Geotechnical Investigation Report Summary
This is a Report of Geotechnical Investigation prepared by Environmental and Geotechnical Specialists, Inc. for the City of Tallahassee's Pump Station 92 wet well construction project. The investigation was conducted to characterize subsurface materials and develop geotechnical design recommendations for the proposed wet well foundation located in northwest Tallahassee along Buck Lake Road. The scope of services included installation of four Standard Penetration Test (SPT) soil borings and one hand-auger soil boring, one Double Ring Infiltration (DRI) test, groundwater depth measurements, laboratory testing for soil classification and strength parameters, and preparation of design recommendations. The investigation was performed in March and June 2025, with the report completed on February 10, 2026. The project site is located at ground surface elevations of 50 to 60 feet (NAVD 88) on currently paved asphalt areas adjacent to an existing pump station.
The subsurface investigation revealed variable soil conditions including loose to medium dense clayey fine sand and highly plastic clay and silt in the upper 25 feet, transitioning to very soft to stiff highly plastic silt and clay with sand lenses to approximately 40 feet depth, and moderately hard to hard weathered limestone below 40 feet. Groundwater was not apparent in the borings due to drilling fluid introduction, but estimated "normal" seasonal high groundwater exists at depths of 5.0 to 5.5 feet in a perched condition. The report identifies potential active soil erosion (active karst) due to circulation loss of drilling fluid and low-strength soil conditions, presenting risk of future settlement. Key recommendations include use of small-diameter (8-inch to 10-inch) micropiles to support the wet well structure at depths bearing on weathered limestone, with allowable capacities ranging from 69 to 143 tons depending on rock socket length (15 to 25 feet). The design also specifies a 24-inch compacted stone base stiffened with geogrid layers and wrapped with geotextile to address weak surface soils. Settlement analysis estimates approximately 3 inches without ground improvement or 1 inch or less with the recommended micropile system. Technical Special Provisions for micropile foundation design and installation and coarse aggregate base construction are included as appendices.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 2026 39-13-25-01/102
REPORT OF
GEOTECHNICAL INVESTIGATION
WET WELL CONSTRUCTION
PUMP STATION 92
TALLAHASSEE, FLORIDA
Prepared For:
MOORE BASS CONSULTING, INC.
805 NORTH GADSDEN STREET
TALLAHASSEE, FLORIDA 32303
Prepared By:
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS, INC.
3676 HARTSFIELD ROAD
TALLAHASSEE, FLORIDA 32303
(850) 386-1253
February 10, 2026
EGS File: 39-13-25-01/102
Moore Bass Consulting, Inc.
805 North Gadsden Street Tallahassee, Florida 32303
ATTN: Jessica Gillispie, P.E.
Civil Engineer/Project Manager
SUBJECT: Report of Geotechnical Investigation
Wet Well Foundation Pump Station 92 Tallahassee, Florida
Dear Jessica:
Environmental and Geotechnical Specialists, Inc. (EGS) has completed the Geotechnical Investigation, as authorized by Moore Bass Consulting, Inc. (MB) and the City of Tallahassee (COT), in connection with planned improvements to the City of Tallahassee’s Pump Station 92. This geotechnical investigation was conducted to characterize the subsurface materials within the area of the proposed wet well, at the locations designated by MB. This report includes summaries of the subsurface investigation and laboratory test data, groundwater measurements, estimated “normal” seasonal high groundwater levels, and geotechnical design and construction recommendations.
SCOPE OF SERVICES
The Scope of Services authorized for this investigation consisted of the following:
Installation of 4 Standard Penetration Test (SPT) soil borings and 1 hand-auger soil boring at the locations designated by MB;
Conducting 1 Double Ring Infiltration (DRI) test at the location designated by MB;
Measuring the depth to groundwater and estimating “normal” seasonal high groundwater levels;
Reviewing the Natural Resources Conservation Service (NRCS) Soil Survey for the project area and correlating the soil borings installed for this study with the subsurface conditions reported in the NRCS Soil Survey;
Conducting laboratory testing for engineering classification of the subsoils and estimation of material strength and compressibility parameters for design;
Developing geotechnical design parameters, and design and construction recommendations; and, Preparation of this Report.
Report of Geotechnical Investigation Wet Well Foundation
SITE LOCATION AND EXISTING CONDITIONS
The project site is located in northwest Tallahassee, Florida along the north side of Buck Lake Road, just south of Walden Road. A Project Location Map is provided as Figure 1 of this Report.
An Aerial View Map, which has been provided as Figure 2, shows the United States Geological Survey (USGS) topographic contours overlaid on an aerial image of the project area. The USGS contours indicate that the general topography within the project area slopes down gently from east to west. Within the project area, ground surface elevations are on the order of elevation (EL) of 50 to 60 feet, as referenced to the North American Vertical Datum of 1988 (NAVD 88).
As part of this investigation, EGS reviewed the NRCS Soil Survey for the project area, which has been superimposed on the Aerial View Map in Figure 2. The NRCS Soil Survey reports that the shallow soils within the project area are primarily Fine Sand underlain by Sandy Loam. The NRCS reported depth to seasonal high groundwater has also been included on this Figure as a color-coded system. According to the NRCS Soil Survey, the seasonal high groundwater is reported to exist in a “perched” condition at a depth of about 5 to 6 feet below the existing ground surface. It should be noted that the NRCS Soil Mapping was likely performed before development occurred within the area.
Photographs of the existing site conditions have been included in Figures 3A and 3B. As shown in the photographs, the existing ground surface at the proposed wet well foundation location is flat and paved with asphalt.
SUBSURFACE INVESTIGATION
The subsurface investigation for this project was conducted by EGS in March and June of 2025. Kevin Sweeney, P.E. served as the Project Engineer and Engineer of Record.
Additional project oversight and QA/QC was provided by Craig Dunkelberger, P.E., EGS Chief Geotechnical Engineer.
EGS installed 4 SPT soil borings, labeled TPS-1 through TPS-4, to depths ranging from 41½ feet to 71½ feet below the existing ground surface for the subsurface investigation included in this Report. Additionally, hand-auger Soil Boring DRI-1 was installed to a depth of 5½ feet below the existing ground surface. A summary of the soil boring labels, depths, and approximate elevations and locations are provided in TABLE 1. A plan view of the soil boring locations is shown in the Soil Boring Location Map provided as Figure 4.
In order to evaluate the relative strength and uniformity of the subsurface materials, the following sampling/testing were performed at the SPT soil boring locations:
Soil Boring Approximate Depth (feet)
Sampling / Testing Type
TPS-1 0 to 12 SPT with split-spoon sampling, continuous
12 to 41½ SPT with split-spoon sampling, 2½-foot intervals
TPS-2 0 to 12 SPT with split-spoon sampling, continuous
12 to 44 SPT with split-spoon sampling, 2½-foot intervals
TPS-3 0 to 12 SPT with split-spoon sampling, continuous
12 to 45 SPT with split-spoon sampling, 2½-foot intervals
45 to 71½ “Wireline” Rock Coring (ASTM D2113), 60-inch
TPS-4 0 to 12 SPT with split-spoon sampling, continuous
12 to 47 SPT with split-spoon sampling, 2½-foot intervals
47 to 66½ “Wireline” Rock Coring (ASTM D2113), 60-inch
The SPT soil borings were installed in accordance with ASTM D1586 using an automatic hammer. All soil borings were hand-augered within the top 5½ feet coupled with static hand Cone Penetration Index (CPI) tests conducted on 1-foot intervals. Sampling was performed on a maximum of 2½-foot intervals to the boring termination depth. CPI values were converted to equivalent SPT “N” values using the correlation N=CPI/4.
As recommended by the FDOT Soils and Foundations Handbook (SFH), at least 1 SPT sample was conducted between each successive 60-inch (5 foot) core run. All rock coring samples were preserved and transported in accordance with ASTM D5079. The laboratory testing performed on rock cores consisted of unconfined compressive strength (UCC) and splitting tensile strength testing. The rock core photos, coring data, and testing data have been included in APPENDIX D.
Soil samples were collected and visually classified in the field by EGS personnel, placed in sealed bags, and transported to the EGS laboratory for classification testing. The testing performed for this investigation included water content, grain-size distribution, and Atterberg Limits tests. The subsoils encountered in the SPT soil borings have been classified with respect to the Unified Soil Classification System (USCS). The subsoils encountered in Soil Boring DRI-1 have been classified with respect to the American Association of State Highway and Transportation Officials (AASHTO) soil classification system. Laboratory test results have been provided on the Report of Soil Borings plan sheets provided in APPENDIX A. Soil Boring Logs and Soil Classification Data sheets are provided in APPENDICES B and C, respectively.
To better evaluate the strength characteristics of clay and silt material encountered, EGS collected undisturbed “Shelby Tube” samples at several SPT soil boring locations. These samples were sealed in the field to prevent moisture loss prior to transport to the EGS laboratory where they were processed for advanced testing, which included unit weight, unconfined compressive strength, and one-dimensional consolidation tests. Select test results are provided on the Report of Soil Borings plan sheets with the testing data sheets included in APPENDIX D.
Field Permeability Tests - EGS conducted 1 DRI test adjacent to the location of hand-auger Soil Boring DRI-1. The DRI test was conducted approximately 24 inches below the existing ground surface. The approximate test location is provided in TABLE 1 and is shown on the Soil Boring Location Map provided as Figure 4.
SUBSURFACE CONDITIONS
Soils - As can be seen on the “Generalized” Design Soil Profile provided in Figure 5 and the Report of Soil Borings plan sheets provided in APPENDIX A, the encountered subsurface materials within about 25 feet of the existing ground surface were variable and generally consisted of Loose to Medium Dense Clayey Fine Sand and Highly Plastic Clayey Sand (SC) and Very Soft to Stiff Highly Plastic Silt and Clay (MH and CH). Below a depth of approximately 25 feet, the soils consisted of Very Soft Highly Plastic Silt and Clay with lenses of Very Loose to Loose Silty and Clayey Sand (SM and SC) to a depth of about 40 feet. Below a depth of approximately 40 feet the encountered subsurface materials consisted of Moderately Hard to Hard Weathered Limestone.
Of note, circulation loss of the drilling fluid occurred in all SPT soil borings at depths ranging from about 35 to 41 feet below the ground surface. The loss of circulation of the drilling fluid is an indication of hydraulic connection to the underlying limestone and can be indicative of active soil erosion.
Groundwater - The depth to groundwater was not apparent within the vertical reaches of the soil borings due to the introduction of drilling fluid into the borings. TABLE 1 provides a summary of the groundwater measurements and the estimated “normal” seasonal high groundwater levels.
It should be recognized that the groundwater data reflects limited measurements and is therefore considered to be preliminary. Fluctuations in groundwater levels should be anticipated throughout the year in response to rainfall, surrounding development and changes to drainage from urbanization. EGS recommends use of piezometers if more detailed groundwater data is needed.
NRCS Soil Survey - The soils encountered in this investigation are generally consistent with those reported in the NRCS Soil Survey for this area. It should be noted that the NRCS Soil Survey mapping is an approximation of likely soils that exist within the project area. Variations in soil properties will occur when comparing data from the NRCS Soil Survey and data obtained by soil sampling.
Pertinent NRCS Soil Survey data has been summarized in TABLE 2 and copies of select tables have been provided in APPENDIX E.
Potential Karst Features - During the time of the field study, no visible surface depressions were observed within the project area; however, a Tallahassee-Leon County (TLC-GIS) mapped “potential karst feature,” which has been identified as a solution sinkhole, is located approximately ¼-mile southeast of the project site. The TLC-GIS “potential karst feature” locations in Leon County are based on the compilation of high-fidelity bare-earth digital elevation models derived from LiDAR point cloud data and only provide information as to the possibility of karst conditions in a general area.
The noted low-strength soil conditions and drill fluid circulation losses are considered to be indicators that there is a high likelihood that “active” subsoil erosion into the porous weathered limestone formation is occurring. EGS cautions that, if left unaddressed, the subsoil erosion could result in the undermining and settlement of the proposed wet well structure over time.
GEOTECHNICAL DESIGN RECOMMENDATIONS
The geotechnical design recommendations made by EGS in this Report are based on the following wet well design criteria provided by the Jonhson and Milner, Inc. (J&M), the project Structural Engineer:
Base Width: 19.333 feet
Length: 27.333 feet
Depth of Foundation: 25.67 feet
Factored Structure and Slurry Weight: ≈ 874 tons
The wet well will be constructed with cast-in-place, reinforced concrete. EGS anticipates that the wet well excavation will be temporarily supported with steel sheet piling and will be fully dewatered.
Settlement - Based on the proposed bearing elevation of the wet well, the structure will bear on Very Soft Highly Plastic Silt and Clay, which are highly compressible soils. Using the results of the installed SPT soil borings and the one-dimensional consolidation laboratory test performed, EGS estimated the settlement of the proposed structure based on the dimensions and loadings provided by J&M. Based on the settlement analysis performed, long-term settlement of the wet well is expected to be on the order of about 3½ inches if no ground improvement or deep foundation system is used.
A “Generalized” Design Soil Profile has been provided in Figure 5. Design computations are provided in APPENDIX F.
Due to the anticipated settlement of the proposed wet well, as well as the low-strength soil conditions and noted drill fluid circulation losses (i.e., high likelihood for active soil erosion), EGS recommends the proposed wet well be supported by a deep foundation to distribute the structural loads to the deeper, stronger Weathered Limestone encountered below a depth of about 40 feet.
Due to the depth of the proposed construction, anticipated limited working room, and relatively small foundation footprint, EGS recommends the use of small diameter (8-inch to 10-inch) micropiles to support the proposed wet well.
Micropile Capacities - Using the results of the rock coring performed at the locations of Soil Borings TPS-3 and TPS-4, EGS estimated the allowable axial capacities of 8-inch and 10-inch diameter micropile foundations for various rock socket lengths. The estimated allowable axial capacities are one-half of the ultimate values, and neglect the contribution of skin friction from the soils encountered above the Weathered Limestone.
The following table includes the estimated allowable axial capacities for 8-inch and 10-inch diameter micropile foundations for rock socket lengths of 15, 20, and 25 feet:
Micropile Allowable Axial Capacity
8-inch Diameter 10-inch Diameter
R o ck S o ck et
L en g th
15 feet 69 tons 86 tons
20 feet 92 tons 114 tons
25 feet 115 tons 143 tons
Design computations are provided in APPENDIX F. A copy of a Technical Special Provision (TSP) for the design and installation of Micropile Foundations has been provided in APPENDIX G.
Micropile Settlement - If micropiles are used to support the proposed wet well, EGS estimates settlement of the wet well to be approximately 1-inch or less.
Excavation and Structure Base Preparation - Due to the presence of very weak and compressible Highly Plastic Silt and Clay, and the high likelihood that active soil erosion (active karst) exists beneath the planned wet well, EGS recommends the wet well bearing surface be prepared as follows:
The structure should be founded on 24 inches of compacted No. 57 stone stiffened with 2 layers of Tensar BX 1500 geogrid. One layer of the geogrid should be place at the bottom of the stone and the other layer 12 inches above the bottom of the No 57 stone. The No. 57 stone should be placed in 6-inch thick lifts with each lift being thoroughly compacted with a heavy walk-behind sled compactor. The No. 57 stone should be fully wrapped (i.e., under the bottom, along all sides and across the top) with a Mirafi FW 404 geotextile.
It should be noted that if the recommended structure base preparation is performed prior to the installation of micropiles, temporary casing will be needed to ensure the proposed micropile locations remain unobstructed by the No. 57 Stone and geosynthetic layers.
A copy of a Technical Special Provision (TSP) for the Coarse Aggregate Base has been provided in APPENDIX G.
Material Reuse - Based on a review of the soils encountered in this investigation and the requirements of the COT Technical Specifications for Water and Sewer Construction, the existing Silty Sand (SM) and Clayey Sand (SC) meet the requirements for Suitable Backfill (Specification Section 4.2.2). While the Silty and Clayey Sands meet the Suitable Backfill criteria per the COT Technical Specifications, EGS does not recommend reuse of these materials due to their plasticity and moisture sensitivity.
Reuse of these materials, in the opinion of EGS, is likely to result in construction difficulties and/or result in poorly compacted backfill.
The Highly Plastic Silt and Clay (MH and CH) do not meet the COT specification for Suitable Backfill and should not be reused as backfill.
Permeability Estimates - Permeability estimates for the encountered soils at the location of Soil Boring DRI-1 have been provided in TABLE 3. These permeability estimates were developed by comparing values reported by the NRCS Soil Survey, results of the field testing conducted by EGS, and values obtained using grain-size distribution parameters with the empirical correlations developed by Byron Prugh (as reported by Powers, et. al., 2007).
It should be noted that the Prugh method is an empirical formulation that provides approximate permeability estimates and may reflect a permeability that is significantly higher than that of the in-place soils.
DRI test data, and grain-size distribution curves used to estimate the permeability rates are presented in APPENDIX H. It should be noted that the permeability values provided in TABLE 3 do not account for the effects of groundwater mounding, clogging with fines, nor do they include a factor of safety.
PLANS PREPARATION
EGS recommends the following be included in the Plans:
Report of Soil Borings included in APPENDIX A;
Technical Special Provision for Coarse Aggregate Base included in APPENDIX G;
Technical Special Provision for Micropile Foundations included in APPENDIX G;
Soil boring location shown in plan view.The electronic files and soil boring location data needed to include the recommended information above has been provided along with this Report.
Additionally, EGS also recommends the following notes be added to the Plans:
All construction shall be performed in the dry. Dewatering and groundwater control during construction should be anticipated. The presence of limestone can impact dewatering efforts and the Contractor should anticipate that more than normal efforts will be required; and, The presence of clay and silt should be considered by the Contractor for design, and installation and removal of temporary excavation support, such as steel sheet piling. The Contractor should anticipate that bracing, shoring or other means may be necessary for excavation support.
CLOSURE
The data and results presented in this Report are intended for the use by Moore Bass Consulting, Inc. and the City of Tallahassee for the proposed Pump Station 92 improvements, as identified herein. This data may not be used without the expressed written consent of Moore Bass Consulting, Inc. and the City of Tallahassee. This Report is not intended for any other use and will likely not be applicable. This Report shall not be reproduced, except in full, without the written approval of Environmental and Geotechnical Specialists, Inc. The data and recommendations presented in this Report are based on the borings made at the specific locations and depths noted. Subsurface conditions at other locations may vary significantly from those presented herein. Should data become available which is different from the data presented herein, Environmental and Geotechnical Specialists, Inc. requests the opportunity to review the data and make any modifications to the design recommendations that may be appropriate.
If you have any questions concerning the information provided in this Report, please do not hesitate to me at (850) 536-8365.
Sincerely, Environmental & Geotechnical Specialists, Inc.
Certificate of Authorization: 6222
Kevin T. Sweeney, P.E.
Geotechnical Project Manager FL P.E. No.: 89538
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY KEVIN
SWEENEY ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED
AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
TABLES
BORING BORING GROUND MEASURED ESTIMATED
LABEL DEPTH 1 SURFACE GROUNDWATER "NORMAL"
ELEVATION 2 DEPTH SEASONAL HIGH
GROUNDWATER
DEPTH
TPS-1 41.5 51.5 532494 2072794 GNA 4 > 10.5 5.0 5
TPS-2 44.0 52.0 532494 2072827 GNA 4 > 14.0 5.0 5
TPS-3 71.5 52.0 532505 2072843 GNA 4 > 10.0 5.0 5
TPS-4 66.5 52.0 532487 2072838 GNA 4 > 10.5 5.0 5
DRI-1 5.5 52.0 532535 2072876 > 5.5 5.0 5
NOTES: 1. DEPTH MEASURED BELOW EXISTING GROUND SURFACE.
NOTES: 2. ELEVATIONS ARE APPROXIMATE AND WERE ESTIMATED USING USGS TOPOGRAPHIC CONTOURS AND GOOGLE EARTH.
NOTES: 3. BORING LOCATIONS ARE APPROXIMATE AND BASED ON GPS MEASUREMENTS RECORDED USING A TRIMBLE GEOEXPLORER XH HANDHELD UNIT.
NOTES: 4. GROUNDWATER NOT APPARENT DUE TO THE INTRODUCTION OF DRILLING FLUID INTO THE BOREHOLE AT THE NOTED DEPTH.
NOTES: 5. ESTIMATED "NORMAL" SEASONAL HIGH GROUNDWATER BELIEVED TO EXIST IN A PERCHED CONDITION.
DRI HAND-AUGER
PUMP STATION / WET WELL SPT SOIL BORINGS
NORTHING EASTING
(FEET)
TABLE 1
(FEET) (FEET) (FEET) (FEET)
SOIL BORING LOCATION AND GROUNDWATER DATA
PUMP STATION 92
TALLAHASSEE, FLORIDA
(FEET)
STATE PLANE COORDINATES 3
(FLORIDA NORTH)
WET WELL CONSTRUCTION
NRCS SOIL
REFERENCE
NUMBER
MATERIAL
NAME
DEPTH
MATERIAL
DESCRIPTION
REACTION
DEPTH TO
SEASONAL
HIGH
GROUNDWATER
(INCHES) (FEET)
0 - 7 FINE SAND SP-SM A-2-4, A-3 4.5 - 5.5
7 - 52 FINE SAND SP-SM A-2-4, A-3 4.5 - 5.5
52 - 80
SANDY CLAY LOAM,
FINE SANDY LOAM
SC, SC-SM
SM
A-2-4, A-2-6, A-4, A-6
4.5 - 5.5
0 - 5 FINE SAND SM, SP-SM A-2 4.5 - 6.0
5 - 26
FINE SAND,
LOAMY FINE SAND
SM, SP-SM A-2 4.5 - 6.0
26 - 80
SANDY CLAY LOAM,
FINE SANDY LOAM
SC, SC-SM
A-2, A-4, A-6
4.5 - 5.5
0 - 17 FINE SAND SM, SP-SM
A-2-4, A-3
4.5 - 6.0
17-61 FINE SAND SM, SP-SM
A-3, A-2-4
4.5 - 5.5
61-80
SANDY LOAM,
SANDY CLAY LOAM,
FINE SANDY LOAM
SC, SC-SM,
SM
A-2-6, A-2-4
4.5 - 5.5
0 - 17 FINE SAND SM, SP-SM
A-2-4, A-3
4.5 - 6.0
17 - 61 FINE SAND SM, SP-SM
A-3, A-2-4
4.5 - 5.5
61 - 80
SAND LOAM,
SANDY CLAY LOAM,
FINE SANDY LOAM
SC, SC-SM,
SM
A-2-4, A-2-6
4.5 - 5.5
NOTES: 1. BASED ON THE NRCS SOIL SURVEY REPORT FOR LEON COUNTY, FLORIDA.
NOTES: 2. SEE APPENDIX E FOR DETAILED NRCS SURVEY INFORMATION.
PLUMMER FINE
SAND, NON-
HYDRIC
HIGH
HIGH
BLANTON FINE
SAND, 0 TO 5
PERCENT
SLOPES
5 LOW
LUCY FINE SAND,
0 TO 5 PERCENT
SLOPES
24 MODERATE
PLUMMER FINE
SAND, HYDRIC
HIGH 0.0
HIGH 0.5
CONCRETE
HIGH 5.0
MODERATE > 6.0
TABLE 2
NRCS SOIL SURVEY DATA
PUMP STATION 92
TALLAHASSEE, FLORIDA
MATERIAL
CLASSIFICATION
CORROSION
POTENTIAL
WET WELL CONSTRUCTION
UNIFIED AASHTO (pH)
UNCOATED
STEEL
STRATUM
LETTER NRCS CITY OF LABORATORY FIELD
SOIL SURVEY TALLAHASSEE GRAIN-SIZE PERMEABILITY
USCS AASHTO ESTIMATE 1 ESTIMATE 2 ESTIMATE 3 ESTIMATE 4
A SM
A-2-4
(< 20% PASSING
NO. 200 SIEVE)
LOAMY FINE
SAND
2.0 - 6.0 1.18 - 4.74 5.7 5.3 5.0 7.5
B SC
A-2-6
(LL < 50)
SANDY CLAY
LOAM
0.4 - 2.0 0.06 - 1.18 0.9 - - 0.4 0.6
NOTES: 1. REPORTED IN NRCS SOIL SURVEY FOR LEON COUNTY, FLORIDA.
NOTES: 2. REPORTED IN THE CITY OF TALLAHASSEE LAND DEVELOPMENT CODE.
NOTES: 3. ESTIMATED FROM GRAIN-SIZE DISTRIBUTION CURVES PROVIDED IN APPENDIX G.
NOTES: 4. MEASURED FROM DOUBLE RING INFILTRATION (DRI) TESTS PERFORMED BY EGS. DETAILED TEST RESULTS ARE PROVIDED IN APPENDIX G.
NOTES: 5. THE SATURATED PERMEABILITY VALUES SHOWN ARE NOT INFILTRATION VALUES SINCE THEY DO NOT INCLUDE THE EFFECTS OF GROUNDWATER
NOTES: 4. MOUNDING, CLOGGING WITH FINES, OR A FACTOR OF SAFETY.
USDA
TEXTURAL
PERMEABILITY VALUES 5
(IN/HR) (IN/HR) (IN/HR) (IN/HR)
SATURATED
VERTICAL
SATURATED
HORIZONTAL
(IN/HR)
TABLE 3
SOIL PERMEABILITY ESTIMATES
TALLAHASSEE, FLORIDA
PUMP STATION 92
CLASSIFICATION SOIL PERMEABILITY VALUES
WET WELL CONSTRUCTION
FIGURES
DRAWN:
D. CARNOTO
CHECKED:
F. SANDERS, P.E.
ENVIRONMENTAL AND GEOTECHNICAL
SPECIALISTS, INC.
3676 HARTSFIELD ROAD
TALLAHASSEE, FLORIDA 32303
OFFICE #: (850) 386-1253
TITLE:
PROJECT LOCATION MAP
WET WELL CONSTRUCTION
PUMP STATION 92
TALLAHASSEE, FLORIDA
ENGINEER:
K. SWEENEY, P.E.
CLIENT:
MOORE BASS CONSULTING, INC.
PROJ. NO.:
39-13-25-01/102
SCALE:
NOT TO SCALE
DATE:
AUGUST 2025
FIGURE NO.:
NOT TO SCALE
PROJECT LOCATION
K. SWEENEY, P.E.
BUCK LAKE RD
WALDEN RD
DRAWN:
ENGINEER:
CLIENT:
CHECKED:
PROJ. NO.: SCALE: DATE: FIGURE NO.:
TITLE:
ENVIRONMENTAL AND GEOTECHNICAL
SPECIALISTS, INC.
3676 HARTSFIELD ROAD
TALLAHASSEE, FLORIDA 32303
OFFICE #: (850) 386-1253
AUGUST 2025 2
AERIAL VIEW MAP
WET WELL CONSTRUCTION
PUMP STATION 92
TALLAHASSEE FLORIDA
F. SANDERS, P.E.D. CARNOTO
MOORE BASS CONSULTING, INC.
39-13-25-01/102
Legend Project Location USGS Elevation Contours (10-feet)
NRCS Map Unit Symbol, Map Unit Name 5, Blanton Fine Sand, 0 to 5 percent slopes 24, Lucy Fine Sand, 0 to 5 percent slopes 41, Plummer Fine Sand
AS SHOWN
0 100
Feet
FIGURE 3A: EXISTING SITE CONDITIONS
(FACING NORTH / NORTHWEST)
FIGURE 3B: EXISTING SITE CONDITIONS
(FACING SOUTHWEST)
K. SWEENEY, P.E.
A
A
A
A A
TPS-2TPS-1
DRI-1
TPS-3
TPS-4
DRAWN:
ENGINEER:
CLIENT:
CHECKED:
PROJ. NO.: SCALE: DATE: FIGURE NO.:
TITLE:
ENVIRONMENTAL AND GEOTECHNICAL
SPECIALISTS, INC.
3676 HARTSFIELD ROAD
TALLAHASSEE, FLORIDA 32303
OFFICE #: (850) 386-1253
AUGUST 2025 4
SOIL BORING LOCATION MAP
WET WELL CONSTRUCTION
PUMP STATION 92
TALLAHASSEE, FLORIDA
F. SANDERS, P.E.D. CARNOTO
MOORE BASS CONSULTING, INC.
39-13-25-01/102
Legend A Approximate Soil Boring Location
AS SHOWN
0 30
Feet
"GENERALIZED" DESIGN SOIL PROFILE
REVISED:
CHECKED:
ENGINEER:
PROJ. NO.:
SCALE:
FIGURE NO.:
DATE:AS SHOWN
PREPARED:
K. SWEENEY, P.E.
D. CARNOTO
OFFICE #: (850) 386-1253
TALLAHASSEE, FLORIDA 32303
3676 HARTSFIELD ROAD
SPECIALISTS, INC.
ENVIRONMENTAL AND GEOTECHNICAL
AUGUST 2025
K. SWEENEY, P.E.
C. DUNKELBERGER, P.E.
39-13-25-01/102
PUMP STATION 92
TALLAHASSEE, FLORIDA
WET WELL CONSTRUCTION
"GENERALIZED" DESIGN SOIL PROFILE
WET WELL CONSTRUCTION - PUMP STATION 92
N
N N
*13
*10
*10
*8
*5
ST
ST
WOH
WOH
50/3"
N
*13
*9
*10
*7
*2
ST
ST
WOH
50/4"
50/4"
50/5"
*7
*7
ST
WOH
*13
*13
*10
WOH
WOH
WOH
ST
WOH
WOH
ST
WOH
WOH
WOH
50/5"
*13
*8
*5
*7
*5
CORE #1
CORE #2
CORE #3
(100%) (30%)
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
T
N
V D
-5
-10
-15
-20
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
-5
-10
-15
-20
(100%)
CORE #1
CORE #2
CORE #3
CORE #4
GNA > 10.5 FEET
GNA > 14.0 FEET
GNA > 10.0 FEET
GNA > 10.5 FEET
51.5 FEET
2072794
532494
TPS-1
52.0 FEET
2072827
532494
TPS-2
52.0 FEET
2072843 532505
TPS-3
52.0 FEET
2072838 532487
TPS-4
ELEVATION
EASTING
NORTHING
BOR #
ELEVATION
EASTING
NORTHING
BOR #
ELEVATION
EASTING
NORTHING
BOR #
ELEVATION
EASTING
NORTHING
BOR #
(100%)
BEARING ELEVATION
APPROXIMATE STRUCTURE
(MH & CH)
HIGHLY PLASTIC SILT & CLAY
VERY SOFT TO FIRM
WEATHERED LIMESTONE
MODERATELY HARD TO HARD
5.
4.
3.
2.
1.
EXISTING GROUND SURFACE
GNA GROUNDWATER NOT APPARENT (NOTE 3)
*N N-VALUE EQUIVALENT (NOTE 2)
DESIGN GROUNDWATER LEVEL
COMPUTATIONS ARE PROVIDED IN APPENDIX F.
ADVANCED TESTING DATA IS PROVIDED IN APPENDIX D. DESIGN
TOPOGRAPHIC MAPS AND GOOGLE EARTH.
ELEVATIONS ARE APPROXIMATE AND ARE BASED ON USGS
NOTED DEPTH.
INTRODUCTION OF DRILLING FLUID INTO THE BOREHOLD AT THE
GNA INDICATES "GROUNDWATER NOT APPARENT" DUE TO THE
STATIC HAND CONE PENTROMETER TESTS.
N-VALUES DENOTED WITH AN ASTERISK (*) WERE DERIVED FROM
TEST (SPT) N VALUES OR EQUIVALENT.
NUMBERS TO LEFT OF BORING INDICATE STANDARD PENETRATION
(MH & CH)
HIGHLY PLASTIC SILT & CLAY
VERY SOFT TO STIFF
HIGHLY PLASTIC CLAYEY SAND (SC)
CLAYEY FINE SAND TO
LOOSE TO MEDIUM DENSE
(SC)
CLAYEY FINE SAND
LOOSE TO MEDIUM DENSE
NOTES
LEGEND
APPENDIX A
GEOTECHNICAL PLAN SHEETS
SOIL BORING LOCATION MAP
DATE BY DESCRIPTION DATE DESCRIPTION
NO.
SHEET
PROJECT TITLE
MOORE BASS CONSULTING, INC.
REVISIONS SEAL:
EGS
Environmental & Geotechnical Specialists, Inc.BY
P.E. NO.: 49932
CRAIG E. DUNKELBERGER, P.E.
PUMP STATION 92
CITY OF TALLAHASSEEOFFICE (850) 386-1253
TALLAHASSEE, FLORIDA 32303
3676 HARTSFIELD ROAD REPORT OF SOIL BORINGS
NOTES
SPLIT-SPOON:
HAMMER WEIGHT: 140 lbs.
AVG. HAMMER DROP: 30.0 in.
OUTSIDE DIAMETER: 2.0 in.
INSIDE DIAMETER: 1.375 in. HARD
VERY STIFF
STIFF
FIRM
SOFT
VERY SOFT
UNDISTURBED SAMPLES
COMPRESSION (KSF)
UNCONFINED
CONSISTENCY
SILTS AND CLAYS
GREATER THAN 8.0
4.0 - 8.0
2.0 - 4.0
1.0 - 2.0
0.5 - 1.0
LESS THAN 0.5
GREATER THAN 24
12 - 24
6 - 12
3 - 6
1 - 3
LESS THAN 1
CONSISTENCY
SILTS AND CLAYS
(BLOWS/12 IN.)
SPT
HARD
VERY STIFF
STIFF
FIRM
SOFT
VERY SOFT
GREATER THAN 40
24 - 40
8 - 24
3 - 8
LESS THAN 3
RELATIVE DENSITY
GRANULAR MATERIALS
(BLOWS/12 IN.)
SPT
VERY DENSE
DENSE
MEDIUM DENSE
LOOSE
VERY LOOSE
AUTOMATIC HAMMER
GREATER THAN 50/3"
50 - 50/3"
30 - 50
10 - 30
3 - 10
0 - 3
CONSISTENCY
LIMESTONE
(BLOWS/12 IN.)
SPT
VERY HARD
HARD
MODERATELY HARD
MODERATELY SOFT
SOFT
VERY SOFT
9.
8.
7.
6.
5.
4.
3.
2.
1.
-200=
PI=
LL=
PLASTICITY INDEX
LIQUID LIMIT
-200 SIEVE
LEGEND
WATER CONTENT (%) Wc=
GNA
SILTY FINE SAND (SM)
STSHELBY TUBE
USCS SOIL CLASSIFICATION GROUP SYMBOL (SM)
UNCONFINED COMPRESSION (KSF) UCC=
WOH
NATURAL DENSITY (PCF ϒ=
WEIGHT OF HAMMER
HIGH GROUNDWATER LEVEL
ESTIMATED "NORMAL" SEASONAL
HIGHLY WEATHERED LIMESTONE
HARD WEATHERED LIMESTONE
HIGHLY PLASTIC CLAY (CH)
HIGHLY PLASTIC SILT (MH)
HIGHLY PLASTIC CLAYEY SAND (SC)
CLAYEY FINE SAND TO
ASPHALT
LIMEROCK BASE
FLUID LOSS (PERCENT LOSS)
GROUNDWATER NOT APPARENT (NOTE 3)
N-VALUE EQUIVALENT (NOTE 2) *N
AASHTO SOIL CLASSIFICATION GROUP SYMBOL (A-2-4)
GROUNDWATER NOT ENCOUNTERED GNE
LABORATORY TESTING RESULTS
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
N
RIG
HAMMER
DRILLER
DATE
ELEVATION
EASTING
NORTHING
BOR #
LL=13
PI=23
-200=22
Wc=14
*12
*10
*10
*10
*10
-200=13
Wc=10
-200=23
Wc=9
AT ELEV. 46.5 FEET
BORING TERMINATED
GNE
CLAYEY FINE SAND (A-2-6)
MEDIUM DENSE BROWN
SILTY FINE SAND (A-2-4)
MEDIUM DENSE BROWN
HAND-AUGER
CPI
J. NELSON
6/19/2025
52.0 FEET
2072876
532535
DRI-1
AND GOOGLE EARTH.
ELEVATIONS ARE APPROXIMATE AND ARE BASED ON USGS TOPOGRAPHIC CONTOURS
CORING PRESSURE IS THE DOWNHOLE DRILLING PRESSURE APPLIED TO THE CORE BIT.
RQD IS THE ROCK QUALITY DESIGNATION.
RECOVERY IS THE PERCENT OF CORE RECOVERED BASED ON TOTAL CORE RUN.
EXTRAPOLATION.
LOCATIONS IS THE SOLE RESPONSIBILITY OF THE PERSON PERFORMING THE
THE LOCATIONS OF THE SOIL BORING. EXTRAPOLATION OF THE SOIL DATA TO OTHER
FOR THE SOIL BORING ONLY AND MAY NOT APPLY TO ANY OTHER LOCATIONS EXCEPT AT
SOIL DESCRIPTIONS, TEST DATA, AND STANDARD PENETRATION VALUES SHOWN ARE
SHOULD BE ANTICIPATED.
DURING THE SUBSURFACE INVESTIGATION. GROUNDWATER LEVEL FLUCTUATIONS
MEASURED GROUNDWATER LEVEL SHOWN IS THE GROUNDWATER LEVEL ENCOUNTERED
DRILLING FLUID INTO THE BOREHOLE, AT THE NOTED DEPTH.
GNA INDICATES "GROUNDWATER NOT APPARENT" DUE TO THE INTRODUCTION OF
PENETROMETER INDEX (CPI) VALUES.
ASTERISK (*) INDICATES EQUIVALENT SPT N-VALUES CONVERTED FROM CONE
FOR 12 INCH PENETRATION (UNLESS OTHERWISE NOTED).
NUMBERS LEFT OF BORING INDICATE STANDARD PENETRATION TEST (SPT) N-VALUES
SOIL BORING LOCATION
N
Feet
BUCK LAKE ROAD
TPS-2TPS-1
EQUIPMENT
EXISTING PUMP STATION
CONSTRUCTION
PROPOSED WET WELL
TPS-3
TPS-4
DRI-1
NO.
SHEET
PROJECT TITLE
MOORE BASS CONSULTING, INC.
REVISIONS SEAL:
EGS
Environmental & Geotechnical Specialists, Inc.BY
P.E. NO.: 49932
CRAIG E. DUNKELBERGER, P.E.
PUMP STATION 92
CITY OF TALLAHASSEEOFFICE (850) 386-1253
TALLAHASSEE, FLORIDA 32303
3676 HARTSFIELD ROAD REPORT OF SOIL BORINGS
N
CLAYEY FINE SAND (SC)
MEDIUM DENSE GRAY
CLAYEY FINE SAND (SC)
LOOSE GRAY
HIGHLY PLASTIC CLAY (CH) WITH SAND
STIFF ORANGE AND GRAY
HIGHLY PLASTIC CLAY (CH) WITH SAND
VERY SOFT TO SOFT ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY (CH)
STIFF TO VERY STIFF ORANGE AND GRAY
SILTY FINE SAND (SM)
MEDIUM DENSE ORANGE AND GRAY
SILTY FINE SAND (SM)
VERY LOOSE ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT (MH)
VERY SOFT ORANGE AND GRAY
HIGHLY WEATHERED LIMESTONE
MODERATELY SOFT WHITE
HIGHLY WEATHERED LIMESTONE
MODERATELY HARD WHITE
N
CLAYEY FINE SAND (SC)
MEDIUM DENSE GRAY
CLAYEY FINE SAND (SC)
LOOSE GRAY
CLAYEY FINE SAND (SC)
VERY LOOSE GRAY
HIGHLY PLASTIC SANDY SILT (MH)
VERY SOFT ORANGE AND GRAY
HIGHLY PLASTIC CLAYEY SAND (SC)
MEDIUM DENSE/STIFF GRAY
HIGHLY PLASTIC SANDY CLAY (CH)
SOFT TO FIRM ORANGE AND GRAY
SILTY FINE SAND (SM)
LOOSE BROWN
HIGHLY PLASTIC SANDY CLAY (CH)
VERY SOFT ORANGE AND GRAY
WEATHERED LIMESTONE
HARD WHITE
RIG
HAMMER
DRILLER
DATE
ELEVATION
EASTING
NORTHING
BOR #
D-25
AUTOMATIC
B. GUERRA
3/3/2025
51.5 FEET
2072794
532494
TPS-1
RIG
HAMMER
DRILLER
DATE
ELEVATION
EASTING
NORTHING
BOR #
D-25
AUTOMATIC
B. GUERRA
3/3/2025
52.0 FEET
2072827
532494
TPS-2
-200=23
Wc=21
LL=122
PI=94
-200=72
Wc=43
LL=71
PI=58
-200=51
Wc=28
-200=33
Wc=36
LL=151
PI=94
-200=60
Wc=114
*7
*7
ST
WOH
*13
*13
*10
WOH
WOH
WOH
ST
WOH
WOH
ST
WOH
WOH
WOH
50/5"
*13
*8
*5
*7
*5
AT ELEV. 10 FEET
AT ELEV. 8 FEET
GNA > 14.0 FEET
LL=23
PI=12
-200=24
Wc=12
LL=116
PI=79
-200=59
Wc=73
-200=20
Wc=50
-200=65
Wc=47
-200=24
Wc=14
LL=117
PI=88
-200=76
Wc=45
HIGHLY PLASTIC CLAY (CH) WITH SAND
VERY SOFT ORANGE AND GRAY
HIGHLY PLASTIC SILT (MH) WITH SAND
STIFF TO VERY STIFF ORANGE AND GRAY
(100%)
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
UCC=4.1
LL=80
PI=36
-200=75
Wc=37
UCC=3.4
LL=56
PI=32
-200=46
Wc=32
UCC=6.6
LL=80
PI=51
-200=66
Wc=45
(100%)
SHEET
PROJECT TITLE
MOORE BASS CONSULTING, INC.
REVISIONS SEAL:
EGS
Environmental & Geotechnical Specialists, Inc.BY
P.E. NO.: 49932
CRAIG E. DUNKELBERGER, P.E.
PUMP STATION 92
CITY OF TALLAHASSEEOFFICE (850) 386-1253
TALLAHASSEE, FLORIDA 32303
3676 HARTSFIELD ROAD REPORT OF SOIL BORINGS
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
-5
-10
-15
-20
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
-5
-10
-15
-20
N 1.7-INCHES ASPHALT
4.0-INCHES LIMEROCK BASE
SILTY FINE SAND (SM)
MEDIUM DENSE BROWN
SILTY FINE SAND (SM)
LOOSE BROWN
CLAYEY FINE SAND (SC)
LOOSE TO MEDIUM DENSE GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND (SC)
MEDIUM DENSE GRAY AND ORANGE
HIGHLY PLASTIC SANDY SILY (MH)
STIFF GRAY
HIGHLY PLASTIC CLAYEY SAND (SC)
LOOSE GRAY AND ORANGE
HIGHLY PLASTIC SILT (MH)
SOFT GRAY AND ORANGE
HIGHLY PLASTIC SILT (MH)
STIFF GRAY AND ORANGE
HIGHLY PLASTIC SILT (MH)
VERY SOFT GRAY AND ORANGE
HIGHLY WEATHERED LIMESTONE
WEATHERED WHITE
WEATHERED LIMESTONE
HARD WHITE
HIGHLY WEATHERED LIMESTONE
WEATHERED WHITE
*13
*10
*10
*8
*5
ST
ST
WOH
WOH
50/3"
RIG
HAMMER
DRILLER
DATE
ELEV.
OFF.
STA.
BOR #
CME-550
AUTOMATIC
B. GUERRA
6/17/2025
52.0 FEET
2072843 532505
TPS-3
CASING LENGTH 45 FEET
AT ELEV. -19.5 FEET
GNA > 10.0 FEET
CORE #1
CORE #2
CORE #3
CORE #4
LL=23
PI=7
-200=30
Wc=12
-200=15
Wc=5
LL=31
PI=13
-200=30
Wc=17
LL=58
PI=35
-200=40
Wc=27
-200=43
Wc=34
-200=41
Wc=45
(100%)
ROCK CORE DATA
SOIL BORING TPS-3
CORE (HR:MIN:SEC)
CORING TIME
RECOVERY
RQD
(LB/IN )
PRESSURE
CORE
45.0 - 50.0
(LB/FT )
COMPRESSION
UNCONFINED
2 (LB/FT )
TENSILE
SPLITTING
2 (LB/IN )
COMPRESSION
UNCONFINED
2 (LB/IN )
TENSILE
SPLITTING
22(FEET)
DEPTH
350 35
-- -- -- --51.0 - 56.0 350 42
7058.0 - 63.0 38
300 3800:05:37 63
5,32900:16:45 56
00:35:44 88
00:12:04
65.0 - 70.0
21,830 - 27,941
16,795
152 - 194
53,390 - 92,680 117371 - 644
UCC=2.5
LL=73
PI=37
-200=63
Wc=44
UCC=2.7
LL=188
PI=113
-200=91
Wc=138
ROCK CORE DATA
SOIL BORING TPS-4
CORE (HR:MIN:SEC)
CORING TIME
RECOVERY
RQD
(LB/IN )
PRESSURE
CORE
47.0 - 52.0
(LB/FT )
COMPRESSION
UNCONFINED
2 (LB/FT )
TENSILE
SPLITTING
2 (LB/IN )
COMPRESSION
UNCONFINED
2 (LB/IN )
TENSILE
SPLITTING
22(FEET)
DEPTH
300 66
53.0 - 58.0 300 28
3359.5 - 64.5 20350
00:13:52
00:14:34
00:14:05
32,472
1,460 10 226
DATE BY DESCRIPTION DATE DESCRIPTION
NO.
SHEET
PROJECT TITLE
MOORE BASS CONSULTING, INC.
REVISIONS SEAL:
EGS
Environmental & Geotechnical Specialists, Inc.BY
P.E. NO.: 49932
CRAIG E. DUNKELBERGER, P.E.
PUMP STATION 92
CITY OF TALLAHASSEEOFFICE (850) 386-1253
TALLAHASSEE, FLORIDA 32303
3676 HARTSFIELD ROAD REPORT OF SOIL BORINGS
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
-5
-10
-15
-20
A P
P R
O X I
M A
T E
E
L E
V A
T I O
N
(F
E E
V D
-5
-10
-15
-20
N
6.0-INCHES LIMEROCK BASE
SILTY FINE SAND (SM)
MEDIUM DENSE GRAY
CLAYEY FINE SAND (SC)
VERY LOOSE TO LOOSE GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND (SC)
MEDIUM DENSE GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND (SC)
LOOSE GRAY AND ORANGE
HIGHLY WEATHERED LIMESTONE
SOFT WHITE
HIGHLY WEATHERED LIMESTONE
MODERATELY HARD WHITE
WEATHERED LIMESTONE
HARD WHITE
HIGHLY WEATHERED LIMESTONE
MODERATELY HARD WHITE
*13
*9
*10
*7
*2
ST
ST
WOH
50/4"
50/4"
50/5"
RIG
HAMMER
DRILLER
DATE
ELEV.
OFF.
STA.
BOR #
CME-550
AUTOMATIC
B. GUERRA
6/18/2025
52.0 FEET
2072838 532487
TPS-4
CASING LENGTH 45 FEET
AT ELEV. -14.5 FEET
1.7-INCHES ASPHALT
CORE #1
CORE #2
CORE #3
-200=22
Wc=9
-200=32
Wc=22
-200=48
Wc=25
LL=54
PI=37
-200=36
Wc=27
LL=75
PI=41
-200=45
Wc=51
LL=152
PI=112
-200=77
Wc=93
HIGHLY PLASTIC CLAY (CH) WITH SAND
VERY SOFT TO SOFT GRAY AND ORANGE
(30%)
APPENDIX B
SOIL BORING LOGS
2.5
7.5
MEDIUM DENSE
GRAY
CLAYEY FINE SAND
LOOSE
GRAY
CLAYEY FINE SAND
STIFF
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
SOFT
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
VERY STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
VERY STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
MEDIUM DENSE
ORANGE AND GRAY
SILTY FINE SAND
VERY LOOSE
ORANGE AND GRAY
SILTY FINE SAND
VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT
SC
SC
CH
CH
CH
CH
CH
CH
CH
SM
SM
MH
-200%=23
-200%=72
LL=122
PI=94
-200%=51
LL=71
PI=58
-200%=66
LL=80
PI=51
-200%=33
-200%=60
LL=151
PI=94
ST
WOH
ST
WOH
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532494
PROJECT NO.: 39-13-25-01/102 EASTING: 2072794
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 51.5
BORING NO.: TPS-1 DATE: 3/3/2025
DRILLER: B. GUERRA FLUID LOSS: 100% @ 35.0'
DEPTH TO WATER (FEET): INITIAL: > 10.5' 24 HR: N/M CASING DEPTH (FEET):NONE
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it e
12.5
17.5
MODERATELY SOFT
WHITE
HIGHLY WEATHERED LIMESTONE
MODERATELY HARD
WHITE
HIGHLY WEATHERED LIMESTONE
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532494
PROJECT NO.: 39-13-25-01/102 EASTING: 2072794
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 51.5
BORING NO.: TPS-1 DATE: 3/3/2025
DRILLER: B. GUERRA FLUID LOSS: 100% @ 35.0'
DEPTH TO WATER (FEET): INITIAL: > 10.5' 24 HR: N/M CASING DEPTH (FEET):NONE
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
7.5
MEDIUM DENSE
GRAY
CLAYEY FINE SAND
LOOSE
GRAY
CLAYEY FINE SAND
VERY LOOSE
GRAY
CLAYEY FINE SAND
VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
VERY STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SILT WITH SAND
STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SILT WITH SAND
VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT
MEDIUM DENSE/STIFF
GRAY
HIGHLY PLASTIC CLAYEY SAND
FIRM
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
LOOSE
BROWN
SILTY FINE SAND
VERY SOFT
SC
SC
SC
CH
MH
MH
MH
SC
CH
CH
SM
-200%=24
LL=23
PI=12
-200%=24
-200%=76
LL=117
PI=88
-200%=75
LL=80
PI=36
-200%=65
-200%=46
LL=56
PI=32
-200%=20
-200%=59
LL=116
PI=79
WOH
WOH
WOH
ST
WOH
WOH
ST
WOH
WOH
WOH
WOH
WOH
ST
WOH
WOH
ST
WOH
WOH
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532494
PROJECT NO.: 39-13-25-01/102 EASTING: 2072827
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: TPS-2 DATE: 3/3/2025
DRILLER: B. GUERRA FLUID LOSS: 100% @ 38.0'
DEPTH TO WATER (FEET): INITIAL: > 14.0' 24 HR: N/M CASING DEPTH (FEET):NONE
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
17.5
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
HARD
WHITE
WEATHERED LIMESTONE
CH
WOH
50/5"
WOH
50/5"
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532494
PROJECT NO.: 39-13-25-01/102 EASTING: 2072827
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: TPS-2 DATE: 3/3/2025
DRILLER: B. GUERRA FLUID LOSS: 100% @ 38.0'
DEPTH TO WATER (FEET): INITIAL: > 14.0' 24 HR: N/M CASING DEPTH (FEET):NONE
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
7.5
1.7-INCHES ASPHALT
4.0-INCHES LIMEROCK BASE
MEDIUM DENSE
BROWN
SILTY FINE SAND WITH LIMEROCK
MEDIUM DENSE
BROWN
SILTY FINE SAND
LOOSE
BROWN
SILTY FINE SAND
MEDIUM DENSE
GRAY AND ORANGE
CLAYEY FINE SAND
LOOSE
GRAY AND ORANGE
CLAYEY FINE SAND
MEDIUM DENSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
STIFF
GRAY
HIGHLY PLASTIC SANDY SILY
LOOSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
SOFT
GRAY AND ORANGE
HIGHLY PLASTIC SILT
STIFF
GRAY AND ORANGE
HIGHLY PLASTIC SILT
SM
SM
SM
SC
SC
SC
MH
SC
MH
MH
-200%=30
LL=23
PI=7
-200%=15
-200%=30
LL=31
PI=13
-200%=40
LL=58
PI=35
-200%=43
-200%=63
LL=73
PI=37
-200%=41
-200%=91
LL=188
PI=113
ST
ST
ST
ST
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532505
PROJECT NO.: 39-13-25-01/102 EASTING: 2072843
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: TPS-3 DATE: 6/17/2025
DRILLER: B. GUERRA FLUID LOSS: 100% @ 41.0'
DEPTH TO WATER (FEET): INITIAL: > 10.0' 24 HR: N/M CASING DEPTH (FEET): 45.0
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
17.5
VERY SOFT
GRAY AND ORANGE
HIGHLY PLASTIC SILT
WEATHERED
WHITE
HIGHLY WEATHERED LIMESTONE
HARD
WHITE
WEATHERED LIMESTONE
CORE #1
REC=56%
RQD=35%
HARD
WHITE
WEATHERED LIMESTONE
CORE #2
REC=88%
RQD=42%
HARD
WHITE
WEATHERED LIMESTONE
CORE #3
REC=70%
RQD=38%
HARD
WHITE
WEATHERED LIMESTONE
CORE #4
REC=63%
RQD=38%
WEATHERED
WHITE
HIGHLY WEATHERED LIMESTONE
MH
WOH
WOH
50/3"
WOH
WOH
50/3"
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532505
PROJECT NO.: 39-13-25-01/102 EASTING: 2072843
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: TPS-3 DATE: 6/17/2025
DRILLER: B. GUERRA FLUID LOSS: 100% @ 41.0'
DEPTH TO WATER (FEET): INITIAL: > 10.0' 24 HR: N/M CASING DEPTH (FEET): 45.0
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
7.5
1.7-INCHES ASPHALT
6.0-INCHES LIMEROCK BASE
MEDIUM DENSE
GRAY
SILTY FINE SAND
LOOSE
GRAY AND ORANGE
CLAYEY FINE SAND
VERY LOOSE
GRAY AND ORANGE
CLAYEY FINE SAND
LOOSE
GRAY AND ORANGE
CLAYEY FINE SAND
MEDIUM DENSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
LOOSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
LOOSE
ORANGE
HIGHLY PLASTIC CLAYEY SAND
LOOSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
SOFT
GRAY AND ORANGE
HIGHLY PLASTIC CLAY WITH SAND
SM
SC
SC
SC
SC
SC
CH
-200%=22
-200%=32
-200%=48
-200%=36
LL=54
PI=37
-200%=45
LL=75
PI=41
-200%=77
LL=152
PI=112
ST
ST
ST
ST
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532487
PROJECT NO.: 39-13-25-01/102 EASTING: 2072838
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: TPS-4 DATE: 6/18/2025
DRILLER: B. GUERRA FLUID LOSS: 30% @ 41.0'
DEPTH TO WATER (FEET): INITIAL: > 10.5' 24 HR: 16.8' CASING DEPTH (FEET): 45.0
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
17.5
VERY SOFT
GRAY AND ORANGE
HIGHLY PLASTIC CLAY WITH SAND
SOFT
WHITE
HIGHLY WEATHERED LIMESTONE
MODERATELY HARD
WHITE
HIGHLY WEATHERED LIMESTONE
HARD
WHITE
WEATHERED LIMESTONE
CORE #1
REC=85%
RQD=66%
HARD
WHITE
WEATHERED LIMESTONE
CORE #2
REC=53%
RQD=28%
HARD
WHITE
WEATHERED LIMESTONE
CORE #3
REC=33%
RQD=20%
MODERATELY HARD
WHITE
HIGHLY WEATHERED LIMESTONE
CH
WOH
50/4"
50/4"
50/5"
WOH
50/4"
50/4"
50/5"
PROJECT: PUMP STATION 92 HAMMER TYPE: AUTOMATIC
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532487
PROJECT NO.: 39-13-25-01/102 EASTING: 2072838
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: TPS-4 DATE: 6/18/2025
DRILLER: B. GUERRA FLUID LOSS: 30% @ 41.0'
DEPTH TO WATER (FEET): INITIAL: > 10.5' 24 HR: 16.8' CASING DEPTH (FEET): 45.0
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION USCS
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
0.5
1.5
MEDIUM DENSE
BROWN
CLAYEY FINE SAND
MEDIUM DENSE
BROWN
SILTY FINE SAND
A-2-6
A-2-4
-200%=23
-200%=22
LL=23
PI=13
-200%=13
PROJECT: PUMP STATION 92 HAMMER TYPE: CPI
CLIENT: MOORE BASS CONSULTING, INC. NORTHING: 532535
PROJECT NO.: 39-13-25-01/102 EASTING: 2072876
PROJECT LOCATION: TALLAHASSEE, FLORIDA ELEVATION (FEET): 52.0
BORING NO.: DRI-1 DATE: 6/19/2025
DRILLER: J. NELSON FLUID LOSS: N/A
DEPTH TO WATER (FEET): INITIAL: > 5.5' 24 HR: > 5.5' CASING DEPTH (FEET):NONE
NOTES: N/M MEANS NOT MEASURED
N/A MEANS NOT AVAILABLE
D E
P T
H
M E
T E
R S
D E
P T
H
F E
E T
S A
M P
L E
S Y
M B
O L
DESCRIPTION AASHTO
TEST
RESULTS
Wc
Wc (%)
N
N-Value
T h is i n fo rm a ti o n p e rt a in s o n ly t o t h is b o ri n g a n d s h o u ld n o t b e i n te rp re te d a s b e in g i n d ic it iv e o f th e s it
APPENDIX C
SOIL CLASSIFICATION DATA
0.0-0.5 14 -- SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
1.0-1.5 21 97 96 95 86 69 41 23 13 SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
2.0-2.5 6 13 SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
3.0-3.5 7 10 SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
4.0-4.5 8 7 SC LOOSE
GRAY
CLAYEY FINE SAND
5.0-5.5 9 7 SC LOOSE
GRAY
CLAYEY FINE SAND
6.0-7.5 12 5 SC LOOSE
GRAY
CLAYEY FINE SAND
7.5-9.0 14 3 SC LOOSE
GRAY
CLAYEY FINE SAND
9.0-10.5 43 100 100 100 98 96 88 72 122 94 12 CH STIFF
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
10.5-12.0 26 1 CH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
12.5-14.0 54 2 CH SOFT
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
15.0-16.5 29 11 CH STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
17.5-19.0 44 11 CH STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS, INC.
SOIL CLASSIFICATION DATA
Project: PUMP STATION 92
Client: MOORE BASS CONSULTING, INC. Project No.: 39-13-25-01/102
Boring: TPS-1 Location: TALLAHASSEE, FL
DEPTH
(FEET)
Wc
-4
-10
-20
-40
-60
-100
-200
LL PI
Org.
N Value
USCS Description
20.0-21.5 28 100 100 100 98 93 66 51 71 58 13 CH VERY STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
22.5-24.0 47 7 CH STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
24.5-26.5 45 100 100 100 100 99 92 66 80 51 ST CH VERY STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
27.5-29.0 36 100 100 100 100 99 90 33 7 SM MEDIUM DENSE
ORANGE AND GRAY
SILTY FINE SAND
30.0-31.5 48 2 SM VERY LOOSE
ORANGE AND GRAY
SILTY FINE SAND
32.5-34.0 114 100 100 100 100 99 96 60 151 94 WOH MH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT
35.0-36.5 81 1 MH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT
38.0-40.0 -- 18 -- MODERATELY SOFT
WHITE
HIGHLY WEATHERED LIMESTONE
40.0-41.5 -- 36 -- MODERATELY HARD
WHITE
HIGHLY WEATHERED LIMESTONE
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS, INC.
SOIL CLASSIFICATION DATA
Project: PUMP STATION 92
Client: MOORE BASS CONSULTING, INC. Project No.: 39-13-25-01/102
Boring: TPS-1 Location: TALLAHASSEE, FL
DEPTH
(FEET)
Wc
-4
-10
-20
-40
-60
-100
-200
LL PI
Org.
N
0.0-0.5 12 -- SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
1.0-1.5 12 100 99 98 88 70 43 24 23 12 13 SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
2.0-2.5 22 8 SC MEDIUM DENSE
GRAY
CLAYEY FINE SAND
3.0-3.5 22 5 SC LOOSE
GRAY
CLAYEY FINE SAND
4.0-4.5 12 7 SC LOOSE
GRAY
CLAYEY FINE SAND
5.0-5.5 13 5 SC LOOSE
GRAY
CLAYEY FINE SAND
6.0-7.5 34 1 SC VERY LOOSE
GRAY
CLAYEY FINE SAND
7.5-9.0 11 WOH SC VERY LOOSE
GRAY
CLAYEY FINE SAND
9.0-10.5 14 97 96 94 84 67 42 24 WOH SC VERY LOOSE
GRAY
CLAYEY FINE SAND
10.5-12.0 45 100 100 100 99 96 84 76 117 88 WOH CH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC CLAY WITH SAND
12.0-14.0 37 100 100 99 98 95 88 75 80 36 ST MH VERY STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SILT WITH SAND
15.0-16.5 43 12 MH STIFF
ORANGE AND GRAY
HIGHLY PLASTIC SILT WITH SAND
17.5-19.0 38 WOH MH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS, INC.
SOIL CLASSIFICATION DATA
Project: PUMP STATION 92
Client: MOORE BASS CONSULTING, INC. Project No.: 39-13-25-01/102
Boring: TPS-2 Location: TALLAHASSEE, FL
DEPTH
(FEET)
Wc
-4
-10
-20
-40
-60
-100
-200
LL PI
Org.
N
20.0-21.5 47 100 100 100 99 97 85 65 WOH MH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY SILT
22.5-24.5 32 100 100 100 99 98 96 46 56 32 ST SC MEDIUM DENSE/STIFF
GRAY
HIGHLY PLASTIC CLAYEY SAND
25.0-26.5 33 6 CH FIRM
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
27.5-29.0 38 2 CH SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
30.0-31.5 50 100 100 100 100 99 59 20 4 SM LOOSE
BROWN
SILTY FINE SAND
32.5-34.0 73 100 100 100 100 99 99 59 116 79 WOH CH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
35.0-36.5 78 WOH CH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
38.0-40.0 57 WOH CH VERY SOFT
ORANGE AND GRAY
HIGHLY PLASTIC SANDY CLAY
40.0-41.5 -- 64 -- HARD
WHITE
WEATHERED LIMESTONE
42.5-44.0 -- 50/5" -- HARD
WHITE
WEATHERED LIMESTONE
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS, INC.
SOIL CLASSIFICATION DATA
Project: PUMP STATION 92
Client: MOORE BASS CONSULTING, INC. Project No.: 39-13-25-01/102
Boring: TPS-2 Location: TALLAHASSEE, FL
DEPTH
(FEET)
Wc
-4
-10
-20
-40
-60
-100
-200
LL PI
Org.
N
0.0-0.1 -- -- -- 1.7-INCHES ASPHALT
0.1-0.4 -- -- -- 4.0-INCHES LIMEROCK
0.4-0.5 13 -- SM MEDIUM DENSE
BROWN
SILTY FINE SAND WITH LIMEROCK
1.0-1.5 8 13 SM MEDIUM DENSE
BROWN
SILTY FINE SAND
2.0-2.5 12 100 98 96 87 72 48 30 23 7 10 SM MEDIUM DENSE
BROWN
SILTY FINE SAND
3.0-3.5 5 100 100 98 87 65 37 15 10 SM MEDIUM DENSE
BROWN
SILTY FINE SAND
4.0-4.5 7 8 SM LOOSE
BROWN
SILTY FINE SAND
4.5-6.0 8 5 SM LOOSE
BROWN
SILTY FINE SAND
6.0-7.5 8 7 SM LOOSE
BROWN
SILTY FINE SAND
7.5-9.0 11 7 SM LOOSE
BROWN
SILTY FINE SAND
9.0-10.5 17 100 100 99 89 72 49 30 31 13 9 SC MEDIUM DENSE
GRAY AND ORANGE
CLAYEY FINE SAND
10.5-12.0 20 4 SC LOOSE
GRAY AND ORANGE
CLAYEY FINE SAND
12.5-14.0 27 100 100 100 99 96 59 40 58 35 11 SC MEDIUM DENSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
15.0-16.5 21 14 SC MEDIUM DENSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
17.5-19.0 30 11 SC MEDIUM DENSE
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS, INC.
SOIL CLASSIFICATION DATA
Project: PUMP STATION 92
Client: MOORE BASS CONSULTING, INC. Project No.: 39-13-25-01/102
Boring: TPS-3 Location: TALLAHASSEE, FL
DEPTH
(FEET)
Wc
-4
-10
-20
-40
-60
-100
-200
LL PI
Org.
N
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
20.0-21.5 34 100 100 99 94 82 56 43 18 SC MEDIUM DENSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
22.5-24.0 45 8 SC MEDIUM DENSE
GRAY AND ORANGE
HIGHLY PLASTIC CLAYEY SAND
25.0-27.0 44 100 100 100 100 100 98 63 73 37 ST MH STIFF
GRAY
HIGHLY PLASTIC SANDY SILY
27.5-29.0 45 100 100 100 100 100 97 41 5 SC…