About this file

This document is a request for proposals for a Mars Sample Return Capture, Containment and Return System Earth Entry System Spin Eject Mechanism. The National Aeronautics and Space Administration Goddard Space Flight Center is seeking proposals to provide all hardware, materials, facilities, services, labor, equipment, analyses and management activities necessary for the preliminary design, final design, fabrication, integration and testing, delivery and post-delivery support of the Spin Eject Mechanism. The contract type will be cost-plus-fixed-fee and the period of performance is 27 months. The anticipated contract award date is no later than March 2022. Offerors must submit proposals by October 19, 2021. The solicitation number is 80GSFC21R0039.

View the file

Other files for this federal contract opportunity

Other files attached to MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5, newest first.
File Type Posted
SEM RFP QA Response Document for Posting 051722.pdf PDF
SEM RFP QA Response Document 050922.pdf PDF
MSR-CCRS-ERM-SOW-0001_Rev-_RevA Compare.pdf PDF
MSRCCRS-SEM-SPEC-0002_Rev-_RevA Compare.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 5.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 4.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 4.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 4 tracked changes.pdf PDF
SEM RFP QA Response Document Amendment 3.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 3.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M clean Amendment 3.pdf PDF
C.1.1 Attachment A MSRCCRS-ERM-SOW-0001B_03-28-2022compare.pdf PDF
C.2.1 Attachment B MSRCCRS-SEM-SPEC-0002B_03-28-2022compare.pdf PDF
C.2 Attachment B MSRCCRS-SEM-SPEC-0002B_03-28-2022.pdf PDF
C.3.1 Attachment C MSRCCRS-ERM-CDRL-0002B_03-28-2022compare.pdf PDF
A.2 Continuation Pages 80GSFC21R0039 Amendment 3.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 3.pdf PDF
C.1 Attachment A MSRCCRS-ERM-SOW-0001B_03-28-2022.pdf PDF
C.3 Attachment C MSRCCRS-ERM-CDRL-0002B_03-28-2022.pdf PDF
F. EXHIBIT 2 SEM Past Performance Questionnaire.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 2.pdf PDF
_MSR-CCRS-SYS-SPEC-0004-DRAFT.pdf PDF
_MSR_D-105140_JPPMP_201215_final_w-sigs1.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 2.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 2.pdf PDF
A.2 Continuation Pages 80GSFC21R0039 Amendment 2.pdf PDF
MSR_D-105140_JPPMP_201215_final_w-sigs1.pdf PDF
A.1 SF30-16c 80GSFC21R0039 Amendment 2.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 2.pdf PDF
B. SF33 14a 80GSFC21R0039 Amendment 2.pdf PDF
Continuation Pages 80GSFC21R0039 Amendment 1.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M Amendment 1.pdf PDF
A. 80GSFC21R0039 RFP Cover Letter Amendment 1.pdf PDF
SF30-16c 80GSFC21R0039 Amendment 1.pdf PDF
C.5 Attachment E_Financial Management Reporting Requirements.pdf PDF
C.8 Attachment H_ SEM IT Security Management Plan.pdf PDF
D. ENCLOSURE 2 SEM IT Security Management Plan.pdf PDF
F. EXHIBIT 2 SEM Past Performance Questionnaire.pdf PDF
B. SF33-14a.pdf PDF
C.1 Attachment A_MSR-CCRS-ERM-SOW-0001.pdf PDF
C.3 Attachment C_MSR-CCRS-ERM-CDRL-0002-_09-07-2021.pdf PDF
C.6 Attachment F_IT Security Applicable Documents List.pdf PDF
A. RFP Cover Letter.pdf PDF
E. EXHIBIT 1 SMALL BUSINESS SUBCONTRACTING PLAN GOALS.pdf PDF
C. ENCLOSURE 1 80GSFC21R0039 RFP Sections B-M.pdf PDF
C.2 Attachment B_MSR-CCRS-ERM-SPEC-0002.pdf PDF
C.4 Attachment D_MSR-CCRS-SMA-REQ-0003-_04-09-2021 (1).pdf PDF
C.7 Attachment G_ SEM Small Business Subcontracting Plan.pdf PDF
C.9 Attachment I_ SEM Quality Assurance Plan.pdf PDF
C.10 Attachment J_ SEM Contractor Proposed Enhancements.pdf PDF
Show all 50

MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Document Section Page Subject Question/Comment Government's Response

Enclosure 1

RFP

80GSFC21R0039

Sections B - M

L.11 77-80 Proposal Preparation Instructions Is NASA able to accept a top level baseline plan, compliance matrix and cost volume in lieu of the current RFP requirements?

No; NASA is not able to accept a top level baseline plan, compliance matrix and cost volume in lieu of current RFP requirements. All offerors are required to prepare proposals as outlined in the RFP.

Enclosure 1

RFP

80GSFC21R0039

Sections B - M

L.13 85-86 Mission Suitability Volume Instructions We have started our review of the MSR CCRS SEM mission documents and seem to be missing two CDRLs, CDRL 2.6.8 and 3.6.8. Are you able to provide those?

The RFP has been updated to correct the CDRL references from

2.6.8 and 3.6.8 to 7.8. Additionally, CDRL references 2.6.4 and 3.6.4, Reliability Analysis Reports, have been corrected to 7.4, Safety and Reliability Documentation.

Enclosure 1

RFP

80GSFC21R0039

Sections B - M

L.14 92 Cost Instructions

What does "GPM" stand for relative to the statement: "...a Significant Subcontractor is defined as any subcontractor whose estimated value causes the cumulative percentage of subcontractor work (form lowest to highest percentage of work) to meet or exceed 20% of the total GPM estimated value..." (RFP Section L, L.14 GSFC 52.215-221 Paragraph (a))

The acronym "GPM" stands for Government Pricing Model. The reference to GPM has been deleted from L.14

Enclosure 1

RFP

80GSFC21R0039

Sections B - M

L.14 91-101 Cost Instructions

The RFP is a competitive procurement, which normally does not require the level of data for a Certified Cost or Pricing Data (CCOPD) procurement. While certified data is not being requested, the amount of data required in the offeror’s cost volume is on par with a CCOPD proposal. Is this intended for this CPFF contract for the SEM mechanism?

Certified Cost or Pricing Data are not required as indicated in the solicitation.The instructions are consistent with standard GSFC cost instructions and have been tailored slightly to obtain cost/price information needed by the MSR CCRS project office.

Enclosure 1

RFP

80GSFC21R0039

Sections B - M

L.14 91-101 Cost Instructions

We have not provided full cost volumes for materials or purchase orders for other competitive procurements. Both Material and Purchase orders are described as part of the subcontracts list of items in the RFP and require cost volumes. Can subcontracts be defined as contracts and interorganizational transfers only (not materials and purchase orders)?

The Government is not revising the definition for subcontracts.

To clarify, the Government is not requesting full cost volumes from all subcontracts only from significant subcontractors as defined in the RFP.

6 RFP

80GSFC21R0039 N/A N/A Proposal due date extension request Proposal due date extension request

The due date for proposal submission has been extended (1) one week from Tuesday, October 12, 2021, to Tuesday, October 19, 2021.

MSR CCRS EES SEM RFP 80GSFC21R0039 QUESTIONS AND ANSWERS

Response Document

File details come from the government source that posted it. Updated .