6-FP Bid Drawing 657-20-101JB (3 Pages) 5 28 2021 .pdf
PDF 1 MB Posted
- Solicitation number
- 36C25522R0058
About this file
This document package includes construction drawings and general notes for a fire suppression system project at a Veterans Affairs medical center, as well as details of the related federal solicitation.
The construction drawings depict the demolition and installation of fire sprinkler systems on the second floor of a VA medical facility. The general notes provide requirements for submittals, permits, testing, infection control measures during construction, and other fire suppression specifications. The related solicitation is for the renovation of space to create a new Whole Health Clinic at the VA medical center located in St. Louis, Missouri. The solicitation was issued by the VA Veterans Health Administration VISN 15 and has a response due date of May 26, 2021. The drawings and solicitation provide the necessary information for contractors to prepare bids to install the fire suppression systems as part of the larger medical center renovation project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE SUPPRESSION GENERAL NOTES
1. THE FIRE PROTECTION CONTRACTOR SHALL USE NFPA-13 (CURRENT EDITION), CHAPTER 27, “PLANS AND
CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER
SYSTEM.
2. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED
EDITION). INSTALLATION SHALL MEET THE REQUIREMENTS OF THE VA.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS
FOR THE APPROPRIATE HAZARD CLASSIFICATION.
4. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS
REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13
AND VA STANDARDS.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND
OPERABLE SYSTEM IN ACCORDANCE WITH NFPA AND VA REQUIREMENTS.
7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY. FIRE PROTECTION CONTRACTOR SHALL INCLUDE IN THEIR BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC CALCULATIONS AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR
REVIEW.
8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.
SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES
TO AVOID CONFLICT.
9. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE
PROTECTION SYSTEM.
10. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT
PRIMARY BUILDING STRUCTURAL MEMBERS.
11. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.
12. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER
DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.
13. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL
WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.
14. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
15. INCLUDE IN BID PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY LOCAL MUNICIPALITY OR VA REQUIRED FOR
COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE INTRODUCED TO VA.
16. PROMPTLY INFORM THE COR, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL LAWS AND REGULATIONS. PERFORM WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL
COST TO THE VA.
17. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO THE VA FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.
18. PROVIDE FIRESTOPPING/ SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
19. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH
LINES. ARMOVER SUPPORTS SHALL COMPLY WITH NFPA13.
20. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.
21. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS
OR CEILING TILE.
FIRE PROTECTION CONTRACTOR
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINE FPCFL
TAMPER SWITCH
FLOW SWITCH
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
ORDINARY HAZARD
GROUP 1 OCCUPANCY
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
KEYNOTE
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER POINT OF NEW CONNECTION
POINT OF TERMINATION/CAP
BACKFLOW PREVENTER
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS
AND VALVES PRIOR TO THE START OF WORK.
2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. THE CONTRACTOR SHALL GIVE THE VA THREE (3) WEEKS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR INTERRUPTION.
3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
4. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING SHALL BE TAKEN
OFFSITE AND DISPOSED OF.
BUILDING AND OCCUPANT SAFETY -
INTERRUPTION OF FIRE PROTECTION SERVICE
1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT
PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY PER VA REQUIREMENTS.
2. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN
ESTABLISHED AREA.
3. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY
DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.
4. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER
9, SECTION 901.7).
5. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
6. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS
USE.
7. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
8. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACITVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE
SMOKE DAMPERS, AND SHUT DOWN FANS.
T&D
TS
FS
ORDINARY HAZARD
GROUP 2 OCCUPANCY
INFECTION CONTROL MEASURES
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN
DUST CONTROL PLAN.
2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE
MAINTAINED.
3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBOURNE OPPORTUNISTIC
PATHOGENS.
5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S
ACCEPTANCE.
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA
13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE
PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS
DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE
PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION
SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS
DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE
BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING
CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING
CODE, ESPECIALLY CHAPTERS 6 (TYPES OF CONSTRUCTION) AND CHAPTER 9 (FIRE
PROTECTION SYSTEMS), NFPA 13 (CHAPTER 8), AND THE PROJECT SPECIFICATIONS
FOR OTHER FIRE PROTECTION REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE: HANGING DETAILS SHOWN ARE SUBJECT
TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILTI QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
UPRIGHT HEAD
SPRINKLER BRANCH LINE
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
UPRIGHT HEAD.
PROVIDE GAURD.
NOTES:
1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTOIN OVER 48" IN WIDTH.
2. COORDINATE WITH THE HVAC AND GENERAL CONTRACTOR.
3. INCLUDE COST OF ADDITIONAL SUPPORTS, AS REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN
FULL CONFORMANCE WITH NFPA REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG
FROM DUCT WORK.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL AS
REQUIRED.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
UL AND FM-APPROVED FIRESTOPPING
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF
CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC
REQUIREMENTS.
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HAED
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:4
A
M
FX001
FIRE PROTECTION GENERAL
INFORMATION
1 3JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
Scale: N.T.S.
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: N.T.S.
PIPE HANGER SUPPORT DETAIL
Scale: N.T.S.
SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: N.T.S.
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL
Scale: N.T.S.
TYPICAL SEMI-RECESSED PENDENT SPRINKLER
DocuSign Envelope ID: 5031BAE7-940A-4160-ADF6-B089AC0BA15C
5/26/2021
EXAM
2E25A
EXAM
2E25
OFFICE
2E23
WAITING
ROOM
2E26
OFFICE
2E27
OFFICE
2E22
TOILET
2E22A
TOILET
2E28
EXAM
2E29
TOILET
2E25B TOILET
2E24
EXAM
2E21
OFFICE
2E20
CHASE
CH-E-1
OFFICE
2CO5
STORAGE
2CO6
ELEVATOR
NO. 2
E2
OFFICE
2CO8
OFFICE
2CO9
CONFERENCE
ROOM
2CO7
OFFICE
2CO3
THERAPY
2CO2
OFFICE
2CO4
CORRIDOR
H210
STAIR
S201
HAC
2E01
ROOF BELOW
ROOF BELOW
EXAM
2C11
PHONE CLO.
2C11A
WAITING
2C01
RECEPTION
2C01A
EXAM
2C01B
IRM
2C10A
OIT
2C10
8.1
K M N P Q
R S T U V
FL
FL
1'' FIRE PROTECTION
DRAIN
(TYP.)
1FL
41" FL
1 1 1
1(TYP.)
1 (TYP.)
/1 FD101/1 FD101
MATCH LINE MATCH LINE
HAC
2E01
R.3 T.1 T.2 U.1
R T U V
FL1(TYP.)
1 (TYP.)
2'' FL DN
1 1/2'' FL UP
MATCH LINE MATCH LINE
/2 FD101/2 FD101
EX. 2'' FL FROM 1ST
FLR TO REMAIN
EX. FIRE DEPARTMENT
VALVE CABINET AND FIRE
EXTINGUISHER TO REMAIN
1. CONTRACTOR SHALL FIELD VERIFY THE
LOCATION AND QUANTITY OF EXISTING
SPRINKLER HEADS. CONTRACTOR SHALL
FIELD VERIFY SIZE AND ROUTE OF EXISTING
SPRINKLER PIPING.
2. SPRINKLER PIPING DEMOLITION SHALL BE
PHASED TO MAINTAIN COVERAGE
THROUGHOUT CONSTRUCTION. TURN UP
EXISTING SPRINKLERS HEADS IN
DEMOLISHED CEILING AREAS AND MAINTAIN
COVERAGE. WHERE SPRINKLERS CANNOT
BE USED FOR COVERAGE PROVIDE A FIRE
WATCH AS SPECIFIED IN SECTION 211313.
3. PROVIDE TEMPORARY SUPPORTS FOR ALL
EXITING UTILITIES SHOWN TO REMAIN IN
ORDER TO PERFORM THE WORK SHOWN ON
THE ‘HA’ SERIES DRAWINGS. ONCE THE ‘HA’
SERIES WORK IS COMPLETED, REMOVE THE
TEMPORARY SUPPORTS AND SUPPORT THE
UTILITIES IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS.
4. FIRESTOP AT NEW AND EXISTING
PENETRATIONS THROUGH FIRE-RATED
WALL, FLOOR AND CEILING ASSEMBLIES.
PROVIDE SMOKE SEALING AT NEW AND
EXISTING PENETRATIONS THROUGH SMOKE-
RATED WALL, FLOOR AND CEILING
ASSEMBLIES. COMPLY WITH DIVISION 07
SPECIFICATIONS. WHERE A PIPE OR OTHER
ELEMENT PENETRATING A FIRE- AND/OR
SMOKE-RATED ASSEMBLY IS DEMOLISHED,
PATCH/REPAIR THE ASSEMBLY TO MATCH
THE FIRE AND/OR SMOKE RATING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:4
A
M
FD101
SECOND FLOOR FIRE PROTECTION
DEMOLITION PLAN
2 3JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
NORTH FIRE PROTECTION DEMOLITION PLAN
Scale: 1/8" = 1'-0"
SOUTH FIRE PROTECTION DEMOLITION PLAN
NORTH
0 4 8 16
NORTH
0 4 8 16
1 DEMOLISH FIRE PROTECTION SPRINKLER
HEADS AND BRANCH PIPING, TYPICAL ALL
ROOMS WITHIN AREA OF WORK.
2 EXISTING FIRE LINE TO REMAIN.
3 EXISTING MAIN TO CORRIDOR/WEST TO
REMAIN.
4 DEMOLISH FIRE PROTECTION MAIN PIPING
TO POINT INDICATED AT LIMITS OF
DEMOLITION. MAKE READY FOR NEW
CONNECTION.
5 EXISTING SIDEWALL SPRINKLER HEAD IN
STAIRWELL TO REMAIN. MAINTAIN
SPRINKLER COVERAGE IN STAIRWELL
THROUGHOUT CONSTRUCTION.
6 EXISTING SPRINKLER ZONE CONTROL
VALVE TO REMAIN.
8.1
K M N P Q
R S T U V
CLASSROOM
2E28
CLASSROOM
2E27
CORRIDOR
H205
GROUP ROOM 1A
2E26A
GROUP ROOM 1B
2E26B
GROUP ROOM 2A
2E25A
GROUP ROOM 2B
2E25B
CORRIDOR
H203
COPY AREA
2E23
OFFICE
2E24
RECEPTION
2E22
WAITING
2E21
CONSULT
2E20
WOMEN'S RESTROOM
2C07B
OFFICE
2C06
PROVIDER OFFICE
2C05
ELEV LOBBY
H206
STAIR S201
H208
CORRIDOR
H207 FL
1'' FIRE PROTECTION
DRAIN
FL
1 (TYP.)
1 (TYP.)
1 (TYP.)
OPEN OFFICE
2C09
OPEN OFFICE
2C08
MEN'S RESTROOM
2C07A
OFFICE
2C02A
OFFICE
2C02B
OFFICE
2C03
OFFICE
2C04A
OFFICE
2C04B
CORRIDOR
H204
STORAGE
2E26C
STORAGE
2E25C
FL
FL
HAC
2E01
MATCH LINEMATCH LINE
/1 FX101/1 FX101
R.3 T.1 T.2 U.1
R T U V
HAC
2E01
CONSULT
2E20
PAT TLT
2E02
CONSULT
2E19
PAT TLT
2E03
CONSULT
2E18
CONSULT
2E04
CONSULT
2E17
CHIRO EXAM
2E05
CHIRO EXAM
2E16
CHIRO EXAM
2E06
CHIRO EXAM
2E15
SOILED
2E07
MEDS
2E14
CLEAN UTILITY
2E08
EXAM
2E13
ACUPUNCTURE
2E09
MASSAGE
2E12
ACUPUNCTURE
2E10
MEDITATION
2E11
CORRIDOR
H201
CORRIDOR
H202
2'' FL DN
1 1/2'' FL UP
1 (TYP.)
FL
MATCH LINE MATCH LINE
/2 FX101 /2 FX101
EX. 2'' FL FROM
1ST FLR
EX. FIRE DEPARTMENT
VALVE CABINET AND FIRE
EXTINGUISHER
1. CONTRACTOR SHALL FIELD VERIFY THE
SIZES AND LOCATION OF ALL EXISTING
SPRINKLER PIPING.
2. FIRESTOP AT NEW AND EXISTING
PENETRATIONS THROUGH FIRE-RATED
WALL, FLOOR AND CEILING ASSEMBLIES.
PROVIDE SMOKE SEALING AT NEW AND
EXISTING PENETRATIONS THROUGH SMOKE-
RATED WALL, FLOOR AND CEILING
ASSEMBLIES. COMPLY WITH DIVISION 07
SPECIFICATIONS. WHERE A PIPE OR OTHER
ELEMENT PENETRATING A FIRE- AND/OR
SMOKE-RATED ASSEMBLY IS DEMOLISHED,
PATCH/REPAIR THE ASSEMBLY TO MATCH
THE FIRE AND/OR SMOKE RATING.
1151 Kildaire Farm Rd.
Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420
108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)
Joint Venture An Alliance for Success
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RATED
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
U.S. Department of Veterans Affairs#
S S S S
© COPYRIGHT Apogee - CEMS JV, LLC
JOHN A. JURGIEL & ASSOCIATES, INC.
123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com
JURGIEL
JOHN A. JURGIEL & ASSOCIATES, INC.
/2
/2
:2
:5
A
M
FX101
SECOND FLOOR FIRE PROTECTION
PLAN
3 3JT/SM
RENOVATE SPACE FOR
WHOLE HEALTH
1 JEFFERSON BARRACKS DR.,
ST LOUIS, MO 63125
MAY 28, 2021
BID DOCUMENTS
657-20-101JB19-335
RCM/PLH
NORTH
0 4 8 16
1 PROVIDE NEW SPRINKLER HEADS AND BRANCH
PIPING AS PER NEW LAYOUT.
2 PROVIDE NEW MAIN TO NORTH PORTION OF EAST
WING.
3 PROVIDE NEW MAIN TO SOUTH PORTION OF EAST
WING.
4 LIGHT HAZARD OCCUPANCY.
5 ORDINARY HAZARD GROUP 2 OCCUPANCY.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
SECOND FLOOR FIRE SUPRESSION PLAN NORTH
Scale: 1/8" = 1'-0"
SOUTH FIRE PROTECTION PLAN
NORTH
0 4 8 16
| 2021-05-26T07:57:24-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .