A2-3 Sheet A2-7.pdf

PDF 185 KB Posted

Attached to
Supai Clinic and Quarters Construction Federal contract opportunity
Solicitation number
75H701-20-R-00007
Issued by
Department of Health and Human Services Indian Health Service

About this file

This notice provides details for a forthcoming construction solicitation for the Supai Clinic and Quarters project to be issued by the Department of Health and Human Services Indian Health Service. The project scope includes replacing the existing IHS Supai Clinic with a new clinic and staff quarters located in Supai Village, Havasupai Reservation. The new clinic will provide primary care, dental, pharmacy, lab, and radiology services as well as specialty care visits and behavioral health programs. The combined clinic and quarters building will be two stories, with the clinic on the first floor and two-bedroom and single-room staff quarters on the second. Construction will be phased to maintain existing transient quarters until the new ones are complete. The anticipated contract value is between $5-10 million. The solicitation is scheduled for release on or about October 16, 2019 and will remain open for approximately 60 days. The procurement will be set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. A firm fixed price construction contract is intended with a period of performance of 494 calendar days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Supai Clinic and Quarters Construction, newest first.
File Type Posted
A3-5 Sheet C3-2.pdf PDF
A3-3 Sheet C2-2.pdf PDF
A3-4 Sheet C3-1.pdf PDF
A3-1 Amend A00003 Pre-Proposal Inquiries 1-114 for 20R00007 12_23_2019.pdf PDF
A3-2 Sheet C2-1.pdf PDF
A00003 Amendment SF30 Supai Clinic.pdf PDF
A2-11 Spec Section 283111 R1.pdf PDF
A2-10 Spec Section 087100 R1.pdf PDF
A2-5 Sheet EP601.pdf PDF
A2-7 Sheet EY101.pdf PDF
A2-12 Supai Medical Equipment 12.07.2019.xls XLS spreadsheet
A2-1 Amend A00002 Pre-Proposal Inquiries 1-104 for 20R00007 12_16_2019.pdf PDF
A2-2 Sheet A2-1.pdf PDF
A2-9 Spec Section 074112 - METAL WALL PANELS R1.pdf PDF
A00002 Amendment SF30 Supai Clinic.pdf PDF
A2-8 Sheet EY201.pdf PDF
A2-4 Sheet E002.pdf PDF
A2-6 Sheet EP702.pdf PDF
A1-2 Pre-Proposal Inquiries 1-88 for 20R00007 12_04_2019.pdf PDF
A1-6 Supplement J10 Exhibit B Map - Schoolhouse Canyon.pdf PDF
A1-11 Elliott Beauty Lease for IHS Constn Hsg 2019.11.14.docx DOCX document
A1-4 Revision to Sheet A2-5 of J01 Supai Drawings - Room Finish Schedule.pdf PDF
A1-5 Addendum to J02 Supai Specs - New Sections 280501 and 280505.pdf PDF
A00001 Amendment SF30 Supai Clinic.pdf PDF
A1-7 Attachment J11 Construction Wage AZ30 1Nov19.pdf PDF
A1-9 Havasupai Tribe Law and Order Code-CHAPTER-18-Tourism-11.3.2018.pdf PDF
A1-10 Havasupai Lodge Lease for IHS Constn Hsg - Copy for Transmission to IHS.docx DOCX document
A1-3 SF1442 Supai clinic 4Dec19.pdf PDF
A1-8 Havasupai Tribe - Resolution No. 64-18 - Tourism Code.pdf PDF
A1-1 Supai Site Visit Agenda and Sign In Sheet 14Nov19.pdf PDF
Attachment_J06_-_Company_Specialized_Experience_Form_Construction.docx DOCX document
Attachment_J01_-_Supai_Construction_Drawings.pdf PDF
Attachment_J10_-_Havasupai_Tribal_Resolution_28-19.PDF PDF
Attachment_J02_-_Supai_Construction_Specifications.pdf PDF
Attachment_J05_-_Self_Performed_Calculation_Sheet_(Construction).docx DOCX document
Attachment_J11_Construction_Wage_AZ30.pdf PDF
Attachment_J03_-_Supai_Specifications_Appendix.pdf PDF
Attachment_J09_-_Havasupai_Tribal_Resolution_27-19.PDF PDF
Attachment_J04_-_Pricing_Sheet.docx DOCX document
Attachment_J08_-_Key_Personnel_Resume_Form.docx DOCX document
Attachment_J07_-_PPQ.docx DOCX document
B01_RFP_Supai_Clinic_and_Quarters_Final.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

ALUM ALUMINUM

ANOD ANODIZED

CLR CLEAR

HM HOLLOW METAL

FACT FACTORY FINISH

MTL CORRUGATED METAL SIDING

MILL MILL FINISH

PT PAINT

SCW SOLID-CORE WOOD

STC SOUND DOOR

STL KNOCKDOWN STEEL FRAME

TS TUBE STEEL

A1

NOTE: ALL GLAZING IN DOORS MUST BE SAFETY GLAZING

ALL GLAZING TO MEET IBC 2406 REQUIREMENTS*

B1

HM FRAME,

HM FLUSH PANEL

HM FRAME

SOLID CORE WOOD

FLUSH PANEL

FE1

6' -8

DOUBLE BIFOLD, SCWSINGLE BIFOLD,

SCW

OVERHEAD COUNTER SHUTTER

WALL MOUNTED

2" 3'-0" 2"

3'-4"

7' -0

2"

7' -2

A2

HM FRAME

SOLID CORE WOOD

FLUSH PANEL

7' -0

2"

7' -2

2" 3'-10" 2"

4'-2"

J2

HM FRAME

SOLID CORE WOOD

FLUSH PANEL

LEAD SHIELDED

B2

7' -0

2"

7' -2

2" 3'-10" 2"

4'-2"

7' -0

/4

3/ 4"

2" 3'-10" 2"

4'-2"

HM FRAME,

HM FLUSH PANEL

H

HM X SCW

SOLID CORE WOOD FLUSH PANEL,

DOUBLE DOOR

6'-4"

2" 6'-0" 2"

7' -2

7' -0

2"

A4

HM FRAME

PAINTED SOLID CORE WOOD

FLUSH PANEL

20 MIN. FIRE RATED

2" 3'-0" 2"

3'-4"

6' -8

2"

6' -1

0"

A3

STL FRAME

PAINTED SOLID CORE WOOD

FLUSH PANEL

2" 3'-0" 2"

3'-4"

6' -8

2"

6' -1

0"

6'-0"

3'-0" 3'-0"

6' -8

2'-6"

B4

HM FRAME,

HM FLUSH PANEL

45 MIN. FIRE RATED

7' -0

2"

7' -2

2" 3'-0" 2"

3'-4"

B5

HM FRAME,

HM FLUSH PANEL

20 MIN. FIRE RATED

7' -0

2"

7' -2

2" 3'-0" 2"

3'-4"

E2

6' -8

3'-0"

J1

HM FRAME

SOLID CORE WOOD

FLUSH PANEL

LEAD SHIELDED

7' -0

/4

3/ 4"

7' -2

2" 3'-0" 2"

3'-4"

SINGLE BIFOLD,

SCW

7' -2

G1

EXTERIOR GATE, PAINTED TUBE STEEL

FRAME W/ MILL FINISH CORRUGATED

METAL INFILL

4'-0"

G2

EXTERIOR GATE, PAINTED STEEL

FRAME W/ MILL FINISH

CORRUGATED METAL INFILL

2'-10"

3' -6

G5

EXTERIOR DOUBLE GATE, PAINTED TUBE

STEEL FRAME W/ PAINTED 20GA

METAL INFILL

1'-8" 1'-8"

3'-4"

4' -0

2'

-6

5'-0"

K

B3

7' -0

2"

7' -2

2" 4'-0" 2"

4'-4"

HM FRAME,

HM FLUSH PANEL

60 MIN. FIRE RATED

C1

HM FRAME, SOLID CORE WOOD

FLUSH PANEL W/ GLAZING &

SIDELITE

2" 6'

-1 0"

2"

7' -2

2"1'-0"2" 3'-10" 2"

6" 2'

-1

6" 2'-10" 6"

7' -0

2"

2" 3'-0" 2"

3'-4"

C3

HM FRAME, SOLID CORE WOOD

FLUSH PANEL W/ SIDELITE

2" 6'

-1 0"

2"

2" 1'-4" 2" 3'-0" 2"

4'-10"

3'-0"

G3

EXTERIOR DOUBLE GATE, PAINTED TUBE

STEEL FRAME W/ MILL FINISH

CORRUGATED METAL INFILL

14'-0"

14'-0"

6' -0

7'-0"

G4

EXTERIOR GATE, PAINTED STEEL

TUBE STEEL FRAME W/ MILL FINISH

CORRUGATED METAL INFILL

D

6" 6"

/4

2' -1

6"

6"

ALUM FRAME

ALUM DOOR

2" 3'-0" 2"

3'-4"

7' -0

2"

7' -2

7' -2

7' -2

B6

HM FRAME,

HM FLUSH PANEL

6' -8

2"

2" 3'-0" 2"

3'-4"

6' -1

0"

B7

7' -0

2"

7' -2

2" 3'-10" 2"

4'-2"

HM FRAME,

HM FLUSH PANEL

20 MIN. FIRE RATED

2" 3'

-2

2" 4'

-1 0"

2" 3'-0" 2" 3'-0" 2" 3'-0" 2" 3'-6" 2" 3'-0" 2" 3'-0" 2"

7' -0

2"1' -2

2"

A2.9

A2.9

A2.9

8' -6

19'-8"

AUTOMATIC DOOR OPERATOR

RE

GIS

TERE

D ARCHITECT

A R I Z O N A , U . S . A

Da t e S ig n ed . . .

CE

RT I F

ICATE NO.23533

ROBIN A.

SHAMBACH

EXPIRES 06/30/2022

RVI

H

P

S

NI

D

C E

I

A

A N

HE TL H

SE

E

H

N M

E

AR P

T

OF

T

C D

SU

S

A

E

TAE L &H

N

VI

S E R

UM

A

H U. S. DEPARTMENT

OF HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

DIVISION OF FACILITIES ENGINEERING

PHOENIX AREA

ARCHITECTS

261 North Court Avenue

520.795.2705 Fax 520.795.6171

www.bwsarchs.com

BURNS WALD-HOPKINS SHAMBACH ARCHITECTS

DRAWN BY:

CONSULTANTS

Tucson, Arizona 85701

CHECKED BY:

CAD DWG FILE:

PROJECT NO:

ISSUE:

SHEET OF

REVIEWED:

DFE ARCHITECT/ ENGINEER

APPROVED:

DFE PROJECT MANAGER

DFE BRANCH CHIEF

CONCURRENCE:

AGENCY REPRESENTATIVE:

TITLE

DATE

DATE

DATE

DATE

REV DATE DESCRIPTION

IHS PROJECT NO.

SHEET TITLE

PH16CR01C9

C:

\R ev it

Lo ca l\S up ai C lin ic

-C en tra l-2

7_

Ch ris

Pi nk er to n.

rv t

/1 3/

1:

:0

AM

A2.7

DOOR SCHEDULE, DOOR

TYPES

08/09/2019 - CONSTRUCTION DOCUMENTS

9032T | 1609.800

TK

SUPAI CLINIC AND

QUARTERS

SUPAI, AZ

Electrical Engineer M3 Engineering 2051 W. Sunset Road, Suite 101, Tucson, AZ, 85704 Phone: 520-293-1488

Structural Engineer Turner Structural Engineering 3026 N. Country Club Road, Tucson, AZ, 85716 Phone: 520-323-3422

Mechanical Engineer Adams & Associates 6422 E. Speedway Blvd., Suite 130, Tucson, AZ, 85710 Phone: 520-323-3858

Civil Engineer Engineering & Environmental Consultants, Inc.

555 E. River Rd., Suite 301, Tucson, AZ, 85704 Phone: 520-321-4625

Medical Equipment Meserve Consulting Services 8 Ladera Road Santa Fe, NM 87508 Phone: 602-684-5688

Furniture Aviar Design 2410 N Huachuca Dr.

Tucson, AZ 85745 Phone:520-624-3342

12/13/19

DOOR SCHEDULE

DOOR

DOOR

TYPE

OPENING SIZE DOOR PANEL FRAME DOOR DETAILS

FIRE

RATING REMARKS

DOUBLE

DOOR WIDTH HEIGHT MATERIAL GLAZING FINISH MATERIAL FINISH SILL HEAD JAMB

HARDWARE

SET NO.

160C B3 No 4' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 60 MIN. 8 201 A4 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 20 MIN. 11 201B1 E1 No 2' - 6" 6' - 8" SCW No FACT GYP PT 11/A2.8 12 DRYWALL WRAPPED OPENING 201F A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 13 201G A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 201H A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 201H1 A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 201H2 F Yes 6' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12A DRYWALL WRAPPED OPENING 201J A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 201J1 E2 No 3' - 0" 6' - 8" SCW No FACT GYP PT 3/A2.8 11/A2.8 12 DRYWALL WRAPPED OPENING 202 A4 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 20 MIN. 11 202B1 E2 No 3' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12 DRYWALL WRAPPED OPENING 202F A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 13 202G A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 202H A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 202H1 A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 202H2 F Yes 6' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12A DRYWALL WRAPPED OPENING 202J A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 202J1 E2 No 3' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12 DRYWALL WRAPPED OPENING 203 B6 No 3' - 0" 6' - 8" HM No PT HM PT 3/A2.8 12/A2.8 12/A2.8 11 203C E2 No 3' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12 DRYWALL WRAPPED OPENING 203D F Yes 6' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12A DRYWALL WRAPPED OPENING 203E A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 204 B6 No 3' - 0" 6' - 8" HM No PT HM PT 3/A2.8 12/A2.8 12/A2.8 11 204C E2 No 3' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12 DRYWALL WRAPPED OPENING 204D F Yes 6' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 14 DRYWALL WRAPPED OPENING 204E A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 205 B6 No 3' - 0" 6' - 8" HM No PT HM PT 3/A2.8 12/A2.8 12/A2.8 11 205C E2 No 3' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12 DRYWALL WRAPPED OPENING 205D F Yes 6' - 0" 6' - 8" SCW No FACT GYP PT 11/A2.8 12A DRYWALL WRAPPED OPENING 205E A3 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 14 206 A4 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 20 MIN. 17 207 A4 No 3' - 0" 6' - 8" SCW No PT STL PT 3/A2.8 2/A2.8 1/A2.8 20 MIN. 17 208 B4 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 12/A2.8 12/A2.8 45 MIN. 9 208B B6 No 3' - 0" 6' - 8" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 10 209 B5 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 12/A2.8 12/A2.8 20 MIN. 9 300 G5 Yes 3' - 4" 3' - 6" MTL No MILL TS PT 13/A2.8 G2

DOOR SCHEDULE

DOOR

DOOR

TYPE

OPENING SIZE DOOR PANEL FRAME DOOR DETAILS

FIRE

RATING REMARKS

DOUBLE

DOOR WIDTH HEIGHT MATERIAL GLAZING FINISH MATERIAL FINISH SILL HEAD JAMB

HARDWARE

SET NO.

002 G1 No 4' - 0" 6' - 0" MTL No MILL TS PT 13/A2.8 G1 003 B1 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 10 004 B1 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 10 005 B1 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 8 006 B4 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 45 MIN. 10 007 B2 No 3' - 10" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 8A 010 G1 No 4' - 0" 6' - 10" MTL No MILL TS PT 13/A2.8 G2 100 D No 3' - 6" 7' - 0" ALUM Yes ANOD ALUM ANOD 14/A2.8 7/A2.8 10/A2.8 AL-01 AUTOMATIC DOOR OPERATOR 100A C1 No 3' - 10" 7' - 0" SCW Yes FACT HM PT 3/A2.8 2/A2.8 1/A2.8 1 BUZZER ACCESS 101 A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 101A H Yes 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 15 101B H Yes 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 15 102 A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 3 105 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 105A K No 5' - 0" 4' - 0" ALUM Yes ANOD GYP PT 16/A7.3 11/A2.9 12/A2.9 2 DRYWALL WRAPPED OPENING 105B K No 5' - 0" 4' - 0" ALUM Yes ANOD GYP PT 16/A7.3 11/A2.9 12/A2.9 2 DRYWALL WRAPPED OPENING 106B A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 107 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 16 BIOMETRIC/KEYPAD ACCESS, DOOR CONTACT

110A C1 No 3' - 10" 7' - 0" SCW Yes FACT HM PT 3/A2.8 2/A2.8 1/A2.8 1 BUZZER ACCESS 110B A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 111 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 3 112 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 113 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 114 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 115 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 116 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 3 117 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 2/A2.8 1/A2.8 6 UNDERCUT DOOR. SEE MECH.

118A A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 118B B2 No 3' - 10" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 8 121 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 122 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 123 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 124 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 125 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 126 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 127 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 6 128 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 129 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 130 A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 131 A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 132 A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 132A A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 3 133 J2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 8/A2.8 8/A2.8 5A LEAD LINED DOOR AND FRAME 134 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 135 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 140 C3 No 3' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 9B 141 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 142B H Yes 2' - 6" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 15 143 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 144 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 146 A2 No 3' - 10" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 147 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 7 148 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 6 150 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 151 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 4 152 A1 No 3' - 0" 7' - 0" SCW No FACT HM PT 3/A2.8 2/A2.8 1/A2.8 6 155 G1 No 4' - 0" 6' - 0" MTL No MILL TS PT 13/A2.8 G2 157 G4 No 7' - 0" 6' - 0" MTL Yes MILL TS PT 13/A2.8 G3 160A B3 No 4' - 0" 7' - 0" HM No PT HM PT 3/A2.8 4/A2.8 9/A2.8 60 MIN. 9A 160B B7 No 3' - 10" 7' - 0" HM No PT HM PT 3/A2.8 2/A2.8 1/A2.8 20 MIN. 9A

DOOR TYPES

STOREFRONT AT DOOR 100

2 12/13/2019 Addendum #2

PUSHBUTTON LOCKSET

Sheets
A2.7 - DOOR SCHEDULE, DOOR TYPES

File details come from the government source that posted it. Updated .