22-APPENDIX F - Pump Station 92 SUE Test Hole Report (4-11-2025).pdf

PDF 5 MB Posted

Attached to
Pump Station 92 Replacement
Solicitation number
IFB-044-26-RM
Issued by
Leon County, Florida

About this file

This is a Subsurface Utility Engineering (SUE) Test Hole Report prepared by Moore Bass Consulting Inc. for the City of Tallahassee's Pump Station 92 Replacement project. The report documents five test holes (TH-1 through TH-5) excavated on April 10-11, 2025, to identify and map subsurface utilities at the project site located at 6636 Buck Lake Road. The testing identified multiple utilities including an emergency stop line to a backup generator (electric), fuel main (FM) lines, fiber optic cable (FOC), and a fuel main utility. All discovered utilities are owned by the City of Tallahassee except for one fiber optic cable of unknown ownership. The utilities were found at varying depths ranging from approximately 1.95 feet to 8.90 feet below ground surface, with materials consisting primarily of High-Density Polyethylene (HDPE) and Polyvinyl Chloride (PVC). Each test hole location was surveyed and documented with GPS coordinates using NAD83 datum and NAVD88 vertical datum in Florida North Zone.

The report provides detailed documentation for each test hole including ground and utility elevations, soil conditions, location conditions, and photographic evidence. Test hole TH-5 presented challenges due to utility angle and cave-ins, requiring lancing at 8.90 feet depth rather than full exposure. All soil conditions were documented as either dry or soft-dry sand and dirt with fair location conditions. The survey data captured precise horizontal coordinates (Northing and Easting) and grade elevations ranging from 50.25 to 52.17 feet, with utility elevations ranging from 43.08 to 50.22 feet. This utility mapping documentation is essential for the design and construction planning of the new pump station replacement project, ensuring that contractors can safely and accurately perform excavation and construction activities while avoiding damage to existing utilities.

View the file

Other files

File Type Posted
20-APPENDIX D - Pump Station 92 Supplemental Technical Specifications - 2026.02.11.pdf PDF
10-10. REQUIRED Vendor Conflict of Interest.docx DOCX document
2-7. REQUIRED BID SCHEDULE.pdf PDF
14-14. REQUIRED HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
17-18. BID SCHEDULRE EXELL .xlsx XLSX spreadsheet
9-6. IFB 044-26-RM PLANS - 2026.02.24 SS.pdf PDF
21-APPENDIX E - Pump Station 92 Report of Geotechnical Investigation (2026-02-10).pdf PDF
1-1. REQUIRED IFB SECTIONS 123.docx DOCX document
19-APPENDIX B - Pump Station 92 Replacement - FDEP Permit (0464185-001-DWC-CG).pdf PDF
3-9. REQUIRED OEV FORMS ITB MWBE Forms Updated 10.06.22.docx DOCX document
12-12. REQUIRED IFB Representations Certifications.docx DOCX document
4-8. REQUIRED PERFORMANCE BOND BID BOND TRENCH SAFETY FORMS.docx DOCX document
6-3. IFB 044-26-RM SUPPLEMENTAL SPECIFICATIONS.pdf PDF
16-17. REQUIRED Certification of a Drug Free Workplace (1).pdf PDF
5-2. IFB 044-26-RM GENERAL PROVISIONSONS.pdf PDF
13-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
8-5. IFB 044-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
11-11. REQUIRED Non Collusion Affidavit of Respondent.docx DOCX document
15-15 REQUIRED Responsible Vendor Review Form.docx DOCX document
7-4. IFB 044-26-RM SPECIAL PROVISIONS.docx DOCX document
18-APPENDIX A - Pump Station 92 Replacement - LC EMP (LEM25015).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subsurface Utility Engineering Test Hole Report

Test Hole # Client:

Project:

PROJECT DATA

WO #: W116353.000 JN: J071518 Date 04/11/2025

Task #: N/A FPN #: N/A PM: Dana Sowers

Station: N/A Offset: N/A Chief: N/A

Crew: N/A Time: 7:46 AM

Weather: clear sky, 60F

TEST HOLE DATA

Utility Type: Electric Location

Condition: Fair

Material: Polyvinyl Chloride

Marker: Hub, Lath, Nail and Disk

Height (IN):

Width (IN):

Top (f):

Bottom (f):

Ground Cover: Dirt

Owner: City of Tallahassee

Soil Type: Sand

Soil Condition: Soft-Dry

Notes:

Also Found:

SURVEY DATA

V Datum:

H Datum:

Zone:

Northing:

Easting:

Grade Elev:

Utility Elev:

TH-1 Moore Bass Consulting INC

City of Tallahassee - Pumping Station #92

1.00

1.00

2.15

2.23

At 2.15' deep found the emergency stop line running to the back up generator. Lanced 10ft in all directions and no other utility was found

Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner

NAVD88 Site Image

NAD83

0903 Florida North

532426.52

2072700.05

50.25

48.10

Profile View

Photo Report

TH-1

City of Tallahassee - Pumping Station #92

6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1

Photo No. 1 Photo No. 2

Photo No. 3 Photo No. 4

Site Image

Project:

PROJECT DATA

WO #: W116353.000 JN: J071518 Date 04/10/2025

Task #: N/A FPN #: N/A PM: Dana Sowers

Station: N/A Offset: N/A Chief: Daniel

Crew: Charles Time: 4:58 AM

Weather: clear sky, 81F

TEST HOLE DATA

Utility Type: FM Location

Condition: Fair

Material: HDPE

Marker: Hub, Lath, Nail and Disk

Height (IN):

Width (IN):

Top (f):

Bottom (f):

Ground Cover: Dirt

Owner: City of Tallahassee

Soil Type: Dirt

Soil Condition: Dry

Notes:

Also Found:

SURVEY DATA

V Datum:

H Datum:

Zone:

Northing:

Easting:

Grade Elev:

Utility Elev:

TH-2 Moore Bass Consulting INC

City of Tallahassee - Pumping Station #92

14.00

14.00

3.60

4.77

N/A

Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner

NAVD88 Site Image

NAD83

0903 Florida North

532452.28

2072789.17

51.09

47.49

TH-2

City of Tallahassee - Pumping Station #92

6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1

Photo No. 1 Photo No. 2

Photo No. 3

Project:

PROJECT DATA

WO #: W116353.000 JN: J071518 Date 04/10/2025

Task #: N/A FPN #: N/A PM: Dana Sowers

Station: N/A Offset: N/A Chief: Daniel

Crew: Charles Time: 5:05 AM

Weather: clear sky, 80F

TEST HOLE DATA

Utility Type: FOC Location

Condition: Fair

Material: HDPE

Marker: Hub, Lath, Nail and Disk

Height (IN):

Width (IN):

Top (f):

Bottom (f):

Ground Cover: Dirt

Owner: Unknown

Soil Type: Dirt

Soil Condition: Dry

Notes:

Also Found:

SURVEY DATA

V Datum:

H Datum:

Zone:

Northing:

Easting:

Grade Elev:

Utility Elev:

TH-3 Moore Bass Consulting INC

City of Tallahassee - Pumping Station #92

2.50

2.50

1.95

2.16

N/A

Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner

NAVD88 Site Image

NAD83

0903 Florida North

532479.67

2072863.96

52.17

50.22

TH-3

City of Tallahassee - Pumping Station #92

6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1

Photo No. 1 Photo No. 2

Project:

PROJECT DATA

WO #: W116353.000 JN: J071518 Date 04/10/2025

Task #: N/A FPN #: N/A PM: Dana Sowers

Station: N/A Offset: N/A Chief: Daniel

Crew: Charles Time: 5:09 AM

Weather: clear sky, 80F

TEST HOLE DATA

Utility Type: FM Location

Condition: Fair

Material: HDPE

Marker: Hub, Lath, Nail and Disk

Height (IN):

Width (IN):

Top (f):

Bottom (f):

Ground Cover: Asphalt

Owner: City of Tallahassee

Soil Type: Dirt

Soil Condition: Dry

Notes:

Also Found:

SURVEY DATA

V Datum:

H Datum:

Zone:

Northing:

Easting:

Grade Elev:

Utility Elev:

TH-4 Moore Bass Consulting INC

City of Tallahassee - Pumping Station #92

12.00

12.00

4.50

5.50

N/A

Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner

NAVD88 Site Image

NAD83

0903 Florida North

532482.90

2072858.36

52.06

47.56

TH-4

City of Tallahassee - Pumping Station #92

6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1

Photo No. 1

Photo No. 2

Project:

PROJECT DATA

WO #: W116353.000 JN: J071518 Date 04/11/2025

Task #: N/A FPN #: N/A PM: Dana Sowers

Station: N/A Offset: N/A Chief: N/A

Crew: N/A Time: 7:50 AM

Weather: clear sky, 60F

TEST HOLE DATA

Utility Type: FM Location

Condition: Fair

Material: HDPE

Marker: Hub, Lath, Nail and Disk

Height (IN):

Width (IN):

Top (f):

Bottom (f):

Ground Cover: Dirt

Owner: City of Tallahassee

Soil Type: Sand

Soil Condition: Soft-Dry

Notes:

Also Found:

SURVEY DATA

V Datum:

H Datum:

Zone:

Northing:

Easting:

Grade Elev:

Utility Elev:

TH-5 Moore Bass Consulting INC

City of Tallahassee - Pumping Station #92

N/A

N/A

8.90

N/A

Could not expose utility due to the angle of the utility and cave ins. While lancing we were able to tap the utility at 8.90ft deep. No other utility was found

Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner

NAVD88 Site Image

NAD83

0903 Florida North

532508.90

2072866.99

51.98

43.08

TH-5

City of Tallahassee - Pumping Station #92

6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1

Photo No. 1

Photo No. 2

Photo No. 3

Photo No. 4

TH-1
Sheet1
TH-2
Sheet1
TH-3
Sheet1
TH-4
Sheet1
TH-5
Sheet1

File details come from the government source that posted it. Updated .