8-Attchment C1 Price Proposal.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 542713
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is a Price Proposal form for design-build services submitted to the City of Detroit Office of Contracting and Procurement (OCP) for the DPD Oakman Renovation project at the Detroit Police Department facility located at 1180 Oakman Boulevard in Michigan. The proposal is structured in two phases: Phase 1 encompasses design and permit drawings services, including drawings for Fire Alarm, Mechanical, and Elevator upgrades, with an associated awardee markup fee if applicable. Phase 2 addresses construction items and requires the respondent to provide pricing for a markup fee based on an anticipated construction cost of approximately $1,700,000, general conditions with specified duration and mobilization/staffing details, and insurance and bond costs.
The proposal requires fully burdened hourly labor rates for various construction manager positions, including Project Director, Project Manager, Project Superintendent, Project Engineer, Project Estimator, Accounting, Clerical, Journeyman for General Contractor, and other positions as needed. All fields in Column B are calculated automatically and must not be edited. The form is designed to capture comprehensive pricing information across both design services and construction phases, with line items left blank for the respondent to complete with proposed costs.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| DPD 1180 Oakman Price Proposal | |||
| DO NOT EDIT ANY OF THE B COLUMNS - THESE ARE CALCULATED FIELDS | |||
| Phase 1: | |||
| Design Services Fee | Anticipated Duration/Hours | Comments | |
| A. Design and Permit Drawings | $ - 0 | - 0 | As needed Permit drawings for Fire Alarm, Mechanical, and Elevator Upgrade |
| Awardee Mark up Fee for Phase 1 if applicalbe and/or not included in A | $ - 0 | ||
| Phase 1 Sub Total: | $ - 0 |
| Phase 2: Construction | ||
| Items | Value - Costs | Comments |
| 1. Mark Up Fee | $ - 0 | if construction cost is approx. $1,700,000.00 |
| 2. General Conditions - specify duration | $ - 0 | Also, note the constructin duration of the GC's, This is to include mobilization and staffing. |
| 3. Insurance and Bond | $ - 0 |
| Construction Manager's Project Personnel | *Hourly Rate* | *Provide Fully Burdened Labor Rates* |
| Project Director | $ - 0 | |
| Project Manager | $ - 0 | |
| Project Superintendent | $ - 0 | |
| Project Engineer | $ - 0 | |
| Project Estimator | $ - 0 | |
| Accounting | $ - 0 | |
| Clerical | $ - 0 | |
| Journeyman for General Contractor | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 |