This is a set of mechanical construction drawings for a renovation project at a Department of Veterans Affairs medical center. The drawings depict demolition plans, new HVAC system layouts and details, schedules for mechanical equipment including fans, ductwork, piping, controls and various construction details. Key elements include renovating space to accommodate a new Whole Health clinic, adding and relocating fan coil units, modifying ductwork and piping, and installing new convection units, humidifiers and associated controls integrated with the building automation system. Completion is required by May 28, 2021 according to the bid documents.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (2 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FL FIRE LINE
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC STEAM CONVECTOR
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE
REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH
COR.
23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS
ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
25. INSTALL PIPING FREE OF SAGS AND BENDS.
26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MECHANICAL GENERAL NOTES
H
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
EQUIPMENT TAG
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
MECHANICAL LEGEND
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING CONTROL VALVE
STEAM TRAP
D CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMITS OF DEMOLITION
INLINE CENTRIFUGAL PUMP
STEAM PRESSURE
REDUCING VALVE
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS)
S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
T THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
DIFFUSER TAG | DIFFUSER CFM
32-CU-4
EG-8 2000
PC PROGRAMABLE CONTROLLER
F
SD
FS
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:5
A
M
M-001
MECHANICAL GENERAL INFORMATION
1 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
DocuSign Envelope ID: 5031BAE7-940A-4160-ADF6-B089AC0BA15C
5/26/2021
ROOF BELOW
ROOF BELOW
OIT
2C10
K M N O P Q
V.3R S T U x8 x8 x8 x8
20x8
20x8 x8
26x6 20x6 18x6 13x6 6x6
3 3
4 4
M-301
M-301
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B
TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
ELEVATOR
NO. 2
E2
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
OFFICE
2CO3
THERAPY
2CO2
OFFICE
2CO4
CORRIDOR
H210
STAIR
S201
HAC
2E01
EXAM
2C11
PHONE CLO.
2C11A
OFFICE
2C10
IRM
2C10A x8 x8 x8 x8
P
R.3 T.1 T.2 U.1
V.3R T U
M-301
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING
CONDITIONS. NOTIFY COR OF CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
B. ALL DEMOLISHED EQUIPMENT SHALL BECOME
PROPERTY OF THE CONTRACTOR UNLESS
NOTED OTHERWISE. CONTRACTOR SHALL
DISPOSE OF EQUIPMENT IN ACCORDANCE
WITH ALL VAMC REQUIREMENTS AND
ENVIRONMENTAL REGULATIONS.
C. REMOVE HANGERS AND SUPPORTS
ASSOCIATED WITH DEMOLISHED PIPES,
DUCTS, AND EQUIPMENT.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:1
A
M
MD101
SECOND FLOOR MECHANICAL
DEMOLITION PLAN
2 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
NORTH
0 4 8 16
1 REMOVE FCU AND ASSOCIATED SUPPORTS
AND CONTROLS COMPLETE.
2 REMOVE AIR TERMINAL, AND ASSOCIATED
DUCT, INSULATION, HANGERS AND
FITTINGS AS SHOWN DARK AND DASHED
TYPICAL.
3 REMOVE DUCT, INSULATION, HANGERS AND
FITTINGS AS SHOWN DARK AND DASHED
TYPICAL.
4 EXISTING TO REMAIN.
5 REMOVE FCU AND ASSOCIATED SUPPORTS
AND CONTROLS COMPLETE. RETAIN FCU
AND CONTROLS FOR INSTALLATION AS
SHOWN ON MH101. COVER, STORE, AND
PROTECT UNITS DURING CONSTRUCTION.
Scale: 1/8" = 1'-0"
NORTH MECHANICAL DEMOLITION PLAN
Scale: 1/8" = 1'-0"
SOUTH MECHANICAL DEMOLITION PLAN
NORTH
0 4 8 16
DN
K M N O P Q
V.3R S T U
3 3
3 3
1 1/2" CWS
2 1/2" CWR
2 1/2" CWR
1 1/2" CWS
1" D
1" CWS
2 1/2" CWR
1" D
1" D
1" D
1" CWR
1" CWS
1" D
1 1/2" CWR
2 1/2" CWS
1" D
1 1/2" CWR
2 1/2" CWS
1" D
1 1/2" CWR
2 1/2" CWS
1" D
2" CWR
2 1/2" CWS
1" D
2" CWR
2 1/2" CWS
1"D
2"CWR
2"CWS
5" CWS
4" CWS
PIPES ON
1ST FLOOR
PIPE ON
2ND FLOOR
P
R.3 T.1 T.2 U.1
V.3R T U
3/4"D
3/4"CWR
3/4"CWS
3/4"D
3/4"CWR
3/4" CWS
3/4"CWS
3/4"CWR
3/4"D
3/4"D
3/4"CWR
3/4" CWS
3/4"CWS
3/4"CWR
3/4"D
3/4"D
3/4"CWR
3/4"CWS
3/4"D
3/4" CWR
3/4" CWS
3/4"D
3/4"CWR
3/4"CWS
3/4"D
3/4"CWR
3/4" CWS
3/4"D
3/4"CWR
3/4" CWS
3/4"D
3/4"CWR
3/4"CWS
3/4"D3/4"CWS
3/4"CWR
3/4"D
3/4"CWR
3/4" CWS
1" D
2" CWR
2" CWS
1" D
2 1/2" CWR
2" CWS
1" D
2 1/2" CWR
1 1/2" CWS
4" CWR
A. CONTRACTOR TO FIELD VERIFY ALL EXISTING
CONDITIONS. NOTIFY COR OF CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
B. ALL DEMOLISHED EQUIPMENT SHALL BECOME
PROPERTY OF THE CONTRACTOR UNLESS
NOTED OTHERWISE. CONTRACTOR SHALL
DISPOSE OF EQUIPMENT IN ACCORDANCE
WITH ALL VAMC REQUIREMENTS AND
ENVIRONMENTAL REGULATIONS.
C. REMOVE HANGERS AND SUPPORTS
ASSOCIATED WITH DEMOLISHED PIPES,
DUCTS, AND EQUIPMENT.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:1
A
M
MD102
SECOND FLOOR MECHANICAL PIPING
DEMOLITION PLAN
3 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
Scale: 1/8" = 1'-0"
NORTH MECHANICAL PIPING DEMOLITION PLAN
Scale: 1/8" = 1'-0"
SOUTH MECHANICAL PIPING DEMOLITION PLAN
NORTH
0 4 8 16
1 REMOVE CWS, CWR, AND DRAIN AS SHOWN
DASHED, INCLUDING HANGERS AND
INSULATION TYPICAL.
2 REMOVE 5"AND 4" CWS RISER.
COORDINATE SHUTDOWN WITH THE VA
COR.
3 REMOVE STEAM CONVECTOR, CONTROL
VALVE, AND STEAM TRAP. MAKE READY
FOR NEW CONVECTOR TO BE INSTALLED.
4 EXISTING TO REMAIN.
5 ON 1ST FLOOR CAP PIPING AND REMOVE
RISERS UP TO 2ND FLOOR. MAKE 1ST
FLOOR PIPING READY FOR NEW
CONNECTION TO OFFSET AS SHOWN ON
MP101.
DN
F F
F F
S
K M N O P Q
V.3R S T U
OPEN OFFICE
2C08
GROUP ROOM 1A
2E26A
GROUP ROOM 2A
2E25A
CORRIDOR
H203
CORRIDOR
H203
ELEV LOBBY
H206
ELEV_
H209
OFFICE
2C06
PROVIDER OFFICE
2C05
WOMEN'S RESTROOM
2C07BMEN'S RESTROOM
2C07A
OPEN OFFICE
2C09
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
OFFICE
2C02A
OFFICE
2C02B
OFFICE
2C03
OFFICE
2C04A
OFFICE
2C04B
RECEPTION
2E22
OFFICE
2E24
COPY AREA
2E23
STORAGE
2E25C
STORAGE
2E26C
WAITING
2E21
WAITING
2E21
STAIR S201
H208
CONSULT
2E20
GROUP ROOM 1B
2E26B
GROUP ROOM 2B
2E25B
CORRIDOR
H204
CORRIDOR
H205
CLASSROOM
2E28
CLASSROOM
2E27
135SD-2
140SD-2
220SD-2
220SD-2
110SD-1
70SD-1
200SD-2 180SD-2 130SD-2
80SD-1
150SD-2
150SD-2
120SD-2
120SD-2
150SD-1
230SD-3
260SD-3
380SD-3
150SD-2
150SD-2
135SD-2
130SD-2
FCU-2E28
FCU-2E27
FCU-2E26A
FCU-2C08
FCU-2C03
FCU-2E25A
FCU-2E25B
FCU-2E23
FCU-2E21
FCU-2E20
FCU-2C06
FCU-2C05
FCU-2C02A
FCU-2C02B
FCU-2C04A
FCU-2C04B
FCU-2E24
CORRIDOR
H207
FCU-C209
FCU-2E26B
x x
300SD-3
100EG-1
105RG-1 95RG-1
40RG-1
80RG-1
105RG-1
110RG-1
45RG-1
90RG-1
80RG-1
280RG-1
120RG-2
90RG-2
125RG-1
160RG-1
200RG-1
280RG-1
225RG-1
180RG-1
195RG-1
90SD-1
200RG-2
310SD-3
350SD-3
350RG-1
170SD-2
235RG-1
145SD-2
FCU-H204
10x8 x
6x6
6x6
6x6
6x6
6x6 6x6 x
6x6 x
6x6
6x6
6x6 6x6
8x6 8x8
8x6 6x6
8ø8ø 10x10
6x6
6x6
6ø
8ø
8ø
MD (35 CFM)
MD (110 CFM)
MD (100 CFM)
MD (100 CFM)
MD (85 CFM)
MD (100 CFM)
MD (100 CFM)
MD (105 CFM)
MD (30 CFM)
MD (30 CFM)
MD (205 CFM)
MD (30 CFM)
MD (30 CFM)
MD (95 CFM)
MD (85 CFM)
MD (35 CFM)
MD (40 CFM)
MD (85 CFM)
MD (30 CFM)
MD (80 CFM)
190EG-1
190EG-1
x
8x8
12x10 150EG-1 x
70EG-1
70EG-1
70EG-1
70EG-1
250RG-1
200RG-2
8ø
8ø
8ø
10ø
10ø
6ø ø
8ø
10ø
6ø
6ø
10ø
10ø
6ø
8x8
8x8 ø
8ø
20x8 16x8
8ø 8x8
8ø
8ø
8ø
12x10
12x8 12x8
8ø8ø
6x6 6x6
8ø
6ø
8x6
8ø
20x6 18x6 13x6 26x6
10ø
MD (85 CFM)
10ø
8ø
8x8
10ø
8x8
8x8
6x6
8ø
FCU-H205
M-301
M-301
12x12
6x6 x8 x1
10x8 x x ø x ø x
6ø
10x10
FAC
H210
MD (35 CFM)
365RG-3
400SG-1
FCU-H210
R.3 T.1 T.2 U.1
V.3R T U
HAC
2E01
PAT TLT
2E02
PAT TLT
2E03
CONSULT
2E04
CHIRO EXAM
2E05
CHIRO EXAM
2E06
SOILED
2E07
CLEAN UTILITY
2E08
ACUPUNCTURE
2E09
ACUPUNCTURE
2E10 MEDITATION
2E11
MASSAGE
2E12
EXAM
2E13
MEDS
2E14
CHIRO EXAM
2E15
CHIRO EXAM
2E16
CONSULT
2E17
CONSULT
2E18
CONSULT
2E19
CONSULT
2E20
CORRIDOR
H201
CORRIDOR
H202
150SD-2
140SD-2
140SD-2
90SD-1
120SD-2
185SD-2 170SD-2
110SD-2
130SD-2
120SD-2
210SD-2
125SD-2
150SD-2
100SD-2
130SD-2
FCU-2E04
FCU-2E05
FCU-2E06
FCU-2E08
FCU-2E09
FCU-2E10
FCU-2E11
FCU-2E12
FCU-2E13
FCU-2E14
FCU-2E15
FCU-2E16
FCU-2E17
FCU-2E18
FCU-2E19
95RG-1
60RG-1
105RG-1 90RG-1
95RG-1
90RG-1
180RG-1
100RG-1
100RG-1
50RG-1
100RG-1
80RG-1
75RG-1
145RG-1 130RG-1
150EG-1
200SD-2
MD (40 CFM)
MD (40 CFM)
MD (40 CFM)
MD (35 CFM)
MD (40 CFM)
MD (30 CFM)
MD (30 CFM)
MD (40 CFM)
MD (35 CFM)
MD (45 CFM)
MD (35 CFM)
MD (45 CFM)
MD (30 CFM)
MD (30 CFM)
MD (30 CFM)
150EG-1
150EG-1
8x8
100RG-2
200SD-2
M-301
6x66x6
6x6
6x6 x
6x6
6x6
6x6
6x6 6x6 ø
6x6
6x6
8ø
8ø
8ø
10x10 ø ø
6x6
6x6 x
6x6
6x6
8x6
6x6
8ø
8ø
HU-2E08
HU-2E08
8ø
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:2
A
M
MH101
SECOND FLOOR HVAC PLAN
4 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
NORTH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
NORTH MECHANICAL PLAN
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
SOUTH MECHANICAL PLAN
1 INSTALL NEW FCU SUPPLY AND RETURN
DUCT TYPICAL.
2 RELOCATED FCU. SEE MD101 FOR FAN COIL
UNITS TO BE SAVED AND REINSTALLED AS
SHOWN.
3 EXISTING TO REMAIN.
4 INSTALL NEW FOUR PIPE FAN COIL UNIT.
5 OFFSET DUCT DOWN BELOW BEAM.
A. COORDINATE ALL WORK WITH THE
GENERAL CONTRACTOR, OTHER TRADES
AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS
OF WORK.
B. UNLESS NOTED OTHERWISE, ALL
DIFFUSERS AND GRILLE RUN-OUTS ARE
THE SAME SIZE AS THE NECK/DUCT
CONNECTION SIZE SPECIFIED IN THE AIR
DEVICE SCHEDULE.
C. ALL DIFFUSER AND GRILLE TAKEOFFS
SHALL INCLUDE A BALANCING DAMPER.
D. SEE ARCHITECTURAL CEILING PLAN FOR
CEILING TYPES AS WELL AS DIFFUSER AND
GRILLE PLACEMENT WITHIN THE CEILING.
E. COORDINATE ALL THERMOSTAT
LOCATIONS WITH ALL OTHER WALL
MOUNTED OBJECTS BEFORE
INSTALLATION.
T
K M N O P Q
V.3R S T U
2 1/2" CWS
2" CWR
1" D
3/4" D
3/4" CWR
3/4" CWS
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
2" CWR
2 1/2" CWS
3/4" CWS
3/4" CWR
3/4" D
1" D
2" CWR
2 1/2" CWS
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWR
3/4" CWS
1" D
2" CWR
2 1/2" CWS
3/4" D
3/4" CWR
3/4" CWS
2 1/2" CWS
2" CWR
1" D
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWR
3/4" CWS
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWR
3/4" CWS
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWR
3/4" CWS
3/4" CWS
3/4" CWR
3/4" D
1" CWR
3/4" D
3/4" CWR
3/4" CWS
CLASSROOM
2E27
GROUP ROOM 1A
2E26A
GROUP ROOM 1B
2E26B
CLASSROOM
2E28
GROUP ROOM 2A
2E25A
CORRIDOR
H205
CORRIDOR
H204
GROUP ROOM 2B
2E25B
CORRIDOR
H203
OFFICE
2E24
COPY AREA
2E23
RECEPTION
2E22
CORRIDOR
H203
ELEV_
H209
ELEV LOBBY
H206
WAITING
2E21
WAITING
2E21
CONSULT
2E20
HAC
2E01 CORRIDOR
H202
OFFICE
2C06
PROVIDER OFFICE
2C05
WOMEN'S RESTROOM
2C07B
MEN'S RESTROOM
2C07A
CORRIDOR
H207
OPEN OFFICE
2C08
OPEN OFFICE
2C09
OFFICE
2C02A
OFFICE
2C02B
OFFICE
2C03
OFFICE
2C04B
OFFICE
2C04A
STAIR S201
H208
MP101
4" CWS
2 1/2" CWS
22222
FCU-C209
FCU-2C08
FCU-2C02A
FCU-2C02B
FCU-2C03
FCU-2C05
FCU-2C06
FCU-2C04A
FCU-2C04B
FCU-2E20
FCU-2E21
FCU-2E23
FCU-2E24
FCU-2E25B
FCU-2E25A
FCU-2E26B
FCU-2E26A
FCU-2E27
FCU-2E28
SC-2E19
SC-2E20
SC-2E21B
SC-2E21A
SC-H203B
SC-2E22
SC-2E24
SC-2E25B
SC-2E25A
SC-2E25A
SC-2E26B
SC-2E26B
SC-2E26A
SC-2E26A
SC-2E27B
SC-2E27ASC-2E28A
SC-2E28B
SC-H205A
SC-H205B
SC-H205C
SC-H205D
SC-H204A
SC-H204B
SC-H204C
SC-H203A
SC-2C06SC-2C07BSC-2C07A
SC-2C08B
SC-2C08A
SC-2C09B
SC-2C09A
SC-2C02B SC-2C03A SC-2C03B SC-2C03C SC-2C04B
SC-2C04A
SC-H207A
SC-H207B
T T T
T
T
T
T
T
T
T
T
T
T T
T
T
T
2 1/2" CWR
1" CWS
2 1/2" CWR
1 1/2" CWS
2 1/2" CWR
TT
2"CWR
2"CWS
2" CWR
2 1/2" CWS
T
M-301
M-301
1" D
1" D
3/4" D
1" D
1" D 1" D9
T
T
T
1" D
1" D
FAC
H210
1" CWS
3/4" D
3/4" CWR
3/4" CWS
3/4" D
3/4" CWR
3/4" CWS
5" CWS
PIPES ON
1ST FLOOR
PIPES ON
2ND FLOOR
4" CWS
5" CWS
T
4" CWS
P
R.3 T.1 T.2 U.1
V.3R T U
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWR
3/4" CWS
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWR
3/4" CWS
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" D
3/4" CWS
3/4" CWR
3/4" D
3/4" CWR
3/4" CWS
ACUPUNCTURE
2E10
CORRIDOR
H201
MEDITATION
2E11
ACUPUNCTURE
2E09
MASSAGE
2E12
EXAM
2E13
CLEAN UTILITY
2E08
MEDS
2E14
SOILED
2E07
CHIRO EXAM
2E15
CHIRO EXAM
2E06
CHIRO EXAM
2E16
CHIRO EXAM
2E05
CORRIDOR
H202
CONSULT
2E04
CONSULT
2E17
CONSULT
2E18
PAT TLT
2E03
PAT TLT
2E02
CONSULT
2E19
SC-2E02
SC-2E03
SC-2E04
SC-2E07
SC-2E08
SC-2E14
SC-2E17
SC-2E19
FCU-2E19
FCU-2E17
FCU-2E16
FCU-2E15
FCU-2E14
FCU-2E12
FCU-2E11
FCU-2E10
FCU-2E09
FCU-2E08
FCU-2E06
FCU-2E05
FCU-2E04
FCU-2E13
FCU-2E18
T
T
T
T
T
1" D
2 1/2" CWR
2" CWS
1"D
2 1/2" CWR
1 1/2" CWS
T
M-301
T
SC-2E18
T
T
T
T
T
T
T
T
T
T
T
3/4" LPS
3/4" LPR
3/4" LPS
3/4" LPR
3/4" LPR
3/4" LPS
3/4" LPR
3/4" LPS
3/4" LPS
3/4" LPR
3/4" LPS
3/4" LPR
3/4" LPS
3/4" LPR
3/4" LPS
3/4" LPR
3/4" LPS
3/4" LPR
HU-2E08
HU-2E08
3/4" LPS
H P
3/4" CWR
FIRST FLOOR
0' - 0"
SECOND FLOOR
12' - 0"
THIRD FLOOR
24' - 0"
V.3U
4" CWS
4" CWS
4" CWS
4" CWS
5" CWS
A. COORDINATE WORKING HOURS ALLOWED
WITH THE VA COR.
B. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
C. COORDINATE THERMOSTAT LOCATION WITH
ALL OTHER WALL MOUNTED OBJECTS IN
ACCORDANCE WITH ADA CODE.
D. COORDINATE FINAL CEILING DIFFUSER
LOCATIONS WITH ALL OTHER CEILING
MOUNTED EQUIPMENT AND/OR DEVICES.
E. ALL CHS/R RUNOUTS TO FAN COIL UNITS
SHALL BE 3/4" UNLESS NOTED OTHERWISE. ALL
FAN COIL UNIT DRAIN PIPING SHALL BE 3/4".
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:3
A
M
MP101
SECOND FLOOR MECHANICAL PIPING
PLAN
5 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
NORTH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
NORTH MECHANICAL PIPING PLAN
Scale: 1/8" = 1'-0"
SOUTH MECHANICAL PIPING PLAN
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
CHILLED WATER RISER BYPASS
1 INSTALL NEW CWS, CWR, AND DRAIN PIPING
MAINS WITH INSULATION AND HANGERS.
2 INSTALL NEW CWS, CWR, AND DRAIN PIPING
TO FCU. SEE DETAIL 1/M-502
3 INSTALL NEW CWS RISERS DOWN IN CHASE
TO FIRST FLOOR AND RECONNECT TO RISER
ON FIRST FLOOR. SEE 1/MP101.
4 INSTALL NEW ISOLATION VALVE.
5 INSTALL NEW STEAM CONVECTOR AND
CONNECT TO EXISTING PIPING. SEE DETAIL
7/M-501
6 INSTALL NEW STEAM CONVECTOR AND
PIPING. CONNECT TO EXISTING PIPING ON
FIRST FLOOR. SEE DETAIL 7/M-501
7 CONNECT 3/4 LPS AND 3/4" LPR TO STEAM
AND CONDENSATE PIPING IN FIRST FLOOR
CEILING AND EXTEND UP IN CHASE TO
ABOVE CEILING AND CONNECT TO HEATING
COIL.
8 1" DRAIN DOWN TO AIR GAP FITTING WITHIN
WALL AT 18"AFF. PROVIDE A 12"x12" ACCESS
DOOR TO ACCESS AND VIEW AIR GAP
FITTING IN CORRIDOR WALL. CONNECT 1”
DRAIN FROM AIR GAP FITTING TO DRAIN
FROM PLUMBING FIXTURE.
9 CAP EXISTING DRAIN PIPE.
10 1" DRAIN FROM HUMIDIFIER DOWN IN WALL.
SEE NOTE 8.
11 INSTALL NEW HUMIDIFIER ON WALL AT 5' 3"
AFF.
12 INSTALL NEW TEMPERATURE AND HUMIDITY
SENSOR AND PRESSURE MONITOR AT 54"
AFF. CONNECT TO BAS.
13 INSTALL NEW TEMPERATURE SENSOR AT 54"
AFF. CONNECT TO BAS.
T
SECOND FLOOR
12' - 0"
THIRD FLOOR
24' - 0"
R T U
14x812x8
3/4" DCWR
3/4" DHWR
2" CWR
2 1/2" CWS
3/4" CWS
3/4" CWR
3/4" D
FCU-2E25A
10ø
6x6
6x6
CEILING
LIGHTS1"D
3/4" DCWS
3/4" DHWS
3/4" DHWR
1 1/2" DCWS
2" DHWS
LIGHTS
FL
SECOND FLOOR
12' - 0"
THIRD FLOOR
24' - 0"
9 10 11
FCU-2C08
4" SAN
4" SAN
CEILING
1/2" DCW 1/2" DHW
8ø
6x6
1" D
12x8
1"O
2" DCW
1 1/2" CWS
2 1/2" CWR
1 1/2"V
LIGHTS
SECOND FLOOR
12' - 0"
THIRD FLOOR
24' - 0"
R T
2 1/2" CWR
2" CWS
16x8
FCU-2E05
1 1/2" DCW
1" DHW
LIGHT
1/2" DHWR
1/2" DHW
3/4" DCW
8ø
2 1/2" CWR
2" CWS
1" D 3/4" D
FL
6x6
3/4" DHWR 2" V
LIGHT FIXTURE
x
CEILING
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:5
A
M
M-301
MECHANICAL SECTIONS
6 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
Scale: 1/4" = 1'-0"
NORTH CORRIDOR SECTION
Scale: 1/4" = 1'-0"
CENTRAL CORRIDOR SECTION TYP.
Scale: 1/4" = 1'-0"
SOUTH CORRIDOR SECTION
0 2 4 8
0 2 4 8
0 2 4 8
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHT.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-16
INSULATION
DUCT
GASKET
INSULATION
SECTION "A-A"
ACCESS PANEL
CASING
GASKET HANDLE INSIDE
FLEXIBLE WASHER
FACTORY
FABRICATED LATCH
SECTION "B-B"
ACCESS DOOR
INSULATION
"B" "B"
"A"
"A"
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
SECTIONSIDE ELEVATION
1/2" ROUND ROD PIN
1/8" CLEARANCE
ALL AROUND
INSIDE END
BEARING
INSULATION
STAND-OFF
DAMPER BLADE
HANDLE
WITH
LOCKING
QUADRANT
STIFFEN BLADE
AS REQUIRED
INSULATION SEE
SPECIFICATION
DUCT
OUTSIDE END BEARING
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.
W1
W
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
1-1/2" POCKET SLIP
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
1" FLANGE & HEM
BOLT ON 4" CENTERALTERNATE
POSITION OF
BOLT 1" x 1/8" BAND IRON
WASHER
FLANGED
CONNECTION ON FAN
SIDE
FLEXIBLE MATERIAL
AS SPECIFIED
5/16" FLANGE
BOLT ON 4" CENTERS
1" x 1/8" BAND IRON
WASHER
FLANGED CONNECTION
ON FAN SIDE
1" x 1/8" DRAW BAND
FLEXIBLE
MATERIAL AS
SPECIFIED
SHEET
METAL
SCREWS ON
12" CENTERS
RIVET ON 4" CENTERS
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
RECTANGULAR FLEXIBLE CONNECTION
ROUND FLEXIBLE CONNECTION
1-1/2"1/2" 1/2"
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN
FOR SPLIT
DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
NOTE:
ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
TO RETURN MAIN
FLOAT AND THERMOSTATIC TRAP.
SEE PLANS, AND SCHEDULES
1" GATE
VALVE
SCHEDULE 80 STEEL PIPE
PIPE SIZE SHALL BE
SAME SIZE AS TRAP
BYPASS - INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE & BELOW TRAP
DRIP LEG OR EQUIPMENT CONNECTION.
MAKE THE SAME SIZE AS THE SUPPLY
MAIN OR EQUIPMENT CONNECTION. SEE
NOTE 1
M
IN
M
IN
FLOW
SEE DRAWINGS
FOR PIPE SIZES
SCALE
POCKET/ DRIP
LEG
SCHEDULE
80 STEEL
PIPE
NOTE:
WHEN MOUNTED IN A GYPSUM BOARD CEILING, PROVIDE
MANUFACTURERS SUFACE MOUNT TRIM FRAME.
VOLUME DAMPER
W/LOCKING QUAD
SHEET
METAL
SADDLE
CEILING
TYPICAL DIFFUSER OR
REGISTER IN LAY-IN
CEILING
FLEXIBLE DUCT SIZE SAME
AS DIFFUSER INLET: 5'-0"
MAX. LENGHT
USE RIGID ELBOWS FOR
CHANGE OF DIRECTION
GREATER THAN 45°
SUPPORT SADDLE
FROM STRUCTURE
SEE SPECIFICATION
FOR CLAMPS AND
SEALANT (TYP.)
THERMAL
INSULATION, SEE
SPECIFICATIONS
CONICAL OUTLET
BRANCH DUCT
12"
CONCRETE
FLOOR SLAB
CLIP ANGLE
STEEL EXPANSION SHIELD FOR
EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRUCTION
THIS TYPE SHALL BE USED ONLY IN
SLABS OR BEAMS OF 4" MIN. DEPTH
TURNBUCKLE
3/8" MIN. DIA.
HANGER RODS
3/8" MIN. DIA. EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRUCTION
3/8" MIN. DIA. INSERTS NEW
CONSTRUCTION ONLY
NUTS &
WASHERS
3/8" MIN. DIA.
HANGER
RODS
FOR PIPES UNDER 2" IN SIZE USE 1 1/2"
X 1 1/2" X 1/4" ANGLE. ALL PIPES 2" AND
LARGER USE 3" X 3" X 1/4" ANGLE
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT PLAN OR SIDE
VIEW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
AIRFLOW
AIRFLOWAIRFLOW
E Q
U
IP
M E
N T
M A
X
M
AX.
M A X
M A
X
M
AX.
M A
X
FAN COIL
UNIT
FLEXIBLE CONNECTION
DISCHARGE PLENUM
OR DUCT
VOLUME DAMPER
TYPICAL
FLEXIBLE DUCT
SUPPLY DIFFUSER
DUCT TRANSITION FROM
FCU OUTLET
CEILING
FILTER RETURN
GRILLE WITH MERV ll FILTER
VIBRATION ISOLATOR
HANGERS
OA VENTILATION
DUCT SEE PLANS
FOR CONTINUATION
FLEXIBLE CONNECTION
(TYPICAL)
HANGERS UP
AND SECURE TO
STRUCTURE
PLENUM
SEE PLANS FOR
FOR DUCT SIZE
RETURN
SUPPLY
COIL
2-WAY COIL PIPING
MANUAL AIR VENT
UNION (TYPICAL)
2-WAY MODULATING
CONTROL VALVE
STRAINER WITH
DRAIN VALVE AND
HOSE CONNECTION
TEMPERATURE/PRESSURE TEST PORT
SHUT-OFF
VALVE (TYP.)
CONCENTRIC REDUCERS,
IF REQUIRED (TYP.)
BALANCING VALVE
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN. PIPING SHALL BE RIGID
COPPER TYPE L OR TYPE M UNLESS
NOTE BELOW IS MET
PITCH DOWN TOWARD DRAIN
CLEANOUT
FLOOR SINK
DRAIN PAN
DIELECTRIC FITTING
NOTES:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES
NOT PASS THROUHG RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAW
THRU
BLOW THRU
2" PLUS X
1" MINIMUM
X
2X
B A
EXISTING RADIATOR
CONTROL WIRING TO FCU CONTROLLER
INCREASER /REDUCER FITTING
TWO-WAY, STEAM CONTROL VALVE
UNION NEW
THERMOSTATIC
STEAM TRAP
EXISTING STEAM PIPING EXISTING RETURN PIPING
WALL WALL
FLOOR
DRAIN PIPE
FIXED AIR GAP - LIKE JR SMITH
MODEL 3955 SPIGOT OUTLET
NO HUB COUPLING
SANITARY PIPE
2" HUB INLET - SPIGOT
OUTLET DEEP SEAL
P-TRAP
1/2 DRAIN PIPE
DIAMETER
SET SCREW
1-1/4" CONDENSATE
DRAIN
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:0
A
M
M-501
MECHANICAL DETAILS
7 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
Scale: No Scale
ACCESS PANEL AND DOOR DETAIL
Scale: No Scale
DUCTWORK RADIUS ELBOW
Scale: No Scale
VOLUME DAMPER DETAIL
Scale: No Scale
DUCTWORK SQUARE VANE ELBOWS
Scale: No Scale
FLEXIBLE DUCT CONNECTIONS
Scale: No Scale
SUPPLY DUCT TAKE-OFFS
Scale: No Scale
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
Scale: No Scale
FLEXIBLE AIR DUCT CONNECTOR
Scale: No Scale
SECURING HANGER RODS IN CONCRETE
Scale: No Scale
DUCT TRANSITIONS
Scale: No Scale
FAN COIL UNIT SECTION
Scale: No Scale
COIL UNIT PIPING DETAILS
Scale: No Scale
COIL DRAIN TRAP DETAIL
Scale: No Scale
CONVECTOR VALVE INSTALLATION DETAIL (BUILDING 1)
Scale: No Scale
FIXED AIR GAP DETAIL
CHR
CHS
HS
SST
PC
T
V-1
RA
FILTER
COOLING COIL
FAN
SA
T-1
ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.
NEW CONVECTOR
NEW TRAP
T
V-2
LPR
LPS
PROGRAMABLE CONTROLLER
SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)
DURING OCCUPIED CYCLE
1. FAN SHALL OPERATE CONTINUOUSLY.
2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1
SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)
3. ON CALL FOR HEATING VALVE V-1 SHALL BE CLOSED AND STEAM
VALVE V-2 SHALL MODULATE OPEN TO MAINTAIN SETPOINT OF 70° F
(ADJ).
4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE
FROM SETPOINT.
5. INCLUDE ROOM TEMPERATURE AND HUMIDITY MONITORING FOR
ROOM 115 MEDICATION/LOGISTICS.
SEQUENCE OF OPERATION UNOCCUPIED CYCLE
1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE
V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK
TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN
COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.
2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND
VALVE V-1 SHALL BE CLOSED. STEAM RADIATOR VALVE V-2 SHALL
CYCLE TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF
68° F (ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.
POINT NAME:
ROOM TEMPERATURE
ROOM TEMPERATURE SETPOINT
DISCHARGE AIR TEMPERATURE
FAN STATUS
FAN ON/OFF
COOLING COIL CONTROL VALVE
ROOM HUMIDITY
ROOM HUMIDITY SETPOINT
HIGH DISCHARGE AIR TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
BI BO
SOFTWARE POINTS
AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
LOW DISCHARGE AIR TEMPERATURE X
NOTES
X
X
X
X
X
X
X X X X
X
X
X
X
X
7 1 1 1 1 6 3 10
TOTAL HARDWARE (11) TOTAL SOFTWARE (10)
HEATING VALVE X
XPOINT NAME:
ROOM TEMPERATURE
ROOM TEMPERATURE SETPOINT
HARDWARE POINTS
AI AO
X
X
BI BO
SOFTWARE POINTS
AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X
X
X
X
NOTES
X
2 1 1 1 2 3
TOTAL HARDWARE (11) TOTAL SOFTWARE (10)
STEAM VALVE X
SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)
ON CALL FOR HEATING VALVE SV-1 SHALL MODULATE OPEN TO
MAINTAIN ROOM SETPOINT (70oF ADJ.)
SEQUENCE OF OPERATION UNOCCUPIED CYCLE
ON CALL FOR HEATING VALVE SV-1 SHALL MODULATE OPEN TO
MAINTAIN ROOM SETPOINT (65oF ADJ.)
PC
T T-1
ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.
CONVECTOR
NEW TRAP
SV-1
LPR
LPS
PROGRAMABLE CONTROLLER
CHR
CHS
HS
SST
PC
V-1
RA
FILTER
COOLING COIL
FAN
SA
T
STEAM COIL
LPS LPR
V-2
PROGRAMABLE CONTROLLER
SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)
DURING OCCUPIED CYCLE
1. FAN SHALL OPERATE CONTINUOUSLY.
2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1
SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)
3. ON CALL FOR HEATING, VALVE V-1 SHALL BE CLOSED AND STEAM
VALVE V-2 SHALL MODULATE TO MAINTAIN SETPOINT OF 70°F (ADJ.)
4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE
FROM SETPOINT.
5. INCLUDE ROOM TEMPERATURE AND HUMIDITY MONITORING FOR
ROOM 115 MEDICATION/LOGISTICS.
SEQUENCE OF OPERATION UNOCCUPIED CYCLE
1. ON CALL FOR OOLING FAN COIL UNIT SHALL OPERATE AND VALVE
V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK
TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN
COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.
2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND
VALVE V-1 SHALL BE CLOSED. STEAM VALVE V-2 SHALL MODULATE
TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF 68° F
(ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.
POINT NAME:
ROOM TEMPERATURE
ROOM TEMPERATURE SETPOINT
DISCHARGE AIR TEMPERATURE
FAN STATUS
FAN ON/OFF
COOLING COIL CONTROL VALVE
ROOM HUMIDITY
ROOM HUMIDITY SETPOINT
HIGH DISCHARGE AIR TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
BI BO
SOFTWARE POINTS
AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
LOW DISCHARGE AIR TEMPERATURE X
NOTES
X
X
X
X
X
X
X X X X
X
X
X
X
X
7 2 1 1 1 6 3 11
TOTAL HARDWARE (11) TOTAL SOFTWARE (10)
STEAM VALVE X X
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:0
A
M
M-502
MECHANICAL DETAILS
8 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
Scale: No Scale
FAN COIL UNIT CONTROLS
Scale: No Scale
FAN COIL UNIT SEQUENCE OF OPERATION
Scale: No Scale
TWO-PIPE FAN COIL UNIT POINTS LIST
Scale: No Scale
CONVECTOR POINTS LIST
Scale: No Scale
CONVECTOR SEQUENCE OF OPERATION
Scale: No Scale
CONVECTOR CONTROLS
Scale: No Scale
FAN COIL UNIT CONTROLS - WITH STEAM COIL
Scale: No Scale
FAN COIL UNIT SEQUENCE OF OPERATION - WITH STEAM COIL
Scale: No Scale
TWO-PIPE FAN COIL UNIT POINTS LIST - WITH STEAM COIL
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:0
A
M
M-601
MECHANICAL SCHEDULES
9 9JT
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM
NOTES:
1. AUTOMATIC FAN SPEED CONTROL WITH OVERRIDE SELECTOR. ADJUST FAN SPEED TO DELIVER THE COOLING SUPPLY AIRFLOW QUANTITY SHOWN ON THE PLAN DRAWING.
2. PROVIDE 120V TO 24V TRANSFORMER, TWO WAY CONTROL VALVE FOR CHILLED WATER, BACNET COMPATIBLE CONTROLLER.
3. RELOCATED SIZE 08 FCU.
4. RELOCATED SIZE 06 FCU.
5. PROVIDE A THREE WAY VALVE
TWO PIPE FCU SCHEDULE
+ LOCATION TYPE
FAN AIR FLOW
EXTERNAL
APD COOLING REQUIREMENTS FAN MOTOR
REMARKSCFM IN WG
MIN SENS
CAPACITY
MIN TOTAL
CAPACITY ENT. AIR Db Wb FLOW EWT WPD POWER
PHASE VOLT RPM
SPEED
CONTROLMBH MBH °F °F GPM °F FT WC HP
FCU-2C02A OFFICE 2C02A HORIZONTAL
CONCEALED
65 0.3 1.1 1.7 75 60 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2C02B OFFICE 2C02B HORIZONTAL
CONCEALED
110 0.3 2.2 2.5 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2C03 OPEN OFFICE 2C03 HORIZONTAL
CONCEALED
445 0.3 8.9 10.6 75 63 1.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2,3
FCU-2C04A OFFICE 2C04A HORIZONTAL
CONCEALED
120 0.3 2.4 2.8 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2C04B OFFICE 2C04B HORIZONTAL
CONCEALED
135 0.3 2.9 3.5 75 63 0.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2C05 PROVIDER OFFICE 2C05 HORIZONTAL
CONCEALED
75 0.3 1.2 1.9 75 60 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2C06 OFFICE 2C06 HORIZONTAL
CONCEALED
130 0.3 2.6 3 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2C08 OPEN OFFICE 2C08 HORIZONTAL
CONCEALED
180 0.3 3.5 4.4 75 64 0.7 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E04 CONSULT 2E04 HORIZONTAL
CONCEALED
150 0.3 3 3.6 75 63 0.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E08 CLEAN UTILITY 2E08 HORIZONTAL
CONCEALED
100 0.3 1.8 2.1 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2E14 MEDS 2E14 HORIZONTAL
CONCEALED
150 0.3 2.3 2.7 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E17 CONSULT 2E17 HORIZONTAL
CONCEALED
330 0.3 2.4 2.9 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E18 CONSULT 2E18 HORIZONTAL
CONCEALED
100 0.3 1.7 2.1 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E19 CONSULT 2E19 HORIZONTAL
CONCEALED
150 0.3 2.6 3.1 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E20 CONSULT 2E20 HORIZONTAL
CONCEALED
115 0.3 2.4 2.9 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2E21 WAITING AREA 2E21 HORIZONTAL
CONCEALED
390 0.3 7.2 9.4 75 63 1.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,3
FCU-2E23 COPY AREA 2E23 HORIZONTAL
CONCEALED
210 0.3 3 3.6 75 63 0.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E24 OFFICE 2E24 HORIZONTAL
CONCEALED
120 0.3 2.5 2.8 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2
FCU-2E25A GROUP ROOM 2E25A HORIZONTAL
CONCEALED
300 0.3 5.9 7.5 75 63 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E25B GROUP ROOM 2E25B HORIZONTAL
CONCEALED
275 0.3 4.5 5.8 75 64 1.0 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E26A GROUP ROOM 2E26A HORIZONTAL
CONCEALED
300 0.3 8.4 15.5 75 68 2.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E26B GROUP ROOM 2E26B HORIZONTAL
CONCEALED
275 0.3 5.9 7.6 75 62 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-2E27 CLASSROOM 2E27 HORIZONTAL
CONCEALED
300 0.3 6.1 7.8 75 64 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4,5
FCU-2E28 CLASSROOM 2E28 HORIZONTAL
CONCEALED
300 0.3 6 7.8 75 63 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4,5
FCU-C209 OPEN OFICE 2C09 HORIZONTAL
CONCEALED
210 0.3 4 5 75 64 0.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-H204 CORRIDOR H204 HORIZONTAL
CONCEALED
260 0.3 10.2 11.7 75 62 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-H205 CORRIDOR H205 HORIZONTAL
CONCEALED
275 0.3 5.9 7.6 75 62 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4
FCU-H210 OFFICE 2C03 HORIZONTAL
CONCEALED
400 0.3 8.9 10.6 75 63 1.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2
NOTES:
1. FIELD VERIFY ENCLOSURE LENGTHS.
2. COLOR AS SELECTED BY THE ARCHITECT OR INTERIOR DESIGNER. SEE 'I' SERIES DRAWINGS.
3. SLOPED TOP ENCLOSURE.
4. PROVIDE 2-WAY STEAM VALVE CONNECTED TO BAS
STEAM CONVECTOR SCHEDULE
MARK LOCATION MOUNTING
ENCLOSURE
LENGTH
ENCLOSURE
LENGTH CAPACITY ENT. AIR TEMP. STEAM FLOW
REMARKSIN IN MBTUH °F LBS/HR
SC-2C02B 2C02 FREE
STANDING
40 24 3860.0 70 °F 4.1 1 , 2, 3, 4
SC-2C03A 2C03 FREE
STANDING
40 24 4367.3 70 °F 4.6 1 , 2, 3, 4
SC-2C03B 2C03 FREE
STANDING
40 24 4367.3 70 °F 4.6 1 , 2, 3, 4
SC-2C03C 2C03 FREE
STANDING
40 24 4367.3 70 °F 4.6 1 , 2, 3, 4
SC-2C04A 2C04A FREE
STANDING
40 24 2783.0 70 °F 2.9 1 , 2, 3, 4
SC-2C04B FREE
STANDING
40 24 4335.0 70 °F 4.6 1 , 2, 3, 4
SC-2C06 FREE
STANDING
40 24 5317.0 70 °F 5.6 1 , 2, 3, 4
SC-2C07A FREE
STANDING
40 24 2833.0 70 °F 3 1 , 2, 3, 4
SC-2C07B 2C07B FREE
STANDING
40 24 3389.0 70 °F 3.6 1 , 2, 3, 4
SC-2C08A 2C08 FREE
STANDING
40 24 2837.0 70 °F 3 1 , 2, 3, 4
SC-2C08B 2C08 FREE
STANDING
40 24 2837.0 70 °F 3 1 , 2, 3, 4
SC-2C09A 2C09 FREE
STANDING
40 24 3271.5 70 °F 3.4 1 , 2, 3, 4
SC-2C09B FREE
STANDING
40 24 3271.5 70 °F 3.4 1 , 2, 3, 4
SC-2E02 FREE
STANDING
40 24 2310.0 70 °F 2.4 1 , 2, 3, 4
SC-2E03 FREE
STANDING
40 24 2220.0 70 °F 2.3 1 , 2, 3, 4
SC-2E04 FREE
STANDING
40 24 3370.0 70 °F 3.6 1 , 2, 3, 4
SC-2E07 2E07 FREE
STANDING
40 24 2550.0 70 °F 2.7 1 , 2, 3, 4
SC-2E08 FREE
STANDING
40 24 2860.0 70 °F 3 1 , 2, 3, 4
SC-2E14 FREE
STANDING
40 24 2600.0 70 °F 2.7 1 , 2, 3, 4
SC-2E17 2E17 FREE
STANDING
40 24 2560.0 70 °F 2.7 1 , 2, 3, 4
SC-2E18 FREE
STANDING
40 24 1300.0 70 °F 1.4 1 , 2, 3, 4
SC-2E19 2E19 FREE
STANDING
40 24 2600.0 70 °F 2.7 1 , 2, 3, 4
SC-2E20 FREE
STANDING
40 24 2760.0 70 °F 2.9 1 , 2, 3, 4
SC-2E21A FREE
STANDING
40 24 4646.0 70 °F 4.9 1 , 2, 3, 4
SC-2E21B 2E21 FREE
STANDING
40 24 4646.0 70 °F 4.9 1 , 2, 3, 4
SC-2E22 2E22 FREE
STANDING
40 24 4874.0 70 °F 5.1 1 , 2, 3, 4
SC-2E24 2E24 FREE
STANDING
40 24 2429.0 70 °F 3.2 1 , 2, 3, 4
SC-2E25A FREE
STANDING
40 24 2818.0 70 °F 3 1 , 2, 3, 4
SC-2E25A 2E25 FREE
STANDING
40 24 2818.0 70 °F 3 1 , 2, 3, 4
SC-2E25B FREE
STANDING
40 24 6220.0 70 °F 6.6 1 , 2, 3, 4
SC-2E26A 2E26A FREE
STANDING
40 24 3018.0 70 °F 3 1 , 2, 3, 4
SC-2E26A 2E26A FREE
STANDING
40 24 3018.0 70 °F 3.2 1 , 2, 3, 4
SC-2E26B 2E26B FREE
STANDING
40 24 3062.0 70 °F 3.2 1 , 2, 3, 4
SC-2E26B 2E26B FREE
STANDING
40 24 3062.0 70 °F 3.2 1 , 2, 3, 4
SC-2E27A 2E27 FREE
STANDING
46 24 4760.0 70 °F 5 1 , 2, 3, 4
SC-2E27B 2E27 FREE
STANDING
46 24 4760.0 70 °F 5 1 , 2, 3, 4
SC-2E28A FREE
STANDING
46 24 4298.0 70 °F 4.5 1 , 2, 3, 4
SC-2E28B FREE
STANDING
46 24 4298.0 70 °F 4.5 1 , 2, 3, 4
SC-H203A FREE
STANDING
40 24 6207.5 70 °F 6.6 1 , 2, 3, 4
SC-H203B FREE
STANDING
40 24 6207.5 70 °F 6.6 1 , 2, 3, 4
SC-H204A H204 FREE
STANDING
40 24 3087.0 70 °F 3.3 1 , 2, 3, 4
SC-H204B FREE
STANDING
40 24 3086.0 70…