This document package includes architectural drawings and specifications for the renovation of space for a whole health clinic at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project involves renovating space on the second floor, including demolition of existing walls, doors, ceilings and fixtures; construction of new walls, doors, ceilings and fixtures; and installation of new flooring. Key areas of renovation include a reception area, exam rooms, offices, classrooms, waiting rooms, and corridors. Mechanical, electrical and plumbing systems will be updated as indicated on supporting engineering drawings. The project is funded under Solicitation 36C25522R0058 and will be performed according to the terms and conditions therein.
The architectural drawings provide details of the existing conditions and scope of demolition and construction work. Sheets include plans depicting wall layouts, door and fixture schedules, sections and elevations detailing wall, door and ceiling assemblies, and construction details. Specifications are also included outlining materials, finishes and technical requirements. The package provides all necessary information for contractors to prepare bids to complete the renovation for the Whole Health Clinic space at the Jefferson Barracks VA Medical Center in St. Louis, Missouri.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
9. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY LICENSES AND/OR PERMITS.
10. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
11. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
DEMOLITION NOTES
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION UNLESS INDICATED
OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT
ARE NOT IDENTIFIED SHALL BE REPORTED TO THE CONTRACTING OFFICER REPRESENTATIVE.
10. ALL HAZARDOUS MATERIAL ABATEMENT TO BE DONE AS INDICATED IN SPECIFICATIONS AND COORDINATED
WITH LICENSED ABATEMENT CONTRACTOR.
CORE TYPES
C. CAST IN PLACE CONCRETE
G. CONCRETE MASONRY UNIT (GROUTED
SOLID)
H. CONCRETE MASONRY UNIT (HOLLOW)
M. METAL STUD FRAMING / METAL FURRING
MM. METAL STUD FRAMING (2 ROWS,
PARALLEL WITH PRESCRIBED AIR GAP
BETWEEN
S. METAL SHAFT WALL CH STUD
T. TILT-UP CONCRETE PANEL
W. WOOD STUD FRAMING / FURRING
SUBSTRATE
CONFIGURATION
a. 5/8" GWB (1 LAYER)
b. 5/8" GWB (2 LAYER)
c. 5/8" GWB (3 LAYER)
d. 5/8" GWB (4 LAYER)
e. 1/2" GWB (1 LAYER)
f. 1/2" GWB (2 LAYER)
g. 1/2" PLWD (1 LAYER)
h. 1/2" PLWD, 1/2" GWB (1 LAYER)
j. 1/2" PLWD, 5/8" GWB (1 LAYER)
m. 5/8" CMT (1 LAYER)
n. 1/2" CMT (1 LAYER)
s. 1" SHAFT LINER
(NONE) CORE ONLY
INSULATION TYPES
A. ACOUSTIC INSULATION
T. THERMAL INSULATION
Xxx##
# X
INSULATION TYPE
CORE SIZE
SUBSTRATE
CORE TYPE
FIRE RATING
PARTITION TAG
TYPE MARK
HOLD SUBSTRATE 1/2" OFF
FINISH FLOOR TYPICAL, NO
EXCEPTIONS
ONE LAYER 5/8" GYPSUM
WALL BOARD EACH SIDE
ON METAL STUDS
TAG STUD SIZE OVERALL THICK UL ASSEMB STC*
Maa1
Maa2
Maa3
Maa4
Maa6
Maa8
REFER TO
PARTITION TAG
FOR
INSULATION
INFORMATION
(SHOWN HERE
FOR
REFERENCE
ONLY - MAY NOT
EXIST), AND
FIRE RATING
1-5/8"
2-1/2"
3-5/8"
4"
6"
8"
2-7/8"
3-3/4"
4-7/8"
5-1/4"
7-1/4"
9-1/4"
STRUCTURAL DECK ABOVE
SILL
PLAN
HEAD
HOLD SUBSTRATE 1/2" OFF
FINISH FLOOR TYPICAL, NO
EXCEPTIONS
ONE LAYER 5/8" GYPSUM
WALL BOARD ON METAL
STUDS
TAG STUD SIZE OVERALL THICK UL ASSEMB STC*
Ma0
Ma1
Ma2
Ma3
Ma4
Ma6
Ma8
REFER TO
PARTITION TAG
FOR
INSULATION
INFORMATION
(SHOWN HERE
FOR
REFERENCE
ONLY - MAY NOT
EXIST), AND
FIRE RATING
7/8"
1-5/8"
2-1/2"
3-5/8"
4"
6"
8"
1-1/2"
2-1/4"
3-1/8"
4-1/4"
4-5/8"
6-5/8"
8-5/8"
STRUCTURAL DECK ABOVE
SILL
PLAN
HEAD
FIRE SEALANT
FIRE RATED GYP WALL BD (5/8")
SHAFTWALL LINER PANEL (1")
UNDERSIDE OF STRUCTURE
*FIRESTOP ALL
PENETRATIONS
Sas2 (1-HR) RATING
Sbs2 (2-HR) RATING
SEALANT SYSTEM COMPLIANT
WITH UL# HW-D-0372
BASE AS SCHEDULED
TAG STUD SIZE OVERALL THICK UL ASSEMB STC*
Sas0
Sbs2
REFER TO
PARTITION TAG
FOR
INSULATION
INFORMATION
(SHOWN HERE
FOR
REFERENCE
ONLY - MAY NOT
EXIST), AND
FIRE RATING
2 1/2" UL-415 423-1/8"
2 1/2" UL-415 423-3/4"
Sas4 4" UL-415 424-5/8"
Sbs4 4" UL-415 425-1/4"
SILL
PLAN
HEAD
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:1
P
M
A-001
ARCHITECTURAL SYMBOLS, PARTITION
TYPES, ABBREVIATIONS AND NOTES
1 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGENDPARTITION TYPE KEY
PARTITION TYPE - Maa PARTITION TYPE - Ma_ PARTITION TYPE - Sas_ AND Sbs_
DocuSign Envelope ID: 16222EA7-D798-4CC7-9C06-921DD28D6352
5/26/2021
TESTIN
G
TENT
SCREENING
STATION
SCREENING
STATION
V A
N V
A N
V A
N
BUILDING SCHEDULE
1 OUTPATIENT CLINICS - VOS - LOGISTICS
1G EMERGENCY GENERATOR FOR BUILDING 1
1CC CONNECTING CORRIDORS
2 CEOSH
3 DOMICILIARY
3T DOMICILIARY OFFICES (MODULAR BLDG)
18 ADMINISTRATION
23 PROSTHETICS
24 CANTEEN - LIBRARY - AUDITORIUM
25 NATIONAL CANTEEN SERVICE (OUTLEASED)
32 FLAGPOLE
35 STORAGE
44 CONCRETE PLATFORM
45 CONCRETE PLATFORM
51 INPATIENT PSYCHIATRIC
51T NEURO PSYCHIATRIC (MODULAR BLDG)
52 LONG TERM SCI
52G EMERGENCY GENERATOR FOR BUILDING 52
52SG TRANSFER SWITCH BUILDING
53 MEDICAL REHABILITION
53G EMERGENCY GENERATOR FOR BUILDING 53
53T MEDICAL REHAB (MODULAR BLDG)
54 REHAB BUILDING (UNDER CONSTRUCTION)
55 CLINIC BUILDING (UNDER ACTIVATION)
55G EMERGENCY GENERATOR FOR BUILDING 55
56 TENANT BUILDING
56G EMERGENCY GENERATOR FOR BUILDING 56
57 ENGINEERING - WAREHOUSE
58 MENTAL HEALTH CLINIC
59 FISHER HOUSE
60 MAIN KITCHEN
60G EMERGENCY GENERATOR FOR BUILDING 60
60T FOOD - NUTRITION - DIETETICS
61 RECREATION - AUDITORIUM
63 GYM - POOL
75 UTILITY PLANT - GENERATOR BLDG & SUBSTATION
81 BUS STOP
89 SECURITY STATION
93 HAZARDOUS WASTE STORAGE
101T MAJOR PROJECTS CFM (MODULAR BLDG)
102T MAJOR PROJECTS (MODULAR BLDG)
104T RECORDS (MODULAR BLDG)
JE
FFERSO
N D
RIV
E
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 1 TRANSFER
SO
U
TH
G
ATE E
N
TR
AN
C E D
R
IV
E
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 2 TRANSFER
FUTURE PROPERTY LINE
TO INTERSTATE 255
N O
R T H
G A T E E
N T R
A N
C E D
R
IV
E
KOCH ROAD
KOCH ROAD
GRAVEL
PARKING
AREA
MISSISSIPPI RIVER
JEFFERSON
BARRACKS
NATIONAL
CEMETERY
CONSTRUCTION ZONE
CONSTRUCTION ZONE
CONST. ZONE
CONST. ZONE
"255 LOT"
CONST.
ZONE
CONST.
ZONE
CONST.
ZONE
60T 55 51T
1G
1CC
104T
101T
1CC
1CC
1CC
3T
55G
52G
53G
60G
52SG
1CC
56G
1CC
53T
102T
D UST CO LLEC TO R
4 160 VO LTS
L
IQ
UE
FIED
PETR
O
LEUM
G
AS
F
LAM
M
A
BLE G
AS 2
T RAS H CO M PAC TO R
P S
IL
VER
B
UILD
ING
1 23
B UIL DING 23
V A PO LICE
E LE CT RIC A CCE SS
T RAN SFO R M ER
T RAN SFO R M ER
T RAN SFO R M ER
E LE CTR IC PAN EL
H VA C U NIT
H VA C U NIT
S &C PA D M O U NTED G EAR
C ATAL O G # 55152 -C3DG IG 2P1 V M O D EL# P M H-9E E13 299 SG -52
1 3278
T RAN SFO R M ER
4 5
LOGISTICS PLAN LEGEND
BUILDING IN CONTRACT
EXISTING BUILDINGS
CONTRACTOR STORAGE CONTAINER
CONTRACTOR VICINITY PARKING
DUMPSTER
PORTA-JONS
DIRECTION FOR SITE ACCESS
BUILDING ACCESS
SITE ACCSESS ROUTE
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:1
P
M
A-002
LOGISTICS SITE PLAN
2 14RER
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
PROJECT DUMPSTER TO BE LOCATED NEAR PARKING
LOT BEHIND BUILDING. COORDINATE FINAL LOCATION
WITH COR.
CONTRACTOR PARKING ON SITE ADJACENT TO
BUILDING IS LIMITED. COORDINATE ADDITIONAL
PARKING IN REMOTE LOTS WITH COR.
NO CONEX STORAGE UNITS ADJACENT TO BUILDING.
COORDINATE LOCATION IN REMOTE PARKING LOT
WITH COR.
PORTABLE TOILET UNITS LOCATED NEAR PARKING
LOT BEHIND BUILDING.
CONTRACTOR USE OF ELEVATOR AND INTERIOR
ACCESS PATH LOCATED ON SHEET LS101.
CONTRACTOR TO KEEP NOISE AND DISTURBANCE TO
A MINIMUM INSIDE OF FACILITY.
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS
REQUIRED TO UNDERGO COVID SCREENING
PROCEDURES PRIOR TO ENTERING THE SITE.
DEPENDING ON RESTRICTIONS IN PLACE, BUILDING
ENTRY MAY FLUXUATE. COORDINATE WITH COR
WEEKLY FOR UPDATES.
1 CONTRACTOR SITE ACCESS AND
VEHICULAR PATH
2 LOCATION OF CONTRACTOR VACINITY
PARKING
3 LOCATION OF DUMPSTER
4 LOCATION OF PORTA-JONS
5 LOCATION OF CONTRACTOR BUILDING
ACCESS
6 CONTRACTOR CONEX STORAGE
CONTAINER
7 BUILDING TO BE RENOVATED, BUILDING 1,
2ND FLOOR
8 LOCATION OF CONTRACTOR BULK
MATERIAL ACCESS, OFF PEAK HOURS
ONLY
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
NORTH
0 8 16 32
Scale: 1" = 100'-0"
LOGISTICS SITE PLAN
A
A.3 B C C.1 D.1
D.2
E F G H J K M N O P Q
R
R
R.2 S T U V V.3
V.3U.1T.2T.1R.3
LL
C.2B.2B.1A.4
10.1
/1 AD102
/2 AD102/2 AD102
/1 AD102
10'-8" 10'-10 1/2"
3'-1 1/2"
11'-6 1/2" 10'-9"
3'-1 1/2"
10'-10 1/2" 10'-8 1/2"
8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2"8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2"
/4
/4
/4
/2
/4
/2
/4
/2
/4
/2
/4
4'-9 1/2" 13'-8 1/2" 18'-6" 18'-6" 19'-1 1/2" 18'-6" 19'-1 1/2" 18'-6" 18'-6" 13'-8 1/2" 4'-9 1/2"
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
ELEVATOR
NO. 2
E2
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
OFFICE
2CO3
THERAPY
2CO2
OFFICE
2CO4
CORRIDOR
H210
STAIR
S201
HAC
2E01
ROOF BELOW
ROOF BELOW
1'-0 1/2" 1'-1"
EXAM
2C11
PHONE CLO.
2C11A
OPTICAL
SHOP
2C12
NURSE
STATION
2C13
EXAM
2C14
EXAM
2C15
MEN'S
TOILET
2C16
KITCHEN
2C17
MECH.
2C18
LAB
2C19
WAITING
ROOM
2C20
OFFICE
2C22
ALCOVE
2C21
TOILET
2C24
OFFICE
2C23
EXAM
2C25
TOILET
2C27
HSKP
2C28
STAIR
S202
OFFICE
2C29
WAITING
ALCOVE
H205A
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
CORR.
H205A
CORR.
H205A
CORR.
H206
STAIR
S203
HSKP
2W36 TOILET
2W34
OFFICE
2W35
OFFICE
2W33
EXAM
2W32
EXAM
2W30
VEST.
2W29E
TOILET
2W29F
EXAM
2W29D
STOR.
2W29C
OFFICE
2W29B
STOR.
2W29A
OFFICE
2W29
EXAM
2W28C
EXAM
2W28B
EXAM
2W28A
EXAM
2W28
EXAM
2W27
OFFICE
2W26
MECH.
2W25
EXAM
2W24
UNISEX
TOILET
2W23
EXAM
2W22C
PHARM.
OFF.
2W22A
OXYGEN
STO.
2W22B
MED. RM.
2W22
CORR.
H208
OFFICE
2W21
UNISEX
TOILET
2W20
WAITING
2W19
OFFICE
2W18
TLT.
2W14
EXAM
2W16
EXAM
2W15
TOILET
2W14
OFFICE
2W13
OFFICE
2W12
TOILET
2W11
EXAM
2W10
EXAM
2W09
TLT.
2W08
EXAM
2W07
BREAKROOM
2W06
STORAGE
2W05
MED
PREP
2W04
TOILET
2W03
FAX
2W02
RECEPTION
2W01
CORR.
H209
IRM
2C10A
4'-0 1/2"
4" 3'-10"
7'-8"
15'-10"15'-10"
OIT
2C10
10'-8"
A. SEE SHEET A-001 FOR GENERAL NOTES.
B. DEMOLITION THAT REQUIRES SYSTEM SHUT
DOWNS FOR PART OF, OR ALL OF THE
FLOOR OR BUILDING IS TO BE COORDINATED
WITH THE COR AND TAKE PLACE AFTER
NORMAL BUSINESS HOURS IF DIRECTED BY
THE COR. SEE ENGINEERING DRAWINGS
FOR LOCATIONS AND SCOPE.
C. DEMOLITION THAT GENERATES SIGNIFICANT
NOISE OR VIBRATION (CUTTING, DRILLING,
CORING, ETC.) TO BE COORDINATED WITH
COR PRIOR TO START OF DEMOLITION. SEE
ENGINEERING DRAWINGS FOR LOCATIONS
AND SCOPE.
D. WHERE REMOVING CMU, CONCRETE, OR
CLAY TILE WALLS, ALL VOIDS AND HOLES
CREATED IN FLOOR SLAB TO BE FILLED IN
WITH SELF-LEVELING COMPOUND FLUSH
WITH EXISTING FLOOR SLAB LEVEL (TYP.).
E. WALL REMOVED THIS FLOOR ARE CLAY TILE
OR CLAY TILE WITH FURRING.
SCOPE OF CONSTRUCTION
EXISTING WALL
DEMOLITION WALL
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:2
P
M
AD101
OVERALL SECOND FLOOR DEMOLITION
PLAN
3 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
NORTH
0 8 16 32
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/32" = 1'-0"
OVERALL SECOND FLOOR DEMOLITION PLAN
SCOPE OF WORK LEGEND
WALL LEGEND
S SS
P R
R
R.2 T V V.3
V.3U.1T.2T.1R.3
/2 AD102/2 AD102
MATCH LINE MATCH LINE
8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2" 9"9"
20'-7 1/2"
1'-0 1/2"
13'-10 1/2" 21'-7" 1'-1"
/4
/4
K M N O P Q
R R.2 S T U V V.3
10.1
8.1
/1 AD102/1 AD102
MATCH LINE MATCH LINE
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B
TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
ELEVATOR
NO. 2
E2
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
OFFICE
2CO3
THERAPY
2CO2
OFFICE
2CO4
CORRIDOR
H210
STAIR
S201
HAC
2E01
3 4 5 7
3 4 7
3 4 73 4 73 4 7
3 4 7 3 4 73 4 7
3 4 7
3 4 7
3 4 7
3 4 7 3 4 7
3 42
3 42
3 42
3 4
3 4 3 4
3 4 5 7
3 4
1'-0 1/2" 10'-9"
3'-1 1/2"
10'-10 1/2" 10'-8 1/2" 1'-1"
ELEV
LOBBY
H206
V.I.F.
9'-10"
V .I
.F
/8
V .I
.F
/8
V.I.F.
1'-10"
EXAM
2C11
PHONE CLO.
2C11A
EXAM
2C01B
OFFICE
2C10
IRM
2C10A
4'-0 1/2" 7'-8"
4" 3'-10"
19'-1 1/2" 18'-6" 18'-6" 13'-8 1/2" 4'-9 1/2" 15'-10"
/4
/4
/4
/2
/4
/2
/8
/8
/4
20'-7 1/2"
1'-0 1/2"
13'-10 1/2" 21'-7" 1 7/8"11 1/8"1'-1"
WAITING
2C01
RECEPTION
2C01A
11'-6"
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
A. SEE SHEET A-001 FOR GENERAL NOTES.
B. DEMOLITION THAT REQUIRES SYSTEM SHUT
DOWNS FOR PART OF, OR ALL OF THE
FLOOR OR BUILDING IS TO BE COORDINATED
WITH THE COR AND TAKE PLACE AFTER
NORMAL BUSINESS HOURS IF DIRECTED BY
THE COR. SEE ENGINEERING DRAWINGS
FOR LOCATIONS AND SCOPE.
C. DEMOLITION THAT GENERATES SIGNIFICANT
NOISE OR VIBRATION (CUTTING, DRILLING,
CORING, ETC.) TO BE COORDINATED WITH
COR PRIOR TO START OF DEMOLITION. SEE
ENGINEERING DRAWINGS FOR LOCATIONS
AND SCOPE.
D. WHERE REMOVING CMU, CONCRETE, OR
CLAY TILE WALLS, ALL VOIDS AND HOLES
CREATED IN FLOOR SLAB TO BE FILLED IN
WITH SELF-LEVELING COMPOUND FLUSH
WITH EXISTING FLOOR SLAB LEVEL (TYP.).
E. WALL REMOVED THIS FLOOR ARE CLAY TILE
OR CLAY TILE WITH FURRING.
ICRA BARRIER LEGEND
LINE REPRESENTS DIAGRAMMED
LOCATION OF ICRA BARRIERS
SCOPE OF CONSTRUCTION
EXISTING WALL
DEMOLITION WALL
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:3
P
M
AD102
ENLARGED SECOND FLOOR
DEMOLITION PLAN
4 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
ENLARGED SECOND FLOOR DEMOLITION PLAN - SOUTH
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
ENLARGED SECOND FLOOR DEMOLITION PLAN - NORTH
NORTH
0 4 8 16
1. REMOVE DOOR, FRAME, HARDWARE AND
ACCESSORIES.
2. REMOVE PLUMBING FIXTURES AND ALL ASSOCIATED
ACCESSORIES.
3. REMOVE FLOOR FINISHES.
4. REMOVE CEILING FINISHES, HARDWARE AND
ACCESSORIES.
5. REMOVE BUILT-IN CABINETS, STORAGE AND
CONTAINERS.
6. REMOVE CHASE. RELOCATE UTILITIES INSIDE PER
MEP DRAWINGS.
7. REMOVE CEILING TILES. GRID AND HARDWARE TO
REMAIN.
8. REMOVE SHOWER PAN AND WATERPROOFING
MEMBRANE. FLOOR TO BE SMOOTH AND LEVEL FOR
NEW FLOOR FINISH.
9. PROTECT DOOR FRAME AND HARDWARE
THROUGHOUT CONSTRUCTION. REPAIR ANY DAMAGE
TO DOOR OR FRAME AS PART OF PREPARATION FOR
NEW PAINTED FINISH.
10. ALL WALLS, FLOORS, AND CEILING FIXTURES ARE TO
BE REMOVED. SALVAGE MEP EQUIPMENT PER
ENGINEERING DRAWINGS.
11. INFECTION CONTROL BARRIER WALL TYPE "A".
12. INFECTION CONTROL BARRIER WALL TYPE "B".
13. INFECTION CONTROL BARRIER WALL TYPE "D".
14. REMOVE EXISTING DOOR, FRAME AND CONTROL
PANEL FOR DUMBWAITER. INFILL WITH NEW 2 HOUR
RATED SHAFTWALL ASSEMBLY.
WALL RATING LEGEND
SCOPE OF WORK LEGEND
WALL LEGEND
P R
R
R.2 T V V.1 V.2 V.3
V.3U.1T.2T.1R.3
7'-0" 7'-0" 7'-0"
HAC
2E01
/1 AC112
MATCH LINE
/1 AC112
MATCH LINE
/2
/8
20'-7 1/2" 7 1/2"
14'-3 1/2" 21'-7" 6 1/2"
3 1/4" 3 1/4"
9"
/4
/4
8'-3 1/2" 8'-3 1/2" 9"9"
1 2
OFFICE
2CO4
K M N O P Q
R R.1 R.2 S T U V V.1 V.2 V.3
10.1
8.1
13'-8 1/2" 4'-9 1/2"
3" 9 1/2" 10'-9" 3'-1 1/2" 10'-10 1/2" 10'-8 1/2"
6 1/2" 3 1/4"
3 1/4"
/2
/4
/2
/4
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B
TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
THERAPY
2CO2
CORRIDOR
H210
HAC
2E01
3 3
3 3 3
ELEVATOR
NO. 2
E2
STAIR
S201
/1 AC112/1 AC112
MATCH LINE MATCH LINE
EXAM
2C11
PHONE CLO.
2C11A
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
IRM
2C10A
/4
/4
/4
/2
/4
20'-7 1/2" 7 1/2"
14'-3 1/2" 21'-7" 6 1/2"
3 1/4" 3 1/4"
9"
19'-1 1/2" 18'-6" 18'-6" 15'-10"
1 2
1 2
1 2
1 2
OIT
2C10
OFFICE
2CO3
OFFICE
2CO4
2'x4' ACOUSTICAL TILE TO BE
DEMOLISHED
DEMOLITION CEILING LEGEND
GYPSUM BOARD CEILING TO
BE DEMOLISHED
DOWNLIGHT TO BE DEMOLISHED
EXIT SIGN TO BE REMOVED
2'x4' LAY-IN LIGHT FIXTURE TO
BE DEMOLISHED
SCOPE OF CONSTRUCTION
NOTE: SUB CEILING AND ALL ASSOCIATED
HARDWARE IS TO BE REMOVED. ANY FINISHES ON
THE UNDERSIDE OF THE STRUCTURE OR
STRUCTURAL SLAB ABOVE SUB CEILING IS TO BE
REMOVED. SUB CEILINGS EXISTS THROUGH ENTIRE
SPACE WITHIN SCOPE. COORDINATE WITH
ABATEMENT DRAWINGS.
EXISTING WALL
DEMOLITION WALL
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:4
P
M
ADC112
ENLARGED SECOND FLOOR
REFLECTED CEILING DEMOLITION
PLAN
5 14RER
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
NORTH
0 4 8 16
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
ENLARGED REFLECTED CEILING DEMOLITION PLAN - SOUTH
Scale: 1/8" = 1'-0"
ENLARGED REFLECTED CEILING DEMOLITION PLAN - NORTH
1 CEILING THIS SPACE TO BE REMOVED. SALVAGE
GRID FOR REUSE. SALVAGE CEILING TILES AND
TURN OVER TO VA.
2 SEE MECHANICAL AND ELECTRICAL FOR
EQUIPMENT AND FIXTURES TO BE SALVAGED FOR
REUSE.
3 REMOVE CEILING AND ALL ASSOCIATED
HARDWARE, FIXTURES, AND EQUIPMENT. SEE
MECHANICAL, ELECTRICAL AND FIRE PROTECTION
FOR ANY ITEMS TO BE SALVAGED FOR REUSE.
SCOPE OF WORK LEGEND
WALL LEGEND
DNUP
A
A.3 B C C.1 D.1
D.1D.2
E F G H J K M N O P Q
R
R.2 S T U V
V.3U.1T.2T.1R.3
LL
C.2B.2B.1A.4
10.1
2E28
CLASSROOM
2E23
COPY AREA
2E24
OFFICE
2E21
WAITING
2E22
RECEPTION
2E11
MEDITATION
2E12
MASSAGE
2E13
EXAM
2E14
MEDS
CHIRO
EXAM
2E15
CHIRO
EXAM
2E16
2E17
CONSULT
2E10
ACUPUNCTURE
2E09
ACUPUNCTURE
CLEAN
UTILITY
2E08
2E07
SOILED
CHIRO
EXAM
2E06
CHIRO
EXAM
2E05
2E04
CONSULT
2E03
PAT TLT
2E02
PAT TLT
2E01
HAC
2E18
CONSULT
2E19
CONSULT
2E20
CONSULT
2C06
OFFICE
2C05
PROVIDER
OFFICE
2C02B
OFFICE
2C09
OPEN OFFICE
2C08
OPEN OFFICE
2C07B
WOMEN'S
RESTROOM
2C07A
MEN'S
RESTROOM
2E27
CLASSROOM
GROUP
ROOM 2A
2E25A
GROUP
ROOM 1A
2E26A
2C02A
OFFICE
2C03
OFFICE
2C04A
OFFICE
2C04B
OFFICE
H201
CORRIDOR
H203
CORRIDOR
H205
CORRIDOR
H207
CORRIDOR
2E26C
STORAGE
STORAGE
2E25C
4'-9 1/2" 13'-8 1/2" 18'-6" 18'-6" 19'-1 1/2" 18'-6" 19'-1 1/2" 18'-6" 18'-6" 13'-8 1/2" 4'-9 1/2"
/4
/4
/4
/2
/4
/2
/4
/2
/4
/2
/4
8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2"
2E28
E
E
A
E
B
E
C
H204
E
C
E
B
E
A
H203
E
C
2C052C07B2C07A2C082C09
C
A
C
B
C
B
C
A
E
E
E
E
E
E
E
E
E
E
H201
E
E
E
E
E
E
E
E
E
STAIR S201
ELEV_
/1 A-102
/2 A-102
/1 A-102
/2 A-102
8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2"
10'-8" 10'-10 1/2"
3'-1 1/2"
11'-6 1/2"
10'-9" 3'-1 1/2"
10'-10 1/2" 10'-8 1/2"
GROUP
ROOM 1B
2E26B
GROUP
ROOM 2B
2E25B
H204
CORRIDOR
H206
ELEV LOBBY
MATCH LINE MATCH LINE
2C03
A-501
A-502
A-502
AC113
EXAM
2C11
PHONE CLO.
2C11A
OPTICAL
SHOP
2C12
NURSE
STATION
2C13
EXAM
2C14
EXAM
2C15
MEN'S
TOILET
2C16
KITCHEN
2C17
MECH.
2C18
LAB
2C19
WAITING
ROOM
2C20
OFFICE
2C22
ALCOVE
2C21
TOILET
2C24
OFFICE
2C23
EXAM
2C25
TOILET
2C27
HSKP
2C28
STAIR
S202
OFFICE
2C29
WAITING
ALCOVE
H205A
WAITING
2C01
RECEPTION
2C01A
CORR.
H205A
CORR.
H205A
CORR.
H206
STAIR
S203
HSKP
2W36 TOILET
2W34
OFFICE
2W35
OFFICE
2W33
EXAM
2W32
EXAM
2W30
VEST.
2W29E
TOILET
2W29F
EXAM
2W29D
STOR.
2W29C
OFFICE
2W29B
STOR.
2W29A
OFFICE
2W29
EXAM
2W28C
EXAM
2W28B
EXAM
2W28A
EXAM
2W28
EXAM
2W27
OFFICE
2W26
MECH.
2W25
EXAM
2W24
UNISEX
TOILET
2W23
EXAM
2W22C
PHARM.
OFF.
2W22A
OXYGEN
STO.
2W22B
MED. RM.
2W22
CORR.
H208
OFFICE
2W21
UNISEX
TOILET
2W20
WAITING
2W19
OFFICE
2W18
TLT.
2W14
EXAM
2W16
EXAM
2W15
TOILET
2W14
OFFICE
2W13
OFFICE
2W12
TOILET
2W11
EXAM
2W10
EXAM
2W09
TLT.
2W08
EXAM
2W07
BREAKROOM
2W06
STORAGE
2W05
MED
PREP
2W04
TOILET
2W03
FAX
2W02
RECEPTION
2W01
CORR.
H207
CORR.
H209
IRM
2C10A
A-502
A-502
A-502
A-502
12 _____ A-502
A-501
SIM.
A-501
A-501
A-501
SIM.
SIM.
FAC
H210
EXAM
2C01B
OIT
2C10
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
1. VERIFY EQUIPMENT, FURNITURE, AND
SYSTEMS FURNITURE ON EQUIPMENT PLANS.
2. SOME WORK TO BE CONDUCTED AFTER
HOURS AND ON WEEKENDS WHEN FACILITY IS
OFF PEAK OPERATING HOURS. COORDINATE
WITH COR FOR TIME AND DAYS. SEE
ENGINEERING DRAWINGS FOR LOCATIONS
AND SCOPE.
3. WORK CONDUCTED OUTSIDE MAIN SCOPE OF
CONSTRUCTION (IT, DATA, TELECOM) TO BE
DONE ON NIGHTS AND WEEKENDS WHEN
FACILITY IS OFF PEAK OPERATING HOURS.
COORDINATE WITH COR FOR TIMES AND
DAYS. SEE ENGINEERING DRAWINGS FOR
LOCATIONS AND SCOPE.
4. ALL MEANS OF EGRESS TO BE MAINTAINED AT
ALL TIMES DURING CONSTRUCTION. MINIMUM
CLEAR CORRIDOR WIDTH TO BE OBSERVED
DURING ALL CONSTRUCTION PHASES.
5. SEE PLANS FOR PARTITION TYPES AND
DIMENSIONS.
SCOPE OF CONSTRUCTION
NEW WALL, SEE
WALL TYPES
NEW DOOR, SEE
DOOR SCHEDULE
NEW TOILET NEW SINK
EXISTING
WALL
EXISTING
DOOR
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:2
P
M
A-101
OVERALL SECOND FLOOR PLAN
6 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/32" = 1'-0"
OVERALL SECOND FLOOR PLAN
NORTH
0 8 16 32
WALL RATING LEGEND
SCOPE OF WORK LEGEND
CONSTRUCTION LEGEND
P
P R
R.2 T V
V.3U.1T.2T.1R.3
CONSULT
2E20
HAC
2E01
PAT TLT
2E02
PAT TLT
2E03
CONSULT
2E19
CONSULT
2E18
CONSULT
2E17
CONSULT
2E04
CHIRO
EXAM
2E05
CHIRO
EXAM
2E06
CHIRO
EXAM
2E16
CHIRO
EXAM
2E15
MEDS
2E14
SOILED
2E07
CLEAN
UTILITY
2E08
EXAM
2E13
ACUPUNCTURE
2E09
ACUPUNCTURE
2E10
MASSAGE
2E12
MEDITATION
2E11
OFFICE
2C04B
/4
E
E
E
E
E
E
E
E
E
H201
E
E
E
E
E
E
E
E
E
/2 A-102/2 A-102
MATCH LINE MATCH LINE
8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2"
7'-5 3/8" 12'-7 3/8"
/8
/4
/8
/4
/2
7'-5"
/4
/4
/8
/8
/2
/4
/4
Maa4
A
Maa3
A Maa3
1 A
Maa3
1 A
Maa3
A
Maa3
A
Ma2
Maa3
A
Maa3
1 A
Maa3
A
Ma4
A
Ma3
A
Maa3
A
Maa3
A Maa3
A
Maa3
A
Maa4
A
Maa4
A
FEC
FEC
Maa4
A
Maa3
A
Maa3
1 A Maa4
A
Maa3
A
Maa3
A
Maa3
1 A
Maa3
A
Maa3
1 A
CORRIDOR
H201
Maa4
A
/2
/8
/8
/8
/8 " 5
/4
Ma4
A
Ma3
A
A-501
A-501
A-502
A-502
A-502
A-501
AC113
_____FHC
20'-7 1/2"
K M N O P Q
R R.2 S T U V V.3
10.1
DN
UP
GROUP
ROOM 2A
2E25A
COPY
AREA
2E23
OFFICE
2E24
RECEPTION
2E22
CHECK
IN KIOSK
2E21A
WAITING
2E21
CONSULT
2E20
HAC
2E01
OFFICE
2C02B
OPEN
OFFICE
2C08
MEN'S
RESTROOM
2C07A
WOMEN'S
RESTROOM
2C07B
OFFICE
2C06
CLASSROOM
2E28
CLASSROOM
2E27
GROUP
ROOM 1A
2E26A
STORAGE
2E26C
OFFICE
2C02A
OFFICE
2C04A
OFFICE
2C04B
13'-8 1/2" 4'-9 1/2"19'-1 1/2" 18'-6" 18'-6"
/4
/4
/4
/4
/2
/8
/8
/4
E
E
STORAGE
2E25C
OPEN
OFFICE
2C09
OFFICE
2C03
STAIR S201
PROVIDER
OFFICE
2C05
ELEV_
CORRIDOR
H205
2C09
C
A
C
B
C
A
C
B
2C08
2C07A 2C07B
2C05
C
E
H203
E
A
E
B
E
C
H204
E
C
E
A
E
B
2E28
E
1'-0 1/2"
10'-9"
3'-1 1/2"
10'-10 1/2" 10'-8 1/2"
1'-1"
/2
/1 A-102/1 A-102
MATCH LINE MATCH LINE
Maa3
A
Maa3
A
Maa3
A
Maa3
A Maa3
A
Ma2
Ma2
Maa3
A Maa3
A Maa3
A
Ma2
Ma2
Ma2
Ma0
Maa3
A
Maa3
A
Maa4
A
Maa3
A
Maa3
A
Ma2
Maa3
A
Maa4
A
Maa3
1 A
Maa4
A
Maa3
A
Maa3
A Ma0
Maa3
A
Maa3
A
Maa3
A
Maa4
A
Maa3
A
Maa3
A
Ma3
A
/2
/4
21'-2 3/4"
7'-4 3/8"
1'-0 3/4"
/4
/4
3'-9 1/2"
GROUP
ROOM 1B
2E26B
GROUP
ROOM 2B
2E25B
E Q
E Q
/2
/8
Ma3
A
1'-1"
16'-2"
11 1/2"
4'-2 1/4" 22'-9 3/4"
/8
/8
3'-9 1/2"
1'-2 3/4"
/8
/8
/2
7"
5'-2 3/8"
9'-2 1/4"
1'-2 3/8"
/2
/2
/2
7'-8 7/8"
145'-4 5/8" RADIUS
33333
FEC
Maa3
A
2C03
5 11
6 Maa4
A
Ma0
Maa3
A
CORRIDOR
H207 ELEV
LOBBY
H206
CORRIDOR
H203
CORRIDOR
H204
/4
FEC
A-401
A-401
A-501
A-501
A-501
A-501
A-501
A-501
A-501
A-501
A-501
A-501
A-501
A-501
3'-0" 7'-1 7/8" 5'-0"
AC113
AC113
AC113
Ma3
A
Ma3
A Ma3
A
WAITING
2C01
RECEPTION
2C01A
IRM
2C10A
Ma2
Ma3
A9 3'-0"
/4
R
/8
R=6'-1 0 1
/2
15'-10"
A-502
A-502
A-502
A-502
A-501
A-501
SIM.
SIM.
A-501
A-502
A-502
A-502
SIM.
FAC
H210
2E21
8'-4 1/4"
EXAM
2C01B
OIT
2C10
11'-6"
/4
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
NEW WALL, SEE
WALL TYPES
NEW DOOR, SEE
DOOR SCHEDULE
NEW TOILET NEW SINK
EXISTING
WALL
EXISTING
DOOR
SCOPE OF CONSTRUCTION
ICRA BARRIER LEGEND
LINE REPRESENTS DIAGRAMMED
LOCATION OF ICRA BARRIERS
1. VERIFY EQUIPMENT, FURNITURE, AND
SYSTEMS FURNITURE ON EQUIPMENT PLANS.
2. SOME WORK TO BE CONDUCTED AFTER
HOURS AND ON WEEKENDS WHEN FACILITY IS
OFF PEAK OPERATING HOURS. COORDINATE
WITH COR FOR TIME AND DAYS. SEE
ENGINEERING DRAWINGS FOR LOCATIONS
AND SCOPE.
3. WORK CONDUCTED OUTSIDE MAIN SCOPE OF
CONSTRUCTION (IT, DATA, TELECOM) TO BE
DONE ON NIGHTS AND WEEKENDS WHEN
FACILITY IS OFF PEAK OPERATING HOURS.
COORDINATE WITH COR FOR TIMES AND
DAYS. SEE ENGINEERING DRAWINGS FOR
LOCATIONS AND SCOPE.
4. ALL MEANS OF EGRESS TO BE MAINTAINED AT
ALL TIMES DURING CONSTRUCTION. MINIMUM
CLEAR CORRIDOR WIDTH TO BE OBSERVED
DURING ALL CONSTRUCTION PHASES.
5. SEE PLANS FOR PARTITION TYPES AND
DIMENSIONS.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:2
P
M
A-102
ENLARGED SECOND FLOOR PLAN
7 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
ENLARGED SECOND FLOOR PLAN - SOUTH
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
ENLARGED SECOND FLOOR PLAN - NORTH
NORTH
0 4 8 16
WALL RATING LEGEND
SCOPE OF WORK LEGEND
CONSTRUCTION LEGEND
1 ALIGN NEW FINISHES TO EXISTING.
2 EXISTING SHAFT TO REMAIN.
3 NEW RADIATOR AND COVER.
4 OPERABLE PARTITIONS WITH 4'-0"H CENTERED
MARKERBOARD ON BOTH SIDES
5 INFECTION CONTROL BARRIER WALL TYPE "A".
6 PORTION OF FINISH WORK OUTSIDE OF INFECTION
CONTROL BARRIER TO BE DONE AFTER PEAK
OPERATING HOURS. PROVIDE TEMPORARY TYPE D
INFECTION CONTROL BARRIER OVER DOOR DURING
THIS PORTION OF CONSTRUCTION. THIS PORTION
OF CORRIDOR TO REMAIN OPERATIONAL AT ALL
OTHER TIMES.
7 PATCH AND REPAIR ABANDONED FLOOR
PENETRATIONS FOR SMOOTH SURFACE TO
RECEIVE NEW FLOOR FINISH.
8 INFILL DUMBWAITER OPENING WITH NEW 2 HOUR
RATED SHAFT WALL. FIRE CAULK AND SEAL ALL
JOINTS PRIOR TO NEW FURRING INSTALLATION.
9 NEW WATER COOLER WITH BOTTLE FILLING
STATION.
10 INFECTION CONTROL BARRIER WALL TYPE "B".
11 INFECTION CONTROL BARRIER WALL TYPE "D".
OS OS OS OS OS OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OS
OPEN
OFFICE
2C09
OPEN
OFFICE
2C08
MEN'S
RESTROOM
2C07A
WOMEN'S
RESTROOM
2C07B
OFFICE
2C02A
OFFICE
2C02B
OFFICE
2C03
OFFICE
2C04A
OFFICE
2C04B
CORRIDOR
H207
ELEV
LOBBY
H206
PROVIDER
OFFICE
2C05
OFFICE
2C06
WAITING
2E21
COPY
AREA
2E23
OFFICE
2E24
GROUP
ROOM 2A
2E25A
GROUP
ROOM 1A
2E26A
CORRIDOR
H205
CLASSROOM
2E27
CLASSROOM
2E28
CORRIDOR
H202
CONSULT
2E20
HAC
2E01
PAT TLT
2E02 CONSULT
2E19
CONSULT
2E18
PAT TLT
2E03
CONSULT
2E04
CONSULT
2E17
CHIRO
EXAM
2E16
CHIRO
EXAM
2E05
CHIRO
EXAM
2E06 CHIRO
EXAM
2E15
MEDS
2E14
SOILED
2E07
CLEAN
UTILITY
2E08
EXAM
2E13
ACUPUNCTURE
2E09
ACUPUNCTURE
2E10
MEDITATION
2E11
MASSAGE
2E12
CORRIDOR
H201
/2 AC112
/1 AC112
/2 AC112
/1 AC112
GROUP
ROOM 1B
2E26B
GROUP
ROOM 2B
2E25B
CORRIDOR
H204
STAIR
S201
H208
OPERABLE
PARTITION
OPERABLE
PARTITION
OPTICAL
SHOP
2C12
NURSE
STATION
2C13
MEN'S
TOILET
2C16
KITCHEN
2C17
MECH.
2C18
LAB
2C19
WAITING
ROOM
2C20
OFFICE
2C22
ALCOVE
2C21
TOILET
2C24
OFFICE
2C23
EXAM
2C25
TOILET
2C27
HSKP
2C28
STAIR
S202
OFFICE
2C29
WAITING
ALCOVE
H205A
WAITING
2C01
RECEPTION
2C01A
CORR.
H205A
CORR.
H205A
CORR.
H206
STAIR
S203
HSKP
2W36 TOILET
2W34
OFFICE
2W35
OFFICE
2W33
EXAM
2W32
EXAM
2W30
VEST.
2W29E
TOILET
2W29F
EXAM
2W29D
STOR.
2W29C
OFFICE
2W29B
STOR.
2W29A
OFFICE
2W29
EXAM
2W28C
EXAM
2W28B
EXAM
2W28A
EXAM
2W28
EXAM
2W27
OFFICE
2W26
MECH.
2W25
EXAM
2W24
UNISEX
TOILET
2W23
EXAM
2W22C
PHARM.
OFF.
2W22A
OXYGEN
STO.
2W22B
MED. RM.
2W22
CORR.
H208
OFFICE
2W21
UNISEX
TOILET
2W20
WAITING
2W19
OFFICE
2W18
TLT.
2W14
EXAM
2W16
EXAM
2W15
TOILET
2W14
OFFICE
2W13
OFFICE
2W12
TOILET
2W11
EXAM
2W10
EXAM
2W09
TLT.
2W08
EXAM
2W07
BREAKROOM
2W06
STORAGE
2W05
MED
PREP
2W04
TOILET
2W03
FAX
2W02
RECEPTION
2W01
CORR.
H209
EXAM
2C11
PHONE CLO.
2C11A
IRM
2C10A
F2225
F2225
F2225
F2225
F2225
EXAM
2C01B
OIT
2C10
REFLECTED CEILING PLAN
LEGEND
CURTAIN TRACK
2'x2' LAY-IN LED
SUPPLY DIFFUSER
RETURN GRILL
DOWN LIGHT
FIXTURE
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
DENOTES GWB
SOFFIT/CEILING
E Q
B
EQ. A
SPRINKLER HEAD
ATC
8'-0"
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
CONTRACTOR TO MEASURE EACH CEILING AREA AND
ESTABLISH A CEILING LAYOUT TO BALANCE BORDER
WIDTHS AT OPPOSITE EDGES OF EACH ROOM. TILES
LESS THAN 6" ON ANY EDGE ARE NOT ACCEPTABLE.
2'x4' LAY-IN LED
EXHAUST DIFFUSER
PENDANT LIGHT
SCOPE OF CONSTRUCTION
A. SEE SHEET AC112 FOR ENLARGED PLAN AND
DETAIL REFERENCES.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:5
P
M
AC111
OVERALL SECOND FLOOR REFLECTED
CEILING PLAN
8 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/32" = 1'-0"
OVERALL SECOND FLOOR REFLECTED CEILING PLAN
NORTH
0 8 16 32
SCOPE OF WORK LEGEND
OS
OS
OS OS OS OS OS OS
OS
OS
OS
OS
OS
OS
S SS
P
R
R.2 T V
V.3U.1T.2T.1R.3
CONSULT
2E20
HAC
2E01
PAT TLT
2E02
CONSULT
2E19
CONSULT
2E18
PAT TLT
2E03
CONSULT
2E04
CONSULT
2E17
CHIRO
EXAM
2E16
CHIRO
EXAM
2E05
CORRIDOR
H202
CHIRO
EXAM
2E15
CHIRO
EXAM
2E06
SOILED
2E07 MEDS
2E14
EXAM
2E13
CLEAN
UTILITY
2E08
ACUPUNCTURE
2E09
ACUPUNCTURE
2E10
CORRIDOR
H201
MASSAGE
2E12
MEDITATION
2E11
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
8'-3 1/2" 7'-0" 7'-0" 7'-0" 8'-3 1/2"
/2 AC112/2 AC112
MATCH LINE MATCH LINE
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
AC113
K M N O P Q
R R.1 S T U V V.3
10.1
/4
/2
/4
/2
/4
/2
13'-8 1/2" 4'-9 1/2"
OPEN
OFFICE
2C08
MEN'S
RESTROOM
2C07A
WOMEN'S
RESTROOM
2C07B
CORRIDOR
H207
PROVIDER
OFFICE
2C05
OFFICE
2C06
CHECK
IN KIOSK
2E21A
ELEV
LOBBY
H206
WAITING
2E21
RECEPTION
2E22
CORRIDOR
H203
COPY
AREA
2E23
OFFICE
2E24
GROUP
ROOM 2A
2E25A
GROUP
ROOM 1A
2E26A
STORAGE
2E26C
STORAGE
2E25C
CORRIDOR
H205
CLASSROOM
2E27
CLASSROOM
2E28
OFFICE
2C02A
OFFICE
2C02B
OFFICE
2C03
CORRIDOR
H207
OFFICE
2C04A
OFFICE
2C04B
WAITING
2E21
CONSULT
2E20
HAC
2E01
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
/4
19'-1 1/2" 18'-6" 18'-6"
/1 AC112/1 AC112
MATCH LINE MATCH LINE
OPEN
OFFICE
2C09
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
GROUP
ROOM 1B
2E26B
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2 GROUP
ROOM 2B
2E25B
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 3"
ACT
2x2
CORRIDOR
H204
8' - 0"
GYP
8' - 0"
GYP
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 3"
ACT
2x2
8' - 3"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP
9' - 0"
GYP8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
7' - 6"
GYP
8' - 3"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
9' - 0"
GYP
8' - 4"
ACT
2x2
8' - 4"
ACT
2x2
9' - 0"
GYP
7' - 6"
GYP
8' - 2"
GYP
OPERABLE
PARTITION
OPERABLE
PARTITION
AC113
A-401
A-401
A-401
AC113
AC113
AC113
AC113
IRM
2C10A
EXAM
2C11
PHONE CLO.
2C11A
WAITING
2C01
RECEPTION
2C01A
F2225
F2225
F2225
F2225
F2225
F2225
A-401
A-401
SIM.
A-401
FAC
H210
EXAM
2C01B
OIT
2C10
NO CEILING THIS
SPACE
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
REFLECTED CEILING PLAN
LEGEND
CURTAIN TRACK
2'x2' LAY-IN LED
SUPPLY DIFFUSER
RETURN GRILL
DOWN LIGHT
FIXTURE
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
DENOTES GWB
SOFFIT/CEILING
E Q
B
EQ. A
SPRINKLER HEAD
ATC
8'-0"
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
CONTRACTOR TO MEASURE EACH CEILING AREA AND
ESTABLISH A CEILING LAYOUT TO BALANCE BORDER
WIDTHS AT OPPOSITE EDGES OF EACH ROOM. TILES
LESS THAN 6" ON ANY EDGE ARE NOT ACCEPTABLE.
2'x4' LAY-IN LED
EXHAUST DIFFUSER
PENDANT LIGHT
SCOPE OF CONSTRUCTION
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:0
P
M
AC112
ENLARGED SECOND FLOOR
REFLECTED CEILING PLAN
9 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
NORTH
0 4 8 16
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
ENLARGED SECOND FLOOR REFLECTED CEILING PLAN - SOUTH
Scale: 1/8" = 1'-0"
ENLARGED SECOND FLOOR REFLECTED CEILING PLAN - NORTH
WALL RATING LEGEND
SCOPE OF WORK LEGEND
SOFFIT LIGHTING - SEE ELECTRICAL
EXISTING CONCRETE BEAM
5/8" GYP. BD. ON 3 5/8" MTL STUDS
5/8" GYP. BD. BOTH SIDES 3 5/8" MTL.
STUDS TO BOTTOM OF FLOORING
ABOVE. BRACE TO STRUCTURE.
ACT CEILING AND GRID - SEE
REFLECTED CEILING PLANS.
SOFFIT
8'-0"
SOFFIT EDGE
7'-6"
ACT CEILING
8'-4"
DOOR - SEE SCHED.
R R.2
ACT CEILING
5/8" GYP. BD. ON
3 5/8" MTL. STUD
SOFFIT
9'-0"
SOFFIT EDGE
8'-3"
EXISTING GLAZING
EXISTING CONCRETE BEAM
EDGE OF GYP. BD., BEYOND
V V.2 V.3
ACT CEILING
5/8" GYP. BD. ON
3 5/8" MTL. STUD
SOFFIT
9'-0"
SOFFIT EDGE
8'-3"
EXISTING GLAZING
EXISTING CONCRETE BEAM
1'-8 3/4"
3 5/8" MTL STUDS TO
BOTTOM OF STRUCTURE
5/8" GYP. BD. ON 3 5/8"
MTL. STUDS
ACT CEILING
8'-4"
SOFFIT
7'-6" 1'-0 1/2"
5/8" GYP. BD. ON 3 5/8"
MTL. STUDS
ACT CEILING
8'-4"
SOFFIT
7'-6"
3 5/8" MTL. STUD TO BOTTOM
OF STRUCTURE
5/8" GYP. BD.
4'-0"
DUCTWORK - SEE
MECHANICAL
EXISTING CONCRETE BEAM
5/8" GYP. BD. ON 3 5/8"
MTL. STUDS
ACT CEILING AND GRID - SEE
REFLECTED CEILING PLANS.
ACT CEILING
8'-4"
SOFFIT
7'-6"
ACT CEILING
8'-4"
PARTITION SOFFIT
8'-2"
OPERABLE PARTITION,
BEYOND
PARTITION GLIDING TRACK
STRUCTURAL STEEL T - SEE STRUCT.
STEEL L CHANNEL BRACING - SEE STRUCT.
3 5/8" MTL. STUD TO BOTTOM OF STRUCTURE
5/8" GYP. BD.
T Y
P
4'-4 3/4"
CEILING SYSTEM - REF
TO RCP FOR TYPE AND
HEIGHT
F.R.T. WOOD
BLOCKING
MTL. STUD BRACING
TO STRUCTURE ABOVE
AT SPLICES AND
WHERE
RECOMMENDED BY
MANUFACTURER
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:1
P
M
AC113
ENLARGED CEILING SECTIONS
10 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
Scale: 3/4" = 1'-0"
SOFFIT SECTION @ CLASSROOM
Scale: 3/4" = 1'-0"
SOFFIT SECTION @ CORRIDOR WINDOW
Scale: 3/4" = 1'-0"
SOFFIT SECTION @ WINDOW
Scale: 3/4" = 1'-0"
SOFFIT SECTION (NARROW) @ RECEPTION
Scale: 3/4" = 1'-0"
SOFFIT SECTION (WIDE) @ RECEPTION
Scale: 3/4" = 1'-0"
SOFFIT SECTION @ KIOSK
Scale: 3/4" = 1'-0"
SECTION @ MOVABLE PARTITION
Scale: 1 1/2" = 1'-0"
CUBICLE CURTAIN
T
CHECK
IN KIOSK
2E21A
/2
/2
/2
CORRIDOR
H203
R=6'-10 1/2"
/8
8'-4 3/8"
Ma3
A
Ma3
A
Ma3
A
PATCH AND REPAIR
EXISTING GYP. BD. FINISH
TO REMAIN FOR LIKE NEW
SURFACE TO RECEIVE
NEW PAINTED FINISH, SEE
INTERIORS SHEET.
T
V V.1 V.2 V.3
COPY
AREA
2E23
OFFICE
2E24
RECEPTION
2E22
E
/2
12'-0"
7"
/4
5'-2 3/8"
7'-8 7/8"
CORRIDOR
H203
5'-10 7/8"
/8
10'-9"
/8
/4
/8
/4
Ma2
Maa4
A
Maa3
A Maa3
A
Maa3
A
Maa3
A
Ma2
Ma3
A
Maa3
A
PATCH AND REPAIR
EXISTING GYP. BD. FINISH
TO REMAIN FOR LIKE NEW
SURFACE TO RECEIVE
NEW PAINTED FINISH, SEE
INTERIORS SHEET.
T U V
T V V.1 V.2 V.3
AC113
AC113
AC113
SIM.
COPY
AREA
2E23
OFFICE
2E24
RECEPTION
2E22
CORRIDOR
H203
A.F.F.8' - 4"A.F.F.7' - 6"
A.F.F.8' - 4"
A.F.F.8' - 3"
A.F.F.8' - 4"
A.F.F.7' - 6"
A.F.F.7' - 6"
R
/2
R
/2
9'-9 1/4"
/4
4'-0"
/2
1'-7 3/4"
/4
16.7°
17.3°
19.5°
.1
2'-8 3/4"
/4
EQ. EQ.
T
T
AC113
A.F.F.7' - 6"
A.F.F.8' - 3"
CORRIDOR
H203
R=6'-10 1/2"
8'-4 3/8"
/8
CHECK
IN KIOSK
2E21A
T
T
AC113
A.F.F.8' - 0"
A.F.F.8' - 4"
CORRIDOR
H205
GROUP
ROOM 1B
2E26B
GROUP
ROOM 1A
2E26A
A.F.F.8' - 4"
A.F.F.8' - 4"
A.F.F.7' - 6"
3'-9 1/4"
/2
2'-3 3/4" 1'-1 7/8"
/4
REFLECTED CEILING PLAN
LEGEND
CURTAIN TRACK
2'x2' LAY-IN LED
SUPPLY DIFFUSER
RETURN GRILL
DOWN LIGHT
FIXTURE
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
DENOTES GWB
SOFFIT/CEILING
E Q
B
EQ. A
SPRINKLER HEAD
ATC
8'-0"
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
CONTRACTOR TO MEASURE EACH CEILING AREA AND
ESTABLISH A CEILING LAYOUT TO BALANCE BORDER
WIDTHS AT OPPOSITE EDGES OF EACH ROOM. TILES
LESS THAN 6" ON ANY EDGE ARE NOT ACCEPTABLE.
2'x4' LAY-IN LED
EXHAUST DIFFUSER
PENDANT LIGHT
A.F.F.8' - 3"
A.F.F.8' - 4"
A.F.F.9' - 0"
/8
8 7/8" 3'-3" 8 7/8"
/2
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:3
P
M
A-401
ENLARGED PLANS AND ENLARGED
CEILING PLANS
11 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
Scale: 1/2" = 1'-0"
ENLARGED SECOND FLOOR PLAN - CHECK-IN KIOSK
Scale: 1/2" = 1'-0"
ENLARGED SECOND FLOOR PLAN - RECEPTION DESK
Scale: 1/2" = 1'-0"
ENLARGED CEILING PLAN @ RECEPTION AREA
Scale: 1/2" = 1'-0"
ENLARGED CEILING PLAN @ CHECK-IN KIOSK
Scale: 1/2" = 1'-0"
ENLARGED CEILING PLAN @ CLASSROOM
Scale: 1/2" = 1'-0"
ENLARGED CEILING PLAN @ LIGHT WELL
M
8.1
1'-6 1/2"
/4
EXISTING CONCRETE
COLUMN. SEE
STRUCTURAL
EXISTING PARTITION
CORNER GUARD, TYP.
5/8" GYP. BD. ON 2 1/2"
MTL. STUD
N
8.1
/4
EXISTING CONCRETE
COLUMN. SEE
STRUCTURAL
5/8" GYP. BD. ON 2 1/2"
MTL. STUD
ACOUSTICAL
SOUND BATTS
1'-9" 1'-2 3/4"
5/8" GYP. BD. ON 7/8"
MTL. STUD
10.1
/8
5/8" GYP. BD. ON
BOTH SIDES 4"
MTL. STUD
1/2" WHITE PLASTIC
REVEAL MOULDING,
PREP SURFACES
FOR SMOOTH GAP
FREE INSTALLATION,
BOTH SIDES OF
OPENING
5/8" GYP. BD. ON 2 1/2"
MTL. STUDS
EXISTING PARTITION
M
CORNER GUARD, TYP.
5/8" GYP. BD. ON 7/8"
HAT CHAN.
5/8" GYP. BD. ON 2 1/2"
MTL. STUD
EXISTING CONCRETE
COLUMN. SEE STRUCT.
P
5/8" GYP. BD. ON
2 1/2" MTL. STUDS
CORNER GUARD,
TYP.
EXISTING CONCRETE
COLUMN. SEE STRUCT.
T
1'-3 1/4"
5/8" GYP. BD.
BOTH SIDES OF
4" MTL. STUDS
5/8" GYP. BD. BOTH
SIDES OF 3 5/8" MTL.
STUDS
CORNER GUARD, TYP.
5/8" GYP. BD. ON 7/8"
HAT CHAN.
5/8" GYP. BD. BOTH
SIDES OF 3 5/8" MTL.
STUDS
V V.1
1'-1 3/4"
CORNER GUARD, TYP.
5/8" GYP. BD. ON
3 5/8" MTL. STUD
PIPING. SEE
PLUMBING
T
9 5/8" 11 1/2"
/8
/8
/4
/8
/8
EXISTING CONCRETE
COLUMN, SEE
STRUCT.
CORNER GUARD, TYP.
5/8" GYP. BD. BOTH
SIDES OF 3 5/8" MTL.
STUDS
5/8" GYP. BD. ON 2 1/2"
MTL. STUD
5/8" GYP. BD. BOTH SIDES
OF 3 5/8" MTL. STUDS
/2
V V.1
/4
/8
/2
/8
10" 1 1/2"
CORNER GUARD, TYP.
5/8" GYP. BD. ON 2 1/2"
MTL. STUDS
EXISTING CONCRETE
COLUMN. SEE STRUCT.
5/8" GYP. BD. ON BOTH
SIDES OF 3 5/8" MTL.
STUDS
6"
5/8" GYP. BD. BOTH
SIDES OF 3 5/8" MTL.
STUDS
EXISTING 2-HR.
SHAFT WALL TO
REMAIN
T
/8
/8
/4
11 1/8" 11" 6 1/4"
CORNER GUARD, TYP.
EXISTING CONCRETE
COLUMN. SEE STRUCT.
5/8" GYP. BD. ON 3 5/8"
MTL. STUDS
2 LAYERS 5/8" GYP.
BD. ON C-H STUDS
ON 1" GYP. BD.
5/8" GYP. BD. ON 3 5/8"
MTL. STUDS
/8
/8
U
EXISTING CONCRETE COLUMN.
SEE STRUCT.
CORNER GUARD, TYP.
5/8" GYP. BD. ON 2 1/2"
MTL. STUDS
/2
/8
/8
11 1/2" 11 1/2"
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:1
:3
P
M
A-501
PLAN DETAILS
12 14RR
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
TJS
Scale: 1 1/2" = 1'-0"
ENLARGED PLAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .