Pump Station 92 Replacement Project - Supplemental Technical Specifications

This document comprises supplemental technical specifications for the City of Tallahassee's Pump Station 92 replacement project, a municipal wastewater lift station infrastructure upgrade located at 6636 Buck Lake Road in Tallahassee, Florida. The project involves construction of a new quadruplex submersible pump station with above-ground valve arrays, including deep foundations utilizing micropiles for the wet well and bypass structure, gravity and force main sanitary sewer piping with associated manholes, electrical service infrastructure, generator installation with automatic transfer switches, motor control equipment, stormwater retention areas, bypass pumping systems, erosion control measures, and site improvements including driveway replacement, fencing removal and installation, and landscaping. The specifications detail comprehensive construction requirements across multiple divisions including concrete forming and reinforcing, cast-in-place concrete with leak testing, non-shrink grouting, epoxy and high-density polyethylene (HDPE) wet well lining systems, submersible sewage pumps rated at 1500 GPM at 227 feet total dynamic head, electrical work, packaged generator assemblies (600 KW, 750 KVA diesel-driven), automatic transfer switches, drilled concrete piers and shafts, and stainless steel slide gates. The mandatory pre-bid meeting is scheduled for March 16, 2026, at 2:00 PM EST via Microsoft Teams, with detailed technical provisions addressing coarse aggregate base, micropile foundations, pump specifications, electrical systems, and quality assurance requirements throughout construction.

The specifications establish rigorous quality assurance standards requiring manufacturers and installers to demonstrate five years of experience in similar work, with specific personnel qualifications mandated for engineers, drill operators, and supervisors on micropile and foundation work. Material requirements specify ASTM-compliant products including reinforcing steel meeting ASTM A615 Grade 60, submersible pump components of cast iron with high chrome white iron impellers and stainless steel fasteners, diesel generator engines with electronic governing systems, and permanent steel pipe casing for micropiles meeting API specifications. Load testing requirements are comprehensive, including static load tests on sacrificial test piles prior to production installation and verification load tests on minimum five percent of production micropiles, with specific acceptance criteria for deflection, creep rates, and failure loads. The project requires detailed submittals including design calculations signed and sealed by professional engineers, shop drawings, micropile installation plans with grouting procedures and load testing methodologies, equipment calibration documentation, and post-construction testing and inspection reports. Payment is structured as lump sum compensation for major items including micropiles, coarse aggregate base, and complete system delivery, with pricing to include all labor, materials, equipment, and incidentals necessary for full project completion and commissioning.

View the file

Other files

File Type Posted
19-APPENDIX B - Pump Station 92 Replacement - FDEP Permit (0464185-001-DWC-CG).pdf PDF
6-3. IFB 044-26-RM SUPPLEMENTAL SPECIFICATIONS.pdf PDF
14-14. REQUIRED HUMAN TRAFFICKING AFFIDAVIT.pdf PDF
5-2. IFB 044-26-RM GENERAL PROVISIONSONS.pdf PDF
21-APPENDIX E - Pump Station 92 Report of Geotechnical Investigation (2026-02-10).pdf PDF
2-7. REQUIRED BID SCHEDULE.pdf PDF
12-12. REQUIRED IFB Representations Certifications.docx DOCX document
3-9. REQUIRED OEV FORMS ITB MWBE Forms Updated 10.06.22.docx DOCX document
1-1. REQUIRED IFB SECTIONS 123.docx DOCX document
17-18. BID SCHEDULRE EXELL .xlsx XLSX spreadsheet
22-APPENDIX F - Pump Station 92 SUE Test Hole Report (4-11-2025).pdf PDF
16-17. REQUIRED Certification of a Drug Free Workplace (1).pdf PDF
4-8. REQUIRED PERFORMANCE BOND BID BOND TRENCH SAFETY FORMS.docx DOCX document
9-6. IFB 044-26-RM PLANS - 2026.02.24 SS.pdf PDF
10-10. REQUIRED Vendor Conflict of Interest.docx DOCX document
18-APPENDIX A - Pump Station 92 Replacement - LC EMP (LEM25015).pdf PDF
8-5. IFB 044-26-RM SUPPLEMENTAL INFORMATION.docx DOCX document
13-13. DRAFT CONTRACT CONSTRUCTION (from IFB) 1.2024.doc DOC document
7-4. IFB 044-26-RM SPECIAL PROVISIONS.docx DOCX document
15-15 REQUIRED Responsible Vendor Review Form.docx DOCX document
11-11. REQUIRED Non Collusion Affidavit of Respondent.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplemental Technical

Specifications for

PS #92 Replacement

MBC Job No. T0545.0103

Date: February 2026

These supplemental technical specifications are to be used in conjunction with the City of Tallahassee UU&PI Engineering Division Technical Specifications for Water and Sewer Construction, Latest Edition.

805 North Gadsden Street - Tallahassee, Florida 32303 - (850) 222-5678 MBC Job No. T0545.0103

Certificate of Authorization No. 00006108

Table of Contents

DIVISION 01 – GENERAL

014500 LEAK TESTING FOR HYDRAULIC STRUCTURES

DIVISION 03 – CONCRETE

031000 CONCRETE FORMING AND ACCESSORIES

032000 CONCRETE REINFORCING

033000 CAST-IN-PLACE CONCRETE

036200 NON-SHRINK GROUTING

DIVISION 09 – FINISHES

099700 HDPE WET WELL LINING SYSTEMS

099700 EPOXY WET WELL LINING SYSTEMS

DIVISION 22 – PLUMBING

221329 SUBMERSIBLE SEWAGE PUMPS

DIVISION 26 – ELECTRICAL

260500 COMMON WORK RESULTS FOR ELECTRICAL

263200 PACKAGED GENERATOR ASSEMBLIES

263623 AUTOMATIC TRANSFER SWITCHES (ATS)

DIVISION 31 – EARTHWORK

316329 DRILLED CONCRETE PIERS AND SHAFTS

DIVISION 40 – PROCESS INTERCONNECTIONS

400559 STAINLESS STEEL SLIDE GATES

GEOTECHNICAL

T289 COARSE AGGREGATE BASE

T455 MICROPILE FOUNDATIONS

014500 - 1

LEAK TESTING OF HYDRAULIC STRUCTURES

T0545.0103 014500 PS #92 Replacement

SECTION 014500 – LEAK TESTING OF HYDRAULIC STRUCTURES

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Hydrostatically test reinforced concrete structures which are intended to contain water to determine that they are watertight and free of detectable leaks.

1.2 REFERENCES

A. ACI 350.1-10 – Specification for Tightness Testing of Environmental

Engineering Concrete Containment Structures

Part 2 - PRODUCTS

2.1 GENERAL

A. Provide water, piping, and equipment to test concrete structures for leakage.

Part 3 - EXECUTION

3.1 INSPECTION AND TESTING

A. Testing and retesting shall conform to the requirements of ACI 350.1-10, Section 2.

B. Prior to testing, clean exposed surfaces by thorough hosing and remove the loosened matter and wash water from the structures.

C. Ground water level shall be brought to a level below the top of the base slab and kept at that elevation or at a lower elevation during the test.

D. Conduct testing before backfill is placed against walls and after all concrete has attained the specified compressive strength.

E. Testing shall not be scheduled for a period when the forecast is for a difference of more than 35°F between the ambient temperature readings at the times of the initial and final level measurements of the water surface.

F. The engineer shall be notified at least one (1) week in advance of any leakage tests.

G. Fill hydraulic structures to be subjected to leakage tests (including modified existing structures) with water to the normal liquid level line. Filling rate shall not exceed 4 feet of water per hour. Repair any running leaks which appear during filling before continuing. After the structure, has been kept full for 3 days, it will be assumed, for the purposes of the test, that the absorption of moisture by the concrete in the structure is complete. Then, close all valves and gates to the structure and measure the change in water surface each day for at least a period of three (3) days, but not longer than five (5) days. In uncovered tanks, water temperature, evaporation and precipitation shall be measured and the

014500 - 2

LEAK TESTING OF HYDRAULIC STRUCTURES

T0545.0103 014500 PS #92 Replacement change in water volume shall be calculated and corrected, if necessary, to account for evaporation, precipitation, and temperature.

H. During the test period, examine all exposed portions of the structure, and mark all visible leaks or damp spots. Such leaks or damp spots shall be repaired later. If the drop in water surface in a 24-hour period exceeds 1/20 of 1 percent of the normal volume of liquid contained in the structure, the leakage shall be considered excessive.

I. If the leakage is excessive, drain the structure, repair leaks and damp spots, and refill the structure and again test for leakage. Continue this process until the drop in water surface in a 24-hour period, with the structure full, is less than

1/20 of 1 percent of the volume of liquid held in the structure.

J. Repairs and additional tests shall be made by the Contractor at no additional cost to the Owner.

K. Apply specified coatings only after acceptance of leakage testing by the

Engineer.

3.2 REPAIR METHODS

A. Methods for repairing concrete not passing the leakage test shall conform to the applicable provisions of Section 03300 and shall be subject to approval by the

Engineer.

END OF SECTION

031000 - 1

CONCRETE FORMING AND

ACCESSORIES

T0545.0103 031000 PS #92 Replacement

SECTION 031000 - CONCRETE FORMING AND ACCESSORIES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Form-facing material for cast-in-place concrete.

2. Form liners.

3. Shoring, bracing, and anchoring.

1.3 DEFINITIONS

A. Form-Facing Material: Temporary structure or mold for the support of concrete while the concrete is setting and gaining sufficient strength to be self-supporting.

B. Formwork: The total system of support of freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as supporting members, hardware, and necessary bracing.

1.4 ACTION SUBMITTALS

A. Product Data: For each of the following:

1. Exposed surface form-facing material.

2. Concealed surface form-facing material.

3. Forms for cylindrical columns.

4. Pan-type forms.

5. Void forms.

6. Form liners.

7. Form ties.

8. Waterstops.

9. Form-release agent.

B. Shop Drawings: Prepared by, and signed and sealed by, a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.

031000 - 2

1. For exposed vertical concrete walls, indicate dimensions and form tie locations.

2. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301.

a. Location of construction joints is subject to approval of the Architect.

3. Indicate location of waterstops.

4. Indicate form liner layout and form line termination details.

5. Indicate proposed schedule and sequence of stripping of forms, shoring removal, and reshoring installation and removal.

6. Indicate layout of insulating concrete forms, dimensions, course heights, form types, and details.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing and inspection agency.

B. Field quality-control reports.

1.6 QUALITY ASSURANCE

A. Testing and Inspection Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Form Liners: Store form liners under cover to protect from sunlight.

B. Waterstops: Store waterstops under cover to protect from moisture, sunlight, dirt, oil, and other contaminants.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.

1. Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."

2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.

031000 - 3

a. For architectural concrete specified in Section 033300 "Architectural Concrete," limit deflection of form-facing material, studs, and walers to

0.0025 times their respective clear spans (L/400).

2.2 FORM-FACING MATERIALS

A. As-Cast Surface Form-Facing Material:

1. Provide continuous, true, and smooth concrete surfaces.

2. Furnish in largest practicable sizes to minimize number of joints.

3. Acceptable Materials: As required to comply with Surface Finish designations specified in Section 033000 "Cast-In-Place Concrete, and as follows:

a. Plywood, metal, or other approved panel materials.

b. Exterior-grade plywood panels, suitable for concrete forms, complying with

DOC PS 1, and as follows:

1) APA HDO (high-density overlay).

2) APA MDO (medium-density overlay); mill-release agent treated and edge sealed.

3) APA Structural 1 Plyform, B-B or better; mill oiled and edge sealed.

4) APA Plyform Class I, B-B or better; mill oiled and edge sealed.

B. Concealed Surface Form-Facing Material: Lumber, plywood, metal, plastic, or another approved material.

1. Provide lumber dressed on at least two edges and one side for tight fit.

C. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class.

1. Provide forms with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.

D. Pan-Type Forms: Glass-fiber-reinforced plastic or formed steel, stiffened to resist plastic concrete loads without detrimental deformation, with straight or tapered end forms.

E. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to support weight of plastic concrete and other superimposed loads.

F. Form Liners:

1. Face Pattern: Smooth.

2.3 WATERSTOPS

A. Flexible Rubber Waterstops: U.S. Army Corps of Engineers CRD-C 513, with factory-

031000 - 4 installed metal eyelets, for embedding in concrete to prevent passage of fluids through joints, with factory fabricated corners, intersections, and directional changes.

1. Profile: As indicated.

2. Dimensions: 4 inches by 3/16 inch thick; nontapered.

B. Chemically Resistant Flexible Waterstops: Thermoplastic elastomer rubber waterstops with factory-installed metal eyelets, for embedding in concrete to prevent passage of fluids through joints; resistant to oils, solvents, and chemicals, with factory fabricate corners, intersections, and directional changes.

1. Profile: As indicated.

2. Dimensions: 4 inches by 3/16 inch thick; nontapered.

C. Flexible PVC Waterstops: U.S. Army Corps of Engineers CRD-C 572, with factory-installed metal eyelets, for embedding in concrete to prevent passage of fluids through joints, with factory fabricate corners, intersections, and directional changes.

1. Profile: As indicated.

2. Dimensions: 4 inches by 3/16 inch thick; nontapered.

D. Self-Expanding Butyl Strip Waterstops: Manufactured rectangular or trapezoidal strip, butyl rubber with sodium bentonite or other hydrophilic polymers, for adhesive bonding to concrete, 3/4 by 1 inch.

E. Self-Expanding Rubber Strip Waterstops: Manufactured rectangular or trapezoidal strip, bentonite-free hydrophilic polymer-modified chloroprene rubber, for adhesive bonding to concrete, 3/8 by 3/4 inch.

2.4 RELATED MATERIALS

A. Reglets: Fabricate reglets of not less than 0.022-inch- thick, galvanized-steel sheet.

Temporarily fill or cover face opening of reglet to prevent intrusion of concrete or debris.

B. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.

C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

D. Rustication Strips: Wood, metal, PVC, or rubber strips, kerfed for ease of form removal.

E. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

2. Form release agent for form liners shall be acceptable to form liner manufacturer.

031000 - 5

F. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.

2. Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.

3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.

PART 3 - EXECUTION

3.1 INSTALLATION OF FORMWORK

A. Comply with ACI 301.

B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish designations specified in Section 033000 "Cast-In- Place Concrete" for as-cast finishes .

C. Limit concrete surface irregularities as follows:

1. Surface Finish-1.0: ACI 117 Class D, 1 inch.

2. Surface Finish-2.0: ACI 117 Class B, 1/4 inch.

3. Surface Finish-3.0: ACI 117 Class A, 1/8 inch.

D. Construct forms tight enough to prevent loss of concrete mortar.

1. Minimize joints.

2. Exposed Concrete: Symmetrically align joints in forms.

E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.

1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.

2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

3. Install keyways, reglets, recesses, and other accessories, for easy removal.

F. Do not use rust-stained, steel, form-facing material.

G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.

1. Provide and secure units to support screed strips

2. Use strike-off templates or compacting-type screeds.

031000 - 6

H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.

1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.

2. Locate temporary openings in forms at inconspicuous locations.

I. Chamfer exterior corners and edges of permanently exposed concrete.

J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches.

K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.

1. Determine sizes and locations from trades providing such items.

2. Obtain written approval of Architect prior to forming openings not indicated on

Drawings.

L. Construction and Movement Joints:

1. Construct joints true to line with faces perpendicular to surface plane of concrete.

2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

3. Place joints perpendicular to main reinforcement.

4. Locate joints for beams, slabs, joists, and girders in the middle third of spans.

a. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.

5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

6. Space vertical joints in walls as indicated on Drawings.

a. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible.

M. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection.

1. Locate ports and openings in bottom of vertical forms, in inconspicuous location, to allow flushing water to drain.

2. Close temporary ports and openings with tight-fitting panels, flush with inside face of form, and neatly fitted, so joints will not be apparent in exposed concrete surfaces.

N. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

O. Retighten forms and bracing before placing concrete, as required, to prevent mortar

031000 - 7 leaks and maintain proper alignment.

P. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.

3. Install reglets to receive waterproofing and to receive through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

4. Install dovetail anchor slots in concrete structures, as indicated on Drawings.

5. Clean embedded items immediately prior to concrete placement.

3.3 INSTALLATION OF WATERSTOPS

A. Flexible Waterstops: Install in construction joints and at other joints indicated to form a continuous diaphragm.

1. Install in longest lengths practicable.

2. Locate waterstops in center of joint unless otherwise indicated on Drawings.

3. Allow clearance between waterstop and reinforcing steel of not less than 2 times the largest concrete aggregate size specified in Section 033000 "Cast-In-Place Concrete."

4. Secure waterstops in correct position at 12 inches on center.

5. Field fabricate joints in accordance with manufacturer's instructions using heat welding.

a. Miter corners, intersections, and directional changes in waterstops.

b. Align center bulbs.

6. Clean waterstops immediately prior to placement of concrete.

7. Support and protect exposed waterstops during progress of the Work.

B. Self-Expanding Strip Waterstops: Install in construction joints and at other locations indicated on Drawings, according to manufacturer's written instructions, by adhesive bonding, mechanically fastening, and firmly pressing into place.

1. Install in longest lengths practicable.

2. Locate waterstops in center of joint unless otherwise indicated on Drawings.

3. Protect exposed waterstops during progress of the Work.

031000 - 8

3.4 REMOVING AND REUSING FORMS

A. Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.

1. Leave formwork for beam soffits, joists, slabs, and other structural elements that support weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.

2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.

B. Clean and repair surfaces of forms to be reused in the Work.

1. Split, frayed, delaminated, or otherwise damaged form-facing material are unacceptable for exposed surfaces.

2. Apply new form-release agent.

C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.

1. Align and secure joints to avoid offsets.

2. Do not use patched forms for exposed concrete surfaces unless approved by

Architect.

3.5 SHORING AND RESHORING INSTALLATION

A. Comply with ACI 318 and ACI 301 for design, installation, and removal of shoring and reshoring.

1. Do not remove shoring or reshoring until measurement of slab tolerances is complete.

B. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection.

3.6 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

C. Inspections:

031000 - 9

1. Inspect formwork for shape, location, and dimensions of the concrete member being formed.

032000 - 1

CONCRETE REINFORCING

T0545.0103 032000 PS #92 Replacement

SECTION 032000 - CONCRETE REINFORCING

1.1 SUMMARY

A. Section Includes:

1. Steel reinforcement bars.

2. Welded-wire reinforcement.

1.2 ACTION SUBMITTALS

1. Each type of steel reinforcement.

2. Epoxy repair coating.

3. Zinc repair material.

4. Bar supports.

5. Mechanical splice couplers.

B. Sustainable Design Submittals:

1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

2. Product Certificates: For regional materials, indicating location of material manufacturer and point of extraction, harvest, or recovery for each raw material.

Include distance to Project and cost for each regional material.

C. Shop Drawings: Comply with ACI SP-066:

1. Include placing drawings that detail fabrication, bending, and placement.

2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.

D. Construction Joint Layout: Indicate proposed construction joints required to build the structure.

1. Location of construction joints is subject to approval of Architect.

1.3 INFORMATIONAL SUBMITTALS

A. Qualification Statements: For testing and inspection agency.

B. Welding certificates.

1. Reinforcement To Be Welded: Welding procedure specification in accordance

032000 - 2 with AWS D1.4/D1.4M.

C. Material Certificates: For each of the following, signed by manufacturers:

1. Epoxy-Coated Reinforcement: CRSI's "Epoxy Coating Plant Certification."

2. Dual-Coated Reinforcement: CRSI's "Epoxy Coating Plant Certification."

D. Material Test Reports: For the following, from a qualified testing agency:

1. Steel Reinforcement:

a. For reinforcement to be welded, mill test analysis for chemical composition and carbon equivalent of the steel in accordance with ASTM A706/A706M.

2. Mechanical splice couplers.

E. Field quality-control reports.

1.4 QUALITY ASSURANCE

A. Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

B. Welding Qualifications: Qualify procedures and personnel in accordance with AWS D1.4/D 1.4M.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage and to avoid damaging coatings on steel reinforcement.

1. Store reinforcement to avoid contact with earth.

2. Do not allow epoxy-coated reinforcement to be stored outdoors for more than 60 days without being stored under an opaque covering.

3. Do not allow dual-coated reinforcement to be stored outdoors for more than 60 days without being stored under an opaque covering.

4. Do not allow stainless steel reinforcement to come into contact with uncoated reinforcement.

PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT

A. Recycled Content: Provide manufacturer documentation for recycled content, indicating postconsumer and preconsumer recycled content.

1. Regional Materials: Steel shall be manufactured within 500 miles of Project site.

032000 - 3

B. Reinforcing Bars: ASTM A615/A615M, Grade 60, deformed.

C. Low-Alloy Steel Reinforcing Bars: ASTM A706/A706M, deformed.

D. Headed-Steel Reinforcing Bars: ASTM A970/A970M.

E. Galvanized Reinforcing Bars:

1. Steel Bars: ASTM A615/A615M, Grade 60, deformed bars.

2. Zinc Coating: ASTM A767/A767M, Class I zinc coated after fabrication and bending.

F. Epoxy-Coated Reinforcing Bars:

1. Steel Bars: ASTM A615/A615M, Grade 60, deformed bars.

2. Epoxy Coating: ASTM A775/A775M or ASTM A934/A934M with less than 2 percent damaged coating in each 12-inch bar length.

G. Dual-Coated Reinforcing Bars: ASTM A1055/A1055M.

1. Steel Bars: ASTM A615/A615M, Grade 60, deformed bars.

2. Zinc Coating: ASTM A1055/A1055M [Type I][Type II].

3. Epoxy Coating: ASTM A775/A775M or ASTM A934/A934M with less than 2 percent damaged coating in each 12-inch bar length.

H. Stainless Steel Reinforcing Bars: ASTM A955/A955M, [Grade 60][Grade 75], Type 304, deformed.

I. Steel Bar Mats: ASTM A184/A184M, fabricated from ASTM A615/A615M, Grade 60, deformed bars, assembled with clips.

J. Plain-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.

K. Deformed-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, flat sheet.

L. Galvanized-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from galvanized-steel wire into flat sheets.

M. Epoxy-Coated Welded-Wire Reinforcement: ASTM A884/A884M, Class A coated, Type 1, plain steel.

2.2 REINFORCEMENT ACCESSORIES

A. Joint Dowel Bars: ASTM A615/A615M, Grade 60, plain-steel bars, cut true to length with ends square and free of burrs.

B. Epoxy-Coated Joint Dowel Bars: ASTM A615/A615M, Grade 60, plain-steel bars, ASTM A775/A775M epoxy coated.

C. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and

032000 - 4 fastening reinforcing bars and welded-wire reinforcement in place.

1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.

b. For epoxy-coated reinforcement, use CRSI Class 1A epoxy-coated or other dielectric-polymer-coated wire bar supports.

c. For dual-coated reinforcement, use CRSI Class 1A epoxy-coated or other dielectric-polymer-coated wire bar supports.

d. For zinc-coated reinforcement, use galvanized wire or dielectric-polymer-coated wire bar supports.

e. For stainless steel reinforcement, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.

D. Mechanical Splice Couplers: ACI 318 Type 1, same material of reinforcing bar being spliced; dowel-bar type.

E. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch in diameter.

1. Finish: Plain.

F. Stainless Steel Tie Wire: ASTM A1022/A1022M, not less than 0.0508 inch in diameter.

G. Epoxy Repair Coating: Liquid, two-part, epoxy repair coating; compatible with epoxy coating on reinforcement and complying with ASTM A775/A775M.

H. Zinc Repair Material: ASTM A780/A780M.

2.3 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

PART 3 - EXECUTION

3.1 PREPARATION

A. Protection of In-Place Conditions:

1. Do not cut or puncture vapor retarder.

2. Repair damage and reseal vapor retarder before placing concrete.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

032000 - 5

3.2 INSTALLATION OF STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.

B. Accurately position, support, and secure reinforcement against displacement.

1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.

2. Do not tack weld crossing reinforcing bars.

C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.

D. Provide concrete coverage in accordance with ACI 318.

E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

F. Splices: Lap splices as indicated on Drawings.

1. Bars indicated to be continuous, and all vertical bars to be lapped not less than 36 bar diameters at splices, or 24 inches, whichever is greater.

2. Stagger splices in accordance with ACI 318.

3. Mechanical Splice Couplers: Install in accordance with manufacturer's instructions.

4. Weld reinforcing bars in accordance with AWS D1.4/D 1.4M, where indicated on

Drawings.

G. Install welded-wire reinforcement in longest practicable lengths.

1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard Practice."

a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches.

2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.

3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.

4. Lace overlaps with wire.

H. Epoxy-Coated Reinforcement: Repair cut and damaged epoxy coatings with epoxy repair coating in accordance with ASTM D3963/D3963M.

I. Dual-Coated Reinforcement: Repair cut and damaged epoxy coatings with epoxy repair coating in accordance with ASTM D3963/D3963M.

J. Zinc-Coated Reinforcement: Repair cut and damaged zinc coatings with zinc repair material in accordance with ASTM A780/A780M.

032000 - 6

3.3 JOINTS

A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

1. Place joints perpendicular to main reinforcement.

2. Continue reinforcement across construction joints unless otherwise indicated.

3. Do not continue reinforcement through sides of strip placements of floors and slabs.

B. Doweled Joints: Install dowel bars and support assemblies at joints where indicated.

Lubricate or asphalt coat one-half of dowel length, to prevent concrete bonding to one side of joint.

3.4 INSTALLATION TOLERANCES

A. Comply with ACI 117.

3.5 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Testing Agency: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

C. Inspections:

1. Steel-reinforcement placement.

2. Steel-reinforcement mechanical splice couplers.

3. Steel-reinforcement welding.

033000 - 1

CAST-IN-PLACE CONCRETE

T0545.0103 033000 PS #92 Replacement

SECTION 033000 - CAST-IN-PLACE CONCRETE

1.1 SUMMARY

A. Section Includes:

1. Concrete standards.

2. Concrete materials.

3. Admixtures.

4. Fiber reinforcement.

5. Vapor retarders.

6. Repair materials.

7. Concrete mixture materials.

8. Concrete mixture class types.

9. Concrete mixing.

B. Related Requirements:

1. Section 031000 "Concrete Forming and Accessories" for form-facing materials, form liners, insulating concrete forms, and waterstops.

2. Section 032000 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.

1.2 DEFINITIONS

A. Cementitious Materials: Portland cement or blended hydraulic cement alone or in combination with one or more of the following:

1. Fly ash, slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.

B. Water/Cementitious Materials (w/cm) Ratio: The ratio by weight of mixing water to cementitious materials.

1.3 ACTION SUBMITTALS

A. Product Data:

1. Portland cement.

2. Blended hydraulic cement.

3. Fly ash.

4. Slag cement.

5. Silica fume.

6. Natural or other pozzolans.

7. Aggregates.

033000 - 2

8. Ground calcium carbonate and aggregate mineral fillers.

9. Admixtures:

a. Include limitations of use. Admixtures that do not comply with reference ASTM International requirements must be submitted with test data for approval.

10. Fiber reinforcement.

11. Vapor retarders.

12. Curing materials.

13. Joint fillers.

14. Repair materials.

B. Sustainable Design Submittals:

1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

C. Design Mixtures: For each concrete mixture, include the following:

1. Mixture identification.

2. Compressive strength at 28 days or other age as specified.

3. Compressive strength required at stages of construction.

4. Durability exposure classes for Exposure Categories F, S, W, and C.

5. Maximum w/cm ratio.

6. Slump or slump flow limit.

7. Air content.

8. Nominal maximum aggregate size.

9. Synthetic macrofiber content.

10. Intended placement method.

11. Submit adjustments to design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant changes.

D. Shop Drawings:

1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.

a. Location of construction joints is subject to approval of the Architect.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For the following:

1. Installer: Include copies of applicable ACI certificates.

2. Testing Agency: Include documentation indicating compliance with ASTM E329 or ASTM C1077 and copies of applicable ACI certificates for testing technicians or ACI Concrete Construction Special Inspector - MH, ASCC.

B. Material Certificates: For each of the following:

033000 - 3

1. Cementitious materials.

2. Admixtures.

3. Fiber reinforcement.

4. Curing compounds.

5. Bonding agents.

6. Adhesives.

7. Vapor retarders.

8. Semirigid joint filler.

9. Joint-filler strips.

10. Repair materials.

C. Material Test Reports: For the following:

1. Portland cement.

2. Blended hydraulic cement.

3. Fly ash.

4. Slag cement.

5. Silica fume.

6. Natural or other pozzolans.

7. Aggregates.

8. Ground calcium carbonate and aggregate mineral filler.

9. Admixtures.

D. Research Reports:

1. For concrete admixtures in accordance with ICC's Acceptance Criteria AC198.

2. For sheet vapor retarder/termite barrier, showing compliance with ICC's

Acceptance Criteria AC380.

E. Preconstruction Test Reports: For each mix design.

F. Field quality-control reports.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: A qualified Installer who employs Project personnel qualified as an ACI-certified Concrete Flatwork Associate and Concrete Flatwork Finisher and a supervisor who is a certified ACI Advanced Concrete Flatwork Finisher/Technician or an ACI Concrete Flatwork Finisher with experience installing and finishing concrete.

1. Post-Installed Concrete Anchors Installers: ACI-certified Adhesive Anchor Installer.

B. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.

1. Manufacturer's production facilities and delivery vehicles certified in accordance with NRMCA's certification requirements or equivalent approval by a State DOT.

033000 - 4

C. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with ASTM C1077 and ASTM E329 for testing that performs duties on behalf of the Architect/Engineer.

1. Personnel performing laboratory tests to be an ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician, Level 1.

Testing agency laboratory supervisor tests to be an ACI-certified Concrete Laboratory Testing Technician, Level 2.

D. Field Quality-Control Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

1. Personnel conducting field tests on plastic concrete properties are to be qualified as an ACI Concrete Field Testing Technician, Grade 1, in accordance with policies from ACI CPP 610.1 or an equivalent certification program.

1.6 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.

1. Include the following information in each test report:

a. Admixture dosage rates.

b. Slump.

c. Air content.

d. Seven-day compressive strength.

e. 28-day compressive strength.

f. Evaluation of permeability-reducing admixtures.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Comply with ASTM C94/C94M and ACI 301.

1.8 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 301 as follows:

1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

2. When air temperature has fallen to, or is expected to fall below 40 deg F during the protection period, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

3. Do not use frozen materials or materials containing ice or snow.

4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.

B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:

033000 - 5

1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete.

Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

1.9 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement sheet vapor retarder/termite barrier material and accessories for sheet vapor retarder/ termite barrier and accessories that do not comply with requirements or that fail to resist penetration by termites within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 CONCRETE STANDARDS

A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.

2.2 CONCRETE MATERIALS

A. Source Limitations:

1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.

2. Obtain each type of admixture from single source from single manufacturer.

B. Cementitious Materials:

1. Portland Cement: ASTM C150/C150M, Type I, gray.

2. Blended Hydraulic Cement: ASTM C595/C595M, cement.

3. Pozzolans: ASTM C618, Class C, F, or N.

4. Slag Cement: ASTM C989/C989M, Grade 100 or 120.

5. Ground Glass Pozzolan: ASTM C1866/C1866M, Type GS or GE.

6. Silica Fume: ASTM C1240.

C. Normal-Weight Aggregates:

1. Coarse Aggregate: ASTM C33/C33M,

2. Maximum Coarse-Aggregate Size: 3/4 inch nominal.

3. Fine Aggregate: ASTM C33/C33M.

4. Recycled Aggregate: Provide documentation of characteristics of recycled aggregate and mechanical properties and durability of proposed concrete, which incorporates recycled aggregate to conform to appliable requirements for the class of concrete.

5. Alkali-Silica Reaction: Comply with one of the following for each aggregate used:

033000 - 6

a. Expansion Result of Aggregate: Not more than 0.04 percent at one year when tested in accordance with ASTM C1293.

b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with ASTM C1567. Do not use this option with fly ash with an alkali content greater than 4.0 percent. Submit supporting data for each aggregate showing expansion in excess of 0.10 percent when tested in accordance with ASTM C1260.

c. Alkali Content in Concrete: Not to exceed 4 lb./cu. yd. for aggregate with expansion greater than or equal to 0.04 percent and less than 0.12 percent or 3 lb./cu. yd. for aggregate with expansion greater than or equal to 0.12 percent and less than 0.24 percent. Test aggregate reactivity in accordance with ASTM C1293. Calculate alkali content of concrete in accordance with ACI 301. Do not use this option with natural pozzolan or fly ash that has a calcium oxide content greater than 18 percent or an alkali content greater than 4.0 percent; or for an aggregate with expansion at one year greater than or equal to 0.24 percent when tested in accordance with

ASTM C1293.

D. Lightweight Aggregate: ASTM C330/C330M, 3/8-inch nominal maximum aggregate size.

1. Limit lightweight aggregate for internal curing to prewetted lightweight fine aggregate in accordance with ASTM C1761/C1761M.

E. Ground Calcium Carbonate or Aggregate Mineral Filler: ASTM C1797. Unless otherwise permitted, do not use mineral filler derived from carbonate sources in concrete for members assigned to Exposure Class S1, S2, or S3.

2.3 ADMIXTURES

A. Air-Entraining Admixture: ASTM C260/C260M.

B. Chemical Admixtures: Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C494/C494M, Type A.

2. Retarding Admixture: ASTM C494/C494M, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type G.

6. Admixtures with special properties, with documentation of claimed performance enhancement, ASTM C494/C494M, Type S.

C. Mixing Water for Concrete Mixtures and Water Used to Make Ice: ASTM C1602/C1602M. Include documentation of compliance with limits for alkalis, sulfates, chlorides, or solids content of mixing water from Table 2 in ASTM C1602/C1602M.

033000 - 7

2.4 ACCESSORIES

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber or ASTM D1752, cork or self-expanding cork.

B. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

2.5 REPAIR MATERIALS

A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand, as recommended by underlayment manufacturer.

4. Compressive Strength: Not less than 4100 psi at 28 days when tested in accordance with ASTM C109/C109M.

B. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/4 inch and that can be filled in over a scarified surface to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.

4. Compressive Strength: Not less than 5000 psi at 28 days when tested in accordance with ASTM C109/C109M.

2.6 CONCRETE MIXTURE MATERIALS

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland or hydraulic cement in concrete assigned to Exposure Class F3 as follows:

1. Fly Ash or Other Pozzolans: 25 percent by mass.

033000 - 8

2. Slag Cement: 50 percent by mass.

3. Silica Fume: 10 percent by mass.

4. Total of Fly Ash or Other Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

5. Total of Fly Ash or Other Pozzolans and Silica Fume: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use corrosion-inhibiting admixture in concrete mixtures where indicated.

2. Use permeability-reducing admixture in concrete mixtures where indicated.

2.7 CONCRETE MIXTURE CLASS TYPES

A. Class A: Normal-weight concrete used for footings, grade beams, and tie beams.

1. Exposure Class: ACI 318 Class W1.

2. Minimum Compressive Strength: As indicated at 28 days.

3. Maximum w/cm Ratio: 0.45.

4. Slump Limit: 5 inches, plus or minus 1-1/2 inches for concrete <Insert limits>.

5. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cementitious materials.

B. Class B: Normal-weight concrete used for foundation walls.

1. Exposure Class: ACI 318 Class W1.

2. Minimum Compressive Strength: As indicated at 28 days.

3. Maximum w/cm Ratio: 0.45.

4. Slump Limit: 5 inches, plus or minus 1.5 inches for concrete <Insert limits>.

5. Air Content:

6. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.

C. Class D: Normal-weight concrete used for interior suspended slabs.

1. Exposure Class: ACI 318 Class F1.

2.8 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M and furnish delivery ticket.

033000 - 9

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verification of Conditions:

1. Before placing concrete, verify that installation of concrete forms, accessories, reinforcement, and embedded items is complete and that required inspections have been performed.

2. Do not proceed until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:

1. Daily access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.

4. Security and protection for test samples and for testing and inspection equipment at Project site.

3.3 TOLERANCES

A. Comply with ACI 117.

3.4 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install reglets to receive waterproofing and through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

3.5 INSTALLATION OF VAPOR RETARDERS

A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder in accordance with ASTM E1643 and manufacturer's written instructions.

1. Install vapor retarder with longest dimension parallel with direction of concrete pour.

2. Face laps away from exposed direction of concrete pour.

033000 - 10

3. Lap vapor retarder over footings and grade beams not less than 6 inches, sealing vapor retarder to concrete.

4. Lap joints 6 inches and seal with manufacturer's recommended tape.

5. Terminate vapor retarder at the top of floor slabs, grade beams, and pile caps, sealing entire perimeter to floor slabs, grade beams, foundation walls, or pile caps.

6. Seal penetrations in accordance with vapor retarder manufacturer's instructions.

7. Protect vapor retarder during placement of reinforcement and concrete.

3.6 INSTALLATION OF CAST-IN-PLACE CONCRETE

A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.

1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.

2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.

B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.

C. Water addition in transit or at the Project site must be in accordance with ASTM C94/C94M and must not exceed the permitted amount indicated on the concrete delivery ticket.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

1. If a section cannot be placed continuously, provide construction joints as indicated.

2. Deposit concrete to avoid segregation.

3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

4. Consolidate placed concrete with mechanical vibrating equipment in accordance with ACI 301.

a. Do not use vibrators to transport concrete inside forms.

b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.

c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.

d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

033000 - 11

1. Do not place concrete floors and slabs in a checkerboard sequence.

2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

3. Maintain reinforcement in position on chairs during concrete placement.

4. Screed slab surfaces with a straightedge and strike off to correct elevations.

5. Level concrete, cut high areas, and fill low areas.

6. Slope surfaces uniformly to drains where required.

7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.

8. Do not further disturb slab surfaces before starting finishing operations.

3.7 INSTALLATION OF JOINTS

A. Construct joints true to line, with faces perpendicular to surface plane of concrete.

B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.

1. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.

2. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

3. Use a bonding agent at locations where fresh concrete is placed against hardened or partially…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .