24-HVAC Building A and C.pdf
PDF 1 MB Posted
- Solicitation number
- 542713
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is a schematic design document for HVAC renovations at the City of Detroit's Detroit Police Department facility located at 1180 Oakman Boulevard, involving Buildings A and C. The proposed work includes installation of new exhaust systems for shower rooms (120C and 120D in Building A), replacement of the HVAC control system, and replacement of grilles as specified. Building A encompasses multiple floors with designated areas including offices, mechanical rooms, locker rooms, interview spaces, and support facilities, while Building C includes armory spaces, offices, corridors, and drive aisles. The schematic design review was issued on January 30, 2025, with floor plans provided at a scale of 3/32 inches equals 1 foot, covering the first and second floors of Building A and the main floor of Building C. General notes indicate that no special HVAC requirements are assumed for certain armory spaces (101, 102, 103), with the design of Armory 104 to be completed by others and not included in the current contract scope.
The document does not contain specific pricing information, contract award dates, response deadlines, or other commercial terms. The schematic design represents an early phase of the project development process and serves as a foundation for detailed design and eventual construction. No information regarding incumbents, funding sources, set-asides, or renewal options is included in this technical drawing package.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALKWAY ABOVE WALKWAY ABOVE
NOT IN CONTRACT
CORR.
120B
VEST
119E
CLO
119D
CLO
119C
MENS
TOILET
119B
WOMENS
TOILET
119A
LOBBY
120G
OFFICE
120S
TOILET
120F
TOILET
120E
SHOWER
120D
SHOWER
120C
BREAK
ROOM
120H
GYM
120A
VESTIBULE
OFFICE
OFFICE
MECH
CLO
115A
OFFICE
STAIR
STAIR
POLICE
RECORDS
TEL/COM
113B
MECHANICAL
ROOM
113A
DPD
RECORDS
ROOM
MECHANICAL
ROOM
ELECTRICAL
ROOM
TEL/COM
121C
ELEV.
EQUIP.
CLO.
102D
OPEN
OFFICE
TOILET
100D
INTERVIEW
001C
LOBBY
100B
VEST.
100A
STAIR
OFFICE
121B OFFICE
121A
OFFICE
CONF.
MECH
VEST
103E
CLO
103D
CLO
103C
MENS
TOILET
103B
WOMENS
TOILET
103A
TOI
102G
TOI
102F
VEST.
102E
OFFICE
102COFFICE
102B
OFFICE
102A
DoIT
RECORDS
106B
DoIT
RECORDS
BREAK
ROOM
109B
KITCH
109A
STAIR
OFFICE
107A
DoIT
RECORDS
OFFICE
108A
DoIT
RECORDS
OFFICE
108B
DoIT
RECORDS
OFFICE
108C
VEST.
107B
DoIT
RECORDS
106A
NOT IN SCOPE
1180 OAKMAN
SHEET NO.
FILE NO.
APPROVED
CHECKED
DRAWN BY
SCALE:
SHEET TITLE
DATEISSUED FOR
BUILDING C
BUILDING A
DETROIT, MI 48204
RENOVATIONS
DPD OAKMAN
BUILDING A
PROPOSED HVAC
FIRST FLOOR PLAN
AS NOTED
MH-201
SCHEMATIC DESIGN REVIEW 01/30/2025
SCALE:
BUILDING A FIRST FLOOR HVAC
3/32"=1'-0"
1. SCOPE OF WORK INCLUDES:
HVAC GENERAL NOTES:
NEW EXHAUST SYSTEM FOR NEW SHOWER ROOMS 120C.D
REPLACEMENT OF CONTROL SYSTEM
REPLACEMENT OF GRILLES ONLY*
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
TRUE NORTH
OPEN TO BELOW
OPEN TO BELOW
889 SQ. FT.
1,116 SQ. FT.
867 SQ. FT.
STO.
OFFICE
221K
OFFICE
221J
OFFICE
221H
OFFICE
OFFICE
221GOFFICE
221F
OFFICE
221E
OFFICE
221D
OFFICE
221C
OFFICE
221B
OFFICE
221A
OPEN
OFFICE
219OFFICE
OPEN
OFFICE
MENS
TOILET
216B
STAIR
IT
CLO.
212B
MECHANICAL
WALKWAY
230B
WALKWAY
230A
VEST
216E
CLO
216D
CLO
216C
WOMENS
TOILET
216A
OPEN
OFFICE
OPEN
OFFICE
OPEN
OFFICE
OPEN
OFFICE
212A
STAIR
STAIR
MECHANICAL
STORAGE
211 MECHANICAL
STAIR
OPEN
OFFICE
OPEN
OFFICE
WALKWAY
230D
WALKWAY
230C
OPEN
OFFICE
WOMENS
LOCKER
ROOM
VEST
205E
CLO
205D
CLO
205C
MENS
TOILET
205B
WOMENS
TOILET
205A
MENS
LOCKER
ROOM
BREAK
ROOM
203C
OFFICE
203OFFICE
203A
STO
202B
OPEN
OFFICE
202A
TASER
STO.
LOBBY
200B
NOT IN SCOPE
1180 OAKMAN
SHEET NO.
FILE NO.
APPROVED
CHECKED
DRAWN BY
SCALE:
SHEET TITLE
DATEISSUED FOR
BUILDING C
BUILDING A
DETROIT, MI 48204
RENOVATIONS
DPD OAKMAN
BUILDING A
PROPOSED HVAC
SECOND FLOOR PLAN
AS NOTED
MH-202
SCHEMATIC DESIGN REVIEW 01/30/2025
SCALE:
BUILDING A SECOND FLOOR HVAC
3/32"=1'-0"
1. SCOPE OF WORK INCLUDES:
HVAC GENERAL NOTES:
NEW EXHAUST SYSTEM FOR NEW SHOWER ROOMS 120C.D
REPLACEMENT OF CONTROL SYSTEM
REPLACEMENT OF GRILLES ONLY*
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
TRUE NORTH
WOMEN
CLOSET
LOBBY
MEN
OPEN
OFFICE
CLOSET
CORR.
CORR.
CORR.
IT.
CLOSET
CLOSET
IT. CLOSET
BREAK
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OPEN
OFFICE
OPEN
OFFICE
DRIVE
AISLE
DRIVE
AISLE
CORRIDOR
DRIVE
AISLE
ARMORY
ARMORY
ARMORY
OFFICE
VEST.
TOILET
TOILET
ARMORY
VEST.
10987654321
A
A.2
B
C
D
T
T
ECUH-1
T
RTU-1
RTU-2
T
T
NOT IN SCOPE
UP TO
ROOFEF
RTU-5RTU-4
UP TO
ROOFEF
UP TO
ROOF
RTU-3
DRIVE
AISLE
1180 OAKMAN
SHEET NO.
FILE NO.
APPROVED
CHECKED
DRAWN BY
SCALE:
SHEET TITLE
DATEISSUED FOR
BUILDING C
BUILDING A
DETROIT, MI 48204
RENOVATIONS
DPD OAKMAN
BUILDING C
PROPOSED HVAC
FLOOR PLAN
AS NOTED
MH-210
SCHEMATIC DESIGN REVIEW 01/30/2025
SCALE:
BUILDING C FIRST FLOOR HVAC
3/32"=1'-0"
1. WE ASSUME NO SPECIAL HVAC REQUIREMENTS
FOR ARMORY 101, 102, 103
HVAC GENERAL NOTES:
2. DESIGN OF ARMORY 104 BY OTHERS- NIC
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
TRUE NORTH
bautistar Polygon Sketch to Scale
0.97 sf bautistar Architect
NOTE IN SCOPE
| Sheets and Views |
| MH-201 |
| Sheets and Views |
| M-202 |
| Sheets and Views |
| MH-210 |
File details come from the government source that posted it. Updated .