2-HA Bid Drawing 657-20-101JB (5 Pages) 5 28 2021 .pdf

PDF 4 MB Posted

Attached to
Z2DA--657-20-101JB FCA-Renovate Space for Whole Health Clinic
Solicitation number
36C25522R0058
Issued by

About this file

This document package includes construction drawings and specifications for a federal abatement project. The drawings depict plans for removing asbestos, lead, and mold impacted materials from Veterans Affairs medical facilities in St. Louis, Missouri. Abatement work includes removing plaster ceilings and walls, floor tiles, pipe insulation, and other building components containing hazardous materials. The solicitation is for abatement services during renovation of space for a new VA Whole Health Clinic. The Department of Veterans Affairs Veterans Health Administration VISN 15 is the contracting agency. The abatement contractor must follow all applicable federal, state and local regulations in conducting this work safely and in accordance with specifications.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAP

FAP

FAP

FAP

SINGLE

CHAMBER

DECON

SINGLE

CHAMBER

DECON

SINGLE

CHAMBER

DECON

SINGLE

CHAMBER

DECON

1C121A

1C122

ROOM

1C123B

1C126

1C125

ROOM

ROOM

ROOM

ROOM

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

108 Benton Lodge Road Suite B

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA100

1ST FLOOR -

LEAD ABATEMENT PLAN

1 5

AMY WALLACE

RAJ

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR, ST

LOUIS, MO 63125

MAY 28, 2021

657-20-101JB

19-335

GKY

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

FIRST FLOOR - LEAD ABATEMENT PLAN

NORTH

0 4 8 16

SHEET KEY NOTES:# SHEET NOTES:

REMOVE PLASTER CEILING WITH LEAD-BASED PAINT (LBP)

AND ADDITIONAL LBP ON CONCRETE DECK, AND ALL LBP

DEBRIS INSIDE A GROSS REMOVAL CONTAINMENT. ACTIVE

UTILITIES ARE ATTACHED TO THE LEAD PLASTER CEILINGS

SCHEDULED FOR REMOVAL. CLEANUP/STABILIZATION (AS

NECESSARY) AND INTERIM CLEARANCES MAY BE REQUIRED

TO ALLOW FOR OTHER TRADES TO REMOVE AND

TEMPORARILY SUPPORT THE UTILITIES PRIOR TO

REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

- CENTER WING: 310 SF PLASTER CEILING WITH LBP

310 SF LBP PAINT ON CONCRETE DECK

L1.

ABATEMENT LEGEND

REMOVE LEAD PLASTER CEILING, LEAD-BASED PAINT

ON CONCRETE DECK, AND ALL LEAD PAINT DEBRIS

AS INDICATED IN KEYNOTES.

THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING

VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS

THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE

CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND

LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER

CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE

INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO

REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR

TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND

CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR

AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT

OUTDOOR TEMPERATURE REQUIREMENTS WITH VA

MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO

SHUTTING DOWN STEAM LINES OR CHILLER LINES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING

INSULATION FROM THE STEAM PIPING MUST BE

ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150

DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS

SHALL BE PROPERLY COORDINATED WITH THE VA TO

MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT

THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO

AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS

UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE

KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS

REQUIRED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (NIGHTS & WEEKENDS)

L1

L1

L1

L1

L1

LIMITS OF NEGATIVE PRESSURE

CONTAINMENT (NIGHTS & WEEKENDS)

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

2E01

HAC

S201

STAIR

H210

CORRIDOR

2CO4

OFFICE

2CO2

THERAPY

2CO3

OFFICE

2CO7

ROOM

CONFERENCE

2CO9

OFFICE

2CO8

OFFICE

E2

NO. 2

ELEVATOR

2CO6

STORAGE

2CO5

OFFICE

CH-E-1

CHASE

2E20

OFFICE

2E21

EXAM

2E24

TOILET

2E25B

TOILET

2E29

EXAM

2E28

TOILET

2E22A

TOILET

2E22

OFFICE

2E27

OFFICE

2E26

ROOM

WAITING

2E23

OFFICE

2E25

EXAM

2E25A

EXAM

H204

CORRIDOR

H203

CORRIDOR

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

108 Benton Lodge Road Suite B

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA101

SECOND FLOOR -

FLOORING ABATEMENT PLAN

2 5

AMY WALLACE

RAJ

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR, ST

LOUIS, MO 63125

657-20-101JB

19-335

GKY

Scale: 1/8" = 1'-0"

SECOND FLOOR - FLOORING ABATEMENT PLAN

NORTH

0 4 8 16

SHEET KEY NOTES:# SHEET NOTES:

REMOVE ASBESTOS FLOOR TILE AND ASSOCIATED ASBESTOS

MASTIC LOCATED IN CENTER WING INSIDE A GROSS REMOVAL

CONTAINMENT.

- CENTER WING: 2,030 SF OF ASBESTOS FLOOR TILE AND

ASBESTOS MASTIC

(1 LAYER)

REMOVE NON-ASBESTOS SHEET FLOORING, ASBESTOS

FLOOR TILE AND ASSOCIATED ASBESTOS MASTIC LOCATED IN

EAST WING INSIDE A GROSS REMOVAL CONTAINMENT.

- EAST WING: 1,270 SF OF NON-ASBESTOS SHEET

FLOORING AND ASBESTOS FLOOR TILE

AND ASBESTOS MASTIC

(2 LAYERS)

A1.

A2.

ABATEMENT LEGEND

REMOVE ASBESTOS FLOOR TILE AND ASSOCIATED

ASBESTOS MASTIC AS INDICATED IN KEYNOTES.

A1

1 LAYER

A1

1 LAYER

A1

1 LAYER

A1

1 LAYER

A1

1 LAYER

A1

1 LAYER

A2

A2

A2

A2

A2

2 LAYERS

2 LAYERS

2 LAYERS

2 LAYERS

2 LAYERS

LIMITS OF GROSS REMOVAL CONTAINMENT

LIMITS OF GROSS REMOVAL CONTAINMENT

A2

2 LAYERS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING

VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS

THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE

CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND

LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER

CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE

INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO

REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR

TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND

CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR

AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT

OUTDOOR TEMPERATURE REQUIREMENTS WITH VA

MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO

SHUTTING DOWN STEAM LINES OR CHILLER LINES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING

INSULATION FROM THE STEAM PIPING MUST BE

ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150

DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS

SHALL BE PROPERLY COORDINATED WITH THE VA TO

MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT

THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO

AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS

UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE

KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS

REQUIRED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

MAY 28, 2021

S201

STAIR

H210

CORRIDOR

2CO4

OFFICE

2CO2

THERAPY

2CO3

OFFICE

2CO7

ROOM

CONFERENCE

2CO9

OFFICE

2CO8

OFFICE

E2

NO. 2

ELEVATOR

2CO6

STORAGE

2CO5

OFFICE

CH-E-1

CHASE

2E20

OFFICE

2E21

EXAM

2E24

TOILET

2E25B

TOILET

2E29

EXAM

2E28

TOILET

2E22A

TOILET

2E22

OFFICE

2E27

OFFICE

2E26

ROOM

WAITING

2E23

OFFICE

2E25

EXAM

2E25A

EXAM

H204

CORRIDOR

H203

CORRIDOR

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

108 Benton Lodge Road Suite B

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA102

SECOND FLOOR - TSI AND OTHER ACM

ABATEMENT PLAN

3 5

AMY WALLACE

RAJ

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR, ST

LOUIS, MO 63125

657-20-101JB

19-335

GKY

Scale: 1/8" = 1'-0"

SECOND FLOOR - TSI AND OTHER ACM ABATEMENT PLAN

NORTH

0 4 8 16

SHEET KEY NOTES:# SHEET NOTES:

REMOVE ASBESTOS PIPE INSULATION INCLUDING ALL

MUDDED FITTINGS, JOINTS, TEES, VALVES, UNIONS, ETC.,

INSIDE A GROSS REMOVAL CONTAINMENT.

- CENTER WING: 510 LF ASBESTOS PIPE INSULATION

INCLUDING MUDDED FITTINGS

- EAST WING: 1,185 LF ASBESTOS PIPE INSULATION

INCLUDING MUDDED FITTINGS

DEMOLISH PIPE CHASES, REMOVE ASBESTOS PIPE

INSULATION FROM PIPE CHASE , CLEAN UP ANY PIPE

INSULATION DEBRIS AND THOROUGHLY CLEAN ALL

SURFACES (INCLUDING THE REMAINING WALLS AND PIPING)

INSIDE A GROSS REMOVAL CONTAINMENT. ASBESTOS PIPE

INSULATION QUANTITIES INCLUDED IN KEYNOTE A1.

- CENTER WING: 6 PIPE CHASES

- EAST WING: 11 PIPE CHASES

REMOVE ASBESTOS TAR FITTINGS FROM CHILLED WATER

LINES INSIDE A GROSS REMOVAL CONTAINMENT.

- CENTER WING: 8 EA ASBESTOS TAR WRAP FITTINGS

- EAST WING: 20 EA ASBESTOS TAR WRAP FITTINGS

REMOVE ASBESTOS INSULATION AT PIPE SADDLES INSIDE A

GROSS REMOVAL CONTAINMENT.

- CENTER WING: 32 EA ASBESTOS INSULATION

- EAST WING: 30 EA ASBESTOS INSULATION

REMOVE ASBESTOS SINK SOUNDPROOFING USING

DISMANTLING TECHNIQUES.

- EAST WING: 2 EA ASBESTOS SINK SOUNDPROOFING

REMOVE FIBERGLASS PIPE INSULATION WITH SUSPECT MOLD

GROWTHS INSIDE A GROSS REMOVAL CONTAINMENT.

- EAST WING: 10 LF FIBERGLASS PIPE INSULATION WITH

SUSPECT MOLD GROWTHS

A1.

A2.

A3.

A4.

A5.

M1.

ABATEMENT LEGEND

REMOVE ASBESTOS PIPE INSULATION AND

ASBESTOS FITTINGS AS INDICATED IN KEYNOTES.

LIMITS OF GROSS REMOVAL CONTAINMENT

LIMITS OF GROSS REMOVAL CONTAINMENT

A2

A2 A2

A2

A2 A2

A2

A2

A2

A2

A2

A2

M1

A5

A5

A1

A3

A4

A1

A3

A4

A1

A3

A4

A1

A3

A4

A1 A1

A1

A1

A1 A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A3

A4

A1

A3

A4

A1

A3

A4

A1

A3

A4

A2

A2

A2

A2

A2

A2

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING

VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS

THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE

CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND

LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER

CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE

INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO

REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR

TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND

CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR

AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT

OUTDOOR TEMPERATURE REQUIREMENTS WITH VA

MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO

SHUTTING DOWN STEAM LINES OR CHILLER LINES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING

INSULATION FROM THE STEAM PIPING MUST BE

ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150

DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS

SHALL BE PROPERLY COORDINATED WITH THE VA TO

MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT

THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO

AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS

UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE

KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS

REQUIRED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

S201

STAIR

H210

CORRIDOR

2CO4

OFFICE

2CO2

THERAPY

2CO3

OFFICE

2CO7

ROOM

CONFERENCE

2CO9

OFFICE

2CO8

OFFICE

E2

NO. 2

ELEVATOR

2CO6

STORAGE

2CO5

OFFICE

CH-E-1

CHASE

2E20

OFFICE

2E21

EXAM

2E24

TOILET

2E25B

TOILET

2E29

EXAM

2E28

TOILET

2E22A

TOILET

2E22

OFFICE

2E27

OFFICE

2E26

ROOM

WAITING

2E23

OFFICE

2E25

EXAM

2E25A

EXAM

H204

CORRIDOR

H203

CORRIDOR

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

108 Benton Lodge Road Suite B

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA103

SECOND FLOOR -

LEAD ABATEMENT PLAN

4 5

AMY WALLACE

RAJ

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR, ST

LOUIS, MO 63125

657-20-101JB

19-335

GKY

Scale: 1/8" = 1'-0"

SECOND FLOOR - LEAD ABATEMENT PLAN

NORTH

0 4 8 16

SHEET KEY NOTES:# SHEET NOTES:

REMOVE PLASTER WALLS WITH LEAD-BASED PAINT (LBP)

INSIDE A GROSS REMOVAL CONTAINMENT.

- CENTER WING: 4,830 SF PLASTER WALLS WITH LBP

- EAST WING: 6,750 SF PLASTER WALLS WITH LBP

REMOVE LEAD-CONTAINING CERAMIC TILE ON WALLS INSIDE

A GROSS REMOVAL CONTAINMENT.

- EAST WING: 670 SF LEAD-CONTAINING CERAMIC TILE

REMOVE RADIATOR COVERS WITH LBP INSIDE A GROSS

REMOVAL CONTAINMENT.

- CENTER WING: 16 EA RADIATOR COVER WITH LBP

- EAST WING: 20 EA RADIATOR COVER WITH LBP

REMOVE WINDOW BOX OUT WITH LBP INSIDE A GROSS

REMOVAL CONTAINMENT. WINDOW TO REMAIN.

- CENTER WING: 1 EA WINDOW BOX OUT WITH LBP

PLASTER WALLS WITH LBP TO REMAIN. PROTECT AS

REQUIRED.

L1.

L2.

L3.

L4.

L5.

ABATEMENT LEGEND

REMOVE WALLS WITH LEAD-BASED PAINT AND / OR

LEAD-CONTAINING CERAMIC TILE AS INDICATED IN

KEYNOTES.

LIMITS OF GROSS REMOVAL CONTAINMENT

LIMITS OF GROSS REMOVAL CONTAINMENT

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L5

L1

L1

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3 L3

L3 L3

L3 L3

L3 L3

L3

L3

L3

L3 L3 L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3 L3

L3 L3

L4

L2

L1

L2

L1

L2

L1

L2

L1

L1

L5

L5

L5

L1

L1

L5

L5

L5

L5

L5

L5

L5

L1

L1

L1

L1

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING

VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS

THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE

CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND

LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER

CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE

INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO

REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR

TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND

CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR

AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT

OUTDOOR TEMPERATURE REQUIREMENTS WITH VA

MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO

SHUTTING DOWN STEAM LINES OR CHILLER LINES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING

INSULATION FROM THE STEAM PIPING MUST BE

ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150

DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS

SHALL BE PROPERLY COORDINATED WITH THE VA TO

MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT

THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO

AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS

UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE

KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS

REQUIRED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

S201

STAIR

H210

CORRIDOR

2CO4

OFFICE

2CO2

THERAPY

2CO3

OFFICE

2CO7

ROOM

CONFERENCE

2CO9

OFFICE

2CO8

OFFICE

E2

NO. 2

ELEVATOR

2CO6

STORAGE

2CO5

OFFICE

CH-E-1

CHASE

2E20

OFFICE

2E21

EXAM

2E24

TOILET

2E25B

TOILET

2E29

EXAM

2E28

TOILET

2E22A

TOILET

2E22

OFFICE

2E27

OFFICE

2E26

ROOM

WAITING

2E23

OFFICE

2E25

EXAM

2E25A

EXAM

H204

CORRIDOR

H203

CORRIDOR

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

DIRTY

CHAMBER

SHOWER

CLEAN

CHAMBER

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

1151 Kildaire Farm Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

108 Benton Lodge Road Suite B

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Alex Kramer (APOGEE)

An Alliance for Success

HA104

SECOND FLOOR -

CEILING ABATEMENT PLAN

5 5

AMY WALLACE

RAJ

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR, ST

LOUIS, MO 63125

657-20-101JB

19-335

GKY

Scale: 1/8" = 1'-0"

SECOND FLOOR - CEILING ABATEMENT PLAN

NORTH

0 4 8 16

SHEET KEY NOTES:# SHEET NOTES:

REMOVE PLASTER CEILING WITH LEAD-BASED PAINT (LBP) AND

ADDITIONAL LBP ON CONCRETE DECK, AND ALL LBP DEBRIS

INSIDE A GROSS REMOVAL CONTAINMENT. ACTIVE UTILITIES

ARE ATTACHED TO THE LEAD PLASTER CEILINGS SCHEDULED

FOR REMOVAL. CLEANUP/STABILIZATION (AS NECESSARY) AND

INTERIM CLEARANCES SHALL BE REQUIRED TO ALLOW FOR

OTHER TRADES TO REMOVE AND TEMPORARILY SUPPORT THE

UTILITIES PRIOR TO REMOVAL/DEMOLITION OF THE PLASTER

CEILINGS.

- EAST WING: 3,160 SF PLASTER CEILING WITH LBP

3,160 SF LBP PAINT ON CONCRETE DECK

REMOVE TWO LAYERS OF PLASTER CEILING WITH LBP AND

ADDITIONAL LBP PAINT ON CONCRETE DECK, AND ALL LBP

DEBRIS INSIDE A GROSS REMOVAL CONTAINMENT. ACTIVE

UTILITIES ARE ATTACHED TO THE LEAD PLASTER CEILINGS

SCHEDULED FOR REMOVAL. CLEANUP/STABILIZATION (AS

NECESSARY) AND INTERIM CLEARANCES SHALL BE REQUIRED

TO ALLOW FOR OTHER TRADES TO REMOVE AND

TEMPORARILY SUPPORT THE UTILITIES PRIOR TO

REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

- CENTER WING: 3,095 SF PLASTER CEILING WITH LBP

(LOWER CEILING)

3,095 SF PLASTER CEILING WITH LBP

(UPPER CEILING)

3,095 SF LBP PAINT ON CONCRETE DECK

- EAST WING: 720 SF PLASTER CEILING WITH LBP (LOWER)

720 SF PLASTER CEILING WITH LBP (UPPER)

720 SF LBP PAINT ON CONCRETE DECK

REMOVE PIPE HANGERS WITH LEAD-BASED PAINT (ORANGE

COLOR) INSIDE A GROSS REMOVAL CONTAINMENT.

- CENTER WING: 60 EA PIPE HANGERS WITH LBP

- EAST WING: 165 EA PIPE HANGERS WITH LBP

REMOVE ASSUMED ASBESTOS CEILING TILE MASTIC ON

UPPER PLASTER CEILING WITH LBP (INCLUDED IN KEYNOTE L2)

INSIDE A GROSS REMOVAL CONTAINMENT.

- CENTER WING: 785 SF ASBESTOS CEILING TILE MASTIC

L1.

L2.

L3.

A1.

ABATEMENT LEGEND

REMOVE LEAD PLASTER CEILING, LEAD-BASED PAINT

ON CONCRETE DECK, AND ALL LEAD PAINT DEBRIS

AS INDICATED IN KEYNOTES.

REMOVE TWO LAYERS OF LEAD PLASTER CEILING,

LEAD-BASED PAINT ON CONCRETE DECK, AND ALL

LEAD PAINT DEBRIS AS INDICATED IN KEYNOTES.

LIMITS OF GROSS REMOVAL CONTAINMENT

LIMITS OF GROSS REMOVAL CONTAINMENT

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L1

L2 L2

L2

L2

L2

L2

L2 L2

L2

L2

L2

L2

A1

L2

A1

L2

A1

L2

A1

L3 L3

L3

L3

L3

L3 L3

L3 L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L3

L1

L3

L1

L3

L1

L3

L1

L3

L1

L3

PHOTO 1: EXAMPLE OF 2 PLASTER CEILINGS WITH LBP AND

ADDITIONAL LBP ON CONCRETE DECK.

PHOTO 3: EXAMPLE OF SPACE BETWEEN UPPER PLASTER

CEILING AND CONCRETE DECK IN EAST WING.

PHOTO 4: EXAMPLE OF LOWER PLASTER CEILING WITH LBP

AND EXISTING UTILITIES.

PHOTO 5: EXAMPLE OF LOWER PLASTER CEILING WITH LBP,

EXISTING UTILITIES, AND ACM PIPE INSULATION

IN CHASE.

PHOTO 2: EXAMPLE OF ASSUMED ASBESTOS CEILING TILE

MASTIC ON PLASTER CEILING WITH LBP IN

CENTER WING..

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING

VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS

THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE

CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND

LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.

ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER

CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE

INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO

REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR

TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.

ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE

PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS

MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS

REQUIRED.

ALL ABATEMENT WORK SHALL BE CONDUCTED DURING

ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE

COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,

UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE

ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED

SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND

CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR

AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED

BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL

AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED

WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH

THE VA COR.

ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING

THAT WILL BE DEMOLISHED, SHALL BE PROPERLY

RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN

ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND

BOILER PLANT INSULATION.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT

PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS

AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD

VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT

PROCEDURES SHALL BE COORDINATED WITH THE VA COR

AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY

PARTITION AND INFECTION CONTROL DETAILS.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING

WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR

RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,

FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE

ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,

HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN

DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT

OUTDOOR TEMPERATURE REQUIREMENTS WITH VA

MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO

SHUTTING DOWN STEAM LINES OR CHILLER LINES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING

INSULATION FROM THE STEAM PIPING MUST BE

ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150

DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS

SHALL BE PROPERLY COORDINATED WITH THE VA TO

MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA

COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT

CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT

CONTRACTOR USING TCLP ANALYTICAL METHODS TO

DETERMINE PROPER WASTE DISPOSAL METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION

OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT

AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT

RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE

FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD

HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION

ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,

PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER

OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED

AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES

WITH AIR MONITORING OR BIOLOGICAL EXPOSURE

MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS

THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA

DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR

SAMPLING SHALL BE CONDUCTED BY THE CPIH ON

REPRESENTATIVE TASKS.

LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT

THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO

AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS

UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE

KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS

REQUIRED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

VAJB Whole Health - HA100 (BD2 5-28-2021)
VAJB Whole Health - HA101 (BD2 5-28-2021)
VAJB Whole Health - HA102 (BD2 5-28-2021)
VAJB Whole Health - HA103 (BD2 5-28-2021)
VAJB Whole Health - HA104 (BD2 5-28-2021)

File details come from the government source that posted it. Updated .