8-5. IFB 044-26-RM SUPPLEMENTAL INFORMATION.docx

DOCX document 14 KB Posted

Attached to
Pump Station 92 Replacement
Solicitation number
IFB-044-26-RM
Issued by
Leon County, Florida

About this file

This supplemental information document supports the Pump Station 92 Replacement Invitation for Bid (IFB 044-26-RM) in Florida and provides technical resources for contractor review. The project involves construction of a new quadruplex submersible pump station with above-ground valve array to replace the existing Pump Station 92 located at 6636 Buck Lake Rd. The scope of work encompasses deep foundations using micropiles for the wet well and bypass structure, grading, clearing, stormwater retention area construction with energy dissipator, driveway demolition and replacement, fencing and gate removal and replacement, landscaping, gravity sanitary sewer piping with manholes, force main piping, bypass pumping, erosion control, electrical and water service installation, generator installation, electrical/motor control equipment array and shade structure construction, demolition and decommissioning of the existing pump station, sheeting and shoring, dewatering, and production of as-builts and record drawings. A mandatory pre-bid meeting is scheduled for March 16, 2026 at 2:00 PM EST via Microsoft Teams. The contractor must maintain operation of the existing pump station during new construction and complete all work in a timely and first-class workmanlike manner.

The supplemental information includes two key technical documents provided for contractor reference: the Report of Geotechnical Investigation for Wet Well Construction dated February 10, 2026 (Appendix E) and the Pump Station 92 Subsurface Utility Engineering Test Hole Report dated April 11, 2025 (Appendix F), both available on Bonfire. The contractor is expressly responsible for locating existing utilities and examining soil conditions within the project area to determine their collective effects on the work, regardless of the inclusion of these supplemental documents.

View the file

Other files

File Type Posted
19-APPENDIX B - Pump Station 92 Replacement - FDEP Permit (0464185-001-DWC-CG).pdf PDF
6-3. IFB 044-26-RM SUPPLEMENTAL SPECIFICATIONS.pdf PDF
14-14. REQUIRED HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
20-APPENDIX D - Pump Station 92 Supplemental Technical Specifications - 2026.02.11.pdf PDF
5-2. IFB 044-26-RM GENERAL PROVISIONSONS.pdf PDF
21-APPENDIX E - Pump Station 92 Report of Geotechnical Investigation (2026-02-10).pdf PDF
2-7. REQUIRED BID SCHEDULE.pdf PDF
12-12. REQUIRED IFB Representations Certifications.docx DOCX document
3-9. REQUIRED OEV FORMS ITB MWBE Forms Updated 10.06.22.docx DOCX document
1-1. REQUIRED IFB SECTIONS 123.docx DOCX document
17-18. BID SCHEDULRE EXELL .xlsx XLSX spreadsheet
22-APPENDIX F - Pump Station 92 SUE Test Hole Report (4-11-2025).pdf PDF
16-17. REQUIRED Certification of a Drug Free Workplace (1).pdf PDF
4-8. REQUIRED PERFORMANCE BOND BID BOND TRENCH SAFETY FORMS.docx DOCX document
9-6. IFB 044-26-RM PLANS - 2026.02.24 SS.pdf PDF
10-10. REQUIRED Vendor Conflict of Interest.docx DOCX document
18-APPENDIX A - Pump Station 92 Replacement - LC EMP (LEM25015).pdf PDF
13-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
7-4. IFB 044-26-RM SPECIAL PROVISIONS.docx DOCX document
15-15 REQUIRED Responsible Vendor Review Form.docx DOCX document
11-11. REQUIRED Non Collusion Affidavit of Respondent.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL INFORMATION

The following documents are provided for the Contractor’s information and use, however the inclusion of these documents does not remedy or remove the Contractor's responsibility to locate existing utilities and to examine the soil conditions within the project area and to determine their collective effects on the work:

1. Report of Geotechnical Investigation – Wet Well Construction – Pump Station 92, EGS, 2-10-2026 (Appendix E)

2. Pump Station 92 Subsurface Utility Engineering Test Hole Report, SSMC, 4-11-2025 (Appendix F)

Appendix E-F on Bonfire

File details come from the government source that posted it. Updated .