A2-9 Spec Section 074112 - METAL WALL PANELS R1.pdf

PDF 315 KB Posted

Attached to
Supai Clinic and Quarters Construction Federal contract opportunity
Solicitation number
75H701-20-R-00007
Issued by
Department of Health and Human Services Indian Health Service

About this file

This notice provides details for a forthcoming construction solicitation by the Indian Health Service. The solicitation will replace the existing Supai Clinic located in Supai Village on the Havasupai Reservation with a new clinic and staff quarters facility. The new two-story building will include primary care, dental, pharmacy, laboratory, and radiology services on the first floor, with two-bedroom and single-room staff quarters on the second floor. Construction must phase maintenance of the existing transient quarters until completion of the new staff quarters. The project magnitude is estimated between $5 million to $10 million. The solicitation will be set aside for small businesses and utilize lowest price technically acceptable evaluation. The notice instructs interested offerors to monitor the Federal Business Opportunities website for posting of the solicitation and any amendments around October 16, 2019.

View the file

Other files for this federal contract opportunity

Other files attached to Supai Clinic and Quarters Construction, newest first.
File Type Posted
A3-5 Sheet C3-2.pdf PDF
A3-3 Sheet C2-2.pdf PDF
A3-4 Sheet C3-1.pdf PDF
A3-1 Amend A00003 Pre-Proposal Inquiries 1-114 for 20R00007 12_23_2019.pdf PDF
A3-2 Sheet C2-1.pdf PDF
A00003 Amendment SF30 Supai Clinic.pdf PDF
A2-11 Spec Section 283111 R1.pdf PDF
A2-10 Spec Section 087100 R1.pdf PDF
A2-5 Sheet EP601.pdf PDF
A2-7 Sheet EY101.pdf PDF
A2-12 Supai Medical Equipment 12.07.2019.xls XLS spreadsheet
A2-1 Amend A00002 Pre-Proposal Inquiries 1-104 for 20R00007 12_16_2019.pdf PDF
A2-3 Sheet A2-7.pdf PDF
A2-2 Sheet A2-1.pdf PDF
A00002 Amendment SF30 Supai Clinic.pdf PDF
A2-8 Sheet EY201.pdf PDF
A2-4 Sheet E002.pdf PDF
A2-6 Sheet EP702.pdf PDF
A1-2 Pre-Proposal Inquiries 1-88 for 20R00007 12_04_2019.pdf PDF
A1-6 Supplement J10 Exhibit B Map - Schoolhouse Canyon.pdf PDF
A1-11 Elliott Beauty Lease for IHS Constn Hsg 2019.11.14.docx DOCX document
A1-4 Revision to Sheet A2-5 of J01 Supai Drawings - Room Finish Schedule.pdf PDF
A1-5 Addendum to J02 Supai Specs - New Sections 280501 and 280505.pdf PDF
A00001 Amendment SF30 Supai Clinic.pdf PDF
A1-7 Attachment J11 Construction Wage AZ30 1Nov19.pdf PDF
A1-9 Havasupai Tribe Law and Order Code-CHAPTER-18-Tourism-11.3.2018.pdf PDF
A1-10 Havasupai Lodge Lease for IHS Constn Hsg - Copy for Transmission to IHS.docx DOCX document
A1-3 SF1442 Supai clinic 4Dec19.pdf PDF
A1-8 Havasupai Tribe - Resolution No. 64-18 - Tourism Code.pdf PDF
A1-1 Supai Site Visit Agenda and Sign In Sheet 14Nov19.pdf PDF
Attachment_J06_-_Company_Specialized_Experience_Form_Construction.docx DOCX document
Attachment_J01_-_Supai_Construction_Drawings.pdf PDF
Attachment_J10_-_Havasupai_Tribal_Resolution_28-19.PDF PDF
Attachment_J02_-_Supai_Construction_Specifications.pdf PDF
Attachment_J05_-_Self_Performed_Calculation_Sheet_(Construction).docx DOCX document
Attachment_J11_Construction_Wage_AZ30.pdf PDF
Attachment_J03_-_Supai_Specifications_Appendix.pdf PDF
Attachment_J09_-_Havasupai_Tribal_Resolution_27-19.PDF PDF
Attachment_J04_-_Pricing_Sheet.docx DOCX document
Attachment_J08_-_Key_Personnel_Resume_Form.docx DOCX document
Attachment_J07_-_PPQ.docx DOCX document
B01_RFP_Supai_Clinic_and_Quarters_Final.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPAI CLINIC BWS 1609.800

Indian Health Services Construction Documents

METAL WALL PANELS 074112 - 1

SECTION 074112 - METAL WALL PANELS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Preformed, prefinished metal wall panels and flashings – flat panel on building typical; corrugated panels for fencing and bio-hazard shed.

B. Miscellaneous trim, flashing, closures, drip flashing, and accessories.

C. Fastening devices.

1.02 RELATED SECTIONS

A. Section 061000, Rough Carpentry for sheathing.

B. Section 072700, Air Barrier (Building Wrap).

C. Section 074113, Metal Roof Panels.

1.03 REFERENCES

A. American Iron & Steel Institute (AISI) Specification for the Design of Cold formed Steel Structural

Members.

B. ASTM 792-86 AZ-50 Aluminum Zinc Alloy Coated Steel (Galvalume Sheet Metal)

C. Spec Data Sheet - Aluminum Zinc Alloy Coated Steel (Galvalume) Sheet Metal by Bethlehem Corp.

D. SMACNA - Architectural Sheet Metal Manual.

1.04 ASSEMBLY DESCRIPTION

A. Assembly includes preformed sheet metal panels, miscellaneous flashing and attaching devices.

1.05 SUBMITTALS

A. Submit detailed drawings showing layout of panels, anchoring details, joint details, trim, flashing, and accessories. Show details of weatherproofing, terminations, and penetrations of metal work.

B. Submit a sample of each type of panel, complete with factory finish.

1.06 QUALITY ASSURANCE

A. Manufacturer: Company specializing in Architectural Sheet Metal Products with ten (10) years minimum experience.

1.07 DELIVERY, STORAGE AND HANDLING

A. Upon receipt of panels and other materials, installer shall examine the shipment for damage and completeness.

Construction Documents

METAL WALL PANELS 074112 - 2

B. Panels should be stored in a clean, dry place. One end should be elevated allowing moisture to run off.

C. Panels with strippable film must not be stored in the open, exposed to the sun.

D. Stack all materials to prevent damage and to allow adequate ventilation.

1.08 WARRANTY

A. Paint finish shall have a twenty-year warranty against cracking, peeling and fading (not to exceed 5 N.B.S. units).

B. Galvalume material shall have a twenty-year warranty against failure due to corrosion, rupture or perforation.

PART 2 PRODUCT

2.01 ACCEPTABLE MANUFACTURERS

A. BASIS OF DESIGN:

Flat Panels: Pac-Clad Wall Panels – Flush – 12” w/one stiffener bead Corrugated Panels: Pac-Clad 7.2 Panel

B. Other manufacturer’s making acceptable products include:

ATAS

Metal Sales

MBCI

Roll Fab AEP Span

1. Flat panel, 12” coverage.

24 ga. steel.

Panels shall be installed horizontal or vertical as shown.

Attachment to wood sheathing/backing as recommended by manufacturer.

2. Corrugated panel 36” coverage 1-1/2” high ribs at 7.2” o.c.

24 ga. steel.

Panels installed horizontal or vertical over open framing Attached to framing as recommended by manufacturer

2.02 SHEET MATERIALS

A. Prefinished Metal shall be Hot-Dipped Galvanized - ASTM A653-94 Grade C G90 Coating A924-94 22- or 24-gauge core steel.

B. Flat and Corrugated Panel Finish: Full strength Kynar 500 PVDF resin-based coating coating, applied by the manufacturer on a continuous coil coating line, with a top side dry film thickness of

0.70 to 0.80 mil over 0.20 to 0.30 mil prime coat, to provide a total topside dry film thickness of 1.0 plus or minus 0.10 mil. Reverse side shall be coated with primer and wash coat of 0.30 mil plus or minus 0.05 mil. Finish shall conform to all tests for adhesion, flexibility, and longevity as specified by the Kynar 500 PVDF resin-based coating supplier.

1. Provide matching color air-dry patching kit for finish for field use.

2. Colors: Several as shown on Finish Schedule.

METAL WALL PANELS 074112 - 3

C. Strippable film shall be applied to the top side of all prefinished metal to protect the finish during fabrication, shipping and field handling. This strippable film SHALL be removed immediately before installation and shall NOT be exposed to direct sunlight any longer than necessary.

D. Field protection must be provided by the contractor at the job site so stacked or coiled material is not exposed to weather and moisture.

E. Flashing maybe factory fabricated or field fabricated. Unless otherwise specified all exposed adjacent flashing shall be of the same material and finish as panel system.

2.03 ACCESSORY MATERIALS

A. Fasteners: Corrosion resistant steel with washers where required. Provide matching neoprene washers where exposed on corrugated panels.

B. Sealant: As specified in Section 079200, Joint Sealers.

2.04 FABRICATION

A. All exposed adjacent flashing shall be of the same material and finish as the wall panels.

B. Hem all exposed edges of flashing on underside, ½ inch.

PART 3 EXECUTION

3.01 INSPECTION

A. Substrate

1. Verify that air barrier installation is complete and all flashings, terminations, and joints are properly installed.

3.02 INSTALLATION

A. Comply with manufacturers standard instructions and conform to standards set forth in the

Architectural Sheet Metal Manual published by SMACNA, in order to achieve a watertight installation.

B. Install panels in such a manner that horizontal lines are true and level and vertical lines are plumb.

C. Install starter and edge trim before installing panels.

D. Remove protective strippable film prior to installation of panels.

E. Attach panels using manufacturer’s standard clips and fasteners, spaced in accordance with approved shop drawings.

F. Do not allow panels or trim to come into contact with dissimilar materials.

G. Remove and replace any panels or components which are damaged beyond successful repair.

METAL WALL PANELS 074112 - 4

3.03 CLEANING

A. Clean any grease, finger marks or stains from the panels per manufacturer’s recommendations.

Provide minor patching using matching finish.

B. Remove all scrap and construction debris from the site.

END OF SECTION