About this file

This document provides details for a solicitation seeking proposals for the MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM). The National Aeronautics and Space Administration Goddard Space Flight Center is requesting proposals to provide all hardware, materials, facilities, services, labor, equipment, analyses and management activities necessary for the preliminary design, final design, fabrication, integration and testing, delivery and post-delivery support of the Spin Eject Mechanism. The contract type will be cost-plus-fixed-fee and have a period of performance from award through 27 months. The anticipated contract award date is no later than March 2022. Proposals are due no later than October 12, 2021 and shall be submitted electronically.

View the file

Other files for this federal contract opportunity

Other files attached to MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5, newest first.
File Type Posted
SEM RFP QA Response Document for Posting 051722.pdf PDF
SEM RFP QA Response Document 050922.pdf PDF
A.2 Continuation Pages 80GSFC21R0039 Amendment 5.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 5.pdf PDF
SEM Preproposal QA Response Document for Posting.pdf PDF
MSRCCRS-ERM-CDRL-0002_Rev-_RevA Compare.pdf PDF
MSR-CCRS-ERM-SOW-0001_Rev-_RevA Compare.pdf PDF
MSRCCRS-SEM-SPEC-0002_Rev-_RevA Compare.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 4.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 4.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 4.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 4 tracked changes.pdf PDF
SEM RFP QA Response Document Amendment 3.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M track changes Amendment 3.pdf PDF
C.6 Attachment F_IT Security Applicable Documents List Rev 2021.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 3.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M clean Amendment 3.pdf PDF
C.1.1 Attachment A MSRCCRS-ERM-SOW-0001B_03-28-2022compare.pdf PDF
C.2.1 Attachment B MSRCCRS-SEM-SPEC-0002B_03-28-2022compare.pdf PDF
C.2 Attachment B MSRCCRS-SEM-SPEC-0002B_03-28-2022.pdf PDF
C.3.1 Attachment C MSRCCRS-ERM-CDRL-0002B_03-28-2022compare.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 2.pdf PDF
_MSR-CCRS-SYS-SPEC-0004-DRAFT.pdf PDF
_MSR_D-105140_JPPMP_201215_final_w-sigs1.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 2.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 2.pdf PDF
A.2 Continuation Pages 80GSFC21R0039 Amendment 2.pdf PDF
MSR-CCRS-SYS-SPEC-0004-DRAFT.pdf PDF
MSR_D-105140_JPPMP_201215_final_w-sigs1.pdf PDF
A. 80GSFC21R0039 RFP Cover Letter Amendment 1.pdf PDF
SF30-16c 80GSFC21R0039 Amendment 1.pdf PDF
B. SF33-14a 80GSFC21R0039 Amendment 1.pdf PDF
Continuation Pages 80GSFC21R0039 Amendment 1.pdf PDF
80GSFC21R0039 RFP Questions Response Document Amendment 1.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M.pdf PDF
C.2 Attachment B_MSR-CCRS-ERM-SPEC-0002.pdf PDF
C.4 Attachment D_MSR-CCRS-SMA-REQ-0003-_04-09-2021 (1).pdf PDF
C.7 Attachment G_ SEM Small Business Subcontracting Plan.pdf PDF
C.9 Attachment I_ SEM Quality Assurance Plan.pdf PDF
C.10 Attachment J_ SEM Contractor Proposed Enhancements.pdf PDF
C.5 Attachment E_Financial Management Reporting Requirements.pdf PDF
C.8 Attachment H_ SEM IT Security Management Plan.pdf PDF
D. ENCLOSURE 2 SEM IT Security Management Plan.pdf PDF
F. EXHIBIT 2 SEM Past Performance Questionnaire.pdf PDF
B. SF33-14a.pdf PDF
C.1 Attachment A_MSR-CCRS-ERM-SOW-0001.pdf PDF
C.3 Attachment C_MSR-CCRS-ERM-CDRL-0002-_09-07-2021.pdf PDF
C.6 Attachment F_IT Security Applicable Documents List.pdf PDF
A. RFP Cover Letter.pdf PDF
E. EXHIBIT 1 SMALL BUSINESS SUBCONTRACTING PLAN GOALS.pdf PDF
Show all 50

MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS)

EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM)RFP

80GSFC21R0039

Amendment 4

1. This amendment revises provision L.11 GSFC 52.215-201 PROPOSAL PREPARATION – GENERAL INSTRUCTIONS (ELECTRONIC PROPOSAL DELIVERY) (MAR 2020) as follows:

FROM:

(b) PROPOSAL CONTENT AND PAGE LIMITATIONS

(1) The following table contains the page limitations for each portion of the proposal submitted in response to this solicitation. Additional instructions for each component of the proposal are located in the solicitation provision noted under the Reference heading.

Proposal Component Volume Reference Page Limitations

Offer Volume I L.12 None Mission Suitability Volume II L.13 35 Pages Cover Page, Tables of Contents, Indices, Project Schedule, and Small Business Subcontracting Plan

Excluded

SOW, SPEC, and Mission Assurance Compliance Matrices

II.a 7 Pages

Quality Assurance Plan (QAP) II.b Excluded Cost Volume III L.14 Mixed

(a) Cost spreadsheets None

(b) Basis of Estimates 3 Pages per

WBS Level* Past Performance Volume IV L.15 Mixed

(a) Information from the Offeror 10 Pages*

(b) Cover Page, Indices, List of those sent Past Performance Questionnaires, Small Business Subcontracting Plan History, Customer Evaluations, Termination/Descope information, and List of Acronyms

Excluded

*Prime Offeror individually and each Significant Subcontractor individually.

MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS)

EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM)RFP

80GSFC21R0039

Amendment 4

TO:

(b) PROPOSAL CONTENT AND PAGE LIMITATIONS

(1) The following table contains the page limitations for each portion of the proposal submitted in response to this solicitation. Additional instructions for each component of the proposal are located in the solicitation provision noted under the Reference heading.

Proposal Component Volume Reference Page Limitations

Offer Volume I L.12 None Mission Suitability Volume II L.13 35 Pages Cover Page, Tables of Contents, Indices, Project Schedule, and Small Business Subcontracting Plan

Excluded

SOW, SPEC, and Mission Assurance Compliance Matrices

II.a Excluded

Quality Assurance Plan (QAP) II.b Excluded Cost Volume III L.14 Mixed

(a) Cost spreadsheets None

(b) Basis of Estimates 3 Pages per

WBS Level* Past Performance Volume IV L.15 Mixed

(a) Information from the Offeror 10 Pages*

(b) Cover Page, Indices, List of those sent Past Performance Questionnaires, Small Business Subcontracting Plan History, Customer Evaluations, Termination/Descope information, and List of Acronyms

Excluded

*Prime Offeror individually and each Significant Subcontractor individually.

2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

(End of Amendment)

File details come from the government source that posted it. Updated .