This document package includes construction drawings and specifications for a federal abatement project. The drawings depict plans for removing asbestos, lead, and mold impacted materials from Veterans Affairs medical facilities in St. Louis, Missouri. Abatement work includes removing plaster ceilings and walls, floor tiles, pipe insulation, and other building components containing hazardous materials. The solicitation is for abatement services during renovation of space for a new VA Whole Health Clinic. The Department of Veterans Affairs Veterans Health Administration VISN 15 is the contracting agency. The abatement contractor must follow all applicable federal, state and local regulations in conducting this work safely and in accordance with specifications.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAP
FAP
FAP
FAP
SINGLE
CHAMBER
DECON
SINGLE
CHAMBER
DECON
SINGLE
CHAMBER
DECON
SINGLE
CHAMBER
DECON
1C121A
1C122
ROOM
1C123B
1C126
1C125
ROOM
ROOM
ROOM
ROOM
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
1151 Kildaire Farm Rd.
Suite 120
Raleigh, NC 27511 www.acg-pa.com
(919)858-7420
108 Benton Lodge Road Suite B
Summerville, SC 29485 www.cemsengineering.com
(843)875-3637
Project Mgr: Alex Kramer (APOGEE)
An Alliance for Success
HA100
1ST FLOOR -
LEAD ABATEMENT PLAN
1 5
AMY WALLACE
RAJ
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR, ST
LOUIS, MO 63125
MAY 28, 2021
657-20-101JB
19-335
GKY
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIRST FLOOR - LEAD ABATEMENT PLAN
NORTH
0 4 8 16
SHEET KEY NOTES:# SHEET NOTES:
REMOVE PLASTER CEILING WITH LEAD-BASED PAINT (LBP)
AND ADDITIONAL LBP ON CONCRETE DECK, AND ALL LBP
DEBRIS INSIDE A GROSS REMOVAL CONTAINMENT. ACTIVE
UTILITIES ARE ATTACHED TO THE LEAD PLASTER CEILINGS
SCHEDULED FOR REMOVAL. CLEANUP/STABILIZATION (AS
NECESSARY) AND INTERIM CLEARANCES MAY BE REQUIRED
TO ALLOW FOR OTHER TRADES TO REMOVE AND
TEMPORARILY SUPPORT THE UTILITIES PRIOR TO
REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
- CENTER WING: 310 SF PLASTER CEILING WITH LBP
310 SF LBP PAINT ON CONCRETE DECK
L1.
ABATEMENT LEGEND
REMOVE LEAD PLASTER CEILING, LEAD-BASED PAINT
ON CONCRETE DECK, AND ALL LEAD PAINT DEBRIS
AS INDICATED IN KEYNOTES.
THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING
VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS
THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE
CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND
LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER
CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE
INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO
REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR
TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE
PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS
MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS
REQUIRED.
ALL ABATEMENT WORK SHALL BE CONDUCTED DURING
ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND
CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR
AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL
AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED
WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR.
ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING
THAT WILL BE DEMOLISHED, SHALL BE PROPERLY
RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN
ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND
BOILER PLANT INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS
AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD
VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT
PROCEDURES SHALL BE COORDINATED WITH THE VA COR
AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY
PARTITION AND INFECTION CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT
OUTDOOR TEMPERATURE REQUIREMENTS WITH VA
MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO
SHUTTING DOWN STEAM LINES OR CHILLER LINES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING
INSULATION FROM THE STEAM PIPING MUST BE
ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150
DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS
SHALL BE PROPERLY COORDINATED WITH THE VA TO
MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA
COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT
CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE
FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD
HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION
ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,
PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER
OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED
AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES
WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS.
LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT
THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO
AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS
UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE
KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS
REQUIRED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (NIGHTS & WEEKENDS)
L1
L1
L1
L1
L1
LIMITS OF NEGATIVE PRESSURE
CONTAINMENT (NIGHTS & WEEKENDS)
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
2E01
HAC
S201
STAIR
H210
CORRIDOR
2CO4
OFFICE
2CO2
THERAPY
2CO3
OFFICE
2CO7
ROOM
CONFERENCE
2CO9
OFFICE
2CO8
OFFICE
E2
NO. 2
ELEVATOR
2CO6
STORAGE
2CO5
OFFICE
CH-E-1
CHASE
2E20
OFFICE
2E21
EXAM
2E24
TOILET
2E25B
TOILET
2E29
EXAM
2E28
TOILET
2E22A
TOILET
2E22
OFFICE
2E27
OFFICE
2E26
ROOM
WAITING
2E23
OFFICE
2E25
EXAM
2E25A
EXAM
H204
CORRIDOR
H203
CORRIDOR
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
1151 Kildaire Farm Rd.
Suite 120
Raleigh, NC 27511 www.acg-pa.com
(919)858-7420
108 Benton Lodge Road Suite B
Summerville, SC 29485 www.cemsengineering.com
(843)875-3637
Project Mgr: Alex Kramer (APOGEE)
An Alliance for Success
HA101
SECOND FLOOR -
FLOORING ABATEMENT PLAN
2 5
AMY WALLACE
RAJ
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR, ST
LOUIS, MO 63125
657-20-101JB
19-335
GKY
Scale: 1/8" = 1'-0"
SECOND FLOOR - FLOORING ABATEMENT PLAN
NORTH
0 4 8 16
SHEET KEY NOTES:# SHEET NOTES:
REMOVE ASBESTOS FLOOR TILE AND ASSOCIATED ASBESTOS
MASTIC LOCATED IN CENTER WING INSIDE A GROSS REMOVAL
CONTAINMENT.
- CENTER WING: 2,030 SF OF ASBESTOS FLOOR TILE AND
ASBESTOS MASTIC
(1 LAYER)
REMOVE NON-ASBESTOS SHEET FLOORING, ASBESTOS
FLOOR TILE AND ASSOCIATED ASBESTOS MASTIC LOCATED IN
EAST WING INSIDE A GROSS REMOVAL CONTAINMENT.
- EAST WING: 1,270 SF OF NON-ASBESTOS SHEET
FLOORING AND ASBESTOS FLOOR TILE
AND ASBESTOS MASTIC
(2 LAYERS)
A1.
A2.
ABATEMENT LEGEND
REMOVE ASBESTOS FLOOR TILE AND ASSOCIATED
ASBESTOS MASTIC AS INDICATED IN KEYNOTES.
A1
1 LAYER
A1
1 LAYER
A1
1 LAYER
A1
1 LAYER
A1
1 LAYER
A1
1 LAYER
A2
A2
A2
A2
A2
2 LAYERS
2 LAYERS
2 LAYERS
2 LAYERS
2 LAYERS
LIMITS OF GROSS REMOVAL CONTAINMENT
LIMITS OF GROSS REMOVAL CONTAINMENT
A2
2 LAYERS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING
VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS
THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE
CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND
LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER
CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE
INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO
REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR
TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE
PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS
MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS
REQUIRED.
ALL ABATEMENT WORK SHALL BE CONDUCTED DURING
ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND
CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR
AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL
AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED
WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR.
ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING
THAT WILL BE DEMOLISHED, SHALL BE PROPERLY
RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN
ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND
BOILER PLANT INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS
AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD
VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT
PROCEDURES SHALL BE COORDINATED WITH THE VA COR
AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY
PARTITION AND INFECTION CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT
OUTDOOR TEMPERATURE REQUIREMENTS WITH VA
MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO
SHUTTING DOWN STEAM LINES OR CHILLER LINES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING
INSULATION FROM THE STEAM PIPING MUST BE
ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150
DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS
SHALL BE PROPERLY COORDINATED WITH THE VA TO
MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA
COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT
CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE
FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD
HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION
ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,
PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER
OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED
AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES
WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS.
LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT
THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO
AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS
UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE
KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS
REQUIRED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
MAY 28, 2021
S201
STAIR
H210
CORRIDOR
2CO4
OFFICE
2CO2
THERAPY
2CO3
OFFICE
2CO7
ROOM
CONFERENCE
2CO9
OFFICE
2CO8
OFFICE
E2
NO. 2
ELEVATOR
2CO6
STORAGE
2CO5
OFFICE
CH-E-1
CHASE
2E20
OFFICE
2E21
EXAM
2E24
TOILET
2E25B
TOILET
2E29
EXAM
2E28
TOILET
2E22A
TOILET
2E22
OFFICE
2E27
OFFICE
2E26
ROOM
WAITING
2E23
OFFICE
2E25
EXAM
2E25A
EXAM
H204
CORRIDOR
H203
CORRIDOR
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
1151 Kildaire Farm Rd.
Suite 120
Raleigh, NC 27511 www.acg-pa.com
(919)858-7420
108 Benton Lodge Road Suite B
Summerville, SC 29485 www.cemsengineering.com
(843)875-3637
Project Mgr: Alex Kramer (APOGEE)
An Alliance for Success
HA102
SECOND FLOOR - TSI AND OTHER ACM
ABATEMENT PLAN
3 5
AMY WALLACE
RAJ
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR, ST
LOUIS, MO 63125
657-20-101JB
19-335
GKY
Scale: 1/8" = 1'-0"
SECOND FLOOR - TSI AND OTHER ACM ABATEMENT PLAN
NORTH
0 4 8 16
SHEET KEY NOTES:# SHEET NOTES:
REMOVE ASBESTOS PIPE INSULATION INCLUDING ALL
MUDDED FITTINGS, JOINTS, TEES, VALVES, UNIONS, ETC.,
INSIDE A GROSS REMOVAL CONTAINMENT.
- CENTER WING: 510 LF ASBESTOS PIPE INSULATION
INCLUDING MUDDED FITTINGS
- EAST WING: 1,185 LF ASBESTOS PIPE INSULATION
INCLUDING MUDDED FITTINGS
DEMOLISH PIPE CHASES, REMOVE ASBESTOS PIPE
INSULATION FROM PIPE CHASE , CLEAN UP ANY PIPE
INSULATION DEBRIS AND THOROUGHLY CLEAN ALL
SURFACES (INCLUDING THE REMAINING WALLS AND PIPING)
INSIDE A GROSS REMOVAL CONTAINMENT. ASBESTOS PIPE
INSULATION QUANTITIES INCLUDED IN KEYNOTE A1.
- CENTER WING: 6 PIPE CHASES
- EAST WING: 11 PIPE CHASES
REMOVE ASBESTOS TAR FITTINGS FROM CHILLED WATER
LINES INSIDE A GROSS REMOVAL CONTAINMENT.
- CENTER WING: 8 EA ASBESTOS TAR WRAP FITTINGS
- EAST WING: 20 EA ASBESTOS TAR WRAP FITTINGS
REMOVE ASBESTOS INSULATION AT PIPE SADDLES INSIDE A
GROSS REMOVAL CONTAINMENT.
- CENTER WING: 32 EA ASBESTOS INSULATION
- EAST WING: 30 EA ASBESTOS INSULATION
REMOVE ASBESTOS SINK SOUNDPROOFING USING
DISMANTLING TECHNIQUES.
- EAST WING: 2 EA ASBESTOS SINK SOUNDPROOFING
REMOVE FIBERGLASS PIPE INSULATION WITH SUSPECT MOLD
GROWTHS INSIDE A GROSS REMOVAL CONTAINMENT.
- EAST WING: 10 LF FIBERGLASS PIPE INSULATION WITH
SUSPECT MOLD GROWTHS
A1.
A2.
A3.
A4.
A5.
M1.
ABATEMENT LEGEND
REMOVE ASBESTOS PIPE INSULATION AND
ASBESTOS FITTINGS AS INDICATED IN KEYNOTES.
LIMITS OF GROSS REMOVAL CONTAINMENT
LIMITS OF GROSS REMOVAL CONTAINMENT
A2
A2 A2
A2
A2 A2
A2
A2
A2
A2
A2
A2
M1
A5
A5
A1
A3
A4
A1
A3
A4
A1
A3
A4
A1
A3
A4
A1 A1
A1
A1
A1 A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A3
A4
A1
A3
A4
A1
A3
A4
A1
A3
A4
A2
A2
A2
A2
A2
A2
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING
VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS
THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE
CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND
LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER
CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE
INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO
REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR
TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE
PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS
MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS
REQUIRED.
ALL ABATEMENT WORK SHALL BE CONDUCTED DURING
ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND
CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR
AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL
AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED
WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR.
ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING
THAT WILL BE DEMOLISHED, SHALL BE PROPERLY
RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN
ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND
BOILER PLANT INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS
AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD
VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT
PROCEDURES SHALL BE COORDINATED WITH THE VA COR
AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY
PARTITION AND INFECTION CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT
OUTDOOR TEMPERATURE REQUIREMENTS WITH VA
MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO
SHUTTING DOWN STEAM LINES OR CHILLER LINES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING
INSULATION FROM THE STEAM PIPING MUST BE
ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150
DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS
SHALL BE PROPERLY COORDINATED WITH THE VA TO
MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA
COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT
CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE
FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD
HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION
ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,
PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER
OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED
AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES
WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS.
LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT
THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO
AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS
UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE
KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS
REQUIRED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
S201
STAIR
H210
CORRIDOR
2CO4
OFFICE
2CO2
THERAPY
2CO3
OFFICE
2CO7
ROOM
CONFERENCE
2CO9
OFFICE
2CO8
OFFICE
E2
NO. 2
ELEVATOR
2CO6
STORAGE
2CO5
OFFICE
CH-E-1
CHASE
2E20
OFFICE
2E21
EXAM
2E24
TOILET
2E25B
TOILET
2E29
EXAM
2E28
TOILET
2E22A
TOILET
2E22
OFFICE
2E27
OFFICE
2E26
ROOM
WAITING
2E23
OFFICE
2E25
EXAM
2E25A
EXAM
H204
CORRIDOR
H203
CORRIDOR
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
1151 Kildaire Farm Rd.
Suite 120
Raleigh, NC 27511 www.acg-pa.com
(919)858-7420
108 Benton Lodge Road Suite B
Summerville, SC 29485 www.cemsengineering.com
(843)875-3637
Project Mgr: Alex Kramer (APOGEE)
An Alliance for Success
HA103
SECOND FLOOR -
LEAD ABATEMENT PLAN
4 5
AMY WALLACE
RAJ
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR, ST
LOUIS, MO 63125
657-20-101JB
19-335
GKY
Scale: 1/8" = 1'-0"
SECOND FLOOR - LEAD ABATEMENT PLAN
NORTH
0 4 8 16
SHEET KEY NOTES:# SHEET NOTES:
REMOVE PLASTER WALLS WITH LEAD-BASED PAINT (LBP)
INSIDE A GROSS REMOVAL CONTAINMENT.
- CENTER WING: 4,830 SF PLASTER WALLS WITH LBP
- EAST WING: 6,750 SF PLASTER WALLS WITH LBP
REMOVE LEAD-CONTAINING CERAMIC TILE ON WALLS INSIDE
A GROSS REMOVAL CONTAINMENT.
- EAST WING: 670 SF LEAD-CONTAINING CERAMIC TILE
REMOVE RADIATOR COVERS WITH LBP INSIDE A GROSS
REMOVAL CONTAINMENT.
- CENTER WING: 16 EA RADIATOR COVER WITH LBP
- EAST WING: 20 EA RADIATOR COVER WITH LBP
REMOVE WINDOW BOX OUT WITH LBP INSIDE A GROSS
REMOVAL CONTAINMENT. WINDOW TO REMAIN.
- CENTER WING: 1 EA WINDOW BOX OUT WITH LBP
PLASTER WALLS WITH LBP TO REMAIN. PROTECT AS
REQUIRED.
L1.
L2.
L3.
L4.
L5.
ABATEMENT LEGEND
REMOVE WALLS WITH LEAD-BASED PAINT AND / OR
LEAD-CONTAINING CERAMIC TILE AS INDICATED IN
KEYNOTES.
LIMITS OF GROSS REMOVAL CONTAINMENT
LIMITS OF GROSS REMOVAL CONTAINMENT
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L5
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3 L3
L3 L3
L3 L3
L3 L3
L3
L3
L3
L3 L3 L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3 L3
L3 L3
L4
L2
L1
L2
L1
L2
L1
L2
L1
L1
L5
L5
L5
L1
L1
L5
L5
L5
L5
L5
L5
L5
L1
L1
L1
L1
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING
VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS
THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE
CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND
LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER
CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE
INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO
REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR
TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE
PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS
MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS
REQUIRED.
ALL ABATEMENT WORK SHALL BE CONDUCTED DURING
ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND
CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR
AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL
AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED
WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR.
ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING
THAT WILL BE DEMOLISHED, SHALL BE PROPERLY
RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN
ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND
BOILER PLANT INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS
AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD
VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT
PROCEDURES SHALL BE COORDINATED WITH THE VA COR
AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY
PARTITION AND INFECTION CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT
OUTDOOR TEMPERATURE REQUIREMENTS WITH VA
MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO
SHUTTING DOWN STEAM LINES OR CHILLER LINES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING
INSULATION FROM THE STEAM PIPING MUST BE
ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150
DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS
SHALL BE PROPERLY COORDINATED WITH THE VA TO
MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA
COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT
CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE
FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD
HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION
ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,
PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER
OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED
AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES
WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS.
LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT
THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO
AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS
UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE
KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS
REQUIRED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
S201
STAIR
H210
CORRIDOR
2CO4
OFFICE
2CO2
THERAPY
2CO3
OFFICE
2CO7
ROOM
CONFERENCE
2CO9
OFFICE
2CO8
OFFICE
E2
NO. 2
ELEVATOR
2CO6
STORAGE
2CO5
OFFICE
CH-E-1
CHASE
2E20
OFFICE
2E21
EXAM
2E24
TOILET
2E25B
TOILET
2E29
EXAM
2E28
TOILET
2E22A
TOILET
2E22
OFFICE
2E27
OFFICE
2E26
ROOM
WAITING
2E23
OFFICE
2E25
EXAM
2E25A
EXAM
H204
CORRIDOR
H203
CORRIDOR
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
DIRTY
CHAMBER
SHOWER
CLEAN
CHAMBER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
1151 Kildaire Farm Rd.
Suite 120
Raleigh, NC 27511 www.acg-pa.com
(919)858-7420
108 Benton Lodge Road Suite B
Summerville, SC 29485 www.cemsengineering.com
(843)875-3637
Project Mgr: Alex Kramer (APOGEE)
An Alliance for Success
HA104
SECOND FLOOR -
CEILING ABATEMENT PLAN
5 5
AMY WALLACE
RAJ
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR, ST
LOUIS, MO 63125
657-20-101JB
19-335
GKY
Scale: 1/8" = 1'-0"
SECOND FLOOR - CEILING ABATEMENT PLAN
NORTH
0 4 8 16
SHEET KEY NOTES:# SHEET NOTES:
REMOVE PLASTER CEILING WITH LEAD-BASED PAINT (LBP) AND
ADDITIONAL LBP ON CONCRETE DECK, AND ALL LBP DEBRIS
INSIDE A GROSS REMOVAL CONTAINMENT. ACTIVE UTILITIES
ARE ATTACHED TO THE LEAD PLASTER CEILINGS SCHEDULED
FOR REMOVAL. CLEANUP/STABILIZATION (AS NECESSARY) AND
INTERIM CLEARANCES SHALL BE REQUIRED TO ALLOW FOR
OTHER TRADES TO REMOVE AND TEMPORARILY SUPPORT THE
UTILITIES PRIOR TO REMOVAL/DEMOLITION OF THE PLASTER
CEILINGS.
- EAST WING: 3,160 SF PLASTER CEILING WITH LBP
3,160 SF LBP PAINT ON CONCRETE DECK
REMOVE TWO LAYERS OF PLASTER CEILING WITH LBP AND
ADDITIONAL LBP PAINT ON CONCRETE DECK, AND ALL LBP
DEBRIS INSIDE A GROSS REMOVAL CONTAINMENT. ACTIVE
UTILITIES ARE ATTACHED TO THE LEAD PLASTER CEILINGS
SCHEDULED FOR REMOVAL. CLEANUP/STABILIZATION (AS
NECESSARY) AND INTERIM CLEARANCES SHALL BE REQUIRED
TO ALLOW FOR OTHER TRADES TO REMOVE AND
TEMPORARILY SUPPORT THE UTILITIES PRIOR TO
REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
- CENTER WING: 3,095 SF PLASTER CEILING WITH LBP
(LOWER CEILING)
3,095 SF PLASTER CEILING WITH LBP
(UPPER CEILING)
3,095 SF LBP PAINT ON CONCRETE DECK
- EAST WING: 720 SF PLASTER CEILING WITH LBP (LOWER)
720 SF PLASTER CEILING WITH LBP (UPPER)
720 SF LBP PAINT ON CONCRETE DECK
REMOVE PIPE HANGERS WITH LEAD-BASED PAINT (ORANGE
COLOR) INSIDE A GROSS REMOVAL CONTAINMENT.
- CENTER WING: 60 EA PIPE HANGERS WITH LBP
- EAST WING: 165 EA PIPE HANGERS WITH LBP
REMOVE ASSUMED ASBESTOS CEILING TILE MASTIC ON
UPPER PLASTER CEILING WITH LBP (INCLUDED IN KEYNOTE L2)
INSIDE A GROSS REMOVAL CONTAINMENT.
- CENTER WING: 785 SF ASBESTOS CEILING TILE MASTIC
L1.
L2.
L3.
A1.
ABATEMENT LEGEND
REMOVE LEAD PLASTER CEILING, LEAD-BASED PAINT
ON CONCRETE DECK, AND ALL LEAD PAINT DEBRIS
AS INDICATED IN KEYNOTES.
REMOVE TWO LAYERS OF LEAD PLASTER CEILING,
LEAD-BASED PAINT ON CONCRETE DECK, AND ALL
LEAD PAINT DEBRIS AS INDICATED IN KEYNOTES.
LIMITS OF GROSS REMOVAL CONTAINMENT
LIMITS OF GROSS REMOVAL CONTAINMENT
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2 L2
L2
L2
L2
L2
L2 L2
L2
L2
L2
L2
A1
L2
A1
L2
A1
L2
A1
L3 L3
L3
L3
L3
L3 L3
L3 L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L1
L3
L1
L3
L1
L3
L1
L3
L1
L3
PHOTO 1: EXAMPLE OF 2 PLASTER CEILINGS WITH LBP AND
ADDITIONAL LBP ON CONCRETE DECK.
PHOTO 3: EXAMPLE OF SPACE BETWEEN UPPER PLASTER
CEILING AND CONCRETE DECK IN EAST WING.
PHOTO 4: EXAMPLE OF LOWER PLASTER CEILING WITH LBP
AND EXISTING UTILITIES.
PHOTO 5: EXAMPLE OF LOWER PLASTER CEILING WITH LBP,
EXISTING UTILITIES, AND ACM PIPE INSULATION
IN CHASE.
PHOTO 2: EXAMPLE OF ASSUMED ASBESTOS CEILING TILE
MASTIC ON PLASTER CEILING WITH LBP IN
CENTER WING..
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
THE ABATEMENT SCOPE OF WORK CONSISTS OF REMOVING
VARIOUS ASBESTOS, LEAD, AND MOLD IMPACTED MATERIALS
THROUGHOUT THE PROJECT LIMITS. ALL WORK SHALL BE
CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND
LOCAL REGULATIONS AND THE CONTRACT SPECIFICATIONS.
ACTIVE UTILITIES ARE ATTACHED TO THE LEAD PLASTER
CEILINGS SCHEDULED FOR REMOVAL AND WILL REQUIRE
INTERIM CLEARANCES TO ALLOW FOR OTHER TRADES TO
REMOVE AND TEMPORARILY SUPPORT THE UTILITIES PRIOR
TO REMOVAL/DEMOLITION OF THE PLASTER CEILINGS.
ASBESTOS TRANSITE PANELS SHOULD BE ASSUMED TO BE
PRESENT BEHIND RADIATORS. NO ABATEMENT OF THIS
MATERIAL IS ANTICIPATED AND SHALL BE PROTECTED AS
REQUIRED.
ALL ABATEMENT WORK SHALL BE CONDUCTED DURING
ADMINISTRATIVE HOURS (7:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE
COORDINATED WITH THE VA COR AND VPIH FOR APPROVALS,
UNLESS OTHERWISE INDICATED ON THE KEYNOTES. THE
ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED
SUBMITTALS. ANY CHANGES TO THE PROCEDURES AND
CONTAINMENT LIMITS SHALL BE SUBMITTED TO THE VA COR
AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED
BY THE ABATEMENT CONTRACTOR. THE LIMITS OF REMOVAL
AND EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED
WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH
THE VA COR.
ABATED PIPE INSULATION AND FITTINGS, EXCLUDING PIPING
THAT WILL BE DEMOLISHED, SHALL BE PROPERLY
RE-INSULATED WITH EQUIVALENT INSULATING PROPERTIES IN
ACCORDANCE WITH VA SPECIFICATION 23 07 11, HVAC AND
BOILER PLANT INSULATION.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT
PROJECT SHALL BE OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS
AND WASTE DISPOSAL CONTAINERS SHALL BE FIELD
VERIFIED WITH THE VA COR AND VPIH. ALL LOADOUT
PROCEDURES SHALL BE COORDINATED WITH THE VA COR
AND VPIH. SEE DEMOLITION DRAWINGS FOR TEMPORARY
PARTITION AND INFECTION CONTROL DETAILS.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING
WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL WILL BE RESPONSIBLE FOR REMOVING OR
RELOCATING ALL EQUIPMENT, COMPUTERS, SUPPLIES,
FURNITURE, DESKS, WALL HANGINGS, ETC., FROM THE
ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO,
HVAC SYSTEMS, STEAM PIPING, ETC., SHALL BE SHUT DOWN
DURING ALL ABATEMENT ACTIVITIES. VERIFY AMBIENT
OUTDOOR TEMPERATURE REQUIREMENTS WITH VA
MAINTENANCE AND OPERATIONS DEPARTMENTS PRIOR TO
SHUTTING DOWN STEAM LINES OR CHILLER LINES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING
INSULATION FROM THE STEAM PIPING MUST BE
ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS THAN 150
DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS
SHALL BE PROPERLY COORDINATED WITH THE VA TO
MINIMIZE IMPACT TO THE HOSPITAL OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA
COR, VPIH, GENERAL CONTRACTOR AND ABATEMENT
CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT
CONTRACTOR USING TCLP ANALYTICAL METHODS TO
DETERMINE PROPER WASTE DISPOSAL METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION
OF LEAD-BASED PAINT WERE IDENTIFIED IN THE PROJECT
AREAS. IT SHOULD BE NOTED THAT OSHA DOES NOT
RECOGNIZE THE HUD DEFINITION AS A THRESHOLD VALUE
FOR LEAD EXPOSURE. ALTHOUGH THE POTENTIAL LEAD
HAZARD FOR NORMAL DEMOLITION OR CONSTRUCTION
ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK,
PROCEDURE AND OTHER WORK AREA CONDITIONS. PROPER
OSHA COMPLIANCE IS CONSIDERED PERFORMANCE BASED
AND INCLUDES EVALUATING POTENTIAL WORK EXPOSURES
WITH AIR MONITORING OR BIOLOGICAL EXPOSURE
MONITORING (BLOOD LEAD TESTING), IF REQUIRED. UNLESS
THE DEMOLITION CONTRACTOR HAS HISTORICAL DATA
DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL AIR
SAMPLING SHALL BE CONDUCTED BY THE CPIH ON
REPRESENTATIVE TASKS.
LEAD-BASED PAINT IN VARYING CONDITIONS IS PRESENT
THROUGHOUT THE BUILDING. CARE SHALL BE TAKEN TO
AVOID ANY DAMAGE OR DISTURBANCE TO THESE WALLS
UNLESS SPECIFICALLY IMPACTED AS INDICATED IN THE
KEYNOTES. ALL OTHER AREAS SHALL BE PROTECTED AS
REQUIRED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
| VAJB Whole Health - HA100 (BD2 5-28-2021) |
| VAJB Whole Health - HA101 (BD2 5-28-2021) |
| VAJB Whole Health - HA102 (BD2 5-28-2021) |
| VAJB Whole Health - HA103 (BD2 5-28-2021) |
| VAJB Whole Health - HA104 (BD2 5-28-2021) |
File details come from the government source that posted it. Updated .