Attachment C- Model Contract - Amendment 1.pdf
PDF 391 KB Posted
- Solicitation number
- 80GRC026R0008
About this file
This is a NASA contract template for fixed-price research and development work at the John H. Glenn Research Center. The contract is structured with multiple sections covering supplies/services, pricing, inspection, deliverables, administration, and special requirements.
The contractor must provide all resources necessary to deliver items and perform tasks in accordance with a Statement of Work to be inserted by the offeror in Section C. Pricing follows a firm fixed-price model with total contract value marked as [TBD], structured around Contract Line Items (CLINs) that should link tasks in the SOW to specific pricing. Payment is milestone-based, contingent upon the Contracting Officer's Representative confirming milestone completion, with invoices submitted electronically to the NASA Shared Services Center. The contract incorporates extensive Federal Acquisition Regulation (FAR) and NASA FAR Supplement (NFS) clauses covering areas including property management, inspection and acceptance at destination, technical direction authority, export license compliance, security requirements for IT resources, data rights, patent rights, and subcontracting obligations. Special requirements include submission of safety and occupational health plans within 30 days of award, compliance with NASA facilities management policies, restrictions on funding activities with China, identification and marking of government equipment using NASA standards, and comprehensive reporting including monthly/quarterly progress reports and a final technical report within specified timeframes. The contractor must also complete organizational conflicts of interest avoidance plans and subcontracting plans where applicable, and comply with all applicable labor, employment, and ethics regulations for federal contractors.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80GRC026R0008 2
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
1852.216-78 FIRM FIXED PRICE. (DEC 1988)
The total firm fixed price of this contract is $[TBD].
(End of clause)
CONTRACT LINE-ITEM NUMBER (CLIN) STRUCTURE
Offeror to provide list of items and/or services to be delivered to the Government. The tasks included in SOW should be linked to the CLIN(s) /SLIN(s) Offeror proposes.
CLIN Associated Task(s) Price
CLIN 01 [TBD] [TBD]
CLIN 02 [TBD] [TBD]
CLIN 03 [TBD] [TBD]
Total [TBD] [TBD]
SUPPLIES AND/OR SERVICES TO BE PROVIDED
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Description/Specifications/Statement of Work found in Section C.
MILESTONE PAYMENT SCHEDULE
Payment Schedule is as follows:
Milestone Payment Schedule – CLIN 001 Base
Milestone Title and Number
Due Date (Month, Year)
Percentage of Total Price
Amount Due (Dollars)
[TBD] [TBD] [TBD] [TBD]
Totals [TBD] [TBD] [TBD]
Payment will be made after the Contracting Officer’s Representative (COR) has confirmed the milestone has been met. All invoices must be submitted in accordance with 1852.232-80
80GRC026R0008 3
SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (DEC 2025) (DEVIATION)
found in Section G of this contract.
(End of Section B)
80GRC026R0008 4
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
STATEMENT OF WORK (SOW)
[Offeror SOW to be inserted]
(End of SOW)
GRC 52.255-90 TECHNICAL DIRECTION. (APR 2016)
(a) Performance of the work under this contract is subject to the technical direction of the Contracting Officer (CO) or the designated Contracting Officer’s Representative (COR).
(b) "Technical direction" means a directive to the Contractor that provides clarification of the contract’s general description of the scope of work, to include approaches, solutions, designs, refinements or shifts within tasks, or inquiries related to the general tasks and requirements in the statement of work or specifications.
(c) Technical Direction does not include any instruction that—
(1) Constitutes an assignment of additional work outside the statement of work (i.e. “new work”;
(2) Constitutes a change as defined in the changes clause;
(3) Constitutes a basis for any increase or decrease in the total price, any milestone price, or the time required for performance or delivery;
(4) Changes any of the expressed terms, conditions, or specifications of the contract; or
(5) Interferes with the contractor's rights to perform the terms and conditions of the contract.
(6) Changes any performance-based requirement.
(d) All technical direction will be issued in writing by the CO or the designated COR.
(e) The Contractor shall proceed promptly with the performance of technical direction issued by the CO or COR, unless, in the Contractor's opinion, any instruction or direction falls within any of the categories defined in paragraph (c) of this clause. In the latter event, the Contractor shall not proceed but shall within 5 working days notify the CO in writing of the basis for its opinion.
Within 30 calendar days of receiving this notification, the CO will either amend the technical direction, request a proposal for an amendment to the contract or Task Order, advise the Contractor in writing that the technical direction is considered to be within the limits of this
80GRC026R0008 5
clause and that the Contractor should proceed promptly with its performance, or rescind the technical direction in its entirety.
(f) A failure of the Contractor and CO to agree that the instruction or direction is both within the requirements of the contract and does not constitute a change under the changes clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.
(g) Any action(s) taken by the Contractor in response to any direction given by any person other than the CO or the designated COR shall be at the Contractor's risk.
Emergency Preparedness and Response (November 2015)
(a) The Contractor’s obligation may include resolution of unusual or emergency situations. The Contractor may be required to assist NASA, within the general scope of work, in preparation for, or in response to emergencies.
(b) Obligations under this requirement shall only arise when one or more of the criteria at FAR 18.001, enabling NASA to utilize “Emergency Acquisition Flexibilities”, are met.
(c) If the emergency preparedness and response requirements result in changes to the contract, all contract adjustments will be processed in accordance with the Changes clause of this contract.
(End of Section C)
80GRC026R0008 6
SECTION D – PACKAGING AND MARKETING
1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT.
(DEC 2025) (DEVIATION)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA–HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA–STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
80GRC026R0008 7
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
National Aeronautics and Space Administration John H. Glenn Research Center Shipping/ Receiving SARF Building 21000 Brookpark Road Cleveland, OH 44135 Email: grc-contracts@mail.nasa.gov
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
(End of Clause)
(End of Section D) mailto:grc-contracts@mail.nasa.gov
80GRC026R0008 8
SECTION E – INSPECTION AND ACCEPTANCE
Clauses incorporated by reference:
The following Contract clauses pertinent to this section are hereby incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, “Clauses Incorporated by Reference” (FEB 1998), of this Contract.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1):
52.246-2 INSPECTION OF SUPPLIES-FIXED-PRICE. (AUG 1996)
52.246-7 INSPECTION OF RESEARCH AND DEVELOPMENT-FIXED-PRICE. (AUG
1996)
52.246-16 RESPONSIBILITY FOR SUPPLIES. (APR 1984)
(End of FAR by reference clauses)
GRC 52.246-92 INSPECTION AND ACCEPTANCE. (JAN 1987)
Final inspection and acceptance of all work performed under this contract, including all deliverable items will be performed at destination.
(End of Section E)
80GRC026R0008 9
SECTION F – DELIVERIES OR PERFORMANCE
with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, “Clauses Incorporated by Reference” (FEB 1998), of this Contract.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1):
52.242-15 STOP-WORK ORDER. (AUG 1989)
52.242-17 GOVERNMENT DELAY OF WORK. (APR 1984)
52.247-34 F.O.B. DESTINATION. (JAN 1991)
PERIOD OF PERFORMANCE (PoP)
The PoP for this contract is: [TBD] Start of PoP: [TBD] End of PoP: [TBD]
(End of Section F)
80GRC026R0008 10
SECTION G – CONTRACT ADMINISTRATION DATA
with the same force and effect as if they were given in full text. Clauses incorporated by reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, “Clauses Incorporated by Reference” (FEB 1998), of this Contract.
NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES:
1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR
NONPROFIT ORGANIZATION. (JUN 2026) (DEVIATION) [Applies to only Other than a Small Business Firm or Nonprofit Organization]
1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND
PATENT REPRESENTATIVE. (JUN 2026) (DEVIATION)
1852.245-75 PROPERTY MANAGEMENT CHANGES. (DEC 2025) (DEVIATION)
[Applicable only if proposing the use of Government Property]
1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY.
(DEC 2025) (DEVIATION) [Applicable only if proposing the use of Government Property]
(End of NFS by reference clauses)
1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (DEC 2025) (DEVIATION)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at
FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:
https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-
80GRC026R0008 11
up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
80GRC026R0008 12
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS. (DEC 2025) (DEVIATION) [Applicable only if proposing the use of Government Property]
(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by
NASA.
(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.
(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address: [Insert name and address of appropriate NASA Center office.], unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.
(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors’ procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report) cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention. Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be
80GRC026R0008 13
adjusted during the next reporting period. Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.
(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the Contractor has a value of $10 million or more, the Contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.
(4) The Contracting Officer may, in NASA’s interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.
(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.
1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR
52.245–1. (DEC 2025) (DEVIATION) [Applicable only if proposing the use of Government Property] For performance of work under this contract, the Government will make available Government property identified below or in Attachment [Insert attachment number or ‘‘not applicable’’] of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245– 1, Government Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at [Insert applicable site(s) where property will be used] and at other location(s) as may be approved by the Contracting Officer. Under FAR 52.245–1, the Contractor is accountable for the identified property.
80GRC026R0008 14
1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (DEC 2025)
(DEVIATION) [Applicable only if proposing contract performance in any NASA Center, Installation, facility, or other NASA real property.]
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Estate Management.
(2) NPD 8831.2, Facilities Maintenance and Operations Management.
[Insert any additional Center occupancy requirements here]
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor's expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
(End of clause)
GRC 52.245-100 | CAPITAL ASSET ACQUISITION. (JUN 2025) [Applicable only if NASA will be taking ownership of a capital asset as a deliverable.] A. The following contract line items have been designated by NASA as capital assets*:
Line Item No. Description Quantity Unit Price Total Price
*A capital asset is tangible property or software that NASA determines to be capital based on the following criteria: 1) has a total acquisition (purchase, fabrication, construction, modification, etc.) cost of $1,000,000 or more, 2) has an estimated useful life of 2 years or more, 3) is not intended for sale in the ordinary course of operations, 4) has been acquired and/or constructed by the contractor with the intention of being used, or being available for use, by NASA, and 5) If acquired for an R&D activity, have an alternative future use. (Note: Items and/or services with values less than $1,000,000 that contribute to the acquisition or increased value of a capital asset (e.g. design for real property projects, components combined to fabricate capital equipment, or generally all costs necessary to bring the property to a usable condition) are also subject to capitalization rules. Generally, NASA will make the capital
80GRC026R0008 15
determination and inform the contractor if such items are classified as capital assets and/or services are needed for a capital project.)
B. During contract performance, if the contractor or NASA determines a need to acquire or fabricate tangible property that may meet the capitalization threshold of $1,000,0000, the contractor shall submit a written request for approval to the contracting officer. Based on internal NASA review, if the items are determined necessary for contract performance and determined to be capital assets, the contracting officer will modify the contract to: 1) Add separate line items to the contract appropriately, and 2) reference those items in paragraph (A) of this clause.
C. If NASA Contractor Financial Management Reports (NASA Form (NF) 533’s) are required under this contract, the contractor shall report all costs incurred against each identified capital asset on its own report page on the NF 533’s.
D. The costs incurred for each item designated as a capital asset shall be identified separately on any invoice, voucher, progress payment request, or other authorized payment request submitted by the contractor under this contract.
(End of Section G)
80GRC026R0008 16
SECTION H – SPECIAL CONTRACT REQUIREMENTS
reference, which are required to be filled-in by the Government, include only the text of the affected paragraph(s). This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, “Clauses Incorporated by Reference” (FEB 1998), of this Contract.
NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES:
1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING. (SEP 2025)
(DEVIATION)
1852.235-73 FINAL SCIENTIFIC AND TECHNICAL REPORTS. (AUG 2025)
ALTERNATE II (AUG 2025) (DEVIATION)
1852.242-72 DENIED ACCESS TO NASA FACILITIES. (DEC 2025) (DEVIATION)
1852.225-70 EXPORT LICENSES. (DEC 2025) (DEVIATION)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract.
In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at [insert name of NASA installation], where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
80GRC026R0008 17
1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT). (MAR 1989)
(a) Of the total price of items [TBD] through [TBD], the sum of [$TBD] is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:
Date Amounts
(b) The Contractor agrees to perform or have performed work on the items specified in paragraph
(a) of this clause up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.
(c) (1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until [TBD].
(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.
(3) (i) The notice shall state the estimated date when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.
(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.
(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, 80GRC026R0008 18 terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.
(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.
(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.
(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.
(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the default clause of this contract. The provisions of this Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a). This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.
(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
1852.235-71 ESSENTIAL PERSONNEL AND FACILITIES. (SEP 2025) (DEVIATION)
(a) The personnel and/or facilities listed below (or specified in the contract Schedule) are considered essential to the work being performed under this contract. Before removing, replacing, or diverting any of the listed or specified personnel or facilities, the Contractor must—
(1) Notify the Contracting Officer reasonably in advance; and
(2) Submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.
(b) The Contractor must make no diversion without the Contracting Officer's written consent;
provided, that the Contracting Officer may ratify in writing the proposed change, and that ratification must constitute the Contracting Officer's consent required by this clause.
80GRC026R0008 19
(c) The Contractor must obtain the contracting officer's prior written approval anytime the Contractor plans to continue the research work during a continuous period in excess of 3 months without the participation of an approved principal investigator or project leader.
(d) The list of personnel and/or facilities (shown below or as specified in the contract Schedule) may, with the consent of the contracting parties, be amended from time to time during the course of the contract to add or delete personnel and/or facilities.
[List here the personnel and/or facilities considered essential, unless they are specified in the contract Schedule].
1852.235-74 ADDITIONAL REPORTS OF WORK—RESEARCH AND DEVELOPMENT.
(SEP 2025) (DEVIATION)
In addition to the final report required under this contract, the Contractor must submit the following report(s) to the Contracting Officer Representative (COR) via the Contracting Officer:
(a) Monthly progress reports. The Contractor must submit separate monthly reports of all work accomplished during each month of contract performance. Reports must be in narrative form, brief, and informal. They must include a quantitative description of progress, an indication of any current problems that may impede performance, proposed corrective action, and a discussion of the work to be performed during the next monthly reporting period.
(b) Quarterly progress reports. The Contractor must submit separate quarterly reports of all work accomplished during each three-month period of contract performance. In addition to factual data, these reports should include a separate analysis section interpreting the results obtained, recommending further action, and relating occurrences to the ultimate objectives of the contract.
Sufficient diagrams, sketches, curves, photographs, and drawings should be included to convey the intended meaning.
(c) Submission dates. Monthly and quarterly reports must be submitted by the 15th day of the month following the month or quarter being reported. If the contract is awarded beyond the middle of a month, the first monthly report must cover the period from award until the end of the following month. No monthly report need be submitted for the third month of contract effort for which a quarterly report is required. No quarterly report need be submitted for the final three months of contract effort since that period will be covered in the final report. The final report must be submitted within days after the completion of the effort under the contract.
80GRC026R0008 20
GRC 52.235-90 FINAL REPORTING-SUPPLEMENTAL REQUIREMENTS. (MAY
20218) The following requirements are in addition to those stated in the Final Scientific and Technical Reports clause (1852.235-73) of this contract.
(1) In addition to the requirements of NPR 2200.2, Requirements for Documentation, Approval, and Dissemination of NASA Scientific and Technical Information, the format and content of the Final Report shall also follow NASA-SP-2015-7602 "NASA Publications Guide for Authors", incorporated herein by reference and made a part hereof. These documents are available at http://www.sti.nasa.gov [Click on "Tools" and then “NASA Publication Guide.”]
(2) The Contractor shall submit an electronic copy of a DRAFT-FINAL REPORT to the NASA Contracting Officer (CO) within 30 days after completion of the technical effort. The CO shall submit the electronic copy of the draft-final report to the Contracting Officer’s Representative (COR) and review comments from the COR for acceptance or rejection of the report. The COR's review will address technical accuracy, conformance with applicable law, policy and publication standards, and a determination of the availability and distribution of NASA-funded documents containing scientific and technical information (STI), via the Web-based Electronic Document Availability Authorization (E-DAA)/NF-1676B. Acceptance or rejection (in part or in total) of the draft-final report will be accomplished by NASA within thirty (30) days after receipt.
Rejected draft-final reports shall be resubmitted within 10 working days for review following correction of the cited deficiency, unless otherwise directed by the NASA CO or NASA COR.
(3) Within thirty (30) calendar days after notification of approval of the Contractor's draft-final report, the Contractor shall distribute the approved Final Report electronically to the CO and
COR
(4) Printing, duplicating, binding and other reproduction required under this contract is subject to the provisions of the Government Printing and Binding Regulations published by the Joint Committee on Printing, Congress of the United States and the clause at NFS 1852.208-81 entitled "Restrictions on Printing and Duplicating".
(5) The Contractor is solely responsible for managing the technical effort, the schedule, and the contract funds to ensure delivery of the Draft-Final Report and the Final Report on time. Failure to deliver the Final Report as scheduled, or a request that additional funding be provided by the government to ensure delivery of the Final Report, may result in a Performance Evaluation of "Unsatisfactory” or a reduction in profit/fee equal to the additional cost associated with delivery of the Final Report, or both.
(6) IF THIS IS A TASK ORDER CONTRACT, the Contractor shall comply with this Final Report requirement for every individual Task Order at the time of Task Order completion.
However, the Contractor is not required to provide a comprehensive Final Report for the entire
80GRC026R0008 21
GRC 52.236-13 GRC MODIFICATION (9/16) TO FAR 52.236-13 -- ACCIDENT
PREVENTION W/ (ALT I) (SEP 2016) ALTERNATE I (SEP 2016) [Applicable only if proposing contract performance in any NASA Center, Installation, facility, or other NASA real property.]
(a) The Contractor shall provide and maintain work environments and procedures which will—
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates;
and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
80GRC026R0008 22
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(f) Within 30 calendar days after contract award, the Contractor shall submit to the Contracting Officer (CO) a detailed safety and occupational health plan for concurrence by the GRC Safety and Health Division, and approval by the CO. Until the Safety and Health Plan is approved, the contractor may only perform necessary phase-in and other administrative activities.
(1) If the contract is for services and/or operations, the Safety and Health Plan shall be prepared in accordance with NASA Procedural Requirements (NPR) 8715.3 NASA General Safety Program Requirements, Appendix E.
(2) If the contract is for construction, the Safety and Health Plan shall be prepared in accordance with: a) Chapter 17 of GLM-QS-8715, Glenn Safety Manual, and b) the General Safety Specification 01 35 26.98.
(3) If the contract statement of work or specification includes site-specific and/or unique safety and health requirements, they shall be addressed in the Safety and Health Plan as well.
Upon approval, the Safety and Health Plan will be incorporated as an Attachment to the contract via modification.
GRC 52.237-91 CONTRACTORS' DUTIES AND RESPONSIBILITIES ON-SITE. (DEC
2016) [Applicable only if proposing contract performance in any NASA Center, Installation, facility, or other NASA real property.]
(a) BADGES AND PASSES
(i) Badge and Pass Issuance Support Service Contractor personnel having a need to enter areas of the NASA Glenn Research Center at Lewis Field or Armstrong Test Facility shall have an identification badge or pass. This badge or pass shall be obtained at the Badge Control Office or Visitor Control Office located at the Main Gate of either Lewis Field or Armstrong Test Facility.
(1) Permanent Badge (Personal Identify Verification (PIV) Credential) Requirements
a. It is recommended that the contractor complete the new employee hiring process at least 10 workdays prior to the employee’s start date.
b. Upon the selection of a new employee, the contractor’s Human Resource (HR) representative shall create an identity in the Identity and Access Management Tool (IdMAX).
c. The contractor’s HR representative shall also complete NASA Form 1760, Position Risk Designation for Non-NASA Employee and GRC
80GRC026R0008 23
1760, Position Risk Designation Cover sheet. Once completed, both forms shall be signed by the NASA COTR and sent to the Office of Protective Services POC for Non-Government Investigations.
d. At the time of visit and/or the Entry-on-Duty appointment, the new employee shall complete the in-person enrollment for PIV credential processing at the Main Gate Badge Control Office.
e. During this activity the new employee shall provide verification of their identity by providing two forms of I-9 documentation (https://www.uscis.gov/sites/default/files/document/forms/i-9.pdf) and fingerprints.
f. Upon Entry-on-Duty, the employee shall be issued a temporary credential (badge) for access to the Center until a Permanent Credential (badge) is created.
Please reference the GRC Office of Protective Services web site for the Permanent Support Service Contractor (SSC) New Hire Identity Creation Process (https://nasa.sharepoint.com/sites/grc-security), and for additional information.
(2) Temporary Pass Requirements
· Short Term Visitors (1-29 days) shall receive a Visitor Pass. Please reference the GRC Office of Protective Services Official Visitors website.
(https://nasa.sharepoint.com/sites/grc-security/SitePages/official-visitors.aspx)
· NASA GRC Service and Vendor Personnel shall receive a Service/Vendor Personnel Pass which will allow only physical access to NASA GRC. Please reference the GRC Office of Protective Services web site (https://nasa.sharepoint.com/sites/grc-security/SitePages/Long-Term-Visitors-and-Local-Badge-Process.aspx) for complete information.
· Temporary workers are defined as those employees that are on Center for more than 29 days and less than 180 days. Please reference the GRC Office of Protective Services web site (https://nasa.sharepoint.com/sites/grc-security/SitePages/Long-Term-Visitors-and- Local-Badge-Process.aspx) for complete information.
All lost or stolen badges or passes shall be reported immediately to the GRC Office of Protective Services (https://nasa.sharepoint.com/sites/grc-security/SitePages/piv-badges.aspx).
(ii) Employee Separation
(1) When an employee terminates and/or resigns employment, the contractor shall issue to the employee GRC 10087, Non-NASA Separation Clearance Record. The contractor shall be responsible for making an inquiry of all offices listed on the form to see if the employee has any outstanding Government items. The employee shall then take this form to all offices that list he/she as having outstanding items. The employee's last stop is for the return of their government https://www.uscis.gov/sites/default/files/document/forms/i-9.pdf https://nasa.sharepoint.com/sites/grc-security https://nasa.sharepoint.com/sites/grc-security/SitePages/official-visitors.aspx https://nasa.sharepoint.com/sites/grc-security/SitePages/Long-Term-Visitors-and-Local-Badge-Process.aspx https://nasa.sharepoint.com/sites/grc-security/SitePages/Long-Term-Visitors-and-Local-Badge-Process.aspx https://nasa.sharepoint.com/sites/grc-security/SitePages/Long-Term-Visitors-and-Local-Badge-Process.aspx https://nasa.sharepoint.com/sites/grc-security/SitePages/Long-Term-Visitors-and-Local-Badge-Process.aspx https://nasa.sharepoint.com/sites/grc-security/SitePages/piv-badges.aspx https://nasa.sharepoint.com/sites/grc-security/SitePages/piv-badges.aspx
80GRC026R0008 24
issued I.D. badge. The contractor is also required to send a notice to the Grc-Ssc- Separations@lists.nasa.gov within 1 day of employees' separation.
(2) The contractor shall ensure that the terminated and/or resigned employee has returned his/her badge to the Main Gate Badge Control Office. Final clearance of a contractor upon completion of a contract will depend in part upon accounting for all badges issued to employees during the performance of the contract.
Security badges are government property, and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.
(3) The contractor's on-site manager shall comply with the Badge and Property Regulations, a copy of which will be given to the contractor's supervisors at the time of the Construction Site Showing.
(4) Upon termination of duties, each employee's badge will be collected and returned to the Main Gate by the contractor. Final clearance of a contractor upon completion of a contract will depend in part upon the accounting for all badges issued to employees during the performance of the contract. Security badges are Government property, and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.
(b) PERSONNEL LOCATION AND IDENTIFICATION The contractor shall:
(1) Ensure that office space occupied by its personnel is clearly labeled with the name of the company.
(2) Ensure, to the extent practical, that external correspondence signed by its personnel is on company letterhead. Internal correspondence, including e-mail and memoranda, must include the name of the company in the signature line or in another clearly identifiable location.
(3) Ensure that its onsite personnel, when receiving or placing telephone calls, identify their employer, in addition to whatever other appropriate greeting is used.
(4) When participating in meetings with Government and/or other contractor personnel, ensure that its personnel properly identify themselves as contractor employees so that their actions will not be construed as acts of Government officials.
(c) EMERGENCY PREPAREDNESS
(1) Emergencies are defined as incidents involving serious personal injury or damage, incidents that cause possible hazardous conditions, or incidents that require immediate attention of the Plant Protection Department or Security. The contractor shall ensure that its employees are informed that Emergency, Fire, Medical, Safety, and Security assistance can be summoned by dialing 911 from a NASA phone, or 216-433-8888 from a cell phone.
(2) For incidents not classified as an emergency, contractor personnel shall be instructed to immediately notify the Contracting Officer's Representative (COR) (rather than dialing 911 from a NASA phone, or 216-433-8888 from a cell phone).
mailto:Grc-Ssc-Separations@lists.nasa.gov mailto:Grc-Ssc-Separations@lists.nasa.gov
80GRC026R0008 25
(3) In the event of any accident investigation activity, the contractor shall cooperate fully with the Government Accident Investigator and the Center Accident Investigation Board.
This cooperation shall include interviews at the accident site and/or at a Board meeting.
(4) The contractor shall provide written guidance to its employees in the event of an emergency, an incident other than an emergency, a Center closure, a building closure, a fire alarm, or tornado alarm. The contractor is encouraged to include in this guidance pre-established instructions, when feasible, to employees such that unnecessary delays and confusion may be avoided by employees who may otherwise be awaiting management instructions. For example, the contractor is encouraged to address what actions employees should immediately take in the event of fire, building closure, Center closure (i.e. late Center opening or early center dismissal) for snow or other causes.
(d) TRAFFIC The contractor agrees to comply and agrees to require that all of its personnel will comply with all posted traffic signs, signals and instructions of personnel assigned for traffic control and parking purposes and with the provisions of the NASA Glenn Research Center Safety Manual (GLM-QS-1700.1), Chapter 19, Vehicle & Pedestrian Safety, incorporated herein by reference and made a part hereof.
(e) PROHIBITION OF FIREARMS Firearms or weapons of any kind are strictly prohibited at the Glenn Research Center.
(f) SECURITY INCIDENTS Theft of property, bomb threats, malicious damage and any other threat or violent situations shall be immediately reported to the GRC Office of Protective Services.
(g) AFTER-HOUR ACCESS During normal working hours, 6:00 a.m. to 6:00 p.m. Monday through Friday, the Security Police Officers at the gates will permit contractor entrance and departure. At any other time, advance clearance is required. Advance clearance may be obtained through the GRC Protective Services Contract COR, who will make the request to the Main Gate Officer (3-2204 at Glenn and 3-3221 at ATF). After-hour clearances, as approved by the COR, are certification to the guards as authority for admittance of a contractor during off hours, including Saturdays, Sundays, and Holidays. This procedure ONLY applies to temporary contractors who are on-site at Glenn for 1 - 179 days within 365 day time-frame and are issued temporary badges (non-smartcard credentials) NOTE: Per ATF management ALL ATF employees are required to follow the after-hour access procedures.
(h) GOVERNMENT PROPERTY ACCOUNTABILITY
(1) Government property and material is subject to the requirements of Federal Acquisition Regulation (FAR) Part 45 and NASA FAR Supplement (NFS) Part 1845.