SOW Area Supported by the Prime & Subcontractors - Content Focus Areas

2.0 Overall General Requirements2.1 Program Management2.2 Business Management2.3 Configuration Management2.4 Information Technology (IT)2.5 Export Control Management2.6 NASA Insight & Approval2.7 Project Life Cycle Reviews2.8 Technical & Program Integration Meetings2.9 Design, Development, Test, & Evaluation (DDT&E)2.10 Software Management2.11 Safety, Reliability, Quality, & Mission Assurance2.12 Risk Management2.13 Launch Vehicle (LV) Integration2.14 ISS Integration2.15 Flight Operations3.0 Design, Development, Test, & Evaluation (DDT&E) Through Critical Design Review (CDR) (CLIN1)4.0 Production, Assembly, Integration, & Test (CLIN2)5.0 Dwell (CLIN3)6.0 Launch Vehicle Integration & Sustaining (CLIN4)7.0 Special Tasks & Studies (CLIN5)Focus Area 1: Propulsion System: ThrustersFocus Area 2: Propulsion System: ValvesFocus Area 3: Propulsion System: RegulatorsFocus Area 4: Propulsion System: Tanks
Prime Contractor (Name and Address fill-in )N/A
Subcontractor (Name and Address fill-in)
Subcontractor (Name and Address fill-in)
Subcontractor (Name and Address fill-in)
Subcontractor (Name and Address fill-in)

Instructions: Provide a summary listing (by name and address) of all subcontractors (regardless of dollar value) that have been identified throughout the offeror’s proposal.

List prime contractor(s) and all subcontractors down the left. Fill in the requested cells. Place an x in each box associated with each SOW section for which each company will be performing the work.

File details come from the government source that posted it. Updated .