This document package includes plans and specifications for a plumbing renovation project at a VA medical center. The project involves demolishing and replacing waste, vent, and domestic water piping on the second floor to renovate space for a new whole health clinic. The package provides demolition plans, new construction plans, plumbing fixture schedules, general notes, specifications and construction details. Key project details include demolishing existing piping and installing new sanitary drainage, vent, and domestic water systems to support plumbing fixtures in the renovated clinic spaces. The project will connect to existing infrastructure and must carefully coordinate shutdowns and tie-ins to maintain medical center operations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANNOTATION ABBREVIATIONS
PLUMBING ABBREVIATIONS
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALANCING/SHUTOFF VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CALIBRATED BALANCING VALVE
CONTROL VALVE
EXPANSION VALVE
GATE VALVE
GLOBE VALVE
QUICK OPEN VALVE
SAFETY RELIEF VALVE
SOLENOID VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
VACUUM RELIEF VALVE
GAS COCK
PLUG VALVE
PLUMBING SYMBOLS
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
PIPE SLOPE ARROW
F
P
T
M
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
OFD OVERFLOW STORM DRAIN
SAN SANITARY WASTE
N NITROGEN
N2O NITROUS OXIDE
O OXYGEN
MV MEDICAL VACUUM
V SANITARY VENT
DCW DOMESTIC COLD WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
PLUMBING SYMBOLS
ANNOTATION SYMBOLS
(E)EXISTING
NEW KEYNOTE
DEMO KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
TEXT INDICATES EXISTING ITEM
PLUMBING EQUIPMENT DESIGNATION
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMITS OF DEMOLITION
P-###
DHWR DOMESTIC HW RECIRCULATION
PLUMBING GENERAL NOTES
PLUMBING DEMOLITION GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF
THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR ANY MECHANICAL OR ELECTRICAL ITEMS THAT NEED TO BE
RELOCATED, REMOVED OR ADJUSTED IN ORDER TO PERFORM PLUMBING WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING OR NEW ADJACENT
CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL. COORDINATE ANY REQUIRED SHUTDOWNS WITH THE COR A MINIMUM OF THREE (3) WEEKS IN
ADVANCE.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES
DAMAGED AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING AND WORK OF OTHER TRADES. PATCH AND REPAIR FLOOR AFTER PLUMBING WORK IS COMPLETE.
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL/FEDERAL CODES AND APPLICABLE
VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED INSTRUCTIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE
GRADE FOR THE PURPOSES INTENDED.
4. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY
AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
5. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR
EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
6. PROVIDE A PISTON-TYPE WATER HAMMER ARRESTOR WHERE INDICATED ON DETAIL ON SHEET P-501 AND WHERE REQUIRED BY SPECIFICATION SECTION 22 11 00. SIZE PER MANUFACTURER’S RECOMMENDATIONS.
7. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED
OTHERWISE.
8. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL/FEDERAL CODES
ALONG WITH SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
9. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF
WALLS AND FLOORS.
10. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
11. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
12. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND
NATIONAL/FEDERAL CODES AND APPLICABLE VA STANDARDS.
13. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
14. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING
OF PIPING WITH EXISTING CONDITIONS.
15. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PIPING SYSTEMS.
16. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR THREE (3)
WEEKS IN ADVANCE.
17. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS
CONTRACT, UNLESS NOTED OTHERWISE.
18. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF
PROJECT.
19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REGRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CLG CIELING
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FL FIRE LINE
FLR FLOOR
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PACAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
CIRCUIT SETTER VALVE
NG
ST
OFD
SAN
N
N2O
O
MV
V
LA MEDICAL LAB AIRLA
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:5
A
M
P-001
PLUMBING GENERAL INFORMATION
1 8JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
PLUMBING LOAD SUMMARY
MARK DESCRIPTION QUANTITY DFU EACH DFU
CW WSFU
EACH
CW WSFU
HW WSFU
EACH HW WSFU
TOTAL WSFU
EACH TOTAL WSFU
P-103 WATER CLOSET, FLUSH VALVE, WALL MOUNT, PUBLIC 6 4 24 10 60 0 0 10 60
P-204 URINAL, WASHOUT, LOW 1 4 2 3 3 0 0 3 3
P-408 LAVATORY, WALL MOUNT, WRIST BLADES, PUBLIC 12 1 12 1.5 18 1.5 18 2 24
P-418 LAVATORY, WALL MOUNT, SENSOR, PUBLIC 3 1 3 1.5 4.5 1.5 4.5 2 6
P-420 SOLID SURFACE INTEGRAL LAVATORY FAUCET, SENSOR, PUBLIC. 4 1 4 1.5 6 1.5 6 2 8
P-502 SERVICE SINK, TERRAZO MOP 1 2 2 3 3 3 3 4 4
P-528 SINK, COUNTER MOUNT, SINGLE COMPARTMENT, CORROSION-RESISTANT STEEL 2 3 6 1.5 3 1.5 3 2 4
P-604 ELECTRIC WATER COOLER 1 4 0.5 10 0.25 0 0 10 0.25
30 53.5 97.75 34.5 109.25
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION QUANTITY WASTE PIPE VENT PIPE
COLD
WATER HOT WATER
WRIST BLADE
HANDLES
ELECTRIC
SENSOR REMARKS
FD-D FLOOR DRAIN, TYPE D 5 3" - - - - -
P-103 WATER CLOSET, FLUSH VALVE, WALL MOUNT, PUBLIC 6 4" 2" 1" - - YES WATER CLOSET, FLUSH VALVE, WALL MOUNT, PUBLIC
P-204 URINAL, WASHOUT, LOW 1 2" 1 1/2" 3/4" - - YES URINAL, WASHOUT, LOW
P-408 LAVATORY, WALL MOUNT, WRIST BLADES, PUBLIC 12 2" 1 1/2" 3/8" 3/8" YES NO LAVATORY, WALL MOUNT, WRIST BLADES, PUBLIC
P-418 LAVATORY, WALL MOUNT, SENSOR, PUBLIC 3 2" 1 1/2" 3/8" 3/8" NO YES LAVATORY, WALL MOUNT, SENSOR, PUBLIC
P-420 SOLID SURFACE INTEGRAL LAVATORY FAUCET, SENSOR,
PUBLIC.
4 2" 1 1/2" 3/8" 3/8" NO YES FAUCET.
P-502 SERVICE SINK, TERRAZO MOP 1 3" 1 1/2" 1/2" 1/2" NO NO SERVICE SINK, TERRAZO MOP
P-528 SINK, COUNTER MOUNT, SINGLE COMPARTMENT,
CORROSION-RESISTANT STEEL
2 2" 1 1/2" 3/8" 3/8" NO NO SINK, COUNTER MOUNT, SINGLE COMPARTMENT, CORROSION-RESISTANT STEEL
P-604 ELECTRIC WATER COOLER 1 1 1/2" 1 1/2" 3/8" - - YES ELECTRIC WATER COOLER
P-708 EMERGENCY EYE AND FACE WASH, WALL MOUNT 1 2" 1 1/2" 3/4" 3/4'' - - EMERGENCY EYE AND FACE WASH, WALL MOUNT
P-812 WATER SUPPLY BOX 2 - - 1/2" - - - WATER SUPPLY BOX
TP-1 TRAP PRIMER 3 - - 1/2" - - - ELECTRONIC TRAP PRIMER.
PLUMBING RECIRCULATION PUMP SCHEDULE
MARK LOCATION SYSTEM TYPE
PERFORMANCE
MIN % EFF R.P.M.
SPEED
CONTROL
ELECTRICAL
REMARKSFLOW HEAD FT TEMPERATURE HP PHASE VOLTAGE
1-CWRP-1 BUILDING 1, CORRIDOR H204 DOMESTIC COLD WATER
RETURN
CARTRIDGE 1 GPM 4.0 50 °F 70 3250 CONSTANT 1/40 1 115 1, 2, 3, 4
REMARKS:
1. INSTALL PER MANUFACTURER'S INSTRUCTIONS.
2. PUMP SHALL HAVE STAINLESS STEEL CASING, UNION CONNECTION AND PANEL MOUNT TAPPINGS.
3. PUMP SHALL HAVE INTEGRAL CHECK VALVE.
4. PUMP SHALL OPERATE CONTINIOUSLY.
DocuSign Envelope ID: 5031BAE7-940A-4160-ADF6-B089AC0BA15C
5/26/2021
HAC
2E01
P
R.3 T.1 T.2 U.1
R T U V
4'' SAN DN
4'' V UP
2'' SAN DN
4'' V
4'' V UP
2'' V UP
2'' SAN DN &
2'' V UP
4'' SAN UP & DN
4'' SAN DN
TO 1ST FLR,
4'' V UP
4'' V UP TO
3RD FLR
2'' V UP
4'' V UP
4'' SAN DN TO BASEMENT
4'' V UP
4'' SAN DN
2'' V UP
2'' V UP
4'' SAN1
4'' SAN DN TO BASEMENT
4" SAN
MATCH LINE MATCH LINE
/2 PD101 /2 PD101
4'' SAN DN TO 1ST FLR
IN 1ST FLR CLG
4'' SAN DN TO BASEMENT
IN 1ST FLR CEILING
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
ELEVATOR
NO. 2
E2
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
OFFICE
2CO3
THERAPY
2CO2
OFFICE
2CO4
CORRIDOR
H210
STAIR
S201
HAC
2E01
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
IRM
2C10A
4'-0 1/2"
OIT
2C10
8.1
K M N P Q
R S T U V
2" V
2'' V UP 4'' SAN DN
4'' V UP
4'' SAN DN
4'' SAN DN
2'' V UP
4'' SAN DN
2'' SAN,
1-1/2'' V
2'' V UP
4'' SAN DN, 2'' V UP
2'' SAN DN
2'' V UP
1 1/2" SAN
1 1/2" SAN
3" SAN
1 1/2" SAN
4" SAN
3" SAN
3" SAN
1-1/2'' SAN AND 1-1/2'' V
1-1/2'' SAN DN
AND 1-1/2'' V UP
2" V
4'' SAN
4'' SAN
4'' SAN 4'' SAN
2'' V
4'' SAN UP
EX. 3'' SAN
EX. SAN
MATCH LINE MATCH LINE
/1 PD101/1 PD101
EX.'' SAN
STACK TO
REMAIN
EX. 2'' V IN 1ST FLR CLG
EX. 2'' V DN TO BASEMENT
2'' V FROM 1ST FLR CLG TO 3RD FLR
1 1/2" V
1 1/2" SAN
1 1/2" V
1 1/2" SAN
EX. 4'' V
UP TO
REMAIN
EX. 2'' V TO REMAIN
EX. 4'' V TO REMAIN
EX. 3'' SAN TO REMAIN
3'' SAN DN TO REMAIN
4" SAN 4
S A N
4" SAN
4" SAN
EX. 2"V UP
TO REMAIN
EX. 2"V UP TO
REMAIN
EX. 2'' V UP TO
3RD FLR TO REMAIN
4'' SAN FROM 3RD FLR TO REMAIN
EX. SAN IN 2ND FLR
CLG TO REMAIN
EX. 4'' SAN IN 2ND FLR CLG
TO REMAIN
EX. 3'' SAN IN 2ND FLR
CLG TO REMAIN
4'' SAN IN
2ND FLR CLG
TO REMAIN
EX. 2'' V UP
TO REMAIN
EX. 4'' SAN IN 2ND FLR CLG TO REMAIN
EX. 2'' VENT RISER FROM 1ST FLR
10 13
1. DEMOLITION WORK SHALL BE PERFORMED
SUCH THAT ALL PIPES, HANGERS,
SUPPORTS, AND VALVES IN SCOPE ARE
REMOVED COMPLETELY TO MAINS. REMOVE
ALL ITEMS TO ENSURE NOTHING IS
ABANDONED IN PLACE.
2. COORDINATE DEMOLITION WITH NEW
CONSTRUCTION SUCH THAT SERVICE
OUTSIDE OF AREA OF WORK IS
UNINTERRUPTED.
3. UNLESS OTHERWISE NOTED, SANITARY
PIPING SHOWN IS LOCATED IN FIRST FLOOR
CEILING AND VENT PIPING IS LOCATED IN
SECOND FLOOR CEILING.
4. PROVIDE TEMPORARY SUPPORTS FOR ALL
EXISTING UTILITIES SHOWN TO REMAIN IN
ORDER TO PERFORM THE WORK SHOWN ON
THE ‘HA’ SERIES DRAWINGS. ONCE THE ‘HA’
SERIES WORK IS COMPLETED, REMOVE THE
TEMPORARY SUPPORTS AND SUPPORT THE
UTILITIES IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS.
5. FIRESTOP AT NEW AND EXISTING
PENETRATIONS THROUGH FIRE-RATED
WALL, FLOOR AND CEILING ASSEMBLIES.
PROVIDE SMOKE SEALING AT NEW AND
EXISTING PENETRATIONS THROUGH SMOKE-
RATED WALL, FLOOR AND CEILING
ASSEMBLIES. COMPLY WITH DIVISION 07
SPECIFICATIONS. WHERE A PIPE OR OTHER
ELEMENT PENETRATING A FIRE- AND/OR
SMOKE-RATED ASSEMBLY IS DEMOLISHED,
PATCH/REPAIR THE ASSEMBLY TO MATCH
THE FIRE AND/OR SMOKE RATING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:0
A
M
PD101
SECOND FLOOR WASTE/VENT
DEMOLITION PLAN
2 8SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
SOUTH WASTE/VENT DEMOLITION PLAN
Scale: 1/8" = 1'-0"
NORTH WASTE/VENT DEMOLITION PLAN
NORTH
0 4 8 16
NORTH
0 4 8 16
1 DEMOLISH ABANDONED SANITARY PIPE
COMPLETE.
2 DEMOLISH SINK/LAVATORY AND ASSOCIATED
SANITARY AND VENT PIPING BACK TO MAINS
AND CAP IF MAINS SERVE FIXTURES OUTSIDE
AREA OF WORK.
3 DEMOLISH SINK AND ASSOCIATED SANITARY
PIPING BACK TO MAIN AND CAP. DEMOLISH
VENT PIPING BACK TO STACK AND PREPARE
FOR NEW CONNECTION IN SECOND FLOOR
CEILING.
4 DEMOLISH VENT/SANITARY PIPING BACK TO
HEADER/STACK AFTER VERIFYING
VENT/SANITARY PIPE DOES NOT SERVE ANY
FIXTURES OUTSIDE AREA OF WORK.
5 SANITARY VENT UP/DOWN TO REMAIN.
6 DEMOLISH 2'' VENT UP AND 2'' SANITARY
DOWN THE CHASE. PREPARE FOR NEW VENT
CONNECTION.
7 DEMOLISH SANITARY BACK TO FIRST FLOOR
CEILING. PREPARE FOR NEW CONNECTION.
8 DEMOLISH SHOWER DRAIN AND ASSOCIATED
WASTE AND VENT PIPING BACK TO THE
MAINS AND CAP IF MAINS SERVE FIXTURES
OUTSIDE AREA OF WORK.
9 DEMOLISH WATER CLOSET AND ASSOCIATED
WASTE AND VENT PIPING BACK TO MAINS
AND CAP IF MAINS SERVE FIXTURES OUTSIDE
AREA OF WORK.
10 DEMOLISH FLOOR DRAIN AND ASSOCIATED
WASTE PIPING BACK TO MAIN AND CAP.
11 DEMOLISH 2'' VENT IN FIRST FLOOR CEILING
TO POINT INDICATED. PREPARE TO
REROUTE.
12 DEMOLISH 2'' VENT IN CHASE FROM FIRST
FLOOR CEILING TO SECOND FLOOR CEILING.
PREPARE FOR NEW CONNECTION IN SECOND
FLOOR CEILING.
13 VERIFY LOCATION OF EXISTING SANITARY
AND VENT.
14 DEMOLISH SANITARY PIPING TO POINT
INDICATED AND PREPARE FOR NEW
CONNECTION. DEMOLISH VENT PIPING IN
WALL AND CAP IN SECOND FLOOR CEILING.
15 DEMOLISH SANITARY TEE. PREPARE FOR
NEW CONNECTION.
16 DEMOLISH 3'' ACID WASTE RISER FROM FIRST
FLOOR CEILING TO SECOND FLOOR CEILING
AFTER NEW OFFSET PIPING IS INSTALLED.
17 DEMOLISH 2'' VENT RISER FROM FIRST
FLOOR CEILING TO SECOND FLOOR CEILING.
PREPARE TO REROUTE.
18 EXISTING TO REMAIN.
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
ELEVATOR
NO. 2
E2
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
OFFICE
2CO3
THERAPY
2CO2
OFFICE
2CO4
CORRIDOR
H210
STAIR
S201
HAC
2E01
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
IRM
2C10A
OIT
2C10
3" DCW
1" DHWR
2" DHW
1/2" DCW
1/2" DHW
2" DHW
1" DHWR
3" DCW
3" DCW
1" DHWR
2" DHW
8.1
K M N P Q
R S T U V
3/4'' DCW TO LAV ON THIRD FLR
3/4'' DHWR UP AND DN TO REMAIN
1'' DHW UP AND DN TO REMAIN
1 1/4'' DCW UP AND DN TO REMAIN
1" O
3/4" O
1" O
1/2" DHW
1/2" DCW
1/2" DCW
1/2" DHW
1 1/4" DCW
1 1/4" DHW
3/4" DCW
3/4" DHW
1 1/2" DCW
3/4" DHW
3/4" DHWR
3/4" LA
1" O
1/2" N
1" O
2'' DCW UP & DN
1 1/4'' DHW UP & DN
1 1/4'' DHW UP & DN
3/4" DHWR
3/4" DHW
3/4" DCW
3/4" DCW
1/2" DHW
/1 PD102/1 PD102
MATCH LINEMATCH LINE
EXISTING TO REMAIN
EXISTING TO REMAIN
EXISTING TO REMAIN
IN 1ST FLR CEILING
FROM BASEMENT
UP FROM 1ST FLR CEILING
TO 2ND FLR CEILING
UP TO 3RD FLR
UP TO 3RD FLR
EXISTING TO REMAIN
EXISTING TO REMAIN
HAC
2E01
P
R.3 T.1 T.2 U.1
R T U V
1/2" DHWR
1/2" DHW
3/4" DCW
1/2" DHWR
1/2" DHW
3/4" DCW
3/4'' DHWR UP
1 1/4'' DHW UP
2'' DCW UP
1/2'' DHW UP
3/4'' DCW UP
1 1/2'' DCW UP
3/4'' DCW UP
1/2'' DHW UP
1'' MV UP
1'' MV UP
1'' MV UP
3/4'' G UP
1'' LA UP
3/4" DHWR
1 1/4" DHW
2" DCW
MATCH LINE MATCH LINE
/2 PD102 /2 PD102
1. DEMOLITION WORK SHALL BE PERFORMED
SUCH THAT ALL PIPES, HANGERS,
SUPPORTS, AND VALVES IN SCOPE ARE
REMOVED COMPLETELY TO MAINS. REMOVE
ALL ITEMS TO ENSURE NOTHING IS
ABANDONED IN PLACE.
2. NO DEAD ENDS SHALL REMAIN. DEMOLISH
PIPING TO WITHIN TWO PIPE DIAMETERS OF
THE BRANCH, RISER, OR MAIN AND CAP.
FIELD VERIFY THE LOCATIONS OF THE
MAINS, BRANCHES, OR RISERS SERVING
THE AREA. WORK ON FLOORS BELOW WILL
BE REQUIRED.
3. COORDINATE DEMOLITION WITH NEW
CONSTRUCTION SUCH THAT SERVICE
OUTSIDE OF AREA OF WORK IS
UNINTERRUPTED.
4. UNLESS OTHERWISE NOTED, DOMESTIC
WATER PIPING SHOWN IS LOCATED IN
SECOND FLOOR CEILING.
5. PROVIDE TEMPORARY SUPPORTS FOR ALL
EXISTING UTILITIES SHOWN TO REMAIN IN
ORDER TO PERFORM THE WORK SHOWN ON
THE ‘HA’ SERIES DRAWINGS. ONCE THE ‘HA’
SERIES WORK IS COMPLETED, REMOVE THE
TEMPORARY SUPPORTS AND SUPPORT THE
UTILITIES IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS.
6. FIRESTOP AT NEW AND EXISTING
PENETRATIONS THROUGH FIRE-RATED
WALL, FLOOR AND CEILING ASSEMBLIES.
PROVIDE SMOKE SEALING AT NEW AND
EXISTING PENETRATIONS THROUGH SMOKE-
RATED WALL, FLOOR AND CEILING
ASSEMBLIES. COMPLY WITH DIVISION 07
SPECIFICATIONS. WHERE A PIPE OR OTHER
ELEMENT PENETRATING A FIRE- AND/OR
SMOKE-RATED ASSEMBLY IS DEMOLISHED,
PATCH/REPAIR THE ASSEMBLY TO MATCH
THE FIRE AND/OR SMOKE RATING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:2
A
M
PD102
SECOND FLOOR DOMESTIC
WATER/MEDICAL GAS DEMOLITION
PLAN
3 8JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: 1/8" = 1'-0"
NORTH DOMESTIC WATER/MEDICAL GAS DEMOLITION PLAN
NORTH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 DEMOLISH SINK/LAVATORY AND
ASSOCIATED DOMESTIC HOT AND COLD
WATER BACK TO MAINS AND CAP.
2 DEMOLISH WATER CLOSET AND
ASSOCIATED DOMESTIC COLD WATER BACK
TO MAINS AND CAP.
3 REMOVE DCW, DHW, AND DHWR INCLUDING
FITTINGS, INSULATION, AND HANGERS BACK
TO FLOOR RISER AND CAP.
4 DEMOLISH DOMESTIC COLD AND HOT
WATER SUPPLY AND HOT WATER RETURN
PIPING IN CHASE AND IN FIRST FLOOR
CEILING. PREPARE TO REROUTE PIPING IN
THE FIRST FLOOR CEILING. PIPING FROM
BASEMENT TO REMAIN.
5 DEMOLISH MEDICAL OXYGEN PIPE AND
ASSOCIATED VALVE BOX BACK TO MAIN AND
CAP.
6 DEMOLISH SHOWER VALVE AND
ASSOCIATED DOMESTIC COLD AND HOT
WATER BACK TO MAINS AND CAP.
7 DEMOLISH SINK/LAVATORY AND
ASSOCIATED DOMESTIC HOT AND COLD
WATER COMPLETE.
8 DEMOLISH WATER CLOSET AND
ASSOCIATED DOMESTIC COLD WATER
COMPLETE.
9 DEMOLISH SHOWER AND ASSOCIATED
DOMESTIC COLD AND HOT WATER
COMPLETE.
10 VERIFY LOCATION OF EXISTING DOMESTIC
WATER PIPING.
11 EXISTING TO REMAIN.
Scale: 1/8" = 1'-0"
SOUTH DOMESTIC WATER/MEDICAL GAS DEMOLITION PLAN
NORTH
0 4 8 16
8.1
M N P Q
R S T U V
EXAM
2C01B
OFFICE
2C02A
OFFICE
2C02B
OFFICE
2C03
OFFICE
2C04A
OFFICE
2C04B
MEN'S RESTROOM
2C07A
WOMEN'S RESTROOM
2C07B
CORRIDOR
H207
OPEN OFFICE
2C08
OPEN OFFICE
2C09
OIT
2C10
OFFICE
2C06
PROVIDER OFFICE
2C05
ELEV_
H209
ELEV LOBBY
H206
STAIR S201
H208
HAC
2E01
CONSULT
2E20
WAITING
2E21
CORRIDOR
H202
CORRIDOR
H203
RECEPTION
2E22
CORRIDOR
H203
COPY AREA
2E23
OFFICE
2E24
GROUP ROOM 2B
2E25BCORRIDOR
H204
CORRIDOR
H205
STORAGE
2E26C
STORAGE
2E25C
CLASSROOM
2E28
CLASSROOM
2E27
GROUP ROOM 1B
2E26B
P-528
P-420
P-420
P-204
P-103
P-103 P-420
P-420
P-408
P-408
P-502
3/4'' DHWR UP AND DN
1'' DHW UP AND DN
1 1/4'' DCW UP AND DN
3/4" DCWR
3/4" DHWR
3/4" DHW
3/4" DCW
2" DCW
3/4" DHW
3/4" DHWR
1 1/2" DCW 1 1/2" DCW
2" DCW
1" DHW
3/4" DHW
3/4" DHWR
1-CWRP-1
EX. 1-1/4'' DHW,
1-1/4'' DCW,
DHWR
EX. 2'' DCW,
1'' DHW,
DHWR
EX. 1-1/2'' DCW,
1-1/4'' DHW,
3/4'' DHWR
2'' DCW UP & DN
1 1/4'' DHW UP & DN
1 1/4'' DHW UP & DN
1'' DHW
3/4'' DHWR
1-1/2'' DCW
3/4" DCW
3/4" DHW
3/4" DHWR
GROUP ROOM 1A
2E26A
GROUP ROOM 2A
2E25A
MATCH LINE MATCH LINE
/1 PP101 /1 PP101
IN 1ST FLR CEILING
IN 2ND FLR CEILING
UP IN WALL
WHA-B
P-103
1 1/2" DCW
WHA-B
0.2 GPM
0.2 GPM
0.4 GPM
0.4 GPM
3/4" 2" 1 1/2"
P-812
P-812
1/2"
1/2'' DCW DN TO
WATER BOX
AND SINK
1/2"
3/4" DCW
3/4" DHW
TP-1
P-604
3/8" DCW
1/2'' DCW IN
1ST FLR CLG
R.3 T.1 T.2 U.1
R T U V
CONSULT
2E20STAIR S201
H208
HAC
2E01
PAT TLT
2E02
PAT TLT
2E03
CONSULT
2E19
CONSULT
2E18
CONSULT
2E04
CONSULT
2E17
CHIRO EXAM
2E05
CHIRO EXAM
2E16
CHIRO EXAM
2E06
CHIRO EXAM
2E15
SOILED
2E07
MEDS
2E14
CLEAN UTILITY
2E08
EXAM
2E13
ACUPUNCTURE
2E09
MASSAGE
2E12
ACUPUNCTURE
2E10
MEDITATION
2E11
CORRIDOR
H201
CORRIDOR
H202
P-502
P-418
P-418
P-103
P-103
P-408
P-408
P-528
P-408
P-408
P-408
P-408
P-418
P-408
P-408
P-708
3/4" DHWR
1" DCW1" DHW
3/4" DHW
3/4" DCW
3/4" DHWR
3/4" DHW
3/4" DCW
3/4'' DCW UP
1/2'' DHW UP
1 1/2" DCW
1 1/4" DHW
3/4" DHWR
3/4" DHWR
3/4" DHWR
3/4" DHWR
1/2" DHWR
1/2" DHW
3/4" DCW
3/4" DHWR
1 1/4" DHW
2" DCW
3/4" DCW
3/4" DHW
1 1/4" DHW
1 1/2" DCW
/2 PP101 /2 PP101
MATCH LINEMATCH LINE
WHA-B
0.2 GPM
0.5 GPM
0.2 GPM
0.2 GPM
0.3 GPM
/4
1"
3/4"
1 1/2"
/4
3/4"
P-408
3/4" DHW
1/2" DCW
P-408
1 1/2" DCW
1" DHW
1/2" DCW
TP-1
TP-1
1/2'' DCW IN 1ST FLR CLG
1/2'' DCW IN 1ST FLR CLG
1/2'' DCW IN 1ST FLR CLG
3/4" 1/2" 3/4"
1. UNLESS OTHERWISE NOTED, DOMESTIC
PIPING SHOWN IS LOCATED IN SECOND
FLOOR CEILING.
2. FIRESTOP AT NEW AND EXISTING
PENETRATIONS THROUGH FIRE-RATED
WALL, FLOOR AND CEILING ASSEMBLIES.
PROVIDE SMOKE SEALING AT NEW AND
EXISTING PENETRATIONS THROUGH SMOKE-
RATED WALL, FLOOR AND CEILING
ASSEMBLIES. COMPLY WITH DIVISION 07
SPECIFICATIONS. WHERE A PIPE OR OTHER
ELEMENT PENETRATING A FIRE- AND/OR
SMOKE-RATED ASSEMBLY IS DEMOLISHED,
PATCH/REPAIR THE ASSEMBLY TO MATCH
THE FIRE AND/OR SMOKE RATING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:3
A
M
PP101
SECOND FLOOR DOMESTIC WATER
PLAN
4 8JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: 1/8" = 1'-0"
SECOND FLOOR DOMESTIC WATER PLAN
NORTH
0 4 8 16
1 1/2'' DCW/DHW DOWN IN WALL TO
BACK-TO-BACK LAVATORIES.
2 3/4'' DCW/DHW TO EMERGENCY FIXTURE
MIXING VALVE.
3 INSTALL BALANCING VALVE ASSEMBLY PER
DETAIL ON SHEET P-501. BALANCE FLOW
RATE AS INDICATED ON PLAN.
4 WATER BOX OUTLET FOR ICE MAKER.
BOTTOM OF BOX SHALL BE INSTALLED 18''
ABOVE FINISHED FLOOR.
5 WATER BOX OUTLET FOR COFFEE MAKER.
BOTTOM OF BOX SHALL BE INSTALLED 3'-4''
ABOVE FINISHED FLOOR.
6 1/2" DCW DOWN TO TRAP PRIMER TP-1
CONNECTION. EXTEND 1/2" DCW IN FIRST
FLOOR CEILING FROM TRAP PRIMER TO
FLOOR DRAIN FD-D.
7 OFFSET 2" DHW, 1 1/2 " DCW, AND 3/4" DWHR
FROM FIRST FLOOR CEILING UP IN WALL AND
RECONNECT TO RISERS UP TO THIRD
FLOOR.
8 1/2'' DCW IN 1ST FLOOR CEILING FROM TP-1
TO FLOOR SINK DRAIN.
9 EXISTING TO REMAIN.
10 EXTEND 1/2" DCW TO HUMIDIFIER AND
TRANSITION TO HUMIDIFIER INLET
CONNECTION.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
SECOND FLOOR DOMESTIC WATER PLAN
NORTH
0 4 8 16
8.1
K M N P Q
R S T U V
OPEN OFFICE
2C09
OPEN OFFICE
2C08
MEN'S RESTROOM
2C07A
WOMEN'S RESTROOM
2C07B
CORRIDOR
H207
OFFICE
2C04A
OFFICE
2C04B
OFFICE
2C03
OFFICE
2C02A
OFFICE
2C02B
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
OIT
2C10
CLASSROOM
2E28
CLASSROOM
2E27
CORRIDOR
H205
GROUP ROOM 1A
2E26A
GROUP ROOM 2A
2E25A
CORRIDOR
H203
COPY AREA
2E23
OFFICE
2E24
WAITING
2E21
WAITING
2E21
CONSULT
2E20STAIR S201
H208
CORRIDOR
H202
OFFICE
2C06
PROVIDER OFFICE
2C05
ELEV_
H209
EX. 4" WASTE
STACK
EX. 2"V UP
EX. 4" WASTE
STACK
EX. 2"V UP
4'' WCO
4'' WCO
4" SAN
FD-D
FD-D
2" SAN
1 1/2" V
EX. 3'' VENT RISER
EX. 2'' FROM 1ST FLR
2" SAN
3'' SAN DN TO
BASEMENT 1 1/2" V
4" SAN
1 1/2" V
EX. 4'' V UP
EX. 2'' V UP
EX. 4'' SAN DN
EX. 4'' SAN DN
EX. 4'' SAN DN TO BASEMENT
EX. 3'' SAN
EX. SAN
2" SAN
2" SAN
P-408
P-408
P-502
P-103
P-420
P-420
P-103
P-204
P-420
P-420
P-528
GROUP ROOM 1B
2E26B
GROUP ROOM 2B
2E25B
RECEPTION
2E22
2" V
4'' SAN
EX.'' SAN
STACK
EX. 2'' V IN 1ST FLR CLG
EX. 2'' V DN TO BASEMENT
2'' V IN 2ND FLR CEILING
2" V
IN 2ND FLR CHASE
4" SAN
IN 1ST FLR CLG
IN 1ST FLR CLG
IN 2ND FLR CHASE
2" V
2" V
2" V
4" SAN
3" SAN
EX. 2''V UP
EX. 2'' V
P-103
IN 1ST FLR CLG
IN 2ND FLR CLG
UP TO 2ND FLR CLG
4" SAN
EX. 2'' V
UP TO 3RD
FLR
4'' SAN FROM 3RD FLR
IN 2ND FLR CLG
4" SAN
EX. 4'' SAN IN 2ND FLR CLG
EX. 4'' SAN IN 2ND FLR CLG
EX. 3'' SAN IN 2ND FLR CLG
EX. 4'' SAN IN 2ND FLR CLG
IN 1ST FLR CLG
4'' SAN IN
2ND FLR CLG
EX. 2''
V UP
EX. 4'' SAN IN 2ND FLR CLG
EX. SAN IN 1ST FLR CLG
IN 1ST FLR CLG
IN 1ST FLR CLG
/1 PW101/1 PW101
MATCH LINE MATCH LINE
IN 1ST FLR CLG
IN 2ND FLR CEILING
2" V
3"
1 1/2" V
P-604
2" SAN
R.3 T.1 T.2 U.1
R T U V
HAC
2E01
PAT TLT
2E02 CONSULT
2E19
PAT TLT
2E03
CONSULT
2E04
CONSULT
2E18
CONSULT
2E17
CHIRO EXAM
2E16
CHIRO EXAM
2E05
CHIRO EXAM
2E06
CHIRO EXAM
2E15
SOILED
2E07
MEDS
2E14
CLEAN UTILITY
2E08
EXAM
2E13
ACUPUNCTURE
2E09
MASSAGE
2E12
MEDITATION
2E11
ACUPUNCTURE
2E10
4" V
1 1/2" V
2" SAN
2" SAN
1 1/2"
V
1 1/2" V
2" SAN2" SAN
2" V
4" V
4" V
4" SAN
2" V
3" SAN
1 1/2" V
2" SAN
FCO
2" V
2" SAN
4'' V UP
2'' SAN DN
4'' V
4'' V UP
EX. 4'' SAN DN
4'' SAN DN, 4'' V UP
4'' V UP
2'' V UP
4'' V UP
4'' SAN DN
4'' V UP
2'' V UP
2'' V UP
3" SAN
2" SAN
2" SAN
FD-D
1 1/2" V
1 1/2" V
FCO
2" V
2" SAN
2" SAN
1 1/2" V
P-103
P-103
P-502
P-418
P-418
P-408
P-408
P-528
P-408
P-408
P-408
P-408
P-708
P-418
P-408
P-408
2" SAN
2" SAN
4" SAN
EX. 4'' SAN DN TO BASEMENT
4" SAN
MATCH LINE MATCH LINE
/2 PW101 /2 PW101
4" SAN
1 1/2" V
IN 1ST FLR CLG
IN 1ST FLR CLG
IN 1ST FLR CLG
IN 1ST FLR CLG
IN 1ST FLR CLG
IN 1ST FLR CLG
2" SAN
1 1/2" V
IN 1ST FLR CLG
4'' SAN DN TO BASEMENT
P-408
P-408
2"
13 3"
4"FD-D
FD-D
3"
3"
1. UNLESS OTHERWISE NOTED, SANITARY
PIPING SHOWN IS LOCATED IN FIRST FLOOR
CEILING AND VENT PIPING IS LOCATED IN
SECOND FLOOR CEILING.
2. FIRESTOP AT NEW AND EXISTING
PENETRATIONS THROUGH FIRE-RATED
WALL, FLOOR AND CEILING ASSEMBLIES.
PROVIDE SMOKE SEALING AT NEW AND
EXISTING PENETRATIONS THROUGH SMOKE-
RATED WALL, FLOOR AND CEILING
ASSEMBLIES. COMPLY WITH DIVISION 07
SPECIFICATIONS. WHERE A PIPE OR OTHER
ELEMENT PENETRATING A FIRE- AND/OR
SMOKE-RATED ASSEMBLY IS DEMOLISHED,
PATCH/REPAIR THE ASSEMBLY TO MATCH
THE FIRE AND/OR SMOKE RATING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:4
A
M
PW101
SECOND FLOOR DRAIN, WASTE, AND
VENT PLAN
5 8JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: 1/8" = 1'-0"
NORTH DRAIN, WASTE, AND VENT PLAN
NORTH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 CONNECT NEW 2" SANITARY TO EXISTING 4"
SANITARY STACK.
2 CONNECT 4'' SANITARY TO EXISTING 4''
SANITARY STACK IN FIRST FLOOR CEILING.
3 CONNECT 2 1/2'' VENT TO EXISTING 4'' VENT
ABOVE CEILING.
4 CONNECT NEW 2'' VENT TO EXISTING 2'' VENT
ABOVE CEILING.
5 CONNECT NEW 1 1/2'' VENT AND 2'' VENT TO
EXISTING 4'' VENT ABOVE CEILING.
6 REROUTE 3" ACID WASTE STACK LATERALLY
ABOVE FIRST FLOOR CEILING, TURN UP INTO
NEW CHASE.
7 NEW 3" ACID WASTE LINE ABOVE SECOND
FLOOR CEILING, RECONNECT TO EXISTING
STACK.
8 INSTALL NEW OFFSET 3" ACID WASTE PIPING
PRIOR TO DEMOLISHING EXISTING.
9 CONNECT NEW 2'' SANITARY FROM
LAVATORIES TO EXISTING 4'' SANITARY IN
FIRST FLOOR CEILING.
10 2'' SANITARY FROM LAVATORY/SINK DOWN TO
FLOOR BELOW. 1 1/2'' VENT UP TO ABOVE
CEILING. PROVIDE ONE WALL CLEANOUT
ABOVE LAVATORY RIM AS SHOWN ON P-501,
DETAIL 3 AND 10.
11 3'' SANITARY FROM SINK DOWN TO FLOOR
BELOW. 1 1/2'' VENT UP TO ABOVE CEILING.
12 4'' SANITARY FROM WATER CLOSET(S) DOWN
TO FLOOR BELOW. 2'' VENT UP TO ABOVE
CEILING.
13 2'' SANITARY FROM LAVATORIES DOWN TO
FLOOR BELOW. 1 1/2'' VENT UP TO ABOVE
CEILING. PROVIDE ONE WALL CLEANOUT
ABOVE LAVATORY RIM AS SHOWN ON P-501,
DETAIL 3 AND 10.
14 4'' SANITARY FROM A GROUP OF FIXTURES
DOWN TO FLOOR BELOW. 2'' VENT UP TO
ABOVE CEILING.
15 2'' SANITARY FROM EMERGENCY EYE/FACE
WASH DOWN TO FLOOR BELOW. 1 1/2'' VENT
UP TO ABOVE CEILING.
16 INSTALL NEW OFFSET 2" VENT PIPING.
17 2'' SANITARY UP TO FLOOR CLEANOUT.
18 2" SAN FROM WATER COOLER P-204 DOWN
TO FIRST FLOOR CEILING. 1 1/2" VENT UP AND
CONNECT IN SECOND FLOOR CEILING.
19 EXISTING TO REMAIN.
Scale: 1/8" = 1'-0"
SOUTH DRAIN, WASTE, AND VENT PLAN
NORTH
0 4 8 16
MINIMUM 16 GAGE GALVANIZED
STEEL PLATE 12"x48" [300x1200mm] MIN. SECURED TO
A MIN. 4 STUDS PER LAVATORY
TYP. 1/8" 1/4"
TYP. [3mm] [6mm]
1/4" [6mm] MOLLY BOLT HOLLOW WALL
ANCHOR (1 EA. SIDE OF LAV)
PLAN
STEEL WALL PLATE
WALL ANCHOR
STUDS
STEEL HANGER BY LAV MFGR
AA
FOR FIXTURE
HEIGHT SEE
ARCHITECTURAL
DRAWINGS
MIN. 5 1/4"
[131mm] GALV/
MACHINE BOLTS
WELDED TO PLATE
MIN. (3) 1/4"
[6mm] MACHINE
BOLTS W/ DOUBLE
LOCK NUTS ON
BACK SIDE
SECTION A
[9 m m
T O
F L O
O R
V A
R
IE
S
1" STOP
FINISHED
FLOOR
FINISHED
WALL
SENSOR
MANUAL
OVER-RIDE
BUTTON
REFER TO
ARCHITECTURAL
PLANS FOR
FIXTURE HEIGHT
/2
/2
2 3/4" 4 3/4"
2 1/4"
C/L OF
FIXTURE
/2
NOTE:
PROVIDE 24 VOLT
TRANSFORMER
FAUCET
LAMINAR FLOW
CONTROL DEVICE
FINISHED
FLOOR
ESCUTCHEON
LOOSE
KEY STOP
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E
A
R C
H
IT
E C
T U
R A
L D
R A
W
IN
G S 1
/4
TRAP PARALLEL
TO WALL
WALL MOUNTED
THERMOSTATIC
MIXING VALVE
3/8" FLEX TO HW
ON FAUCET
OFFSET WASTE
8"
1 1/2'' VENT. SEE PLANS FOR
CONTINUATION.
2'' WALL CLEANOUT
WITH CHROME
PLATED COVER
2'' SANITARY. SEE
PLANS FOR
CONTINUATION.
2'' SANITARY
QUICK CLOSING
VALVE
WATER HAMMER ARRESTOR
ISOLATION VALVE
OUTLET
PROVIDE ACCESS
DOOR TO ALLOW FOR
ACCESS TO WATER
HAMMER ARRESTOR
HOT OR COLD WATER
RETURN PIPING
SWING TYPE
CHECK VALVE
BALANCING
VALVE
RETURN PIPING
HOT OR COLD WATER
BALL VALVE (TYP OF TWO)
FINISHED
FLOOR
REFER TO
ARCHITECTURAL
PLANS FOR
FIXTURE HEIGHT
FINISHED
WALL
CARRIER
1" STOP
/2
4 3/4"
C/L OF
FIXTURE
SENSOR
MANUAL
OVER-RIDE
BUTTON
2 3/4"
INSTALL PER PDI STANDARDS AND
MANUFACTURER'S INSTRUCTIONS.
PROVIDE WHA AT ALL QUICK
CLOSING VALVES.
IF BRANCH IS GREATER THAN
20' LONG, PROVIDE ANOTHER
WHA IN MIDDLE, EACH SIZED
FOR HALF THE FIXTURE UNITS
IF HORIZONTAL BRANCH IS LESS
THAN 20' LONG, PROVIDE ONE
WHA AT END OF LINE
HOT OR COLD WATER SUPPLY
WATER HAMMER
ARRESTER (TYP)
WHA-A
WHA-B
WHA-C
WHA-D
WHA-E
WHA-F
1/2"
3/4"
1"
1-1/4"
1-1/2"
2"
1-11
12-32
33-60
61-113
114-154
154-330 FIXTURE WITH QUICK
CLOSING VALVE (TYP)
PDI
SIZE
PIPE
SIZE
FIXTURE
UNIT LOAD
ACCESSIBLE
MAINTENANCE
SHUTOFF (TYP)
NOM. SIZE (IN.)
PIPE (FT.)
TUBING (FT.)
5 FT
THRU 3/4
1 1 1/4
1 1/2
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR
LOW TEMPERATURE
PIPE)
PROVIDE HIGH
COMPRESSIVE
STRENGTH
INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD AT
HANGER
WELD
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH CHANNEL
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2" x 2" x 1/4" ANGLE
NOTES:
SEE SPECIFICATIONS FOR
DETAILED HANGER
REQUIREMENTS. SIDE VIEW TRAPEZE HANGER
FOR UP TO 1000 LB. UNIFORM
LOAD
1" MAX.
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (8" MIN.)
2 2 1/2 3 4 5 6 8 10 12
11 12 14 16 17 19 22 23
9 10 12 13 14 16 - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
MAXIMUM PIPE/TUBING SUPPORT SPACING
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
TRAP PARALLEL TO WALL
FINISHED
FLOOR
ESCUTCHEON
LOOSE
KEY STOP
F O
R F
IX
T
U R
E H
E
IG
H T
S S
A
R C
H
IT
E C
T U
R A
L D
R A
W
IN
G S 1
/4
8"
WALL MOUNTED
THERMOSTATIC
MIXING VALVE
3/8" FLEX TO FAUCET
OFFSET WASTE
J-BOX WITH TRANSFORMER OR PLUG-IN ON
DUPLEX RECEPTACLE. SHOWN FOR
REFERENCE ONLY. COORDINATE WITH
ELECTRICAL CONTRACTOR.
1 1/2'' VENT. SEE PLANS FOR
CONTINUATION.
2'' WALL CLEANOUT
WITH CHROME
PLATED COVER
2'' SANITARY
2'' SANITARY. SEE
PLANS FOR
CONTINUATION.
1-1/2" P-TRAP
WITH CLEANOUT
SOLID SURFACE
INTEGRAL
LAVATORY
FINISHED FLOOR
THERMOSTATIC MIXING
VALVE
HOT & COLD WATER
CONNECTIONS
HOT & COLD WATER
CONNECTIONS TO FAUCET
SEE ARCHITECTURAL
PLANS AND PLUMBING
SPECIFICATIONS FOR
DIMENSIONS
SENSOR
OPERATED
FAUCET SEE
SPECIFICATIONS
NOTE: COUNTER IS SHOWN FOR
REFERENCE ONLY.
COORDINATE INSTALLATION
WITH THE COUNTER PROVIDED.
1-1/2" P-TRAP
WITH CLEANOUT
WRIST OPERATED
DECK MOUNT
GOOSENECK FAUCET
COUNTER
MOUNT SINK
FINISHED FLOOR
THERMOSTATIC MIXING
VALVE
HOT & COLD WATER
CONNECTIONS
HOT & COLD WATER
CONNECTIONS TO FAUCET
SEE ARCHITECTURAL
PLANS AND PLUMBING
SPECIFICATIONS FOR
DIMENSIONS
NOTE: COUNTER IS SHOWN FOR
REFERENCE ONLY.
COORDINATE INSTALLATION OF
SINK WITH THE COUNTER
PROVIDED.
TYP. PIPE SUPPORTS
(SEE SPECIFICATIONS)
TYPICAL PRESSURE GAUGE
AND GAUGE COCK
COLD WATER CIRCULATION PUMP.
SEE EQUIPMENT SCHEDULE
(PUMP MOTORS SHALL BE INSTALLED
SO THAT MOTOR IS IN A HORIZONTAL
POSITION)
1/2" FLEXIBLE ELECTRICAL CONDUIT
FROM AQUASTAT TO PUMP BY
ELECTRICAL CONTRACTOR
THERMOMETER
TO POWER SOURCE. SEE
'E' SERIES DRAWINGS.
TYPICAL SHUT-OFF VALVE
CHECK VALVE
TYPICAL DIELECTRIC UNION COLD WATER CIRCULATION LINE
FROM BUILDING SYSTEM
DRAIN IN BOTTOM
OF BASIN
MOP BASIN ON FLOOR
WALL
FAUCET LOCATED BETWEEN
36" AND 42" ABOVE FLOOR
1/2'' DCW TO TRAP PRIMER
ASSEMBLY
FROM COLD
WATER MAIN
TRAP PRIMER
VALVE LOCATED
INSIDE WALL CAVITY
PROVIDE LOCKABLE
ACCES DOOR
DISTRIBUTION UNIT FOR
MULITPLE INSTALLATIONS
WALL
VENT PIPING
LOCATED IN WALL
FINISHED FLOOR
COPPER PIPING PASSING THRU
CONCRETE SLAB SHALL BE PROTECTED
BY A PROTECTIVE SHEATING OR
WRAPPING TO PERVENT CORROSION
TO THE COPPER
PROVIDE TRAP PRIMER
CONNECTION ADAPTER SO
THAT TRAP PRIMER LINES
CAN BE ROUTED BELOW
SLAB OR IN FLOOR BELOW
CEILING SPACE FROM
VALVE TO DRAIN
FLOOR DRAIN OR FLOOR SINK
SEE FLOOR PLANS FOR
DRAIN LOCATIONS
WASTE PIPE
TO MAIN
JUCTION-BOX FOR TRANSFORMER
CODE ALLOWED DISTANCE
NO MORE THAN
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:4
A
M
P-501
PLUMBING DETAILS
6 8JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: No Scale
LAVATORY MOUNTING DETAIL
Scale: No Scale
WATER CLOSET WALL HUNG DETAIL-SENSOR OPERATED
Scale: No Scale
TYPICAL WHEELCHAIR LAVATORY DETAIL
Scale: No Scale
WATER HAMMER ARRESTOR DETAIL
Scale: No Scale
HOT/COLD WATER BALANCING VALVE STATION DETAIL
Scale: No Scale
URINAL MOUNTING DETAIL - SENSOR OPERATED
Scale: No Scale
WATER HAMMER ARRESTOR SCHEDULE AND INSTALLATION
Scale: No Scale
PIPE HANGER
Scale: No Scale
LAVATORY WITH MIXING VALVE -SENSOR OPERATED DETAIL
Scale: No Scale
SENSOR OPERATED SOLID SURFACE INTEGRAL LAVATORY
Scale: No Scale
COUNTER MOUNTED SINK
Scale: No Scale
COLD WATER RECIRCULATION PUMP DETAIL
Scale: No Scale
MOP BASIN
Scale: No Scale
FLOOR DRAIN & TRAP PRIMER DETAIL
3" AW
2" SAN
2"
2" 2"
2"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
1 1/2"
3" 2"
1 1/2"
1 1/2"
2"
/2
/2
2"
/2
/2
2"
4"
3"
1 1/2"
2"
1 1/2"
2"
1 1/2"
2"
P-408
P-408
P-408
P-408
P-528
P-708
P-408
P-418 P-408
P-408
P-408
P-418
P-418
P-103
P-103
P-502
P-528
P-420 P-420
P-204
P-103
P-420
P-420 P-103
P-408
P-408
FD-D FD-D
FD-D
4" SAN
S A N
S A N
S A N
V
S A N
V
S A N
V
V
S A N
S A N
S A N
V
V 3 S A N
AW
V
S A N
S A N
S A N
V
S A N
VS
A N 4"
S A N
S A N
S A N
S A N
2"
2"
2"
4"
2"
2"
2"
CO
S A N
S A N
S A N
4" V
S A N
4" V
4" V
4"
4"
4"
2"
3"
P-812
P-812
P-103
P-408
P-408
2"
FD-D
FD-D
FCO
P-604
2"
1 1/2"
TP-1
TP-1
TP-1
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:5
A
M
P-901
SANITARY AND VENT PIPE RISERS
7 8SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: No Scale
SANITARY AND VENT PIPE RISERS
FCO
4'' WCO
4'' WCO
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
2" 3/4"
3/4"
2"
1 1/2"
1 1/2"
1"
3/4"
3/4"
3/4" 3/4" 3/4"
3/4"
1" 1"
1 1/2" 1 1/4"
3/4"
1 1/4"
1 1/2"
3/4"
3/4" DCW
3/4" DHW
1" 3/4"
3/4"
P-528 P-420
P-420 P-204
P-103
P-420 P-420
P-103
P-408
P-408
3/4"
P-408
P-408
P-408
P-528
P-708
P-418
P-408
P-408
P-408
P-408
P-103
P-103
P-418
P-418
P-502
3/4" 3/4" 1 1/2"
3/4" 1"
1 1/4"
1/
1"
1 1/4"
1 1/4"
3/4"
3/4"
1 1/4"
1 1/4"
WHA-B
WHA-B
WHA-B
3/4" 3/4"
1 1/2"
3/4"
1 1/2"
3/4"3/4"
3/4"
1"
3/4" 3/4"
3/4"
3/4" 3/4"
3/4" 3/4"
1 1/2"
2" 3/4"1-CWRP-1
3/4"
3/4"
3/4"
1/2"
1/2"
1/2" 1/2"
P-812
P-812
2"
3/4"
P-408P-408
P-408
1 1/2"
1"
P-103 P-604
TP-1
TP-1
TP-1
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:5
A
M
P-902
DOMESTIC PIPE RISERS
8 8SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: No Scale
DOMESTIC WATER RISERS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
| Sheets |
| FX001 - FIRE PROTECTION GENERAL INFORMATION |
| FD101 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN |
| FX101 - SECOND FLOOR FIRE PROTECTION PLAN |
| P-001 - PLUMBING GENERAL INFORMATION |
| PD101 - SECOND FLOOR WASTE/VENT DEMOLITION PLAN |
| PD102 - SECOND FLOOR DOMESTIC WATER/MEDICAL GAS DEMOLITION PLAN |
| PP101 - SECOND FLOOR DOMESTIC WATER PLAN |
| PW101 - SECOND FLOOR DRAIN, WASTE, AND VENT PLAN |
| P-501 - PLUMBING DETAILS |
| P-901 - SANITARY AND VENT PIPE RISERS |
| P-902 - DOMESTIC PIPE RISERS |
| 2021-05-26T07:57:25-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .