This is a price proposal form for design-build services requested by the City of Detroit Office of Contracting and Procurement for the Detroit Police Department facility renovation located at 1180 Oakman Boulevard in Michigan. The proposal is structured in two phases: Phase 1 covers design and permit drawings for fire alarm, mechanical, and elevator upgrades, with an option for a markup fee if applicable; Phase 2 addresses construction items and general conditions. The form requests bidders to provide hourly rates for multiple construction manager personnel positions including project director, project manager, project superintendent, project engineer, project estimator, accounting, clerical, journeyman, and other labor categories, with all rates to be fully burdened labor costs.
The price proposal template includes line items for Phase 1 design services fees with anticipated duration and hours noted as needed, a Phase 1 subtotal, and Phase 2 construction costs with a markup fee referenced against an anticipated construction cost of approximately $1,700,000. Bidders must specify general conditions duration and include mobilization and staffing costs, as well as provide insurance and bond costs. The spreadsheet notes that column B contains calculated fields and should not be edited by respondents. All pricing fields in the provided document appear blank, indicating this is the template form awaiting bidder completion.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| DPD 1180 Oakman Price Proposal | |||
| DO NOT EDIT ANY OF THE B COLUMNS - THESE ARE CALCULATED FIELDS | |||
| Phase 1: | |||
| Design Services Fee | Anticipated Duration/Hours | Comments | |
| A. Design and Permit Drawings | $ - 0 | - 0 | As needed Permit drawings for Fire Alarm, Mechanical, and Elevator Upgrade |
| Awardee Mark up Fee for Phase 1 if applicalbe and/or not included in A | $ - 0 | ||
| Phase 1 Sub Total: | $ - 0 |
| Phase 2: Construction | ||
| Items | Value - Costs | Comments |
| 1. Mark Up Fee | $ - 0 | if construction cost is approx. $1,700,000.00 |
| 2. General Conditions - specify duration | $ - 0 | Also, note the constructin duration of the GC's, This is to include mobilization and staffing. |
| 3. Insurance and Bond | $ - 0 |
| Construction Manager's Project Personnel | *Hourly Rate* | *Provide Fully Burdened Labor Rates* |
| Project Director | $ - 0 | |
| Project Manager | $ - 0 | |
| Project Superintendent | $ - 0 | |
| Project Engineer | $ - 0 | |
| Project Estimator | $ - 0 | |
| Accounting | $ - 0 | |
| Clerical | $ - 0 | |
| Journeyman for General Contractor | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 | |
| Others: | $ - 0 |