This document package includes construction drawings and general notes for a fire suppression system project at a Veterans Affairs medical center, as well as details of the related federal solicitation.

The construction drawings depict the demolition and installation of fire sprinkler systems on the second floor of a VA medical facility. The general notes provide requirements for submittals, permits, testing, infection control measures during construction, and other fire suppression specifications. The related solicitation is for the renovation of space to create a new Whole Health Clinic at the VA medical center located in St. Louis, Missouri. The solicitation was issued by the VA Veterans Health Administration VISN 15 and has a response due date of May 26, 2021. The drawings and solicitation provide the necessary information for contractors to prepare bids to install the fire suppression systems as part of the larger medical center renovation project.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SUPPRESSION GENERAL NOTES

1. THE FIRE PROTECTION CONTRACTOR SHALL USE NFPA-13 (CURRENT EDITION), CHAPTER 27, “PLANS AND

CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION OF AUTOMATIC SPRINKLER

SYSTEM.

2. THE FIRE PROTECTION CONTRACTOR SHALL COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED

EDITION). INSTALLATION SHALL MEET THE REQUIREMENTS OF THE VA.

3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR PROPOSED LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS

FOR THE APPROPRIATE HAZARD CLASSIFICATION.

4. THIS FACILITY SHALL BE A TOTALLY SPRINKLERED BUILDING. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS

REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13

AND VA STANDARDS.

6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HYDRAULICALLY CALCULATE SPRINKLER REQUIREMENTS PER THE APPROPRIATE HAZARD OCCUPANCY AND PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND

OPERABLE SYSTEM IN ACCORDANCE WITH NFPA AND VA REQUIREMENTS.

7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW AND PRESSURE AVAILABLE TO THE FACILITY. FIRE PROTECTION CONTRACTOR SHALL INCLUDE IN THEIR BID, ALL COSTS ASSOCIATED WITH FLOW TEST. SUBMIT HYDRAULIC CALCULATIONS AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR

REVIEW.

8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.

SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES

TO AVOID CONFLICT.

9. REFER TO SPECIFICATION SECTIONS IN DIVISION 21 FOR ADDITIONAL INFORMATION PERTAINING TO THE FIRE

PROTECTION SYSTEM.

10. SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS AT

PRIMARY BUILDING STRUCTURAL MEMBERS.

11. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS PER NFPA REQUIREMENTS.

12. DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT, AND OTHER

DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.

13. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO SHOW OR DESCRIBE ALL

WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF CONTRACT DOCUMENTS.

14. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

15. INCLUDE IN BID PERMIT, INSPECTION, AND OTHER FEES REQUIRED BY LOCAL MUNICIPALITY OR VA REQUIRED FOR

COMPLETION OF WORK SO NO ADDITIONAL EXPENSES ARE INTRODUCED TO VA.

16. PROMPTLY INFORM THE COR, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL LAWS AND REGULATIONS. PERFORM WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL

COST TO THE VA.

17. FIRE PROTECTION CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A PROFESSIONAL ENGINEER. THE SUBMITTAL SHALL BE SENT TO THE VA FOR REVIEW AND APPROVAL. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.

18. PROVIDE FIRESTOPPING/ SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

19. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH

LINES. ARMOVER SUPPORTS SHALL COMPLY WITH NFPA13.

20. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONVENTIONAL INSTALLATION.

21. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS, CORRIDORS

OR CEILING TILE.

FIRE PROTECTION CONTRACTOR

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINE FPCFL

TAMPER SWITCH

FLOW SWITCH

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

ORDINARY HAZARD

GROUP 1 OCCUPANCY

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS

KEYNOTE

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER POINT OF NEW CONNECTION

POINT OF TERMINATION/CAP

BACKFLOW PREVENTER

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS

AND VALVES PRIOR TO THE START OF WORK.

2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. THE CONTRACTOR SHALL GIVE THE VA THREE (3) WEEKS NOTICE PRIOR TO THE PLANNED SHUTDOWN OR INTERRUPTION.

3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

4. ALL FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING SHALL BE TAKEN

OFFSITE AND DISPOSED OF.

BUILDING AND OCCUPANT SAFETY -

INTERRUPTION OF FIRE PROTECTION SERVICE

1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS DOWN AND OUT OF COMMISSION, THE FIRE PROTECTION CONTRACTOR SHALL HAVE SUFFICIENT

PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY PER VA REQUIREMENTS.

2. A FIRE PROTECTION WATCH IS IMPLEMENTED TO ENSURE THE FIRE SAFETY OF A BUILDING IN THE EVENT OF ANY ACT, OR SITUATION INSTIGATING AN INCREASED RISK TO PERSONS OR PROPERTY. THE TERM “FIRE WATCH” IS USED TO DESCRIBE A DEDICATED PERSON OR PERSONS WHO’S SOLE RESPONSIBILITY IS TO LOOK FOR FIRES WITHIN AN

ESTABLISHED AREA.

3. IN THE OPINION OF THE FIRE AND LIFE-SAFETY GROUP (FLS) OF FACTORY MUTUAL (FM), ANY REQUIRED FIRE PROTECTION SYSTEM THAT IS OUT OF SERVICE FOR MORE THAN 4 HOURS AND OCCUPIED IS REQUIRED TO ESTABLISH A FIRE WATCH. FOR THE PERSON OR PERSONS ASSIGNED TO THE FIRE WATCH, THIS MUST BE THEIR ONLY JOB DUTY

DURING THE TIME PERIOD OF THE FIRE PROTECTION RENOVATION WORK.

4. THE OUT OF SERVICE EQUIPMENT MUST BE TAGGED “OUT OF SERVICE”. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION (REFERENCE INTERNATIONAL FIRE CODE- CHAPTER

9, SECTION 901.7).

5. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

6. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS

USE.

7. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

8. IN GENERAL, A FIRE WATCH IS TO FULFILL THE INTENT OF NFPA-72 AS FOLLOWS: 1. NOTIFY OCCUPANTS TO EVACUATE WHEN THERE IS A FIRE IN THE BUILDING; 2. NOTIFY THE CENTRAL MONITORING STATION TO INITIATE EMERGENCY PERSONNEL RESPONSE; 3. ACITVATE FIRE PROTECTION SYSTEMS IN ORDER TO RELEASE DOOR HOLDERS, CLOSE

SMOKE DAMPERS, AND SHUT DOWN FANS.

T&D

TS

FS

ORDINARY HAZARD

GROUP 2 OCCUPANCY

INFECTION CONTROL MEASURES

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN

DUST CONTROL PLAN.

2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE

MAINTAINED.

3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBOURNE OPPORTUNISTIC

PATHOGENS.

5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S

ACCEPTANCE.

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, ESPECIALLY CHAPTERS 6 (TYPES OF CONSTRUCTION) AND CHAPTER 9 (FIRE

PROTECTION SYSTEMS), NFPA 13 (CHAPTER 8), AND THE PROJECT SPECIFICATIONS

FOR OTHER FIRE PROTECTION REQUIREMENTS.

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE: HANGING DETAILS SHOWN ARE SUBJECT

TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILTI QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

UPRIGHT HEAD

SPRINKLER BRANCH LINE

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

UPRIGHT HEAD.

PROVIDE GAURD.

NOTES:

1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTOIN OVER 48" IN WIDTH.

2. COORDINATE WITH THE HVAC AND GENERAL CONTRACTOR.

3. INCLUDE COST OF ADDITIONAL SUPPORTS, AS REQUIRED. ADDITIONAL SUPPORTS SHALL BE IN

FULL CONFORMANCE WITH NFPA REQUIREMENTS. ADDITIONAL SUPPORTS SHALL NOT BE HUNG

FROM DUCT WORK.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL AS

REQUIRED.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

UL AND FM-APPROVED FIRESTOPPING

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE: MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF

CONCRETE OR CMU WALLS SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC

REQUIREMENTS.

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HAED

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:4

A

M

FX001

FIRE PROTECTION GENERAL

INFORMATION

1 3JT/SM

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM/PLH

Scale: N.T.S.

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: N.T.S.

PIPE HANGER SUPPORT DETAIL

Scale: N.T.S.

SPRINKLER ABOVE AND BELOW DUCT DETAIL

Scale: N.T.S.

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL

Scale: N.T.S.

TYPICAL SEMI-RECESSED PENDENT SPRINKLER

DocuSign Envelope ID: 5031BAE7-940A-4160-ADF6-B089AC0BA15C

5/26/2021

EXAM

2E25A

EXAM

2E25

OFFICE

2E23

WAITING

ROOM

2E26

OFFICE

2E27

OFFICE

2E22

TOILET

2E22A

TOILET

2E28

EXAM

2E29

TOILET

2E25B TOILET

2E24

EXAM

2E21

OFFICE

2E20

CHASE

CH-E-1

OFFICE

2CO5

STORAGE

2CO6

ELEVATOR

NO. 2

E2

OFFICE

2CO8

OFFICE

2CO9

CONFERENCE

ROOM

2CO7

OFFICE

2CO3

THERAPY

2CO2

OFFICE

2CO4

CORRIDOR

H210

STAIR

S201

HAC

2E01

ROOF BELOW

ROOF BELOW

EXAM

2C11

PHONE CLO.

2C11A

WAITING

2C01

RECEPTION

2C01A

EXAM

2C01B

IRM

2C10A

OIT

2C10

8.1

K M N P Q

R S T U V

FL

FL

1'' FIRE PROTECTION

DRAIN

(TYP.)

1FL

41" FL

1 1 1

1(TYP.)

1 (TYP.)

/1 FD101/1 FD101

MATCH LINE MATCH LINE

HAC

2E01

R.3 T.1 T.2 U.1

R T U V

FL1(TYP.)

1 (TYP.)

2'' FL DN

1 1/2'' FL UP

MATCH LINE MATCH LINE

/2 FD101/2 FD101

EX. 2'' FL FROM 1ST

FLR TO REMAIN

EX. FIRE DEPARTMENT

VALVE CABINET AND FIRE

EXTINGUISHER TO REMAIN

1. CONTRACTOR SHALL FIELD VERIFY THE

LOCATION AND QUANTITY OF EXISTING

SPRINKLER HEADS. CONTRACTOR SHALL

FIELD VERIFY SIZE AND ROUTE OF EXISTING

SPRINKLER PIPING.

2. SPRINKLER PIPING DEMOLITION SHALL BE

PHASED TO MAINTAIN COVERAGE

THROUGHOUT CONSTRUCTION. TURN UP

EXISTING SPRINKLERS HEADS IN

DEMOLISHED CEILING AREAS AND MAINTAIN

COVERAGE. WHERE SPRINKLERS CANNOT

BE USED FOR COVERAGE PROVIDE A FIRE

WATCH AS SPECIFIED IN SECTION 211313.

3. PROVIDE TEMPORARY SUPPORTS FOR ALL

EXITING UTILITIES SHOWN TO REMAIN IN

ORDER TO PERFORM THE WORK SHOWN ON

THE ‘HA’ SERIES DRAWINGS. ONCE THE ‘HA’

SERIES WORK IS COMPLETED, REMOVE THE

TEMPORARY SUPPORTS AND SUPPORT THE

UTILITIES IN ACCORDANCE WITH THE

DRAWINGS AND SPECIFICATIONS.

4. FIRESTOP AT NEW AND EXISTING

PENETRATIONS THROUGH FIRE-RATED

WALL, FLOOR AND CEILING ASSEMBLIES.

PROVIDE SMOKE SEALING AT NEW AND

EXISTING PENETRATIONS THROUGH SMOKE-

RATED WALL, FLOOR AND CEILING

ASSEMBLIES. COMPLY WITH DIVISION 07

SPECIFICATIONS. WHERE A PIPE OR OTHER

ELEMENT PENETRATING A FIRE- AND/OR

SMOKE-RATED ASSEMBLY IS DEMOLISHED,

PATCH/REPAIR THE ASSEMBLY TO MATCH

THE FIRE AND/OR SMOKE RATING.

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RATED

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:4

A

M

FD101

SECOND FLOOR FIRE PROTECTION

DEMOLITION PLAN

2 3JT/SM

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM/PLH

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

NORTH FIRE PROTECTION DEMOLITION PLAN

Scale: 1/8" = 1'-0"

SOUTH FIRE PROTECTION DEMOLITION PLAN

NORTH

0 4 8 16

NORTH

0 4 8 16

1 DEMOLISH FIRE PROTECTION SPRINKLER

HEADS AND BRANCH PIPING, TYPICAL ALL

ROOMS WITHIN AREA OF WORK.

2 EXISTING FIRE LINE TO REMAIN.

3 EXISTING MAIN TO CORRIDOR/WEST TO

REMAIN.

4 DEMOLISH FIRE PROTECTION MAIN PIPING

TO POINT INDICATED AT LIMITS OF

DEMOLITION. MAKE READY FOR NEW

CONNECTION.

5 EXISTING SIDEWALL SPRINKLER HEAD IN

STAIRWELL TO REMAIN. MAINTAIN

SPRINKLER COVERAGE IN STAIRWELL

THROUGHOUT CONSTRUCTION.

6 EXISTING SPRINKLER ZONE CONTROL

VALVE TO REMAIN.

8.1

K M N P Q

R S T U V

CLASSROOM

2E28

CLASSROOM

2E27

CORRIDOR

H205

GROUP ROOM 1A

2E26A

GROUP ROOM 1B

2E26B

GROUP ROOM 2A

2E25A

GROUP ROOM 2B

2E25B

CORRIDOR

H203

COPY AREA

2E23

OFFICE

2E24

RECEPTION

2E22

WAITING

2E21

CONSULT

2E20

WOMEN'S RESTROOM

2C07B

OFFICE

2C06

PROVIDER OFFICE

2C05

ELEV LOBBY

H206

STAIR S201

H208

CORRIDOR

H207 FL

1'' FIRE PROTECTION

DRAIN

FL

1 (TYP.)

1 (TYP.)

1 (TYP.)

OPEN OFFICE

2C09

OPEN OFFICE

2C08

MEN'S RESTROOM

2C07A

OFFICE

2C02A

OFFICE

2C02B

OFFICE

2C03

OFFICE

2C04A

OFFICE

2C04B

CORRIDOR

H204

STORAGE

2E26C

STORAGE

2E25C

FL

FL

HAC

2E01

MATCH LINEMATCH LINE

/1 FX101/1 FX101

R.3 T.1 T.2 U.1

R T U V

HAC

2E01

CONSULT

2E20

PAT TLT

2E02

CONSULT

2E19

PAT TLT

2E03

CONSULT

2E18

CONSULT

2E04

CONSULT

2E17

CHIRO EXAM

2E05

CHIRO EXAM

2E16

CHIRO EXAM

2E06

CHIRO EXAM

2E15

SOILED

2E07

MEDS

2E14

CLEAN UTILITY

2E08

EXAM

2E13

ACUPUNCTURE

2E09

MASSAGE

2E12

ACUPUNCTURE

2E10

MEDITATION

2E11

CORRIDOR

H201

CORRIDOR

H202

2'' FL DN

1 1/2'' FL UP

1 (TYP.)

FL

MATCH LINE MATCH LINE

/2 FX101 /2 FX101

EX. 2'' FL FROM

1ST FLR

EX. FIRE DEPARTMENT

VALVE CABINET AND FIRE

EXTINGUISHER

1. CONTRACTOR SHALL FIELD VERIFY THE

SIZES AND LOCATION OF ALL EXISTING

SPRINKLER PIPING.

2. FIRESTOP AT NEW AND EXISTING

PENETRATIONS THROUGH FIRE-RATED

WALL, FLOOR AND CEILING ASSEMBLIES.

PROVIDE SMOKE SEALING AT NEW AND

EXISTING PENETRATIONS THROUGH SMOKE-

RATED WALL, FLOOR AND CEILING

ASSEMBLIES. COMPLY WITH DIVISION 07

SPECIFICATIONS. WHERE A PIPE OR OTHER

ELEMENT PENETRATING A FIRE- AND/OR

SMOKE-RATED ASSEMBLY IS DEMOLISHED,

PATCH/REPAIR THE ASSEMBLY TO MATCH

THE FIRE AND/OR SMOKE RATING.

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

108 Benton Lodge Road Suite B Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Alex Kramer (APOGEE)

Joint Venture An Alliance for Success

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RATED

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

U.S. Department of Veterans Affairs#

S S S S

© COPYRIGHT Apogee - CEMS JV, LLC

JOHN A. JURGIEL & ASSOCIATES, INC.

123 N. Main Street (636)757-3060 St. Charles, MO. 63301 Jurgiel.com

JURGIEL

JOHN A. JURGIEL & ASSOCIATES, INC.

/2

/2

:2

:5

A

M

FX101

SECOND FLOOR FIRE PROTECTION

PLAN

3 3JT/SM

RENOVATE SPACE FOR

WHOLE HEALTH

1 JEFFERSON BARRACKS DR.,

ST LOUIS, MO 63125

MAY 28, 2021

BID DOCUMENTS

657-20-101JB19-335

RCM/PLH

NORTH

0 4 8 16

1 PROVIDE NEW SPRINKLER HEADS AND BRANCH

PIPING AS PER NEW LAYOUT.

2 PROVIDE NEW MAIN TO NORTH PORTION OF EAST

WING.

3 PROVIDE NEW MAIN TO SOUTH PORTION OF EAST

WING.

4 LIGHT HAZARD OCCUPANCY.

5 ORDINARY HAZARD GROUP 2 OCCUPANCY.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

SECOND FLOOR FIRE SUPRESSION PLAN NORTH

Scale: 1/8" = 1'-0"

SOUTH FIRE PROTECTION PLAN

NORTH

0 4 8 16

2021-05-26T07:57:24-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .