A.2 Continuation Pages 80GSFC21R0039 Amendment 4.pdf
PDF 156 KB Posted
- Attached to
- MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5 Federal contract opportunity
- Solicitation number
- 80GSFC21R0039
About this file
This document provides details for a solicitation seeking proposals for the MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM). The National Aeronautics and Space Administration Goddard Space Flight Center is requesting proposals to provide all hardware, materials, facilities, services, labor, equipment, analyses and management activities necessary for the preliminary design, final design, fabrication, integration and testing, delivery and post-delivery support of the Spin Eject Mechanism. The contract type will be cost-plus-fixed-fee and have a period of performance from award through 27 months. The anticipated contract award date is no later than March 2022. Proposals are due no later than October 12, 2021 and shall be submitted electronically.
View the file
Other files for this federal contract opportunity
Show all 50
MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS)
EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM)RFP
80GSFC21R0039
Amendment 4
1. This amendment revises provision L.11 GSFC 52.215-201 PROPOSAL PREPARATION – GENERAL INSTRUCTIONS (ELECTRONIC PROPOSAL DELIVERY) (MAR 2020) as follows:
FROM:
(b) PROPOSAL CONTENT AND PAGE LIMITATIONS
(1) The following table contains the page limitations for each portion of the proposal submitted in response to this solicitation. Additional instructions for each component of the proposal are located in the solicitation provision noted under the Reference heading.
Proposal Component Volume Reference Page Limitations
Offer Volume I L.12 None Mission Suitability Volume II L.13 35 Pages Cover Page, Tables of Contents, Indices, Project Schedule, and Small Business Subcontracting Plan
Excluded
SOW, SPEC, and Mission Assurance Compliance Matrices
II.a 7 Pages
Quality Assurance Plan (QAP) II.b Excluded Cost Volume III L.14 Mixed
(a) Cost spreadsheets None
(b) Basis of Estimates 3 Pages per
WBS Level* Past Performance Volume IV L.15 Mixed
(a) Information from the Offeror 10 Pages*
(b) Cover Page, Indices, List of those sent Past Performance Questionnaires, Small Business Subcontracting Plan History, Customer Evaluations, Termination/Descope information, and List of Acronyms
Excluded
*Prime Offeror individually and each Significant Subcontractor individually.
MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS)
EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM)RFP
80GSFC21R0039
Amendment 4
TO:
(b) PROPOSAL CONTENT AND PAGE LIMITATIONS
(1) The following table contains the page limitations for each portion of the proposal submitted in response to this solicitation. Additional instructions for each component of the proposal are located in the solicitation provision noted under the Reference heading.
Proposal Component Volume Reference Page Limitations
Offer Volume I L.12 None Mission Suitability Volume II L.13 35 Pages Cover Page, Tables of Contents, Indices, Project Schedule, and Small Business Subcontracting Plan
Excluded
SOW, SPEC, and Mission Assurance Compliance Matrices
II.a Excluded
Quality Assurance Plan (QAP) II.b Excluded Cost Volume III L.14 Mixed
(a) Cost spreadsheets None
(b) Basis of Estimates 3 Pages per
WBS Level* Past Performance Volume IV L.15 Mixed
(a) Information from the Offeror 10 Pages*
(b) Cover Page, Indices, List of those sent Past Performance Questionnaires, Small Business Subcontracting Plan History, Customer Evaluations, Termination/Descope information, and List of Acronyms
Excluded
*Prime Offeror individually and each Significant Subcontractor individually.
2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
(End of Amendment)
File details come from the government source that posted it. Updated .