About this file

This document is an Environmental Management Permit (EMP) issued by Leon County Department of Development Support and Environmental Management for the City of Tallahassee's Pump Station 92 Replacement project located at 6636 Buck Lake Road, Tallahassee, Florida. The permit (LEM25-015), issued on October 20, 2025, authorizes construction of infrastructure associated with replacing the existing Pump Station 92, including a new quadruplex submersible pump station design with above-ground valve array, deep foundations using micropiles, grading, clearing, stormwater retention area construction, driveway replacement, fencing modifications, landscaping, sanitary sewer piping with manholes, force main piping, bypass pumping systems, erosion control measures, electrical and water service, generator installation, and decommissioning of the existing pump station. The permit is valid for 36 months from issuance (expiring October 20, 2028) and requires a pre-construction conference with County Environmental Inspector Laurence Dickinson prior to work commencement. A mandatory pre-bid meeting is scheduled for March 16, 2026, at 2:00 PM EST via Microsoft Teams.

The permit includes total fees of $2,502.00 ($2,388.00 for Stormwater Standard Form and $114.00 for Environmental Tree Removal Permit), which have been fully paid. The City of Tallahassee is the permittee, with Abby Denhart listed as the permit holder. The permit requires compliance with Leon County Land Development Code Article IV, Chapter 10, posting of permit placards on-site, maintenance of approved plans on-site, notice of intent to proceed filed at least three working days prior to construction, designation of an environmental management officer in responsible charge, and adherence to Florida Sediment and Erosion Manual standards. Additional conditions include restrictions on construction hours (7:00 AM to 8:00 PM weekdays and Saturdays; 9:00 AM to 5:00 PM Sundays), procurement of all necessary federal, state, and local permits (including City of Tallahassee, FDEP, NWFWMD, and FDOT permits), protection of historic and archaeological resources, protection of critical root zones of protected trees, on-site use or approved disposal of excavated materials, water quality monitoring during dewatering activities (turbidity not exceeding 29 NTU, pH 6.5-8.5), and submission of record drawings, operating permit applications, and compliance certifications signed by a Florida-licensed professional engineer at least 20 days prior to final inspection request.

View the file

Other files

File Type Posted
10-10. REQUIRED Vendor Conflict of Interest.docx DOCX document
8-5. IFB 044-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
13-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
7-4. IFB 044-26-RM SPECIAL PROVISIONS.docx DOCX document
15-15 REQUIRED Responsible Vendor Review Form.docx DOCX document
11-11. REQUIRED Non Collusion Affidavit of Respondent.docx DOCX document
5-2. IFB 044-26-RM GENERAL PROVISIONSONS.pdf PDF
21-APPENDIX E - Pump Station 92 Report of Geotechnical Investigation (2026-02-10).pdf PDF
2-7. REQUIRED BID SCHEDULE.pdf PDF
12-12. REQUIRED IFB Representations Certifications.docx DOCX document
3-9. REQUIRED OEV FORMS ITB MWBE Forms Updated 10.06.22.docx DOCX document
1-1. REQUIRED IFB SECTIONS 123.docx DOCX document
17-18. BID SCHEDULRE EXELL .xlsx XLSX spreadsheet
22-APPENDIX F - Pump Station 92 SUE Test Hole Report (4-11-2025).pdf PDF
16-17. REQUIRED Certification of a Drug Free Workplace (1).pdf PDF
4-8. REQUIRED PERFORMANCE BOND BID BOND TRENCH SAFETY FORMS.docx DOCX document
9-6. IFB 044-26-RM PLANS - 2026.02.24 SS.pdf PDF
19-APPENDIX B - Pump Station 92 Replacement - FDEP Permit (0464185-001-DWC-CG).pdf PDF
6-3. IFB 044-26-RM SUPPLEMENTAL SPECIFICATIONS.pdf PDF
14-14. REQUIRED HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
20-APPENDIX D - Pump Station 92 Supplemental Technical Specifications - 2026.02.11.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reviewer Name Reviewer Email Reviewer Phone

Deji Ajose-Adeogun ajoseadeogund@leoncountyfl.gov -

Report Date: 10/20/2025 Description : The City of Tallahassee Underground Utilities and Public Infrastructure Engineering Division proposes to replace the existing Pump Station 92. EMP Standard Form Address : 6636 BUCK LAKE RD, Tallahassee, FL, 32317 Record Type : Environmental Permit Stormwater Standard Form Document Filename : Permit Card.pdf

Reviewer Contact Information:

Markups for this Approved Document or Plan

Review Report - Approved

Application Number: LEM25015

General Comments

LEON COUNTY

DEPARTMENT OF DEVELOPMENT SUPPORT AND ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL MANAGEMENT PERMIT

TO SPEAK TO AN ENVIRONMENTAL INSPECTOR, CALL (850) 606-1300.

PERMIT EXPIRES THIRTY-SIX (36) MONTHS FROM ISSUANCE PER ARTICLE 5, SECTION 7-41(4)(A)(1), ENVIRONMENTAL MANAGEMENT ACT

PERMIT EXPIRES: 10/20/2028

PERMIT #:

PROJECT NAME:

LEM25015

CoT Pump Station 92 Replace, 6636 Buck

Lake Rd

LOCATION: 6636 BUCK LAKE RD

Tallahassee, FL 32317

PERMITTEE: Abby Denhart

DATE ISSUED:

PARCEL TAX ID:

10/20/2025

121905 C0031

FEE INFORMATION

Stormwater Standard Form

Non-Res

2,388.00

Env Tree Removal Permit 114.00

TOTAL FEES:

TOTAL PAYMENTS

BALANCE:

2,502.00

2,502.00

0.00

Deji Ajose-Adeogun, P.E.

Director, Environmental Services Division

County Administrator's Designee

ACCEPTANCE OF THIS PERMIT ACKNOWLEDGES PERMISSIONS FOR LEON COUNTY PERSONNEL TO INSPECT AT

REASONABLE TIMES THE PROPERTY AND WORK ASCRIBED IN THIS PERMIT. FAILURE TO POST THE PERMIT PLACARD IN

A CONSPICUOUS PLACE ON-SITE OR FAILURE TO HAVE THE APPROVED PERMIT AND PLANS AVAILABLE ON-SITE MAY

RESULT IN THE IMMEDIATE ISSUANCE OF A STOP WORK ORDER.

Reviewer Name Reviewer Email Reviewer Phone

Deji Ajose-Adeogun ajoseadeogund@leoncountyfl.gov -

Report Date: 10/20/2025 Description : The City of Tallahassee Underground Utilities and Public Infrastructure Engineering Division proposes to replace the existing Pump Station 92. EMP Standard Form Address : 6636 BUCK LAKE RD, Tallahassee, FL, 32317 Record Type : Environmental Permit Stormwater Standard Form Document Filename : PAA.pdf

Reviewer Contact Information:

Markups for this Approved Document or Plan

Review Report - Approved

10/20/2025 LEM25-015 Page 1 of 7 (Pages are Two-Sided)

BOARD OF COUNTY COMMISSIONERS

LEON COUNTY

DEPARTMENT OF DEVELOPMENT SUPPORT AND ENVIRONMENTAL

MANAGEMENT

COT PUMP STATION 92

REPLACEMENT

ENVIRONMENTAL MANAGEMENT PERMIT

LEM25-015

A Pre-Construction Conference with the County Environmental Inspector is required.

(Contact Laurence Dickinson at 850-606-1358 or 850-544-0828 to schedule.)

This environmental management permit authorizes the construction (within the approved limits of cleaning) infrastructure (i.e., stormwater management system, etc.) associated with the proposed pump station replacement on parcel ID. No.: 121905 C0031 in Leon County, consistent with the attachments and exhibits identified below.

Attachment A: Permit Conditions Exhibit A: Approved Plans (Permit Plan Set) Exhibit B: Erosion Certification Exhibit C: Approved Stormwater Report

The permittee should be familiar with the permit conditions and all other attachments and exhibits included in this permit prior to the commencement of development activity. Failure to conform to this permit may cause appropriate enforcement action to be taken that could include a "Stop Work Order" or a "Notice of Violation".

Approved By:

Ayodeji Ajose-Adeogun, P.E., Director Date County Administrator Designee Environmental Services

BW

10/20/2025 LEM25-015 ATTACHMENT A Page 2 of 7

ATTACHMENT "A"

PERMIT CONDITIONS:

COT PUMP STATION 92 REPLACEMENT

GENERAL CONDITIONS:

1. The permittee shall conduct all development activity consistent with the "Environmental Management Act," Article IV, Chapter 10 of the Leon County Land Development Code. Reference Section 10-4.105.

2. Posting of placards. A placard indicating issuance of a valid permit shall be posted in a conspicuous place on site at all times during the development activity. Reference Section 10-4.203(c)(1).

3. Permit and plans on-site. A copy of the approved permit and plans (Exhibit "A" and subsequent approved contractor "Shop Drawings") shall be available on site at all times when any development activity is occurring on the site. Reference Section 10-4.203(c)(2).

4. Notice of intent to proceed. A notice of intent to proceed shall be filed with the County Administrator or designee at least three working days prior to initiation of any physical development activity on any site, except for development activity limited to that which has been permitted in relation to construction of a detached single-family residence, which shall require filing of a notice of intent to proceed within 24 hours prior to initiation of development activity. The notice shall specify the site location and the permit number applicable to the activity and shall specify the date and approximate time at which such physical development activity is to commence. Reference Section 10-4.203(c)(3).

5. Environmental Management Officer. The permittee shall designate, as part of the environmental management permit application, an individual to act as the environmental management officer for the project. Such individual shall be in responsible charge of all on-going work on the site and shall have sufficient familiarity with the project to ensure that all work is proceeding according to the approved plans and permit. The designated environmental management officer is not required to remain on the site at all times during all operations but must ensure that during such time as the officer is not personally present on the site a designated alternate person remains in responsible charge of the project. Reference Section 10- 4.203(c)(6).

6. Permit Expiration. Environmental management permits shall expire 36 months after issuance unless otherwise specified by the County Administrator or designee for master planned subdivisions or phased development projects. Reference Section 10-4.214(a)(1).

7. Extensions. Permits may be extended, by request of the applicant and approval of the County Administrator or designee, for successive periods of time not to exceed 36 months each, provided the request for extension is made prior to the expiration of the prior approval and provided continuous good faith efforts have been made to complete the development. Reference Section 10-4.214(a)(2).

8. Early expiration for cause. If no substantial and readily observable site development activity has taken place within 24 months of the issuance of the permit or, once development is started, if no such development activity occurs for any 24 consecutive months, the County Administrator or designee may, after notifying the permittee and providing an opportunity for hearing, determine the permit to be expired and shall so notify the permittee. Such a permit may not thereafter be extended. Reference Section 10-4.214(a)(3).

10/20/2025 LEM25-015 ATTACHMENT A Page 3 of 7

9. Effect of permit expiration. Once a permit has expired, no further development activity may proceed on the permitted development site unless and until a new permit application has been submitted and approved for the particular development site and activity. Reference Section 10-4.214(d).

10. Continued responsibility under expired permit. Permit expiration shall not, however, terminate the obligations of the permittee or property owner to ensure continued compliance with this code, or to complete and maintain the landscaping, trees, or stormwater management systems and facilities which were required for undertaking the development activities on the site. Where a permitted development activity has been commenced under a permit prior to the date of the permit's expiration, but has not received final inspection approval prior to such expiration, the developer, owner, or permittee of the development site may be cited for any violation of this code or of the permit and plans which had been approved for the development activity or site, and may be required to submit, and obtain the County Administrator or designee's approval of, a new environmental management permit application or an application for amendment of the expired permit, or to complete and maintain the landscaping, trees, or stormwater management systems and facilities which were required by the expired permits, as necessary to prevent significant adverse environmental impacts as a result of the development activity which has occurred on the site. Reference Section 10- 4.214(d).

11. Notice of transfer of permit. No later than ten days after the sale or legal transfer of property upon which a stormwater management facility has been, or is approved to be, constructed pursuant to a permit issued by the county, a notice of transfer of permit shall be submitted to the County Administrator or designee.

Reference Section 10-4.214(f)(1).

12. Transfer liability. Until a proper notice of permit transfer is provided to the County Administrator or designee, the permittee and any other person constructing, operating, or maintaining the permitted facility shall be liable for compliance with the terms of the permit. The permittee transferring the permit shall remain liable for corrective actions required as a result of any violations occurring prior to sale unless the new permittee obtains approval of the County Administrator or designee to specifically assume such obligations and provides to the County Administrator or designee written evidence in legal form of such assumption of obligations. For facilities that have received final inspection approval prior to the time of sale or legal transfer, the original permittee shall remain liable for performance of warranty obligations as set forth in section 10-4.209(d), absent an express assumption of liability as to such warranty obligations by the subsequent holder of the property. Reference Section 10-4.214(f)(2).

13. Amendments. Any minor change or deviation from the approved plans shall require an amendment to this permit. Substantial changes, including significant increases in impervious area, changes in intended land use, modification of stormwater management system, new phases of development, or other additions, shall not be treated as amendments, but shall require a new permit application. Reference Section 10-4.215.

14. During development. All environmental management controls and facilities shall be maintained in a manner which will ensure proper functioning and protection from unnecessary environmental degradation, throughout the development process. Reference Section 10-4.210(a).

15. Post-development. Upon completion of development activities and construction, the permittee shall ensure that each site is properly stabilized, and that swales and other stormwater management features shown in the permit are in place in a manner consistent with the permit, approved plans and specifications. Reference Section 10-4.210(b).

16. Post-construction inspection. Prior to requesting a final inspection by the director pursuant to section 10-

4.212(b)(3), the permittee shall cause a qualified professional personally to inspect the site and facilities and certify as provided for in Section 10-4.208(b). Reference Section 10-4.208(a).

10/20/2025 LEM25-015 ATTACHMENT A Page 4 of 7

SPECIFIC CONDITIONS:

1. Permit Scope. As shown in Exhibit “A” (the permit plan set), this permit authorizes the construction (within the approved limits of cleaning) of infrastructure (i.e., stormwater management system, etc.) associated with the proposed pump station replacement on parcel ID. No.: 121905 C0031 in Leon County consistent with the attachments and exhibits accompanying this permit.

2. Licensed contractors. All excavation, grading work, and other site work shall be performed under the supervision of a certified or registered general contractor, building contractor, residential contractor, commercial or residential pool/spa contractor, or underground utility contractor, or by an excavation, grading and site contractor duly licensed by the County Contractors Licensing Board. Reference Section 10- 4.203(c)(5).

3. Notification of Easements. A copy of any and all required easements, with proof of executed recording, shall be provided to the county administrator or designee prior to final inspection. Where transfer of title for any affected parcel is proposed, the owner shall provide clear information to each prospective buyer prior to execution of any contracts, about the existence, impacts, and responsibilities associated with any easements on the property. A copy of the applicable easements shall be provided by the owner to each prospective purchaser prior to closing, and the copy shall be initialed by the parties and attached to such closing documents upon execution. Reference Section 10-4.203(c)(8).

4. Stormwater management facility operating permit. No stormwater management facility shall be utilized until a stormwater management operating permit is obtained. An operating permit is not required for facilities which have as their primary function the conveyance of stormwater, facilities under construction as part of an approved development plan, and temporary facilities which are part of an erosion and sediment control plan. Reference Section 10-4.209(a).

5. Required disclaimers. Any contract for the conveyance of title to land for which stormwater management is provided by a system or facility not maintained by the County or the City of Tallahassee shall contain the following statement: "Neither Leon County nor the City of Tallahassee is responsible for the maintenance, upkeep or improvement of any stormwater management facility utilized by the land described herein. Title to this property carries with it the requirement that the current and all subsequent owners or their authorized agent obtain a stormwater management facility operating permit from the County. The owner of this property shall be legally responsible, jointly with other owners using the facility and based on pro rata share, for compliance with all stormwater management facility operating permit maintenance and operation requirements, as well as all other permit conditions, unless such maintenance and operation obligations have been specifically assumed by some other entity pursuant to Director approval and appropriate documentation recorded in the public records of Leon County." Reference Section 10-4.210(d).

6. Landscape and tree maintenance, if applicable. All landscaping, landscaped areas, landscape development, buffer areas, trees, and conservation areas required as part of this permit shall be maintained and used pursuant to Sections 10-4.348(b), 10-4.355, 10-4.209(f)(1)(h), 10-4.209(g)(7) and 10-4.211 of the Land Development Code and shall be checked for compliance during the operating permit renewal process. An Operating Permit covering the landscape and tree maintenance shall be submitted (Section 10-4.351(e)(2)i.).

For projects with no Stormwater Management Facility(ies), a Stand-Alone Operating Permit to ensure the perpetual maintenance, shall be submitted. This will ensure compliance with the requirements, purpose, intent, and objectives of the permit (Section. 10-4.203(c)(9)).

10/20/2025 LEM25-015 ATTACHMENT A Page 5 of 7

7. Intergovernmental Transfer. If at any time, the City of Tallahassee (the "City") annexes the permitted development into its corporate boundary, then this permit shall be transferred to the City with all provisions fully enforceable by the City. The City shall assume the role of the County in each provision of this permit.

8. System Evaluation & Redesign. At any time, should the County determine that the stormwater management system, stormwater pollution prevention plan, landscape plan, or any maintenance program is not functioning as designed, the County may request a system evaluation to determine compliance. The Permittee shall have thirty (30) days to evaluate the discrepancy and respond. Should the Permittee verify that a discrepancy exists, then the Permittee shall have sixty (60) days to redesign and implement the appropriate redesign necessary to correct the discrepancy. This process does not apply to any event of noncompliance with the permit and approved plans, in which case the enforcement provisions of the Environmental Management Act shall apply.

9. Other Permits. This permit is issued with the condition that the applicant procure and comply with all other necessary federal, state, and local agency permits, including but not limited to the City of Tallahassee (COT) Utilities or Infrastructure, Florida Department of Environmental Protection (FDEP) permits, FDEP 10-2 permit, Northwest Florida Water Management District (NWFWMD) permits, Florida Department of Transportation (FDOT) drainage and/or access connection permits, NPDES permit and Leon County driveway connection permit. These permits must be provided to the environmental inspector prior to the pre-construction. Reference Section 10-4.201(f).

10. Construction or repair of buildings, excavation of streets and highways: The construction, demolition, alteration or repair of any building or the excavation of streets and highways other than between the hours of 7:00 a.m. and 8:00 p.m. on weekdays and Saturdays and between 9:00 a.m. and 5:00 p.m. on Sundays.

This prohibition does not apply to the delivery and installation of concrete and other materials associated with residential slab installation. In cases of emergency, construction or repair noises are exempt from this provision. Reference Section 12-56(10).

11. If prehistoric or historic artifacts, such as pottery or ceramics, projectile points, dugout canoes, metal implements, historic building materials, or any other physical remains that could be associated with Native American, early European, or American settlement are encountered at any time with the project site area, the permitted project shall cease all activities involving subsurface disturbance in the vicinity of the discovery. The applicant shall contact the Florida Department of State, Division of Historical Resources, Compliance Review Section at (850) 245-6333. Project activities shall not resume without verbal and/or written authorization. In the event that unmarked human remains are encountered during permitted activities, all work shall stop immediately, and the proper authorities notified in accordance with Section 872.05, Florida Statutes.

12. Engineering Review Limitations: The review of this permit was limited to verifying compliance with the minimum standards of the Environmental Management Act (EMA) and other general civil site design standards. Any plans/specifications relating to the structural, water, or sewer component, or the like, were not reviewed in depth for constructability or compliance with other regulatory agencies.

10/20/2025 LEM25-015 ATTACHMENT A Page 6 of 7

SPECIAL CONDITIONS:

As shown in Exhibit “A” (the permit plan set), this permit authorizes the construction (within the approved limits of cleaning) of infrastructure (i.e., stormwater management system, etc.) associated with the proposed pump station replacement on parcel ID. No.: 121905 C0031 in Leon County consistent with the attachments and exhibits accompanying this document.

1. As used herein, the term “permittee” shall refer to the current owner(s) of the parcel. This permit may be transferred to another party in accordance with the General Conditions. Upon the Director’s approval of a Notice of Transfer of Permit, the term “permittee” shall refer to the new property owner(s) identified in this approved notice. The permittee shall ensure that all contractors and other agents authorized by the permittee to conduct the permitted development activities abide by the terms and conditions of this permit.

2. The permittee or permittee’s authorized agent shall arrange a pre-construction conference prior to the commencement of any construction/development activities. The inspector for this project is Mr. Laurence Dickinson who may be contacted at 850-606-1358 or 850-544-0828

3. Any associated permits and the “Stormwater Management Inspector Certification” shall be submitted to the Environmental Inspector as part of the request to schedule the pre-construction conference referenced in Special Condition #2 above.

4. Engineer of Record or designated delegate shall complete the Design Professional 7-Day Certification Form for sedimentation & erosion control measures on site. [See Exhibit B].

5. Project staging activity in areas outside of the areas shown in Exhibit “A” will require a separate Environmental Management Permit from Leon County Development Support and Environmental Management (LCDSEM). LCDSEM should be contacted regarding any proposed staging activity outside of the project area prior to construction commencement.

6. Limits of clearing to be marked and/or staked out prior to pre-construction meeting with the Inspector.

7. The erosion control measure shall be in accordance with Florida Sediment and Erosion Manual. Items such a stabilization, pinned sod, and matting blankets shall be utilized to prevent and erosion that will leave the site.

a. Sediment Control measures shall be sufficient to prevent the tracking or direct flow of mud and sediments onto public or private streets or drainage ditches. Any sediments or mud spilled, dropped, washed, or tracked from any vehicles onto the public or private streets or into the public drainage system shall be recovered and cleaned up immediately. Wash water shall be carried away from entrance to a settling area for sediment removal. Dedicated wash area and wash racks will be required if excessive tracking is observed by the inspector. Permittee may be asked to provide additional measures.

b. Sediment controls which are breached due to development activity, rain or other factors shall be repaired within 24 hours of the breach.

c. Additional silt fences or other sediment/erosion control devices and measures may be required, as specified by the inspector. Proposed staging areas shall be discussed with the inspector and explicitly demarcated within the site.

d. During discharge of water to offsite areas, water quality must be monitored during dewatering activities to ensure that the discharge does not create adverse impacts. The daily water quality samples shall be analyzed for turbidity using a calibrated field turbidity meter. Turbidity shall not exceed 29 Nephelometric Turbidity Units (NTUs) above background in Class III receiving waters. pH must be within the range of 6.5 to 8.5 SU and must not cause a change in the pH of the receiving water body more than 0.2 SU.

10/20/2025 LEM25-015 ATTACHMENT A Page 7 of 7

8. All soil excavated as part of this project shall be used on-site or properly disposed of at an approved location.

This permit does not include storage of excavated materials on-site.

9. No protected trees shall be impacted.

a. Work within the critical root protection zone (CRPZ) of protected trees shall be minimized to the extent practicable. Any work (including materials or equipment storage) to be performed within the CRPZ of protected trees shall be discussed with and approved by the County Environmental Inspector prior to beginning the work.

b. Contractor shall hire an arborist to evaluate any impacted protected trees. A report from the arborist shall be submitted to the County for review

10. Approved Finished Floor Elevations (FFEs) as shown in plan set shall be used for all building permits.

11. Notwithstanding the general and specific conditions contained in this permit, this project will require submittal of the following items to the Director at least 20 days prior to the permittee/applicant’s request for final inspection and ensuing request for final certificate of occupation:

a. Operating Permit Application

i. Capacity Accounting Record for the SWMF.

b. Record Drawings

i. Record drawings shall mean a complete set of permitted drawings signed and sealed by a qualified professional with final constructed grades, culvert diameters, stormwater facilities dimensions, planted landscape materials, field changes, and marked with "record drawing" on each sheet.

ii. The qualified professional shall be responsible for the project's conformance to the Leon County approved permitted plans.

c. Compliance Certification signed/sealed by a Florida licensed Professional Engineer

i. As part of the Compliance Certification, the Engineer of Record shall verify and certify that all items under their supervision including drainage, grades, and ADA requirements have been met.

d. Tree Mitigation report

i. If tree mitigation is required; documentation detailing the mitigation efforts shall be included in the compliance report by the permittee’s registered arborist or landscape architect.

In the event that any condition of this permit is subject to multiple interpretations and becomes the source of conflict that cannot be resolved onsite by the contractor and the environmental inspector, the matter shall be forwarded to the Environmental Services Director for clarification/interpretation.

Report Date: 10/20/2025 Description : The City of Tallahassee Underground Utilities and Public Infrastructure Engineering Division proposes to replace the existing Pump Station 92. EMP Standard Form Address : 6636 BUCK LAKE RD, Tallahassee, FL, 32317 Record Type : Environmental Permit Stormwater Standard Form Document Filename : Exhibit B - Erosion Certificate

Reviewer Contact Information:

Markups for this Approved Document or Plan

Review Report - Approved

EXHIBIT B

Design Professional 7-day Visit Certification

I certify that I or my authorized representative inspected the erosion control measures on site, and it is in compliance with the approved Environmental Permit Plans.

First, Last Name, PE Date of Inspection & Signature

FL. PE#: xxxxx

Inspection Deficiencies

Note: Deficiencies must be addressed immediately and re-inspected prior to commencement of work on site.

Re-inspection (if required)

First, Last Name, PE Date of Inspection & Signature

FL. PE#: xxxxx

Contractor will be responsible for inspecting and maintaining erosion control measures after certification.

Contractor can refer to the Florida Sediment and Erosions control Manual for additional measure. Note that the

Engineer of Record and/or the Leon Environmental Inspector may require additional erosion control measures if deemed necessary

This document shall be kept on site during construction for verification.

T0545.0103 Approved EMP Placard LEM25015.pdf
1
T0545.0103 EMP Permit Conditions LEM25015.pdf
1
2
3
4
5
6
7
T0545.01030 Erosion Control 7 Day Certification.pdf
1

File details come from the government source that posted it. Updated .