8-Mech BidDrawing 657-20-101JB (9 Pages) 5 28 2021 .pdf

PDF 2 MB Posted

Attached to
Z2DA--657-20-101JB FCA-Renovate Space for Whole Health Clinic
Solicitation number
36C25522R0058
Issued by

About this file

This is a set of mechanical construction drawings for a renovation project at a Department of Veterans Affairs medical center. The drawings depict demolition plans, new HVAC system layouts and details, schedules for mechanical equipment including fans, ductwork, piping, controls and various construction details. Key elements include renovating space to accommodate a new Whole Health clinic, adding and relocating fan coil units, modifying ductwork and piping, and installing new convection units, humidifiers and associated controls integrated with the building automation system. Completion is required by May 28, 2021 according to the bid documents.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (2 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FL FIRE LINE

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT

AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC STEAM CONVECTOR

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

MECHANICAL ABBREVIATIONS

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE

REQUIRED.

6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH

COR.

23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS

ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

25. INSTALL PIPING FREE OF SAGS AND BENDS.

26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS

GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST

MECHANICAL GENERAL NOTES

H

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

EQUIPMENT TAG

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

MECHANICAL LEGEND

S-60

S-15

CR-15

CHWS

CHWR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING CONTROL VALVE

STEAM TRAP

D CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMITS OF DEMOLITION

INLINE CENTRIFUGAL PUMP

STEAM PRESSURE

REDUCING VALVE

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS)

S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

T THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

DIFFUSER TAG | DIFFUSER CFM

32-CU-4

EG-8 2000

PC PROGRAMABLE CONTROLLER

F

SD

FS

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:5

A

M

M-001

MECHANICAL GENERAL INFORMATION

1 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

DocuSign Envelope ID: 5031BAE7-940A-4160-ADF6-B089AC0BA15C

5/26/2021

ROOF BELOW

ROOF BELOW

OIT

2C10

K M N O P Q

V.3R S T U x8 x8 x8 x8

20x8

20x8 x8

26x6 20x6 18x6 13x6 6x6

3 3

4 4

M-301

M-301

EXAM

2E25A

EXAM

2E25

OFFICE

2E23

WAITING

ROOM

2E26

OFFICE

2E27

OFFICE

2E22

TOILET

2E22A

TOILET

2E28

EXAM

2E29

TOILET

2E25B

TOILET

2E24

EXAM

2E21

OFFICE

2E20

CHASE

CH-E-1

OFFICE

2CO5

STORAGE

2CO6

ELEVATOR

NO. 2

E2

OFFICE

2CO8

OFFICE

2CO9

CONFERENCE

ROOM

2CO7

OFFICE

2CO3

THERAPY

2CO2

OFFICE

2CO4

CORRIDOR

H210

STAIR

S201

HAC

2E01

EXAM

2C11

PHONE CLO.

2C11A

OFFICE

2C10

IRM

2C10A x8 x8 x8 x8

P

R.3 T.1 T.2 U.1

V.3R T U

M-301

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS. NOTIFY COR OF CONFLICTS

PRIOR TO PROCEEDING WITH DEMOLITION.

B. ALL DEMOLISHED EQUIPMENT SHALL BECOME

PROPERTY OF THE CONTRACTOR UNLESS

NOTED OTHERWISE. CONTRACTOR SHALL

DISPOSE OF EQUIPMENT IN ACCORDANCE

WITH ALL VAMC REQUIREMENTS AND

ENVIRONMENTAL REGULATIONS.

C. REMOVE HANGERS AND SUPPORTS

ASSOCIATED WITH DEMOLISHED PIPES,

DUCTS, AND EQUIPMENT.

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RATED

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:1

A

M

MD101

SECOND FLOOR MECHANICAL

DEMOLITION PLAN

2 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

NORTH

0 4 8 16

1 REMOVE FCU AND ASSOCIATED SUPPORTS

AND CONTROLS COMPLETE.

2 REMOVE AIR TERMINAL, AND ASSOCIATED

DUCT, INSULATION, HANGERS AND

FITTINGS AS SHOWN DARK AND DASHED

TYPICAL.

3 REMOVE DUCT, INSULATION, HANGERS AND

FITTINGS AS SHOWN DARK AND DASHED

TYPICAL.

4 EXISTING TO REMAIN.

5 REMOVE FCU AND ASSOCIATED SUPPORTS

AND CONTROLS COMPLETE. RETAIN FCU

AND CONTROLS FOR INSTALLATION AS

SHOWN ON MH101. COVER, STORE, AND

PROTECT UNITS DURING CONSTRUCTION.

Scale: 1/8" = 1'-0"

NORTH MECHANICAL DEMOLITION PLAN

Scale: 1/8" = 1'-0"

SOUTH MECHANICAL DEMOLITION PLAN

NORTH

0 4 8 16

DN

K M N O P Q

V.3R S T U

3 3

3 3

1 1/2" CWS

2 1/2" CWR

2 1/2" CWR

1 1/2" CWS

1" D

1" CWS

2 1/2" CWR

1" D

1" D

1" D

1" CWR

1" CWS

1" D

1 1/2" CWR

2 1/2" CWS

1" D

1 1/2" CWR

2 1/2" CWS

1" D

1 1/2" CWR

2 1/2" CWS

1" D

2" CWR

2 1/2" CWS

1" D

2" CWR

2 1/2" CWS

1"D

2"CWR

2"CWS

5" CWS

4" CWS

PIPES ON

1ST FLOOR

PIPE ON

2ND FLOOR

P

R.3 T.1 T.2 U.1

V.3R T U

3/4"D

3/4"CWR

3/4"CWS

3/4"D

3/4"CWR

3/4" CWS

3/4"CWS

3/4"CWR

3/4"D

3/4"D

3/4"CWR

3/4" CWS

3/4"CWS

3/4"CWR

3/4"D

3/4"D

3/4"CWR

3/4"CWS

3/4"D

3/4" CWR

3/4" CWS

3/4"D

3/4"CWR

3/4"CWS

3/4"D

3/4"CWR

3/4" CWS

3/4"D

3/4"CWR

3/4" CWS

3/4"D

3/4"CWR

3/4"CWS

3/4"D3/4"CWS

3/4"CWR

3/4"D

3/4"CWR

3/4" CWS

1" D

2" CWR

2" CWS

1" D

2 1/2" CWR

2" CWS

1" D

2 1/2" CWR

1 1/2" CWS

4" CWR

A. CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS. NOTIFY COR OF CONFLICTS

PRIOR TO PROCEEDING WITH DEMOLITION.

B. ALL DEMOLISHED EQUIPMENT SHALL BECOME

PROPERTY OF THE CONTRACTOR UNLESS

NOTED OTHERWISE. CONTRACTOR SHALL

DISPOSE OF EQUIPMENT IN ACCORDANCE

WITH ALL VAMC REQUIREMENTS AND

ENVIRONMENTAL REGULATIONS.

C. REMOVE HANGERS AND SUPPORTS

ASSOCIATED WITH DEMOLISHED PIPES,

DUCTS, AND EQUIPMENT.

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RATED

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:1

A

M

MD102

SECOND FLOOR MECHANICAL PIPING

DEMOLITION PLAN

3 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

Scale: 1/8" = 1'-0"

NORTH MECHANICAL PIPING DEMOLITION PLAN

Scale: 1/8" = 1'-0"

SOUTH MECHANICAL PIPING DEMOLITION PLAN

NORTH

0 4 8 16

1 REMOVE CWS, CWR, AND DRAIN AS SHOWN

DASHED, INCLUDING HANGERS AND

INSULATION TYPICAL.

2 REMOVE 5"AND 4" CWS RISER.

COORDINATE SHUTDOWN WITH THE VA

COR.

3 REMOVE STEAM CONVECTOR, CONTROL

VALVE, AND STEAM TRAP. MAKE READY

FOR NEW CONVECTOR TO BE INSTALLED.

4 EXISTING TO REMAIN.

5 ON 1ST FLOOR CAP PIPING AND REMOVE

RISERS UP TO 2ND FLOOR. MAKE 1ST

FLOOR PIPING READY FOR NEW

CONNECTION TO OFFSET AS SHOWN ON

MP101.

DN

F F

F F

S

K M N O P Q

V.3R S T U

OPEN OFFICE

2C08

GROUP ROOM 1A

2E26A

GROUP ROOM 2A

2E25A

CORRIDOR

H203

CORRIDOR

H203

ELEV LOBBY

H206

ELEV_

H209

OFFICE

2C06

PROVIDER OFFICE

2C05

WOMEN'S RESTROOM

2C07BMEN'S RESTROOM

2C07A

OPEN OFFICE

2C09

WAITING

2C01

RECEPTION

2C01A

EXAM

2C01B

OFFICE

2C02A

OFFICE

2C02B

OFFICE

2C03

OFFICE

2C04A

OFFICE

2C04B

RECEPTION

2E22

OFFICE

2E24

COPY AREA

2E23

STORAGE

2E25C

STORAGE

2E26C

WAITING

2E21

WAITING

2E21

STAIR S201

H208

CONSULT

2E20

GROUP ROOM 1B

2E26B

GROUP ROOM 2B

2E25B

CORRIDOR

H204

CORRIDOR

H205

CLASSROOM

2E28

CLASSROOM

2E27

135SD-2

140SD-2

220SD-2

220SD-2

110SD-1

70SD-1

200SD-2 180SD-2 130SD-2

80SD-1

150SD-2

150SD-2

120SD-2

120SD-2

150SD-1

230SD-3

260SD-3

380SD-3

150SD-2

150SD-2

135SD-2

130SD-2

FCU-2E28

FCU-2E27

FCU-2E26A

FCU-2C08

FCU-2C03

FCU-2E25A

FCU-2E25B

FCU-2E23

FCU-2E21

FCU-2E20

FCU-2C06

FCU-2C05

FCU-2C02A

FCU-2C02B

FCU-2C04A

FCU-2C04B

FCU-2E24

CORRIDOR

H207

FCU-C209

FCU-2E26B

x x

300SD-3

100EG-1

105RG-1 95RG-1

40RG-1

80RG-1

105RG-1

110RG-1

45RG-1

90RG-1

80RG-1

280RG-1

120RG-2

90RG-2

125RG-1

160RG-1

200RG-1

280RG-1

225RG-1

180RG-1

195RG-1

90SD-1

200RG-2

310SD-3

350SD-3

350RG-1

170SD-2

235RG-1

145SD-2

FCU-H204

10x8 x

6x6

6x6

6x6

6x6

6x6 6x6 x

6x6 x

6x6

6x6

6x6 6x6

8x6 8x8

8x6 6x6

8ø8ø 10x10

6x6

6x6

6ø

8ø

8ø

MD (35 CFM)

MD (110 CFM)

MD (100 CFM)

MD (100 CFM)

MD (85 CFM)

MD (100 CFM)

MD (100 CFM)

MD (105 CFM)

MD (30 CFM)

MD (30 CFM)

MD (205 CFM)

MD (30 CFM)

MD (30 CFM)

MD (95 CFM)

MD (85 CFM)

MD (35 CFM)

MD (40 CFM)

MD (85 CFM)

MD (30 CFM)

MD (80 CFM)

190EG-1

190EG-1

x

8x8

12x10 150EG-1 x

70EG-1

70EG-1

70EG-1

70EG-1

250RG-1

200RG-2

8ø

8ø

8ø

10ø

10ø

6ø ø

8ø

10ø

6ø

6ø

10ø

10ø

6ø

8x8

8x8 ø

8ø

20x8 16x8

8ø 8x8

8ø

8ø

8ø

12x10

12x8 12x8

8ø8ø

6x6 6x6

8ø

6ø

8x6

8ø

20x6 18x6 13x6 26x6

10ø

MD (85 CFM)

10ø

8ø

8x8

10ø

8x8

8x8

6x6

8ø

FCU-H205

M-301

M-301

12x12

6x6 x8 x1

10x8 x x ø x ø x

6ø

10x10

FAC

H210

MD (35 CFM)

365RG-3

400SG-1

FCU-H210

R.3 T.1 T.2 U.1

V.3R T U

HAC

2E01

PAT TLT

2E02

PAT TLT

2E03

CONSULT

2E04

CHIRO EXAM

2E05

CHIRO EXAM

2E06

SOILED

2E07

CLEAN UTILITY

2E08

ACUPUNCTURE

2E09

ACUPUNCTURE

2E10 MEDITATION

2E11

MASSAGE

2E12

EXAM

2E13

MEDS

2E14

CHIRO EXAM

2E15

CHIRO EXAM

2E16

CONSULT

2E17

CONSULT

2E18

CONSULT

2E19

CONSULT

2E20

CORRIDOR

H201

CORRIDOR

H202

150SD-2

140SD-2

140SD-2

90SD-1

120SD-2

185SD-2 170SD-2

110SD-2

130SD-2

120SD-2

210SD-2

125SD-2

150SD-2

100SD-2

130SD-2

FCU-2E04

FCU-2E05

FCU-2E06

FCU-2E08

FCU-2E09

FCU-2E10

FCU-2E11

FCU-2E12

FCU-2E13

FCU-2E14

FCU-2E15

FCU-2E16

FCU-2E17

FCU-2E18

FCU-2E19

95RG-1

60RG-1

105RG-1 90RG-1

95RG-1

90RG-1

180RG-1

100RG-1

100RG-1

50RG-1

100RG-1

80RG-1

75RG-1

145RG-1 130RG-1

150EG-1

200SD-2

MD (40 CFM)

MD (40 CFM)

MD (40 CFM)

MD (35 CFM)

MD (40 CFM)

MD (30 CFM)

MD (30 CFM)

MD (40 CFM)

MD (35 CFM)

MD (45 CFM)

MD (35 CFM)

MD (45 CFM)

MD (30 CFM)

MD (30 CFM)

MD (30 CFM)

150EG-1

150EG-1

8x8

100RG-2

200SD-2

M-301

6x66x6

6x6

6x6 x

6x6

6x6

6x6

6x6 6x6 ø

6x6

6x6

8ø

8ø

8ø

10x10 ø ø

6x6

6x6 x

6x6

6x6

8x6

6x6

8ø

8ø

HU-2E08

HU-2E08

8ø

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RATED

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:2

A

M

MH101

SECOND FLOOR HVAC PLAN

4 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

NORTH

0 4 8 16

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

NORTH MECHANICAL PLAN

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

SOUTH MECHANICAL PLAN

1 INSTALL NEW FCU SUPPLY AND RETURN

DUCT TYPICAL.

2 RELOCATED FCU. SEE MD101 FOR FAN COIL

UNITS TO BE SAVED AND REINSTALLED AS

SHOWN.

3 EXISTING TO REMAIN.

4 INSTALL NEW FOUR PIPE FAN COIL UNIT.

5 OFFSET DUCT DOWN BELOW BEAM.

A. COORDINATE ALL WORK WITH THE

GENERAL CONTRACTOR, OTHER TRADES

AND THE COR TO MINIMIZE DISRUPTION OF

AREAS OUTSIDE OF THE PROJECT LIMITS

OF WORK.

B. UNLESS NOTED OTHERWISE, ALL

DIFFUSERS AND GRILLE RUN-OUTS ARE

THE SAME SIZE AS THE NECK/DUCT

CONNECTION SIZE SPECIFIED IN THE AIR

DEVICE SCHEDULE.

C. ALL DIFFUSER AND GRILLE TAKEOFFS

SHALL INCLUDE A BALANCING DAMPER.

D. SEE ARCHITECTURAL CEILING PLAN FOR

CEILING TYPES AS WELL AS DIFFUSER AND

GRILLE PLACEMENT WITHIN THE CEILING.

E. COORDINATE ALL THERMOSTAT

LOCATIONS WITH ALL OTHER WALL

MOUNTED OBJECTS BEFORE

INSTALLATION.

T

K M N O P Q

V.3R S T U

2 1/2" CWS

2" CWR

1" D

3/4" D

3/4" CWR

3/4" CWS

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

2" CWR

2 1/2" CWS

3/4" CWS

3/4" CWR

3/4" D

1" D

2" CWR

2 1/2" CWS

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWR

3/4" CWS

1" D

2" CWR

2 1/2" CWS

3/4" D

3/4" CWR

3/4" CWS

2 1/2" CWS

2" CWR

1" D

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWR

3/4" CWS

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWR

3/4" CWS

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWR

3/4" CWS

3/4" CWS

3/4" CWR

3/4" D

1" CWR

3/4" D

3/4" CWR

3/4" CWS

CLASSROOM

2E27

GROUP ROOM 1A

2E26A

GROUP ROOM 1B

2E26B

CLASSROOM

2E28

GROUP ROOM 2A

2E25A

CORRIDOR

H205

CORRIDOR

H204

GROUP ROOM 2B

2E25B

CORRIDOR

H203

OFFICE

2E24

COPY AREA

2E23

RECEPTION

2E22

CORRIDOR

H203

ELEV_

H209

ELEV LOBBY

H206

WAITING

2E21

WAITING

2E21

CONSULT

2E20

HAC

2E01 CORRIDOR

H202

OFFICE

2C06

PROVIDER OFFICE

2C05

WOMEN'S RESTROOM

2C07B

MEN'S RESTROOM

2C07A

CORRIDOR

H207

OPEN OFFICE

2C08

OPEN OFFICE

2C09

OFFICE

2C02A

OFFICE

2C02B

OFFICE

2C03

OFFICE

2C04B

OFFICE

2C04A

STAIR S201

H208

MP101

4" CWS

2 1/2" CWS

22222

FCU-C209

FCU-2C08

FCU-2C02A

FCU-2C02B

FCU-2C03

FCU-2C05

FCU-2C06

FCU-2C04A

FCU-2C04B

FCU-2E20

FCU-2E21

FCU-2E23

FCU-2E24

FCU-2E25B

FCU-2E25A

FCU-2E26B

FCU-2E26A

FCU-2E27

FCU-2E28

SC-2E19

SC-2E20

SC-2E21B

SC-2E21A

SC-H203B

SC-2E22

SC-2E24

SC-2E25B

SC-2E25A

SC-2E25A

SC-2E26B

SC-2E26B

SC-2E26A

SC-2E26A

SC-2E27B

SC-2E27ASC-2E28A

SC-2E28B

SC-H205A

SC-H205B

SC-H205C

SC-H205D

SC-H204A

SC-H204B

SC-H204C

SC-H203A

SC-2C06SC-2C07BSC-2C07A

SC-2C08B

SC-2C08A

SC-2C09B

SC-2C09A

SC-2C02B SC-2C03A SC-2C03B SC-2C03C SC-2C04B

SC-2C04A

SC-H207A

SC-H207B

T T T

T

T

T

T

T

T

T

T

T

T T

T

T

T

2 1/2" CWR

1" CWS

2 1/2" CWR

1 1/2" CWS

2 1/2" CWR

TT

2"CWR

2"CWS

2" CWR

2 1/2" CWS

T

M-301

M-301

1" D

1" D

3/4" D

1" D

1" D 1" D9

T

T

T

1" D

1" D

FAC

H210

1" CWS

3/4" D

3/4" CWR

3/4" CWS

3/4" D

3/4" CWR

3/4" CWS

5" CWS

PIPES ON

1ST FLOOR

PIPES ON

2ND FLOOR

4" CWS

5" CWS

T

4" CWS

P

R.3 T.1 T.2 U.1

V.3R T U

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWR

3/4" CWS

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWR

3/4" CWS

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" D

3/4" CWS

3/4" CWR

3/4" D

3/4" CWR

3/4" CWS

ACUPUNCTURE

2E10

CORRIDOR

H201

MEDITATION

2E11

ACUPUNCTURE

2E09

MASSAGE

2E12

EXAM

2E13

CLEAN UTILITY

2E08

MEDS

2E14

SOILED

2E07

CHIRO EXAM

2E15

CHIRO EXAM

2E06

CHIRO EXAM

2E16

CHIRO EXAM

2E05

CORRIDOR

H202

CONSULT

2E04

CONSULT

2E17

CONSULT

2E18

PAT TLT

2E03

PAT TLT

2E02

CONSULT

2E19

SC-2E02

SC-2E03

SC-2E04

SC-2E07

SC-2E08

SC-2E14

SC-2E17

SC-2E19

FCU-2E19

FCU-2E17

FCU-2E16

FCU-2E15

FCU-2E14

FCU-2E12

FCU-2E11

FCU-2E10

FCU-2E09

FCU-2E08

FCU-2E06

FCU-2E05

FCU-2E04

FCU-2E13

FCU-2E18

T

T

T

T

T

1" D

2 1/2" CWR

2" CWS

1"D

2 1/2" CWR

1 1/2" CWS

T

M-301

T

SC-2E18

T

T

T

T

T

T

T

T

T

T

T

3/4" LPS

3/4" LPR

3/4" LPS

3/4" LPR

3/4" LPR

3/4" LPS

3/4" LPR

3/4" LPS

3/4" LPS

3/4" LPR

3/4" LPS

3/4" LPR

3/4" LPS

3/4" LPR

3/4" LPS

3/4" LPR

3/4" LPS

3/4" LPR

HU-2E08

HU-2E08

3/4" LPS

H P

3/4" CWR

FIRST FLOOR

0' - 0"

SECOND FLOOR

12' - 0"

THIRD FLOOR

24' - 0"

V.3U

4" CWS

4" CWS

4" CWS

4" CWS

5" CWS

A. COORDINATE WORKING HOURS ALLOWED

WITH THE VA COR.

B. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

C. COORDINATE THERMOSTAT LOCATION WITH

ALL OTHER WALL MOUNTED OBJECTS IN

ACCORDANCE WITH ADA CODE.

D. COORDINATE FINAL CEILING DIFFUSER

LOCATIONS WITH ALL OTHER CEILING

MOUNTED EQUIPMENT AND/OR DEVICES.

E. ALL CHS/R RUNOUTS TO FAN COIL UNITS

SHALL BE 3/4" UNLESS NOTED OTHERWISE. ALL

FAN COIL UNIT DRAIN PIPING SHALL BE 3/4".

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RATED

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:3

A

M

MP101

SECOND FLOOR MECHANICAL PIPING

PLAN

5 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

NORTH

0 4 8 16

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

NORTH MECHANICAL PIPING PLAN

Scale: 1/8" = 1'-0"

SOUTH MECHANICAL PIPING PLAN

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

CHILLED WATER RISER BYPASS

1 INSTALL NEW CWS, CWR, AND DRAIN PIPING

MAINS WITH INSULATION AND HANGERS.

2 INSTALL NEW CWS, CWR, AND DRAIN PIPING

TO FCU. SEE DETAIL 1/M-502

3 INSTALL NEW CWS RISERS DOWN IN CHASE

TO FIRST FLOOR AND RECONNECT TO RISER

ON FIRST FLOOR. SEE 1/MP101.

4 INSTALL NEW ISOLATION VALVE.

5 INSTALL NEW STEAM CONVECTOR AND

CONNECT TO EXISTING PIPING. SEE DETAIL

7/M-501

6 INSTALL NEW STEAM CONVECTOR AND

PIPING. CONNECT TO EXISTING PIPING ON

FIRST FLOOR. SEE DETAIL 7/M-501

7 CONNECT 3/4 LPS AND 3/4" LPR TO STEAM

AND CONDENSATE PIPING IN FIRST FLOOR

CEILING AND EXTEND UP IN CHASE TO

ABOVE CEILING AND CONNECT TO HEATING

COIL.

8 1" DRAIN DOWN TO AIR GAP FITTING WITHIN

WALL AT 18"AFF. PROVIDE A 12"x12" ACCESS

DOOR TO ACCESS AND VIEW AIR GAP

FITTING IN CORRIDOR WALL. CONNECT 1”

DRAIN FROM AIR GAP FITTING TO DRAIN

FROM PLUMBING FIXTURE.

9 CAP EXISTING DRAIN PIPE.

10 1" DRAIN FROM HUMIDIFIER DOWN IN WALL.

SEE NOTE 8.

11 INSTALL NEW HUMIDIFIER ON WALL AT 5' 3"

AFF.

12 INSTALL NEW TEMPERATURE AND HUMIDITY

SENSOR AND PRESSURE MONITOR AT 54"

AFF. CONNECT TO BAS.

13 INSTALL NEW TEMPERATURE SENSOR AT 54"

AFF. CONNECT TO BAS.

T

SECOND FLOOR

12' - 0"

THIRD FLOOR

24' - 0"

R T U

14x812x8

3/4" DCWR

3/4" DHWR

2" CWR

2 1/2" CWS

3/4" CWS

3/4" CWR

3/4" D

FCU-2E25A

10ø

6x6

6x6

CEILING

LIGHTS1"D

3/4" DCWS

3/4" DHWS

3/4" DHWR

1 1/2" DCWS

2" DHWS

LIGHTS

FL

SECOND FLOOR

12' - 0"

THIRD FLOOR

24' - 0"

9 10 11

FCU-2C08

4" SAN

4" SAN

CEILING

1/2" DCW 1/2" DHW

8ø

6x6

1" D

12x8

1"O

2" DCW

1 1/2" CWS

2 1/2" CWR

1 1/2"V

LIGHTS

SECOND FLOOR

12' - 0"

THIRD FLOOR

24' - 0"

R T

2 1/2" CWR

2" CWS

16x8

FCU-2E05

1 1/2" DCW

1" DHW

LIGHT

1/2" DHWR

1/2" DHW

3/4" DCW

8ø

2 1/2" CWR

2" CWS

1" D 3/4" D

FL

6x6

3/4" DHWR 2" V

LIGHT FIXTURE

x

CEILING

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:5

A

M

M-301

MECHANICAL SECTIONS

6 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

Scale: 1/4" = 1'-0"

NORTH CORRIDOR SECTION

Scale: 1/4" = 1'-0"

CENTRAL CORRIDOR SECTION TYP.

Scale: 1/4" = 1'-0"

SOUTH CORRIDOR SECTION

0 2 4 8

0 2 4 8

0 2 4 8

NOTES:

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHT.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-16

INSULATION

DUCT

GASKET

INSULATION

SECTION "A-A"

ACCESS PANEL

CASING

GASKET HANDLE INSIDE

FLEXIBLE WASHER

FACTORY

FABRICATED LATCH

SECTION "B-B"

ACCESS DOOR

INSULATION

"B" "B"

"A"

"A"

NOTES:

1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.

ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE

CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH ONE VANE

SHORT RADIUS ELBOW

WITH TWO VANES

R

SHALL

EQUAL OR

BE

GREATER

THAN 1/6 W

R

SHALL

EQUAL OR

BE

GREATER

THAN 1/3 W

R

SHALL

EQUAL OR

BE

GREATER

THAN W

R

W

W

2/3W

R

/3

W

/3

W

1/2W

VAN

E

VAN

E R

W

1/6W

NOTES:

1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR

FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.

SECTIONSIDE ELEVATION

1/2" ROUND ROD PIN

1/8" CLEARANCE

ALL AROUND

INSIDE END

BEARING

INSULATION

STAND-OFF

DAMPER BLADE

HANDLE

WITH

LOCKING

QUADRANT

STIFFEN BLADE

AS REQUIRED

INSULATION SEE

SPECIFICATION

DUCT

OUTSIDE END BEARING

NOTES:

1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN

VANES AND A 3/4" TRAILING EDGE.

4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.

W1

W

SHEET METAL AS

SPECIFIED FOR

DUCTWORK

1-1/2" POCKET SLIP

DUCT

1-1/2" MIN. TO 3" MAX.

INSTALLED. 6" NOMINAL

WITH MATERIAL TAUT

1" FLANGE & HEM

BOLT ON 4" CENTERALTERNATE

POSITION OF

BOLT 1" x 1/8" BAND IRON

WASHER

FLANGED

CONNECTION ON FAN

SIDE

FLEXIBLE MATERIAL

AS SPECIFIED

5/16" FLANGE

BOLT ON 4" CENTERS

1" x 1/8" BAND IRON

WASHER

FLANGED CONNECTION

ON FAN SIDE

1" x 1/8" DRAW BAND

FLEXIBLE

MATERIAL AS

SPECIFIED

SHEET

METAL

SCREWS ON

12" CENTERS

RIVET ON 4" CENTERS

DUCT

1-1/2" MIN. TO 3" MAX.

INSTALLED. 6" NOMINAL

WITH MATERIAL TAUT

RECTANGULAR FLEXIBLE CONNECTION

ROUND FLEXIBLE CONNECTION

1-1/2"1/2" 1/2"

SHEET METAL AS

SPECIFIED FOR

DUCTWORK

MAIN SUPPLY

DUCT

PROVIDE VOLUME

DAMPER

PROVIDE

VOLUME

DAMPER

1/4 W OR

4" MIN.

SUPPLY REGISTER OR

BRANCH DUCT

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN

FOR SPLIT

DIMENSION

TURNING VANES

AIR FLOW

AIR FLOW

A

IR

F L O

W

AIR SPLIT DUCT TAKE-

OFF PLAN VIEW

BRANCH DUCT TAKE-OFF

PLAN VIEW

AIR FLOW

A

IR

F

LO

W

W

MAIN SUPPLY

DUCT

CONICAL TAP

TERMINAL UNIT DUCT TAKE-

OFF PLAN VIEW

AIR FLOW

A

IR

F

LO

W

W

NOTE:

ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPE

TO RETURN MAIN

FLOAT AND THERMOSTATIC TRAP.

SEE PLANS, AND SCHEDULES

1" GATE

VALVE

SCHEDULE 80 STEEL PIPE

PIPE SIZE SHALL BE

SAME SIZE AS TRAP

BYPASS - INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE & BELOW TRAP

DRIP LEG OR EQUIPMENT CONNECTION.

MAKE THE SAME SIZE AS THE SUPPLY

MAIN OR EQUIPMENT CONNECTION. SEE

NOTE 1

M

IN

M

IN

FLOW

SEE DRAWINGS

FOR PIPE SIZES

SCALE

POCKET/ DRIP

LEG

SCHEDULE

80 STEEL

PIPE

NOTE:

WHEN MOUNTED IN A GYPSUM BOARD CEILING, PROVIDE

MANUFACTURERS SUFACE MOUNT TRIM FRAME.

VOLUME DAMPER

W/LOCKING QUAD

SHEET

METAL

SADDLE

CEILING

TYPICAL DIFFUSER OR

REGISTER IN LAY-IN

CEILING

FLEXIBLE DUCT SIZE SAME

AS DIFFUSER INLET: 5'-0"

MAX. LENGHT

USE RIGID ELBOWS FOR

CHANGE OF DIRECTION

GREATER THAN 45°

SUPPORT SADDLE

FROM STRUCTURE

SEE SPECIFICATION

FOR CLAMPS AND

SEALANT (TYP.)

THERMAL

INSULATION, SEE

SPECIFICATIONS

CONICAL OUTLET

BRANCH DUCT

12"

CONCRETE

FLOOR SLAB

CLIP ANGLE

STEEL EXPANSION SHIELD FOR

EXISTING CONSTRUCTION AND

INSERTS FOR NEW CONSTRUCTION

THIS TYPE SHALL BE USED ONLY IN

SLABS OR BEAMS OF 4" MIN. DEPTH

TURNBUCKLE

3/8" MIN. DIA.

HANGER RODS

3/8" MIN. DIA. EXPANSION BOLTS FOR

EXISTING CONSTRUCTION AND

INSERTS FOR NEW CONSTRUCTION

3/8" MIN. DIA. INSERTS NEW

CONSTRUCTION ONLY

NUTS &

WASHERS

3/8" MIN. DIA.

HANGER

RODS

FOR PIPES UNDER 2" IN SIZE USE 1 1/2"

X 1 1/2" X 1/4" ANGLE. ALL PIPES 2" AND

LARGER USE 3" X 3" X 1/4" ANGLE

NOTE:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.

TYPICAL DUCTWORK TRANSITION WITH

EQUIPMENT MOUNTED IN DUCT PLAN OR SIDE

VIEW

TYPICAL DUCTWORK TRANSITION

PLAN OR SIDE VIEW

AIRFLOW

AIRFLOWAIRFLOW

E Q

U

IP

M E

N T

M A

X

M

AX.

M A X

M A

X

M

AX.

M A

X

FAN COIL

UNIT

FLEXIBLE CONNECTION

DISCHARGE PLENUM

OR DUCT

VOLUME DAMPER

TYPICAL

FLEXIBLE DUCT

SUPPLY DIFFUSER

DUCT TRANSITION FROM

FCU OUTLET

CEILING

FILTER RETURN

GRILLE WITH MERV ll FILTER

VIBRATION ISOLATOR

HANGERS

OA VENTILATION

DUCT SEE PLANS

FOR CONTINUATION

FLEXIBLE CONNECTION

(TYPICAL)

HANGERS UP

AND SECURE TO

STRUCTURE

PLENUM

SEE PLANS FOR

FOR DUCT SIZE

RETURN

SUPPLY

COIL

2-WAY COIL PIPING

MANUAL AIR VENT

UNION (TYPICAL)

2-WAY MODULATING

CONTROL VALVE

STRAINER WITH

DRAIN VALVE AND

HOSE CONNECTION

TEMPERATURE/PRESSURE TEST PORT

SHUT-OFF

VALVE (TYP.)

CONCENTRIC REDUCERS,

IF REQUIRED (TYP.)

BALANCING VALVE

DRAIN LINE SHALL BE AT LEAST THE

SAME SIZE AS THE NIPPLE ON THE

DRAIN PAN. PIPING SHALL BE RIGID

COPPER TYPE L OR TYPE M UNLESS

NOTE BELOW IS MET

PITCH DOWN TOWARD DRAIN

CLEANOUT

FLOOR SINK

DRAIN PAN

DIELECTRIC FITTING

NOTES:

1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES

NOT PASS THROUHG RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAW

THRU

BLOW THRU

2" PLUS X

1" MINIMUM

X

2X

B A

EXISTING RADIATOR

CONTROL WIRING TO FCU CONTROLLER

INCREASER /REDUCER FITTING

TWO-WAY, STEAM CONTROL VALVE

UNION NEW

THERMOSTATIC

STEAM TRAP

EXISTING STEAM PIPING EXISTING RETURN PIPING

WALL WALL

FLOOR

DRAIN PIPE

FIXED AIR GAP - LIKE JR SMITH

MODEL 3955 SPIGOT OUTLET

NO HUB COUPLING

SANITARY PIPE

2" HUB INLET - SPIGOT

OUTLET DEEP SEAL

P-TRAP

1/2 DRAIN PIPE

DIAMETER

SET SCREW

1-1/4" CONDENSATE

DRAIN

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:0

A

M

M-501

MECHANICAL DETAILS

7 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

Scale: No Scale

ACCESS PANEL AND DOOR DETAIL

Scale: No Scale

DUCTWORK RADIUS ELBOW

Scale: No Scale

VOLUME DAMPER DETAIL

Scale: No Scale

DUCTWORK SQUARE VANE ELBOWS

Scale: No Scale

FLEXIBLE DUCT CONNECTIONS

Scale: No Scale

SUPPLY DUCT TAKE-OFFS

Scale: No Scale

FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY

Scale: No Scale

FLEXIBLE AIR DUCT CONNECTOR

Scale: No Scale

SECURING HANGER RODS IN CONCRETE

Scale: No Scale

DUCT TRANSITIONS

Scale: No Scale

FAN COIL UNIT SECTION

Scale: No Scale

COIL UNIT PIPING DETAILS

Scale: No Scale

COIL DRAIN TRAP DETAIL

Scale: No Scale

CONVECTOR VALVE INSTALLATION DETAIL (BUILDING 1)

Scale: No Scale

FIXED AIR GAP DETAIL

CHR

CHS

HS

SST

PC

T

V-1

RA

FILTER

COOLING COIL

FAN

SA

T-1

ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.

NEW CONVECTOR

NEW TRAP

T

V-2

LPR

LPS

PROGRAMABLE CONTROLLER

SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)

DURING OCCUPIED CYCLE

1. FAN SHALL OPERATE CONTINUOUSLY.

2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1

SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)

3. ON CALL FOR HEATING VALVE V-1 SHALL BE CLOSED AND STEAM

VALVE V-2 SHALL MODULATE OPEN TO MAINTAIN SETPOINT OF 70° F

(ADJ).

4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE

FROM SETPOINT.

5. INCLUDE ROOM TEMPERATURE AND HUMIDITY MONITORING FOR

ROOM 115 MEDICATION/LOGISTICS.

SEQUENCE OF OPERATION UNOCCUPIED CYCLE

1. ON CALL FOR COOLING FAN COIL UNIT SHALL OPERATE AND VALVE

V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK

TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN

COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.

2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND

VALVE V-1 SHALL BE CLOSED. STEAM RADIATOR VALVE V-2 SHALL

CYCLE TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF

68° F (ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.

POINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

DISCHARGE AIR TEMPERATURE

FAN STATUS

FAN ON/OFF

COOLING COIL CONTROL VALVE

ROOM HUMIDITY

ROOM HUMIDITY SETPOINT

HIGH DISCHARGE AIR TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

LOW DISCHARGE AIR TEMPERATURE X

NOTES

X

X

X

X

X

X

X X X X

X

X

X

X

X

7 1 1 1 1 6 3 10

TOTAL HARDWARE (11) TOTAL SOFTWARE (10)

HEATING VALVE X

XPOINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

HARDWARE POINTS

AI AO

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

X

X

X

X

NOTES

X

2 1 1 1 2 3

TOTAL HARDWARE (11) TOTAL SOFTWARE (10)

STEAM VALVE X

SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)

ON CALL FOR HEATING VALVE SV-1 SHALL MODULATE OPEN TO

MAINTAIN ROOM SETPOINT (70oF ADJ.)

SEQUENCE OF OPERATION UNOCCUPIED CYCLE

ON CALL FOR HEATING VALVE SV-1 SHALL MODULATE OPEN TO

MAINTAIN ROOM SETPOINT (65oF ADJ.)

PC

T T-1

ROOM TEMPERATURE SENSOR, WALL MOUNTED 48" AFF.

CONVECTOR

NEW TRAP

SV-1

LPR

LPS

PROGRAMABLE CONTROLLER

CHR

CHS

HS

SST

PC

V-1

RA

FILTER

COOLING COIL

FAN

SA

T

STEAM COIL

LPS LPR

V-2

PROGRAMABLE CONTROLLER

SEQUENCE OF OPERATION OCCUPIED CYCLE - 6:00 AM TO 5:00 PM (M-F)

DURING OCCUPIED CYCLE

1. FAN SHALL OPERATE CONTINUOUSLY.

2. ON CALL FOR COOLING, V-2 SHALL BE CLOSED AND VALVE V-1

SHALL MODULATE TO MAINTAIN SETPOINT OF 75° F (ADJ)

3. ON CALL FOR HEATING, VALVE V-1 SHALL BE CLOSED AND STEAM

VALVE V-2 SHALL MODULATE TO MAINTAIN SETPOINT OF 70°F (ADJ.)

4. ALARM BAS IF ROOM TEMPERATURE IS 5 DEGREES F OR MORE

FROM SETPOINT.

5. INCLUDE ROOM TEMPERATURE AND HUMIDITY MONITORING FOR

ROOM 115 MEDICATION/LOGISTICS.

SEQUENCE OF OPERATION UNOCCUPIED CYCLE

1. ON CALL FOR OOLING FAN COIL UNIT SHALL OPERATE AND VALVE

V-1 SHALL MODULATE TO MAINTAIN ROOM TEMPERATURE SETBACK

TEMPERATURE OF 78° F (ADJ). WHEN SETPOINT IS SATISFIED FAN

COIL UNIT SHALL STOP AND VALVE V-1 SHALL CLOSE.

2. ON CALL FOR HEATING, FAN COIL UNIT SHALL REMAIN OFF AND

VALVE V-1 SHALL BE CLOSED. STEAM VALVE V-2 SHALL MODULATE

TO MAINTAIN ROOM TEMPERATURE SETBACK SETPOINT OF 68° F

(ADJ). WHEN SETPOINT IS SATISFIED VALVE V-2 SHALL CLOSE.

POINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

DISCHARGE AIR TEMPERATURE

FAN STATUS

FAN ON/OFF

COOLING COIL CONTROL VALVE

ROOM HUMIDITY

ROOM HUMIDITY SETPOINT

HIGH DISCHARGE AIR TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON

GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

LOW DISCHARGE AIR TEMPERATURE X

NOTES

X

X

X

X

X

X

X X X X

X

X

X

X

X

7 2 1 1 1 6 3 11

TOTAL HARDWARE (11) TOTAL SOFTWARE (10)

STEAM VALVE X X

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:0

A

M

M-502

MECHANICAL DETAILS

8 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

Scale: No Scale

FAN COIL UNIT CONTROLS

Scale: No Scale

FAN COIL UNIT SEQUENCE OF OPERATION

Scale: No Scale

TWO-PIPE FAN COIL UNIT POINTS LIST

Scale: No Scale

CONVECTOR POINTS LIST

Scale: No Scale

CONVECTOR SEQUENCE OF OPERATION

Scale: No Scale

CONVECTOR CONTROLS

Scale: No Scale

FAN COIL UNIT CONTROLS - WITH STEAM COIL

Scale: No Scale

FAN COIL UNIT SEQUENCE OF OPERATION - WITH STEAM COIL

Scale: No Scale

TWO-PIPE FAN COIL UNIT POINTS LIST - WITH STEAM COIL

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:1

:0

A

M

M-601

MECHANICAL SCHEDULES

9 9JT

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM

NOTES:

1. AUTOMATIC FAN SPEED CONTROL WITH OVERRIDE SELECTOR. ADJUST FAN SPEED TO DELIVER THE COOLING SUPPLY AIRFLOW QUANTITY SHOWN ON THE PLAN DRAWING.

2. PROVIDE 120V TO 24V TRANSFORMER, TWO WAY CONTROL VALVE FOR CHILLED WATER, BACNET COMPATIBLE CONTROLLER.

3. RELOCATED SIZE 08 FCU.

4. RELOCATED SIZE 06 FCU.

5. PROVIDE A THREE WAY VALVE

TWO PIPE FCU SCHEDULE

+ LOCATION TYPE

FAN AIR FLOW

EXTERNAL

APD COOLING REQUIREMENTS FAN MOTOR

REMARKSCFM IN WG

MIN SENS

CAPACITY

MIN TOTAL

CAPACITY ENT. AIR Db Wb FLOW EWT WPD POWER

PHASE VOLT RPM

SPEED

CONTROLMBH MBH °F °F GPM °F FT WC HP

FCU-2C02A OFFICE 2C02A HORIZONTAL

CONCEALED

65 0.3 1.1 1.7 75 60 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2C02B OFFICE 2C02B HORIZONTAL

CONCEALED

110 0.3 2.2 2.5 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2C03 OPEN OFFICE 2C03 HORIZONTAL

CONCEALED

445 0.3 8.9 10.6 75 63 1.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2,3

FCU-2C04A OFFICE 2C04A HORIZONTAL

CONCEALED

120 0.3 2.4 2.8 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2C04B OFFICE 2C04B HORIZONTAL

CONCEALED

135 0.3 2.9 3.5 75 63 0.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2C05 PROVIDER OFFICE 2C05 HORIZONTAL

CONCEALED

75 0.3 1.2 1.9 75 60 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2C06 OFFICE 2C06 HORIZONTAL

CONCEALED

130 0.3 2.6 3 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2C08 OPEN OFFICE 2C08 HORIZONTAL

CONCEALED

180 0.3 3.5 4.4 75 64 0.7 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E04 CONSULT 2E04 HORIZONTAL

CONCEALED

150 0.3 3 3.6 75 63 0.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E08 CLEAN UTILITY 2E08 HORIZONTAL

CONCEALED

100 0.3 1.8 2.1 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2E14 MEDS 2E14 HORIZONTAL

CONCEALED

150 0.3 2.3 2.7 75 62 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E17 CONSULT 2E17 HORIZONTAL

CONCEALED

330 0.3 2.4 2.9 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E18 CONSULT 2E18 HORIZONTAL

CONCEALED

100 0.3 1.7 2.1 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E19 CONSULT 2E19 HORIZONTAL

CONCEALED

150 0.3 2.6 3.1 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E20 CONSULT 2E20 HORIZONTAL

CONCEALED

115 0.3 2.4 2.9 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2E21 WAITING AREA 2E21 HORIZONTAL

CONCEALED

390 0.3 7.2 9.4 75 63 1.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,3

FCU-2E23 COPY AREA 2E23 HORIZONTAL

CONCEALED

210 0.3 3 3.6 75 63 0.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E24 OFFICE 2E24 HORIZONTAL

CONCEALED

120 0.3 2.5 2.8 75 63 0.5 48 10 0.15 1 115 1150 ECM MOTOR 1,2

FCU-2E25A GROUP ROOM 2E25A HORIZONTAL

CONCEALED

300 0.3 5.9 7.5 75 63 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E25B GROUP ROOM 2E25B HORIZONTAL

CONCEALED

275 0.3 4.5 5.8 75 64 1.0 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E26A GROUP ROOM 2E26A HORIZONTAL

CONCEALED

300 0.3 8.4 15.5 75 68 2.6 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E26B GROUP ROOM 2E26B HORIZONTAL

CONCEALED

275 0.3 5.9 7.6 75 62 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-2E27 CLASSROOM 2E27 HORIZONTAL

CONCEALED

300 0.3 6.1 7.8 75 64 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4,5

FCU-2E28 CLASSROOM 2E28 HORIZONTAL

CONCEALED

300 0.3 6 7.8 75 63 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4,5

FCU-C209 OPEN OFICE 2C09 HORIZONTAL

CONCEALED

210 0.3 4 5 75 64 0.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-H204 CORRIDOR H204 HORIZONTAL

CONCEALED

260 0.3 10.2 11.7 75 62 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-H205 CORRIDOR H205 HORIZONTAL

CONCEALED

275 0.3 5.9 7.6 75 62 1.3 48 10 0.15 1 115 1150 ECM MOTOR 1,2,4

FCU-H210 OFFICE 2C03 HORIZONTAL

CONCEALED

400 0.3 8.9 10.6 75 63 1.8 48 10 0.15 1 115 1150 ECM MOTOR 1,2

NOTES:

1. FIELD VERIFY ENCLOSURE LENGTHS.

2. COLOR AS SELECTED BY THE ARCHITECT OR INTERIOR DESIGNER. SEE 'I' SERIES DRAWINGS.

3. SLOPED TOP ENCLOSURE.

4. PROVIDE 2-WAY STEAM VALVE CONNECTED TO BAS

STEAM CONVECTOR SCHEDULE

MARK LOCATION MOUNTING

ENCLOSURE

LENGTH

ENCLOSURE

LENGTH CAPACITY ENT. AIR TEMP. STEAM FLOW

REMARKSIN IN MBTUH °F LBS/HR

SC-2C02B 2C02 FREE

STANDING

40 24 3860.0 70 °F 4.1 1 , 2, 3, 4

SC-2C03A 2C03 FREE

STANDING

40 24 4367.3 70 °F 4.6 1 , 2, 3, 4

SC-2C03B 2C03 FREE

STANDING

40 24 4367.3 70 °F 4.6 1 , 2, 3, 4

SC-2C03C 2C03 FREE

STANDING

40 24 4367.3 70 °F 4.6 1 , 2, 3, 4

SC-2C04A 2C04A FREE

STANDING

40 24 2783.0 70 °F 2.9 1 , 2, 3, 4

SC-2C04B FREE

STANDING

40 24 4335.0 70 °F 4.6 1 , 2, 3, 4

SC-2C06 FREE

STANDING

40 24 5317.0 70 °F 5.6 1 , 2, 3, 4

SC-2C07A FREE

STANDING

40 24 2833.0 70 °F 3 1 , 2, 3, 4

SC-2C07B 2C07B FREE

STANDING

40 24 3389.0 70 °F 3.6 1 , 2, 3, 4

SC-2C08A 2C08 FREE

STANDING

40 24 2837.0 70 °F 3 1 , 2, 3, 4

SC-2C08B 2C08 FREE

STANDING

40 24 2837.0 70 °F 3 1 , 2, 3, 4

SC-2C09A 2C09 FREE

STANDING

40 24 3271.5 70 °F 3.4 1 , 2, 3, 4

SC-2C09B FREE

STANDING

40 24 3271.5 70 °F 3.4 1 , 2, 3, 4

SC-2E02 FREE

STANDING

40 24 2310.0 70 °F 2.4 1 , 2, 3, 4

SC-2E03 FREE

STANDING

40 24 2220.0 70 °F 2.3 1 , 2, 3, 4

SC-2E04 FREE

STANDING

40 24 3370.0 70 °F 3.6 1 , 2, 3, 4

SC-2E07 2E07 FREE

STANDING

40 24 2550.0 70 °F 2.7 1 , 2, 3, 4

SC-2E08 FREE

STANDING

40 24 2860.0 70 °F 3 1 , 2, 3, 4

SC-2E14 FREE

STANDING

40 24 2600.0 70 °F 2.7 1 , 2, 3, 4

SC-2E17 2E17 FREE

STANDING

40 24 2560.0 70 °F 2.7 1 , 2, 3, 4

SC-2E18 FREE

STANDING

40 24 1300.0 70 °F 1.4 1 , 2, 3, 4

SC-2E19 2E19 FREE

STANDING

40 24 2600.0 70 °F 2.7 1 , 2, 3, 4

SC-2E20 FREE

STANDING

40 24 2760.0 70 °F 2.9 1 , 2, 3, 4

SC-2E21A FREE

STANDING

40 24 4646.0 70 °F 4.9 1 , 2, 3, 4

SC-2E21B 2E21 FREE

STANDING

40 24 4646.0 70 °F 4.9 1 , 2, 3, 4

SC-2E22 2E22 FREE

STANDING

40 24 4874.0 70 °F 5.1 1 , 2, 3, 4

SC-2E24 2E24 FREE

STANDING

40 24 2429.0 70 °F 3.2 1 , 2, 3, 4

SC-2E25A FREE

STANDING

40 24 2818.0 70 °F 3 1 , 2, 3, 4

SC-2E25A 2E25 FREE

STANDING

40 24 2818.0 70 °F 3 1 , 2, 3, 4

SC-2E25B FREE

STANDING

40 24 6220.0 70 °F 6.6 1 , 2, 3, 4

SC-2E26A 2E26A FREE

STANDING

40 24 3018.0 70 °F 3 1 , 2, 3, 4

SC-2E26A 2E26A FREE

STANDING

40 24 3018.0 70 °F 3.2 1 , 2, 3, 4

SC-2E26B 2E26B FREE

STANDING

40 24 3062.0 70 °F 3.2 1 , 2, 3, 4

SC-2E26B 2E26B FREE

STANDING

40 24 3062.0 70 °F 3.2 1 , 2, 3, 4

SC-2E27A 2E27 FREE

STANDING

46 24 4760.0 70 °F 5 1 , 2, 3, 4

SC-2E27B 2E27 FREE

STANDING

46 24 4760.0 70 °F 5 1 , 2, 3, 4

SC-2E28A FREE

STANDING

46 24 4298.0 70 °F 4.5 1 , 2, 3, 4

SC-2E28B FREE

STANDING

46 24 4298.0 70 °F 4.5 1 , 2, 3, 4

SC-H203A FREE

STANDING

40 24 6207.5 70 °F 6.6 1 , 2, 3, 4

SC-H203B FREE

STANDING

40 24 6207.5 70 °F 6.6 1 , 2, 3, 4

SC-H204A H204 FREE

STANDING

40 24 3087.0 70 °F 3.3 1 , 2, 3, 4

SC-H204B FREE

STANDING

40 24 3086.0 70…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .