25-Electrical Building A.pdf
PDF 10 MB Posted
- Solicitation number
- 542713
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This document comprises electrical construction drawings and specifications for Building A at the City of Detroit Police Department facility located at 1180 Oakman Boulevard in Detroit, Michigan. The project involves comprehensive electrical work including power distribution systems, branch circuit wiring, grounding systems, lighting installations, and temporary electrical power for construction purposes. The electrical drawings span multiple sheets detailing electrical plans for the first and second floors, lighting plans, one-line diagrams, panel schedules, conduit routing, and grounding details. The specifications establish standards for materials, equipment quality, installation methods, testing procedures, and workmanship in accordance with the National Electrical Code (NEC) and local codes. All electrical equipment must bear UL or ETL labels, and conductors are specified as soft annealed copper insulated for 600 volts using THHN or THWN insulation types. The contractor is responsible for all cutting, patching, excavating, backfilling, concrete work, and removal of debris, with all work to be completed to leave the area broom-clean upon project completion.
Safety switches must be enclosed heavy-duty type with quick-make and quick-break mechanisms, mounted between 3 and 6 feet above finished floors, with manufacturers limited to Square D, Siemens, or Eaton Cutler-Hammer. Panelboards shall be enclosed dead-front safety type with rectangular solid copper bus bars, and the electrical contractor is required to balance circuit loads across phases and provide typed, complete directory cards identifying circuits by actual building room numbers rather than contract drawing designations. The contractor must submit five sets of shop drawings for equipment including safety switches, power distribution panels, panelboards, receptacles, wire, and conduit, with all submissions requiring approval stamps from the general contractor or subcontractor before submission to the architect and engineer. A one-year warranty period is required from the date of building opening for all work and materials except lamps, with the contractor obligated to remedy any defects developing during this guarantee period at no additional cost to the owner.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
SEAL
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T ɸ
ABBREVIATIONS
NOTES
ELECTRICAL POWER SYMBOLS LIGHTING SYMBOLSELECTRICAL ONE-LINE SYMBOLS
SCALE:
SITE LOCATION MAP
NTS
E-100 N SCALE:
ELECTRICAL SHEET INDEX
NTS
E-000
CITY OF DETROIT
1180 OAKMAN BLVD
DETROIT, MICHIGAN
SCALE:
SITE LOCATION MAP
NTS
E-000 N
E.000
E L E
C T
R
IC
A L
IN
D
E X
L E
G E
N D
A
B B
R E
V
IA
T
IO
N S
N
O T
E S
AutoCAD SHX Text GENERAL DUPLEX RECEPTACLE QUAD RECEPTACLE GFI RECEPTACLE WEATHER PROOF/WATER PROOF RECEPTACLE 220V RECEPTACLE DISCONNECT SAFETY SWITCH CEILING-MOUNTED JUNCTION BOX TELECOM DATA JACK
AutoCAD SHX Text
GFI
AutoCAD SHX Text
WP
AutoCAD SHX Text SINGLE POLE LIGHT SWITCH 3-WAY LIGHT SWITCH LIGHT DIMMER SWITCH WALL-MOUNTED OCCUPANCY SWITCH EXIT SIGN COMBINATION EXIT SIGN EMERGENCY LIGHT EMERGENCY REMOTE LIGHT FIXTURE 2' x 2' RECESSED LIGHT FIXTURE 2' X 4' RECESSED LIGHT FIXTURE DOWNLIGHT FIXTURE WALL MOUNTED LIGHT FIXTURE STRIP LIGHT
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
OS
AutoCAD SHX Text M
AutoCAD SHX Text
UTILITY METER TRANSFORMER CIRCUIT BREAKER MOTOR FUSED SWITCH
AutoCAD SHX Text
LODGE FWY.
AutoCAD SHX Text
HUGHES
AutoCAD SHX Text
WILSON
AutoCAD SHX Text
IDAHO
AutoCAD SHX Text
PARKS
AutoCAD SHX Text
WABASH
AutoCAD SHX Text
OAKMAN
AutoCAD SHX Text
INDIANDALE
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
MUIRLAND
AutoCAD SHX Text
WILDEMERE
AutoCAD SHX Text
PARKSIDE
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
PASADENA
AutoCAD SHX Text
DORIS
AutoCAD SHX Text
KENDALL
AutoCAD SHX Text
EWALD
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
OAKMAN CT.
AutoCAD SHX Text
FLEET
AutoCAD SHX Text
LASALLE CT.
AutoCAD SHX Text
LINWOOD
AutoCAD SHX Text
WAVERLY
AutoCAD SHX Text
14TH
AutoCAD SHX Text
MONTVILLE
AutoCAD SHX Text
MONTVILLE
AutoCAD SHX Text
ROSA PARKS BLVD.
AutoCAD SHX Text
LASALLE
AutoCAD SHX Text
LINWOOD
AutoCAD SHX Text
FORD
AutoCAD SHX Text
LABELLE
AutoCAD SHX Text
KENDALL
AutoCAD SHX Text
OAKMAN BLVD.
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
AutoCAD SHX Text A AMPERE AMPERE ACT ABOVE COUNTER TOP ABOVE COUNTER TOP AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE ABOVE FINISHED GRADE AIC AMPERE INTERUPPTING CURRENT AMPERE INTERUPPTING CURRENT ATS AUTOMATIC TRANSFER SWITCH AUTOMATIC TRANSFER SWITCH BATT BATTERY BATTERY C CONDUIT CONDUIT CB CIRCUIT BREAKER CIRCUIT BREAKER CKT CIRCUIT CIRCUIT CP CONTROL PANEL CONTROL PANEL CR CARD READER CARD READER DCP DOOR CONTROL PANEL DOOR CONTROL PANEL DS DISCONNECT SWITCH DISCONNECT SWITCH EBU EMERGENCY BATTERY UNIT EMERGENCY BATTERY UNIT EC ELECTRICAL CONTRACTOR ELECTRICAL CONTRACTOR EM EMERGENCY EMERGENCY EQUIP EQUIPMENT EQUIPMENT EV ELECTRIC VEHICLE ELECTRIC VEHICLE EWC ELECTRIC WATER COOLER ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER ELECTRIC WATER HEATER EXIST. EXISTING EXISTING F FUSE/FUSED FUSE/FUSED GC GENERAL CONTRACTOR GENERAL CONTRACTOR GND GROUND GROUND GFCI GROUND FAULT CIRCUIT INTERUPPTER GROUND FAULT CIRCUIT INTERUPPTER HP HORSEPUMP HORSEPUMP HVAC HEATING VENTILATING & AIR CONDITIONING HEATING VENTILATING & AIR CONDITIONING IG ISOLATED GROUND ISOLATED GROUND JB JUNCTION BOX JUNCTION BOX KVA KILO-VOLT AMPERE KILO-VOLT AMPERE KW KILOWATT KILOWATT LTG LIGHTING LIGHTING LP LIGHTING PANEL LIGHTING PANEL MCA MINIMUM CIRCUIT AMPS MINIMUM CIRCUIT AMPS MC METAL CLAD METAL CLAD MCB MAIN CIRCUIT BREAKER MAIN CIRCUIT BREAKER MFR MANUFACTURER MANUFACTURER MLO MAIN LUGS ONLY MAIN LUGS ONLY MTD MOUNTED MOUNTED NEC NATIONAL ELECTRIC CODE NATIONAL ELECTRIC CODE NF NONFUSED NONFUSED NIC NOT IN CONTRACT NOT IN CONTRACT NL NIGHT LIGHT NIGHT LIGHT NTS NOT TO SCALE NOT TO SCALE OS OCCUPANCY SENSOR OCCUPANCY SENSOR P POLE POLE PF POWER FACTOR POWER FACTOR PNL PANEL PANEL PNLBD PANELBOARD PANELBOARD PHASE PHASE PRI PRIMARY PRIMARY RECP RECEPTACLE RECEPTACLE RP RECEPTACLE PANEL RECEPTACLE PANEL SE SERVICE ENTRANCE SERVICE ENTRANCE SEC SECONDARY SECONDARY SW SWITCH SWITCH TBB TELEPHONE BACKBOARD TELEPHONE BACKBOARD TR TAMPER RESISTANT TAMPER RESISTANT TVSS TRANSIENT VOLTAGE SURGE SUPPRESSER TRANSIENT VOLTAGE SURGE SUPPRESSER TYP TYPICAL TYPICAL UG UNDERGROUND UNDERGROUND UON UNLESS OTHERWISE NOTED UNLESS OTHERWISE NOTED UT UTILITY TRANSFORMER UTILITY TRANSFORMER V VOLTS VOLTS VAC VOLTS ALTERNATING CURRENT VOLTS ALTERNATING CURRENT VDC VOLTS DIRECT CURRENT VOLTS DIRECT CURRENT W WATTS/ WIRE WATTS/ WIRE WP WEATHERPROOF WEATHERPROOF XFMR TRANSFORMER TRANSFORMER %Z PERCENT IMPEDENCEPERCENT IMPEDENCE
AutoCAD SHX Text GENERAL: UNLESS SPECIFICALLY INDICATED OTHERWISE, UNLESS SPECIFICALLY INDICATED OTHERWISE, UNLESS SPECIFICALLY INDICATED OTHERWISE, UNLESS SPECIFICALLY INDICATED OTHERWISE, SPECIFICALLY INDICATED OTHERWISE, SPECIFICALLY INDICATED OTHERWISE, INDICATED OTHERWISE, INDICATED OTHERWISE, OTHERWISE, OTHERWISE, ALL WORK SHOWN ON THE ELECTRICAL DRAWINGS IS NEW WORK SHOWN ON THE ELECTRICAL DRAWINGS IS NEW WORK SHOWN ON THE ELECTRICAL DRAWINGS IS NEW SHOWN ON THE ELECTRICAL DRAWINGS IS NEW SHOWN ON THE ELECTRICAL DRAWINGS IS NEW ON THE ELECTRICAL DRAWINGS IS NEW ON THE ELECTRICAL DRAWINGS IS NEW THE ELECTRICAL DRAWINGS IS NEW THE ELECTRICAL DRAWINGS IS NEW ELECTRICAL DRAWINGS IS NEW ELECTRICAL DRAWINGS IS NEW DRAWINGS IS NEW DRAWINGS IS NEW IS NEW IS NEW NEW NEW WORK TO BE PROVIDED UNDER THIS CONTRACT. COORDINATION: COORDINATE AND COOPERATE WITH ALL : COORDINATE AND COOPERATE WITH ALL COORDINATE AND COOPERATE WITH ALL COORDINATE AND COOPERATE WITH ALL AND COOPERATE WITH ALL AND COOPERATE WITH ALL COOPERATE WITH ALL COOPERATE WITH ALL WITH ALL WITH ALL ALL ALL TRADES ON THE PROJECT. RECORD DRAWINGS: SECURE AN EXTRA SET OF DRAWINGS: SECURE AN EXTRA SET OF DRAWINGS: SECURE AN EXTRA SET OF SECURE AN EXTRA SET OF SECURE AN EXTRA SET OF AN EXTRA SET OF AN EXTRA SET OF EXTRA SET OF EXTRA SET OF SET OF SET OF OF OF ELECTRICAL DRAWINGS TO BE KEPT ON SITE AND MARK, DRAWINGS TO BE KEPT ON SITE AND MARK, DRAWINGS TO BE KEPT ON SITE AND MARK, TO BE KEPT ON SITE AND MARK, TO BE KEPT ON SITE AND MARK, BE KEPT ON SITE AND MARK, BE KEPT ON SITE AND MARK, KEPT ON SITE AND MARK, KEPT ON SITE AND MARK, ON SITE AND MARK, ON SITE AND MARK, SITE AND MARK, SITE AND MARK, AND MARK, AND MARK, MARK, MARK, DAILY, THE DRAWINGS IN RED AS THE PROJECT THE DRAWINGS IN RED AS THE PROJECT THE DRAWINGS IN RED AS THE PROJECT DRAWINGS IN RED AS THE PROJECT DRAWINGS IN RED AS THE PROJECT IN RED AS THE PROJECT IN RED AS THE PROJECT RED AS THE PROJECT RED AS THE PROJECT AS THE PROJECT AS THE PROJECT THE PROJECT THE PROJECT PROJECT PROJECT PROGRESSES IN ORDER TO KEEP AN ACCURATE RECORD IN ORDER TO KEEP AN ACCURATE RECORD IN ORDER TO KEEP AN ACCURATE RECORD ORDER TO KEEP AN ACCURATE RECORD ORDER TO KEEP AN ACCURATE RECORD TO KEEP AN ACCURATE RECORD TO KEEP AN ACCURATE RECORD KEEP AN ACCURATE RECORD KEEP AN ACCURATE RECORD AN ACCURATE RECORD AN ACCURATE RECORD ACCURATE RECORD ACCURATE RECORD RECORD RECORD OF ALL DEVIATIONS BETWEEN THE WORK SHOWN ON THE ALL DEVIATIONS BETWEEN THE WORK SHOWN ON THE ALL DEVIATIONS BETWEEN THE WORK SHOWN ON THE DEVIATIONS BETWEEN THE WORK SHOWN ON THE DEVIATIONS BETWEEN THE WORK SHOWN ON THE BETWEEN THE WORK SHOWN ON THE BETWEEN THE WORK SHOWN ON THE THE WORK SHOWN ON THE THE WORK SHOWN ON THE WORK SHOWN ON THE WORK SHOWN ON THE SHOWN ON THE SHOWN ON THE ON THE ON THE THE THE DRAWINGS AND THE WORK WHICH IS ACTUALLY INSTALLED. AND THE WORK WHICH IS ACTUALLY INSTALLED. AND THE WORK WHICH IS ACTUALLY INSTALLED. THE WORK WHICH IS ACTUALLY INSTALLED. THE WORK WHICH IS ACTUALLY INSTALLED. WORK WHICH IS ACTUALLY INSTALLED. WORK WHICH IS ACTUALLY INSTALLED. WHICH IS ACTUALLY INSTALLED. WHICH IS ACTUALLY INSTALLED. IS ACTUALLY INSTALLED. IS ACTUALLY INSTALLED. ACTUALLY INSTALLED. ACTUALLY INSTALLED. INSTALLED. INSTALLED. THESE MARKED DRAWINGS SHALL REFLECT ANY AND ALL MARKED DRAWINGS SHALL REFLECT ANY AND ALL MARKED DRAWINGS SHALL REFLECT ANY AND ALL DRAWINGS SHALL REFLECT ANY AND ALL DRAWINGS SHALL REFLECT ANY AND ALL SHALL REFLECT ANY AND ALL SHALL REFLECT ANY AND ALL REFLECT ANY AND ALL REFLECT ANY AND ALL ANY AND ALL ANY AND ALL AND ALL AND ALL ALL ALL CHANGES AND REVISIONS TO THE ORIGINAL DESIGN WHICH AND REVISIONS TO THE ORIGINAL DESIGN WHICH AND REVISIONS TO THE ORIGINAL DESIGN WHICH REVISIONS TO THE ORIGINAL DESIGN WHICH REVISIONS TO THE ORIGINAL DESIGN WHICH TO THE ORIGINAL DESIGN WHICH TO THE ORIGINAL DESIGN WHICH THE ORIGINAL DESIGN WHICH THE ORIGINAL DESIGN WHICH ORIGINAL DESIGN WHICH ORIGINAL DESIGN WHICH DESIGN WHICH DESIGN WHICH WHICH WHICH EXISTS IN THE COMPLETED WORK. DELIVER THE MARKED IN THE COMPLETED WORK. DELIVER THE MARKED IN THE COMPLETED WORK. DELIVER THE MARKED THE COMPLETED WORK. DELIVER THE MARKED THE COMPLETED WORK. DELIVER THE MARKED COMPLETED WORK. DELIVER THE MARKED COMPLETED WORK. DELIVER THE MARKED WORK. DELIVER THE MARKED WORK. DELIVER THE MARKED DELIVER THE MARKED DELIVER THE MARKED DELIVER THE MARKED THE MARKED THE MARKED MARKED MARKED DRAWINGS TO THE ARCHITECT/ENGINEER AT PROJECT TO THE ARCHITECT/ENGINEER AT PROJECT TO THE ARCHITECT/ENGINEER AT PROJECT THE ARCHITECT/ENGINEER AT PROJECT THE ARCHITECT/ENGINEER AT PROJECT ARCHITECT/ENGINEER AT PROJECT ARCHITECT/ENGINEER AT PROJECT AT PROJECT AT PROJECT PROJECT PROJECT CLOSE-OUT. TESTS: TEST ALL WIRING FOR CONTINUITY AND GROUNDS TEST ALL WIRING FOR CONTINUITY AND GROUNDS TEST ALL WIRING FOR CONTINUITY AND GROUNDS ALL WIRING FOR CONTINUITY AND GROUNDS ALL WIRING FOR CONTINUITY AND GROUNDS WIRING FOR CONTINUITY AND GROUNDS WIRING FOR CONTINUITY AND GROUNDS FOR CONTINUITY AND GROUNDS FOR CONTINUITY AND GROUNDS CONTINUITY AND GROUNDS CONTINUITY AND GROUNDS AND GROUNDS AND GROUNDS GROUNDS GROUNDS BEFORE CONNECTING ANY FIXTURES OR DEVICES. PERFORM CONNECTING ANY FIXTURES OR DEVICES. PERFORM CONNECTING ANY FIXTURES OR DEVICES. PERFORM ANY FIXTURES OR DEVICES. PERFORM ANY FIXTURES OR DEVICES. PERFORM FIXTURES OR DEVICES. PERFORM FIXTURES OR DEVICES. PERFORM OR DEVICES. PERFORM OR DEVICES. PERFORM DEVICES. PERFORM DEVICES. PERFORM PERFORM PERFORM INSULATION RESISTANCE TESTS ON ALL WIRING #8 OR RESISTANCE TESTS ON ALL WIRING #8 OR RESISTANCE TESTS ON ALL WIRING #8 OR TESTS ON ALL WIRING #8 OR TESTS ON ALL WIRING #8 OR ON ALL WIRING #8 OR ON ALL WIRING #8 OR ALL WIRING #8 OR ALL WIRING #8 OR WIRING #8 OR WIRING #8 OR #8 OR #8 OR OR OR LARGER TO ENSURE THAT ALL PORTIONS ARE FREE FROM TO ENSURE THAT ALL PORTIONS ARE FREE FROM TO ENSURE THAT ALL PORTIONS ARE FREE FROM ENSURE THAT ALL PORTIONS ARE FREE FROM ENSURE THAT ALL PORTIONS ARE FREE FROM THAT ALL PORTIONS ARE FREE FROM THAT ALL PORTIONS ARE FREE FROM ALL PORTIONS ARE FREE FROM ALL PORTIONS ARE FREE FROM PORTIONS ARE FREE FROM PORTIONS ARE FREE FROM ARE FREE FROM ARE FREE FROM FREE FROM FREE FROM FROM FROM SHORT-CIRCUITS AND GROUNDS. INSPECTIONS: ARRANGE ALL NECESSARY INSPECTIONS. : ARRANGE ALL NECESSARY INSPECTIONS. ARRANGE ALL NECESSARY INSPECTIONS. ARRANGE ALL NECESSARY INSPECTIONS. ALL NECESSARY INSPECTIONS. ALL NECESSARY INSPECTIONS. NECESSARY INSPECTIONS. NECESSARY INSPECTIONS. INSPECTIONS. INSPECTIONS. DELIVER ALL REQUIRED INSPECTION CERTIFICATES TO THE ALL REQUIRED INSPECTION CERTIFICATES TO THE ALL REQUIRED INSPECTION CERTIFICATES TO THE REQUIRED INSPECTION CERTIFICATES TO THE REQUIRED INSPECTION CERTIFICATES TO THE INSPECTION CERTIFICATES TO THE INSPECTION CERTIFICATES TO THE CERTIFICATES TO THE CERTIFICATES TO THE TO THE TO THE THE THE OWNER. GROUNDING: PROVIDE GROUNDING IN ACCORDANCE WITH : PROVIDE GROUNDING IN ACCORDANCE WITH PROVIDE GROUNDING IN ACCORDANCE WITH PROVIDE GROUNDING IN ACCORDANCE WITH GROUNDING IN ACCORDANCE WITH GROUNDING IN ACCORDANCE WITH IN ACCORDANCE WITH IN ACCORDANCE WITH ACCORDANCE WITH ACCORDANCE WITH WITH WITH THE NEC FOR THE ELECTRICAL SYSTEM INCLUDING NEC FOR THE ELECTRICAL SYSTEM INCLUDING NEC FOR THE ELECTRICAL SYSTEM INCLUDING FOR THE ELECTRICAL SYSTEM INCLUDING FOR THE ELECTRICAL SYSTEM INCLUDING THE ELECTRICAL SYSTEM INCLUDING THE ELECTRICAL SYSTEM INCLUDING ELECTRICAL SYSTEM INCLUDING ELECTRICAL SYSTEM INCLUDING SYSTEM INCLUDING SYSTEM INCLUDING INCLUDING INCLUDING EQUIPMENT FRAMES CONDUITS, SWITCHES, CONTROLLERS, FRAMES CONDUITS, SWITCHES, CONTROLLERS, FRAMES CONDUITS, SWITCHES, CONTROLLERS, CONDUITS, SWITCHES, CONTROLLERS, CONDUITS, SWITCHES, CONTROLLERS, SWITCHES, CONTROLLERS, SWITCHES, CONTROLLERS, CONTROLLERS, CONTROLLERS, WIRE-WAYS, NEUTRAL CONDUCTORS, AND OTHER NEUTRAL CONDUCTORS, AND OTHER NEUTRAL CONDUCTORS, AND OTHER CONDUCTORS, AND OTHER CONDUCTORS, AND OTHER AND OTHER AND OTHER OTHER OTHER EQUIPMENT. PROVIDE AN EQUIPMENT GROUNDING PROVIDE AN EQUIPMENT GROUNDING PROVIDE AN EQUIPMENT GROUNDING AN EQUIPMENT GROUNDING AN EQUIPMENT GROUNDING EQUIPMENT GROUNDING EQUIPMENT GROUNDING GROUNDING GROUNDING CONDUCTOR IN ALL POWER CIRCUITS. LABELS: PROVIDE LABELS FOR ALL PANELBOARDS, PROVIDE LABELS FOR ALL PANELBOARDS, PROVIDE LABELS FOR ALL PANELBOARDS, LABELS FOR ALL PANELBOARDS, LABELS FOR ALL PANELBOARDS, FOR ALL PANELBOARDS, FOR ALL PANELBOARDS, ALL PANELBOARDS, ALL PANELBOARDS, PANELBOARDS, PANELBOARDS, CABINETS, SAFETY SWITCHES, MOTOR-DISCONNECT SAFETY SWITCHES, MOTOR-DISCONNECT SAFETY SWITCHES, MOTOR-DISCONNECT SWITCHES, MOTOR-DISCONNECT SWITCHES, MOTOR-DISCONNECT MOTOR-DISCONNECT MOTOR-DISCONNECT SWITCHES, AND MOTOR CONTROLLERS. LABELS SHALL BE AND MOTOR CONTROLLERS. LABELS SHALL BE AND MOTOR CONTROLLERS. LABELS SHALL BE MOTOR CONTROLLERS. LABELS SHALL BE MOTOR CONTROLLERS. LABELS SHALL BE CONTROLLERS. LABELS SHALL BE CONTROLLERS. LABELS SHALL BE LABELS SHALL BE LABELS SHALL BE SHALL BE SHALL BE BE BE MACHINE ENGRAVED, LAMINATED PLASTIC, PERMANENTLY ENGRAVED, LAMINATED PLASTIC, PERMANENTLY ENGRAVED, LAMINATED PLASTIC, PERMANENTLY LAMINATED PLASTIC, PERMANENTLY LAMINATED PLASTIC, PERMANENTLY PLASTIC, PERMANENTLY PLASTIC, PERMANENTLY PERMANENTLY PERMANENTLY ATTACHED WITH SELF-TAPPING SCREWS OR RIVETS. DO WITH SELF-TAPPING SCREWS OR RIVETS. DO WITH SELF-TAPPING SCREWS OR RIVETS. DO SELF-TAPPING SCREWS OR RIVETS. DO SELF-TAPPING SCREWS OR RIVETS. DO SCREWS OR RIVETS. DO SCREWS OR RIVETS. DO OR RIVETS. DO OR RIVETS. DO RIVETS. DO RIVETS. DO DO DO NOT USE SELF-ADHESIVE LABELS. J-BOX LABELING: LABEL ALL JUNCTION BOXES WITH LABELING: LABEL ALL JUNCTION BOXES WITH LABELING: LABEL ALL JUNCTION BOXES WITH : LABEL ALL JUNCTION BOXES WITH LABEL ALL JUNCTION BOXES WITH LABEL ALL JUNCTION BOXES WITH ALL JUNCTION BOXES WITH ALL JUNCTION BOXES WITH JUNCTION BOXES WITH JUNCTION BOXES WITH BOXES WITH BOXES WITH WITH WITH PERMANENT MARKER IDENTIFYING CIRCUIT NUMBER AND MARKER IDENTIFYING CIRCUIT NUMBER AND MARKER IDENTIFYING CIRCUIT NUMBER AND IDENTIFYING CIRCUIT NUMBER AND IDENTIFYING CIRCUIT NUMBER AND CIRCUIT NUMBER AND CIRCUIT NUMBER AND NUMBER AND NUMBER AND AND AND PANELBOARD OF CIRCUITS WITHIN. PANEL DIRECTORY: PROVIDE TYPEWRITTEN PANELBOARD DIRECTORY: PROVIDE TYPEWRITTEN PANELBOARD DIRECTORY: PROVIDE TYPEWRITTEN PANELBOARD : PROVIDE TYPEWRITTEN PANELBOARD PROVIDE TYPEWRITTEN PANELBOARD PROVIDE TYPEWRITTEN PANELBOARD TYPEWRITTEN PANELBOARD TYPEWRITTEN PANELBOARD PANELBOARD PANELBOARD DIRECTORY CARD IN EACH PANELBOARD INCLUDING CARD IN EACH PANELBOARD INCLUDING CARD IN EACH PANELBOARD INCLUDING IN EACH PANELBOARD INCLUDING IN EACH PANELBOARD INCLUDING EACH PANELBOARD INCLUDING EACH PANELBOARD INCLUDING PANELBOARD INCLUDING PANELBOARD INCLUDING INCLUDING INCLUDING EXISTING PANELBOARDS MODIFIED FOR THIS PROJECT WITH PANELBOARDS MODIFIED FOR THIS PROJECT WITH PANELBOARDS MODIFIED FOR THIS PROJECT WITH MODIFIED FOR THIS PROJECT WITH MODIFIED FOR THIS PROJECT WITH FOR THIS PROJECT WITH FOR THIS PROJECT WITH THIS PROJECT WITH THIS PROJECT WITH PROJECT WITH PROJECT WITH WITH WITH CIRCUIT LOAD INFORMATION AND ROOM NUMBER CLEARLY LOAD INFORMATION AND ROOM NUMBER CLEARLY LOAD INFORMATION AND ROOM NUMBER CLEARLY INFORMATION AND ROOM NUMBER CLEARLY INFORMATION AND ROOM NUMBER CLEARLY AND ROOM NUMBER CLEARLY AND ROOM NUMBER CLEARLY ROOM NUMBER CLEARLY ROOM NUMBER CLEARLY NUMBER CLEARLY NUMBER CLEARLY CLEARLY CLEARLY IDENTIFIED. USE ACTUAL ROOM NUMBERS IN THE BUILDING, USE ACTUAL ROOM NUMBERS IN THE BUILDING, USE ACTUAL ROOM NUMBERS IN THE BUILDING, ACTUAL ROOM NUMBERS IN THE BUILDING, ACTUAL ROOM NUMBERS IN THE BUILDING, ROOM NUMBERS IN THE BUILDING, ROOM NUMBERS IN THE BUILDING, NUMBERS IN THE BUILDING, NUMBERS IN THE BUILDING, IN THE BUILDING, IN THE BUILDING, THE BUILDING, THE BUILDING, BUILDING, BUILDING, NOT THE ROOM NUMBERS SHOWN ON THE CONTRACT THE ROOM NUMBERS SHOWN ON THE CONTRACT THE ROOM NUMBERS SHOWN ON THE CONTRACT ROOM NUMBERS SHOWN ON THE CONTRACT ROOM NUMBERS SHOWN ON THE CONTRACT NUMBERS SHOWN ON THE CONTRACT NUMBERS SHOWN ON THE CONTRACT SHOWN ON THE CONTRACT SHOWN ON THE CONTRACT ON THE CONTRACT ON THE CONTRACT THE CONTRACT THE CONTRACT CONTRACT CONTRACT DRAWINGS, AS THEY ARE OFTEN DIFFERENT. CONNECTION DETAILS: SECURE APPROVED SHOP DRAWINGS DETAILS: SECURE APPROVED SHOP DRAWINGS DETAILS: SECURE APPROVED SHOP DRAWINGS SECURE APPROVED SHOP DRAWINGS SECURE APPROVED SHOP DRAWINGS APPROVED SHOP DRAWINGS APPROVED SHOP DRAWINGS SHOP DRAWINGS SHOP DRAWINGS DRAWINGS DRAWINGS SHOWING WIRING DIAGRAMS, ROUGH-IN AND HOOK UP WIRING DIAGRAMS, ROUGH-IN AND HOOK UP WIRING DIAGRAMS, ROUGH-IN AND HOOK UP DIAGRAMS, ROUGH-IN AND HOOK UP DIAGRAMS, ROUGH-IN AND HOOK UP ROUGH-IN AND HOOK UP ROUGH-IN AND HOOK UP AND HOOK UP AND HOOK UP HOOK UP HOOK UP UP UP DETAILS FROM OTHER INVOLVED CONTRACTORS FOR FROM OTHER INVOLVED CONTRACTORS FOR FROM OTHER INVOLVED CONTRACTORS FOR OTHER INVOLVED CONTRACTORS FOR OTHER INVOLVED CONTRACTORS FOR INVOLVED CONTRACTORS FOR INVOLVED CONTRACTORS FOR CONTRACTORS FOR CONTRACTORS FOR FOR FOR EQUIPMENT WHICH MUST BE CONNECTED ELECTRICALLY. MOUNTING HEIGHTS: MOUNTING HEIGHTS INDICATED ARE HEIGHTS: MOUNTING HEIGHTS INDICATED ARE HEIGHTS: MOUNTING HEIGHTS INDICATED ARE MOUNTING HEIGHTS INDICATED ARE MOUNTING HEIGHTS INDICATED ARE HEIGHTS INDICATED ARE HEIGHTS INDICATED ARE INDICATED ARE INDICATED ARE ARE ARE FROM THE FINISHED FLOOR TO THE CENTERLINE OF THE THE FINISHED FLOOR TO THE CENTERLINE OF THE THE FINISHED FLOOR TO THE CENTERLINE OF THE FINISHED FLOOR TO THE CENTERLINE OF THE FINISHED FLOOR TO THE CENTERLINE OF THE FLOOR TO THE CENTERLINE OF THE FLOOR TO THE CENTERLINE OF THE TO THE CENTERLINE OF THE TO THE CENTERLINE OF THE THE CENTERLINE OF THE THE CENTERLINE OF THE CENTERLINE OF THE CENTERLINE OF THE OF THE OF THE THE THE WIRING DEVICE UNLESS OTHERWISE NOTED. MOUNTING DEVICE UNLESS OTHERWISE NOTED. MOUNTING DEVICE UNLESS OTHERWISE NOTED. MOUNTING UNLESS OTHERWISE NOTED. MOUNTING UNLESS OTHERWISE NOTED. MOUNTING OTHERWISE NOTED. MOUNTING OTHERWISE NOTED. MOUNTING NOTED. MOUNTING NOTED. MOUNTING MOUNTING MOUNTING HEIGHTS OF LIGHTING FIXTURES AND FIRE ALARM DEVICES OF LIGHTING FIXTURES AND FIRE ALARM DEVICES OF LIGHTING FIXTURES AND FIRE ALARM DEVICES LIGHTING FIXTURES AND FIRE ALARM DEVICES LIGHTING FIXTURES AND FIRE ALARM DEVICES FIXTURES AND FIRE ALARM DEVICES FIXTURES AND FIRE ALARM DEVICES AND FIRE ALARM DEVICES AND FIRE ALARM DEVICES FIRE ALARM DEVICES FIRE ALARM DEVICES ALARM DEVICES ALARM DEVICES DEVICES DEVICES ARE TO THE BOTTOM OF THE FIXTURE OR DEVICE UNLESS TO THE BOTTOM OF THE FIXTURE OR DEVICE UNLESS TO THE BOTTOM OF THE FIXTURE OR DEVICE UNLESS THE BOTTOM OF THE FIXTURE OR DEVICE UNLESS THE BOTTOM OF THE FIXTURE OR DEVICE UNLESS BOTTOM OF THE FIXTURE OR DEVICE UNLESS BOTTOM OF THE FIXTURE OR DEVICE UNLESS OF THE FIXTURE OR DEVICE UNLESS OF THE FIXTURE OR DEVICE UNLESS THE FIXTURE OR DEVICE UNLESS THE FIXTURE OR DEVICE UNLESS FIXTURE OR DEVICE UNLESS FIXTURE OR DEVICE UNLESS OR DEVICE UNLESS OR DEVICE UNLESS DEVICE UNLESS DEVICE UNLESS UNLESS UNLESS OTHERWISE NOTED. BARRIERS: WHERE A MULTIPLE GANG BOX HAS CIRCUITS : WHERE A MULTIPLE GANG BOX HAS CIRCUITS WHERE A MULTIPLE GANG BOX HAS CIRCUITS WHERE A MULTIPLE GANG BOX HAS CIRCUITS A MULTIPLE GANG BOX HAS CIRCUITS A MULTIPLE GANG BOX HAS CIRCUITS MULTIPLE GANG BOX HAS CIRCUITS MULTIPLE GANG BOX HAS CIRCUITS GANG BOX HAS CIRCUITS GANG BOX HAS CIRCUITS BOX HAS CIRCUITS BOX HAS CIRCUITS HAS CIRCUITS HAS CIRCUITS CIRCUITS CIRCUITS OF DIFFERENT VOLTAGES OR SYSTEMS WHICH ARE DIFFERENT VOLTAGES OR SYSTEMS WHICH ARE DIFFERENT VOLTAGES OR SYSTEMS WHICH ARE VOLTAGES OR SYSTEMS WHICH ARE VOLTAGES OR SYSTEMS WHICH ARE OR SYSTEMS WHICH ARE OR SYSTEMS WHICH ARE SYSTEMS WHICH ARE SYSTEMS WHICH ARE WHICH ARE WHICH ARE ARE ARE REQUIRED TO BE SEPARATED, PROVIDE THE TO BE SEPARATED, PROVIDE THE TO BE SEPARATED, PROVIDE THE BE SEPARATED, PROVIDE THE BE SEPARATED, PROVIDE THE SEPARATED, PROVIDE THE SEPARATED, PROVIDE THE PROVIDE THE PROVIDE THE THE THE CODE-REQUIRED SEPARATION USING A FULL HEIGHT AND SEPARATION USING A FULL HEIGHT AND SEPARATION USING A FULL HEIGHT AND USING A FULL HEIGHT AND USING A FULL HEIGHT AND A FULL HEIGHT AND A FULL HEIGHT AND FULL HEIGHT AND FULL HEIGHT AND HEIGHT AND HEIGHT AND AND AND DEPTH BARRIER PLATE. FIRE PROOFING: FOR ANY WALL OR FLOOR PENETRATIONS PROOFING: FOR ANY WALL OR FLOOR PENETRATIONS PROOFING: FOR ANY WALL OR FLOOR PENETRATIONS FOR ANY WALL OR FLOOR PENETRATIONS FOR ANY WALL OR FLOOR PENETRATIONS ANY WALL OR FLOOR PENETRATIONS ANY WALL OR FLOOR PENETRATIONS WALL OR FLOOR PENETRATIONS WALL OR FLOOR PENETRATIONS OR FLOOR PENETRATIONS OR FLOOR PENETRATIONS FLOOR PENETRATIONS FLOOR PENETRATIONS PENETRATIONS PENETRATIONS THROUGH FIRE RATED STRUCTURES PROVIDE FIRE RATED STRUCTURES PROVIDE FIRE RATED STRUCTURES PROVIDE RATED STRUCTURES PROVIDE RATED STRUCTURES PROVIDE STRUCTURES PROVIDE STRUCTURES PROVIDE PROVIDE PROVIDE FIRE-PROOFING TO SEAL ALL THE PENETRATIONS AFTER TO SEAL ALL THE PENETRATIONS AFTER TO SEAL ALL THE PENETRATIONS AFTER SEAL ALL THE PENETRATIONS AFTER SEAL ALL THE PENETRATIONS AFTER ALL THE PENETRATIONS AFTER ALL THE PENETRATIONS AFTER THE PENETRATIONS AFTER THE PENETRATIONS AFTER PENETRATIONS AFTER PENETRATIONS AFTER AFTER AFTER THE CONDUIT HAS BEEN INSTALLED. FIRE PROOFING FOR CONDUIT HAS BEEN INSTALLED. FIRE PROOFING FOR CONDUIT HAS BEEN INSTALLED. FIRE PROOFING FOR HAS BEEN INSTALLED. FIRE PROOFING FOR HAS BEEN INSTALLED. FIRE PROOFING FOR BEEN INSTALLED. FIRE PROOFING FOR BEEN INSTALLED. FIRE PROOFING FOR INSTALLED. FIRE PROOFING FOR INSTALLED. FIRE PROOFING FOR FIRE PROOFING FOR FIRE PROOFING FOR PROOFING FOR PROOFING FOR FOR FOR PENETRATIONS SHALL BE UL APPROVED PER THE SHALL BE UL APPROVED PER THE SHALL BE UL APPROVED PER THE BE UL APPROVED PER THE BE UL APPROVED PER THE UL APPROVED PER THE UL APPROVED PER THE APPROVED PER THE APPROVED PER THE PER THE PER THE THE THE PENETRATION MADE IN ORDER TO MAINTAIN FIRE RATED MADE IN ORDER TO MAINTAIN FIRE RATED MADE IN ORDER TO MAINTAIN FIRE RATED IN ORDER TO MAINTAIN FIRE RATED IN ORDER TO MAINTAIN FIRE RATED ORDER TO MAINTAIN FIRE RATED ORDER TO MAINTAIN FIRE RATED TO MAINTAIN FIRE RATED TO MAINTAIN FIRE RATED MAINTAIN FIRE RATED MAINTAIN FIRE RATED FIRE RATED FIRE RATED RATED RATED INTEGRITY OF THE STRUCTURE. CLEAN UP: ON PROJECT CLOSE-OUT, CLEAN ALL UP: ON PROJECT CLOSE-OUT, CLEAN ALL UP: ON PROJECT CLOSE-OUT, CLEAN ALL ON PROJECT CLOSE-OUT, CLEAN ALL ON PROJECT CLOSE-OUT, CLEAN ALL PROJECT CLOSE-OUT, CLEAN ALL PROJECT CLOSE-OUT, CLEAN ALL CLOSE-OUT, CLEAN ALL CLOSE-OUT, CLEAN ALL CLEAN ALL CLEAN ALL ALL ALL ELECTRICAL DEVICES, LIGHTING FIXTURES, LAMPS AND DEVICES, LIGHTING FIXTURES, LAMPS AND DEVICES, LIGHTING FIXTURES, LAMPS AND LIGHTING FIXTURES, LAMPS AND LIGHTING FIXTURES, LAMPS AND FIXTURES, LAMPS AND FIXTURES, LAMPS AND LAMPS AND LAMPS AND AND AND LENSES, AND REMOVE ALL PAINT SPATTERS FROM AND REMOVE ALL PAINT SPATTERS FROM AND REMOVE ALL PAINT SPATTERS FROM REMOVE ALL PAINT SPATTERS FROM REMOVE ALL PAINT SPATTERS FROM ALL PAINT SPATTERS FROM ALL PAINT SPATTERS FROM PAINT SPATTERS FROM PAINT SPATTERS FROM SPATTERS FROM SPATTERS FROM FROM FROM DEVICES, FIXTURES, AND PLATES. REPLACE ALL FIXTURES, AND PLATES. REPLACE ALL FIXTURES, AND PLATES. REPLACE ALL AND PLATES. REPLACE ALL AND PLATES. REPLACE ALL PLATES. REPLACE ALL PLATES. REPLACE ALL REPLACE ALL REPLACE ALL ALL ALL INOPERATIVE LAMPS. OWNER FURNISHED EQUIPMENT: CONTRACTOR SHALL FURNISHED EQUIPMENT: CONTRACTOR SHALL FURNISHED EQUIPMENT: CONTRACTOR SHALL EQUIPMENT: CONTRACTOR SHALL EQUIPMENT: CONTRACTOR SHALL : CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL OBTAIN CUT SHEETS, INSTALLATION DATA, AND ROUGH-IN CUT SHEETS, INSTALLATION DATA, AND ROUGH-IN CUT SHEETS, INSTALLATION DATA, AND ROUGH-IN SHEETS, INSTALLATION DATA, AND ROUGH-IN SHEETS, INSTALLATION DATA, AND ROUGH-IN INSTALLATION DATA, AND ROUGH-IN INSTALLATION DATA, AND ROUGH-IN DATA, AND ROUGH-IN DATA, AND ROUGH-IN AND ROUGH-IN AND ROUGH-IN ROUGH-IN ROUGH-IN REQUIREMENTS FOR OWNER FURNISHED, CONTRACTOR FOR OWNER FURNISHED, CONTRACTOR FOR OWNER FURNISHED, CONTRACTOR OWNER FURNISHED, CONTRACTOR OWNER FURNISHED, CONTRACTOR FURNISHED, CONTRACTOR FURNISHED, CONTRACTOR CONTRACTOR CONTRACTOR INSTALLED EQUIPMENT AND COORDINATE ROUGH-IN AND EQUIPMENT AND COORDINATE ROUGH-IN AND EQUIPMENT AND COORDINATE ROUGH-IN AND AND COORDINATE ROUGH-IN AND AND COORDINATE ROUGH-IN AND COORDINATE ROUGH-IN AND COORDINATE ROUGH-IN AND ROUGH-IN AND ROUGH-IN AND AND AND POWER REQUIREMENTS WITH THE OWNER'S REQUIREMENTS WITH THE OWNER'S REQUIREMENTS WITH THE OWNER'S WITH THE OWNER'S WITH THE OWNER'S THE OWNER'S THE OWNER'S OWNER'S OWNER'S REPRESENTATIVE PRIOR TO STARTING ANY ASSOCIATED PRIOR TO STARTING ANY ASSOCIATED PRIOR TO STARTING ANY ASSOCIATED TO STARTING ANY ASSOCIATED TO STARTING ANY ASSOCIATED STARTING ANY ASSOCIATED STARTING ANY ASSOCIATED ANY ASSOCIATED ANY ASSOCIATED ASSOCIATED ASSOCIATED WORK. CONDUIT ROUTING: ALL CONDUIT RUN OVERHEAD SHALL ROUTING: ALL CONDUIT RUN OVERHEAD SHALL ROUTING: ALL CONDUIT RUN OVERHEAD SHALL ALL CONDUIT RUN OVERHEAD SHALL ALL CONDUIT RUN OVERHEAD SHALL CONDUIT RUN OVERHEAD SHALL CONDUIT RUN OVERHEAD SHALL RUN OVERHEAD SHALL RUN OVERHEAD SHALL OVERHEAD SHALL OVERHEAD SHALL SHALL SHALL BE RUN AT THE BOTTOM OF THE FLOOR, ROOF RUN AT THE BOTTOM OF THE FLOOR, ROOF RUN AT THE BOTTOM OF THE FLOOR, ROOF AT THE BOTTOM OF THE FLOOR, ROOF AT THE BOTTOM OF THE FLOOR, ROOF THE BOTTOM OF THE FLOOR, ROOF THE BOTTOM OF THE FLOOR, ROOF BOTTOM OF THE FLOOR, ROOF BOTTOM OF THE FLOOR, ROOF OF THE FLOOR, ROOF OF THE FLOOR, ROOF THE FLOOR, ROOF THE FLOOR, ROOF FLOOR, ROOF FLOOR, ROOF ROOF ROOF STRUCTURE, OR LOWEST CHORD OF JOIST SPACE (AS OR LOWEST CHORD OF JOIST SPACE (AS OR LOWEST CHORD OF JOIST SPACE (AS LOWEST CHORD OF JOIST SPACE (AS LOWEST CHORD OF JOIST SPACE (AS CHORD OF JOIST SPACE (AS CHORD OF JOIST SPACE (AS OF JOIST SPACE (AS OF JOIST SPACE (AS JOIST SPACE (AS JOIST SPACE (AS SPACE (AS SPACE (AS (AS (AS APPLICABLE) ABOVE IN ORDER TO AVOID CONFLICTS WITH ABOVE IN ORDER TO AVOID CONFLICTS WITH ABOVE IN ORDER TO AVOID CONFLICTS WITH IN ORDER TO AVOID CONFLICTS WITH IN ORDER TO AVOID CONFLICTS WITH ORDER TO AVOID CONFLICTS WITH ORDER TO AVOID CONFLICTS WITH TO AVOID CONFLICTS WITH TO AVOID CONFLICTS WITH AVOID CONFLICTS WITH AVOID CONFLICTS WITH CONFLICTS WITH CONFLICTS WITH WITH WITH OTHER TRADES. WIRING DEVICES: ALL RECEPTACLES AND SWITCHES SHALL DEVICES: ALL RECEPTACLES AND SWITCHES SHALL DEVICES: ALL RECEPTACLES AND SWITCHES SHALL ALL RECEPTACLES AND SWITCHES SHALL ALL RECEPTACLES AND SWITCHES SHALL RECEPTACLES AND SWITCHES SHALL RECEPTACLES AND SWITCHES SHALL AND SWITCHES SHALL AND SWITCHES SHALL SWITCHES SHALL SWITCHES SHALL SHALL SHALL BE LABELED WITH PLASTIC LAMINATED LABEL WITH THE LABELED WITH PLASTIC LAMINATED LABEL WITH THE LABELED WITH PLASTIC LAMINATED LABEL WITH THE WITH PLASTIC LAMINATED LABEL WITH THE WITH PLASTIC LAMINATED LABEL WITH THE PLASTIC LAMINATED LABEL WITH THE PLASTIC LAMINATED LABEL WITH THE LAMINATED LABEL WITH THE LAMINATED LABEL WITH THE LABEL WITH THE LABEL WITH THE WITH THE WITH THE THE THE PANELBOARD DESIGNATION AND CIRCUIT NUMBER FROM DESIGNATION AND CIRCUIT NUMBER FROM DESIGNATION AND CIRCUIT NUMBER FROM AND CIRCUIT NUMBER FROM AND CIRCUIT NUMBER FROM CIRCUIT NUMBER FROM CIRCUIT NUMBER FROM NUMBER FROM NUMBER FROM FROM FROM WHICH IT IS FED. EQUIPMENT DEMONSTRATION: PROVIDE A DEMONSTRATION DEMONSTRATION: PROVIDE A DEMONSTRATION DEMONSTRATION: PROVIDE A DEMONSTRATION PROVIDE A DEMONSTRATION PROVIDE A DEMONSTRATION A DEMONSTRATION A DEMONSTRATION DEMONSTRATION DEMONSTRATION OF THE OPERATION OF ALL ELECTRICAL COMPONENTS THE OPERATION OF ALL ELECTRICAL COMPONENTS THE OPERATION OF ALL ELECTRICAL COMPONENTS OPERATION OF ALL ELECTRICAL COMPONENTS OPERATION OF ALL ELECTRICAL COMPONENTS OF ALL ELECTRICAL COMPONENTS OF ALL ELECTRICAL COMPONENTS ALL ELECTRICAL COMPONENTS ALL ELECTRICAL COMPONENTS ELECTRICAL COMPONENTS ELECTRICAL COMPONENTS COMPONENTS COMPONENTS UPON REQUEST OF THE OWNER. CEILING PLENUM: ALL REQUEST OF THE OWNER. CEILING PLENUM: ALL REQUEST OF THE OWNER. CEILING PLENUM: ALL OF THE OWNER. CEILING PLENUM: ALL OF THE OWNER. CEILING PLENUM: ALL THE OWNER. CEILING PLENUM: ALL THE OWNER. CEILING PLENUM: ALL OWNER. CEILING PLENUM: ALL OWNER. CEILING PLENUM: ALL CEILING PLENUM: ALL CEILING PLENUM: ALL PLENUM: ALL PLENUM: ALL ALL ALL WIRING THAT WILL NOT BE RUN IN CONDUIT SHALL BE THAT WILL NOT BE RUN IN CONDUIT SHALL BE THAT WILL NOT BE RUN IN CONDUIT SHALL BE WILL NOT BE RUN IN CONDUIT SHALL BE WILL NOT BE RUN IN CONDUIT SHALL BE NOT BE RUN IN CONDUIT SHALL BE NOT BE RUN IN CONDUIT SHALL BE BE RUN IN CONDUIT SHALL BE BE RUN IN CONDUIT SHALL BE RUN IN CONDUIT SHALL BE RUN IN CONDUIT SHALL BE IN CONDUIT SHALL BE IN CONDUIT SHALL BE CONDUIT SHALL BE CONDUIT SHALL BE SHALL BE SHALL BE BE BE PLENUM RATED. .
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.200
E L E
C T
R
IC
A L P
L A
N
S T
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 1st FLOOR
3/32" = 1"-0"
E-000
AutoCAD SHX Text H-1
AutoCAD SHX Text E.211
AutoCAD SHX Text
AutoCAD SHX Text
SD
AutoCAD SHX Text
XFMR LC
AutoCAD SHX Text
LP-HA
AutoCAD SHX Text
RP-LC
AutoCAD SHX Text
LP-HD
AutoCAD SHX Text
RP-LG
AutoCAD SHX Text
XFMR
AutoCAD SHX Text
UTILITY XFMR
AutoCAD SHX Text
XFMR LE
AutoCAD SHX Text
RP-LE
AutoCAD SHX Text E.210
AutoCAD SHX Text
AutoCAD SHX Text E.212
AutoCAD SHX Text
AutoCAD SHX Text E.213
AutoCAD SHX Text
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY EQUIPMENT, VERIFY EQUIPMENT, VERIFY VERIFY VERIFY MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C MINIMUM. ALL CONDUCTORS SHALL BE RATED FOR 90°C MINIMUM.4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.201
E L E
C T
R
IC
A L P
L A
N n d F
L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 2nd FLOOR
3/32"= 1'-0"
E-201
AutoCAD SHX Text
XFMR LF
AutoCAD SHX Text
RP-LF
AutoCAD SHX Text
XFMR LB
AutoCAD SHX Text
RP-LB
AutoCAD SHX Text H-1
AutoCAD SHX Text E.221
AutoCAD SHX Text
AutoCAD SHX Text
SD
AutoCAD SHX Text
XFMR LC
AutoCAD SHX Text
LP-HA
AutoCAD SHX Text
RP-LC
AutoCAD SHX Text
LP-HD
AutoCAD SHX Text
RP-LG
AutoCAD SHX Text
XFMR
AutoCAD SHX Text
UTILITY XFMR
AutoCAD SHX Text
XFMR LE
AutoCAD SHX Text
RP-LE
AutoCAD SHX Text E.220
AutoCAD SHX Text
AutoCAD SHX Text E.222
AutoCAD SHX Text
AutoCAD SHX Text E.223
AutoCAD SHX Text
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY EQUIPMENT, VERIFY EQUIPMENT, VERIFY VERIFY VERIFY MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C MINIMUM. ALL CONDUCTORS SHALL BE RATED FOR 90°C MINIMUM.4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.210
E L E
C T
R
IC
A L P
L A
N
S T
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 1st FLOOR
3/16" = 1"-0"
E-210
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text H-1
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
CR
AutoCAD SHX Text
CR
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY EQUIPMENT, VERIFY EQUIPMENT, VERIFY VERIFY VERIFY MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C MINIMUM. ALL CONDUCTORS SHALL BE RATED FOR 90°C MINIMUM.4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.211
E L E
C T
R
IC
A L P
L A
N
S T
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 1st FLOOR
3/16" = 1"-0"
E-211
AutoCAD SHX Text
XFMR LC
AutoCAD SHX Text
LP-HA
AutoCAD SHX Text
RP-LC
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text J
AutoCAD SHX Text
CR
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON FINAL LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON LOCATIONS OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON OF MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON MECHANICAL EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON EQUIPMENT SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PRIOR TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY TO PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY PURCHASE & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY & INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY INSTALLATION OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY OF EQUIPMENT, VERIFY EQUIPMENT, VERIFY EQUIPMENT, VERIFY VERIFY VERIFY MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C MINIMUM. ALL CONDUCTORS SHALL BE RATED FOR 90°C MINIMUM.4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE ALL CONDUCTORS SHALL BE AS NOTED ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.212
E L E
C T
R
IC
A L P
L A
N
S T
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 1st FLOOR
3/16" = 1"-0"
E-212
AutoCAD SHX Text
RP-LA
AutoCAD SHX Text
XFMR LA
AutoCAD SHX Text
UTILITY XFMR
AutoCAD SHX Text
LP-HB
AutoCAD SHX Text
ELP-HC
AutoCAD SHX Text
SITE LIGHTING
AutoCAD SHX Text
DP-1
AutoCAD SHX Text
DP-2
AutoCAD SHX Text
MAIN DISTRIBUTION PANEL
AutoCAD SHX Text
45KVA LD
AutoCAD SHX Text
XFMR
AutoCAD SHX Text
RP-LD
AutoCAD SHX Text
RP-LD2
AutoCAD SHX Text
INVERTER SWITCH
AutoCAD SHX Text
SITE CONTACTORS
AutoCAD SHX Text J
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
CR
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT FINAL LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT EQUIPMENT EQUIPMENT SHALL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL NOTED ON MECHANICAL NOTED ON MECHANICAL ON MECHANICAL ON MECHANICAL MECHANICAL MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF PRIOR TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF & INSTALLATION OF & INSTALLATION OF INSTALLATION OF INSTALLATION OF OF OF EQUIPMENT, VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' MANUFACTURERS' MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C ALL CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C BE RATED FOR 90 C BE RATED FOR 90 C RATED FOR 90 C RATED FOR 90 C FOR 90 C FOR 90 C 90 C 90°CMINIMUM. 4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON ALL CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.213
E L E
C T
R
IC
A L P
L A
N
S T
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 1st FLOOR
3/16" = 1"-0"
E-213
AutoCAD SHX Text
LP-HD
AutoCAD SHX Text
XFMR LE
AutoCAD SHX Text
RP-LE
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GFI
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text J
AutoCAD SHX Text J
AutoCAD SHX Text
CR
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT FINAL LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT EQUIPMENT EQUIPMENT SHALL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL NOTED ON MECHANICAL NOTED ON MECHANICAL ON MECHANICAL ON MECHANICAL MECHANICAL MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF PRIOR TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF & INSTALLATION OF & INSTALLATION OF INSTALLATION OF INSTALLATION OF OF OF EQUIPMENT, VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' MANUFACTURERS' MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C ALL CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C BE RATED FOR 90 C BE RATED FOR 90 C RATED FOR 90 C RATED FOR 90 C FOR 90 C FOR 90 C 90 C 90°CMINIMUM. 4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON ALL CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.220
E L E
C T
R
IC
A L P
L A
N n d
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 2nd FLOOR
3/16" = 1"-0"
E-220
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT FINAL LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT EQUIPMENT EQUIPMENT SHALL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL NOTED ON MECHANICAL NOTED ON MECHANICAL ON MECHANICAL ON MECHANICAL MECHANICAL MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF PRIOR TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF & INSTALLATION OF & INSTALLATION OF INSTALLATION OF INSTALLATION OF OF OF EQUIPMENT, VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' MANUFACTURERS' MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C ALL CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C BE RATED FOR 90 C BE RATED FOR 90 C RATED FOR 90 C RATED FOR 90 C FOR 90 C FOR 90 C 90 C 90°CMINIMUM. 4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON ALL CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.221
E L E
C T
R
IC
A L P
L A
N n d
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 2nd FLOOR
3/16" = 1"-0"
E-221
AutoCAD SHX Text
XFMR LB
AutoCAD SHX Text
RP-LB
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT FINAL LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT EQUIPMENT EQUIPMENT SHALL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL NOTED ON MECHANICAL NOTED ON MECHANICAL ON MECHANICAL ON MECHANICAL MECHANICAL MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF PRIOR TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF & INSTALLATION OF & INSTALLATION OF INSTALLATION OF INSTALLATION OF OF OF EQUIPMENT, VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' MANUFACTURERS' MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3. ALL CONDUCTORS SHALL BE RATED FOR 90 C ALL CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C CONDUCTORS SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C SHALL BE RATED FOR 90 C BE RATED FOR 90 C BE RATED FOR 90 C RATED FOR 90 C RATED FOR 90 C FOR 90 C FOR 90 C 90 C 90°CMINIMUM. 4. SEE SHEET E-502 FOR GROUNDING DETAILS. SEE SHEET E-502 FOR GROUNDING DETAILS. 5. ALL CONDUCTORS SHALL BE AS NOTED ON ALL CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON CONDUCTORS SHALL BE AS NOTED ON SHALL BE AS NOTED ON SHALL BE AS NOTED ON BE AS NOTED ON BE AS NOTED ON AS NOTED ON AS NOTED ON NOTED ON NOTED ON ON ON CONDUIT/CABLE SCHEDULE 6. SEE SHEET E-402 FOR PANEL SCHEDULE.SEE SHEET E-402 FOR PANEL SCHEDULE.
O
AK
M
AN
B
LV
D
D
ET
R O
IT
, M
I 4
C
IT
Y O
F D
E T
R O
IT
D
E T
R O
IT
P
O L
IC
E D
E P
A R
T M
E N
T
E.222
E L E
C T
R
IC
A L P
L A
N n d
F L O
O R
ELECTRICAL PLAN NOTES
SCALE:
ELECTRICAL PLAN - 2nd FLOOR
3/16" = 1"-0"
E-222
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
PRINTER
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
CR
AutoCAD SHX Text J
AutoCAD SHX Text
ISSUE DATES:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
G. GRAY
AutoCAD SHX Text
XX-XX-XXXX
AutoCAD SHX Text
DRAWINGS
AutoCAD SHX Text 01/24/2025
1. FINAL LOCATIONS OF MECHANICAL EQUIPMENT FINAL LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT LOCATIONS OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT OF MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT MECHANICAL EQUIPMENT EQUIPMENT EQUIPMENT SHALL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL BE AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL AS NOTED ON MECHANICAL NOTED ON MECHANICAL NOTED ON MECHANICAL ON MECHANICAL ON MECHANICAL MECHANICAL MECHANICAL DRAWINGS OR AS APPROVED BY OWNER. 2. PRIOR TO PURCHASE & INSTALLATION OF PRIOR TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF TO PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF PURCHASE & INSTALLATION OF & INSTALLATION OF & INSTALLATION OF INSTALLATION OF INSTALLATION OF OF OF EQUIPMENT, VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' VERIFY MANUFACTURERS' MANUFACTURERS' MANUFACTURERS' INSTALLATION REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO REQUIREMENTS. ADHERE TO ADHERE TO ADHERE TO ADHERE TO TO TO REQUIREMENTS. 3.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .